Loading...
HomeMy WebLinkAboutCross Sound Ferry Appendices to DEIS 1997 APPENDICES For the: Draft Environmental Impact Statement for the Application of Cross Sound Ferry Services, Inc. Orient Point, Town of Southold Suffolk County, New York Prepared by: Inter-Science Research Associates, Inc. Environmental Planning and Development Consultants 36 Nugent Street; P.O. Box 1201 Southampton, New York 11969-1201 (516) 283-5958 Date Prepared: October, 1997 OCT 15 091 —.— PROPERTY OF PLANNING OFFICE TOWN OF SOUTHOLD INTE - CIENCE CONSULTANTS REPORTS r SITE DATA PERMITS,PERMIT INFORMATION LETTERS MISCELLANEOUS REPORTS, REFERENCES,QUOTED MATERIAL, SEQRA DOCUMENTATION COASTAL ENGINEERING ANALYSIS OF THE CROSS SOUND FERRY PROJECT ORIENT, LONG ISLAND, NEW YORK PREPARED BY MICHAEL S. BRUNO, PHI), P.E. AND KELLY L. PtAN N, PHD DAVIDSON LABORATORY STEVENS INSTITUTE OF TECHNOLOGY HOBOKEN, NEW JERSEY 07030 SEPTEMBER, 1997 A-1 I. EXISTING SITE CONDITIONS: 1.1 Physical and Oceanographic Features: The Cross Sound Ferry site is located on the south side of Orient Point, Long Island. The site faces slightly east of south and is located on Gardiners Bay, north of Gardiners Island and the southern fork of Long Island, and west of Plum Island. This location provides shelter from extreme wave action approaching from all directions except the east-northeast to east-southeast (70 degrees- 110 degrees True North). The alongshore transport associated with this wave action is directed to the south-west. This pattern of sand transport is also evident in the aerial photographs of the region. Local, wind-driven seas from the south (Gardeners Bay) can also impact the site. An analysis was performed of the wind-wave climate at the site, based on a one- year record of the surface winds at the Cross Sound Ferry terminal. We employed the 1995 wind record in the analysis. Figure 1 illustrates the directional distribution of winds in 1995. Note that the reported direction represents the direction from which the wind is blowing. Figure 2 provides more detailed information about the wind climate, including the frequency of occurrence of winds having specified magnitudes, for each direction. The wind characteristics and a knowledge of the wind fetch, or distance over which the wind acts, can be employed in the estimation of the resulting wind wave characteristics at the site. We employed the U. S. Army Corps of Engineers' wind wave forecasting algorithm in this analysis. The results can be summarized as follows: Wind Speed Significant Wave Height (ft.) Peak Period (s.) (kts.) (average height of highest 33%waves) 15 3.36 3.63 20 4.31 4.12 25 5.21 4.53 30 6.06 4.90 40 7.62 5.53 50 9.04 6.06 It should be noted that the extreme waves (in excess of 6 feet in height) will likely break well before reaching the site. The mean tide range at the site is 2.5 feet. The Spring tide range is 3.0 feet. Overall, the beach fronting the project site is extremely coarse-grained, with two distinct berms, one just landward of the mean high tide line and one seaward of the temporary dredge spoil disposal stockpile area. These features are clearly visible in the photographs provided as Figure 3a,b. Samples of the surface and sub-surface (approximately 5 inches below the surface) sediments were obtained during a site visit on 19 July, 1997. Both surface and sub-surface samples were collected because of the vertical non-uniformity of the sediments in the area. A total of seven samples were obtained, spanning four different locations: A-2 SAMPLE LOCATION 1 surface intertidal zone 1 subsurface " 2 surface landward of mean high water 2 subsurface " 3 surface seaward of temporary dredge spoil disposal stockpile area 3 subsurface " 4 surface top of temporary dredge spoil disposal stockpile area A sieve analysis was conducted on the sediment.samples(see Appendix A) at Stevens Institute of Technology in Hoboken, New Jersey. Results of this analysis can be summarized as follows: SAMPLE MEDIAN GRAIN SIZE(MM) 1 surface 12.84 1 subsurface 0.4 2 surface 7.2 2 subsurface 4.4 3 surface 16.3 3 subsurface 13.6 4 surface 8.3 In summary, the surface sediments in the beach area from approximately mean low water to the temporary dredge spoil disposal stockpile area can be characterized as coarse sand to fine gravel. The subsurface sediments in the intertidal zone can be characterized as medium sand; the remaining subsurface sediments are similar to the surface sediments and can be characterized as coarse sand to fine gravel. The site is bordered on the west by an existing parking lot and the Cross Sound Ferry slip (fig. 3a), and on the east by undeveloped property(N/F Morris) characterized by a sparsely vegetated dune area backed by a grass lawn(fig. 4a,b). It is worth noting that the area further east of the site is characterized by a maturely vegetated dune system. West of the Cross Sound Ferry lies a federally owned ferry terminal, a privately owned marina/restaurant, and further westward, Orient Beach State Park. A-3 1.2 Historical Overview: A review of aerial photographs of the site dating from 1955 through 1996 indicates that the site was previously cultivated farmland that extended seaward to a thin line of vegetation bordering the sand beach. Prior to 1969, the current dirt road was constructed along the seaward line of vegetation, at which point new vegetation began to take root in the region between the upper beach berm and the dirt road. Whereas the region considerably east of the project site slowly developed a densely vegetated dune, the site itself did not support such growth, most likely because of edge effects associated with the adjacent areas (to be discussed later in this report) and the use of what would be a natural location for a dune system as a temporary storage area for dredge spoils. 1.3 Relationship of Site to Coastal Erosion Hazard Area: The CEHA-designated landward limit of the Natural Protective Feature Area runs along the landward edge of the existing dirt road that borders the seaward edge of the project site. The proposed project therefore lies landward of the CEHA. 1.4 Relationship of Site to FEMA Flood Zones: The project site lies largely in FEMA Special Flood Hazard Area Zone AT This means that the area is subject to inundation by the 100 year flood, and has a base flood elevation of 7 feet. Since the proposed parking lot will have a minimum elevation of slightly less than 8 feet, we do not consider the project to be at high risk of flooding. A small portion of the site (in the north-east corner) lies in FEMA Zone B, which is defined as an area that has only a moderate or minimal risk of flood damage. 1.5 Relationship of Site to Tidal Wetlands: The NYSDEC Tidal Wetland Map does indicate that "Coastal Shoals, Bars and Mudflats" ("SM") and"Littoral Zone" ("LZ") areas are located offshore of the site A-4 H. ANTICIPATED IMPACTS: 2.1 Beach: Since the project will not extend to the beach, or into what would be a natural location for a dune system, we do not anticipate any impact on the physical characteristics and dynamics of the beach area. This expectation is based on the assumption that drainage of the parking area will be directed away from the beach. Since the project site is not currently serving as a sediment source to downdrift beaches, we do not anticipate any impact on adjacent beach areas (e.g. Orient Beach State Park). 2.2 Tidal Wetlands: As mentioned in section 2.1, the project will not extend to the beach and therefore will not impact the offshore, littoral zone. We do not anticipate any impact on the physical characteristics and dynamics of the coastal shoals, bars and mudflats located in the littoral zone seaward of the project site. 2.3 Dune: There is currently no dune fronting the project site. Rather the natural dune area has been utilized as a temporary stockpile area for spoils resulting from the occasional dredging of the Cross Sound Ferry slip. Approximately 3,600 cubic yards/year are dredged from the slip and trucked to Orient Beach State Park for use as beach fill (A. Wronowski, pers. comm.). We do not anticipate any impact on the sparsely vegetated dune region immediately east of the project site. This region has already been impacted by edge effects associated with the dirt road and grass lawn landward of the dune area. It serves as a transition region from the project site(where no dune exists) to the maturely vegetated dune system far removed (to the east) from the project site. We do not anticipate any further degradation of the transition region because the project site does not represent a barrier to vegetation recruitment from the mature dune system to the transition region. A-5 III. Mitigation Measures to Minimize Impacts: 1. The parking area should be located landward of the existing dirt road that borders the seaward edge of the project site. Measures should be taken to assure that vehicles are prohibited access to the dredge spoil area that lies immediately seaward of the dirt road. 2. During construction, the temporary dredge spoil disposal stockpile area should be utilized as a temporary barrier to minimize runoff and sediment transport from the project site to the beach area. In particular, care should be taken to avoid intense storm water flow toward the beach during the construction process; when laden with sediments these flows can be highly erosive and may cause degradation of the beach face and adjacent dune regions. 3. The project design should ensure that any and all run-off from the completed parking area is directed away from the beach and dune areas. 4. If possible, new dune vegetation should be planted and maintained along the seaward boundary of the project site. This recommendation is made without knowledge of the plans for future access to the temporary dredge spoil disposal stockpile area. A-6 Frequency Histogram of Wind Direction 60 F 278 OUT OF 364 DAYS IN 1995 HAD APPRECIABLE WINDS 50 ------ ... ................. 40 ....... ... .... 30 U 20 - 10 0 N NW W SW S SE E NE Wind Direction Figure 1 30 Frequency Histogram for Northerly Winds Frequency Histogram for Southerly Winds 30 zs zs zo Zo i 15 I5 g10 s ° 10 5 0 0 5 10 15 20 25 30 35 40 45 s0 5 10 IS 20 25 30 35 40 45 50 Wind Speed(kU) Wind Speed(kU) 30 Frequency Hbtogram for NorthWesterly Winds Frequency Histogram for SouthEasterly Winds 30 �u T2s 620 20 g 10 ;Is 0 4 s S 10 15 20 25 30 35 40 45 50 0 Wind Speed(kU) 50 10 IS 20 25 30 35 40 45 50 Wind Speed(ku) I pp 30 Frequency Histogram for Westerly Winds Frequency Histogram for Easterly Winds �zs 30 20 25 20 e 15 15 a $10 X10 d 5 � s 0 0 S 10 Is 211 25 30 35 40 45 50 5 10 15 20 25 30 35 40 45 So Wind Speed(kU) Wlnd Speed(ku) 30 Frequency Histogram for SouthWesterly Winds Frequency Histogram for NorthEasterly Winds �2s 30 e 2 25 e,20 15 is 10 er 10 S 0 0 5 10 1 5 20 2S 30 35 40 45 50 5 10 15 20 25 30 35 40 45 50 Wind Speed(kU) Wind Speed(kU) Figure 2 ,{s/ //k,¢/#S.,%r�ii�ft_/•` 4.Y4f:/ .rk'>'.j ,::-.};a+�r •,r:: rrtr ! >` rkr///•s'hir'r%/�j9 { „j... :•' rr�. :,1' 7.!{ lJ,•i/ rf i�,!r/f.•.{Y'y� ��'i�r.'!/Wrj;iY�: .-J.i'if il,%�'�%•./r¢ r� f�:.r Js'/iii:'�r rr /�}'!�/�jf}yf�:'%r'i >,rSt•3rii.r l4 y{i y /! :/% / i !.'•.'•iii{%#<:r,^,^,.•:.'• s r. t J).:{{}7;'•» "r00' .:r ,J, Ssl? 1 tli' S'; :p'! � „rf:.' ,r.'.+, :yr%',/+,.'r,•'•r,'t;•,r:l.;lrr;<,: S•n••;y}Y;.:.::t:S;'•Yt},4w,S::•r:'<:;irf•�ff}+tr.•ri i>c{ 4 y,y r.r/1iJ::h4S>{{�:. r:�; '/,•�%%Y'.i•};•+irYr'l'l:Jf:<J`:S'ifr6.o,. •;yt2;{.,,.n...v ;:jS;:}Cxfi'}:;r;,;:;... ;,}�;:./4r•y2;v {rr/fS<:;:: y{»i r//:',�.r1r,,.r :::.,/,-:t?: f 1's%/:/.::.Y,{{.{r,,{. XY}�;i�?y{}o�;••YY,:as;wt;�Y y. n•.;r.�,':;kX:' :;ik'4., .:/:S• k.>H,''Y.,-.•f�,c,;.,r%/:k/�/••{y>fl+r r>'•%1��/+c:J,r,-r .r.?t4.,c..:Y•`a�?t�.zt•�.•�.}: .iQ•4��\6Y •K},r.}:+:i.«4`�.:�aY:{,•::,:: ,`;\,n k;,' ?..f:>"+.;r ,::rt:f•.•n{:!::rfr�•.{�tf•:.//:.;{...-•-rk.�it;�?:;#;•'.4i:.Y:•}:::•:�•.};�Cy.: .a:2?•: ,»/+r:. ..�.,..r.,.;;/. :,f,.......:. ..f....,..y..::Fa+:;:v:::2:•::.� �''v::r:,:S>:}i;-`.•Y•'•:i:'t�':.�.,Y{{.{..r.::....{::--. xyw:4v:,.h.,.. ...:. {++:'?•Y:•}•4:?.:•%4l...............{t+,{.}•i:};{}n}}:}•.};;..:r.v:::::::::::::::.....YY.?•:{•i:•.vnv:::::L?^::'+av4•.... ..... .Y.... rrrJ..:.f., ..�..::.{-::::{•{;#•::::.v+• };\,.}};;..;,y'}�x:•{,;p •Y.}h4•:v, •t4,$YY:G:::}ii:`}}'i:' .:.,•. ....x....:..:.:..::.::::::::::::::::::::::::n:v::vv.v•.v•.:vY::v.vk»t.}::........x.t.. v. .............::..: .?%y}};{•%•%:i??4Yi}}Y})};?{?4:Li:iiviii:v�i:({(vi:isLi:: iiii<vviY::ii:v}:y:{?:?:i»:':'::yyY Y}i\:i{}•.:a:•-.a a4�ji 3:•%�,/.;,.;;,;,,;,:;. diy;:itit.. v\Y:-:•Y:-:-:4}:•:4:{?v}:4Y:?•}}};;;:•;Y}i}Y} '•' .:.w:::.v;.....,.v..:.:::i::•Y:?+.L:ti:ttt.ntv. n. t•: !. ..:, n yy: ............................................. ,:.v:w::::::::.. ..n 4..v:YY{.t; v.-•:.v:V;;.:.....ttv.v::::::::::::: •.,*•};..;Y:•%riY"{•iv:{3. k •:::�nr..:.::::::::::::.::::::::::::}}}:i4;vYYY:•::?-Y:JY:•Y}Y}Y;4:::::::.{•}:•:{{{?v...v......... 4v. „v\,... "�#:%;#?#:%ilii}'••w :�#?iy�!L:-i:4: }}•?:tv'• ...,4::::is?2�: is'is#:;':v::%:::'y:.:........ :%.......... :viv:::%% ..t . y l*X, ,y:;i:i: :. .t,v:.w::tti•:ti?>.?•}:•}}:•:?{tii} :i:i ................................. ,O' .v.:}:tt•.w.::vn,:vw:::.:xv.,v.v.:vxy .....::. .::.::::::.�:::::. ....vv:•.i:;•Y}}}•: ::•:::.v:vvv.yv..:y...v¢v:::.};n• .v.::}:..vhn:.�•:h:Y:? t 44 i .yrco•. '4. 3' 'Ttvv Figure 3a: View west :\r;:iyu,.{:;;;,� rr.1<��:"�1r�//.��,Y,yr//"•5 ..��tS:p ,./ /y :f :\�t n i a`�J�`'Y•}!:��:::'t��':�� �.;�.',+r.%..!%..k:;r.�tl/%}:i'//.: ;'•::f?»�.:,' k',i f r. >�vr;4,:z>t �•4 •.�..•'�:vir„f: .;!. r.4vii�.•' :s�;g'v;���;;;sji;;�7' •;�llf/ r y- r,/ f. . ., ./fr,./??.r:{{.»>,S:?tk�:'v:4::�; fS::.;:��v %s�s•�:a.�.l:fh�,:.%./-::a +4 t, f r{:. V {Aytii;� /�+,}�l�/.,:}ii:.;i�::^}i}i::?i{.i;:�F ii}is#::i:i.4r'rr:4iirfi%/''•'Y,i,.r:.%.y{�f{Jii:?%h}ii}�' , / ,.; .::a:is%•Y;::ns:i:};s}}}ii:i:-:}:i>i:i:;:;:}:i-::}:t`+... / ' :. +. ..:::::%:�:SiiiiPiR�SSS:;:.>'a�Y»:'.`:;:;??L:•i^?{{:;?.i•:n::'.::.,{:.%.}.:.:........... �r:;:lrr.-% •>''?:`^.}YS:tfyi.i: .fif/'.r';}w :3%%"Y:S. S� .t�K!.�( Y?.n;•r''•r,'.':2<y:_2'id'.''S:<.'S:r i'r.., /:: r "%%rl•.m•.+rr"t:•. ::t• „4`:� ",, •?•:n:Y;??:S:?:SS:;:;i;;;;;i:.;%::::::::f.}//,:;•,,•.;lrj�jfi/fl}•{%;:>ffi+::•{::'•�.:;�:r,;• •.' x`.;F',!fG j jj? ,• ti. f;?;u YMb'4?Q1:[;~;iis><.: ....... ... .>.. i':H,.•':S:'`/•.''?7r#Y:w:i••:.::t:::>z::::'::;:S::i::::S.;;#Y;;:.;::::.<::;:: ......: ....�:i:{:. of ::ri:?.i;.,;.::::r...� .!'.?:::::::::•::.:::k:h::.::::.:::::::::..:�:::::::::.;:{urn}i::.�. •r::.kY;.:r. .r-{ncn•n•,:./tt.�i::�:i.::.Y.•n .:'{.•Y5:%%%:�:�%:�:�%:�:�:�:�%:�%:i}i:::: '..-/•r-Y::Y:'{.`}I'S:vY?•YJ.;i:i: ' � '✓i::ki:::i•Y:i:#�:•iy::..::::.:Yii•:.;fi:Y.v::�::iso:(:ii�iiy{:���}j:,:t:v'-{;:-::4•}'?::��:•:h�:'{.}:Yi::}i:i}YY}}}i}:ff.'':�':Siii:::. tf i:'Jf.'•i: •Y}t:r,.:vr::.};i}:»}}}:•:{-}}"r '::y/{'.tr?i;4} ii+y%�i iiriiii":.i'•.. ......i.. V> ` (il .,',:•:��',3,.^;:'•r..,...::.,r.•:{:{trr:ri.!afr 'r%.;•,:••::Yyy w;ydya� , u:%sf'.•g•:.Ff, /r'SY.{-.4 ..r.-I•{r:: •:.a 1 : r.-..rl:;./s#{t,?S>i,;-:%:;# ;:�:%;:;r;{<{:�•�:. .n�l'r+,Y /6•�.,nv;r.�?Yl..:•,�;�SY;''k.�i;#i:#'�r4:S:wf;�l':;y,.;•} rr,+r.:.;:::snr.,{.,y.}?,y;.n>._.,•:.,ri,;./{{yfSy?::G:'y": {?•»:l'•.?� >�i:�Si',•' I q :•::�#i%:;`:'�y::,.,.,r1,(4 .J..rf•,'!r,.-:}6.r{+'.:',%id: .<rFq'K:%ti';:�`%;#::t'•%Ykt':•{+'%%%}%{'S;�i'';l:r•r ' 7+rirr:,.,: ::;>{ •?" : r,.i#' r'r�G'}rr�;.. f:iS1 iy(�f/(.4i: i;rc{%iti;;'!}!{`•i:2%�is�;%:ji# r,.43{:%4S:> +�pn q.�fJ ,�,�C S'•'�' f.1<'•-,;-:• {df{. ,::x? ?'i: ir,.;iY i(:v yi......... :•{'.%$:'y iYt:G•%•}YiY:•}:,%�ff�Gi`-f-E{'°IA11/r:�� r "1v�^{•i•`' aS>:•'!,.':Srnx•:; y;✓Y�;S•Y .:;{iYS;•/,;-. •:}""/,Yii: ::;g.:Si•o:�Sry'iy%"frj;':t•}%i`:3'-r.•:y -.�:-.y-:'-r'-:i�: vFtCa: i;��{Y�.`•�'. n� t:�(9.:i{4 ,1........ `' '�'%:;S r ,J::: fr;nr, .r,U ./„ >::..�',n,.+'..sc{�• '>. s.. LS. }'{4 �' 4',-',�•v 'yn; {. / r:,..;•{,..•}•+' :: >!t`.;}�”'yn++•{f„J;;<;:%;::' kc/r; ry ? '(' ...}YLA. t' � ...r.. };%.;�.%y;;;i,?�n>::�':•gykY::?{u.a.G:"•.'•r::^,.:.•.,G'Fi;y-,>:�rr..:: r+.l;y :/.r�1,1{�fkiy.#�> ��•' •/:..: y. CiY..:::y-::..tk. ::4.::.:•-..: /r:4}rY:}•Si:j.+•$;jY%�:j�:J+i'. .�.:... y.;m � Vs.>�?•i:idi::i!6i%?;:S? ;%%:`''•. l••k u:?•rrt:::•.�.::-.4 �. :.4,,+;.::{.;�?;�;:;�{y.. :..YY.,;{::: si. .• '~'• '44 .,�§�:#, �.�,'#'`•�;:::•�;y.;?,}.:,y{;,. Vis:-::;a;3 H;;�;S w ! l'•'''� r�i{�i 4' n,. .< { ;•: ...... .. ...,.•, ;.' ,:y.,.,1;:+ +,»Sr',:4:`ir,.'3f�:r!r.�� rf;�lr, :y",il s,:::Yt Y�'' ,,k- �;• , y}.t0.,r:'{k}�. 4::+.Y:�;:•::}3/.u�::�-�!�'i {.«:fi;•:#i'r,.;{+is..S't},,'1 ../i 1 ° 4 J•.\ •;y�.Yf;{ f.SS: <S$•:i:•:yi.;?.:;i• .,{#•.. .f:aC{>.br,,.:i;i.;•�{4 r•�M"','i;r, rfr••' ...m`,. ''.k;'i+yl,,••/,;,Lf"� !{ ,y' r •::,},V>} �� �{��n,_'1.•.::�'ri :��'fi':Y/'v'+: Y'OYY: � 'n r•}•.4�� ' /.� .[y'` .r/' }A':+ 4•{;r::;.. -:;q,. qzz �- •, !��•. ,.? r`'��^'y�z WykJ�.7'?�%f�: a�'yy�r•'�`S`r� �r 7GG�6Gr{:•' ��. .�' {@2.k� "Zw -,.. :Y .,r�:�c ri!''�':• q,:>ti k�,• �.���G, /•,�r r {h!'v,.,1»{,� J,4�',y,G..:. :r� »s,., � �> •: v,�.ofG .:.y:}{1rjyp•� �ry i`''.f�, w `ri •.•.'y..•{%2�• ,fG:4•: ,.!�:. ..:6 � 4cty;.-.•r.S;{.,:y,.. �y n S�f4s:r�.}ji r.•i��' y rlr•rb,•'' r'11:6:''�i.:�r��• .'#. :r `y'�'l �di:lr6Y�. Figure 3b: View east A-9 {1i1//r,'/J:.; h'{';,•r;3.rJf :;:;:'%5:;:;:{.';'"9!Si{/•f,�%{, x:: %i,•,i.,"",Rlrr`,/f'S':.+,::S.t'iffi, x .:{:1.:.t%:•:. f::xz./l.'.' +, ,'., Y„ t \,.. , l:,r/.';:r,'/../:.J,/.,%%%% ::<} :'::;.{r::;::;;.;... ;G.rS, ,:.'•:b�x{?�:,YLt;,:tir.,it, ,, - it}iY•J"•:.:�•'.S}9{J Ji.S't' .:::,;:y:.,:%x;'<i:.R.. {4'. ray,.+?:Y".•.`t:, \` . ''Iri /i/ �:.%. �r.�..,,� %'�'} •t':rx f�•�/•,'•.1.?f% %y41.':,zq %' • v,�\k ti •ti,r;•F{r,�v::•.}•}::xl::: 4:! r,.-�$}••.'':is}:;•}/{..:•S:z .{{{SSS• ;},kb<;+�"•; Si::}:;:z2::'t'::"r.;{.; ?%4.';:% }•S' 'Sr:}`•.}}•: :::t-:::54#:: :.5::•:y?:gxSS•!,;••vo`,9i r.;'.+r.'��•'••\+:»•,, z'�, ``4�z�kFt4}.'t�':: �.:. .:4cx •6�%�/ � ::: Rf/f:y�: f,�f� {•} R,,��\\� t•.�'t,.fv: ,t:; t3�::� ;-S:k�2S}:•?•:{/•:•.,R!.•:�Y .::rr�r, ;3.3�;#;zY,• ��„ ,:\`;},\'•,.•`.t` .:.i.:•::•:f::r:::•::::R• }ri,{••:%t,':{4•;. •,+�,{Jf";5'f,:. :.:Sdr.•:i+-�-:.i.:r.•:::::R:.,?{•::.r, •. .,t, „a , t, Ji2'�:.. '`'/f r{/ ,'l::SS::::.:tJ.••;Si.:'f .;Jf%: +ff:•+,n+::•;!•�•y{:.;r••r •xu• /'/{S;::/x: f.hy,,F, tiC'.R, fff./lr+::.::.;{,::•:x:r?.{/fJ{ 'i: ?•S`S:rr'{if/i: /f +r✓.J'J:r'�:J'J�.•!f/.,r.xr:%%••}• x';> .kJ...:+,/,:{•;;;r{:R>:.t?.:R?: ±5:..: ?l}':{;ry i {r{/{.;'.::f2�:•':.��::.'q.:h•�,4c••+JSP/...,%%'f/ �, .4}:••x•k,�:,`zz, „\,\.;t•�`:.5;{{ f � {�4 .:x. �.�r., J fJ a ,ft;.,.. .4•t\.\ '�> �//:! l} 4:i»J l�{ //� �/ ����/f r i fi 'Rf:f J' J / � �,v } fi.yJ• J:}:.v '' ?;„• {:/� ,ly'�i,><'i3�'Jf�i r;�J�1/�a/i,��..�//% /�..'1%`.{f€'4/JJ�i '�•{/�'/!{!;/.1/ \\:\;., \'• r.£.•i{ /, ., ..^.k $. +r++r.,,'/,';S!{/.u,•.{r{r{iri.'{.%;r.ht :. r:::4{r'/}fY, f+` 't":f'::•:•:':'�.,�:t::;:S±:;;?¢:r..//.,. .r�'.•:�'l`: .}•`'.':'.,t•. ` A:}z\;}. !/ i''W,rr-'ti':::}:J-+G{lfllrR;;!:�'ri}it fR..: �' +,Sl !;{Y: /;` •t}i SR - Jri» {.%...................• S {,:i{'•,'{x{{':{�p:,\ `;')}.{ r7 +.:{.{,+.trJr fl:.r.{./,.,..//Y'::•!+t,fr.}-}:±:.:Y}::•+.{.::::4.r.'r<f::•}:+iNI.•fi%:.Jr•• :'J•'J.Jfi yJ.4 ln.u..::{. 1:rhlJl% :•.?{.}y .0„ , ,; \ti.�`.�.':'�•sr,;�%w, �;:.,r{rf.{rr •f::oY:::r.,.:::::•S}:.J r:::::±::4{,.:}:::::.{:r;{::•t:{::R.}•:::.,.Jf�..,.{:.1:;..:.r� ff:..R.{.}:%r.+t{,,•t{:Rln:•:%l/ •rf{rn:..:.4\}:,}� v \`.h};4•+r •>y,t?irfi. 9.• ;';''!-'{19f::/:;'S»So;:;;..:r.::•}r:..'G:S:±Y'}};;'+rJA$ '•:Yi'%iii:{. irf{i'{1}rfrJr :}�:i{.•:+'�,ri'•'/J.r:'Gr' J'Y :{}i•'`}'tL {•�cn,}• r� { 'J�r:'r r/. J JJ/ i J !r, {{/{ R 1•+ 1:r! Roof.+I: 4i/{/:..f ,•Yrl.,. ;;+,i;t:Sr>:ir.SSf'.<S::;S;;'iSsti;;i'{,SS<r'1,{;r'S##{ S//:.%:r�, f ./{J!i •,f , 'n•;:.xr,,,R ••• .rd:;/l:,. ;: r ..;R{..:::::::�::.;':'-}:?;.}}.}.. .. .....5::%•:s;.: .}.;.. /lr::.•:......;�'..,r.'rr.:. ;', <'t`:•t.:•t:` 4/.,:R.;:..ia: :.l i J ..�:i•'•S;S2:• it.:`•'t•':<}•:?;.-±r::.;r:.{{.. .:.JJ%.r,�.. {1 .:: R• }.::.::$::::::;}::5::::::>:::;::::}:Sr.4;•::+{^•:.. :. r•,/,f ,!/}•J it /. fl, {:' if{li,9f::c't': f~.t.}3 '::l Y{::r •.:f x .}••}:•::•S<SSS?.'•iS.'•::S#S3'5'rii;{.iR y rf1:,r / {l/,•! J,c/:r•.,,.rr j :G I{+.rr•.lR.: Jr .0 /.•::. r 4 f .//!.. / r .. /. .l.' { .{,:•'. 1»:..if� !}/.:.�J: i::is}::5:::'::•:`'': ::: ::t3::i ::tt. ..a..G :;:.}{{.;;i5.::•}:{{{{.R.!{.::.::'}::.R fr'''f�+• I. r:;+j ..✓,...{.+' rS+$•i ./..Rl....x.:.::::::::::::::::::::•:•::•;}}}:.i:;•::;;•;:<i•>±±±±}}%.}::.} .}}\ .J t Rflr.:. ..fy:v}:t44S{{:{.!: : � J ..t'\xv:?•}:?•}:{±•}}}O::iii:{;.;.:.:{t>.ti%:titi;4;R+l;li....v•v:�i:��:{n•:.... l+.lr.{�i. ��/r�{f ..v....rR•:r-::<i;v;.}};•}•.}•.}••;•i::.}:.}:.}:.}:.}:.}:::.}::.}:.`,:iil�• ........ .l J .n:...J.{.}•R:r:{.: ,,!{'f r:.:.//.r`:.?.:..'.•.vr :•.R.l..r:r..:.:.v:.....:....:.v:::•::•::•::•::?•::::::::::::>}:::-::::::::::::::::::::::�.,•}}{:::v::...:..:::::.v:::.Y}:;•}:•}.•::::•::i+R•:'r.•}.....Jr<J :::/.•.•::::.�:::::::::.�::.:::,•:}::::::::::::::::::::::....:.. .../-::f:/fxx{J:..}•::t.::{..:.1.>R <:,%....:.+pct•}'-..........Jr.'wl.......:... .:..t.t.:.::::.t.:::::.:::::}:•}:t.;:<{<•;;•;:•;;4;4±Y±:.:{-±;-±;-:;-:r;-±;4±5;•S}}:.±:.±:;•S;-±:-±:.:../ f...:.........:.t..:..:....:. { %/;SS'}:4;•%fJ{ r{%.,.:•YS}l.» ..... :::::::::..::.�.,.:. ..t..........................t..............:Y:.}:4}w.:;.};i±>±±±±;•±};•iY}:;:�:}Y:{.};•:<•}:•}:•;:;r:{.}•r.:tr::{{.::r .:r. .. ...r... ....... v:.f.••. ./.J{ .{r :i v:r/::{$.vw.{•:::.v.:.:..:::::. .:v\•.v:::::.:::::::::::::::::.:v::n• :,f.::?x+;r... .r.Ri{ti+.•::w:!•:::-: tv......:.............. t,t?::::::......ti4:{;•::•i:•}:?•}:•:;t4:;;4t::»v::. ...l..�l:xr{%rrf..xx.x. 1....:./1• '°�'::5±::-:.....r.:l::.:....! .... ...t.t...:.::•.t}.......}..:...}.::.;::::::.}.a•Y:4Y::::::::::::::::t•::.�:.tt„t.�t+.;:S:zti4}tik••{::±;YSSiSii}.tw::::w:::.:v::::::v::::::..... •r:•. ......t..,v:-:x::.v:•w::::w:::::::::.�::::v:n:v:.........•:wntv:;,tb•+•ti.::titi......v::w::::::::•:•v:::::•::••:•.•••::•:}.... ..•.. w.vtvv::::::J::::•{r,{•}:{;•}'Jti ti�}Oiiiiii}iii}i}i}i}i}i:::+Ti::i.±};;•i:Ci?C;Y:}}-:::::::t•: 'fit••}i..: ..f.:.:.. ..{::.};:'::±.'t.:t,•.t•:.t:.......t, x:/}..•r::•:: {{...:O.R:••. ......... ........r.:vxtizt>.}.}'tt;:•:ti:::::.}'.rr•-}:};Si}}:4}:4:'Y::ii±Yii:.Yi:4:::::•::;•}±:•}}i}±:n±}}}:ry±:4±±:•}±Y:'.•Y:•Y:4:O:;;;Oii}}}}}}}}i}}:}i}}}}}ii}i}::.}:-ii:}}:i•}:v:•±:4:YY:•±±i: ...: +''/fff t::}:.4. t ..tiff{}{zt;v:t4:4.4}±}±}}}i:iYi}:?:.:::::::.<:::::::::::::::.v::::::::::nv:.v::::::::::::::::::::::::::::::::::::::.�:::.:v: •:is > �:}v:::}%izz:;}r.}}i�i}itii;ij'.:•}±Y....vn�\.i}itivjitv.:::v.::r....................n.........:::::::::::::::::::::::::::::.vv::::::::::::::::::::::::::::::::::::::::::::tv:ii::i`::iiY:}" vJ� r.:.: w:::::::v tiv:{:vv};{;.}}}::_..:::.±:Ji±}±>i:?•i:�i±:isiii ......±}}±}}:•}}}±±:•ii}}±:•±:4:'.ii:::vi:}i;?[}}}}}}}}}}}}}}}}:;•±Y}±X;{:.±±±±yy {• rrry::Jri{•t:::.i:iv±}:4:ii;•:itiv:.v: v: i' r Orf. :.:v:v:::::•.�:::::':':::i:::j;±ivv:'-ii±iii .. Figure 4a: Grass lawn landward of sparsely vegetated dune y. F. { ... }`; rY,'•: RtS<">•.rJR:J.`z:}}S}•S.. •J..J/iJ•)!`•t `i`.:'?SS . -ig a a. „•)zi,.w.s;'.};kc3»..Y ar G�if#;J.r,v ..,M.:.',z?:•F:vi?�/f,sr,.:.:}••..�fh}}}.:zzo- g}�ti\: \ �\ .,\,�,.}`.; +,••}fit\,,.,,,.� ; :�J�„v,yl }r.{F .:Jfi:r./{...t::;:.?»:{. f.•{%.+{'•.:} ••: .::fi.;: .:, .>,„ <,v\t „, ,{,�:^S:.v.'J,,,'Y�..'r�'r..{>:�{R:fJJ.,/,/ �i'rfl: r.:.•d:.}. f�lJi:^'/.:f. r..�'•{..:::i'�:%f /�4:•/,( .Sf.• '�;c:4.3, :..,', >}%t?:t,Yit.;.�.�J.�/r•/•.'.{�+•r••:t+. 7f/Y"/�.»f'.•:;i{../{.:Rr;{f/.::{::/{t•{.ntf.• Y.J•'��rr {.itit::•: � •i>.F %1}?"Irxxf/•.r:I:r.J/.•/r<f�i .i�,. ;?{..L U•f•.�::4:v::4:;ti};;{?;;;i;:{}r r, :,`�y. /., r:/,,4 .:/.:, r fdc } � :iS %'''R{:4.'i•'.'•: l:%J/R.,rf%..;:...::.:::::::::::.,iSS }7 R/. ft ?+;•cu;.. a`��'e. ?±F:j}Sr}.;.• f+:%%f'f.�iS4{i;�Yi%%: :}';"SS:%i�x:.: v:$x:...... ::;J+{{// r{� : -x ..f ..rJJ.R{.....fJ.....:..:»t{•:iif iii}: -{.•.t4Jhrr}: �ii:::iiiiiii}}}:.'•:fyh{r..xr.4'/.:�+l,.J/.•.r 4:::•i:t�r�If YrY, :'�>;�;•'�•4 � �i:'S�'3''iY'"+.�rr:,;..r,,..y.+:}}:•}%n:ti•}:;4r•:::u{l�}..i???=v.}'f.:.'%:>:;:::::.i:???;c./{•;;;:?+::�`..:•:%: . / !./: .J. %:/:•:::_.:::�:{rrti.::Jtt•:x::•,::;;:.:::•::.:...:::u;.,,:•::/.{.:,/.•,�i.y!Rr%{S:vS:tr,.•r/,.'!C' ;`':uSif:�{f:9.Ct'^^,�.'!4/ci'�.�?S'•'}{f�i'S.}:•.f:x.} ...r::•.:.:.;n.:...;.{..: ::r.{:...n.../• fJ•%•f•..,: •`•:::\.,.5...........�.zz•:::: .,,f.:iS;ff:xfJ: ..�.:.::t:.::.R..:.:•:S<::Sr:;:S:;:::;5:;:-�SSc S:{✓:�:-:: : rr::.+:.: :q�.i.z.�.�.. :i .:•R..•:.,Cw:x!tii ii:4%::::;i,;fi;"::/f/<}f rk:Y :;Srl..} 5. }'r:�.rY.}:t:`_,.�1.',`fi 7} 7,.h t•,;a%,+ "\ +'.y.• t•:::SS''SS,'•S3S::,:ifir±ij.J,rr�. "y}1}tti +SCOW`,: r�Y}::'isfrffi•'.i%}�i:'.;:�?}?�r%��.:: .. •\ir:dC{4;•}�i::- .{JJr'J:i }.±.s:}. .+1,:+.1�} '•";\'�}��;\::C3C .4}f•:ill;:: R':... ..':ii'S'rii v W {3'� :...t,. ,6,er•;!.r..:.:4: ;. x:.St,:.:............ .SSrJY}Y:..ow::�,•J..':• :,:r:;:y'::t::::? ..a::t•:::.1:5;�:'• »15.,,;:::`>}y,:, �.:.;.,}:. y}r,.S�t;.:.:ya:r":•4}; ''x';'ti x.; ..r::;xy:•.y4•.>}...1. -.ry•::.Rti.f :±.d,•yk:•:• �y�: �Su:< ai;:.t}}S::•.:... . .3:a:,..;.:r-±:%;:•al}::.y':dX.:..,.t.:..4{.:•? ;�`:;•::::.4:.}•.:}.... :+r:%l: •'•5::::oo."R�'.•:.. .Y ,'••''•?'zC+}w•..,} ,..�38,.;;.d.. >:.a}„•4-:-::,?9,.c{..�}i:T.:ICr:.r ::..•.,:[S::{::.: ..i+lJ .i:} r..•Ja ,'•} x-.+.}i'• 4: �.0 •'{3i.}. {..+.?,: �'rf'kk':+' ..{.;};.5.::: ..f.,:..}:;:...:.::::.4.:�ti4'Y ,S,^.;� ..pG.»..L.�'rio:$c:':::?E:�•':•':FFa!q•:RR•.:. •:.t }{••:.4;R):X .-. r..?S:i :J.•:.� ::4.....,,: .,..�RRyyqq Y.. x... ��•�•R.� :r: '.i;;r':4.;,yr+.H:;; ;:. :fJ�•.:. ::Sr;t::•:-'/,.;JR�:�'{:.O.:•r S3. : .y,.:�;';gN+_S;•,;5;/}:-}xrj; :? .>.Cr.. t° :i'q: •-;,y'iitu'R•.. :i ' ,.:cf. %,::.i.7:y r'li1J.•'r.;. :.;7iv' ';Sf3.'•fJ.'vGf: ,JRF.... '•i'•!:iS?>:{:r:y.S:"::r::i,:,,.,..R.:.:v:oa:{4:: � ': :S"• t}V' {:l:�4..};;,�,-..i..%..Sr:::3:.s{.,. .}r'?�:?}.::i} ., ,{d+.. .•r"..-}.;<.%!r ,•x::{�f4':}' a" •.ay �:, �:rr 4F±.n.}:,'4,.''•::}±�?i•}:•.•}•-:o.•:-�.� t }::•�? v,{.R,a .rb?�:..::..:. r' 'q•::}:Y+ "�:;E,k::R• ..°•.J.•�'.`}•''':S:;b.•.a.{..:.rt .: �. t•:r,.: �. {W.,..:;:.i;{ii ..�. <... t; �\�T:';4•..•s,�..}::»• :;`:$5:.±:'-'•3R"t;�5t. ��Ra�'CS�•la:C}i. � fr... ':.'t7tit .•J•.;•.: 5 :.•{.,:FS .A,.., �..i::. a>•.;�;..::R};Y}'•.'k.:i.:�:::4:S;:y::.,!;}•RRi.ti! , rg.}'•.�.:4fi., -' .'.:r*' dr i F,:--, '�,r. >f;+x�.:':.. :�4..,.:.• .r.,.ti: k.:::. f.. a' ':.;:.' k.r.aSS;;. }: 'S ri4 e���..-�.'i„. NA'Lv.:�Zo:G�.wai:eta7��• ':v#.-R .l"f. 3: �:.{y3'•;;'. ) K�:f.. .4i3'? 4t' „ ::A' � ry.:- f9SS ':-:A:a+,.��... ,u••;:;w:•:; -.-y, •.4:f.• yFy,,'?S{A '�•.Y.. �.•. Figure 4b: Sparsely vegetated dune A-10 Appendix A: Grain Size Analysis A-11 GrainSizeData >:�i� ''iii.`••,. Experiment Place: Soils Lab, Chem. BLDG. Experiment Date: July 24,1997 Experimenters: Dr. Raju Datla Xiao Li Analysis Method: Sieve Analysis Result of Experiment: #1,surface: d50=12.84mm #1,subsurface: d50=0.4mm #2,surface: d50=7.20mm #2,subsurface: d50=4.40mm #3,surface: d50=16.30mm #3,subsurface: d50=13.60mm #4,surface: d50=8.3mm Sample Place: #1, Surface Sample Weight: 664 gm Shake Time: 6 minutes U.S. sieve No. Diameter Wt. of Sample wt. percent finer (mm) (gram) M M 1 25 0 0.00 100.00 1/2. 12.5 348.55 52.42 47.58 3/8. 9.5 170.93 25.71 21.87 4 4.75 135.9 20.44 1.43 10 2 8.61 1.29 0.13 20 0.85 0.35 0.05 0.08 40 0.425 0.04 0.01 0.07 60 0.25 0.09 0.01 0.06 100 0.15 0 0.00 0.06 200 0.075 0 0.00 0.06 pan 0.4 0.06 0.00 Total 664.87 100.00 A-12 GrainSizeData Sample Place: #2, Surface Sample Weight: 445 gm Shake Time: 6 minutes U.S. sieve No. Diameter Wt. of Sample wt. percent finer (mm) (gram) N M 50 100.00 1 25 36.62 8.18 91.82 1/2. 12.50 40.14 8.97 82.84 3/8. 9.50 74.31 16.61 66.24 4 4.75 168.67 37.70 28.54 10 2.00 30.96 6.92 21.62 20 0.85 6.14 1.37 20.25 40 0.425 68.72 15.36 4.89 60 0.25 21.00 4.69 0.19 100 0.15 0.00 0.00 0.19 200 0.075 0.00 0.00 0.19 pan 0.87 0.19 0.00 Total 447.43 100.00 Sample Place: #3, Surface Sample Weight: 778gm Shake Time: 5 minutes U.S. sieve No. Diameter Wt. of Sample wt. percent finer (mm) (gram) N N 50 100.00 1 25 75.97 9.69 90.31 1/2. 12.5 468.9 59.80 30.52 3/8. 9.5 138.03 17.60 12.91 4 4.75 100.9 12.87 0.05 10 2 0.21 0.03 0.02 20 0.85 0.04 0.01 0.01 40 0.425 0 0.00 0.01 60 0.25 0 0.00 0.01 100 0.15 0 0.00 0.01 200 0.075 0 0.00 0.01 pan 0.11 0.01 0.00 Total 784.16 100.00 A-13 i GrainSizeData Sample Place: #4, Surface Sample Weight: 984gm Shake Time: 7 minutes U.S. sieve No. Diameter Wt. of Sample wt. percent finer (mm) (gram) N M 50 100.00 1 25 30.79 3.13 96.87 1/2. 12.5 357.83 36.34 60.53 3/8. 9.5 74.7 7.59 52.95 4 4.75 136.46 13.86 39.09 10 2 107.31 10.90 28.19 20 0.85 121.04 12.29 15.90 40 0.425 89.08 9.05 6.85 60 0.25 40.77 4.14 2.71 100 0.15 20.37 2.07 0.64 200 0.075 0 0.00 0.64 pan 6.3 0.64 000 Total 984.65 100.00 Sample Place: #1, Subsurface Sample Weight: 293gm Shake Time: 15 minutes U.S. sieve No. Diameter Wt. of Sample wt. percent finer (mm) (gram) M M 1 25 0 0.00 100.00 1/2. 12.5 20.88 7.09 92.91 3/8. 9.5 16.72 5.67 87.24 4 4.75 14.54 4.93 82.30 10 2 2.6 0.88 81.42 20 0.85 4.24 1.44 79.98 40 0.425 75.94 25.77 54.21 60 0.25 126.16 42.82 11.39 100 0.15 32.71 11.10 0.29 200 0.075 0.78 0.26 0.03 pan 0.08 0.03 0.00 Total 294.65 100.00 A-14 GrainSizeData Sample Place: #2, Subsurface Sample Weight: 684 gm Shake Time: 7 minutes U.S. sieve No. Diameter Wt. of Sample wt. percent finer (mm) (gram) M M 1 25 0 0.00 100.00 112. 12.5 68.96 10.06 89.94 3/8. 9.5 65.92 9.62 80.33 4 4.75 189.64 27.66 52.66 10 2 129.15 18.84 33.83 20 0.85 69.36 10.12 23.71 40 0.425 138.31 20.17 3.54 60 0.25 21.18 3.09 0.45 100 0.15 2.3 0.34 0.11 200 0.075 0 0.00 0.11 pan 0.76 0.11 0.00 Total 685.58 100.00 Sample Place: #3, Subsurface Sample Weight: 787 gm Shake Time: 5 minutes U.S. sieve No. Diameter Wt. of Sample wt. percent finer (mm) (gram) M M 50 100.00 1 25 95.18 12.10 87.90 1/2. 12.5 316.94 40.29 47.61 3/8. 9.5 163.32 20.76 26.85 4 4.75 210.22 26.72 0.13 10 2 0.71 0.09 0.04 20 0.85 0.02 0.00 0.04 40 0.425 0 0.00 0.04 60 0.25 0.05 0.01 0.03 100 0.15 0 0.00 0.03 200 0.075 0 0.00 0.03 pan 0.25 0.03 0.00 Total 786.69 100.00 A-15 #1,surface grain size distribution (#1,surface) 100.00 90.00 - 8000 7000 . . 0 6000 d a w 50 00 -- --- w rn � 4000 3000 2000 10.00 - - 0.00 100 10 1 0.1 0.01 grain size,diameter(mm) #1,subsurface grain size distribution (#1,subsurface) 100.00 ::. 90.00 8000 - 70.00 60.00 50.00 <....:....:..:...:::.::::....:.::..::::::...: :. a 4000 30.00 20.00 10.00 77 .......... ...... ..:..::. . 0.00 100 *..:.:...:.,::..::.. . :....:........... ..... ... 10 1 0.1 0.01 grain size,diameter(mm) #2 ,surface grain size distribution (#2,surface) 100.00 90.00 80.00 70.00 " 0 60.00 a c ., 5000 c ; a� v a 4000 3000 2000 10.00 0.00 100 10 1 0 0 grain size,diameter(mm) #2,subsurface grain size distribution(#2,subsurface) 100.00 : .::... ....:.:.... ..... .. 9000 - -- -- — --- - --8000 -- 7000 60.00 .:. :.:... ...... .. ,:..:..::.. :.....:. e m a � 50.00 .......... ....... ..:... �o c d .......... a 40.00 30.00 20.00 10.00 ..... 0.00 ...:. .... . :.... .... . ..._... ..... .: ..... .. :.,.. ... ... , ..............::::::.::.. ..,:::.;:::..:`.:.::.:: : ..... . .... .. . .:...:. . .. . 100 10 10.1 0.01 grain size,diameter(mm) #3, surface grain size distribution (#3,surface) 100.00 9000 .. 80.00 7000 0 6000 0 v 5000 CD L a 4000 30.00 2000 - - - - -- 1000 .. .... 0.00 100 10 1.: 0.1 001 grain size ,diameter(mm) #3,subsurface grain size distribution (#3,subsurface) 100.00 ;:.:...:......:......:::.:..: .. 90.00 Scl 8000 :.. ,. ... ...::: ... :. :... .:.. ..:.:.;:.::.. ..:. 70.00 .:::....:.....: ..:.....::. ... 60.00 ........ ...:.;..:. ...: as c 5000 c .: 40 ............ :........:....... ........:......:....:.... ...::'. :'.::::..:: a 30.00 . .:.: .::;: :;:.>..::. :::....:.:;::.::::...::;:.:::::.:::.::.::::.;.......:..::....:... ... :...:..:::::..:...:. 20.0077: 77 10.00 444 :.:..;.:;.:.:.:::.:. :.......................................::.::::.:.:. .:::........... ............... :.:'::: 0.00 :.:.:. .:......:..: .......::.:::...:::.:.:.:...::. .:.:. ...... .. 100 10 1 0.1 0.01 grain size ,diameter(mm) #4,surface grain size distribution (#4,surface) 100.00 90.00 i , -1- 7 � 70 00 0 60.00 v a � 5000 . . .. .. N w .. .. ..-. .. .. ..... .. .. .. . V a 4000 3000 20.00 10.00 0.00 100 10 1 0.1 0.01 grain size,diameter(mm) RESUME Michael S. Bruno - Director, Davidson Laboratory Associate Professor, Department of Civil, Environmental, and Ocean Engineering Stevens Institute of Technology S.S.#156-56-6607 Hoboken, New Jersey 07030 (201) 216-5338 EDUCATION ScD. Civil-Ocean Engineering Massachusetts Institute of Technology- 1986 Woods Hole Oceanographic Institution M.S. Civil Engrg University of California at Berkeley 1981 B.S. Civil Engrg New Jersey Institute of Technology 1980 PROFESSIONAL REGISTRATION Registered Professional Engineer in the State of New Jersey POSITIONS Associate Professor Stevens Institute of Technology 1989-Present Director, Davidson Laboratory Assistant Professor New Jersey Institute of Technology 1986-1989 Research Assistant Massachusetts Institute of Technology 1982-1986 Principal Engineer New Jersey Bureau of Coastal Engr. 1981-1982 Director, New Jersey Coastal Protection Technical Assistance Service Editor-in Chief, Journal of Marine Environmental Engineering, Gordon & Breach Secretary-General - Pan American Federation of Coastal and Ocean Engineers Member, New Jersey Maritime Advisory Council A-23 HONORS AND AWARDS Fulbright Scholar, 1996 (appointment at University of Thessaloniki, Greece) Office of Naval Research Young Investigator Award, 1991 President, Sigma Xi, Stevens Institute of Technology Chapter Outstanding Service Award, American Society of Civil Engineers, 1988 James Robbins Award for excellence in teaching, N.J. Inst. of Tech. 1986 - 1987 Who's Who in America Professional Societies Society of Naval Architects and Marine Engineers American Society of Civil Engineers American Geophysical Union American Shore and Beach Preservation Association The Oceanography Society Refereed Publications I. Bruno, M.S., Herrington, T.O., Rankin, K.L. and K.E. Ketteridge, 1997. Artificial Reefs and Other Emerging Technologies: Prospects for Success, Proceedings, Coastal Zone 97, Boston, Ma. 2. Bruno, M.S. and R.L. Van Dyck, 1997. Experimental Study of Containment Boom Behavior in Waves, J. Marine Technology, SNAME, Vol. 34, 24-30. 3. Bruno, M.S., T.O. Herrington, and K.L. Rankin, 1996. The Use of Artificial Reefs in Erosion Control: Results of the New Jersey Pilot Reef Project, Proceedings, Ninth Conference on Beach Preservation Technology, St. Petersburg, Fla. January 25, 1996, 239-254. 4. Waters, J.K. and M.S. Bruno, 1995. Internal Wave Generation by Ice Floes Moving in Stratified Water: Results from a Laboratory Study, J. Geophys. Res., 100, 13635-13639. 5. Ahsan, A.K.M., Bruno, M.S., Oey, L.Y., and R.I. Hires, 1994. Wind-Driven Dispersion in New Jersey Coastal Waters, ASCE Journal of Hyd. Div., Vol. 120, 1264-1273. 6. Bruno, M.S., 1993. Laboratory Testing of an Artificial Reef Erosion Control Device, Proceedings, Coastal Zone '93, ASCE, Vol. 2, 2147-2158. 7. Cho, W.C. and M.S. Bruno, 1992. Breaking Wave Generation in the Laboratory, J. Korean Society of Coastal and Ocean Engineers, Vol. 4, 178-186. 8. Bruno, M.S., 1992. Laboratory Study of an Artificial Reef Beach Erosion Control Device, Trans. Pan American Federation of Coastal and Ocean Engineers. A-24 9. Bruno, M.S., 1992. Quantifying Sea Ice Drag Through Laboratory Experiments, Proceedings, Eleventh Intl. Conf. on Offshore Mechanics and Arctic Engrg., _ ASME, 5-10. 10. Bruno, M.S., 1992. "Oceanography", Encyclopedia of Environmental Sciences and Engineering, Third Edition, Gordon and Breach, New York, 801-812. 11.Ahsan, A.K.M. and M.S. Bruno, 1992. A Three-Dimensional Eulerian - Lagrangian Transport Model, Estuarine and Coastal Modeling, ASCE, 1-12. 12. Bruno, M.S., 1991. The Effect of Internal Waves on Sea Ice Drift, Proceedings, Tenth Intl. Conf. on Offshore Mechanics and Arctic Engineering, ASME, 137-141. 13. Martin, J.P., J.R. Weggel, M.S. Bruno, and S. Halsey, 1991. The Use of High Fly Ash Concrete for Marine Structures, Trans. American Coal Ash Association, Washington, D.C., 54, 1-15. 14. Bruno, M.S., 1991. A Note on the Determination of Sea Ice Concentration, ASME J. Offshore Mech. and Arctic Engrg., 113, 88-90. 15. Bruno, M.S., 1991. Beach Erosion - Shoreline Evolution Modeling: A Case Study, Proceedings, Pan American Federation of Engineering Societies, Washington, D.C., ASCE, 213-221. 16. Bruno, M.S., M. Muntisov, and H.B. Fischer, 1990. The Effect of Buoyancy on Transverse Mixing in Streams, ASCE Journal of Hyd. Div., 116, 1484-1494. 17. Bruno, M.S., 1990. Field Measurements of Ice Drag Coefficients, Proceedings, Ninth Intl. Conference on Offshore Mechanics and Arctic Engineering, ASME, 155-159. 18. Ahsan, A.K.M. and M.S. Bruno, 1989. Three-Dimensional Modeling of Pollutant Transport in Coastal Waters, Estuarine and Coastal Modeling, ASCE, 462-471. 19. Bruno, M.S., 1989. An Eulerian-Lagrangian Model for the Prediction of Ice Hazards in Shallow Waters, Proceedings, Eighth Intl. Conference on Offshore Mechanics and Arctic Engineering, ASME, The Hague, The Netherlands, Vol. 4, 229-234. 20. Bruno, M.S., O.S. Madsen, 1989. Coupled Circulation and Ice Floe Movement Model for Partially Ice-Covered Continental Shelves, J. Geophys. Res., 94, 2065-2078. 21. Madsen, O.S., and M.S. Bruno, 1987. A Methodology for the Determination of Drag Coefficients for Ice Floes, ASME J. Offshore Mech. and Arctic Engr., 109, 381-387. A-25 22. Madsen, O.S., and M.S. Bruno, 1986. A Methodology for the Determination of Drag Coefficients for Ice Floes, Proceedings, Fifth Intl. Conference on Offshore Mechanics and Arctic Engineering, ASME, Tokyo, Vol. 4, 410-417. Other Maior Publications 1. Herrington, T.O., M.S. Bruno, and K.E. Ketteridge, 1997. "Monitoring Study of the Beachsaver Reef at Cape May Point, New Jersey", Report SIT-DL-96-9-2751, submitted to the Borough of Cape May Point, N.J., Stevens Institute of Technology. 2. Bruno, M.S. 1996. "Field Investigation and Sediment Transport Analysis of the Manasquan, New Jersey Shoreline", Report SIT-DL-9-96-2740, submitted to U.S. Army Corps of Engineers, Stevens Institute of Technology. 3. Bruno, M.S., T.O. Herrington, K.L. Rankin, and K.E. Ketteridge, 1996. "Monitoring Study of the Beachsaver Reef at Avalon, New Jersey, Report SIT-DL-9-96-2739, submitted to the Borough of Avalon, N.J., Stevens Institute of Technology. 4. Bruno, M.S. 1996. "Laboratory Study of the Dispersion Characteristics of Orimulsion", Report SIT-DL-95-9-2734, submitted to Roy F. Weston, Inc., Stevens Institute of Technology. 5. Hassan, S.Y., and M.S. Bruno, 1996. "The Effect of a Submerged Breakwater on Nearshore Water Quality", AGU Spring Meeting, abstract published in Transaction, AGU. 6. Ketteridge, K.E., and M.S. Bruno, 1996. "The Effects of Porosity on Beach Profile Evolution", AGU Spring Meeting, abstract published in Transactions, AGU. 7. Yang, J., and M.S. Bruno, 1996. "Laboratory-Based Damage Analysis of Coastal Structures", AGU Spring Meeting, abstract published in Transactions, AGU. 8. Herrington, T.O., and M.S. Bruno, 1996. "Determination of Dominant Nearshore Hydrodynamic Forcing Adjacent to a Tidal Inlet", AGU Spring Meeting, abstract published in Transactions, AGU. 9. McKenna, W., and M.S. Bruno, 1996. "Effect of Shore Protection Strategies on Shoreline Change Along the New Jersey Coast", AGU Spring Meeting, abstract published in Transactions, AGU. 10. Bruno, M.S. and R.B. Abel, 1995. "Engineering New Jersey's Shoreline", Proceedings, International Symposium on Coastal Ocean Space Utilization, Yokohama, Japan, National Science Foundation. 11. Van Dyck, R.L., and M.S. Bruno, 1995. "Effect of Waves on Containment Boom Response, Proceedings, 1995 International Oil Spill Conference, San Diego. A-26 12. Bruno, M.S. and R. Datla, 1995. "Scale Model Test of the Demi-Tek "Rotating Reef Erosion Control Device", Report SIT-DL-95-9-2720, _ submitted to Demi-Tek, Inc., Stevens Institute of Technology. 13. Bruno, M.S. 1994. "Results of Shoreline Monitoring Program, Manasquan, New Jersey", Report SIT-DL-95-9-2717, submitted to the Borough of Manasquan, New Jersey, Stevens Institute of Technology. 14. Bruno, M.S., 1994. "Physical Model Study of MOTO Wave Energy Extraction System", Report SIT-DL-949-2710, submitted to Greenworld Group, New York, N.Y., Stevens Institute of Technology. . 15. Bruno, M.S. and T.O. Herrington, 1994, "Monitoring Study of the Beachsaver Reef at Avalon, New Jersey", Report SIT-DL-94-9-2709, submitted to the Borough of Avalon, New Jersey, Stevens Institute of Technology. 16. Waters, J.K., Bruno, M.S., Herrington, T.O., and K.L. Rankin, 1993. "A Laboratory Investigation of Sea Ice Dynamics in a Stratified Waterbody", Report SIT-DL-93-9-2695, submitted to Office of Naval Research, Stevens Institute of Technology. 17. Waters, J.K., and M.S. Bruno, 1993. "A Laboratory Investigation of Internal Wave Generation by Sea Ice", AGU Fall Meeting, abstract published in EOS Transactions, AGU, October. 18. Herrington, T.O., Rankin, K.L., and M.S. Bruno, 1993. "Performance of a Nourished Beach Protected by a Nearshore Submerged Concrete Reef', AGU Fall Meeting, abstract published in EOS Transactions, AGU, October. 19. Rankin, K.L., Herrington, T.O. and M.S. Bruno, 1993. "An Analysis of Wave Transformation Over a Submerged Artificial Reef, AGU Fall Meeting, abstract published in EOS Transactions, AGU, October. 20. Bruno, M.S. and S. Thomas, 1993. 'The Influence of an Artificial Reef on Nearshore Mixing", AGU Fall Meeting, abstract published in EOS Transactions, AGU, October. 21. Thomas, S., R.I. Hires and M.S. Bruno, 1993. "Anthropogenic Influences on Residual Circulation in a Tidal Strait', AGU Spring Meeting, abstract published in EOS Transactions, AGU, April 20, 1993. 22. Bruno, M.S., 1992. "Three-Dimensional Modeling of Pollutant Transport in Surface Waters', Report SIT-DL-92-9-2680, submitted to U.S. Geological Survey, Stevens Institute of Technology. 23. Bruno, M.S., 1992. "Laboratory Simulation of Beach Erosion Dynamics- How Small is Small?", AGU Fall Meeting, abstract published in EOS Transactions, American Geophysical Union, October 27. A-27 24. Bruno, M.S., T.G. McKee, and W.M. Claris, 1992. "Laboratory Study of an Artificial Reef Beach Erosion Mitigation Device", Report SIT-DL-92-9-2676, Stevens Institute of Technology. 25. Bruno, M.S., T.G. McKee and R.I. Hires, 1992. Modeling the Water Quality Impact of Point Source Loadings in a Narrow Estuary", AGU Spring Meeting, abstract published in EOS Transactions, American Geophysical Union, April 10. 26. Bruno, M.S., 1992. "Beach Erosion and Retaining Wall Deterioration at Spring Lake and Belmar, New Jersey, Report SIT-DL-91-11-2667, Stevens Institute of Technology. 27. Bruno, M.S., 1991. "Modeling-State of the Art", in Proceedings, Southern New Jersey Coastal Modeling Workshop, U.S. Army Corps of Engineers. 28. Bruno, M.S., McKee, T.G. and R.I. Hires, 1991. "Combined Hydraulic- Water Quality Model for the Arthur Kill Waterway, Report submitted to New York City Dept. of Sanitation. 29. Bruno, M.S., S. Leatherman and H. Bokuniewicz, 1991. "Sand Transport at the East Hampton Groins". Marine Sciences Research Center, SUNY Stony Brook. 30. Bruno, M.S. and T.O. Herrington, 1990. "Concrete Artificial Reefs and the Potential for Coal Fly Ash Utilization". Report SIT-DL-90-9-2652, Stevens Institute of Technology. 31.Ahsan, Q., Bruno, M.S., Hires, R.I. and L.Y. Oey, 1990. "Horizontal Dispersion in New Jersey Coastal Waters", AGU Fall Meeting, abstract published in EOS Transactions, American Geophysical Union, Oct. 23. 32. Bruno, M.S., 1990. 'Beach Groin Acts as Barrier to Longshore Transport". EOS Transactions American Geophysical Union, Vol. 71, No. 38, 1090. 33. Bruno, M.S., 1989. "An Eulerian-Lagrangian Model for the Prediction of Ice Hazards in Shallow Coastal Waters". Report SIT-DL-89-9-2640 submitted to National Science Foundation, Stevens Institute of Technology. 34. Bruno, M.S., 1988. 'The Feasibility of Sand-Bypassing for the Alleviation of Beach Erosion at Manasquan and Shark River, New Jersey", Report prepared for the New Jersey Department of Environmental Protection, Division of Coastal Resources, New Jersey Institute of Technology. 35. Bruno, M.S., 1986. "A Coupled Hydrodynamic and Ice Floe Movement Model", Report MIT/WHOI 86-23, Woods Hole Oceanographic Institution. 36. Bruno, M.S. and M. Muntisov, 1981. 'Buoyancy-Driven Transverse Mixing in Streams", Report UCG/HEL 82/01, Univ. of California at Berkeley. A-28 Funded Research 1. State of New Jersey- Coastal Protection Technical Assistance Service. July, 1993 - June, 1997. $1,220,000. 2. U.S. Army Corps of Engineers -The Analysis of the Nearshore Dynamics and Sediment Transport along the Manasquan, New Jersey Shoreline. June, 1996-August, 1996. $19,000. 3. Great Lakes Dredge and Dock Co., -Analysis of Shoreline Erosion in the Keta Region of Ghana. April, 1994 - Spring, 1997. $10,000. 4. Borough of Manasquan, New Jersey- Coastal Engineering Analysis of Shorefront. March, 1994 -June, 1997. $39,600. 5. Roy Weston, Inc. - Laboratory Analysis of the Dispersion of Orimulsion in Waves and Currents. October, 1995- December, 1995. $56,500. 6. NOAA Sea Grant- Shoreline Change on the Developed New Jersey Coast. August, 1995- July, 1997. $54,952. 7. Roy Weston, Inc. -Analysis of Spill Risk at Proposed Tanker Terminal. March, 1995 -April, 1996. $11,000. 8. Breakwaters International, Inc. - Computer Modeling of Shoreline Response Landward of Proposed Reef at Bal Harbour, Florida. March, 1995 - September, 1995. $28,000. 9. Tensar Corporation - Laboratory Study of the Tensar Marine Mattress. August, 1994 - March, 1995. $18,000. 10. ERM Corporation - Laboratory Testing of the Earth Rib Module Dune Stabilizing Device. August, 1994 - May, 1995. $33,000. 11. Demi-Tek, Inc. - Laboratory Testing of the Rotating Reef. August, 1994 - March, 1995. $23,400. 12. Erosion Control Corporation - Laboratory Study of the Erosion Control Mat. June, 1994 - May, 1995. $27,100. 13. Office of Naval Research - The Generation of Internal Waves by Sea Ice and the Associated Enhancement of Ice-Water Drag, (AASERT Award). June, 1994 - May, 1997. $140,411. A-29 14. U.S. Army Corps of Engineers - The Development and Testing of Frequency Dependent Models for Large Scale Water Quality Loading Estimation. June, 1994 - May, 1995. $170,501. 15. NOAA Sea Grant- The Reduction of Pollution in Marinas. June, 1994 - May, 1995. $85,000. 16. NOAA Sea Grant - The Effect of Combined Sewer Outfalls on Coastal and Estuarine Waters. June, 1994 - May, 1995. $70,000. 17. Borough of Cape May, New Jersey- Field Monitoring of Artificial Reef. May, 1994- December, 1995. $80,000. 18. Borough of Spring Lake, New Jersey- Field Monitoring of Artificial Reef. May, 1994 - December, 1995. $80,000. 19. Greenworid Corp. - Reduced Scale Testing of the MOTO Wave Energy Extraction Device. March, 1994 - September, 1995. $65,720. 20. Borough of Spring Lake, New Jersey- Study of Erosion Control Disks. November, 1993 - May, 1995. $28,000. 21. Office of Naval Research - Research Instrumentation Grant. October, 1993 - September, 1994. $73,407. 22. U.S. Coast Guard - Laboratory Study of Oil Spill Boom Behavior in Waves. June, 1993 - May, 1994. $85,000. 23. Borough of Avalon, New Jersey - Field Monitoring of Submerged Artificial Reef. May, 1993 -April, 1995. $100,000. 24. American Group of Companies - Laboratory Evaluation of Artificial Seaweed. April, 1993 - October, 1993. $22,000. 25. County of Monmouth, New Jersey - Sedimentation Study of Monmouth Cove Marina. February, 1993 - December, 1993. $29,260. 26. Coastal Stabilization - Physical Model Study of the Stabeach Erosion Control System. February, 1993 - June, 1993. $26,500. 27. Office of Naval Research - The Enhancement of the Ice-Water Drag Force Due to Internal Waves. June, 1992 - May, 1995 $105,438. -30 28. Breakwaters International- Laboratory Investigation of Beach Erosion Mitigation Using Concrete Artificial Reefs. _ March, 1992 - May, 1993. $ 32,500. 29. International Technologies Corp- Water Quality Modeling for the Musconetcong River. January, 1992 -July, 1992. $12,000. 30. Office of Naval Research - Internal Wave Generation by Sea Ice. July, 1991 - June, 1994. $223,443. 31. R.T. Associates - Testing of Oil Spill Recovery and Containment System. June, 1991. $10,000. 32. HydroQual, Inc. - Laboratory Testing of a Sediment Transport Measuring Device. June, 1991. $4,700. 33. NOAA Sea Grant- Artificial Reef Study. October, 1990 - July, 1991. $7,376. 34. New York Department of Sanitation - Circulation Modeling and Wasteload Allocation Study for the Arthur Kill Waterway. (Co-Investigator) August, 1990 - December, 1991. $160,183. 35. U.S. Geological Survey- Three Dimensional Model of Pollutant Transport in Surface Waters. July, 1990 - June, 1992. $66,182. 36. Universal Studios - Analysis of Dynamic and Hydrodynamic Forces on Underwater Structures. July, 1990 - June, 1991. $14,888. 37. New Jersey Marine Sciences Consortium - Oil Slick Behavior in the Coastal Environment. March, 1990 - February, 1991. $12,550. 38. Public Service Elec. & Gas - Laboratory Studies of Artificial Reefs/Shore Protection Devices. January, 1990 -August, 1990. $5,500. 39. New Jersey Environmental and Occupational Health Sciences Institute. Coastal Transport Modeling. September, 1989 - August, 1990. $30,000. 40. National Science Foundation -The Development of an Eulerian-Lagrangian Model for the Prediction of Sea Ice Movement in Shallow Waters. September, 1987 - August, 1989. $54,255. r A-31 41. New Jersey Department of Environmental Protection -The Analysis of Beach Erosion Conditions Along Northem New Jersey. _ June, 1987- May, 1988. $22,384. 42. New Jersey Marine Sciences Consortium -Three-Dimensional Pollution Transport in Coastal Waters. May, 1987 - May, 1989. $2,500. A-32 Professional Experience Area of specialization is hydrodynamics, with particular emphasis on physical and numerical modeling of wave dynamics, sediment transport, and coastal structures. Has participated in numerous coastal and ocean engineering projects, including: * Continuing efforts as consultant to the State of New Jersey on matters related to shore protection and erosion control. * The analysis of an artificial reef beach erosion mitigation system, using a scale model in the Davidson Laboratory wave tank, and field monitoring at three full-scale installations, for the State of.New Jersey. * The development of sediment transport and shoreline evolution models for application to beaches at Harvey Cedars, Manasquan and Old Bridge, New Jersey, and the Hamptons, Long Island. * The development and verification of a combined circulation-water quality model for the Arthur Kill-Newark Bay system, for the New York City Dept. of Sanitation (with International Technology Corporation). * The development of a circulation model for the prediction of currents in the shallow regions of the Arctic Ocean, for Standard Oil of Ohio. * The development of a computer model for the prediction of surface wave generation and transformation, including finite depth effects and wave breaking. Performed at the Woods Hole Oceanographic Institution with funding from the U.S. Department of Commerce. * Expert witness for the County of Monmouth during the 1988 grand jury investigation into the source of pollutants responsible for the summer, 1988 beach closings along the northern New Jersey coastline. * Preliminary design of a marina development, including wave analysis, sediment transport study, and breakwater configuration, for T&M Associates, Middletown, New Jersey. A-33 Professional Activities Editor-in-Chief, Joumal of Marine Environmental Engineering, Gordon and Breach Science Publishers. Secretary General - Pan American Federation of Coastal and Ocean Engineering. Member, New Jersey Maritime Advisory Council. Member, Executive Committee, Society of Naval Architects and Marine Engineers, N.Y. Metropolitan Section, 1994- present Member, Board of Trustees, New Jersey Marine Sciences Consortium. Member, National Research Council Committee on Oil Spill Countermeasures, 1995-1997. Member, State of New Jersey Beach Erosion Committee. Member, Management Plan Advisory Committee, PSE&G Wetlands Restoration Project, 1994-1997. Member, Technical Program Committee, 1992 Offshore Mechanics and Arctic Engineering Conference, ASME, Calgary Co-Chairman - 21st Conference of Pan American Federation of Engineering Societies, Coastal and Ocean Engineering Section, Washington, D.C., August 19-24, 1990 Journal Referee: 1) AGU J. Geophysical Research 2) ASME J. Offshore Mechanics and Arctic Engineering 3) ASCE J. Waterways, Ports and Coastal Engineering 4) ASCE Joumal Hydraulics 5) ASCE Estuarine and Coastal Modeling 6) ASME Intl. Conference on Offshore Mechanics and Arctic Engineering 1986 (Tokyo) 1989 (The Hague, Netherlands) 1990 (Houston) 1991 (Stavanger, Norway) 1992 (Calgary) �-34 Proposal Review: 1. Defense Advanced Research Projects Agency (DARPA) 2. NOAA National Sea Grant Program 3. EPA National Estuary Program 4. New Jersey Dept. of Environmental Protection 5. Hudson River Foundation New Jersey Representative- Delaware Estuary Scientific and Technical Advisory Committee, 1988-1990. A-35 Academic Activities Coordinator, coastal engineering graduate program, Stevens Institute of Technology, 1989 - present Thesis Supervisor. PhD. - Mr. Won Cho, Experimental Investigation of Surface Wave Instabilities. May, 1992. PhD. - Mr. A.K.M. Quamrul Ahsan, Three-Dimensional Modeling of Coastal Pollution Transport January, 1993. PhD. - Ms. Jennifer Waters, The Generation of Internal Waves by Sea Ice. May, 1995. PhD. - Mr. Raju Datla, Interaction Between Submerged Turbulence and Surface Waves. June, 1996. PhD. - Mr. Thomas Herrington, Analysis of Dominant Forcings in the Vicinity of a Tidal Inlet and Submerged Artificial Reef. June, 1996. MS - Mr. Christopher Obropta, Sediment Transport Along Northern New Jersey. June, 1988. MS - Mr. Thomas Herrington, Hydrodynamic Analysis of Artificial Reefs. May, 1992. MS - Ms. Jennifer Waters, Laboratory Investigation of Sea Ice Dynamics. May, 1993. MS - Ms. Kelly Rankin, Wave Transformation Over a Submerged Reef. May, 1994. MS - Mr. Jesse Falsone, Following Sea Behavior of America's Cup Class Sailboat. May, 1994. MS - Ms. Katherine Ketteridge, Laboratory Study of The Influence of Sand Permeability on Cross-Shore Transport. December, 1996. MS - Mr. Jun Yang, Laboratory Study of Wave Forces on a Submerged Stone Breakwater. May, 1996. MS - Mr. Sherif Hassan, The Effect of a Shore-Parallel Reef on Mixing Rates in the Nearshore Region. May, 1996. MS - Mr. Waiter McKenna, The Effect of Man-Made Structures on Shoreline Changes at Atlantic City, New Jersey, May, 1997. a-36 ASCE Student Chapter Advisor: Stevens Institute of Technology: 1989-1991 New Jersey Institute of Technology: 1986-1989 (Chapter received 1987 national award) Faculty Council - New Jersey Institute of Technology, 1988-1989 Chairman, Education Committee, Society of Naval Architects and Marine Engineers, N.Y. Metropolitan Section, 1994- present A-37 Final Vegetation Report on Cross Sound Ferry Project at Orient Point, Southold Township, Suffolk County, New York PREPARED FOR: INTER-SCIENCE RESEARCH ASSOCIATES ENVIRONMENTAL PLANNING & DEVELOPMENT P.O. BOX 1201, 36 NUGENT STREET SOUTHAMPTON, NEW YORK 11969-1201 PREPARED BY: ERIC LAMONT, PH.D. BOTANICAL CONSULTANT 717 SOUND SHORE ROAD RIVERHEAD, NEW YORK 11901 SEPTEMBER 1997 ] A-38 Contents Summary........................................................................................ 3 Introduction................................................................................. 4 Discussion of Vegetation Types on Site..........................4 Value of Habitat for Wildlife............................................... 5 Freshwater and Tidal Wetlands ..........................................5 Unique Flora in Marine Environment .................................5 Rare and Endangered Plants...................................................6 Revegetation of Undeveloped Areas...................................8 Appendix: List of Species Observed................................... 1 0 A-39 Summary 1 . The project site is classified as a successional old field. The area is dominated by a large number of non-native plant species interspersed with a fewer number of native species. Successional fields are among the most common types of ecological communities on eastern Long Island. 2. Successional fields are utilized by some species of birds and small mammals as nesting sites, a source of food, and protection from predators. 3. No freshwater or tidal wetlands occur on site nor within 100 feet of the proposed development site. 4. There is no unique flora occurring in the bordering marine environment of Gardiners Bay that will be negatively impacted by the proposed development project. 5. No rare plant species were observed at the proposed development site. 7. The rare Seabeach Knotweed was not observed this year along the rocky beach adjacent to the proposed development site, but suitable habitat is available for the plant to colonize. 8. Clearing of vegetation should be restricted to only those areas necessary, and after construction the site should be landscaped with naturally occurring vegetation. 9. A complete list of all species observed on site is provided in the appendix. Sixty-nine species of vascular plants were identified from the site during July to September, 1997; of the 69 species, 44 (64%) are non- native species. A-40 Introduction This vegetation report is based upon: 1) Approximately 16 hours of field work at the proposed development site and adjacent lands during July, August, and September, 1997. This time period was ideal for observing the entire growing season of vascular plants: spring species were still identifiable by fruit in July, and the autumn bloom of goldenrods and asters were observed in mid-September. Searches for the rare seabeach knotweed (Polygonum glaucum) were conducted along the cobble beach from Orient Point to the eastern portion of Orient Beach State Park. 2) Literature searches of rare plants and rare ecological communities reported by the New York State Department of Environmental Conservation/N.Y.S. Natural Heritage Program. Results Site Description: According to the classification system of Reschke (1990), Ecological Communities of New York State, the project site is classified as a successional old field. The area is dominated by a large number of non-native plant species interspersed with a fewer number of native species. Successional fields are among the most common types of ecological communities on eastern Long Island where land had once been cleared and was subsequently abandoned. Rare native plants and animals do not usually occur in these highly disturbed areas. Sixty-nine species of vascular plants were identified from the site during July to September, 1997; of the 69 species, 44 (64%) are non- native species. Ragweed (Ambrosia artemisiifolia) and mugwort (Artemisia vulgaris) form extensive stands. Some native species include A-41 goldenrods (Solidago spp.) and asters (Aster spp.). This large number of observed plant species is characteristic of land undergoing the early stages of ecological succession. Climax plant communities in northeastern United States typically are dominated by a significantly lower number of plant species. Successional fields are relatively short lived, they naturally succeed into shrubland communities which in turn can succeed into woodland or forest communities. The successional field stage is characteristically dominated by opportunistic species that require a high degree of light intensity. Non-native plant species from Europe and Asia often invade these successional fields; such is the case at the proposed development site. A complete list of all species observed on site is provided in the appendix of this report. Successional fields are utilized by some species of birds and small mammals as nesting sites, a source of food, and protection from predators. Conversely, predators such as hawks, owls, and red fox prey upon small birds and mammals occurring in successional fields. No freshwater or tidal wetlands occur on site nor within 100 feet of the proposed development site. No unique flora occurring in the bordering marine environment of Gardiners Bay will be negatively impacted by the proposed development project. The only two flowering plant species occurring in the shallow waters of eastern Long Island bays are eelgrass (Zosters marina var. stenophylla) and widgeon-grass (Ruppia maritima); neither species occurs in waters within the immediate vicinity of the Cross Sound Ferry dock at IOrient. Marine eelgrass meadows are communities of subtidal aquatic beds occurring in quiet waters below the lowest tide level. A-42 Characteristic algae occurring in this marine ecosystem are sea lettuce (Ulva lactuca), Enteromorpha spp., Polysiphonia spp., and Cladophora gracilis. The marine waters adjacent to the ferry dock are too turbulent to support an eelgrass meadow. Rare Plants: No rare plant species were observed at the proposed development site. New York Natural Heritage Program reports 11 species of rare plants from the vicinity of Orient Point (the following list is arranged in alphabetical order by genus, followed by the common name of each species, the habitat supporting each species, and comments specifically related to the proposed development site): 1. Agrimonia rostellata, Woodland Agrimony; moist rich woods; suitable habitat for this species does not exist on site. 2. Angelica lucida, Coastal Angelica; beaches & rocks along the coast; fewer than five populations of this rare plant occur in New York (all in eastern Suffolk County), suitable habitat occurs adjacent to the proposed development site but no plants were located during field searches. 3. Carex hormathodes, Marsh Straw Sedge; salt marshes; suitable habitat for this species does not exist on site. 4. Eleocharis fallax, Creeping Spikerush; fresh & brackish swamps; suitable habitat for this species does not exist on site. 5. Ligusticum scothicum, Scotch Lovage; sandy or rocky seashores; the largest New York population of this rare species occurs at Orient Beach State Park, suitable habitat occurs adjacent to the proposed development site but no plants were located during field searches. A-43 6. Onosmodium virginianum, Virginia False Gromwell; dry woods & barrens; suitable habitat for this species does not exist on site. 7. Polygonum glaucum, Seabeach Knotweed; sandy or rocky beaches; the disturbed successional field on site does not provide suitable habitat for seabeach knotweed, but the adjacent rocky beaches provide ideal habitat for this rare plant. Seabeach knotweed occurs along the rocky beaches at Orient Beach State Park and also at Orient Point. I did not observe any plants this year along the rocky beach adjacent to the proposed development site but certainly suitable habitat is available for the plant to colonize. Seabeach knotweed is an annual, which means the plant lives for one year, reproduces, sets seed, and dies. The seeds are dispersed along seashores by wind and high tides. The seeds can survive extended periods of saltwater exposure. Populations of this rare and unique plant commonly migrate short distances along rocky beaches from year to year. To my knowledge, the upper beach above the high tide level bordering the proposed development site will in no way be impacted by the project; therefore, suitable habitat capable of supporting future populations of seabeach knotweed should remain available for colonization. 8. Polygonum tenue, Slender Knotweed; dry, chiefly acid soils; a population of this rare plant occurs on storm ridges at Orient Beach State Park; this rare plant does not typically occur in highly disturbed soils; no plants were located on site during field searches. 9. Rumex maritimus var. fueginus, Golden Dock; shorelines; suitable habitat occurs adjacent to the proposed development site but no A-44 plants were located during field searches. 10. Sagina decumbens, Small-flowered Pearlwort; sandy soils in partial to full sunlight, and in waste places; fewer than five populations of this rare plant occur in New York, suitable habitat occurs on site but no plants were located during field searches. 11. Sesuvium maritimum, Sea Purslane; damp coastal sands; suitable habitat occurs adjacent to the proposed development site but no plants were located during field searches. Revegetation of undeveloped areas: The DEIS scoping outline indicates that clearing of vegetation should be restricted to only those areas necessary, and after construction the site should be landscaped with naturally occurring vegetation. These initiatives will have a positive impact upon the environment. Currently, the northern and eastern borders of the property are largely dominated by non-native species of trees and shrubs. Many of the existing trees (Japanese black pine and mimosa) are either dead or dying. The invasive non-native vine, oriental bittersweet (Celastrus orbiculata), cascades down through the trees and shrubs. I recommend that the entire border of non-native, dying, woody vegetation be removed and replanted with native vegetation. Recommended species for revegetation: The following plant list was prepared with consideration to the following factors: 1) the plants must be able to survive harsh environmental conditions such as exposure to salt spray, cold wind, winter ice, and sand blow-up; 2) the plants should be native to northeastern United States; 3) the plants should be A-45 aesthetically pleasing (ie., producing flowers, colorful berries, autumn leaf color, etc.)., and should complement the existing native vegetation; and 4) the plant species should be commercially available. The following list of plant species are recommended for revegetation (although not all of the listed species need be included in the final landscape plan; often, a simple landscape design is more successful than a complex and elaborate one): List of Recommended Plant Species Common Name Scientific Name American Holly Ilex opaca Bayberry Myrica pensylvanica Bearberry Arctostaphylos uva-ursi Indian Grass Sorghastrum nutans Little Bluestem Schizachyrium scoparium Lowbush Blueberry Vaccinium pallidum Northern Arrowwood Viburnum recognitum Red Cedar Juniperus virginiana Shadbush Amelanchier canadensis ISwitch Grass Panicum vir9 atum Winged Sumac Rhus copallinum 1 A-46 Appendix List of Plant Species Observed [Note: An asterisk (*) indicates a non-native species] Scientific Name Common Name *Abutilon theophrasti Velvet-leaf *Acer platanoides Norway Maple *Achillea millefolium Common Yarrow Agrostis perennans Autumn Bent Grass *Albizia julibissim Mimosa *Arctium minus Common Burdock *Artemisia vulgaris Mugwort Asclepias syriaca Common Milkweed Aster ericoides Heath Aster Aster pilosus Heath Aster Aster simplex Tall White Aster Baccharis halimifolia Groundsel-tree *Bromus mollis Soft Chess Grass *Bromus tectorum Downy Chess Grass *Celastrus orbiculata Oriental Bittersweet *Chenopodium album Lamb's Quarters *Cichorium intybus Chicory *Cirsium vulgare Bull Thistle Conyza canadensis Horseweed *Cyperus esculentus Yellow Nut-grass *Dactylis glomerate Orchard Grass *Daucus carota Queen Anne's Lace *Digitaria sanguinalis Tall Crabgrass *Echinochloa crusgali Barnyard Grass *Elaeagnus umbellate Autumn Olive *Eragrostis cilianensis Stinkgrass Eragrostis pectinacea Lovegrass Erigeron strigosus Daisy Fleabane Euthamia graminifolia Flat-top Goldenrod *Festuca elatior Meadow Fescue Gnaphalium obtusifolium Sweet Everlasting A-47 Appendix: List of Plant Species Observed (continued) Juncus tenuis Path Rush Juniperus virginiana Eastern Red Cedar Lepidium virginicum Wild Peppergrass *Linaria vulgaris Butter-and-Eggs *Lolium multiflorum Italian Ryegrass *Matricaria matricarioides Pinapple Weed Oenothera biennis Common Evening Primrose Panicum acuminatum Panic Grass Parthenocissus quinquefolia Virginia Creeper *Pastinaca sativa Wild Parsnip *Phleum pratense Timothy Grass Phytolacca americana Pokeweed *Pinus thunbergii Japanese Black Pine *Plantago aristata Bracted Plantain *Plantago lanceolata English Plantain *Plantago major Common Plantain *Poa compressa Canada Bluegrass *Polygonum arenastrum Knotweed *Polygonum persicaria Smartweed *Potentilla recta Sulfer Cinquefoil *Portulaca oleracea Purslane *Raphanus raphanistrum Wild Radish Rhus copallinum Winged Sumac *Rosa multiflora Multiflora Rose Rubus flagellaris American Dewberry *Rumex crispus Curly Dock *Setaria faberi Giant Foxtail Grass *Silene latifolia White Campion Solidago altissima Tall Goldenrod Solidago juncea Early Goldenrod Solidago rugosa Rough Goldenrod *Sonchus asper Spiny Sow Thistle *Spergularia rubra Sand Spurry Toxicodendron radicans Poison Ivy *Trifolium pratense Red Clover - *Trifolium repens White Clover *Verbascum thapsus Common Mullein Vicia cracca Cow Vetch A-48 t Eric E. Lamont 717 Sound Shore Road, Riverhead, New York 11901 Tel: 516/722-5542 EDUCATION: 1991 Ph.D. Biology, City University of New York and the New York Botanical Garden joint doctoral program, New York, N.Y. 1978 M. S. Biology, Long Island University/C.W. Post Center, New York. 1975 B. S. Biology, Kansas State University, Manhattan, Kansas. WORK EXPERIENCE: 1981-present Biology Teacher, Riverhead High School, Riverhead, New York. 1994-present Adjunct Instructor, Botany & Ecology, State University of New York, Empire State College, Long Island Center, New York. 1988-present Botanical Consultant, government agencies & private institutions. 1988-1992 Botanist, Town of Southampton, Long Island, New York. 1989-1991 Botanist, Atlantic Golf Club, Bridgehampton, New York. Summer 1982 Interpretive Specialist, The Nature Conservancy, Long Island, New York. Summer 1981 Interpretive Ranger, U.S. Department of Interior/National Park Service, Fire Island National Seashore, New York. 1 9 8 0-1 9 81 Adjunct Instructor, Biology Department, Long Island University, N.Y. 1979-1981 Resident Director/Teacher, BOCES Outdoor & Environmental Education Center, Lloyd Harbor, New York. Summer 1980 Research & Teaching Assistant, Queens College Center for Environmental Teaching & Research, City University of New York. Summer 1979 Agricultural Laborer, Kibbutz Yiron, Northern Galilee, Israel. 1977-1978 Director, Environmental Arts Program, Nassau County Office of Cultural Development, Roslyn Harbor, New York. CERTIFICATION: New York State Permanent Teaching Certificate in Biology, Chemistry, Physics, Earth Science, and General Science. A-49 PROFESSIONAL SERVICE: 1991-present President, Long Island Botanical Society, Long Island, New York. 1997-present Honorary Research Associate, Brooklyn Botanic Garden, New York. 1991-present Secretary/Executive Board Member, New York Flora Association. 1993-present Executive Board Member, South Fork Natural History Society, New York. 1993-present Field Trip Leader/Manuscript Reviewer, Torrey Botanical Society, N.Y. 1979-present Co-coordinator/compiler, National Audubon Society, Christmas Bird Census, Cold Spring Harbor & Orient Point, Long Island, New York. PUBLICATIONS: 1997. Foreword. In: W. C. Chapman, Orchids of the northeast. Syracuse University Press, Syracuse, New York. 1997. Flora of North Carolina's Outer Banks, Ocracoke Island to Virginia. Jour. Torrey Bot. Soc. 124: 71-88. [with R. Stalter]. 1996. Atlas of the orchids of Long Island, New York. Bull. Torrey Bot. Club 123: 157-166. 1995. Taxonomy of Eupatorium section Verticillata (Asteraceae). Memoirs of the New York Botanical Garden 72: 1-68. 1994. Lespedeza striata (Fabaceae), an addition to the flora of New York, with notes on its introduction and spread in the eastern United States. Bull. Torrey Bot. Club 121: 377-378. 1994. Rediscovery of Solidago sempervirens var. mexicana (Asteraceae) in New York, with notes on its taxonomic history. Bull. Torrey Bot. Club 121: 292-294. 1994. In Memorium: Arthur Cronquist (1918-1992). Bartonia 58: 126-129. 1993. The status of the Coastal Plain Pondshore community in New York. Bull. Torrey Bot. Club 120: 180-187. [with R. Zaremba]. 1993. The vascular flora of Fort Sumter and Fort Moultrie, South Carolina, one year after Hurricane Hugo. Castanea 58: 141-152. [with R. Stalter]. 1992. Guide to the goldenrods of Long Island, New York. Long Island Botanical Society Newsletter 2(5): 1-7. 1991. The vascular flora of Orient Beach State Park, Long Island, New York. Bull. Torrey Bot. Club 118: 459-468. [with R. Stalter]. 1991. Life forms of the flora at Hempstead Plains, New York, and a comparison with four other sites. Bull. Torrey Bot. Club 118: 191-194. [with R. Stalter & D. Kincaid]. A-50 PUBLICATIONS (continued): 1990. Eupatorium steelei (Asteraceae), a new species from the southern Appalachian Mountains of eastern U.S.A. Brittonia 42: 279-282. 1990. A new combination in Eupatorium section Verticillata (Asteraceae). Phytologia 69: 467-468. 1990. The vascular flora of Assateague Island, Virginia. Bull. Torrey Bot. Club 117: 48-56. [with R. Stalter]. 1988. Current status of orchids on Long Island, New York. Bull. Torrey Bot. Club 115: 113-121. [with J. Beitel & R. Zaremba]. 1987. Vegetation of Hempstead Plains, Mitchell Field, Long Island, New York. Bull. Torrey Bot. Club 114: 330-335. [with R. Stalter]. 1986. Vegetation of Fire Island, New York. Bull. Torrey Bot. Club 113: 298-306. [with R. Stalter & J. Northup]. A-51 Wildlife Inventory and Analysis Cross Sound Ferry Project Orient Point, New York by Jeremy J. Hatch, Ph.D. September 12, 1997 A-52 CROSS SOUND FERRY, ORIENT POINT: WILDLIFE II.2.0 TERRESTRIAL AND AOUATIC ECOLOGY: EXISTINONDITIONS 2.a) Existing Wildlife Invento The project site was visited during daylight hours on 27 and 28 July, 1997. I walked over the site, with binoculars, observing birds and other wildlife I turned over logs etc, but did not attempt any trapping. I also visited nearby areas, including the shoreline, the County Park, and Orient Beach State Park. On the basis of these observations and after consulting Sommers and Alfieri (1997), Andrle and Carroll (198 8) and the NY Natural Heritage Program, I concluded that additional visits (e.g. at other seasons) would not be necessary It was immediately apparent that the project site is not in a natural state, is bounded on all sides by severely modified habitats, and shows little prospect of significant wildlife value These tentative conclusions were supported by subsequent examination. The site is dominated by weedy vegetation with significant areas of bare ground on which timbers are stored. To the SW (compass directions approximate) it abuts an existing parking lot; to the SE (ocean side) is a heap of beach gravel (to a non-specialist's eye this appears to be clean spoil) To the NE is a line of non-native conifers and mown non-native grass. To the NW, across a road, are houses surrounded by gardens/yards Beyond the houses is abandoned farmland covered with scrubby vegetation, much of it non-native, that comprises a County Park. Species observed at site During these visits the following species were recorded 7 birds and 3 mammals Birds (The list includes those species observed feeding or resting; but excludes remote sightings of species unaffected by the proposed development, such as Cormorants, Mallards) The status codes are- M=Migrant (present in breeding season) R= resident, B=probably nested at the site (others listed probably nested nearby) Sp cies Status Barn Swallow Hirundo rustica M American Crow Corvus brachyrhynchos R Gray Catbird Dumetella carolinesis MB European Starling Sturnus vulgaris R American Goldfinch Carduelis tristis R Song Sparrow Melospiza melodia R B House Sparrow Passer domesticus R A-53 Mammals White-tailed Deer Odocoileus virginianus Rabbit Sylvilagus Sp. Cat Felis catus, possibly feral, likely predator Reptiles and.Aml2hibians None recorded Additional species expected Numerous additional species of birds are likely to occur in small numbers, especially during migration, but the area does not constitute a significant resource for transients. Breeding birds in this northernmost tip of Long Island listed by Andrle& Carroll (1988) include about 61 species of land-birds (identified as confirmed or probable breeders). About half of these could eventually occur at the project site in small numbers during the breeding season if the site were left untouched and successional changes in the vegetation continued. None of these are listed species, or otherwise notably rare on Long Island. Some of the more likely species are: House Finch Carpodacus mexicanus R Common Grackle Quiscalus quiscula M Rufous-sided Towhee Pipilo erthrophthalmus M Northern Cardinal Cardinalis cardinalis R Common Yellowthroat Geothlypis trichas M Northern Mockingbird Mimus polyglottos R American Robin Turdus migratorius M Tufted Titmouse Parus bicolor R Black-capped Chickadee Parus atricapillus R Tree Swallow Tachycineta bicolor M Eastern Kingbird Tyrannus tyrannus M Mourning Dove Zenaida macroura R During the fall and winter the site, in its present stage of vegetation, would be likely to be visited by several other species, including the following, some of which would be seen more reliably in the County Park. White-throated Sparrow Zonotrichia albicollis Savannah Sparrow Passerculus sandwichensis Field Sparrow Spizella pusilla Tree Sparrow Spizella arborea Other mammals that probably occur on the site are several rodents, including: A-54 White-footed Mouse Peromyscus leucopus Meadow mole Microtus pennsylvanicus and other widespread mammals. b) Natural Heritage Program, DEC Information about wildlife requested and received from the files of the New York Natural Heritage Program included only 2 bird species, but also noted that the site is near to a designated habitat. This area is Plum Gut, which is designated Significant Coastal Fish and Wildlife Habitat and is part of the State's Coastal Management Program (CMP) c) Designated Wildlife species No designated species (endangered, threatened, or special concern) were identified on the site Designated bird species that occur in the area include 2 beach-nesting birds and the Osprey (Pandion haliaetus, status Threatened), however none have been reported nesting near the project site (Sommers and Alfieri 1997) Beach-nesting species of possible concern are Piping Plover (Charadrius melodus, status Endangered) and Least Tern (Sterna antillarum, status Endangered). Both species nest at Orient Beach (west of the Ferry Terminal and Marina) and not near the site. It is possible that these species will move from their present nesting areas, so the significance of the project site as potential nesting habitat needs to be addressed. d) Habitat requirements of listed species The most suitable breeding conditions for beach-nesting species include isolated beaches free of predators In addition, Piping Plovers need immediate (walking) access to extensive inter- tidal areas of fine sand The shore adjacent to the project site meets none of these requirements. Thus, any increased activity resulting from the development will not affect these populations of plovers or terns Ospreys require nesting sites within convenient range of fishing areas. They nest on bare trees or purpose-built nest-poles, and suitable nest-sites can limit populations. However, no ospreys nest on or near the project site, and prospective locations for constructing nest-poles are not in short supply in the area. Designated Habitats Plum Gut is located between Orient Point and Plum Island, about 2.4 km (1.5 miles) from the project site The ferries travel through this area of turbulent tidal exchange. This area has been designated because of its importance for marine fishes, serving as a foraging area and major migration corridor (Information provided by NYS Department of State). A-55 C.2 ANTICIPATED ROPACTS Impact on existing wildlife Impacts on wildlife will be minimal. Feeding and/or breeding habitat for a few common birds and mammals will be eliminated, but no designated species will be affected. Impact on designated habitat No impact expected because the proposed work will not alter water movements in the area, and no increases in ferry traffic are proposed. III. MITIGATION MEASURES--NATURAL RESOURCES C.1. Wildlife: No mitigation measures are specifically called-for. Plantings with native vegetation would be appropriate. Also, it would be desirable to operate all aspects of the Ferry Terminal so as to minimize nuisance birds (notably gulls, starlings and House Sparrows) and other vermin that may interfere with other wildlife and thereby lower biodiversity. This means eliminating all available food. (This suggestion is not a commentary on current operations). REFERENCES CITED Sommers, L.A. and M.L. Alfieri. 1997. 1996 Long Island Colonial Waterbird and Piping Plover Survey. NYS DEC. Andrle, R.F and J.R. Carroll. (Eds). 1988 The Atlas of Breeding Birds in New York State. Cornell Univ. Press Report s m ted y: Jeremy J Hatch, Ph.D. 1 A-56 JEREMY J. HATCH 83 Blue Hill Terrace Milton, MA 02186 Telephone (617) 696-1677 (617) 287-6615 (6600) FAX (617) 287-6650 email: hatch@umbsky.cc.umb.edu Dr. Hatch is a professional biologist with extensive experience in coastal ecology and ornithology. He is currently Associate Professor of Biology at the University of Massachusetts in Boston, and conducts research on behavior and ecology of seabirds. Education Ph.D. (Zoology) Duke University, 1967 M.A., Cambridge University, 1965 B.A., Natural Sciences/Zoology, Cambridge University, 1961 Employment History 1969-present Member of the Biology faculty at the University of Massachusetts at Boston. Teaches courses in animal behavior, ornithology and ecology. Conducts research on behavioral ecology of seabirds. Currently Associate Professor. 1979 Research Wildlife Biologist, Institute of Pacific Islands Forestry, Hawaii. 1967-69 Postdoctoral fellowship(National Institutes of Health) at The Rockefeller University, New York. Professional Associations American Ornithologists Union (Elected Member), Animal Behavior Society, Association of Field Ornithologists, British Ornithologists Union, British Trust for Ornithology, Colonial Waterbird Society, Cooper Ornithological Society, International Society for Behavioral Ecology Professional Experience 1970-present Research on the behavioral ecology of terns and other seabirds and shorebirds. 1975-present Annual monitoring of terns and Piping Plovers at sites in Massachusetts Bay, Boston Harbor and Buzzards Bay. Results contributed to the annual census coordinated by Mass. Division of Fisheries and Wildlife. Work includes censusing, measurement of breeding success, and assessment of impacts on the birds. 1988 Status of rare birds on the Elizabeth Islands (Piping Plover, Northern Harrier, Grasshopper Sparrow). 1984 Under contract to U.S. Fish and Wildlife Service. Censused all colonial waterbirds and beach-nesting birds in Boston Harbor and Elizabeth Islands. 1978-82 Restoration and creation of breeding sites for terns in Boston Harbor, MA. Experimental analyses of substrate preferences. Annual maintenance of these artificial sites continues. A-57 1979 Prepared part of work plan and conducted field research on forest birds of Hawaii as part of a team for U.S. Forest Service. Fieldwork on tropical seabirds in Hawaii and Northern Marianas. 1970 Reproductive biology of herons. 1968-69 Fieldwork in Maine on navigation by terns and gull-tern interactions. Consulting Activities 1997 Birds and Waste Transfer Stations 1996 Comments on USFWS: "Restoration of Avian Diversity on Monomoy National Wildlife Refuge" 1993-94 Evaluated management programs for gulls and the links to human health as subconsultant for Mass. Water Resources Authority. 1991 Prepared section of EIS dealing with birds and mammals for a coastal property in the town of Southampton, NY. 1990 Consulted on beach-nesting birds in western Long Island,NY- this included fieldwork on the beach, amending a work plan,preparing a management plan, and court testimony. 1975-present Provided information on wildlife issues arising in Boston Harbor to USFWS, Massachusetts Audubon Society and others. 1987 - Commentary on Draft Environmental Assessment of Plan for Monomoy National Wildlife Refuge, and Plan for Parker River National Wildlife Refuge. Comments on Proposed Status of the Roseate Tern. Publications (excluding abstracts and field notes) 1998 (in press) Nisbet, I.C.T. and J.J. Hatch. Consequences of a female-biased sex ratio in a socially monogamous bird: female-female pairs in the endangered Roseate tern. Ibis. 1996 Hatch, J.J. Threats to public health from gulls (Laridae). Intl. J. Env. Health Res. 6: 5-16. 1996 Nisbet, I.C.T., D.M. Fry, J.J. Hatch and B. Lynn. 1996. Feminization of male Common tern embryos is not correlated with exposure to specific PCB congeners. Bull. Env. Contain. Toxicol. 57: 895-901. 1995 Hatch, J.J. Changing populations of Double-crested Cormorants. In: Nettleship, D.N. and Duffy, D.C. (eds.). The Double-crested Cormorant. Biology, Conservation and Management. Colonial Waterbirds 18 (Special Publ. 1): 3-17. 1994 Sabo, T., R. Kesseli, J.L. Halverson, I.C.T. Nisbet & J.J. Hatch. PCR-based method for sexing Roseate terns (Sterna dougallii). Auk 111: 1023-1027. 1992 Hatch, J.J. Cormorant and Clam. Bird Observer. 20(3) 14-15. 1991 Hailman,J.P. and J.J. Hatch. The place of juvenile honeycreepers in the interspecific dominance hierarchy. 'Elepaio in press. A-58 1988 Nisbet, I.C.T. & J.J. Hatch. Durability of incoloy bands on Common Terns. Colon. Waterbirds. 11: 113-114. 1986 Clapp, R.B. & J.J. Hatch. Range extension for the Gray-backed Tern in the Western Pacific. Colon. Waterbirds 9: 110-112. 1985 Hatch, J.J. Lateral asymmetry of the bill of Loxol2s coccineus (Drepanidinae). The Condor 87: 546-547. 1985 Hatch, J.J. The White Tern may be unable to hover in still air. J. Field Ornithol. 56:427- 428. 1985 Nisbet, I.C.T. & J.J. Hatch. Influence of band size on rates of band loss by Common terns. J. Field Ornithol. 56: 178-181. 1985 Drury, W.H. & J.J. Hatch. Great Cormorants nesting on New England Coast, another seabird species returns. Amer. Birds 39: 259. 1984 Hatch, J.J. Rapid increase of Double-crested Cormorants nesting in Southern New England. Am. Birds 38: 984-988. 1983 Nisbet, I.C.T. & J.J. Hatch. Band wear and band loss in Roseate terns. J. Field Ornithol. 54: 90. 1983 Hatch, J.J. & I.C.T. Nisbet. Band wear in Arctic terns. J. Field Ornithol. 54: 91. 1983 Hatch, J.J. & I.C.T. Nisbet. Band wear and band loss in Common terns. J. Field Ornithol. 54: 1-27. 1982 Hatch, J.J. The cormorants of Boston Harbor and Massachusetts Bay. Bird Obs. of Eastern Mass. 10: 65-73. 1975 Hatch, J.J. Homing experiments with Arctic terns released over land and sea. Bird- Banding 46: 47-54. 1975 Hatch, J.J. Piracy by Laughing Gulls (Larus atricilla): an example of the Selfish Group. This 117: 357-365. 1974 Hatch, J.J. Homing experiments with Audubon's shearwaters. Auk 91: 830-832. 1974 Hatch, J.J. Longevity record for the Arctic tern. Bird-Banding 45: 269-270. 1971 Hatch, J.J. "Collective territories in Galapagos mockingbirds". in Behavioral Ecology, P.H. Klopfer (ed.) Dickinson Publ. Co. 1970 Hatch, J.J. Predation and piracy by gulls at a temery in Maine. Auk 87: 244-254. 1968 Klopfer, P.H., &J.J. Hatch. "Some Experimental Considerations", a chapter in Animal Communication. T.A. Sebeok, ed. (Indiana University Press). 1967 Hatch, J.J. Thesis. "Diversity of the Song of Mockingbirds, (Mimus 1oly lg off) reared in different auditory environments". Duke University, Durham, N.C. 1966 Hatch, J.J. Collective territories in Galapagos mockingbirds, with notes on other behavior. Wilson Bulletin, 78: 198-207. 1965 Hatch, J.J. Only one species of Galapagos mockingbird feeds on eggs. Condor 67: 354- 355. A-59 Technical Reports, Book Reviews, Non-refereed papers 1997 "Terns of Europe and North America" (book review). Quart. Rev. Biol. 72: 210-211. 1997 "Ecology and Conservation of the Marbled Murrelet" (book review). Wilson Bull. 109: 191-192. 1994a "Gull Populations at Wachusett Reservoir". Technical report as subconsultant to Mass. Water Resources Authority. 1994b "Gulls and Human Health". Technical report as subconsultant to Mass. Water Resources Authority. 1991a Report to Island Trustees on "Rare Animals on the Elizabeth Islands." 1991 Report to the Massachusetts Natural Heritage Program on "Status of Piping Plover, Northern Harrier and Grasshopper Sparrow on the Elizabeth Islands, Massachusetts." 1990 Hatch, J.J. Two very different bird books. Conserv. Biol. 4: 331-332. (reviewed Gill's Ornithology and ICBP's Save the Birds). 1987 "Leach's Storm-petrel on the Elizabeth Islands". Report to Mass. Division of Fisheries and Wildlife. 1987 Hatch, J.J. Bird Conservation. Conserv. Biol. 1: 349-352. (a review of 4 volumes in the Technical Publications series of the International Council for Bird Preservation). 1986 Hatch, J.J. & L. Kaufman. In the shadow of skyscrapers: returning wildlife to urban estuaries. Aquasphere: (Sept. 1986). 1984 "Seabirds nesting in Boston Harbor and Buzzards Bay". Report to U.S.F.W.S. 1976 (with T.W. Custer et al.). Reproductive patterns of colony-nesting wading birds of the Atlantic coast, 1975 (Report from Patuxent Wildlife Research Center). A-60 AIR QUALITY STUDY FOR PROPOSED CROSS SOUND FERRY PARKING LOT EXPANSION SOUTHOLD, NEW YORK Prepared for. CROSS SOUND FERRY, INC. Prepared by. DUNN ENGINEERING ASSOCIATES SEPTEMBER 1997 A-61 Table of Contents AIR RESOURCES: EXISTING CONDITIONS . . . . . . . . . . . . 1 1 . Meteorological Conditions Found On-Site and Vicinity . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2. On-Site Ambient Air Quality . . . . . . . . . . . . . . . . 2 3. Existing Air Quality Standards . . . . . . . . . . . . . . . 3 AIR RESOURCES: ANTICIPATED IMPACT . . . . . . . . . . . . . 8 SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Disk #390, Cross Sound Ferry File: Air:\Cover A-62 AIR RESOURCES : Existing Condition Disk#390, Cross Sound Ferry File: Air:\Cover A-63 New York State is divided into eight Air Quality Control Regions (AQCRs) based on geographic locations. The site of the proposed action is located within Suffolk County, which is within the New Jersey/New York/Connecticut Interstate Air Quality Control Region. The New York State Department of Environmental Conservation(NYSDEC),Division of Air Resources, is the responsible State agency for monitoring and reporting on air quality within New York State. 1. Meteorological Conditions Found On-Site and Vicinity The project area is located at the eastern terminus of New York State Route 25 within the Town of Southold. Route 25 terminates at the easternmost point of the North Fork on Long Island. As such, there are effects on local meteorology caused by proximity to large bodies of water. There are two effects on air quality as related to mobile source impacts due to the local meteorology. Both of these tend to minimize impacts. The location of the site, close to large bodies of water, has an effect on prevailing winds. There exists in the project location stiff breezes off the water for the vast majority of the time due to the unsheltered nature of the coastline. The wind speeds and atmospheric instability serve to lessen the impact of vehicle emissions on pollutant concentrations. Pollutant concentrations from emission sources are quickly reduced as pollutants are mixed with large volumes of air. A second effect due to location is the moderation in temperature due to the surrounding waters. The water tends to dampen seasonal variations in temperature. As a result, temperatures in the summer are lower than inland areas while winter temperatures are higher due to heat evaporation from the water. Vehicle emissions are highest when atmospheric temperatures are low. The temperatures in the winter, moderated by the warming effects of the water,have the effect of reducing vehicle emissions as compared to colder inland areas. 2. On-Site Ambient Air Quality The New York State Department of Environmental Conservation maintains a network of ambient air quality monitoring stations located throughout the State in each of the Ambient Air Quality Control Regions in order to evaluate the attainment status of each region. The closest air quality monitoring station to the project site is located in Babylon. Disk #390, Cross Sound Ferry File: Air\Existing Condition A-64 Currently, the whole of Suffolk County is, along with most of downstate New York, classified as a severe non-attainment area for ozone. This can be defined as an area where one-hour average concentrations were found to be in excess of 0.180 parts per million. It should be noted that ozone is a secondary pollutant with respect to mobile sources. Ozone is not emitted from vehicles but is a product of chemical reactions with other pollutants present in the atmosphere. As such, the study of ozone concentrations leads to a regional approach based on vehicle miles traveled in a large area like the New Jersey/New York/Connecticut Interstate Air Quality Control Region and not on a project specific basis. However,it is readily apparent that the provision of ferry service to Connecticut from Orient leads to a lessening of VMT as compared to the automobile trips to Connecticut without the ferry. Suffolk County is designated in attainment for other criteria air pollutants designated as such by the U.S. Environmental Protection Agency (EPA). 3. Existing Air Quality Standards As required by the Clean Air Act Amendments of 1970 and 1977, National Ambient Air Quality Standards (NAAQS) have been established for six major "criteria" pollutants: carbon monoxide, nitrogen oxides, ozone, particulates, sulfur oxides, and lead. These standards are presented on Table 1,along with the corresponding New York State standards. The"primary"standards have been established to protect the public health. The"secondary" standards are intended to protect the nation's welfare and account for air pollutant effects on soil, water, visibility, materials, vegetation, and other aspects of the general welfare. The primary air pollutants generated by the proposed action are those associated with transportation sources, primarily automobile traffic. An assessment of those criteria pollutants associated with automobile emissions is provided below. Although Carbon Monoxide is the primary pollutant associated with automobile emissions, those criteria pollutants emitted in smaller quantities are also identified below with a brief discussion on source apportionment. a. Sulfur Dioxide (SO2) The air quality in the vicinity of the project site is better than the Ambient Air Quality Standards for SO2 and is presently defined as an "attainment" area for SO2. Over the last few years the air quality trend shows an improvement in S02 levels. Disk #390, Cross Sound Ferry File: Air\Existing Condition A-65 AMBIENT AIR QUALITY STANDARDS-NEW YORK STATE/FEDERAL New York State Standards Corresponding Federal Standards Pollutant Averaging Period Primary Standard Secondary Standard Conc. Units Statistic -- --] (2) Conc. U(3)ts Statistic Conj Units Statistic Sulfur Dioxide 12 consecutive months 0.03 PPM Arithmetic Mean(AM) 80 ug/m3 A.M. 24-Hour 0.14 PPM Maximum(2) 365 ug/m3 Maximum(2) 3-Hour 0.50 PPM Maximum 1300 ug/m3 Maximum Carbon Monoxide 8-Hour 9 PPM Maximum 9 PPM Maximum 9 PPM Maximum 1-Hour 35 PPM Maximum 35 PPM Maximum 35 PPM Maximum Ozone(4) 1-Hour _ 0.12 PPM Maximum 235 ug/m3 Maximum 235 ug/m3 Maximum Hydrocarbons 3-Hour 0.24 PPM Maximum (non-methane) (6:00-9:00 A.M.) a Nitrogen Dioxide 12 consecutive months _0.05 _PPM A.M. 100 ug/m3 A.M. 100 ug/m3 A.M. 01 Lead(5) 3 consecutive months 1.5 ug/m3 Maximum Inhalable(6) 12 consecutive months 50 ug/m3 A.M. 50 ug/m3 A.M. Particulates(PM10) 24-Hour 150 ug/m3 Maximum 150 ug/m3 Maximum Total Suspended 12 consecutive months 75 ug/m3 Geometric Mean(GM) Particulates 24-Hour 250 ug/m3 Maximum 260 ug/m3 Maximum 150 ug/m3 Maximum (TSP)(17) (1) New York State also has standards for berylium,fluorides, hydrogen sulfide, and settleable particulates(dustfall). Ambient monitoring for these pollutants is not currently conducted. (2) All maximum values are concentrations not to be exceeded more than once per calendar year. (Federal Ozone Standard not to be exceeded more than three days in three calendar years.) (3) Gaseous concentrations for Federal standards are corrected to a reference temperature of 2.TC and to a reference pressure of 760 millimeters of mercury (4) Former NYS Standard for ozone of 0.08 PPM was not officially revised via regulatory process to coincide with the Federal standard of 0.12 PPM which is currently being applied by NYS to determine compliance status. (5) Federal standard for lead not yet officially adopted by NYS but is currently being applied to determine compliance status. (6) Federal Standard for PM10 not yet officially adopted by NYS,but is currently being applied to determine compliance status. (7) New York State also has 30,60,and 90-day standards as well as annual geometric mean standards of 45,55,and 65 ug/m'in Part 257 of NYCRR. While these TSP standards have been superseded by the above PM10 standards,TSP measurements may still serve as surrogates to PM10 measurements in the determination of compliance status. SOURCE: New York State Department of Environmental Conservation, Division of Air Resources, 1995 Annual New York State Air Quality ReportAmbient Air Monitoring System Executive Summary (Dated July, 1996). Table 1 Federal and State Air Quality Standards Disk#390, Cross Sound Ferry File: Air\Table-I Sulfur dioxide emissions produced from fuel combustion are related to the sulfur content in the fuel. The lighter petroleum distillates such as gasoline have a very low percentage of sulfur in comparison to distillate oils and other forms of fossil fuel such as coal. Therefore, SO2 emissions are more commonly associated with industrial boiler and power plant emissions as well as various chemical manufacturing processes that use sulfur as a raw material. Sulfur dioxide is not a primary pollutant associated with automobile emissions. b. Nitrogen Dioxide (NO2) The air quality in the vicinity of the project site is better than the Ambient Air Quality Standards for NO2 and is presently defined as an "attainment" area for NO2. Nitrogen dioxide emissions produced from fuel combustion are related to the nitrogen content in the fuel as well as the combustion temperature. The lighter petroleum distillates such as gasoline have a very low percentage of nitrogen in comparison to distillate oils and other forms of fossil fuel such as coal. Therefore, as with SO2, NO2 emissions are more commonly associated with industrial boiler and power plant emissions as well as various chemical manufacturing processes that use nitrogen as a raw material. Nitrogen dioxide is not a primary pollutant associated with automobile emissions. c. Particulates On July 31, 1987, the EPA adopted new standards for particulate matter. Values for Total Suspended Particulates (TSP) were replaced with new inhaleable particulate matter standards (PM 10) pertaining to small particles, less than 10 microns in size, which are though to be responsible for adverse health effects. Inhalable particulates are monitored at the Babylon monitoring site. The monitoring data from this site indicates no exceedences of the 24 hour or 12 month averaging period NAAQS. d. Lead (Pb) The air quality in the vicinity of the project site is better than the National Ambient Air Quality Standards for Pb and is currently defined as an"attainment" area for Pb. While Disk #390, Cross sound Ferry File: Air\Existing Condition A-67 data on lead is not collected at the Babylon monitoring site, it is collected at the station in Eisenhower Park. Over the last few years the air quality trend shows a major improvement, with annual Pb levels decreasing from .98 ppm in 1977 to .04 ppm in 1988. The maximum 90 day concentrations decreased from .60 ppm in 1983 to .07 ppm in 1988 to .03 ppm in 1992. Although elevated ambient Pb concentrations have been attributed to automobile emissions in the past,with the banning of the manufacture of lead fueled automobiles in the 1970's, automobile emissions are no longer considered a primary source of ambient airborne lead. This can be demonstrated by the large decrease in ambient Pb concentrations once the ban went into effect. e. Ozone (03) The air quality in the entire Metropolitan Air Quality Control Region does not meet the National Ambient Air Quality Standards for 03 and is presently defined as a "non- attainment" area for 03. Ozone concentrations are monitored in Babylon. The 1992 monitoring results indicate that even the second highest 1 hour average (.126 ppm) exceeds the AAQS of.l2ppm. Unlike the other pollutants, ozone is not a combustion byproduct but is a secondary pollutant produced by a photochemical process during periods of strong solar radiation. Hydrocarbons,which are produced by incomplete fuel combustion act as a catalyst in the production of 03 and are thus considered precursors to the formation of 03. Ozone non-attainment is a regional problem,with the majority of the northeast in non- compliance with the national standards. The difficulty in identifying and regulating major sources is that 03 production can take place a large distance from the source and the level of impact from any individual source cannot be quantified through present modeling techniques, but must be reviewed through regional planning strategies. Therefore, the role of transportation sources in the regional 03 attainment status is evaluated by the regulatory agencies through regional planning strategies. All major projects constructed in areas where regional planning strategies are in place must therefore comply with the goals of the regional plan. f. Carbon Monoxide (CO) Suffolk County is presently designated as an attainment area for CO. Disk #390, Cross sound Ferry File: Air\Existing Condition A-68 Carbon Monoxide emissions produced from fuel combustion are related to the efficiency of the combustion process and not the fuel itself,except however,some fuels are more easily combusted. Automobiles play a major role in ambient CO concentrations due to the close proximity of the source to the breathing zone which minimizes the dilution effect of the atmosphere. Carbon Monoxide is the primary pollutant associated with automobile emissions and methods to quantify the level of impact on the local air quality have been developed and are widely in use. Disk #390, Cross Sound Ferry File: Air\Existing Condition A-69 AIR RESOURCES : Anticipated Impact Disk #390, Cross Sound Ferry File: Air:\Cover A-70 Specific details relating to the traffic characteristics of the proposed action are contained in the report titled Traffic Impact Study, Cross Sound Ferry, September 1997, prepared by Dunn Engineering Associates. As stated in the Traffic Impact Study, the growth in traffic levels on Route 25 due to the proposed action are very low when compared to existing levels. The proposed action is to construct a 155 space parking lot to handle peak periods of passenger-only use of the ferry service. As shown in the Traffic Impact Study, the additional 155 parking spaces are anticipated to be used in the summer peak period and will only accommodate additional ferry usage on a limited number of ferry runs per week. There is a direct correlation between CO concentrations due to automobile traffic volumes. As volume increases due to the proposed action are expected to be very small, the impacts on CO concentrations in the study area are expected to be insignificant. The study area is not in exceedence of either the 1-hour or 8-hour NAAQS for CO and is expected to remain as such with insignificant increases in CO levels. Reducing the CO air quality impacts further is the effect of the limited time period over which the traffic arriving and departing from the ferry occurs. The NAAQS for CO includes a 1-hour average maximum concentration of 35 ppm and an 8-hour average maximum concentration of 9 ppm. The 1-hour standard is rarely exceeded due to automobile traffic and the 8-hour standard is of greater concern. The short duration nature of the traffic minimizes its effect on an 8-hour average concentration because the emission source is not present for an extended period of time. In addition, the highest volumes are expected to occur during warm weather periods as that is when the greatest amount of ferry activity occurs. This contrasts with the worst case conditions for the production of CO in automobiles. As a characteristic of the process by which burning fuel creates CO due to automobiles, cold weather and cold engines cause significantly higher rates of CO emissions from motor vehicles. Traditional analysis of CO concentrations influenced by automobile traffic are performed to simulate worst case cold weather conditions for this reason. As stated previously, Suffolk County is designated as a non-attainment area for ozone. Ozone as a secondary pollutant cannot be examined on a project specific basis but is handled on a regional level. Ozone production has a correlation to vehicle miles traveled (VMT)within a regional area. The expansion of the parking lot will reduce vehicle miles traveled by allowing additional ferry trips and reducing the number of longer automobile Disk #390, Cross Sound Ferry File: Air\Anticipated Impact A-71 trips to Connecticut. Reduction in VMT translates into positive impacts on ozone concentration. Based on the foregoing, there is expected to be no significant impact on air quality in the study area due to the proposed action. Traffic increases are expected to be negligible and several factors act to mitigate CO production. In addition, lower VMT due to additional ferry trips will decrease production of ozone. Disk #390, Cross Sound Ferry File. Air\Anticipated Impact A-72 SUMMARY Disk #390, Cross Sound Ferry File: Air:\Cover A-73 The location of the proposed project is within the New Jersey/New York/Connecticut Interstate Air Quality Control Region. Suffolk County is designated as an attainment area for carbon monoxide (CO) but a non-attainment area for ozone. The traffic increases due to the proposed action are minor when compared to background volumes in the study area. Any increases in CO concentrations are expected to be insignificant. Local meteorological conditions such as winds and temperature will act to further mitigate impacts. No contravention of the National Ambient Air Quality Standards (NAAQS) for CO are expected. The expansion of the parking lot and associated increase in ferry trips will have a positive impact on ozone production. Ozone is a regional problem related to vehicles miles traveled (VMT). Additional ferry trips will reduce VMT by eliminating auto trips to Connecticut, resulting in lower ozone production. Based on the foregoing, there is expected to be no significant impact on air quality in the study area due to the proposed action. Disk #390, Cross sound Ferry File: Air\Summary A-74 VISUAL RESOURCE ASSESSMENT FOR CROSS SOUND FEERY ORIENT , NY SEPTEMBER 1997 PREPARED BY ARAIYS DESIGN L.A., P.C. LANDSCAPE ARCHITECTS SOUTHPORT STUDIO 85 RED CREEK ROAD HAMPTON BAYS. NY A-75 VISUAL RESOURCE ASSESSMENT The following Visual Resource Assessment is based upon on a methodology developed in 1976 by Jones and Jones, Landscape Architects, Seattle, Washington, for the Federal Highway Administration. This methodology has been used extensively by the state highway agencies for the assessment and determination of the visual impacts of roadway projects throughout the country. Due to the SEQR's recommended visual assessment procedures, the methodology mentioned above has been slightly modified. A visual impact can be defined as the degree of change in visual resources and viewers responses to those resources caused by a development project. The change in visual resources must be measured both qualitatively and quantitatively in order to properly assess the degree of visual impact. An appendix is attached which defines some of the terminology and techniques used in this report. The following is a brief description of the visual assessment procedure: Existing Visual Environment - Qualitative change is first assessed by determining the existing visual character and quality of the surrounding area. The interrelationships of the visual elements of fine, form, color and texture are examined to determine the visual character in terms of dominance, scale, diversity and continuity. Visual quality of the surrounding area is assessed using three criteria: vividness, intactness and unity. The visual character and visual quality are used to define the existing visual environment of the surrounding area. Proposed Project - The project is described on order to assess the change in visual resource A-76 Views of the Proposed Site - In order to assess the quantitative change in visual resources and viewer response, the views of the site are studied to determine how the change is seen be whom and how many people The types and numbers of viewers are considered in assessing viewer response Mitigation Measures - Actions are proposed and described that will lessen the visual impact of the proposed project. Significance of Visual Impact - In order to determine the significance or importance of the visual impacts of the proposed project, each view of the project is assessed to determine the visual compatibility of the view with the surrounding area in terms of the visual elements and visual character mentioned above The change in visual quality is also assessed. The viewer groups and the context of the view form the viewing locations are studied to determine the change in viewer response. All of these categories are considered to determine the significance of the visual impact. Existing Visual Environment The general visual environment of the surrounding area is characterized by general flat, non- wooded terrain interrupted by water and shoreline vegetation, interspersed with local highway structures, residential, agricultural and commercial use The project site has been disturbed with existing vegetation located on its east and north boundaries This marine/upland landform's color and texture is interrupted by the structures of the existing parking areas, buildings, ferry docks and residential structures adjacent to the site. The most dominant visual intrusions in the landscape is the existing ferry operation with the parking lots, buildings and ferry dock. A-77 Overall visual quality if the surrounding area can be described as low to medium. The vividness of the area is medium to high as result of the combination of the Gardiner's Bay and existing vegetation. However the intactness and unity are diminished by the number of man-made structures. Proposed Project - The project consists of the construction of a gravel parking area with the appropriate lighting adjacent to an existing ferry facility. The site will be relandscaped with indigenous, native plant species with buffers located along the north, east and south side of the project site. Views of the Proposed Site - There are two main views of the proposed site which have been determined to be significant are from the existing road (Route 25) and Gardiner's Bay. Route 25 - The site is one parcel removed from Route 25. The physical roadway ends at the ferry terminal and/an existing parking lot and commercial building separate the proposed site from the roadway. Residential driveways extend easterly from Route 25 which are adjacent to the northerly border of the site. Because of the existence of evergreen and deciduous vegetation and the proposed enhancement of the existing buffer with native, indigenous plant material. The degree of unity and intactness will be increased with the increased buffer planting as well as the proposed planting within the proposed parking field. Gardiner's Bav - The site fronts of Gardiners Bay and is clearly visible from boaters traveling in a generally east west direction. The view will be a distant view with the duration of the view relative to the speed of the viewer Because of the proposed A-78 maritime planting scheme to be included along with the proposed parking field, the project will increase the degree of unity and intactness_ Character of Communitv - As stated above, the surrounding area consists of residential, commercial, governmental and agricultural uses On the northerly boundary, three existing residences are buffered by existing evergreen and deciduous vegetation. This buffer area establishes the visual unity and intactness of the area. The proposed buffer on the northen border of the project will increase that degree of unity and intactness of the surrounding area. Due to the commercial uses to the west of the project site, the introduction of the large planted island near the western border of the proposed site will provide again an increase in the unity and intactness of the travelers views Site Lighting - Because of the existing use of the site adjacent to the project site, there is an existing high level of light on the site for security and safety reasons The proposed project includes the placement of light standards within the proposed parking area for security and safety The light standards will be a maximum of 14 feet tall with single fixtures arranged to provide a sufficient amount of light for pedestrian safety The proposed light fixture will have baffles which will direct the light downward and keep any light from spilling on the neighboring properties (See Appendix "L" for more details) IN'itigation Measures 1. The project includes the use of significant landscape buffer area on the periphery of the site between the adjoining property increasing the unity and intactness of the view from ' the exterior of the site 2 The creation of landscape island within the parking area soften and filter the view of the parked cars from within the ferry facility A-79 3. The use of native, indigenous plant material throughout the site will provide similar texture and color as the surrounding landscape there by increasing the degree of unity and intactness. 4. The use of crushed stone as the paving surface will more closely mimic the texture and color of the shoreline, thereby further increasing the degree of unity and intactness of the views of the project site 5. The parking area as shown is the minimal amount necessary for proper use and safety, allowing for the minimal amount of land disturbance while providing for the greatest amount of landscape buffers and islands possible. 6 The use of pedpstrian style light standards and light fixtures which will provide low level of lighting which shall be adequate for pedestrian safety without encroachment into the surrounding community Significance of Visual Impact The significance of the visual impacts from the site from the two different viewing locations as well as the site lighting: 1 Route 25• The visual impact on the travelers on Route 25 will be reduced with the use of landscape buffers around the project site. The landscaped islands within the parking area will further reduce the visual impact of the use of the parking area. 2 Gardiner's Bay: The visual impact from Gardiner's Bay has the potential for significance because of the recreational nature of the bay. The introduction of maritime/upland vegetation between the shoreline and the water will increase the degree of unity and intactness thereby reducing the visual impact of the project. A-80 3 Site Liv,htin-g The visual impact of the site lighting on the surrounding area has a potential for significance because of the commercial nature of the proposed use However, the use of pedestrian scale light standards (14'height) and light fixtures which direct the light downward will reduce the impact of the lighting so it will not be significant Summary of Visual Impact The visual character of the area will change slightly with the placement of the parking area and the installation of landscape buffers enhancing the existing vegetation around the project site. The visual quality of the area should not changed significantly The addition of the landscape buffers on the perimeter and within the proposed parking area may slightly improve the visual quality of the surrounding area. Finally, the viewer response should not change The proposed project will not have significantly affect the view from the existing roadways or from the surrounding surface waters. In summary, the proposed project should not have a significant visual impact upon the surrounding area. A-81 LANDSCAPE DESIGN NARRATIVE The proposed landscape treatment for the project has been developed to address community needs as well as those of the project sponsors. The existing plant material will be analyzed to determine the appropriateness of the species with any non-native shrub and vine species being removed for the installation of the proposed plants. To reduce the visual impact, native plant material has been selected to provide harmony with the surrounding area. Buffer plantings on the periphery of the project will be added to the existing plant materia(to serve as a visual barrier between the neighbors and the parking area. The use of landscaped islands within the proposed project soften the views of the site The utilization of native plant material will add to the diversity of the wildlife habitat while reducing the need for extensive maintenance and care. As with other projects of this size, the maintenance of the plant material and the landscape may become burdensome. The proposed use of organic compost as a soil amendment and mulch will provide continuous nutrients for the plant material, increasing the survivability of the new plantings. Irrigation will be provided for the first two growing seasons in the form of"drip irrigation" to further insure the transition of the plants from the nursery to the project site. It is the design intent to emulate the existing native habitat as closely as possible while providing a growth-inducing environment for the proposed plant material. A-82 esthetics -n� Li for highways U.cz. Seca;Lmenr of iransccra;icn .ic-wav �aminis�rilcn Naticnaiicnwav Insrlturc- enc Cffic�cr `^vtrenmentai Pciic•: OE"/E_'--Fc- EY --cnes z .acnes. 5e-attte. 'Nasi rnamn IN (--CCF==a CN '.'V! ; v==j enc:.:n date :ecar:.:,ent :r -rznscc--a.icn c;,e- 1 -s=cc:a:es. nc.. Cc:ccer 9% A-83 Visual.�ssc.asment Prnct~as A generalized visual impact assessme.^.t process is illustrated in the accompanying diagram. This assessment process is siirular in broad outllnc to the visual resource management(VRM) syste.--is employed by sever-ai major fedc3l agezc:es. —1 he major components of this proccss incude es- tabilshing the visual environment of the project. assessing the visual resources of the project area. and identifying viewer response to those resources. These components define the existing or baseline conditions. We can then assess the resource change chat would be introduced by the project and the as- sociated viewer response: these allow us to determine the degree of visual impact. THE VISUAL ENVIRONMENT VISUAL RESOURCES VIEWERS i vt�aal viaaal) vises: j viewer i c3sar.cter quautv i ava.as�e 1 .m.idvity Lr---U-M ch.aRe vi<,,recap ne I� vio"Al bmqmctI Thee are vie prnnapai lsmmz mat a uuuai impoa^xs--ment Mould addn=.the mauLm Importance of thea taues uxil changefrom prgea to pro)c+a. A-84 T__� _.1r �'R_ti'_:__ ..'1 'T:sua_ _:==^ac_cn . 17_zua_ ::=cr-:az_cn _: = _ancsc_=e .s =-.e _cent_ ct ?_:csc_ce cc. ocnenz= or 'aat;.=as suc: _s zcurza_:s , va?_alis ==•rets , .oreszs , =cwns or :Z_cnways . c:a=actar c - .—ec cv `.e =a=la==s cc.:.ncs_:c Lt. e__me.^_cs or z_ese =az=ares ata cc-or, and c_xt a or =-e 1_ncscace ' s J:sua_ ==scu:ces . "fie_= _near=__az_onsz=?s can ce ec- ect_-re_ cast=_wed :n t=r-s suc! as : Dcr,:=,arse ce cc:.tcone_^.== or stet_ -e=z_=as a sda_^.e .;.av 'e cue tc =rcm_nenz cvs_z_on_:c, cc:.z==st, a_c- =_n=, or or ,az_ar. ela-mems . Sc__e _s --te apcare_nz s-=e ==_=t_an- sn_cs ce=:,een Lancscace cc:nccne.^_zs or _nc t .e== su=_cu:.c_ �= 'er=-_-• .s = =Unction ar ct ca_tsrn e_am. enm= as we__ as =-e vas=ec-: -rcnc =em, and acre =a_ac_on- ct I I I A-85 _71SUAL PATTERN ELEMENTS Ix Cl 17 cc/ef 45enoo Cr 1'77a17- 12 ��lo, �Ilrar ,ltllll( Cc% �-'�� " I ..hut. � Ir� 611f�►l�rrtll!I'trr A-86 �rwSUAL CHARACTER w� 7j;� charc���zr of rr��� vfsib/� �ar�c�oape r=�R.'�1 GCM I NANC= LINE CCL-CF;-7 CCN71N,JU1Ti Y A-87 PATTERN CHARACTER 7 77a, Gi'I/IC,-5 Gam'�1.!/QGC'I �C.l'Id :?G2 =1771CC 17C---77S alle while Cv¢ra// s,L2 Cr> arz //crc-z/r7 �4=/Z.�/�77 = 77=44/7"crr77 .�/r;� - VC/'/QJZ/ ara`2.�cz f�G7'tcrl7�,C� - Acres' mCrC d/' t=2 i(ah i7 7- ' a- ��: x-e 7770 rcohr4117C1/e—�:r cr 77/4 �^.r7T%i'/L/%7"G, - l✓�/,'r7c17�<.rvr2:'�` r"C:� C7- ILI �raua/ rr/arc��hi a= h A-88 D. V=:UAL, QU;LLZ "_' visual Qua_'_=-r; While manv factors ccnz=:�huze to a lardscaue ' s visual cuai_zy , ev can ccnlre_n-, ent'_•r be c=ouped under =e head_:cs . V=vidress , i:tzc-=.ess and Un_4 Analocaus ccncaazs : scene=,-,r class �I_•r_c::.ess . The me.r.mrabi__ _v a:fcres- s_cn received '_cm ccrz=ast—.c _ana- sc=ne e_e=ent s as z-tev ccm is a �.. a sz==:t_nc and d_sz_act_ve visual ?at=erZ. _:t=c=-ess . The _nzecr_`-r of visual order t_�s na ura and-man-ou:._z :anascace, and t.'ie exzenr- to whit: the lanascac_ a -s --ae ==omt visual enc=o ac :ae_^.z. Uni The decree to wh_c -!,--e v=sua_ =esourczs of t_.e :andsc_ne itiz toce=:er _c -'or:: a ccneranz, ha=cn_cus visual oaz Un-, t-,r re.e=s to t;.e comaos_z_cnal' aa=- :nonv or between ?andscace elements . J I 1 A-89 V1 EWSA EXPo5QRs • vioul�5hea • vie UIMo crCUCS Qrd nurrrCe, • Vlerv2r IOGa�IOn, disrarIC2 at^d rc5�r"iol7 • vie;,v dura;"ion arld re qu e,"7 c y VI EwS R 71VIT1': ACTIVITY 6440 AWARSIME55 • GL�r'rQYJ l` l�/P.I.I�P rQ vI E W �� 5E.'�SiTiV1TY: LOC,:L. V�.LlJ�S • GC,!/�"2.''1;= /oc�/ va/ue s cT�^�',o;arr s • proJ'ec;' irnpac=; onr"-i�z5� vc'/ue s V( F--WE;Z 5 0%44 ( CULTUR-A►L SI�NI>=iC.�NCc • exr�nr�A hi� B'or'ic, sc�e.7;'iiC, ur�iau2 or r2 crZ� ,';or r2 source - e /imina or o�- change, oT I`he rz�ours e and A-90 VISUAL COWATEBE= The c7c7'&Ia, Cr ,cCTe,,"7��rc7/ bi/if Cl ��cc4 w/�"h ifs P sQ�l� C�;y7 ,be obj�r1vQ/ ' et�c�/��c�-f� � y 9 CZW P,4T1a1 L1TY OF PAT 7F-F N �L�.M ANTS (i orm, /ih�, /cr, i 0rr"�r�) �M P,�i 1 �i L1T'1' Off' PATT��"cl�J C,r{,a,RACT�.FZ A-91 COMPATIBMITY: PATTERN ELEMENTS rr _z �! r •/`��Y.,iR/, Jai�� La�sS��%/�j���%:�='-�'-i� seJ '���!1'l6 •� .I��/`t .fiS,i� iyt � �`•f I /i!/ia !1� ` i����..1 � �sls��%► �. ,�`���r.. �1 i, ,:�`( J• :� .l>�"/rye. ,.,� i.�..� ..L'e'i �,.t.`ZNN J�/:tf��+.j�l`�.•%"ter- f��/l:•Z����.//��/'�c.l.` 11�.•1 � 1 SEP-I1-97 IP- 24 FROM. ID= RCHITECTURA.L REA IGHTIMG SL, VG Vandal Guard The SL VG Vandal Guard win fs the newslandard lcx vandal resistant lighting. The YmN size and pure lams of ft Vandal - Guard make R a perp d owWoment to any slhe iiglrting design such as p2ric%srhoois ` and pedowian areas A high periormarme IefW0r system delivers higher lends of illmination,at hetet wallages,than ofd Style V&WW rodures.A segmented,specular and semi-spectiiar optlgl system wmbined with a vertical imp oderg4ort delvers heUm quality lighting while Saving energy. The housing and cap area one piece high Strength casting.The Vandal Guard can be L post t0p or arm rmunted. ate. r ' .17 7 r . i 1 yr �i! ••9 SL VG PT3 PR4-4Rt4 SL VG Pia PF144RIO y -- A-93 SEP-11-97 13: 16 FROM, ID, U3 SL VG PT SL VG AM �'" 14 - Arm x 16.,''wu m 22%z 165 auem O f MEM NALME HPS 78 i00 176 To 109150 WE EPA SL VG M _POST TOP MOUNT-TYPE 3 DISTRBUTION . . 36 143 S_L Y6 m - POS_T TOP MOUNT,TYPE 5 DIS_FMT10N - 99 149 SL_Y6_AM3 1NITH ARA1,TYPE 3_01_SfRIBUTION— .Y .,_�... —— . 42 1.86 S1 VQ At" -�^- VnTH ARM.TYPE j 01014BUTION- � � � 42 1.66 10-17 LIMPS OW -CONSULT INP FACTORY FOR SPECIAL SBZF IV4VS OR MOUN7W ARRANGEACYrS FW MEW OR EWTM POLES. EXAMPLES __ OPTION$ ick Alai ifl01IPS _277 - 08Z WPS NSS House side Weld SL VO PT'S 1WHPS 120 • PRI-4R1D-125 BLK BE2-4 (xm polymumb lox in lieu OT SL VG PTS 776M �120 DB"1 -226 WNI GR _ Eryf°C 2-SL VG A185 175M 277 • PR$ZA14-188 LGY PWJER ARMS LIJL LkWy di mal lens b cmcmI FDCIURE LAMP VOLTAGE AM BASE-POLECOLOR - 0/11085 the ftre Inww — WPS Wall m0urttin6 PIO 1u1 AM(wm) VniOns CAT 'S L V C7 P-TS- 7 A-94 b _ .Typicai Corifiguilajoiis` ���rasaaaat�a■ �aataaa � a��aaaiitpi=aa ■�■ ua �� ■�a���a��a� ■aaar■ ■tea■ n��� ■ate ■�A �aa��a� ��a� lwOMEN oil ■aa rn� � IN ■�luaa : OMEN �1 laaara�ati ■a�aalaa --�aa�i� lan�lallu�a a��a��a■ ■laa�aa� aa� �a�an�a�■ ■aa ■ate ■gaaaa� � I ��a■ a ■tea � it I ��a■=�a �a ��a���■ vau Oaa�a ■0Moll M �=1rao NEI I C M. ;I• ' I �'cnd,n 'd - - SEP-11-97 13. 17 FROM. ID- -19 �� HOUSING MOUNTING ImRossingsholl be cast aluminuft Aluminum shaft be certified as pure Yost top MOWW p:fthousing,hall slip a low inch O.D.pole and to { M shay.tree of any PoM34 foreign materiab or 005metic filters;Casting6 30006110 the pole wtlh three stalnkss diet!sd screws. shall be of uuform wall ihickrres %%O no vaMirtg ar mord shilling.Mtntmtm Arm mO M 110:tiro arm ftl be 61WI T-6 eW ded aluminum.dreumter- wail thin shall be Zn B-.The top rlrq.cage and ballast housing stall be eatW1Y wr:lded ro rite 1bd rre Mnsinq. The ann shalllavean intemaL cm a one piece,high strength castin¢Elecirkal Components an:mounded in the 314runum end 0319 welded insula the ane.Theplate shall be lapped to aooep't Indata>♦illtin a sea►ed t�rrtperiment.The ballast t�rrtparireent stall be 300[001 taro 318-16 bogs tar pale mounting. with a Cast alurnieun Dover and a si[ioone yaslaEt.AN flan wN grab the tam- FINISH resiswit stainless steel. The Jun shall be one 0tae molded awylia,sealed in the housing with sit- Fuaam finish shall consist of cleanIn e0lft and dnsing followed by a icone P*is to prevw dog,insect or motsk ne auntarninatiort. prove chromate priaw.deionaed wmmr fume.Owen dryoR arld tap coated . ELECTRICAL V4 athennowt TGIC super polyesla pwrdurcoal VOL The Arm shall meet the A AMA 605.2 pmtmtanoe spedfiation vrtdrlf 1c10111605 passing a 3000 hour All electrical components shalt be U.L•listed,edh m are high Wnr Tat` sat Spray test for owasiOn resistm tar rated to(-30°starting.Ballast shat[bb moratted to an cast housing for RELAMPINB MWITI m tna.�rfrssipa nn Medium base paroetein sodiets SWI be 41N rated.notated bm up ire the housing.The da*i W assembly shall be Fourcal►Iive,ddnfe a 31001,spat heed 3CFM art loosened to remove ft premmd with qA*dismtrrnwb for fnstaflatimand servicing. top Ion retam*Q. REFLECTOR MODULE CERTIFICATION The optical aMM111y shall CORSW of art outer housing FI.,dues shall be ilstld whh EFL Testing Laboratories tar fuer location use. of spun aluminum that is axnpletdy seated to prevent dug,insetf or WARRANiY moisture contamination.The rellmlor nulule stroll owWst of segmented, sf1 a shall warranty at three years �ular and semispewhr Almk*parteb 0redsdy tainted and poellio o Ballast Com �a limited *Min the housing.The reflector module sha0 be ruiah bfe on nindy degree Ballast 1rWl Cara►the ballast ffmof cturees Ercdted wwa* fncartents for proper Iekt positioning. I Complete 010tomebric data for all Mffectw Configurations is avail- LAW TYPE LUKENS YCORYM11ON FACTOR able in IES forrneWd Iles on S5'disks.Call Your local AAL repre- ro,I, c>ew - MOD .36 ......__..�_-. -- . sentative for a copy.All resting Is Performed by a certified 100w UK,freer sw til To stibshUe wmew I&M in Bre isoractdle charts.multiply the 175w UK tree` :a000 1.00 Chart l8lcre3 by the Conversion fadm.M&Mng height is to the tamp 70wr HPs,chert Wp0 .46 center. 1t14rr HPS,clew 9500 .56 150w HPS,clear lett 1.14 1 • SL VG PT3-175MH SL VG PT5-175MH Horizontal footcanilles Horlmntal footcandles 175w MH ED-1712'mounting hef01 175w MH ED-1712 trtounting height 1w IV Ir 14' t6l IV t 2.00 1.46 1.12 88 2.00 1.46 1.12 .881.00` t 1.00 .73 .55 .44 > 1.00 .73 .56 .44 .50 .37 28 .22 28 .14 11 2 J 20 .14 .11 .05 , .10 117 .05 .04 .10 .07 .05 .04 a 1 z s a ee 1 a 1 2 3 4 s LOrKrl UDSK 06cint"IN MWWD G HB6:M LDnGau)CK OtS'DtfileE mu A10t1iffn 11MRS A-96 SEP-11-97 13. 10 FROM. 1D- PAGE CPh's LITEwP(10 U3.00 Point-By-Point Numeric Output 11:23 11-Sep-97 R 2� PROJECT: ORIENT AREA: PARKINS LOT ORIDS LOT VALUES ARE FC, SCALE: 1 IH= 20.OFT, H0PZ GRID LU>, HORZ CAI-C, Z= 0.0 Computed in accordance uith IE$ recommendations t CIIN=D_$6 MAX=4_89 AUE=201 AUEiI1IN= 2.34 ITAXiMIN- 5.69 UNDL (0 = RAL SINGLE, 14;• HIGH, STD. Y-AXIS r_1_ 1.0 '--'= 0_5 122.50 + + + + + 6 1.08 0- 1-10 .13 1.4t 1.3 X1.41 1.1 1-10 .93 1.08 8 t 1 112-50 + + + + + ' + I + + + + + 8 1.40 1.66 2.14 1.73 1.7 1 1.78 1.73 2.14 1.66 1.40 1. 1 102_50 + + + + + + + 1, + + + + + + 1-66 2.75 4.03 2.70 1A 1. 't.70 2.70 4.03 2.75 1.66 9 1 ' G+UNDL 92.50 + + + + +t + + + UN% + 1 2.14 4.03 4.89 3.77 2-2� 1.13 �_23 3.77 4.89 4.03 2.14 .1 82.50 + + + + + + + + + + + 3 1.73 2-70 3.77 2.40 1.9]r - 'd-31 2.40 3.77 2.70 1.73 1. 72.50 + + + + + {{` + )` + + + + + L'I: a 62.50 + + + + + + + + + + + + 52.50 + t I/ + J } + t ++ + �+ �+ +,. 41 1.78 1.70 2.23 1.91 2.2 E29 1.91 2.23 1.70 1.78 I_ s 42.50 _1 1.73 2.70 3.77 2.10 1-91r' 1.86 1.91 2.40 3.77 2.70 1.73 .1 r � 32-50 IINDL r 4UNDLF + 1 2.14 4.03 'p.89 3.77 2.2� B 23 3.77 4. 9 4.03 2.14 1 1 t 22.50 + + + + + + i + ; + + + + + + 3 1.66 2.75 4.03 2.70 1.7[1 .5 11.70 2.70 4.03 2.75 1.66 0 9 12.50 + + + + + 1 + ; + + + + + 8 1.40 1-66 2.14 1.73 1.?4 N. .9 `1.78 1.73 21+ 1.66 1.40 1 0 2. -0 + + + + 2-50 22.50 42.50 62.50 82.50 102.50 122.50 12.50 32.50 52.50 72.50 92.50 112.50 X-AXIS f-r4 S{ Act wad A-97 SEP-11-97 13. 18 F om. 1D. PAGE CPM Lighting LITEPRO U3_00 CONTOUR PLOT P.1 1 TEST #SLUG, CATALOG #SLUGPT5-175"H [[[ NUM LUHSr ORIENTATION; 1 r ?&A MOUNTING HEIGHT; 14.0, BRACKET ARH LENGTH: 0.0 LLF: 1.00, LIMENS: 15000, ILL. UNITS; FC % SCALE: 1 IN= 20.OFT 6O. to_ao 20.00 A -6(.60 -4 0 -2 00 0.)o 20 00 4 00 60 00 -20.00 -60_00 Lege A=1.00 6=0.50 A-98 O v l SITE ANALYSIS CROSS SOUND FERRY MOM .1 SOUTH" "Mvm a OWALWU n "W n moor A�M6_ , �,w, ,ft .w wa r-rnv I Ji E; PARKING -7- SUGGESTED SUGGESTED PLANT LIST I American Holly Hex opaca Bayberry Myrica pennsylvanica Bearberry Arctostaphylos uva-ursi Indian Grass Sorghastrum nutans Little Blue Stem Schizachyrium scoparium % Lowbush Blueberry Vaccinium paiiidum Northern Arrowwood Viburnum recognitum \ �• Red Ceder Juniperus virginiano Shadbush Amelanchiercanadensis ( �= Switch Grass Panicum virgatum 1 I — Winged Sumac Rhus copallinum 1 IqAJIIVI-- "14 PKalN�. AN V RG ;.I t`J I TO 1. 0 PLANT KEY: EVERGREEN PLANTS DECIDUOUS PLANTS GRASSES AND GROUNDCOVERS i-;•,,11 rs(J.J.L. e I6 91 CONCEPTUAL_PLANTING PLAN CROSS SOUND FERRY ' � i� uuurt wAmaw "ev r�a 0 0lvEL-�O Aftl M�!„Ol.n DATE $-I— _ !uU�..�.�. G y.,... �......,, .. ! ,P-I - !� naxnrAansim \ GATE lUBMITT /REVISION 1 STATEMENT OF QUALIFICATIONS Araiys Design L.A., P.C. Landscape Architects Southport Studio 85 Red Creek Road Hampton Bays, NY 11946 (516) 728 - 3513 FAX 728 - 1378 A-101 1 / Introduction Araiys Design, L.A., P.C. is a professional corporation providing landscape architectural services to a variety of clients in the metropolitan area with over twenty years experience. They have been retained by public, non- profit and private entities to design or renovate sites within the municipal, recreational, corporate, health care, housing, industrial, educational, retail and residential province. Working with other design professionals, the firm utilizes a multidisciplinary approach to achieve cost effective, comprehensive design solutions for their clients. As landscape architects, they understand that our resources include the landscape and the people that live on it. Araiys Design is dedicated to social and environmental responsibility on a local as well as global level. Professional Sdrvices: • Project Feasibility Studies • Site Analysis and Land Use Planning • Environmental Analysis/Environmental Impact Study • Landscape Design, Site Design and Engineering • Waterfront Design and Planning • Recreation Facility Design and Planning • Wetland Design and Reclamation • Construction Document Preparation and Supervision Professional Affiliations • American Society of Landscape Architects • American Planning Association • International Society of Arboriculture A-102 Staff Biographies The staff of Araiys Design, L.A., P.C. is a highly skilled and diverse group of individuals including designers and computer aided design specialists who employ the latest technologies for design and construction drawing production. Because of the staff s use of these tcchnologies, they provide the firm with the ability to integrate with other design professionals to produce high quality drawings and documents efficiently. TIMOTHY A. RUMPH, ASLA President/Landscape Architect Qualifications Tim has over twenty years in both public and private practice. As President of Araiys Design, L.A., P.C. since 1993, he has effectively managed his staff to provide clients with effective solutions. Tim has expertise in planning and development from residential to large scale municipal works. He has a comprehensive understanding of environmental, zoning and regulatory issues. With the experience as a consultant to municipalities Tim has provides expertise in the effective management of projects through State, County and local government approval processes. Years of Experience 21 Years Education Rutgers University Cook College Bachelor of Science in Landscape Architecture Goddard College Master of Arts - Social Ecology Registration/Landscape Architecture State of New York - 1982 State of New Jersey- 1985 A-103 Dana J. Hepler Chief Designer/Landscape Architect Qualifications Dana is a registered landscape architect with over 15 years experience in land planning and project management. He is currently Chief Designer/Project Manager for our firm. Dana has worked on several large scale mixed u"se projects which have won him professional design citations. Dana's knowledge and design skills provide Araiys Design with great experience from design concept to final construction. Years of Experience 18 Years Education Kent State University Architectural Technology Ohio State University Bachelor of Landscape Architecture Prior Affiliations Environetics, Long Island, New York Design Properties,`LTD., Long Island, New York Registration /Landscape Architecture State of New York - 1982 State of New Jersey - 1985 State of Massachusetts - 1983 State of Pennsylvania - 1983 A-104 Dana J. Hepler Chief Designer/Landscape Architect Qualifications Dana is a registered landscape architect with over 15 years experience in land planning and project management. He is currently Chief Designer/Project Manager for our firm. Dana has worked on several large scale mixed use projects which have won him professional design citations Dana's knowledge and design skills provide Araiys Design with great experience from design concept to final construction. Years of Experience 18 Years Education Kent State University Architectural Technology Ohio State University Bachelor of Landscape Architecture Prior Affiliations Environetics, Long IslAnd, New York Design Properties,'LTD , Long Island, New York Registration /Landscape Architecture State of New York - 1982 State of New Jersey - 1985 State of Massachusetts - 1983 State of Pennsylvania - 1983 A-104 John J. Lucey Senior Landscape Architect Qualifications John is currently our Director of Computer Operations, supervising the development of construction documents and working drawings. John maintains quality control of our designs through the construction process insuring the caliber of the built work. Years of Experience 13 Education Cornell University- Ithaca, New York Bachelor of Science in Landscape Architecture Jennifer A. Miller Junior Landscape Architect Qualifications Jenn has over five years of experience in the field, specializing in residential planning, design and project management strategies. With extensive experience in landscape installation, Jenn also has expertise in on-site supervision, plant care and maintenance. Years of Experience 5 Years Education Suffolk Community College -Riverhead Associate of Science in Landscape Design University of Rhode Island - Wakefield Bachelor of Landscape Architecture A-105 Partial Project List Commercial B.J.'s Wholesale Club - Islandia, New York Calverton Links Golf Course - Riverhead, New York Fox Hill Golf& Country Club - Baiting Hallow, New York Riverhead Centre - Riverhead, New York Riverhead Landing - Riverhead, New York Ridgeway Country Club - White Plains, New York Rough Riders Landing - Montauk, New York Southampton Mini-Storage - Southampton, New York Strathmore Commons -Middle Island, New York Strathmore on the Green - Middle Island, New York Suffolk County Water Authority - Islip, New York Suffolk County OTB - Bohemia, New York Villas at Hart's Cove - East Moriches, New York Institutional Quogue School - Quogue, New York Remsenberg-Speonk School - Remsenberg, New York Southampton Public Schools - Southampton, New York Tuckahoe School - Southampton, New York The Rinx @ Hofstra - Hofstra University, New York Municipal Bergen Point Golf Course - Suffolk County Parks - Babylon, New York Flying Point Park - Village of Southampton, New York Foster Avenue Park - Town of Southampton - Hampton Bays, New York Hampton West Park - Town of Southampton - West Hampton, New York Jamesport Community Center - Town of Riverhead, New York Laurel Lake Park - Town of Southold, New York Pape Park - Town of Babylon, New York Phelps Park - Town of Babylon, New York Riverhead Ice Rink - Town of Riverhead, New York Setauket Greenbelt - Town of Brookhaven, New York Tanner Park - Town of Babylon, New York Tasker Park - Town of Southold, New York The Rinx - Town of Islip - Hauppauge, New York Town of Southampton, Town Hall - Southampton, NY Red Creek Park, Town of Southampton, New York A-106 STAGE I ARCHIVAL SEARCH AND ARCHAEOLOGICAL SURVEY OF THE CROSS SOUND FERRY PROPERTY ORIENT POINT TOWN OF SOUTHOLD, SUFFOLK COUNTY, NEW YORK PROJECT ARCHAEOLOGIST AND CONTRIBUTOR: David J. Bernstein, Ph.D. Daria E. Merwin The Institute for Long Island Archaeology Department of Anthropology State University of New York at Stony Brook Stony Brook, New York 11794-4364 August 1997 A-107 TABLE OF CONTENTS II.2.13. HISTORIC/PREHISTORIC RESOURCES: EXISTING CONDITION . . . . . . . 1 1. Inventory/description of historic areas and/or structures located on or in the proximity of the project site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. Stage I archaeological survey . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 (B) HISTORIC/PREHISTORIC RESOURCES: ANTICIPATED IMPACT . . . . . . . 13 1. Impact on historic structures/areas identified on the State Register . . . . . . . 13 2. Impact on historic structures/areas identified on the National Register . . . . . 13 3. Impact on historic structures/areas identified by the Town and/or County . . . 13 4. Impact on historic structures/areas identified by the Society for the Preservation of Long Island Antiquities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 III.B. HISTORIC ARCHAEOLOGICAL RESOURCES . . . . . . . . . . . . . . . . . . . 14 1. Preservation of portion of site for archaeological research . . . . . . . . . . . . 14 VI. REFERENCES AND CONTACTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 A-108 II. EXISTING, NO-BUILD AND BUILD ENVIRONMENTAL CONDITIONS. 2. DESCRIPTION OF EXISTING CONDITIONS AND ANTICIPATED IMPACTS. CULTURAL RESOURCES. B. HISTORIC/PREHISTORIC RESOURCES: EXISTING CONDITION. 1. Inventory/description of historic areas and/or structures located on or in the proximity of the project site. The cultural resource assessment of the Cross Sound Ferry project consists of an archival search and archaeological survey. The archival search includes examination of state and local archaeological site and architectural files, historic maps, and a literature review. Results of the archival search are described below, while those from the archaeological survey are presented in the next section. No prehistoric archaeological sites within one mile of the project area were documented in the files of the Suffolk County Archaeological Association, the Institute for Long Island Archaeology, the New York State Museum or the State Historic Preservation Office in Albany. One unstudied historic period archaeological site is located within an one mile radius, the site of Orient Point Inn and Revolutionary Fort (#A10310.0007). This archaeological site includes remains associated with Orient Point Inn, and is located directly across Main Road (NY 25) from the entrance to the ferry terminal. The oldest part of the inn was built possibly as early as 1672, though it was extensively remodeled in subsequent centuries. The structure was demolished in 1985 after years of vandalism and neglect. No formal archaeological investigation has been conducted on the site. The site files of the State Historic Preservation Office, the Town of Southold Register of Designated Landmarks, and the Society for the Preservation of Long Island Antiquities document three inventoried properties within the immediate vicinity of the project area, including the Orient Point Ferry complex (#A10310.001040), the late eighteenth century mile marker on the grounds of the Ferry complex ("30 M Suff C.H.," #A10310.001039), and "Point Farm" (#A10310.001041) across from the area of proposed impact on the north side of the dirt extension of Main Road. Additionally, State files indicate that one structure is eligible for listing on the National Register of Historic Places, the Orient Point Lighthouse, situated off the mainland, more than one mile east of the project area. A search through the National Park Service computerized National Register database produced two listed properties in Orient: the Orient Historic District (west of the project area along NY 25) and the Terry-Mulford House. Both of these properties are located more than one mile to the west of the Cross Sound Ferry. A-109 2. Staize I archaeological survey. The results of a Stage I cultural resource assessment of the Cross Sound Ferry property in Orient Point, Town of Southold, Suffolk County, New York are presented below. The cultural resource assessment includes an archival search (Stage IA) and archaeological survey (Stage IB). ARCHIVAL RESEARCH. An evaluation of the natural and cultural history of an area is essential to understanding past land use, as well as determining the likelihood of encountering prehistoric or historic archaeological sites. Human groups locate their settlements in order to best take advantage of the characteristics of the natural and social landscape. Thus, knowledge of a region's history and environmental features is crucial in reconstructing past behavior and assessing the probability of locating evidence of early activities. A search of the available published records and site files was undertaken to determine if any previous studies had documented archaeological remains in, or in the vicinity of, the project area. Pertinent historical records such as maps, photographs, and descriptive histories were examined to obtain information on past activities in the study parcel. This investigation provided data on previous land owners, structures, and the types of land use practices that were employed. Natural and Cultural History. Environmental Setting. Orient Point is the easternmost tip of the north fork of Long Island (Figures 1 and 2). The peninsula was formed by the Harbor Hill recessional moraine. Soils in the project area are classified as Haven loam, 0-2% slopes (Warner et al. 1975). These are deep, well-drained, medium-textured soils, and topography is generally flat to slightly undulating. Elevation above sea level in the project area is ten feet (three meters). There are no surface fresh water sources within or immediately adjacent to the Cross Sound Ferry property. The area of proposed impact is separated from Gardiners Bay to the south by a large dredge spoil pile and sandy beach. Currently, the project area is an open lot with low volunteer vegetation, with small to medium-sized trees along the northwest and northeast lot boundaries (as seen in the 1996 aerial photograph). Soil disturbance (dredge spoil heaps, tall berms, grading, etc.) is evident over approximately 30% of the project area. In the past, this environment could have supported a wild fruit, berry, and nut harvest. Faunal resources in the vicinity potentially included fin- and shellfish, waterfowl, and a variety of terrestrial birds and mammals. A-110 project area o o Figure 1. Map of Long Island showing the location of the Cross Sound Ferry project area. A-111 et rient Pt- ,_ .. .r•�''''���.•-''' ���1`_��, ., `.-"'r-.....�•"' "-..-�';+.�8', IaE1thOLLS6 " �r , oin O 4fyfY,: -C '�N.. A-,Cw:• ,0•. /F..f�, Y" - .+,, _ ,r'•y> w.,. f�� ",� ..,•• a\ �._. u 20 � � :' :. '; ,z ^"•,> ,_ >SRR >�. y �l�` '.� —+� Orient Project area Point - SO �z �' c `n-l:�• N.•' Y •ti1A •a , S ' Pilins Latharri Cern .J i. ; �P•�xit•� •�� i i t `) ��'• s' ,,.�i sa''� �` .'iy�ty .Win•' r %�6aM''f i:r x y1zrA , 9tA F�2•' ''sem Tell- iz- z' Cem b 7: r.URIL+�1T BEACH . � `. "-r- a`a •)j..::�y,'�y. "<'v^•t�.<: ��%: y "="`��: ijcYs,'rt q„. $TATE PARK. Wit- ..�« ..>.w•. ,, ,- acs., ,x. , •* `r".- •'-"� '^ a? �.a syr`/hoz ,y i;�nti:". r -- "�/��' ^l+`d•.rs'rr"�;.n+" :�.i.'��•s'`.�:w' ,`,�,��`'YS�'`' r• �'�';Z» aati i ev,,,'' ,J ,;:,ls .z�;. _ S"'" �. -r.,.ix%sr a��-= .;•>._: �Z{s •. Y::,r '�' _Fa- � a:r .�x°a�,:>Y :s'�%`�••:�Y:`'�:,fi'„"a�^.C,r.:.,,y`;,;>r_;,;,y�",�,.�`n..�i;5. `c1ry''8IN 't*' .�:L5s.: ;y4 4', :sy;.::.:.'�" "ms;µ' �is>: :�,< •' .f�: s .a,:,„ - �_(,t, �;-d'$m rI�':':3:,,�..'.-`�r-+"' I� _ ,,°,,,"�a.'�' -'r<'sS':.�a;,:;,:^ .....";Y;/:�'�'^=•1`.:_., Y .l 9 i .�y''f.� ::moi'» - 'k y,.$•.•?i:w•' o� .9.�•- -.�p'C�dT .,5:�"''.t_.»ar"C,e n- "� - �;x,,�3't�..•, ''�•.r`'.`s •moi.-.J'> jF 4.i jV:,f,t � �:•�^ / *�`=br-E,.',t�`• � .s."S3'»�nZi'=.i 3`""`�` - ''_`�,.5:"�."i,> ',�(�" v".+�',i i r, tiY';.iCw v` „•�7'�+% 1• ;y„'v"y i '�.1. •sir `�A `f._«;::'a:' - " ''F? .�•• .Z,i.'• `''�4 ` �;,n.,,C,• „Alia:''".gyp ..`",r"" .�,'e.'S.'..,( 'y '.rr i'^ yg°'•�' 'V Lys :i. ��?.� '•�1-.,•;:�' ,., `�!�'`'.,:<•. �.3,.;..';• ->�.:�i '".;�:.'.,�y.'.r,9:.� .a'r.; ''` fv '•sit- .3. '^1 ;r..," '• jy ,• ,' ' .;af -•'".? 'yet � °^::^-;'-�i••'t. ^„D� w�.'�"1�',.^.';�s�'•> y.�> - ..b'.-.mo i r'.'°r» .K r b _ .:?0..� ';-"„ceik�r�';,��•, "' '�.,y>�.fx�iy.;�'.t^..a" q�:'{:.:', Ak iA •] ` ._ .•,,-z.,`F`' 'ham f'.,c'�.`c vy.,- f�'�,i, �.�.,..'.4.• t'�^` • >b ,2cti" .;:,-ice a,s '2'+• Pv''° :��''r;;Y^.',:, �. ,*j ���„”�, 'jJ •�.: ,:yy< ^.�i .. .ir• _, . .�:s' ;': y,' ,. ��.'!`.3vK'�, ..�it .,zr t Figure 2. 1954 and 1956 USGS topographic maps (Plum Island, New York-Connecticut and Orient, New York, 7.5' series) showing the location of the Cross Sound Ferry. A-112 Prehistoric Period. The floral and faunal resources mentioned above were most likely exploited by prehistoric Native American groups living in the area prior to European colonization. However, a search of state and local prehistoric site files reveals a paucity of data for this section of eastern Long Island. There are no recorded prehistoric sites within a one mile radius of the Cross Sound Ferry property; the closest known site is the Eagles Neck Point site, 1.6 miles (2.6 kilometers) to the southwest (Johannemann and Schroeder n.d.). Nearly all of the prehistoric sites recorded for the hamlets of Orient and Orient Point are located along the small embayments on the south shore of the North Fork, such as Hallocks Bay and Long Beach Bay, and along Orient Harbor, all to the west of the Cross Sound Ferry. At least fourteen prehistoric sites have been explored in Orient; almost all were found on the shores of small embayments. Among these sites are those described by local amateur archaeologist Roy Latham as belonging to the "Orient Focus" of the Terminal Archaic period (Latham 1962, 1964). Embayments and their feeder streams would have provided fresh water along with a variety of animal, vegetal, and mineral resources for food, shelter, and raw materials for tools. In comparison, the project area would have offered significantly fewer resources. Therefore, sensitivity for the presence for prehistoric remains within the project area is moderate to low. Expected site types for the vicinity of the Cross Sound Ferry property include manifestations of short-term or sporadic use, such as occasional hunting. Historic Period. Orient Point is a hamlet within the Town of Southold, a community founded by a small group of Puritans from the New Haven colony around 1640. Southold claims to be the oldest English settlement in New York State, though this has been challenged by the Town of Southampton (Turano 1994:89). The lands known to the Native Americans as Yennecock (present-day Southold, Thompson 1839) were acquired by the English colonists in a series of deeds dating prior to 1640. While 1640 does appear to be the date of initial settlement by an organized colonizing party, some historians cite evidence for earlier utilization of Southold lands, possibly as early as 1637 (Hall 1975, Goodrich 1984, Turano 1994). Orient, known as Oysterponds until 1836, was settled in 1661 when the area was divided into forty 50 acre lots (Cottral 1959:7). Orient Point, including the project area, was used for common pasturage. Access was via the King's Highway (modern Main Road, New York State Route 25) and by boat. During the eighteenth century, Orient Harbor was busy with commercial water traffic, though the American Revolution virtually eliminated this industry. At the start of the Revolution, the local patriots constructed a small fort on Point Farm, on the Sound side of Orient Point (Cottral 1959:9). This fort was not effective in warding off British attacks, and British troops were frequently quartered at the Orient Point Inn (formerly located northwest of the project area). Benedict Arnold used the Inn as a staging ground for attacks on Connecticut (Cottral 1959:9-10). A-113 Orient Point was desolate following the war, as several families had fled to Connecticut, and abandoned farms had been laid to waste. There was little chance to rebuild Orient's maritime trade before the War of 1812 threatened waterborne commerce. Once more, local residents fortified Orient Point, though British warships did minimal damage along the shore (Hazelton 1925:700). Orient Harbor never regained its once-thriving maritime industry. However, during the nineteenth century, packet ships (first under sail, and later steam) began regular service from Orient Point to New London and other southern New England ports. By 1874, regular steamship service operated from the dock of what is now the Cross Sound Ferry (Bayles 1874:380). The project area was used for common pasture land in the seventeenth and eighteenth centuries (Cottral 1959). By 1672, a structure was built (later incorporated into the Orient Point Inn) northwest of the project area. This property was purchased by Jeremiah Vail in 1687, and it remained in the Vail family as Point Farm for the next century (Munsell 1882:31). When the Latham family acquired Point Farm in 1798, it consisted of approximately 1,000 acres, and possibly included the project area. However, a survey of historic maps (e.g., Burr 1829, Beers 1873, Hyde 1896) indicates that no structures were present within the area of proposed impact. The house now standing opposite the project area is the Latham House, moved to point farm around 1865. Expected historic archaeological site types within the project area include refuse deposits associated with Point Farm. ARCHAEOLOGICAL RESEARCH. A two phase survey design was employed to search for archaeological remains on the Cross Sound Ferry property. Similar survey designs, used in other areas of Long Island, have proven successful in detecting prehistoric and historic sites. The initial phase of the survey involved a surface reconnaissance and inspection intended to locate large and easily visible remains. The second phase entailed subsurface testing. Field Inspection and Surface Survey. An initial surface reconnaissance was conducted on May 19, 1997. The entire parcel was walked over, with special attention given to examining exposed soil for artifacts or other surface manifestations of past cultural activity. Vegetation patterns and topographic features which might provide insight into previous land use were observed. Areas of extensive soil disturbance were also noted. Despite fair to good surface visibility, no prehistoric or historic artifacts or cultural features were identified in the project area. Photographs showing current field conditions are presented below. A-114 r,� fir'ry���..''•'r �`, +.�` ^`I — - - - -- r W. ?— , •�►�.ri..:t:Ys' � _r :•..'•fit � �• _ / ' -r y • y ?, +S. :i,.�r3-. ',p - rJE+'-ee _ ',".'+y,y,. � t� ��� • :!.` AM- • \ 'jS`,�.L r. �` s- �*„7. -� i�:�� ..s ! '� 'vy„�Ia._., � t(' ( .�/ r y .. 4•' Yip _ �-��..-, t•�- ,7"h �y", -k,_ � } A. nt$` rF `�!'`� '', �I,Z:`>- �r. .�f1-��..T�f.:�. � fi i p••wf;�T •is r �r t .I,� ': int.. ji' s v -•r .1. .. • !• ,rte y r 54 •��.F-FY �� • �T'�• - - . M.�L'l��lir ti k t 4K ++',. / a-�`-te :�[tti _ �r ,, h• r. A .�4 � 's• ;(�s� iX` ra i iri � j � '1.-••Y�j,4(" r ' '.1F 4. �'„a� s f�+.,F� � a� ., n� T. ,a s.,�...j. �r���Y /J i r�4 Y tj,w/'C F Y.✓�,�.. r vyy .'f� -C- i,�� �� h �r `.t \ W.�' ! � w � �K�Y � � �r ,�S.Wa .r. .1�f�'ti�'7l�'1ri,+i a�it� �.1� •{��'1�� ♦�..i ",yy`i'Y� R ���a l�'t�t"'�•` .�"`t._.,'�•. !" 'sS � !`y� C LV ot s • •• • • • ••• -• I. • Subsurface Testing. The second phase of the field survey consisted of the excavation of shovel test pits (STPs) designed to detect the presence of cultural remains beneath the ground surface. The area of proposed impact measures approximately 1.4 acres (0.57 hectare) (Figure 3). However, approximately 30% of this area was not subject to subsurface testing because of extensive soil disturbance (including dredge spoil mounds, a cut dirt road, and tall soil berms). The remaining 70% (0.98 acre [0.40 hectare]) of the property was tested. A total of 15 STPs was excavated on the Cross Sound Ferry property (Figure 3). In general, STPs are located 20 meters (66 feet) apart along six rows which are also 20 meters apart. However, the four pits along the northwestern boundary of the project area (STPs 1 through 4) were excavated 10 meters (33 feet) apart because of the higher likelihood at this location for finding artifacts associated with the Orient Point Inn which formerly stood nearby, across Main Road. Shovel test pits have a diameter of approximately 30 centimeters (12 inches). All STPs were dug well into the B2 subsoil, typically over 50 centimeters (20 inches) below the present ground surface. The soil from each test unit was screened through six millimeter (0.25 inch) wire mesh to aid in the identification and recovery of cultural materials. All field records, including test pit specifics and photograph negatives, are curated at the State University of New York at Stony Brook. Results. The data recorded in the field for each shovel test pit are presented in Table 1, below. All opening and closing depths on Table 1 are given in centimeters below ground surface. Disturbed and plow zone soil horizons were encountered in all STPs excavated on the Cross Sound Ferry property. No cultural material other than recent trash (bottle glass, styrofoam cups) was recovered during subsurface testing. A-118 12 reJ disturbed1 _ 9 —is_ 2turbed \ I 1 I - k 14 — — — — — lie -- - - [:7 ' A , F-1 I j aA. nt..n�0 1 15 � I � � • r Iv'e our >Mi nnrr( 7 pil- disturbed ---------------- tl t 5 ® mapping datum Archaeological Investigation of the 1 t illl 'a p= ra' • s`m sterile shovel test pit Ctoss Sound Ferry, Proposed Parking Facility photograph angle Orient Point, Town of Southold ill r;!I Suffolk County, New York t .11 Institute for Long Island Archaeology, 1997 • :� i SCI[E l•�70 6m 0 6 12 18m Figure 3. Map showing location of shovel test pits and photograph angles for the Cross Sound Ferry property. A-119 Table 1. Shovel Test Pit Inventory. STP # level open close soil horizon soil description 1 1 0 10 disturbed medium brown sandy silt 2 10 60 BZ orange brown silt 2 1 0 14 disturbed medium brown sandy silt w/pebbles &gravel 2 14 52 B, yellow brown silt w/pebbles & gravel 3 1 0 6 AO/A, dark brown silty loam 2 6 30 plow zone medium brown sandy silt 3 30 60 BZ orange brown silty sand 4 1 0 6 AO/A, dark brown silty loam 2 6 25 disturbed medium brown sandy silt 3 25 29 buried A dark brown silty loam 4 29 60 BZ orange brown silty sand 5 1 0 30 plow zone medium brown sandy silt 2 30 68 BZ orange brown silt 6 1 0 28 plow zone medium brown silt 2 28 54 B, orange brown silt 7 1 0 6 AO/A, dark brown silty loam 2 6 20 plow zone medium brown sandy silt 3 20 60 Bz orange brown silty sand 8 1 0 10 disturbed medium brown sandy silt w/pebbles & gravel 2 10 40 BZ orange brown silt 9 1 0 4 AO/A, dark brown loamy silt 2 4 20 disturbed medium brown silt 3 20 28 plow zone light brown silt 4 28 61 BZ orange brown silt w/pebbles & gravel 10 1 0 8 disturbed dark brown silty loam 2 8 57 BZ orange brown silty sand 3 57 60 BZ gray clay 11 1 0 20 plow zone medium brown sandy silt 2 20 60 BZ orange brown sandy silt 12 1 0 29 plow zone medium brown silt 2 29 60 BZ light yellow brown clay silt 13 1 0 58 disturbed dark orange brown silty sand 14 1 0 17 disturbed medium brown silt w/pebbles & gravel 2 17 41 BZ yellow brown silt w/pebbles & gravel 15 1 0 40 disturbed dark brown silty sand w/pebbles & gravel A-120 SUMMARY OF STAGE I ARCHAEOLOGICAL SURVEY. No prehistoric or historic artifacts or features were identified during the archaeological investigation of the Cross Sound Ferry property at Orient Point. Therefore, no further archaeological testing is recommended. (B) HISTORIC/PREHISTORIC RESOURCES: ANTICIPATED IMPACT. 1. Impact on historic structures/areas identified on the State Register. Surface inspection and subsurface testing in the area of proposed impact indicate that there are no artifacts or features within the project area associated with the Orient Point Inn archaeological site (#A10310.0007), the Orient Ferry complex (#A10310.001039 [mile marker] and #A10310.001040), or with Point Farm (#A10310.001041). Additionally, in terms of historical/architectural resources, the planned project will have minimal visual impact. The area of proposed impact is currently an open lot bounded along the northwest and northeast sides by dense vegetation, along the southeast side by a dredge spoil pile, and along the southwest by a dirt road abutting the present parking area. There will be no impact to structures associated with the Orient Ferry complex, including the late eighteenth century mile marker and ferry terminal buildings. Because nearly all of the existing vegetation in the northern section of the project area will be maintained, there will be little visual impact to the houses on the north side of the dirt extension of Main Road, including Point Farm. 2. Impact on historic structures/areas identified on the National Register. No impact. 3. Impact on historic structures/areas identified by the Town and/or County. No impact. 4. Impact on historic structures/areas identified by the Society for the Preservation of Long Island Antiquities. See #1, above. A-121 III. MITIGATION MEASURES TO MINIMIZE ENVIRONMENTAL IMPACT. CULTURAL RESOURCES. B. HISTORIC ARCHAEOLOGICAL RESOURCES. 1. Preservation of portion of site for archaeological research. No prehistoric or historic cultural remains were identified on the Cross Sound Ferry property during the archaeological survey, and no further testing is recommended. Therefore, there will be no impact to archaeological resources as a result of the proposed project. A-122 VI. REFERENCES AND CONTACTS. Bayles, Richard M. 1874 Historical and Descriptive Sketches of Suffolk County. Published by the author, Port Jefferson, New York. Beers, F. W. 1873 Atlas of Long Island, New York. Beers, Comstock, and Cline, New York. Burr, David 1829 An Atlas of the State of New York. Manuscript on file in the Department of Special Collections, Frank Melville Library, State University of New York at Stony Brook. Cottral, George E. 1959 History of Orient. In Historical Review: a Word and Picture Journey into Orient's Past. Oysterponds Historical Society, Salisbury Printers, Uniondale, New York. Goodrich, Magdaline 1984 A Brief History of the Town of Southold. Suffolk County Tercentary Commission, West Sayville, New York. Hall, Warren 1975 Pagans, Puritans, and Patriots of Yesterday's Southold. Cutchogue-New Suffolk Historical Council, Cutchogue, New York. Hazelton, Henry I. 1925 The Boroughs of Brooklyn and Queens and the Counties of Nassau and Suffolk, Long Island, New York. Lewis Historical Publishing, New York. Hyde, E. Belcher 1896 Atlas of Long Island, New York. Hyde and Company, Brooklyn, New York. Johannemann, Edward and Laurie Schroeder n.d. Archival Evaluation of the Orient Point Subdivision, Orient Point, Southold. Long Island Archaeology Project, State University of New York at Stony Brook. Manuscript on file in Department of Anthropology, Stony Brook. Latham, Roy 1962 A Double Child Burial in Orient, Long Island. The New York State Archaeological Association Bulletin 26:8-9. A-123 1964 More Notes on the Stone Utensils in the Orient Burials. The New York State Archaeological Association Bulletin 30. Munsell, William W. 1882 History of Suffolk County, New York. Published by the author, New York. Thompson, Benjamin F. 1839 A History of Long Island, Containing an Account of the Discovery and Settlement. E. French, New York. Turano, Francis J. 1994 Two Hundred Years of Family Farm Households, 1700-1900: the Archaeology of the Terry-Mulford Site, Orient (Oysterponds), New York. Doctoral dissertation, Department of Anthropology, State University of New York at Stony Brook. United States Geological Survey 1954 Plum Island, New York-Connecticut. 7.5' series. Department of the Interior, Washington, D. C. 1956 Orient, New York-Connecticut. 7.5' series. Department of the Interior, Washington, D. C. Warner, John W., jr., W. E. Hanna, R. J. Landry, J. P. Wulforst, J. A. Neeley, R. L. Holmes, and C. E. Rice 1975 Soil Survey of Suffolk County, New York. United States Department of Agriculture, Soil Conservation Service. Washington, D. C. Site Files Consulted. Institute for Long Island Archaeology Department of Anthropology State University of New York at Stony Brook Stony Brook, New York 11794 New York State Museum Cultural Education Center, Empire State Plaza Albany, New York 12230 New York State Office of Parks, Recreation, and Historic Preservation New York State Bureau of Historic Sites, Peebles Island Waterford, New York 12188 A-124 Society for the Preservation of Long Island Antiquities 93 North Country Road Setauket, New York 11733 Suffolk County Archaeology Association Drawer AR Stony Brook, New York 11790 Town of Southold Landmark Preservation Commission Register of Designated Landmarks 1983-1996 A-125 SITE FILE SEARCH RESULTS. I A-126 Me To: Daria Merwin From: Lori Blair Subject: Orient Point Date: June 12. 1997 Following= are the results of the site file search NYSN1 - no reported archeological sites within one mile (nearest are near Browns Hill') sensitivity assessment ,N-ill be mailed directly to you OPRHP one historic archeological site within one mile (directly across the street from the project area). A103-10-0007 is the site of Orient Point Inn & Revolutionar\ Fort currently occupied by IS"' -19`" century structures (form enclosed The computer inventory for Southold contains just about 1.300 entries to sort through. There are no National Register listed properties in Orient Point. The Orient Point Lighthouse has been determined eligible for the Register(I couldn't find a fond for the lighthouse). As far as the building-structure inventory ("blue forms"), I relied heavily on the computer inventory's identification of location Nattituck, Orient. Orient Point. etc. So. although it took quite a while to sort through the 1300 entries - I ended up ��itli inventoried properties in the immediate vicinity of your project area - actuall" 2 are in your project area. including the Orient Point Ferry and the Milestone #30. The forms are enclosed There Ntiere no previous surveys in the vicinity of the project area. A-127 ARCHEOLOGICAL SITE INVENTORY FORM FOR OFFICE USE ONLY DIVISION FOR HISTORIC PRESERVATION UNIQUE SITE NO. 1�q to 3 - /O - 000 7 NEW YORK STATE PARKS AND RECREATION QUAD. /�N l 1sl- 11 ALBANY,NEW YORK SERIES u S. G S. 7 z NEG. NO. 518 474-0479 REPORTED BY Barbara Van Liew 3 ill .Cormtry Road YOUR ADDRESS Setauket , L.I . 11733 TELEPHONE: 516-941-9444 ORGANIZATION (if anv). SOC . for the Preservation of L.I . Anti auities DATE Mlrch 1983 S' to OF 1 SITE NA,ti4E. Orient Point Irn & Revolutionary Fort 2. COUNTY Suff o1kTO`�1'/CITY: Southold VILLAGE Orient 3. LOCATION Rcute 25 ovnosite Orient Point Ferry to New London 4. PRESENT OWNER ? 5 OWNER'S ADDRESS.-? 6. DESCRIPTION, CONDITION, EVIDENCE OF SITE: A later structure built in 18tr & t 19th centuries - now occu-iies the s'_u� ❑ STANDING RUINS El CELLAR HOLE WITH WALLS ❑ SU'-:FACE TRACES VISIBLE ❑ WALLS WITHOUT CELLAR HOLE ❑ UNDER CULTIVATION ❑ EROSION ❑ UNDERWATER ❑ NO VISI3LE EVIDENCE ❑ OTHER 7. COLLECTION OF MATERIAL FROM SITE. ❑ SURFACE HUNTING BY WHOM DATE ❑ TESTING BY V HO�i DATE ❑ EXC.'.VATION BY WHOM DATE t CZ NONE none known PRESENT REPOSITORY OF MATERIALS. 8. PREHISTORIC CULTURAL AFFILIATION OR DATE: Not Known HP-3 A-128 _�..�.,•. ..,v s........ ..-._ _ .". ,_ _ - _..r - ..«.._.. .. ...._._ 3 _._w- _+.. .:wry .. ... �. ... ._ __._-_ ._ A19t0 of Suffolk Count =- IIMRICAL DOCUMENTATION OF SITE: 2'Y Mansel u , :-1882 "Town of Southold" p-35 ; History of Lo Island , BF Thompson �TQol.= = K: = ==s -1843 P•386 ; Preservation Notes , S A olo3 � Oct. 1967; V01-XV No.3 , " $�Vol.VII No. 3 , Oct. 1971; Vol. IX No. 3 , ct. 1973 1979• til �x 10. POSSIBILITY OF SITE DESTRUCTION OR DISTURBANCE: Destruction imminent 11. REMARKS: Reportedly this inn was first built in 1672. No archeological research has -9-44t;* been conducted at this site as far as is known. 12.. MAP LOCATION 7 1h MINUTE SERIES QUAD. NAME: 15 MINUTE SERIES QUAD. NAME: U.S.G.S. COORDINATES: D.O.T. COORDINATES• (if known) ATTACH SKETCH, TRACING OR COPY OF MAP 51 53 Arn N. zs _ z �Orient /6 Point 'PLUM nLANt QUAD Orient— _ O 2 SOURCE OF MAP: NYS DO'_" Poiiit ° 83a0'�A�� vaM /5 Piling 14 25 \ t,. 13. 'PHOTOGRAPHS (optional) FeR1 �o Z y � �5� ,ORIENT BEACH y STATE PARK FEET �} b A-129 sland Antiquities Preservation Notes—Society for the Preservation of Long island Antiquities an-'e in 1729. ORIENT POINT REZONING " " 6 �- lies the Is it taps for the ancient Ith century by Orient Point Inn at Orient + _" e adjoining p Point which now stands for- ' . ni graveyard j lorn and vacant? Allegedly built in part in the 17th cen- tury, during the Revolution the Orient Point Inn served as a garrison for British troops. on of what is After the War it was report- i Irbor is a edly enlarged in 1796 and Orient Point Inn tm. to every- then rebuilt ca. 1834. The historian, Benjamin F. Thompson, many of the described it in 1843 as "the extensive hotel of Jonathan L. ce hat Davis Latham, which, in many respects, is not excelled by any hotel )a-_.ard. lying or watering place in the Union." In spite of some late 19th in the south- century enlargement, the building is a remarkably unspoiled and c rbor, is of unusual example of a hotel-type unique in the early years of t ; I that the this country. Located opposite the New London Ferry landing, house which the Inn is at the end of what is now Route 25. Along this road, v s built in which was once known as the king's Highway, many of the old ar is needed milestones have been preserved, the farthest east—marking 30 urrounded by mi. to RiN erhead Court House — still standing near the ferry slip. :id Anyone This very far-off tip of Long Island is a charming and unique 1 century, agricultural area, and for the arriving travelers on the ferry from New London the scene as they disembark is like a breath of fresh air. Conservationists and preservationists are suggesting that the whole point be designated an agricultural district under y recent N.Y. State enabling legislation, with the historic Inn in a special historic district category by itself receiving tax abate- H. o. 2) the ment to encourage its restoration and continued operation in vas Incorrectly some appropriate manner. mz'-er of fact, ;ol tv district au County it EARLY LONG ISLAND GRAVESTONES tic it interest Information as to the whereabouts of old Long Island public c In up and and family burving grounds is wanted. Write or telephone: Mrs. s a source of Gav Levine. 21 Hewitt Blvd., Center Moriches, L.I., 11934 (516-878-4070). 5 • A-130 i — PRESERVATION NOTES I THE SOCIETY" FOR THE PRESERVATION of LONG ISLAND ANTIQUITIES � li�t:n�k� I Lkkt� \'�� I.tt �� F_•i;n�r r ROBERT K. GAMBL)_. L%( cutaut Uircc'tor � z sea i9(�A 9��" _�. _ -• zo i �•.•` J Y �I�� wry .'-) .� ".�" �..a�yy�wy'_}^'�!R:_ ��y\ ORIENT POINT HOUSE,ORSENT POINT. surroLn C04VTY.LONG L-A,%W LN.Y. V.B PARbOKS PWOPPIE70N See page 2 Illustration from W.W Munsell, History of Suffolk County, 1882 It tta\ becurne apparrnt that thnrr• of us who aretnterestedrnr•unservattonand prescri,attun nerd to be ah•rted to the threat< nJ destruction of the trreplaeeable values and enclronment that comprise our heritage.and to the actions propused to avert such threats. These• brief notes are drsq:nrd lu alert vou. Vol. IX, No 3, October 1973 Setauket, L.I., N.Y. 11733 A-131 s ` NEW YORK STATE HISTORIC ARCHAEOLOGICAL SITE INVENTORY FORM For Office Use Only--Site Identifier Project Identifier Date November 1987_ Your Name Town of Southold S=LIA Phone (516 765 1892 Address own a , i'Ialn a . , Southold Zip — organization (if any) Southold Town CommunityDeyel o=ent Office 1. Site Identifier (s) Orient Point Inn 2. County Suffolk One of following: City Township Incorporated Village OriPrt Unincorporated Village or Hamlet 3 . Present Owner nmirto of 511f-folk Address nnurty Canter Nai,n�1gA N_ Y Zipl17R7 4 . Site Description (check all appropriate categories) : Structure/site Superstructure : comp lete_partial—col lapsed not evident Foundation : above below X (ground level) not evident Structural subdivisions apparent X Only surface traces visible -XBuried traces detected List construction materials (be as specific as possible) : Wood Store Grounds Lo%,r shrubbery, small trees ' Under cultivation Sustaining erosion X Woodland _Upland Never cultivated Previously cultivated Floodplain _Pasty= : Soil Drainage : excellent good X fair _ poor _ Slope : flat X gentle X moderate - -steep_ Distance to nearest water from structure (approx. ) 1 mile N and S , Elevation : (less than) 5 . Site Investigation (append additional sheets , if necessary) : Surface--date (s) _Site Map (Submit with form* ) No testing or collection undertaken . Collection Subsurface--date (s) Testing : shovel coring_ other unit size no. of units (Submit plan of units with form*) No excavation undertaken . Excavation : unit size no. of units (Submit plan of units with form*) * Submission should be 8�2"x11" , if feasible Investigator Manuscript or published report (s) (reference fully) : None Present repository of materials None _�_ A-132 OR-6o 6 . Site inventory : a•_ date constructed or occupation period n _1672, enlarged c . 1800 , b. previous owners, if known occupied untill 1960's . Jonathan Latham, 1796, Hotel Proprieter, M.B.Parsons, 1860-1875 , C. modifications , if known - Geo. C. Gibb, c. 1896 . Enlarged in several stades . Griffin Journal: 1857 states that (append additional sheets , if necessary) 7ronathan Latham built large boarding house in 1834-35 . 7 . Site documentation (append additional sheets, if necessary) : a. Historic map references 1) Name U.S .Coast SurveyDateT-55, 1838 Source Present location of original, if known 2) Name Chace , Suff.CntyDate 1858 Source Present location of original, if known b. Representation in existing photography see attachments 1) Photo date Where located 2) Photo date Where located C . Primary and secondary source documentation (reference fully) see attachment d. Persons with memory of site : 1) Name Many Address 2) Name Address 8 . List of material remains other than those used in construction (be as specific as possible in identifying object and material) : Tar and gravel (recent) driveway material. Round headed windows with interlocking muntins reportedly were reused when a section of Inn was altered in 19th century. They are now in a house on south side of Skippers Lane (now on National Register. ) If prehistoric materials are evident, check here and fill out prehistoric site form. 9 . Map References : Map or maps showing exact location and extent of site must accompany this form and must be identified by source and date. Keep this submission to 8,"x11" , if feasible. NYS DOT Orient and Plum Island quad USGS 7-� Minute Series Quad. Name attached For Office Use Only--UTM Coordinates 10 . Photography (optional for environmental impact survey) : Please submit a _5"x7' black and white print (s) showing the current state of the site. Provide a label for the print (s) on a separate sheet. attached Form prepared by '`urt F-ahofer, research assistant. A-133 ` -" :UtLDIti'G STIZU( f t!Rf'- I!�`'t=\' FOKY f 0101 U\IQUf. S11 E NO �0�!Q_�� r DIVISION FOR HISTORIC PRESERVATIO\ QUAD NEW YORK STATE PARKS AND RECREATION SERIES ALBANY, NE1S' YORK (518) 474-04"9 NEG NO YOUR tiA11EmOW Ci COU 1� SPL?A DATE 110-Velob r 108'7 YOUR ADDRESS To-,,:n -:all, Main Ro_�_�TELEPHONE `1 :Z65-1802 Southold , L.I . , i.° - 11971 ORGANIZATION (if any) Southold Town Community Development Cffice i i i i i s i # # # # i i s # s : # 4 # s # # # i # s i ■ i i i i i i i IDENTIFICATION I BUILDING NAME(S) Crierrt Poir1"`Ferry 2 COUNTY S3ffQ1k TM1N VTY. 5nuthol d VILLAGE. Or; e^t 3. STREET LOCATION Emits 2` — at and Of K i rgS E'ghwalr 4. OWNERSHIP a public ❑ b, private L S PRESENT OWNER Cross Ss2V_, Ferry ADDRESS Rnx 3Z _ NPw Tfnnd _ C-11 . 05320 h USE- Original Ferry Yn Cann Present " e-r-rr�gnrn_, 7. ACCESSIBILITY TO PUBLIC Exterior visible from public road Yes No C1 Interior accessible- Explain DESCRIPTION 8. BUILDING; a. clapboard ❑ b stone ❑ c. brick ❑ d. board and batten ❑ MATERIAL e. cobblestone ❑ f. shingles El g. stucco ❑ other l) STRUCTURAL a wood frame with interlockir•g joints ❑ SYSTEM h. wood frame with 1:&t members t'=� (if known) l•. miso,,r. Icad bearin, walls d metal (explain) e. other Dolens mark ferry slip 10 CONDITIO\ a excellent ❑ b. good ] c fair ❑ d. deteriorated tI I I INTL-GRIT1 a onemal site ❑ b move' ❑ if so,when° �. list major alter.,ttons and dates (if known) . Updated over the yearn, , There is no dock -today. 12. PHOTO. neo-: F-7 X77-34a 13. MAp.N.Y°S . DOT Plum Island Quad . Docking ferry fron Prl; f7 .d -�.y,'�^�'+:..k ^• _gay+ - •• .� •,� 6 S - y it��^� 1�`��/J3`,-fV' J ..�y �w�i�'+Li'fYt=•:i�l[�{ham-• — ... �• �+iY�}`��' •Tlf i::•.,Li ix u.f. d� j�-}7Lr "Y�. ..- �t�^,--.. ..3 •L— -. � ;- (,•...TY a%•aa�� M .�r1.c��.�s}'i�h�r° �{, N S •"�P's.f.",:=.:;,.' ?;�,�•, ''�,'_ �< �"' ,It' (,_,'"�i.} `v. „dt p 'S,'l�ity`'+,� . ` '�Z� '>f-' `.r .t�':�'".'�i.r•jiz•'�o't,� 1?f:>:e:..,f,.�' Y ! YS�.:.LL y`'��::�. �=;..rt...s, rice� ?�.-:.,•-�""_ ry;��:yY2 y,r°:�+3�•'-.titer _ % hT.t ^r^c., >:1'` T d '•.y:`,..�,•.� icy,,R:y,•.t,.t + O .t. �{�' 4w.:i�:, 4.: •.�;'• 'Y•.��++.�.niatr rtr Y:.ar^.cv_>•, �r'fi .' •c ... ;>. L Point 25 ._ A �,a�-,I..K•�S''_ �;.^_:ycH,F`wf•..�;..j i -., i� .L1: `9 -.0°� � +',• ��r `i 4 i�'Q; S:A:Z N..N. — t��•1 f A-134 tri ( i i SY 14. THREATS TO BUILDING a. none known b. zoning❑ c. roads ❑ d developers ❑ e. deterioration ❑ f other- 15 therI5 RLLATLD OUTBUILDINGS AND PROPERTY- a. barn❑ b. carriage house ❑ C. garage ❑ d privy ❑ e. shed ❑ f. greenhouse ❑ g. shop ❑ h. gardens ❑ i landscape features•fid_ gel j. other avedarkin 1 t 16 SURROUNDINGS OF THE BUILDING (check more than one if necessary): a.open land K] b. woodland ❑ C. scattered buildings ❑ d densely built-up ❑ e. commercial ❑ f industrial ❑ g. residential h.other: 17 INTFRRELATIONSHIP OF BUILDING AND SURROUNDINGS: (Indicate if building or structure is in an historic district) Near the very tip of the North Fork on a gravel beach. Adjacent to 48--acre parcel at Orient Point recently acquired as open space by the County of Suffolk. 18. OTHER NOTABLE FEATURES OF BUILDING AND SITE (including interior features if known). There was a "steamboat wharf" here in 1874. In 1898 it was called "Orient Point Wharf Company Dock." It was "Point Dock" on the 1909 map. SIGNIFICANCE 19. DATE OF INITIAL CONSTRUCTION _ lath century or earlier ARCHITECT BUILDER. '0 HISTORICAL AND ARCtJITECTURAL ],IMPORTANCE- ;~ This spot has long been a landing for boats. The small sloops that were originally used could be drawn up on the beach. In 1874 Bayles described it as a Steamboat Wharf. There were buildings on this site on the 1838 survey. Historic American Engineering Record , N.P.S . 1974. 21. SOURCES- Griffins Journal, 1857. T .i ayles , etches of Suffolk County, 1874 �1�hts and Le ends. ran i t amon. 1987 Z. -zel—nyde, 1909 I , ?? U.S . Coast Survey. — l ----------------- T-55 838 Form prepared by Kurt Kahofer, research assistant. {� ,., ._ A-135- CHAPTER 25 ORIENT POINT LIGHT, Orient Point, NY (1899) Light List No.: 20135 Location: Latitude 41° 9.8' N Longitude 72° 13.4' W Height: 6»' Range: 15 miles,Flashing White every 5 seconds,Hom Lens: 190 mm, 2.03 amps Automated: 1966 Orient Point Lighthouse (known affectionately as the "Coffee Pot" by locals) is cirular-plan, cast-iron tower, on a concrete-filled, cast-iron foun- dar,on. A beacon on the tip of Long Island since 1 S99, the light is painted brown at the top of the tower and µh:te at the bottioom. Besides the light- house, the site includes two ^.,:rap (stones thrown together without order to prevent erosion) break--waters which form a protected approach south of the tower, a concrete dock, and the riprap shoring which encircles the foundation. The lighthouse marks the western end of Plum Gut, a channel which contiects Long Island Sound µ::h Gardiners Bay and points south, east and west, and overlooks Plum Island to the east. Orient Point, so named in 1836, because it was the mos: easterly tip of the North Fork peninsula of Long Island, lies to the sou:.-west of the light. The meeting of waters converging from several direct:ens produces violent and potentially dan- gerous currents to the unwary in Plum Gut. Currents can be five to six knots, and a mean chop de`el;rs µhen the wind is counter to the tidal current. The µord gut refers is a narrow passage of water between two larger bodies of µatcr. Thus. Pi.im Gut is a narrow passage of water named after adjacent Plum Island.. Orient Point Lighthouse stands at one end of Oyster Pond Reef, a body of rocks submerged under only some 10 feet of water and which extends nearly one third the way across the Gut, while the channel in the Gut of- fers depths of more than 100 ft-t:. Every summer, many yachts from Long Island Sound and Nc%µ Englar� sail past this aid to mariners to rendez- vous at Shelter Island. Greenper,, Montauk,Sag Harbor, and other excel- lent harbors in the area. Description of the Lighthouse The shell of the foundation of the light is a cast-iron caisson 25 feet in diameter and 32 feet tall, It rests directly upon the rocks of Oyster Pond Q p Reef which was levelled to provide. a stable footing for the light.The cais- V l son is made of curved cast-iron Fates µhich have flanges projecting into the shell's interior Bolts thro.:,h these flanges hold the plates together. The cast-iron sections were ;nade in New York City and brought to the Orient Point Wharf Comnar� the New London Ferry now T izhts and Le verc s c?arlan Hamilton 1987 -- A-137 18g9 docks)by sailing ship.A barge then floated the structure to the reef for as- sembly at low tide. The caisson was then filled with concrete; a space in the top of the shell was left unfilled to provide space for equipment and supplies. The tower rests directly upon this foundation. It takes the form of a truncated cone. 24 feet tall,with diameters of 21' at the base and 18 feet at the top. The circular watch deck surmounts the tower and in turn sup- ports the circular lantern. The three stories within the tower held living quarters for the crew in the days of manned operation.construction of the tower walls resembles very closely that of the foundation,curved cast-iron plates bolted together by internal flanges. The tower is lined with brick. The brick lining is three feet thick at the bottom and tapers to a smaller thickness in the upper stories.The windows and door openings of the first two stories are presently fitted with steel plates to deter vandals. Four round ports light the tower's third floor. Galleries with railings are found at both the watch deck and lantern levels.The lantern walls are cast-iron at the bottom and glazed over their upper halves in a diagonal-lattice pattern with bronze muntins. the sheet metal-covered lantern roof is pitched with a ventilator ball at its apex.In- side the tower, a cast-iron stairway ascends around the periphery, sepa- rated from the living areas by a wall of sheet iron.The stairs are set into the brick lining of the tower.The watch deck features beaded-board walls. No early illuminating equipment remains in the lantern, since the origi- nal fourth order lens showed a fixed red light visible for 11Y. miles.It wa4 replaced by an electric lamp and a modern plastic lens when the light was automated in 1966. Orient Point Lighthouse retains its historical integrity virtually intact. Besides the main structural components, the beacon still has such fea- tures as the hoodmolds and gallery brackets which identify the light as a product of a distinctive period, the late 19th century. Cracks in the foun- dation which were repaired with patch plates and regrouting behind the patches may have given instability in the footing of the light.As a result, the structure, as every sailor knows, now lists about five degrees out of plumb. Keepers N.A.Anderson,who was born in Norway,was appointed first keeper of the light on October 20, 1899 at an annual salary of 5600 a year.He served until 1919. His assistant, Daniel McDermott, bom in Ireland, was ap- pointed on December 10, 1899 at an annual salary of 5450 a year.He later resigned.At the turn of the century, lighthouses were considered too dan- gerous for women. For example, Mrs. Anderson, wife of the first keeper, roomed at Orient Point. During her husband's 20 years of service as keep- er, some very cold winters occasionally formed great ice sheets around the lighthouse, thus preventing boat passage and literally marooning him from the mainland and his wife. Lip-rts and lezends . Harlan Hpnilton 1987 A-138 i 6,2 M I Ltiti _. 1:.+.� sr t 1:it'�•--. H. . . _ (Tient Point Dock. The steamer Catskill loading cars on ferry to 'leondon. The 2-story building was the freigrt house - office upstairs , freight stored downstairs. The " cribs" were sluice ways to let water and gravel go on through so it (if it had been a solid dock) wouldn' t build up beach on one side and dig out the other (as groins r do ) . circa 1930' s Collection hss . Robt . C . Reeves Sr. ( Gertrude ling Reeves ) A-139 llla;,ta7vF .'. t Point Ferry -� , r-i ent -.-6? Ft�1. LONG ISLAND INVENTORY � oc'* 0L"r1) 0 00o � o ` T M .T TIT Y• yi TM SC PA 0 4 FO NT Ml MY Y1 YS MI 1 I OC C. a C O o o O cl o Cj o .� Q J 7 17 O I W' •. ♦' TI so Ii CI O- N( hY •( YO Y• YA V( f♦ IN It MI TI 01 CO AI -F N • IB c /.ND ,or.st. � �ext. HAER INVENTORY Quad. pL'UJj" VEPA'Ib 4:'00 1 NAM( OF STRUCTURE I NATURE T STRUCTURE. COTTON MILL. BRIDGE. STEAM ENGINE. ETC R l ENT PONf -COO Ma r rhe -docksAS 5`tn.cf�rtt _ 1. LOCATION ST CET UM [R G1 OR TOM COUM CCvr�.� Or1erz�- � so�W a-w, r J'a�lk L,S 'T•,Xe, STAt( S OwNER v- / 0( � RT?N , STRICT • NUMEER CITY R TOWN AT le�. ^/18ieb 8►Vs1DC/ M1(I , v- 6 DESCRIPTION. CONDITION. EIC(LLLN1 C3 GOOC ; (AIR 0 DEIERIORATED 0 RUINS C3 UNCI►05EO CD ALTERED � „A•S ,� L- r'errj Seruice locate a.�- -Ek e►cj o•FMeu1"Rd( .I J I DANGER OF DEMOUTION OR INJURY NATURE O( TMRLAI o� • . . 1 RELATED SOURCES OF INFORMATION. CONTACTS LOCATION Of SOURCES .. I EXISTING SURVEYS. 0 N CRA B$ C]MAER Cj STATE D COUNTI [3 LOCAL (DOTNER (SPECIFY). I DATE OF SUR',ET IC RECORDED OT TOUR NAME ADDRESS N�FF �yAT�rVA7� PLEASE RETURN TO THE HISTORIC AMERICAN ENGINEERING REC0M NATIONAL PARK SERVICE WASHINGTON 0 C rtAo O I IN lJ L I S S [ E i 01 It rl (I It st h S. EI 1. H trz Ir zz (r I T z ( ► S 1 E t IT E S E 1 L- V Ei ti U (� C/ -'.0 (i :✓ fl v 'l J J 0 J 7 J U J J U 0 \ jq ope ra ti cn Since ti,,- 1,04 c e nfu✓y� f� �t r,- r-ertn�e ova L�zl DSC h Qw'�- a Y1l�l car G�M �'o�h. ✓�K k-4 .T' rrLer rn OK-+ 5, j. r.ic f•:47•r>r.l�er A-140 FOR OFFICE USE ONLY Y ; UCTURE INVENTORY FORM ,pBUtLDINGSTR UNIQUE SITE NO. 10340.0,9103 OR-61 `r '. '- QUAD DIVISION FOR HISTORIC PRESERVATION NEW YORK STATE PARKS AND RECREATION SERIES pLI3�NY. lNEW YORE; (Sl8) 47 4-0479 NEG. NO. >'== Town of Scuthold/SPLIA November 1987 YOUR NAME DATE. YOUR ADDRESS Town Hall, Main Rd. TELEPHONE: 516 765 1892 Southold LI NY 11971 ORGANIZATION (if any) Southold Town Community Development Office IDENTIFICATION 1. BUILDING NAME(S) Milestone # 30M 2. COUNTY Suffolk TOWN/CITY Southold VILLAGE Orient 3 STREET LOCATION In parking area of Orient Point Ferry Terminal 4 OWNERSHIP a public 0 b. private C 5 PRESENT OWNER Cross—Sound Ferry Co. ADDRESS Box 33, New London, CT 06320 6 USE Original milestone Present unused 7 ACCESSIBILITY TO PUBLIC Exterior visible from public road Yes No ❑ Interior accessible. Explain DESCRIPTION H BUILDING, a. clapboard ❑ b stone KI c. brick ❑ d board and batten ❑ NIATI-RI.1L e. cobblestone ❑ f. shingles ❑ g. stucco E-1other 9 STRUCTURAL a. wood frame with interlocking joints 17 SYSTLM b wood frame with light members ❑ Of• knoxn) c. masonry load bearing walls ❑ d. metal (explain) e. other stones set deep into around 10 CONDITION a excellent Z: b good ❑ C. fair ❑ d. deteriorated ❑ 11. INTLGRITI a. original site D b. moved ❑ if so,w•hen° c. list major alterations and dates (if known) 12. PHOTO. ne8: KK VIII-13, fm E13. MAP: NYS DOT Plum Island auad 30 ?6 2 U �Onent point � .fit.,. `e "-"'�•'� �a�s �`__� - __.�-- � f i s • - ?•;-:y,..� ..':`* ,' :. s• "'1f, :;�-` ,:'"�"`'�a' �` Oriente-'�s -�• .� Point ¢° 2 i f�''--�.. ��.tK�,��R� ;�a y• ' ''` ,,gyp•.,i��• 5 �:'',,�•.. 8- -v+•;• ling 25 Ilk Co �.` .o + �•'•=-r"1 Y' .Ls _.sem ENT BEACH �•. i' -\ ;R� '� ;„�,K >,r,y aA� rc V /.. 5I'.'.T:. ?A RX .•ET.�.�cLf���llt. t-M-dSl'�.�•�iG�•:�!'�..LC�'tii+� �'� ��33'14`�Tin'r-.K�sr•^.�L��.�" �� b HP-1 A-141 - -- -- _ OR-61 14. THREATS TO BUILDING a. none known Elb. zoning Elc. roads ®parking lot d. developers ❑ e. deterioration ❑ f other. 15 RELATED OUTBUILDINGS AND PROPERTY: a. barn❑ b. carriage house ❑ c. garage ❑ d. privy ❑ e. shed ❑ f. greenhouse ❑ g shop ❑ h. gardens ❑ i. landscape features: j. other: 16 SURROUNDINGS OF THE BUILDING (check more than one if necessary)• a.open land 1�j b. woodland ❑ c. scattered buildings ❑ d.densely built-up ❑ e. commercial ❑ f. industrial ❑ g. residential ❑ h.other parking lot, service road 17 INTFRRELATIONSHIP OF BUILDING AND SURROUNDINGS: .(Indicate if building or structure is in an historic district) L Located on a grass meridian between the ferry parking/ waiting area and service road, between the terminal building and dock. 18. OTHER NOTABLE FEATURES OF BUILDING AND SITE (including interior features if known): Milestone inscribed "30 M Suff C.H." (C.H. signifies Court House, in Riverhead). SIGNIFICANCE 19. DATE OF INITIAL CONSTRUCTION 18th century ARCHITECT BUILDER 0. HISTORICAL AND ARCHITECTURAL IMPORTANCE: Milestones were in use since the Roman times, or before. They were used as travellers' guides to a specific destinat- ion. The milestones along historic Kings Hwy. marked the. distance to the County Court House in Riverhead. That so many survive on the North Fork is remarkable. These stongs-were restored by Mr. Archibald Young (according to Otto Van Tuyle in 1966. ). 1. SOURCES Milestone List, prepared by former Southold Town Historian. Around the Forks. Edna Yeager, 1985. Long Island Forum. March 1972. 22. THE\1E Form prepared by Kurt Kahofer, research assistant A-142 P - ,i lest one 30P�r a Orient 41 0R-61 7 M TO SUFFOLK C.H. This marker is on the old Post Road--a detour from Route 25 Royden Kucster located it, partially buried, in the woods behind his home and reset it around 1960 8 hi TO SUFFOLK C.H. East of Long Island Railroad and opposite the East End Car Wush. 92M TO SUFFOLK C.H. East of B-ay Avenue, in front of Michael and Joyce Mattes'antique store "vie- traria-- Attic." 10 N1 TO SUFFOLK C.H. West of Marr acaoka Avenue and the Rally Gas Station. 11 hi TO SUFFOLK C.H. On Manor Hill,just east of Wagon Wheel Lane. 12 M TO SUFFOLK C.H. West of Cutchogue Village Green and Highland Avenue. 13 M TO SUFFOLF C.H. E3st of Key Food Shopping Center and opposite Cutchogue Town Garage + 14 MITO SUFFOLK C.H. East"of Skunk Lane and west of Ted's Auto Body Shop. 1$M TO SUFFOLK CTL - East of Peconic Lane, in Brrv* Cliff Sod Fara. 161M TO SUFFOLK C.H. Opposite Triangle Park, between South Harbor Road and Route 25 17 M TO SUFFOLK C..x-L 4 In front of the First Presbyteria-n Church's manse. 18 M TO SUFFOLK C.H. Eoisseau Avenue and Route 48. 19 Al TO SUFFOLK C.H. West of Sound,,iew Avenue, opposite North Ford Condominium Mote! 20 M TO SUFFOLK. C.H. I East ( 2 mile) of Albertson Lane. i 21 MISSLNG 22 M TO SUFFOLK C.H. East of Madison Avenue, behind John Zaleski's Fara. Stand. = M SUFFOLK C.H. West of Marto 1--^e �Clea-res Pu+ it Esl3 e�) 24 M TO SUFFOLK C.H. Just east-af.C— tery Road and East 14arion Chapel. Has no marling -- 25 1N1ISS1'rG 26 Al TO SUFFOLK C.H. East of Orient Causeway, west of Latham Farm Stand -- 27 MISSING 2S M TO SUFFOLK C.H. Moved from old Post Road to Route 25 29 M TO SUFFOLK C.H. About 1 mile west of Greenway East (Street) 30 M TO SUFFOLK C.H. At Orient Poin; F err+ rilestone List , „outhol Town historian. A-143 ' == FOR OFFICE USE ONLY OR 63 s• ,,.tea ... . % ' F ,VUILDING-STRUCTURE INVENTORY FORM UNIQUE SITE NO./63+o• o,010VI -aa y.~h �DIVISION FOR HISTORIC PRESERVATION QUAD NEW YORK STATE PARKS AND RECREATION SERIES =4. ALBANY, NEW YORK (518) 474-0479 NEG. NO. YOUR NAME Town of Southold/SPLIA DATE: November 1987 YOUR ADDRESS. Town Hall , Main Rd . TELEPHONE: 516 765-1,992 Southold , L.I . , N.Y. 11971 ORGANIZATION (if any) Southold Town Community Develo=ment Offi ce IDENTIFICATION I. BUILDING NAME(S) Latham house "Point Farm" 2. COUNTY: 311-f'folk TOWN/CITY- So»thol d VILLAGE: -Ori ant 3. STREET LOCATION. RFD 115 . Main Rd . (ext- ) .Pa gt of Ferry entrance. - 4. OWNERSHIP. a. public ❑ b. private CE 5. PRESENT OWNER. ADDRESS: .6. USE: Original: residence Present-, regi-dPncP 7. ACCESSIBILITY TO PUBLIC Exterior visible from public road. Yes 12 No ❑ Interior accessible: Explain private- regi dPn_np DESCRIPTION _. 8. BUILDING a. clapboard ❑ b. stone ❑ c. brick ❑ d. board and batten ❑ MATERIAL. e. cobblestone ❑ f. shingles ® g. stucco ❑ other: l) STRUCTURAL a. wood frame with interlocking joints SYSTEM b. wood frame with light members ❑ (if kn(wn) c. masonry load bearing walls ❑ d. metal (explain) e. other 10 CONDITION: a. excellent IX b. good ❑ c. fair ❑ d. deteriorated ❑ 11. INTEGRITY. a. original site ❑ b. moved if so,when' C.1865 c list major alterations and dates (if known): Moved from sitoof Orville Terry house� OR 49 . It had been a Terry house . !*, _ Modern shingles added. 12. PHOTO:FA VII-I I , frm S 13. MAP: N.Y.S. DOT Plum Island quad 6 /' 30 O� -_ _ ; ass..� ��sa.:a.....s''•s i •r� ' Ori ' Point R° i 25Ira . nt J >I • 2c ENT REACH ..i�....t-''Z:.-cam ,r::.; '--' ..r!r n`-a :•'�`. -•b• STATE PARK � �'"� F r,• a..Nfit'�`�`"�"6�?`��-�,,s.:'��:+'�::;�''�' ��' HP-1 MW .i: � _ ' -__ -a;:_I -7�. .. ,w .1:.-`;. } . Th- Vii• rY..i. ... __ .. •� �..___•-• -•• — �-.-.�]-�:.._._ � -s.,:L'wi:i - . 1* .-.1_ i''•'- •'�4••4'TpA - _5�:. /F2.;F-•z r.. .. � -.� ., .-._...,.. 14 THREATS TO BUILDING- a none known El� b. zoning ❑ c. roads ❑ d. de\,elopers ❑ e. deterioration ❑ f. other 15 RELATED OUTBUILDINGS AND PROPERTY- a. barn'-7 b carriaee house ❑ c. garage ❑ d prt" _ e. shed 29 f. greenhouse ❑ g. shop _ h. gardens ❑ i landscape features: j. other: 10 SURROUNDINGS OF THE BUILDING (check more than one if necessary). a.open land b. woodland ❑ c. s:.attered buildings ❑ d. densel} built-up ❑ e. commercial ❑ f. industrial ❑ g. residential ❑ h.other• Gardinar B Y on th-e South 17 INTFRRELATIONSHIP OF BUILDING AND SURROUNDINGS. (Indicate if building or structure is in an historic district) Located in a low density residential area east of the end of N-Fain Rd . , (NYS Ete . 25) historic Kings Hwy. Open farm land to'N and S . Gardiners Bay to the south. 18. OTHER NOTABLE FEATURES OF BUILDING ANb SITE (including interior features if known). 2-story, 3 bay, side entrance plan , flat roof house . 1-.;-story, 4 bay, hip roof wing on west. Porch across the front of both sections . 1-story wing on rear. "Entrance with narrow sidelizhts . 6/6 windows . Interior end chimney on east end . (Perhaps the wing included part SIGNIFICANCEof the earlier house that was on this site . ) 11). DATE OF INITIAL CONSTRUCTION 1835 or earlier for the wing.* ARCHITECT. BUILDER. 20 HISTORICAL AND ARCHITECTURAL IMPORTANCE- In 1798 Joseph Latham bought the farm for his son from Rufus Tuthill . This handsome waterfront property will continue to be surrounded by open-space as Suffolk County in January 1988 acquired the adjacent acreage up to and including thepoint to protect it from development. r 21. SOURCES Research by Oysterponds Historical Society. U.S . Coast Surve . T-55 : 1838 interview Mrs . rville Terry 2/7/88. ::• 1F J2. THEME. :... xa,��i,� . .- , Form prepared b K - - p P y urt Kahofer, research assistant. —__ •• a`• . 3 if''!y 1 •fes . A-145 OR 63 ATTACINUTT George Latham house , "Point Farm" Ur 1974 view Collections Oysterponds Historical Society A-146 104 GRIFFIN'S JOURNAL, a bag w ith corn. flu was startled Leyoud measurv, and it -was some tiutc before he could cullcct himself budi- ciently toad(I ress Iris visitor in Ianbuuac l,rul,er ott tiuch an occasion. llowcvcr,cre lie could do this to his mind, t11c aflri-lltcd intruder, with a sigh, cried out "I art al; undone tnan forever." I Lobe nut so bad as that," replied tlic enmmiscrate Yr.Eine ; "I suppose`'o1.11-fa- mily are iu need of bread ; had y ,u iufuruud tuc; that T,as the cage, I would Willingly llaN u assisted thelu ; you LaN e broken a prominent comuland, and dune toe an injury, but in case you rrlpent,;mlll fully rufraiu i'cuut thio course furuver, you ]lave my LcartyYforz'ivcness." To thi;thctretnL]iu,•ulanob.crvcd,withtc;us, •'Tluuuall God's as�i�tauicc, 1 rlcNer w ill take from ;ill ori, 11-Mill what is not my own." 2Ir. ]ling then gave lulu ilio hand. It is now about one hundred and fifteen years since this transaction, and the tnau's nauic is not vet revealed. - e Dr. Tllo;nas Vail Nvus the oldest son of Thomas Vail, Sr., w•hn wa- tl)c soli of Jeremiah Vail 3d,wL,) was the eon of Jeremiah Vale sd,who was the sop, of Jeruuliall "ail 1st, who Fettled at UI•sterpolid; ill 163G, on what is nuw known as the Point Farn, ;old now owned by the sons of the late Capt. Jonathan F. Latham. Tho- ma` Fail, Sr.,about 1756, married sauna 1, the daugh- ter of Richard and Ilanuall Drown. Was a captain of Militia, in which station he w a; res1weted. Not far from 17G7 l;c retnovcd with Lis faimily into the state of Vermont, scar or in the town of Poulfort. At this place Thomas, the eldest son, lived with his father until AuCustus Griffin' s J0L1MP 1857 A-147 t Munsell History of Suffolk County, 1882 THF. Tf11Vs' OF S01'THOLD 31 Lpun the north road which runs nearly parallel with the residence of Albert Albertson (deceased). John the sound is a village known as "Oregon," which con- Corey s house stood very near to Conkling's. tains sonic forty houses in 2 fettile farming district. The Hashamomacl• people were admitted as freemen of the town at a very early date. In accordance with an agreement made in 1684 John Conkling had a tract HASHAMOMACK. of go acres laid out to him. This tract is now owned by Richard A.Conklin and William H. H. Moore. As has been stated in a former place, the first land The population of Hashamoinaek in 188o was 143• purchased in Southold of which we have any written record was at Hashamomack. From another deed which ORIENT. is entered at considerable length in the town book it ; appears that James Farrett sold at some time, probably The whole extent of land lying cast of a line running 1640,to Matthew Sinderland the greater part of this lo• from the head of Stirling Creek to the sound_as_called cality; that the purchaser died without issue and left all in ancient times yster ons ppeianand Lower Necks. his! rids to his wife Katherine,who afterward married The former is now known as East_Marion,the latter as N%i4 am Salmon,who thus came into possession of the Orirnt:-'Theic'landi were surveyed 05a divided among lana .After his wife's death he marned Sarah Horton. the freeholders,or owners of rights of commonage,in Aft"r William Salmon s death John Conkling married his r661 The lots ran north and south from bay'to sound, w•ii 3w, and having bought the shares belonging to Sal- and a single lot was So acres. The Young' family chose mG','s children he became the sole owner, with the ex• to have their shares of the common an sin tFiese necks ception of a portion which it seems Salmon had given rather than in the great western divisions.and part of is even now in the possession of thei him. their shares r de- to John Corey to induce him to come and live with Conkling, to make all sure,obtained a deed from the scendants. We learn from a deed that the extreme point son of Wyandanch the Indian sachem. The boundaries next to Plum Gut was drawn by Jerry Jones,w o so ld of this tract as descrihed in a deed from Paucump, it to Gales Sylvester,who sold to Jeremiah Vale jr. sachem of Corchaug,to'A I liam Salmon in 166o were as in 1687. It descended from him to his heirs and re• followi 'fom's Creek(now Mill Creek) was the line on maimed in the family about too years,the last owner of the west and the sound on the north. The northeast the name being Stephen Vail,great-grandson of the first, corner was to be at a place called Minnapaugs, being as who left it about 1773. From 1Son to 1852 it was owned the deed says "a little pond and a parcel of trees stand- by Captain Jonathan Latham. ing by 1t;" and thence the east line ran "south to a In 1670 Gideon Youngs recorded among his lands creek called Pawcucl-atux." All the land east of this "eight small lots in the Oyster Ponds Lower Neck." belonged to the town,by purchase made probably about This tract of 400 acres embraces almost all the village of 164q. In ancient times a fence was made from the head Orient,which lies between the wharf and what is known of Stirling Creek to the sound,and in February 1662 as Narrow River. Gideon Youngs was nota son of the town gave all the land between this fence and the pastor Youngs,but of Captain Joseph Youngs,of whose bounds of the tract above described to Captain John history we know little. Gideon died in 1699. His Youngs,Thomas Moore,and the'•Hashamomack inhab• descendants still own most of this valuable estate- itants"—that is, persons who by purchase or otherwise One of the first settlers here was Richard Brown,who had becomeowners of the Salomon tract mentioned had a house and 8o acres of land to the west of the above. The fence above spoken of ran along the west Youngs tract above described. In 1668 he gave John line of the lands late of J Newcll Youngs and Jeremiah Tuthill"six acres of land where his house now standeth." King,deceased). in dividing this tract the Hash and this is probably the first appearance of John Tuthill stir people took the part east of their own land. at Oyster Ponds. In 1670 Abraham Whither had a farm Thomas Moore took his part east of that bounded north and settled here. His land, which fronted Oyster by the sound and south by land he already owned there. Ponds harbor on the west and was called the"Hog Pond 1 The east part next to the fence fell to Captain Youngs, farm," stiU retains the name, and is now owned by J. This grant embraced several hundred acres,and wits Lewis Tuthill, fcoce, • In a679 Thomas Rider gave to his son-in-law John given on condition that they should maintain the tiY which was w prevent cattle he-. straying oft the Oyster Higgins+11 his land at Oyster Ponds Upper Neck. This, P6nds Necks (now East Marlon and Orient). William tr'^t lies at Fast Marion,and is on the point opp•ss" salmon add in 1649 three•foortbs of his land to Henry i.xtrem+ li rtht Will o. sbtlteC Inland. It howarede io Whitney, Edward Tredwell and Thomas Base- the Wiggins family ever since, and is now t►sed by n; t•. dict. 'Che house in which Salmoo lived, and which William A;�tna. may luvc'been-built by Matthew Sinderlaod himself, 611muel Ring lived at Oyster Ponds Lower Neck in tdyr. stood oo the farm of 1Viiliam Wickham(deceased),someIn 1685 Abraham Corey sold to John TuthiU b Kra+ thirty rods south of the railroad. John Conkling,who at Uystet Ponds Upvtr Neetw ,bounded t bT�! e sou one of"the very earllli2>.ert bad his house 0n Za Moore and west by Jobe Wiggins, and e2tteat}i��ttno 1 east side of 1,SiU Crcck,about twenty rods' southeast tl?a sound to the bsy:,Thiawa rat 'tct IiFlat iLsiit-x,:-• r A-148 w ^. .,� Od CLU. .,#.: . Steeped in tradition, resisting but yielding to cha774 e, Latham family descendents live a good life in century-old farm homes, tilling their rich but dwindling acreage on Long Island's windy tip. Soils of Orient Point Farm or. Long ls;and's In the beginning, pasture, timber, and to. Latham bacco were the main crops. Alone came hay northeastern tip have been tiled by the families throueh 163 sears of Nar, boom. and corn to feed the cattle and work horses. depression, hurricane, and cl ou:h Later, the Lathams produced and shipped Joseph Latham bought the farm for his chickens and eggs to hungry people in Nev. 19-year-old son, Jonathan. ,-; I%9S "hen York City-110 miles to the west. Now, John Adams "as president. Or t`: 1.0'X'-2:re vegetable production is the farm's mainstay_ spread stood the Orient Point Inn—nov, the Animals—fat cattle, strong horses, and busy road from the Latham place ar,c sail! ,kei:on:- hens—are gone; only a family of cats remains. ing guests. Peas, beans, and potatoes are planted in Jonathan's son, Elias, filled his father's April. The peas are harvested in mid-June, the shoes. Then came Benjamin Drake Lat^am. beans a bit later. Then cucumbers, lima beans. His sons, George and B:njamin Dwig`,.. ana cabbaee, and cauliflower are planted. The George's son, Georg: Jr., no'.;, run the farm. hard-µorking Lathams also raise a variety of vegetables for their own use, including straw- berries, tomatoes, onions, and melons. Crops are planted, grown, and harvested within earshot of the deep-throated honks of fog horns, loud clangs of belt buoy's that ride in the channel, and the noisy slap of water .a x4� �_•" y — aeamst a low shoreline. After sundown, the unrranr Oricnt Point lighthouse. star,d;n,- 'osis an eerie beam of i;ci•t acre ^ ' Po;r_._ Farm income hasn't set records recent sears. Veectaole prices are often ur- {•,: certain and of the original 1,000 acres,•or.i• .45 remain But a: Point Farm, the good, average, and ' bad years come and go—just like the winds that whistle across the narrow neck of civiliza- i •r ty t tion jutting into the Atlantic. And somehow, an enduring partnership with the land, steward- ;.,n;� ;.,n ship over food for fellow men, and the sea- t; •', , , �, '� scented air seem to make themselves heard abo�c thin scrstchings in a faded ledger. ... / r' � 'fir�`� �. � •�� 1 ! ' i `'4 The Furrows cTL1l,y—nLtP'LlSt i q51 in� �p3��lYJ I ins .�'f A-149 NOISE IMPACT STUDY FOR PROPOSED CROSS SOUND FERRY PARKING LOT EXPANSION SOUTHOLD, NEW YORK Prepared for; CROSS SOUND FERRY, INC. Prepared by. DUNN ENGINEERING ASSOCIATES SEPTEMBER 1997 A-150 a Table of Contents NOISE RESOURCES: EXISTING CONDITIONS . . . . . . . . . . . 1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Existing Condition . . . . . . . . . . . . . . . . . . . . . . . . 1 NOISE RESOURCES: ANTICIPATED IMPACT . . . . . . . . . . . 6 Parking Lot Noise . . . . . . . . . . . . . . . . . . . . . . . . 7 Traffic Noise . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Construction Noise . . . . . . . . . . . . . . . . . . . . . . . 8 SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Disk #390, Cross Sound Ferry File: Noise:\Cover A-151 NOISE RESOURCES : Existing Condition Disk #390, Cross Sound Ferry File: Noise:\Cover A-152 Introduction Noise levels are measured in decibels (dB). As the human ear cannot perceive all frequencies equally well, these units are adjusted to correspond to human hearing. This adjusted unit, the A-weighted decibel (dBA), is the unit by which ambient noise is usually measured. A one decibel change in noise is the smallest change detectable by the human ear under ideal laboratory conditions. A 3 decibel change,under normal conditions, is barely noticeable by the average person and a 10 dB change is perceived as a doubling or halving in loudness. Figure A illustrates typical noise levels of familiar activities. Since few sources produce noise that is constant over time,parameters (called noise descriptors)that characterize noise levels which vary over a period of time are needed. One method is to describe the fluctuating noise heard over a specific time period as if it had been a steady, unchanging sound. For this purpose, a descriptor called the equivalent sound level, Leq, can be computed. The Leq is the constant sound level that, in a given time period (e.g., one hour, Leq[1]), conveys the same sound energy as the actual time-varying sound. Existing Condition Much of the existing noise in the vicinity of the ferry operation is a result of some aspect of the operation itself, whether from vehicles traveling to and from the ferry on Route 25 or from activity within the existing ferry parking lots and on the queueing area for the auto ferry. Traffic to and from other destinations in the vicinity also contribute to ambient noise conditions, as do other noise sources such as wind, etc. In order to establish ambient noise levels, noise readings were performed in the vicinity of the two sensitive receptors in the study area, identified as the two residences on the north side of Route 25 opposite the ferry property. These noise readings were performed using a Metrosonic Model 307 noise dosimeter, which through internal circuitry provides noise readings in the A-weighted scale. The readings were performed during the anticipated hours of greatest impact of the project, identified in the Traffic section of this report as those times when the high speed passenger ferry arrives at Orient from New London carrying its largest volumes of passengers and when daytime activities which generate noise have subsided. As these arriving passengers return to their vehicles, depart the parking lot closest to the residences and drive west on Route 25 is the time when additional noise is most likely to be generated. These instances occur at approximately 7:40 P.M. and 9:40 P.M. Disk #390, Cross Sound Ferry File: Noise\Noise A-153 Sound COMMON OUTDOOR NOISES Pressure COMMON INDOOR NOISES Levels (d BA) 110 Rock Band at 5 m Jet Flyover at 300 m 100 Inside Subway Train (New York) Gas Lawn Mower at 1 m 90 Food Blender at 1 m Diesel Truck at 15 m 80 Garbage disposal at 1 m Noisy Urban Daytime Shouting at 1 m Gas Lawn Mower at 30 m 70 Vacuum Cleaner at 3 m Commercial Area Normal Speech at 1 m 60 Large Business Office Quiet Urban Daytime 50 Dishwasher Next Room Quiet Urban Nighttime 40 Small theatre, Large Conference Room (Background) Quiet Suburban Nighttime 30 Library Bedroom at Night Quiet Rural Nighttime 20 Concert Hall (Background) Broadcasting and Recording 10 Studio 0 Threshold of Hearing Source: Highway Noise Fundamentals, U.S. Department of transportation, Federal Highway Administration, September 1980 Figure A Typical Noise Levels Disk#390,Cross sound Ferry File: Table-A.vo A-154 Figure B presents the locations at which the readings were taken. The noise readings obtained are presented in Table A. As can be seen, ambient Leq readings of 53 and 54 dBA prevail during times of low activity at the ferry, and readings of 56 and 57 are common during increased activity of the ferry operation. Noise sources associated with the ferry identified during these times were car doors closing and vehicles departing from the parking lot. The highest instantaneous noise occurrences,shown in the table as Lmax,were produced by the ferry boats blowing their horns during arrival and departures. It should be noted that insect noise in proximity to the noise meter contributed significantly to ambient levels. Disk #390, Cross sound Ferry File: Noise\Noise A-155 , Y 3 _ i ti` n m iF ell Ao r _ z - ► t e ir •' ! rJ� r . - 7 &bf ot - � ' a _ • , d y x, � ��ti � _ IL _ r G � 4 - • y. :t . • r - _.,"ate"• 'a '�' A ., '` .- & Via. st Ir te .00 Ile 14 •,' } F * a t - r _ r f • _ �r a N c 3 r 1 t if or I JP 40 *x i ; r t _ Noise Readings Location Time -- Comments Leq (dBA) Lmax (dBA) 7:15 P.M. 54 56 No significant ferry activity, Lmax due to car door in parking lot 7:40 P.M. 57 66 Passenger ferry arrived at 7:50, significant parking lot activity Receptor#1 8:25 P.M. 57 75 Car ferry unloading, ferry horn produced Lmax 9:40 P.M. 55 68 Car ferry arrived at 9:55 P.M. Loud car exited parking lot 6:30 P.M. 57 83 Car ferry departed, Lmax due to ferry horn 7:40 P.M. 56 61 Passenger ferry arrived 7:50, significant parking lot activity. Receptor#2 8:50 P.M. 54 58 Car on gravel road produced Lmax No significant activity 8:25 P.M. 57 80 Car ferry arrived, vehicles debarked and departed, Lmax due to ferry horn Table A Ambient Noise Readings Disk #390, Cross Sound Ferry File: Noise\Table-A NOISE RESOURCES : Anticipated Impact Disk #390, Cross Sound Ferry File: Noise:\Cover A-158 Parking Lot Noise As discussed in the Traffic section of this report, it is expected under worst case conditions that the construction of the parking facility combined with the expected growth in ferry use will result in an increase in demand on the third daily high speed ferry,which departs Orient at 12:00 Noon. This is due to the lack of capacity on the second ferry, which limits its growth, and the fact that parking capacity exists for the 10:00 A.M. ferry to accommodate excess demand. It is further assumed that passengers destined for New London on the 12:00 Noon ferry would return to Orient on the 7:40 boat. Thus, the anticipated time of greatest impact of the proposed action on the noise environment is during that time when the 7:40 ferry arrives in port, discharges its passengers and the passengers leave the ferry parking lot. As can be seen from the noise readings taken for the existing conditions analysis, Leq noise levels increase by two to three dBA during times of increased activity of the ferry operations. This noise impact is generated by the existing operation, which is of considerably greater magnitude than the expected increase due to the proposed action. However, the location of the proposed parking lot is such that the activity would take place closer to receptor#2 than at present time, thus an increase in Leq might be expected during peak times at that location. However, this impact can be expected to be less than 3 dBA, which would result in a barely perceptible noise impact due to parking lot activity. Traffic Noise As discussed, the proposed action will result in an increase in traffic volumes on Route 25 traveling to and from the ferry operation. However, in order for an increase in noise of 3 dBA to occur, a 100 percent increase in hourly traffic, or a 100 percent increase in hourly truck traffic, or a 100 percent increase in the combination of car and truck traffic is necessary. An increase in vehicular speeds of 15 mph would also result in a 3 dBA increase in noise levels. Clearly, the proposed action will not result in nearly the increase in traffic volumes required to cause this magnitude change in noise levels. Furthermore, since the project would not have a significant effect on existing roadway operating conditions, vehicles speeds in the study area are not expected to change significantly due to project generated traffic. Also, the proposed action will not generate significant truck traffic. As a result, neither of these two factors would affect a change in existing noise levels. Disk #390, Cross Sound Ferry File: Noise\Anticipated Impacts A-159 Construction Noise The potential noise impact generated during construction activities at the project site would depend on the phase of construction(site preparation, excavation, foundation, erection, and finishing), the type and amount of construction equipment, and the percentage of time the equipment operates over the work day. Excavation would tend to be the noisiest phase of construction for this project. Noise levels would tend to decrease as other construction activities proceed (see Table 3). Office Building, Hotel, Domestic Housing Hospital, School, Industrial Parking Activity Garage Service Station Public Works I II I II I II Ground Clearing 83 83 84 84 84 83 Excavation 88 75 89 89 89 71 Foundations 81 81 78 77 77 77 Erection 81 65 87 84 84 72 Finishing 88 72 89 89 1 89 ( 74 I. All pertinent equipment present at site. II. Minimum required equipment at site. Note: Noise levels are for a reference distance of 50 feet. Source: Alfredson, Robin J., and May, D.M., "Construction Equipment Noise", and May, Daryl N., "Handbook of Noise Assessment", 1978. Table B Typical Sound Levels at Construction Sites (leq, DBA) Noise levels associated with project construction activities are expected to be less than 89 dBA at a distance of fifty (50) feet from the source. Since no proposed development will take place within fifty feet of a sensitive receptor,the noise levels should be even lower than this. Noise levels at the two sensitive receptors would be less than those listed in Table B due to their additional distance from the construction site. In addition,some further noise reduction would be gained through the frame construction of the residences. It should be noted that the higher nosie levels would occur in the initial stages of construction during the clearing Disk #390, Cross Sound Ferry File: Noise\Anticipated Impacts A-160 and excavation operations. These phases are generally completed relatively quickly, and constitute a small percentage of the total construction time schedule. Overall construction activity and noise will be a short-term impact. Mitigation measures will be utilized during the construction has to keep noise impacts at a minimum and will include: a. Construction equipment utilized at the site will be required by contract specifications to have efficient intake and exhaust mufflers on internal combustion engines. Through the use of efficient mufflers, noise levels will be kept to a minimum during the clearing and grading phases of construction which are usually the worst case situations from a noise standpoint. b. Construction activity will be limited to daytime hours by contract specifications. c. Shields or other physical barriers, such as berms of earth or soil stockpiles, will be used to restricted the transmission of noise. d. The erection of soundproof housing or enclosures will also be utilized for noise producing machinery, particulary for situations where generators and/or compressors are operated by prolonged time periods. Disk #390, Cross Sound Ferry File: Noise\Anticipated Impacts A-161 SUMMARY Disk #390, Cross Sound Ferry File: Noise:\Cover A-162 Findings and conclusions based on the analysis and data presented in this report can be summarized as follows: 1. The proposed action, expansion of the existing parking facility, in conjunction with normal growth of traffic in the area and increase in ferry business, could be expected to have a minor impact on noise conditions in the vicinity of the ferry operations based on the worst case conservative assumptions presented in this report. Under these conditions, a slight increase in noise due to parking lot activity could be expected at receptor#2,the easternmost residence adjacent to the site. However, this increase would likely be on the order of 3 dBA or less, which is barely perceptible. 2. Traffic generated by the ferry operation could also increase due to the proposed action during some time periods,however,the magnitude of this change is not nearly great enough to cause a perceptible noise impact. 3. Finally, construction of the parking lot will result in a short-term impact due to construction activity. However, this noise impact is temporary in nature, and mitigation measures will be utilized so as to keep noise impacts to a minimum. 4. Construction of an earth berm along the property line or a stockade-type fence would further serve to minimize the impact of the parking lot related noise in the two residences. Disk #390, Cross Sound Ferry File: Noise\Summary A-163 TABLE OF AREAS FOR PROPERTIES OF CROSS SOUND FERRY SERVICES, INC. EXISTING CONDITIONS: TERMINAL & WEST PARCELS: TOTAL AREA: 109,945 S.F. BUILDINGS: 3,045 S.F. PAVEMENT/CONC. WALKS: 37,990 S.F. GRAVEL PARKING: 35,130 S.F. FRENCH DRAINS: 4,885 S.F. LANDSCAPING/LAWN AREAS: 24,730 S.F. BEACH: 4.165 S.F. TOTAL AREA: 109,945 S.F. "SNACK BAR" PARCEL: AREA: 63,640 S.F. BUILDING, PATIO&CONC.WALK: 3,545 S.F. GRAVEL PARKING: 48,745 S.F. ' EXISTING VEGETATION: 3,530 S.F. BEACH: 7.820 S.F. TOTAL AREA: 63,640 S.F. "TRUST" PARCEL: AREA: 107,855 S.F. EXISTING VEGETATION: 62,230 S.F. EARTH ROADS: 12,575 S.F. BEACH & DREDGE SPOIL AREA: 33.050 S.F. TOTAL AREA: 107,855 S.F. PROPOSED CONDITIONS: PROPOSED SITE PLAN (TRUST PARCEL ONLY) TERMINAL&WEST PARCELS: NO CHANGE "SNACK BAR" PARCEL: NO CHANGE "TRUST" PARCEL: AREA: 107,855 S.F. LANDSCAPING & GRASS: 15,410 S.F. GRAVEL PARKING &DRAINAGE: 55,150 S.F. BEACH & DREDGE SPOIL AREA: 37.295 S.F. TOTAL AREA: 107,855 S.F. JOHN, J. RAYNOR, P.E. & L.S., P.C. 516-726-7266 A-164 Drainage Computations for Proposed Site Plan for Cross Sound Ferry Services, Inc. July 21, 1997 Capacities of drainage facilities have been computed as follows: Gravel trench: L x W x D (2.33') x 50% Gravel trench with drainage unit: Drainage units = 2.6 c.f. per Lf. Gravel trench above drainage unit 1'x 3' x .5 = 1.5 c.f. per Lf. 4.11 c.f. per Lf. Drainage Area #1 : Area: 22,600 s.f. x 0.40 x 5" = 3,767 c.f. Provide 225 Lf. of gravel trench w/ drainage units = 925 c.f. with an additional 11' wide gravel trench = 2.883 c.f. Total: 3,808 c.f. Drainage Area #2: Area: 23,600 s.f. x 0.40 x 5" = 3,933 c.f. Provide 252 Lf. of gravel trench w/ drainage units = 1,036 c.f. with an additional 10' wide gravel trench = 2.936 c.f. Total: 3,972 c.f. Drainage Area #3 Area: 6,000 s.f. x 0.40 x 5" = 1,000 c.f. Provide 18 Lf. of gravel trench w/ drainage units = 74 c.f. with an additional 795 s.f. gravel area (French Drain)= 926 c.f. Total: 1,000 c.f. Drainage Area #4 Area: 19,000 s.f. x 0.40 x 5" = 3,167 c.f. Provide 243 Lf. of gravel trench w/ drainage units = 999 c.f. with an additional 8' wide gravel trench = 2.265 c.f. Total: 3,264 c.f. A-165 Analysis of Existing Sanitary Systems: "Terminal" Parcel: Existing sanitary system on the "terminal parcel" is comprised of a septic tank and 12 leaching pools, each 10' diameter x 5' deep. Septic Tank: 10' dia. x 6' Liquid Depth = 5,000 gal (Two Day Flow) 5,000 gal = 2 days = 2,500 gal/day 2,500 gal _ 1.5 sf leaching area/gal = 1,667 sf leaching area 1,667 sf leaching area - 31.4 sf leaching area/of of 10'dia. leaching pool = 53.07 of "Snack Bar" Parcel: Existing Sanitary System is comprised of a 900 Septic Tank and 5 leaching pools, each 10' diameter x 2' deep Design Flow: 1,582 s.f. (wet store) x 0.15 gpd/sf=237.3 gpd Two Day Flow: 2 x 238 gpd = 476 gpd Notes- 1) Existing sanitary system for"Terminal Parcel"was determined based on information shown on the Site Plan for the"Cross Sound Ferry Terminal At Orient Point"dated 7/1/85.prepared by Ward Associates, P.0,the"Plan for Cross Sound Ferry Services, Inc"., last revised May 16, 1995, prepared by Peconic Surveyors, P C and phone conversations with Tom Shaughnessy of Cross Sound Ferry Services, Inc. 2) Existing sanitary system for"Snack Bar"parcel was determined based on information shown on the*Site Plan Snack Bar Cross Sound Ferry Services,Inc"., last revised June 7, 1988,prepared by Young&Young and phone conversations with Tom Shaughnessy of Cross sound Ferry Services, Inc. John J. Raynor, P.E. & L.S., P.C. 516-726-7600 A-166 McDONALD GEOtSCIENCE Box 1000 a Southold.New York 11971 a (516)765-3677 TEST HOLE DATA SHEET Name: Inter-Science Cross Sound Ferry Surveyor: Location: Orient Tax Map Number: 1000-15-9-3.5 Project Description: Lot Date: 7/7/97 Brown silty loam OL Pale brown loamy silt ML -------- BS 3.5' Brown fine to coarse sand SW -------- 7.8' Water in brown fine to coarse sand SW 14' Comments: Test hole boring. . .$150.00 A-167 SUFFOLK CCUNTY DEPARTMENT OF HZkLTH SERVICES - WATER ANALYSIS NAME: Cross Sound Ferry ADDRESS Dock. Road Orient, N.Y. 11957 SAMPLE DATA :IAY-06-1997 GG SAMPLE TAP: KITCHEN ,5,,V q c/l /3,r1,f - USEPA Result MCL or AL Result MCL total coli_'orn ABSENT absent oxamyl . . . . . . . . . <1 50. ppb specif'_c Gond. . . . 386 - umhos/cm carbaryl . . . . . . . <1 50. ppb pH 6.2 - 1-nanthol . . . . . . <1 - ppb nitrate . . . 8.2 10.0 ppm methomyl . . . . . . . <1 50. ppb nitrite <0.02 1.0 ppm propoxur . . . . . . . <1 50. ppb free am:-,or-4a . . . . 0.09 - ppm methiocarb . . . . . <1 50. ppb chloride 65 250. ppm alpha-BHC . . . . . <0.20 0.2 ppb sulfate_ . . . . 32 250. ppm beta-BHC . . . . . . <0.20 0.2 ppb iron . . . . . <0.10 0.3 ppm * gamma-BHC . . . . . . <0.20 0.2 ppb manganese . . . . 0.022 0.3 ppm * delta-BHC . . . . . <0.20 0.2 ppb copper . . . . . 140.00 1300 ppb AL# lindane(sum BHC) - 0.2 ppb sodium . . . 36.8 - ppm + heptachlor <0.20 0.4 ppb zinc . . . . . <50.0 5000 ppb heptachl"epoxide <0.20 0.2 ppb cadmium . . . . . . . <1.0 5. ppb aldrin . . . . . . . . . <0.20 - lead <1.0 15. ppb AL# dieldrin . . . . . . . <0.20 - silver . . . . <5.0 50 ppb 4,4 DDE . . . . . . . . <0.20 - alumirum <5.0 - ppb 4,4 DDD . . . . . . . . <0.20 - arsenic . . . <2.0 50 ppb 4,4 DDT . . . . . . . . <0.20 - barium 54.6 2000 ppb endrin . . . . . . . . . <0.20 0.2 ppb beryllium . . . . . <1.0 4 ppb endrin aldehyde <0.20 - cobalt <1.0 - ppb chlordane . . . . . . <0.20 2. ppb alachlor . . . . . <0.20 2. ppb aldicarb . . . . . . . . <1 - ppb methoxychlor <0.20 40. ppb aldicarb sulfoxide <1 - ppb endosulfan I . . . <0.20 - aldicarb sul=one <1 - ppb endosulfan II . . <0.20 - TOTAL ALDIC=LRB . . <1 7, ppb dacthal . . . . . . . . <0.2 50. ppb carbofuran . . . . . . <1 40. ppb monomethyltetra- <10.00 50. ppb 3-hydrexycarbfuran <1 - ppb tetrachlorotere- <10.00 50 ppb ppm = parts per million ppb = parts per billion * Iron and manganese combined should not exceed 0.5 ppm . + Moderately restricted sodium diet should not exceed 270 ppm . Severely resticted sodium diet should not exceed 20 ppm . # Lead & copper Action Levels (AL) are not Maximum Contaminant Levels (MCL) Result Result vinyl chloride . . . . . . . . . <0.5 (2) benzene . . . . . . . . . . . . . . . . . . . . . <0.5 methylene chloride . . . . . <0.5 toluene . . . . . . . . . . . . . . . . . . . . . <0.5 1,1 dichloroethane . . . . . 2.0 chlorobenzene . . . . . . . . . . . . . . . <0.5 trans 1,2 dichloroethene <0.5 ethylbenzene . . . . . . . . . . . . . . . . <0.5 chloroform . . . . . . . . . . . <0.5 (100) o-xylene . . . . . . . . . . . . . . . . . . . . <0.5 1,2 dic:^.loroethane . . . . . <0.5 m-xylene . . . . . . . . . . . . . . . . . . . . <0.5 1,1,1 --ichloroethane . . 0.5 p-xylene . . . . . . . . . . . . . . . . . . . . <0.5 carbon _ezrachloride . . . <0.5 total xylene . . . . . . . . . . . . . . . . <0.5 1 bromo 2 chloroethane . <0.5 2 chlorotoluene (o) . . . . . . . . . <0.5 1,2 dichlorcpropane . . . . <0.5 3 chlorotoluene (m) . . . . . . . . . <0.5 trichlcroethene . . . . . . . . <0.5 4 chlorotoluene (p) . . . . . . . . . . <0.5 chlorodibromomethane . . . <0.5 (100) total chlorotoluene . . . . . . . . . <0.5 1,2 dibromoethare . . . . . . <0.02 (0.05) 1,3,5 trimethylbenzene . . . . . . <0.5 2 bromci chloropropane <0.5 1,2,4 trimethylbenzene <0.5 bromofcrm . . . . . . . . . . . . . . <0.5 (100) m,p-dichlorobenzene . . . . . . . . . <0.5 tetrachloroethene . . . . . . <0.5 1,2 dichlorobenzene (o) . . . . . <0.5 cis dichlorcethene . . . . . <0.5 p-diethylbenzene . . . . . . . . . . . . <0.5 freon 113 . . . . . . . . . . . . <0.5 1,2,4,5 tetramethylbenzene . . <0.5 dibromcmethane . . . . . . . . . <0.5 1,2,4 trichlorobenzene . . . . . . <0.5 1,1 dichloroethene . . . . . <0.5 1,2,3 trichlorobenzene . . . . . . <0.5 bromodichlcromethane . . . <0.5 (100) ethenylbenzene (styrene) . . . . <0.5 2,3 dichloropropene . . . <0.5 1 methylethylbenzene (cumene) <0.5 cis dichloropropene . . . . <0.5 n-propylbenzene . . . . . . . . . . . . . <0.5 trans dichloropropene . . <0.5 tert-butylbenzene . . . . . . . . . . . <0.5 1,1,2 trichloroethane . . <0.5 sec-butylbenzene . . . . . . . . . . . . <0.5 1,1,1,2 tetrachlo ethane <0.5 isopropyltoluene (p-cymene) . <0.5 s-tetrachloroethane . . . . <0.5 n-butylbenzene . . . . . . . . . . . . . . <0.5 1,2,3 trichloropropane . <0.5 hexachlorobutadiene . . . . . . . . . <0.5 2,2 dic%ioropropane . . . . <0.5 1,2 dibromo 3-chloropropane <0.02 (0.2) 1,3 dic _oropropane . . . . <0.5 methyl-tertiary-butyl-ether <0.5(50) dichlorcd4fiuoromethane. <0.5 2-butanone (MEK) . . . . . . . . . . . . . <20.0(50) tetrah%' ran . . . . . . . . <20.0 (50) chlorodifluoromethane. . . . . . . . <0.5 NOTE: < symbol means "less than" indicating no detection Maximum Contaminant Levels (MCL s) for volatile organic and hydrocarbon compounds are 5 parts per billion (ppb) each. Limits established for individual compounds are noted in parentheses() . A-168 SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES - WATER ANALYSIS NAME. Cross Sound Ferry ADDRESS: Dock Road Ofient, N.Y. 11957 SAMPLE DATE: MAY-06-1997 SAMPLE TAP: Ctar2,e USEPA Result MCL or AL Result MCL total coliform . . . ABSENT absent oxamyl . . . . . . . . . <1 50. ppb specific cond. . . . . 382 - umhos/cm carbaryl . . . . . . . <1 50. ppb pH . . . . . . . . . . . . . . . 6.3 - 1-napthol . . . . . . <1 - ppb nitrate . . . . . . . . . . 4.6 10.0 ppm methomyl . . . . . . . <1 50. ppb nitrite . . . . . . . . . . <0.02 1.0 ppm propoxur . . . . . . . <1 50. ppb free ammonia . . . . . <0.02 - ppm methiocarb . . . . . <1 50. ppb chloride . . . . . . . . . 83 250. ppm alpha-BHC . . . .. <0.20 0.2 ppb sulfate . . . . . . . . . . 22 250. ppm beta-BHC . . . .. . <0.20 0.2 ppb iron . . . . . . . . . . . . . <0.10 0.3 ppm * gamma-BHC . . . . . . <0.20 0.2 ppb manganese . . . . . . . . 0.004 0.3 ppm * delta-BHC . . . . . <0.20 0.2 ppb copper . . . . . . . . . . . 500.00 1300 ppb AL# lindane(sum BHC) - 0.2 ppb sodium . . . . . . . . . . . 34.2 - ppm + heptachlor <0.20 0.4 ppb zinc . . . . . . . . . . . . . <50.0 5000 ppb heptachl"epoxide <0.20 0.2 ppb cadmium . . . . . . . . . . <1.0 5. ppb aldrin . . . . . . . . . <0.20 - lead . . . . . . . . . . . . . <1.0 15. ppb AL# dieldrin <0.20 - silver . . . . . . . . . . . <5.0 50 ppb 4,4 DDE . . . . . . . . <0.20 - aluminum . . . . . . . . . <5.0 - ppb 4,4 DDD . . . . . . . . <0.20 - arsenic . . . . . . . . . <2.0 50 ppb 4,4 DDT . .. . . . . . <0.20 - barium . . . . . . . . . . . 42.5 2000 ppb endrin . .. . . . . . . <0.20 0.2 ppb herylli inn . . . . . . . <1.0 4 ppb endrin aldehyde <0.20 - cobalt . . . . . . . . . . . <1.0 - ppb chlordane . . . . . . <1.00 2. ppb alachlor . . . . . . . <0.50 2. ppb aldicarb . . . . . . . . . <1 - ppb methoxychlor .. . <0.50 40. ppb aldicarb sulfoxide <1 - ppb endosulfan I . . . <0.20 - aldicarb sulfone <1 - ppb endosulfan II . . <0.20 - TOTAL ALDICARB . . <1 7. ppb dacthal . . . . . . . . <0.2 50. ppb carbofuran . . . . . . . <1 40. ppb monomethyltetra- <10.00 50. ppb 3-hydroxycarbfuran <1 - ppb tetrachlorotere- <10.00 50. ppb ppm = parts per million ppb = parts per billion * Iron and manganese combined should not exceed 0.5 ppm . + Moderately restricted sodium diet should not exceed 270 ppm . Severely resticted sodium diet should not exceed 20 ppm . # Lead & copper Action Levels (AL) are not Maximum Contaminant Levels (MCL) . Result Result vinyl chloride . . . . . . <0.5 (2) benzene . . . <0.5 methylene chloride . . . . . <0.5 toluene . . . . . <0,5 1,1 dichloroethane . . . . . <0.5 chlorobenzene . . .. <0.5 trans 1,2 dichloroethene <0.5 ethylbenzene <0.5 chloroform . . . . . . . . . . . . . <0.5 (100) o-xylene <0.5 1,2 dichloroethane . . . . . <0.5 m-xylene . . . . . . . . .. . . . . .. . . . . <0.5 1,1,1 trichloroethane . . 11.0 p-xylene . . . . . . . . . .. . .. . . . . . . <0.5 carbon tetrachloride . . . <0.5 total xylene . . . . . . .. .. . .. . . . <0.5 1 bromo 2 chloroethane . <0.5 2 chlorotoluene (o) . .. .. . . . . <0.5 1,2 dichloropropane . . . . <0.5 3 chlorotoluene (m) . ... .. . . . <0.5 trichloroethene . . . . . . . . <0.5 4 chlorotoluene (p) . ..... . .. . <0.5 chlorodibromomethane .. . <0.5 (100) total chlorotoluene . .. . . . . . . <0.5 1,2 dibromoethane . . . . . . <0.02 (0.05) 1,3,5 trimethylbenzene . .. . . . <0.5 2 bromo 1 chloropropane <0.5 1,2,4 trimethylbenzene <0.5 romoform . . . . . . . . . . . . . . <0.5 (100) m,p-dichlorobenzene . ... . . . . . <0.5 tetrachloroethene . . . . . . <0.5 1,2 dichlorobenzene (o) . . . . . <0.5 is dichloroethene . . . . . <0.5 p-diethylbenzene . .. .. . . . . <0.5 freon 113 . . . . .. . . . . . . . . <0.5 1,2,4,5 tetramethylbenzene . . <0.5 dibromomethane . . . . . . . . . <0.5 1,2,4 trichlorobenzene .. . . . . <0.5 1,1 dichloroethene . . . . . 0.9 1,2,3 trichlorobenzene . . ... . <0.5 bromodichloromethane .. . <0.5 (100) ethenylbenzene (styrene) <0.5 2,3 dichloropropene . . . . <0.5 1 methylethylbenzene (cumene) <0.5 cis dichloropropene . . . . <0.5 n-propylbenzene . .. . . .... .. . . <0.5 trans dichloropropene . . <0.5 tert-butylbenzene . . . .. .. . . . . <0.5 1,1,2 trichloroethane . . <0.5 sec-butylbenzene .. . . ... .. .. . <0.5 1,1,1,2 tetrachlo ethane <0.5 isopropyltoluene (p-cymene) . <0.5 s-tetrachloroethane . . . . <0.5 n-butylbenzene . . . .. . ... . . . . . <0.5 1,2,3 trichloropropane . <0.5 hexachlorobutadiene .. . . .. . . . <0.5 2,2 dichloropropane . . . . <0.5 1,2 dibromo 3-chloropropane <0.02(0.2) 1,3 dichloropropane . . . . <0.5 methyl-tertiary-butyl-ether <0.5(50) dichlorodifluoromethane. <0.5 2-butanone (MEK) . . . . .. . . ... . . <20.0(50) tetrahydrofuran . . . . . . . . <20.0 (50) chlorodifluoromethane.. .. . . . . <0.5 NOTE: < symbol means "less than" indicating no detection Maximum Contaminant Levels (MCL s) for volatile organic and hydrocarbon compounds are 5 parts per billion (ppb) each. Limits established for individual compounds are noted in parentheses() . A-169 COUNTY OF SUFFOLK ROBERT J.GAFFNEY SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF HEALTH SERVICES MARY I_HIeeERD,M.D..M.P.H. JUN-18-1997 COMMISSIONER Cross Sound Ferry Mr. Richard McMurray Box 33 Vew London, Ct 6320 )ear Mr. McMurray Re: Water Sample MAY-06-1997 Kitchen - S�v.9{fC �•�2 . Cross Sound Ferry 123-5120191-62 -n inspection of the Cross Sound Ferry Non-community ublic Water Supply was conducted on 05/06/1997 at which time the water supply facilities met acceptable sanitary standards . ►nalysis of your water supply indicated at the time of sampling :he drinking water met New York State Department of Health recommended drinking water standards for the parameters tested. have enclosed the analytical results of the water sample collected from your non-community public water supply. Should --ou have any questions, please contact this office. V ry ruly , Donald Van De Water Senior Public Health Sanitarian Bureau of Drinking Water DV18 H TION OF ENVIRONMENTAL QUALITY 225 RABRO DRIVE EAST,NAUPPAUGE.N.Y 11788-4290 II =E OF WATER RESOURCES TEL (516) 853-3076 A-170 COUNTY OF SUFFOLK ROBERT J. GAFFNEY SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF HEALTH SERVICES MARY E.HIBBERO,M.D.,M.P.H. COMMISSIONER WAIVER FROM REQUIREMENTS OF MANDATORY DISINFECTION Pursuant to Part 5 of the New York State Sanitary Code, the following non-community public water supply is granted a waiver from mandatory disinfection: NAME OF PUBLIC WATER SUPPLY:Cross Sound Ferry NYSHD ID# : 123 14004897 62 OWNER .Mr. Richard McMurray ADDRESS :Box 33 :New London, Ct 6320 The waiver is subject to termination, if at any time the owner of the public water supply fails to comply with either the New York State or the Suffolk County Sanitary Code requirements . This waiver shall expire one year from this date 06/20/1997 . Issued by: SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES BUREAU OF DRINKING WATER SUPPLY cc :NYSHD ^I ;ION OF ENVIRONMENTAL QUALITY 225 RABRO DRIVE EAST,HAUPPAUGE.N.Y 1 1 788-4290 1 _-E OF WATER RESOURCES 0 TEL (516) 853-3076 A-171 COUNTY OF SUFFOLK � 5 ROBERT J.GAFFNEY SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF HEALTH SERVICES MARY E HIBBERD.M.D..M.P.H. COMMISSIONER WAIVER FROM REQUIREMENTS OF MANDATORY DISINFECTION Pursuant to Part 5 of the New York State Sanitary Code, the following non-community public water supply is granted a waiver from mandatory disinfection: NAME OF PUBLIC WATER SUPPLY:Cross Sound Ferry NYSHD ID# : 123 14004897 62 OWNER .Mr. Richard McMurray ADDRESS :Box 33 :New London, Ct 6320 The waiver is subject to termination, if at any time the owner of the public water supply fails to comply with either the New York State or the Suffolk County Sanitary Code requirements . , This waiver shall expire one year from this date 06/18/1997 . Issued by: SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES BUREAU OF DRINKING WATER SUPPLY cc :NYSHD 0 TION OF ENVIRONMENTAL QUALITY 225 RABRO DRIVE EAST,HAUPPAUGE.N.Y. 11788-4290 CE OF WATER RESOURCES ■ ■ TEL (316) 853.3076 A-172 COUNTY OF SUFFOLK ROBERT J. GAFFNEY SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF HEALTH SERVICES MARY E.HIBBERD.M.D.,M.P.H. JUN-20-1997 COMMISSIONER Cross Sound Ferry [r. Richard McMurray fox 33 New London, Ct 6320 lear Mr. McMurray D.e: Water Sample 05/06/1997 Cross Sound Ferry 123-5120191-62 Analysis of your water supply indicates at the time of sampling volatile organic compound (VOC) exceeded the drinking water tandard. The microbiological and inorganic chemical parameters tested were within established NYSHD drinking water standards xcept as noted on the enclosed analytical results . vOC"s have been used as cleaning solvents , degreasing agents and pertain compounds as pesticides . The concentration of the volatile rganic compound present in your water is listed on the enclosed _nalytical results sheet'. , n alternative source of water must be used for drinking water, ntil a potable water source is available. Your establishment must conspicuously post the enclosed public notification at all -ntrances . Bottled water must be made available and served upon ustomer request . Bagged ice must be utilized where ice is to ,.,e consumed. onnection to a public water supply is recommended whenever ellwater is found contaminated. If public water is not available considerations must be given to installing a deeper well r carbon filtration. If you elect to install filtration, plans ast be submitted to and approved by Mr. Farmer, SCDHS Bureau of Drinking Water, prior to installation. Please provide this ^ffice with a written plan of your action for obtaining a potable iter supply for your establishment within 30 calendar days . Should you have any questions , feel free to contact this office . Very truly yours, Donald Van De Water Senior Public Health Sanitarian Bureau of Drinking Water D TION OF ENVIRONMENTAL QUALITY 225 RABRO DRIVEEAST.HAUPPAUGE.MY 1 1 788-4290 D CE OF WATER RESOURCES ■ N TEL (S16) 853-3076 A-173 Suffolk Counly Department of Health Services Office of Ecology Peconic Estuary System Water Quality Monitoring Data-1996 Dale Time Sta Secchi Temp D.O. Sal. T Coliform F Coliform NI13 NOx NO2 NO3 TNN TDNN TDPO o-PO4 TP04 TOC DOC TSS Ch1-T Ch1-F SIO3 Aureo (ft) (C) (mg/1) (0/00) (mpn/100 m (mpn/100 (mg/1) (mg/1) (Ing/1) (mg/1) (mg/1) (mg/1) (mg/I) (mg/1) (mg/1) (mg/1) (mg/1) (mg/1) (ug/1) (ug/1) (mg/1) (cells/nil 01/03/96 I flit 11 i 60 1 5 116 29.66 4 4 < 000 0 006 020 0 1 1 0.091 0.009 0 105 1 850 1 550 69 1.6 68 61/23/96 1005 115 1 2 I u 5 2956 4 2 0 021 - 0 005 038 025 0 053 0.019 0 073 1 360 1 410 114 1 4 23 01/3(1/96 730 Hs s 4 5 19 1 1 6 28 74 9(1 13 01 K19 0 0(19 027 021 0 065 0 007 0 095 2 130 1 910 71 1 5 46 (12'(896 828 11 i 7(1 -1 1 13 1 2854 _ 2 0(107 0 005 n 34; 022 0 037 0 006 0 097 1 821) 1 530 10.0 1 9 0 62'28 96 644 Ili 15 0 2 1 12 3 2954 4 2 0 06 0 006 4122 016 0(42 < 0 005 0 055 1 770 1 850 3 1 1 0 0 03'07N9(S 93i Ili 90 1 i 11 7 28 30 2 2 0 0l l � 0 015 (128 028 0 067 < 0005 0 668 1 681) 1 570 69 1 5 23 03 13,96 1254 1 15 1(,0 1 5 11 7 2814 2 O fN 17 0 016 0 27 0 16 0.050 < 0 005 0042 1 790 1 800 26 1 1 23 03,21/96 910 Ili 8 0 3 5 11)9 2833 2 2 0 005 0 006 1)34 024 0 073 < 0 005 0 085 1 6i0 1 460 43 2 1 23 03!27190 1 1ni Ili 14(1 5 0 11 7 2869 2 2 n(K) 0(X15 1)21 024 0140 6.(15 0076 1�N 1 1 630 2 3 1 5 0 (4 01'96 7in HS S 1'_0 5 3 2831 _ 2 0(1 < 0 065 (124 022 0 125 < 0 005 u Hu 1 620 1 590 27 26 23 (4(19'96 1030 115 130 6o 86 2801 2 0(0 6 0005 n 2n 005 0.085 0 005 01)81 1 921) 1 600 36 25 0 (4118/96 81 i Ili 90 7 1 94 2762 4 - 2 a(05 0 005 1129 0 17 0 032 - 0 005 0068 1 730 1 770 40 33 2(4 04^3196 1026 Ili 130 105 2767 2 2 1)008 < 0(15 (121 1)24 0038 0026 0(47 188(1 1880 26 19 442 (4/29/96 858 Ili 120 119 83 2776 2 uMs 0005 024 021 00.13 0015 0066 17in 1740 16 12 612 Oi,08/96 I I io Ili 11 0 124 83 2728 ' , - (1 On ()()(Is 0 37 0 26 0(46 0(113 11061 1 77n 1 820 1 8 16 0 192 136 Oi 11496 841) Ili 91) 11 7 8 7 2734 _ 2 1)00 0(15 1)32 0 21) 0 038 0 008 0(43 1 Sim) l 780 1 9 1 6 1)122 34 nil-1296 1118 II5 90 134 90 2748 _ 2 D00 0.(15 021 016 0.(45 (1(K16 0(46 17(N) 154(1 16 14 0277 68 05!29x96 831 Ili I I 0 1 5 6 80 27 3o _ 2 0 014 0 015 n 39 027 0 039 0(K)5 0(43 14-4o 1 430 1 9 1 5 020 68 (6/06,96 1 l l o 1 11 120 176 77 2739 _ 2 (1 1)29 0005 044 0 50 0 054 < (1.0(15 O 057 1 870 1 660 8 3 69 0 070 34 (6,11,96 846 Ili 75 184 85 2761 _ 2 6020 0.167 415 005 4)(42 0037 0076 2180 1SIu 110 33 6028 68 116/2(06 1027 I 1 5 l 1)0 202 67 27.62 _ 2 - 6 0 1 0 005 1114 0 25 u.(40 0009 0(45 1 780 1 810 72 59 0 173 272 06/25/96 755 1 1 5 S S 189 7 1 27.94 4 2 0 Ni < 0 0(15 1128 0 23 0.02 0 013 0.063 1 630 1 560 50 3 5 0 2ul 68 r 0,03/96 959 Ili 192 7 1 28 30 2 2 6 60 0.(15 (1 14 026 0 061 < 0 005 0 088 1 431) 1.210 6.6 39 0 118 68 07/09/96 1256 Hs 5 10.0 21 5 65 28.09 2 2 O(XI c 0.005 031 023 0 068 0.005 0 059 1 5641 1 470 30 1 9 6 130 0 (17/18/96 1015 115 70 22 1 64 2829 2 2 u 01 0 018 1)31 0 30 0078 6 01.1 0 669 1 i1 N 1 1 390 4.1 35 0 169 68 07123/96 131 i 115 8 5 21 5 67 28 29 2 2 0 00 0 027 034 0 16 O(196 0(x16 0 071 1 670 1 501 5.2 39 0 287 68 1)8!01796 9(K) I 1 5 7 5 21 8 64 28 15 4 2 0(Il) 01)20 1131 0 32 0 096 0.031 0 098 16_0 1 6(4) 5 8 36 0 405 tib OVIT96 1310 Ili 9 5 22 1 72 28 16 2 2 000 0 012 4127 0.21 0 074 0.025 0(180 1 7(N 1 1 610 7.9 40 0 395 136 n8/14/Ski I(K)i II5 Ina 21 5 65 2827 2 2 0014 , O00,; 1)36 005 o(134 0.009 0099 1 750 1 5611 32 13 0124 68 08/22/96 1235 Ili In6 231 62 2835 2 2 O(1 0017 1)27 0.09 0(41 0.027 00 4 1910 1 790 43 26 0213 O 08129/96 94) 115 8 5 227 63 2866 30 2 OW 0 616 11(9 005 0.126 0 020 0.137 1530 1 500 40 2 1 0 180 0 09/04/96 1249 Ili 75 23 1 6.6 2865 2 2 u M 6 017 1127 0.20 0 029 0.038 0 053 1 7(N) 1 740 3.8 0 028 68 (012/96 913 115 70 22.1 63 28.96 2 2 0 f1 0 008 0 19 020 4(41 0.021 0.052 1 450 1 450 45 24 0 056 0 (1)/17/96 1015 1 15 206 67 28.82 2 2 0 034 0 018 1129 0 26 0.055 0 029 0.009 1 640 1 500 19 14 0 229 0 (1)/24;96 859 1 15 8 5 187 67 2879 _' 2 0140 0 022 023 0 24 0 071 0.022 0 081 1 590 1 440 14 2.2 0 277 0 10/62/96 11 12 115 lo(l 186 T6 3019 2 2 0 015 0 023 O 22 6 36 0 073 0.013 0 093 1 530 1'_'50 6.3 24 0 332 68 10!68/96 843 115 12 0 160 77 2905 < 2 2 c 000 < 0.005 027 036 0.107 0.018 0.079 1 440 1 410 0.168 0 10/17/96 1106 115 150 14.6 8.1 28.87 2 2 0012 0.017 034 430 0.088 0.622 0.070 1.640 1430 3.3 2.2 0.225 0 10/22/96 8.15 115 so 142 7.5 28.42 23 13 6 010 0.011 0.26 028 0 059 0 015 0.066 1 470 1 470 3.2 1.9 0.144 68 1(01/96 1007 115 1.10 13 5 8.2 28.30 8 2 - 000 0 014 0 35 033 0 055 4029 0.059 1 470 1.350 4.0 19 0.367 0 11/07/96 834 115 11.5 11 3 90 2848 - 2 , 2 000 0 021 0 33 034 0.079 0.019 0.145 1 460 1 440 3.6 29 0.191 612 11/1.1/96 956 115 10.0 10.1 86 2848 2 2 0.00 0.019 020 021 0.047 0.025 0.053 1 410 1 380 6.0 2.0 0.271 136 11/20/96 747 115 11.0 82 9.3 28.32 2 2 000 u Ol I 1)48 057 0 070 0.009 0.057 1.360 1 310 5.2 2.2 0.183 0 11/26/96 905 115 60 T6 11 5 29.36 < 2 , 2 0.00 < 0.005 041 020 0.049 0012 0.067 1.340 1 270 10.5 1.8 0.045 68 12/03/96 1158 115 11 0 6.4 lu 0 28 13 8 2 000 � 0 005 058 037 0 035 0 014 0.078 1 430 1 340 75 07 < 0 028 0 12/11/96 824 115 70 62 104 2780 8 2 0 034 0 025 0 47 041 0.034 0 012 0 038 1 480 1 460 107 1 7 0 126 0 12/17/96 1111 115 90 61 108 2757 2 2 0 013 0 007 0 55 042 0 050 0.007 0.058 1.590 1 430 1 L 8 14 0.039 0 12/31/96 1114 115 70 5 1 10.1 2718 8 4 < 002 < 0,005 042 0.06 0 066 0 014 0.041 1.630 1480 4.7 1.2 0.075 0 D1 EAN 9.2 126 83 2827 46 1 1 0 007 0 011 031 0.23 0 060 0 013 0 072 1.653 1.552 50 2.2 0 125 777 01/23/96 944 116 1 1 106 29 40 2 < 2 < 000 < 0.005 0.39 0.25 0.063 0.007 0.080 1 480 1 300 16.0 121 16 0 (11/30/96 920 116 20 67 28 73 Su 2 0.)14 0 019 028 022 0.077 0 011 0 107 1 860 1.640 69 14 46 02/08/96 850 116 -0 8 13.1 28 52 2 = 2 0 00 0005 0.34 020 0 0411 0 005 0 074 1 750 1 560 loo 20 23 02/28/96 835 116 2 1 12 1 2864 2 2 0(0 < 0 005 021 0 19 0 055 0 005 0 052 1 560 1.500 3 2 1 1 0 03/07/96 925 116 1 5 11 5 2824 2 2 0 016 , 0(05 033 0.27 0 056 c 0 005 0 067 1 870 1 700 57 16 0 uYl3/96 1110 116 18 119 2819 2 2 001, Ions 027 021 0042 0005 0147 1760 1.530 25 07 0 1)3 21/96 835 116 3 8 108 28 17 2 2 0 006 0(M 6 033 023 0 071 0005 0 082 1 530 1 470 30 I I 23 0 3'2 7196 1035 116 50 I(14 2831 2 2 0012 0005 030 020 0144 0005 0084 2(40 1710 25 11 23 (14 0I'96 821 116 S4 28 43 2 2 000 a 005 0.25 019 0 145 0 005 a 144 1 690 1 550 2 2 24 46 04 09,116 858 116 5 7 8 5 28(4 4 2 o 006 < 0 005 Off 005 0147 a(05 (1 062 1 9(M) 1 790 1 1 06 0 (4 18'96 758 116 68 9 5 _7 83 _ 2 u O(l • (105 027 0 17 00-12 0(05 0 071 1 730 1 690 70 2 8 25 264 423'90 810 116 110 29 oil 2 2 o(IIo 0(M)i 023 (1 IS 0 04 (1029 1)(03 1870 1920 30 10 06 3(6 04'_9:96 927 116 1(16 87 2741 _ 2 Imus u(M15 024 11Is 0053 0014 11(j(,2 1730 I"1 130 15 09 os u;08'90 1045 116 11 7 1)0 27 37 ' 2 0 410 0 005 (1 35 0 25 0(42 0 015 (1148 1 680 1 630 180 1 4 o 9 I IW 2o4 (1; 13,96 1 1_26 116 12(l 9 1 27 39 2 ' ')00 0 005 0 3' 0 26 0(}18 6 021 0149 1 890 1 660 09 0 8 0 175 0 Ili 14,96 933 116 11 2 go 2742 2 2 0 00 0 005 o33 0 31 0 037 0(K6 a 054 1 860 1 660 200 1 6 1 5 0 093 0 ns^2;'1)6 955 116 148 92 27 41 2 _ 0 00 < 0(05 0 24 0 22 0 025 0(06 0 029 1 570 1 610 30.0 08 o6 0 212 0 415 29196 914 116 15 0 8 2 27 36 2 2 0(0 - 0(05 0 30 027 0 028 0 605 0 038 1 460 1.340 170 19 20 0 233 34 06,116 96 933 116 17 1 7 7 27 0 2 2 0013 6 007 056 007 0 085 0 605 0(49 1 690 1 690 400 1 S 16 0 148 34 (1611'96 930 Illi 177 8' 2793 2 DIM) 0(M17 059 (11S 0038 01x16 0(62 1890 1630 1290 82 49 0(49 0 1)6 20106 8 iO I Io 19 3 67 27 79 _ ' 0 00 0 005 (139 0 19 0 036 o u0S 0 012 1 920 1 670 81 0 55 54 0100 1112 00'S 106 828 Illi 18 8 7o 28 1 3 2 2 (1(ill 11105 0 27 025 0 210 0 010 0 238 1 810 1 660 46.0 1 9 1 9 0 159 0 07 03 96 042 116 19 5 68 28 30 '+ _ 0 01) 0(M 0 032 025 0 062 _ 0 005 6 072 1 450 1 NO 79 0 49 20 0 078 0 (17ill)116 1109 1 l 21 1 6'_ '_832 _ 2 000 _ (IWi 035 023 0068 ((M1i 0168 1770 1760 6.0 22 O9 (089 0 (j7 18:96 955 116 27 68 2832 2 2 600 0005 027 028 0059 0011 0(63 1860 1840 440 17 15 0108 0 07'_310o 113; Ilo 21 2 (,7 28;I 2 2 u(M1 0031 034 034 0014 0014 0(MK3 1640 1610 280 30 28 0354 0 073L90 11 i9 116 2001 70 2S 611 2 2 014 11(1()5 033 019 0138 0014 0123 1720 L540 60 47 0297 136 9 08(11/96 845 116 207 63 28 29 2 _ 2 0(10 0 010 032 026 0 089 0 027 01189 1 570 1 650 600 65 46 0 406 272 ()81(17/96 1 130 116 21 6 7 1 2841 2 2 < 0 Um 0(115 (27 0 23 (11,50 0(121) (1 076 1 680 1 580 590 3.3 1 7 0,248 0 v 18 14/96 937 116 21 2 65 28 39 2 ' 0 01.1 - 0(05 039 0 28 o 4181 0 009 0 11)5 1 7(0 1 540 510 24 1 5 0 117 0 08'22,196 1 N H6 21 9 o 4 28 81 2 2 0 00 0 008 (1 24 < 1,05 1)(41 0018 0 049 1 620 1 540 700 26 14 0 114 0 ()8'29,'96 921 116 224 66 28 76 110 < 2 0(g) 0 012 0 05 ; 0 05 0 133 0 020 0 138 1 520 1 600 410 40 25 (1 141 ( 1)9.(4;96 1106 116 226 63 289' ' 2 0 0 o 00 033 014 0037 0027 01,57 1670 1590 520 10 0065 0 09.12196 854 116 21 9 6 9 2917 ' c 2 0 00 m(M 1) (119 0 18 (1149 M122 (o55 1 5 5 1 790 730 32 1 8 0 055 0 (19/24'96 936 116 IS 5 69 2<10u 2 2 0 029 u016 025 023 0 063 0 013 0 066 1 440 1 370 430 3 5 1 8 0'_(0 11 10/02/96 935 116 184 79 2896 _ 2 2 _ 0 00 0 016 030 024 0 088 0 014 0 058 1 450 1 410 1330 19 1.3 0 177 0 10,08/96 920 116 160 7 8 29 26 2 2 . 000 0 006 a 33 024 0 077 0 018 (1 147 1 270 1 260 33.0 23 14 0 117 0 10,10/96 1 139 116 15 9 76 2894 2 2 0 019 0 018 030 < (05 0 086 0 019 0 104 1 510 1 460 25 14 u 141 (_1 I(1 17196 921 1 1 6 140 8 2 2892 2 2 OOH I 0 014 032 0 28 m 108 0 01 1 (120 1 440 1 440 370 09 08 0 088 0 1(1'22/96 918 Illi 142 74 2857 2 2 (1 0(1(1 0(114 034 031 0161 0017 0061 171x1 1430 370 34 38 0122 68 111/31/96 S30 Ho 126 84 28 36 2 2 m(0 0 009 o29 027 0 065 0 025 0 086 1 430 1 490 370 20 1 5 0 312 0 11107/96 906 116 11 2 9 1 2848 2 2 00o 0 008 032 031 0 083 0 016 o090 1 400 1 470 460 35 1 6 0 151 0 11/14/96 82(1 116 94 8 7 28 28 2 2 000 < 0 005 035 036 0 025 0 024 0 037 1 410 1 400 41.0 25 1 8 0.219 0 11/20/96 822 116 8 3 93 28 34 _ 2 0.00 0 009 051 049 0 064 0108 0 103 1 340 1 300 70.0 53 14 0 173 0 1 l,'26/96 1620 116 74 106 28 27 2 2 000 = 0 005 050 025 0(4S 0 013 0 047 1 320 1 3SO 40.0 90 16 0 061 0 12/03/96 1143 116 63 101 28 15 2 2 < 0(M 1 0(0S 029 1 80 0 091 0 009 0 O(i0 1 580 1 340 37.0 27 0.7 < 0 028 0 12/11196 1012 116 5 9 I1)3 2775 13 2 OO-f0 0 011 0 55 0 31 00-17 O 01 S 0 043 1 610 1 420 330 119 1 5 0 109 0 12117/96 1059 116 1 1 0 64 11 0 2749 2 2 0 020 0 O((l 054 0 46 O(49 0 007 0 052 1 460 1 420 440 So 1 4 0 054 0 12/31196 920 116 100 49 10 3 27 27 2 2 � 11 02 � 0 005 034 0 05 0 074 0 016 0 031 1 420 1 300 360 62 2.5 0 091 0 MEAN 105 12 7 82 28.27 4 1 02 0 005 0 006 032 0 25 0 066 0 01 1 0 075 1 634 1 548 337 3 8 1 8 0 109 324 01/30/96 SOO 138 80 23 99 28 37 136 30 0 027 ONO 027 0 20 0 074 0 022 0 075 1 650 1 680 61 07 0 (12/28/96 720 138 130 1 8 11 7 27 17 110 17 (1(0 0 056 u 21 0 ON 0 0(12 0005 0 102 1 480 1 SSO 3 7 1 2 0 03/13/96 1230 138 220 19 123 28 31 2 2 OW a 0(15 021 0 15 0 059 0005 0 062 1 420 1 400 20 0.5 0 03/27/96 1048 138 140 48 11,5 2844 ' 2 u 00 0 005 021 019 0 039 0()0(5 0 043 1 740 1 720 1 8 1 1 23 04/09/96 1002 138 120 54 90 28 29 < 2 2 0 006 0 011 021 021 0(152 0 005 0 058 1 590 1 6S(1 2 7 2 3 0 04/23/96 1004 138 140 8.9 2802 2 < 2 0 014 < 0.005 0.24 0.23 0 044 0 015 0 055 1 750 1.680 20 2 1 204 05/08/96 1 125 138 120 10.3 92 2757 2 r 2 < 0,00 < 0 005 031 024 0 027 0 015 0(433 1.600 1 710 14 1 2 442 05/13/96 812 138 105 85 98 2683 23 < 2 0 009 0.007 037 0.33 0.041 0.005 0 054 1 590 1.380 0.9 08 0.075 0 05/22/96 1158 138 12.0 142 9.2 2744 2 < 2 < 000 < 0.005 0.31 0.26 0.027 < 0 005 0 045 1 620 1.620 1.6 1 3 0.233 68 (6/06/96 1416 138 15.0 154 84 2788 < 2 < 2 < 0.00 0 007 0.32 027 0.048 < 0.005 0.059 1 580 1 680 56 46 0 092 0 (61/20/96 1010 138 8 5 184 78 27.94 2 < 2 < 0.00 < 0,005 0.30 018 0 050 0 013 0 065 1 720 1.630 93 8 3 0 193 34 07/09/96 1227 138 100 20.4 77 28.35 < 2 < 2 < 000 0.007 0.31 0.29 0.060 < 0.005 0 096 2070 1 560 7.8 5.5 0088 68 07/23/96 1255 138 90 20.3 79 2829 2 < 2 < 000 0.476 026 024 0.048 < 0 005 0 071 1 840 1 700 4.2 3.8 0204 0 07/31/96 757 138 80 207 7 1 2867 < 2 < 2 < 000 0 009 038 0.29 0.114 0 019 0 158 1 590 1 530 5 8 60 0 289 68 08/07/96 1250 138 11 0 222 90 28 50 2 < 2 < 000 0014 025 026 0 099 0 016 0 077 1 680 1.580 35 29 0 218 0 08/22/96 1208 138 120 22 5 75 2889 2 2 ; 000 0,008 0 17 0 12 0 067 0 022 0 088 1 770 1 520 43 26 0 122 0 09/(11,'96 1227 138 70 227 73 28 88 2 < 2 < 0.00 0.007 0.27 030 0.015 0 014 0 101 1 510 1 400 1 7 < 0 028 0 10/02/96 1048 138 l 1 U 183 79 2897 13 = 2 < 000 0 017 027 0.22 0 074 0 021 0084 1 670 1.560 90 40 0 308 0 10/10/96 1 121 138 11 0 170 73 2946 2 2 U016 a 070 006 006 0.054 0 030 0 126 1 210 1.070 3.9 2(l 0221 0 10/17796 1047 138 10 5 160 7.9 2931 2 < 2 0.006 0 054 032 051 0 096 0012 0 1 10 1 160 1 100 46 2 7 0 223 0 10.31,96 953 138 IU0 135 84 2838 4 4 < 000 001.3 041 0.31 0075 0020 6061 1 530 1330 46 1 8 0225 0 11114%96 937 138 10.0 11 2 8 1 28 54 23 4 < 0 00 0.060 034 036 0.017 0 o34 0 052 1 360 1.300 3 5 26 0 365 0 11/26/96 955 138 6 0 82 102 2845 2 < 2 < 000 0 021 070 0 32 0.053 0 015 0 075 1 420 1 390 104 2 1 0 145 68 12/11%96 848 138 11 0 79 97 2733 23 23 0.040 0 091 040 052 0.090 0 029 0 052 1 430 1 370 23 1 3 0 430 0 12%31/96 1045 138 5 0 63 96 2737 < 2 < 2 < 0 02 < 0(05 0.45 0.41 0.035 0 015 0 052 1 870 1 480 10.0 20 0 128 U 111 EAN 109 128 85 2823 13 2 3 2 0 005 0 022 030 026 0.057 0 013 0 071 1 594 1 504 45 2 5 0 142 390 (15/13196 837 139 105 84 98 2661 17 < 2 0.010 0 008 0.32 0.26 0.044 0 006 0 049 1 630 1 610 09 0.9 0 075 0 07131196 835 139 8.0 180 74 28 96 2 2 < 0 00 U Ul 7 025 025 0 111 0 019 0.123 1 390 1 430 20 1 9 0 238 136 10/10/96 91 u 1 139 110 172 74 2940 2 2 0 015 0 068 1129 (132 0076 0 024 0 126 1 110 1 130 27 1 5 0 213 68 MEAN 98 145 82 28 2_9 63 67 0.0US 0 031 029 (128 0 077 0 016 0 099 1 377 1.390 19 14 0 175 680 9 I v rn �n 100, STATE OF NEW FORK DEPARTMENTCIF STATE ALBANY NY 12231 GAIT.5 S'4AFFFn SfcnFTAnyr)F STATE October 31 , 1984 Mr. Robert J. Schuch, P.E. DiCesare-Bentley Engineers, Inc. 593 Poquonnock Road Groton, Connecticut 06340 Re: F-84-117 (Revised) U.S. Army Corps of Engineers/NY District Permit - Cross Sound Ferry Services Inc. Dear Mr. Schuch: The Department of State has completed its evaluation of the revised project data submitted on October 23, 1984, for the above-reference project. Pursuant to 15 CFR Section 930.63, and based upon the revised project infor- mation submitted, the Department of State concurs with your consistency certifi- cation. This concurrence is without prejudice to, and does not obviate the need to obtain all other applicable licenses , permits , and approvals required under existing State statutes. The U.S. Army Corps of Engineers is being notified of this decision by copy of this letter. Sincerely, Geor R. Stamford Coastal Programs Administrator GRS:KJC:dlb cc: Mr. Neil Dobson, COE/NY U/CES,keit 1984 _ , A-177 p*pflcatbnNo. 84-189-L2 (Public Notice No 11712-RG—i .g-L2) NarnoofAppiicant Cross Sound Ferry Services, Inc. Effective Dat* Expiration Dots(If appUmble) DEPARTMENT OF THE ARMY PERMIT Referring to written request dated 13 March 1984 for a permit to: f�) Perform work in or affecting navigable waters of the United States,upon the recommendation of the Chief of Engineers. pursuant to Section 10 of the Rivers and Harbors Act of March 5.1899 W U.S.C.4wk, 1 ) Discharge dredged or fill material into waters of the United States upon the issuance of a permit from the Secretary of the Army acting through the Chief of Engineers pursuant to Section 404 of the Clean Water Act W U.S.C.13"); ( I Transport dredged material for the purpose of dumping it into ocean waters upon the issuance of a permit from the Secretary of the Army acting through the Chief of Engineers pursuant to Section IDS of the Marine Protection,Research and Sanctuaries Act of 1972(86 Star.1062;P.L.92.6!2); Cross Sound Ferry Services, Inc. 2 Water Street New London, CT 06320 203 443-5281 is hereby authorized by the Secretary of the Army: to Reconstruct an existing ferry loading ramp, install three 19-pile dolphins, and two 37-pile dolphins, and remove seven 27-pile dolphins to upgrade an existing commercial ferry docking facility. to Gardiners Bay; at Main Road, Orient, Town of Southold, Suffolk County, New York; in accordance with the plans and drawings attached hereto which are incorporated in and made a part of this permit(on draw- inns.sive file number or other definite identification marks.) 1522-15 (Gardiners Bay - Cross Sound Ferry Services, Inc. - crocking facility) subject to the following condlUons: 1. General Condithm: a. That all activities identified and authorized herein shall be consistent with the terms and conditions of this permit;and that any activities not specifically identified and authorized herein shall constitute a violation of the terms and conditions of this permit which may result in the modification,suspension or revocation of this permit,in whole or in part,as set forth more specifically in General Conditions j or k hereto.and in the institution of such legal proceedings as the United States Govern- ment may consider appropriate,whether or not this permit has been previously modified,suspended or revoked in whole or in lurt. ENG FORM 1721,Sep 82 EDITION OF 1 JUL 77 IS OBSOLETE (EX 1145 t-Wf) A-178 b. That all activitlee authorized herein shall, if they involve, during their construction or operation. any discharge of pollutants into weters of the United States or ocean waters,be at all times consistent with applicable water quality standards, effluent limitations and standards of performance,prohibitions,pretreatment standards and management practices establish• ed pursuant to the Clean Water Act W U.S.C. 13M,the Marine Protection,Research and Sanctuaries Act of 1972 I.P.L. 92.6.42. 88 Stat J0621.or pursuant to applicable State and local law. a. That when the setivity authorised herein involves a discharge during its construction or operation, or any pollutant lincluding dredged or fW material),into waters of the United States,the authorized activity shall,if applicable water quality$tan• dards are revised or modified during the term of this permit,be modified,if necessary,to conform with such revised or modified water quality standards within 6 months of the effective date of any revision or modification of water quality standards.or as directed by an implementation plan contained in such revised or modified standards,or within such longer period of time as the District Engineer,In consultation with the Regional Administrator of the Environmental Protection Agency,may determine to be reasonable under the circumstanem d. 77hat the discharge will not destroy a threatened or endangered species an Identified under the Endangered Species Am or endanger the critical habitat of such species. e. That the permittee assess to make every reasonable effort to prosecute the construction or operation of the work authorized herein in a manner•o as to minimize any adverse impact on fish,wildlife,and natural environmental values. f. That the permittee agrees that he will prosecute the construction or work authorized herein in a manner so as to minimize any degradation of water quality. g. That the permittee$hall allow the District Engineer or his authorized representativeis)or designeetsl to maks periodic in• $pectioos at any time deemed necessary in order to assure that the activity being performed under authority of this permit is in accordance with the terms and conditions prescribed herein. h. That the permittee shall maintain the structure or work authorized herein in good condition and in reasonable ac- cordance with the plans and drawings attached hereto. I. That this permit does not convey any property rights,either in real estate or material,or any exclusive privileges; and that it does not authorize any injury to property or invasion of rights or any infringement of Federal. State, or local laws or regulations. 1. That this permit does not obviate the requirement to obtain state or local assent required by low for the activity autboriz• ed herein. k. That this permit may be either modified, suspended or revoked is whole or in pars pursuant to the policies and pro- twdure•of 33 CFR 325.7. 1. That In issuing this permit,the Government has relied on the information and data which the permittee has provided in connection with his permit application. If. subsequent to the issuance of this permit, such information and data prove to be materially false, materially incomplete or inaccurate,this permit may be modified,suspended or revoked,in whole or in part, and/or the Government may,in addition,institute appropriate legal proceedings. m. That any modification,suspension,or revocation of this permit shall not be the basis for any claim for damages against the Uaited States. a. That the permittee shall notify the District Engineer at what time the activity authorized herein will be commenced, as far In advance of the time of commencement as the District Engineer may specify,and of any suspension of work,if for a period of more than one week,resumption of work and Its completion. o. That If the activity authorized herein is not completed on or before day of—.19 ,Ith?"yearn font the dap o/issuance o/thU permit unless otherwise spit-4 d)this permit. if not previously revoked or specifically extended. Shall automatically expire P. That this permit does not authorize or approve the construction of particular structures,the authorisation or approval of which may require authorization by the Congress or other agencies of the Federal Governmeat q. That If and when the permittee desires to abandon the activity authorized herein,unless ouch abandonment Is part of a transfer procedure by which the permitter Is transferring his Interests herein to a third party pursuant to General Condition t hereof,he most restore the area to a condition eatisfectory to the District EcglnW, r. That if the recording of this permit to possible ander applicable State or local law,the permittee shall take such action as may be necessary to record this permit with the Regioter of Deeds or other appropriate official charged with the responsibility for maintaining records of title to and intereeta in real property. _— A-179 a. That there shall be no unreasonable interference with navigation by the cdstence or use of the activity authorised herein. t That this permit may not be transferred to a third party without prior written notice to the District Engineer.either by the transferee's written agreement to comply with all terms and conditions of this permit or by the tranaferree subscribing to this permit in the space provided below and thereby agreeing to comply with all term@ and conditions of this permit In addi• tion,if the permittee transfere the interests authorized herein by conveyance of realty,the deed @hall reference this permit and the terms and conditions specified herein and this permit @hall be recorded along with the deed with the Register of Deeds or other appropriate official u. That if the pwmittee during prosecution of the work authorized herein, encounters a previously unidentified ar. cheological or other cultural resource within the area subject to Department of the Army jurisdiction that might be eligible for listing in the National Register of Historic Places,he @hall immediately notify the district engineer. 11. Special Condlflons:(.flan Etat conditions relating sprc(AwRy to the proposed stntctum or wort artAwkeed by dh pmW* The outermost cell will be equipped with light and sound apparatus as per regulations of the United States Coast Guard, to include at a minimum sufficient sting as to be visible at least 3 miles and a fog horn to be audible for one mile. A-180 The following Special Conditions will be applicable when appropriate: STRUCTURES IN OR AFFECTING NAVIGABLE WATERS OF THE UNITED STATM a e entitled to compensation » this permit dose not authorize the Enteric *hallnotof bbe nee with any existing or proposed Federal Project and that the permittee or result from•zlettng or hlture for damage or injury to the structures or work authorized hereto which may be caused by ooperations undertaken by the United Stabs In the public Interest b. That no attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the activity authorised by this permit a That if the display of lights and signals on any structure or work authorized herein is not otherwise provided for by law, such lights and signals a•may be prescribed by the United States Coast Guard shall be installed and maintained by and at the expense of the permittee. d. That the permittee,upon receipt of a notice of revocation of this authorized structure or work,shall,without e: Permit or repot Its expiration be/ore completion of the Army authorized his authorized representative ho pease to the United States and In such time and manner u the Secretary of the ply with the direction of the Secretary of the Army oreM shl his representativetore the waterway to its s the Secrets.If the permittee fails to tom• the waterway to its former condition.by contract or otherwise,and recover the cost thereof from the tary peri designee may restore e. Structures for Small Hoare:That permittee herebyreeo subject to damage by Swavemall wash from asci �:es the Possibility that the structure permitted herein may be proper steps to a by the into passing vessels.The Issuance of this permit does not relieve the permittee from taking all wave wash and the "of the structure Permitted herein and the safety of boat@ moored thereto from damage by permittee shall not hold the United States liable for any such damage. MAINTENANCE DREDGING, for a That when the work authorized herein includes periodic maintenance dredging,it may be performed under this permit Years from the date of issuance of this permit(ten Years unbar otherwise indicated); b. That the permittee will advise the District Engineer in writing at least two weeks before hs intends to undertake any maintenance dredging, DISCHARGES OF DREDGED OR FILL MATERIAL INTO WATERS OF THE UNITED STATESt a That the discharge will be carried out inconformity with the goats and objectives of the.EPA Guidelines established pure sumnt to Section 4041b1 of the Clean Water Act and published in 40 CFR 230; b. That the discharge will consist of suitable material free from toxic Pollutants In toxic amounts. e. That the fill created by the discharge will be properly maintained to prevent erosion and other non•point sources of pollu- tion. DISPOSAL OF DREDGED MATERIAL INTO OCEAN WATERSt a. That the disposal will be carried out in conformity with the goals, objectives, mad requirements of the EPA criteria established pursuant to Section 102 of the Marine Protection,Research and Sanctuaries Act of 1972,published in 40 CFR 220- 228. b. That the permittee shall Placa a copy of this permit in a Conspicuous place In the vessel to be used for the transportation and/or disposal of the dredged material as authorized herein. This permit shall become effective on the date of the District Engineer's signstura. Permittee hereby accepts and agrees to comply with the terms and conditions of this permit Cross Sound F9fWfr #rvices, Inc. BY AUTHORITY OF THE SECRETARY OF THE AVAYI DATE DISMCT ENtNNEEE, DATE U.S.ARAi1Y,Conn o►fN91IR g Transferee hereby agrees to comply with the terms and conditions of this permit TRANSFEREE DATE A-181 U.S. SOVERNMENT PRINTING OFFICE 7987 1522-15 (Gardiners Bay - Cross Sound Ferry Services, Inc. - docking facility) 11� , too'* 171 8 0 t c _ - eN /^tSr.lr V/r ST�r� O► uel., ,orr alp A) 1' a• (� 2 r f.pAAll DL►T Or TV A.V6 i 126^ LA7 4f f0 _— �•I�.L' _1 1 1. 53 1 A)[.-�� _ I 11 T,.r A i / 4 .. r `: AILLI rO/)r RI TLIL a _.Arraoti M•L I 71 wl pr:•^} I•, .�� .Alt W Ar+JUbYA M.t } .1 ►• —_ArrrOa .A4W e+ttl. aAMr I •wla `••t — 49 wi o I rls+ '1;e* It: GARDIWEFS 1 •� t!Il7C ¢ANn P SO IJn 10 fl G .rf 1411 0 + 10 — BAY ,. BAY / 4e:¢vlrr a/4 d I N / 'Q jf,JUlret+LL )/JG -:.. A _ F / 39 NI.W•rJHW Iltl / STt ll RAI AI)AP4F M /3 1� LONG C OO (70 VL — f / 11 P ALOA,f. LAlh'r - 1 __JJ J 10 7114 -,rill hUlvl.l •o I �.. 1 n ;_� 05 �iLj 1 Ilwe �10 15 t7 C • 1„� o �srArE GS.AMT I.IA,1 VICINITY MAP ((-HART” 12351) C YARDS '0 1 - �•� ..«__,�� J 70 01.1"M A)0T E— FS / I E_L1-VATI0,M5 bA5L.17 OA3 MLW ' 0.0 ® 2.TIpE5 FOLOM 1984 N.D. A A • to • 3. ruIZPOSL : COMMLP-CIAL FL V-IZY GAO D ► 1JEaS „ ., u5E 0 0 B�Y q PCLUP05Ln ACTIVITILb ' C t EBB A, P-LNIOVAL OF f,XIST• 1ZAMP 0JOT EY.ISTIVC 77 rILE SHOWN 0JV ri"M AT LOCATIOJU Lxlsrl" 97- PILI DotI'M10 Toalkmmi) FLOOD OF ALlJ p-AMI'. t!0Lr//rA1 op VrrLA,Eo To eL [LPAOVLv , -209 w,,,. VE1. Is Pj C.OJu5TQUCTI0IAG1 OF AMW DOCKIN (Tv NC.AQ PILI OOlr110 -•� � 1 FACILITY SIMILA.tZ TO LXISTWG nOCIC1AUG F&CILITY (TO tt-E-M&14) C. IN5Te LL ATION OF 3 OQ 4 -))EW uE1J • ^IL[i 19 - PILE- POLI H)A35,2 • AUF-1.J 37 -PILE POLpN►NS. n DOLI4Q E S(ALTFV-),)NTE-,RE.M7VF- P EY.IST11`:IG 2.7-PILE POLPV41PS 5. APT()IUF12� m I L'I''' '17 r"f (L)E5 i U.S. DEPT. OF AWICULTUVE EAa t : ST&TE OF K7.Y. PE.PnV 1 1 4F-: Q 1 n_ r- Ta&),-)P012T&T10X) VELA A ' ' ILW [ y7 �]vr-vIsu✓ OC-t. 23, 1984 1 • Ioo /UF_W Ff_.121ZY hOCKJAG FACILITY IN G1�,121)WE-12_5 15AY GvurmC SCALL�IA� FE.L.T &T : DM)LA)T , TOWA) OF SOUTNOLI7 5UFFOLI.2. GUIVTY , IVF W YOVV_ &PP1_IC&TIC)1J f5Y ' GP O) 5 `.x(119.)P Ff.-P- nY S�.L?);1�.F 1 ►�� . I • �C Al � �'� `_-�I I(11..1 h-) L f P)V 11AV Y 198 1 1_ LY LMG17`) 1X)C (;120T(?A1 (. C)1�)NF.C� T" ICI )T JIALLT I OF 2 A-182 It. t d. Iso'.' NTLI ! — - 00� Cn'0'TC' 3 MEW AVJV5rAa1.F. -- — - UEr,1 19 PILE yaW 37 alte 9Z AAA e � 43TR9l UAIAr tXlj 19 C+1.7 77 1111.1 DOIt'NIl)- M1.PIII/)S VoLrIr II) rol!•Nlvs - FI 70 ' MI IJ I; /^11flSrly6 lOT TOM i r '.� I I L1C1ST•. I 'll �� ST"L L bUi V.MAll P120FILE OF LI )JE OF. DOLP1-1105 SCALE ' I" - 80' G12APMC. S(-&LF- 1?7 FEET O 20 40 8D fNAVID NLLS IVOICATa se VIA6 STILL Mas 14'VIA.STRILL. ►Itl! at s ILO' lLL\ ••N D' �(Z, Tout) 7 'IVSV S rwI'.*►I7lMLaI..' Oou6M.14aLtvJAlt>at S4.0' CWM ELCN TVO1 lT e �I •� / r " wict lot TO a4MW1.L "04LLAGN 0A TU4U -l%AuLp TO . , aALW .ILL. It p►LL OOt/W,AI >ti ►Ila pOLrN11J i 1p - pT IpC PILES TO HLVE •wAT. PILL! TV M►V'L • t IVO blkn TEL 1110 ILATTaQ -IWmalou PILES TO NWS lwv IV'T. L'A`tal. TO ►tea 9 L 7A WNW /I'p1.♦ 1.1000 IN PATTI% FntIS.iF, Ov 11710 •ATTaa -IST IUt L.&VIA TO "WIS ls TO Il 19 TOTAL -ALL►Ill PWVI ) It" LaTI9L E1,O.O HlW TO to, PIRIOLTINATHM -ALL ryLLa TO M /aww •e tV P/MST7)/vww 1 i E.LEVATIO)-) PL&X) VIEW 37 L QD 19 PILE POLPH I Q5 sch'LE : I" - 10' GUNPHIC SCALE 1>J FEET 0 2 A 10 REVISED OCT Z3, 198,1 �ULW F'Lp py pOCICI,UG FACILITY IN : GAP-PIAIE-RS 4b AY ,h,T : 03Z•IE�UT , TOWN OF SOUTHOLl7 5UFFOLV_ COUNTY �Uf_LL1 YC)RV— A P P L)C A T)OAU E5 Y•• ! r, 1, �rZoSS 5oU�n FEV- QY 5E12vIC 5 IJl1c -`'' ALE. : AS 5H0WN - ,� DOTE- FE.131ZUAP-y 198. 4 CLL - 15E-NTLLY LA3G -5. )AJC- ' 12 1 C E. SA G;?-DT" , C oNv� ECT I CUT '1'�. ''1'r n1.l�I Air, ��•� ''rrI11IlI11I11,1`` ;JNEF T 2 OF 2- A-183 A-183 DEPARTMENT OF THE ARMY NEW YORK DISTRICT. CORPS OF ENGINEER.; 26 FEDERAL PLAZA NEW YORK. N. Y. 10278 -0090 REPLY TO g Au ust 8 1984 _ ATTENTION OF: Regulatory Branch/Eastern Permits Section SUBJECT: Application No. 84-189-L2, Cross Sound Ferry Services, Inc. Cross Sound Ferry Services, Inc. c/o DiCesare - Bentley Engineers, Inc. 593 Poquonnock Road Groton, CT 06340 Gentlemen: Enclosed are two unsigned copies of the Department of the Army authori- zation for your work. Please review them and if you agree to all statements and conditions therein, have both copies signed under the corporate seal by the president or other officer authorized to sign for the corporation and return both copies to this office. They must be accompanied by a copy of the record of the election of the officer signing the authori- zation or a copy of the by-law or record of proceedings of the governing body of the corporation showing the authority of the officer signing them. The supporting documents must be certified by the custodian of such records, under the corporate seal, to be true copies. If the officer's authority was given by resolution, enough of the records of the corporation should be copied, along with the resolution, to show it was adopted. All matter copied (not simply the resolution) should be certified to be true copies. Your attention is directed to Special Condition (a) of the draft permit which requires you to install light and sound apparatus on the outermost cell as per the regulations of the United States Coast Guard. The permit fee is to be paid by a certified check or money order made payable to the "Treasurer of the United States" in the amount of $100.00 which is as prescribed by Corps of Engineers Permit Regulations (33 CFR 325) . To insure proper crediting, please write your application number as shown above and the word "Regulatory" on your certified check or money order. Upon receipt of the two signed copies with the supporting documenta- tion and payment of the permit fee, the original copy of the authorization will be numbered and signed by this office and returned to you. No work may begin until you receive your permit. Since 1 , loo Enclosure DENNIS J, USZKOWSKI, Ph.D. Chief, Regulatory Branch A-184 Application No. 84-189—L2 (Public Notice No 11712-84-189-L2) Name of Applicant Cross Sound Ferry ServicesInc. Effective Date Expiration Date(If applicable) DEPARTMENT OF THE ARMY PERMIT Referring to written request dated 13 March 1984 for a permit to: (x) Perform work in or affecting navigable waters of the United States,upon the recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers and Harbors Act of March 3,1899(33 U.S.C.40.4►; (A Discharge dredged or fill material into waters of the United States upon the issuance of a permit from the Secretary of the Army acting through the Chief of Engineers pursuant to Section 404 of the Clean Water Act(33 U.S.C. 1344); 1 ) Transport dredged material for the purpose of dumping it into ocean waters upon the issuance of a permit from the Secretary of the Army acting through the Chief of Engineers pursuant to Section 103 of the Marine Protection, Research and Sanctuaries Actof 1972(86Stat. 10152;P.L.92-632); Cross Sound Ferry Services, Inc. 2 Water Street New London, CT 06320 (203) 443-5281 is hereby authorized by the Secretary of the Army: to Reconstruct an existing ferry loading ramp, install three 27-pile dolphins and one 45-pile dolphin, construct a 20-foot diameter breasting cell filled with gravel and capped with concrete and remove seven 27-pile dolphins to upgrade an existing commercial ferry docking facility. in Gardiners Bay; at Main Road, Orient, Town of Southold, Suffolk County, New York; in accordance with the plans and drawings attached hereto which are incorporated in and made a part of this permit(on draw- ings,give file number or other definite identification marks.) 1522-15 (Gardiners Bay - Cross Sound Ferry Services, Inc. docking facility) subject to the following conditions: I. General Conditions: a. That all activities identified and authorized herein shall be consistent with the terms and conditions of this permit;and that any activities not specifically identified and authorized herein shall constitute a violation of the terms and conditions of this permit which may result in the modification,suspension or revocation of this permit,in whole or in part,as set forth more specifically in General Conditions j or k hereto,and in the institution of such legal proceedings as the United States Govern- ment may consider appropriate,whether or not this permit has been previously modified,suspended or revoked in whole or in pert ENG FORM 1721, Sep 82 EDITION OF I JUL 77 IS OBSOLETE IERtla.2.30yi A-185 b. That all activities authorized herein shall, if they involve, during their construction or operation, any discharge of pollutants into waters of the United States or ocean waters,be at all times consistent with applicable water quality standards, effluent limitations and standards of performance,prohibitions,pretreatment standards and management practices establish- ed pursuant to the Clean Water Act(33 U.S.C. 1344►,the Marine Protection,Research and Sanctuaries Act of 1972(P.L. 92 532, 86Stat. 10152),or pursuant to applicable State and local lam. c. That when the activity authorized herein involves a discharge during its construction or operation, or any pollutant (including dredged or fill material),into waters of the United States,the authorized activity shall,if applicable water quality Stan dards are revised or modified during the term of this permit,be modified,if necessary,to conform with such revised or modified water quality standards within 6 months of the effective date of any revision or modification of water quality standards,or as directed by an implementation plan contained in such revised or modified standards,or within such longer period of time ss the District Engineer,in consultation with the Regional Administrator of the Environmental Protection Agency,may determine to be reasonable under the circumstances. d. That the discharge will not destroy a threatened or endangered species as identified under the Endangered Species Act. or endanger the critical habitat of such species. e. That the permittee agrees to make every reasonable effort to prosecute the construction or operation of the work authorized herein in a manner so as to minimize any adverse impact on fish,wildlife,and natural environmental V Rlues. I. That the permittee agrees that he will prosecute the construction or work authorized herein in a manner so as to minimize any degradation of water quality. g. That the permittee shall allow the District Engineer or his authorized representatives)or designees)to make periodic in- spections at any time deemed necessary in order to assure that the activity being performed under authority of this permit is in accordance with the terms and conditions prescribed herein. h. That the permittee shall maintain the structure or work authorized herein in good condition and in reasonable Ac cordance with the plans and drawings attached hereto. L That this permit does not convey any property rights,either in real estate or material,or any exclusive privileges; and that it does not authorize any injury to property or invasion of rights or any infringement of Federal, State, or local laws or regulations. j. That this permit does not obviate the requirement to obtain state or local assent required by law for the activity authoris- ed herein. k. That this permit may be either modified, suspended or revoked in whole or in part pursuant to the policies and pro- cedures of 33 CFR 325 7. I. That in issuing this permit,the Government has relied on the information and data which the permittee has provided in connection with his permit application. If, subsequent to the issuance of this permit, such information and data prove to be materially false,materially incomplete or inaccurate,this permit may be modified,suspended or revoked, in whole or in part. and/or the Government may,in addition,institute appropriate legal proceedings. m. That any modification,suspension,or revocation of this permit shall not be the basis for any claim for damages against the United States. n. That the permittee shall notify the District Engineer at what time the activity authorized herein will be commenced, as far in advance of the time of commencement as the District Engineer may specify,and of any suspension of work,if for a period of more then one week,resumption of work and its completion. o. That if the activity authorized herein is not completed on or before day of 19 _,(three years from the date of issuance of this permit unless otherwise specified)this permit,if not previously revoked or specifically extended, shall automatically expire. p. That this permit does not authorize or approve the construction of particular structures,the authorization or approval of which may require authorization by the Congress or other agencies of the Federal Government. q. That if and when the permittee desires to abandon the activity authorized herein,unless such abandonment is part of a transfer procedure by which the permittee is transferring his interests herein to a third party pursuant to General Condition t hereof,he must restore the area to a condition satisfactory to the District Engineer. r. That if the recording of this permit is possible under applicable State or local law,the permittee shall take such action as may be necessary to record this permit with the Register of Deeds or other appropriate official charged with the responsibility for maintaining records of title to and interests in real property. A-186 s. That there shall be no unreasonable interference with navigation by the existence or use of the activity authorized herein. L. That this permit may not be transferred to a third party without prior written notice to the District Engineer,either by the transferee's written agreement to comply with all terms and conditions of this permit or by the transferree subscribing to this permit in the space provided below and thereby agreeing to comply with all terms and conditions of this permit. In addi- UOn,if the permittea transfers the interests authorized herein by conveyance of realty,the deed shall reference this permit and the terms and conditions specified herein and this permit shall be recorded along with the deed with the Register of Deeds or other appropriate official. u. That if the permittee during prosecution of the work authorized herein, encounters a previously unidentified ar- cheological or other cultural resource within the area subject to Department of the Army jurisdiction that might be eligible for listing in the National Register of Historic Places,he shall immediately notify the district engineer. If. Special Conditions:(Here list conditions relating specifically to the proposed structure or work authorized by this permit): a. The outermost cell will be equipped with light and sound apparatus as per the regulations of the United States Coast Guard to include at a minimum sufficient lighting as to be visible at least three miles and a fog horn audible for at least one mile. A-187 The following Special Conditions will be applicable when appropriate: STRUCTURES IN OR AFFECTING NAVIGABLE WATERS OF THE UNITED STATES: a. That this permit does not authorize the interference with any existing or proposed Federal project and that the permittee shall not be entitled to compensation for damage or injury to the structures or work authorized herein which may be caused by or result from existing or future operations undertaken by the United States in the public interest. b. That no attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the activity authorized by this permit. c. That if the display of lights and signals on any structure or work authorized herein is not otherwise provided for by law, such lights and signals as may be prescribed by the United States Coast Guard shall be installed and maintained by and at the expense of the permittee. d. That the permittee,upon receipt of a notice of revocation of this permit or upon its expiration before completion of the authorized structure or work,shall,without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct,restore the waterway to its former conditions. if the permittee fails to com- ply with the direction of the Secretary of the Army or his authorized representative,the Secretary or his designee may restore the waterway to its former condition,by contract or otherwise,and recover the cost thereof from the permittee. e. Structures for Small Boats:That permittee hereby recognizes the possibility that the structure permitted herein may be subject to damage by wave wash from passing vessels.The issuance of this permit does not relieve the permittee from taking all proper steps to insure the integrity of the structure permitted herein and the safety of boats moored thereto from damage by wave wash and the permittee shall not hold the United States liable for any such damage. MAINTENANCE DREDGING: a. That when the work authorized herein includes periodic maintenance dredging,it may be performed under this permit for years from the date of issuance of this permit(ten years unless otherwise indicated),- b. That the permittee will advise the District Engineer in writing at least two weeks before he intends to undertake any maintenance dredging. DISCHARGES OF DREDGED OR FILL MATERIAL INTO WATERS OF THE UNITED STATES: a. That the discharge will be carried out in conformity with the goals and objectives of the EPA Guidelines established pur- suant to Section 404(b)of the Clean Water Act and published in 40 CFR 230: b. That the discharge will consist of suitable material free from toxic pollutants in toxic amounts. c. That the fill created by the discharge will be properly maintained to prevent erosion and other non-point sources of pollu- tion. DISPOSAL OF DREDGED MATERIAL INTO OCEAN WATERS: a. That the disposal will be carried out in conformity with the goals, objectives, and requirements of the EPA criteria established pursuant to Section 102 of the Marine Protection,Research and Sanctuaries Act of 1972,published in 40 CFR 220- 228. b. That the permittee shall place a copy of this permit in a conspicuous place in the vessel to be used for the transportation and/or disposal of the dredged material as authorized herein. This permit shall become effective on the date of the District Engineer's signature. Permittee hereby accepts and agrees to comply with the terms and conditions of this permit. Cross Sound FerryESerrvvices, Inc. DATE BY AUTHORITY OF THE SECRETARY OF THE ARMY: DATE DISTRICT ENGINEER, U.S.ARMY,CORPS OF ENGINEERS Transferee hereby agrees to comply with the terms and conditions of this permit. TRANSFEREE DATE A-188 U.S. rOVERMIMIT FPI11'FT1lr, OFFI(.F 1981 r) - 1401- 114 •� %,P Irf w /r srAre. or Asti wr „ '• 1 ,,��`�l►os AI Z _6TArL G0.A ur �L►r Ayl OF TRAN6 Z �11►P.LliL.Sl.1 , ��� T ^I �+—•� -. 1 x76 �p I as Ir �... NLW COAJCKL.TL �� �y Sa. ;;:.:.:..:: r: -APP.. t2. ^1►.90q NTL 1 �•' . r, it AItw LnJUpTAbLL -- K � -3 �, •' �, v NS T El .A►P20 ►aurEI.L cn.lP 1' b i 49 .SO LKIST 'CiWSS ,,, Awl T^ 14; 01 Q SLO.uC CLAMP SOUMD C 6AMWERS / O - FIG ��r IMI (TO BLNAUN) FLKRT b�Prr. •.n�� SAY N I &uevlcce�k AnJUST&SLL 1/JG p NLu•MNW•NTL �/ STLIL RANr I7 Ilr OLO.NG Lx16T / os (To LtLNAIA►1 ' LONG p STLLL 6ULIl►NL►P /,� 8r !S NTL J 3 ;,i 10/ 11 ?• ; 72- n 42 MLIJ .....� r 4 •►. 0.? �srlrL GLLAA)r 1_IAJL VICl/VI-TY MIIP (CHART012354) .!, AIC, 1000 Be" 30" YARDS AILW XT-PILI •O fti L><IS #J-) 27 PILL AOLI"IUS voLPMl1J m TO QLMAIA, /UOT J " I ® 1 f._LEVATIO,V5 F3ASLl7 VA) MLIA = 0.0 ;a• 2.TIPE.5 FtLOM 1984 N.D. A.A. ®-Io.• 9 3• PUR PO:,F. : COM)AT-12 .IAL FL1'LUY 1 NtIJ z7-PILL GAk 1 /vF—lzS DOL►MIN USE- -1 SE-I PIZOPO".F,h ACTIVITIES ® jO noLrwlas Y O. 1ZL/�'./IIJ.'11_ OF m,&mv, ow ° SHOWAI 0)Ll pL.AM) AT LOCATIOA) LLISTO" ;7•VILL w DOL►NIA1 VLOOIT OF AF..W P-AMP TO AL LLLIMOVLD ^-ZO.• NLLJ p. (TTP.) _ 27-PILL 0 �.. COAZITCLIICTIOA) OF NEW 17OCK)A)6 DOL►NIAI e.ce F,SC.11 .1•1'Y 51NI1LALC TO LA15TL43G ® POCK)AW2 FACIL)YY (fro tzr ulkim) G. INS 1'r% I.L.ATIO/U s ' 27 - !'ll.f_ nol_pla)u5, i-Juf.1�J POLPH114, AMP )-.A)F.I,J Ncw +e•n►L 20' 0 CT-LL. L>bLdNIN n. MLMOVAL OF 7 EX15TIAXP Z7 - PILL 17OLPHIA5 y 5 11,PJ0)A)F.IZ`3 WE-51': 11.b. PLrfr Of AGIZ.ICIRTIML 710'L CLLL r-b bl STATL OF ;3.X. 11F^PT. OF T'CLl�NS. PLAU I � 00AEW F1r1212Y u0cY-lXNG FACIL_M I IJ : G 1l.LZ h I A)E_G.;:3 IbRY GRAPHIC 5CALLoIAI FELT &T : DIZ_IE-�T , TnWAU OF 5OUTNOI„n SUF FOUL COUNTY , A L W Y012_lL bPPL)C,&Tl0N 13Y CIZO55 bolv3n FC12Q•Y b -.CLv1(,.E`) lAc. �- �� n5 . • ` - 5cAT E F- UbCUA12Y 198.4 pICE SACL1= - p�f_l�1Tl,�Y ��11G12.`.�. 1Jl)C "'`.•r I,IL Ga0To1\) CO1J A)LCT I C UT ���►I►IIIIIIIII�,, � 'Ni CLT I OF Z A-189 3 5' NEW t1AMV O`/FIHA.UG ° I� 90• 100• ��NG• 3 CLW AVJVSTADLL Ex IST. 27 NLW 17 /ILi I /1LW 45 PILE- 20' d CI LL Al I/RAAAIP PILL DOL►H VOLP"IA3S_ IJJ 4T;P) CL 26 MHW\ �;�I L.C1O-- I I 1 I ExIST1 -0 V�11►1 ^"�r.r. ....n ...,n....� �` .._��.�- _ I II DO T T^M LXIbr,, III ll lI St•LLL P 12-O F- I L E-. ®ULK NLA1f 1'• = 80' 0 ZO 40 80 FELT --'� RUDDLtt r)UMrtR (TYr..1 ELLV. 19 - 12" GO.UG_GAP -QUDLL2 DUMOLt0. 7'IMCLR` FIL.LLP WITH % ((I rt �I GYL11.VE.L - xStifa,, -� +WALLIA WALL-Jf , it_ l` �rti it 4V�C / M H W --- --- ---- --- �\ J� M L W ,20 1'S2B SH ELT FILL L--= 5 LC-T 10� A- A JJ f-w zo_o C L1_L=P1.b. V 1 W I" = 10, 0 Z 4 10 FLLT 1••= )0` ® 2 4 f0 F- V y -12Y hoC11 ))36 FACILITY I N : G A Iz P 1 AIE. Ib AY AT : oP l><,O�� rO J TYJK) �ELJ 0Y9RKt .p S OF i"C'L V_ C � APPL)CA,T) 13Y: .1t Sow3V FEuCLY S�tzvIC�.S to SCALE - AS Stianl.Jly FLe)12-UAP-y 1984 G►ZOTO,,V , C UIJJvCT I CUT OF 2 '"'�,,, �('f 1r11 SIF' `,.•� JNE-•�T Z '��tt)It 111111,` A-190 — New York State Department of Environmental Conservation Building 40 - SUNY, Stony Brook, New York 11790-2356 Telephone (516) 444-0365 Facsimile (516) 444-0373 Aft Michael D. Zagata Commissioner AMENDMENT TO PE IT Date: Re: Permit No. & Location: } I -4-738-01c-q7 /pOOC, Nve,—w L6,.ac .p...1, C-E, cF• sa v Dear rr\(L Your recent request to extend the above permit has been reviewed pursuant to 6NYCRR, Part 621. The expiration date is extended to 12 131 19-7 Your recent request to modify the above permit has been reviewed pursuant to 6NYCRR, Part 621. It has been determined that the proposed modifications will not substantially change the scope of the permitted actions or the existing permit conditions. Therefore, the permit is amended to authorize: r (2QW10-a( e� 3 e,-..sf,.:J J-t-.,.f,qun_.) c�elpl,,.,s t!aocaC/�.ks,3J+l4c//,v, ) r ,lCn, we5+ S ilp 4'a 2C a" /� FA�4sl,P a ACconRia,., W� �. C-e. - A('l`2.c'.-4zO r ln,J �...J l^�c[Ati.. LJ Rc,.,cu:`,ic... J'.1 kc It 13 J5 This letter is an amendment to the original permit and, as such, shall be available at the job site whenever authorized work is in progress. All other terms and conditions remain as written in the original permit. Very truly yours, Permit Administrator cc: b bl4 - A-191 %-n-t(81871-9d New York State Department of Environmental Conservation Am AL abow C E NIW ,4mw N OT I The Department of Environmental Conservation (DEC) has issued permit(s) pursuant to the Environmental Conservation Law N for work being conducted at this site. For further information regarding the nature and extent of work approved and any Departmental conditions on it, contact the Regional Permit Administrator listed below. Please refer to the permit number shown when contacting the DEC. Regional Permit Administrator Permit Number 17 '1,3 9-0/0 zoi�®°Z�® ROBERT A. GREENS Expiration Date a a o / 7- NOTE: This notice is NOT a permit ,�r,�� C6Gtlr►G� ry �t°r ;/i��, �y+c� , Orc2r►7� FOJ hI RGA L, •� � - local�o n � _ - ? i�r��oTaru poipItI oc ILI kap Od � r wo •� �� •• Jam!1 . Z,S �,.ttc�.� : vel.• • a . ' � 1 N YS D E C �ec.....� �ti�tea,�,�,�-�. ol APPROVED '� t-4-135- o t�DZ-7/000na-� G� - - DATE►��—�15 �rL« couj1d 'firer.; Pr , <Mi-;VV ,,tom K �?Oih :-Ou.n�l Nc-yl IPP ?New. ol, rt%LSf r p /0/.30/916 A-193 PERM 42e (1/83) STATE OF NEW YORK - DEPAR TMENT OF THANSPOR TATION SH No 2,380 Permit Fee $ 100.00 Est Compl Date Ins. Fee $ 2.50 Total Received $ 102.WX Check or M O. No. 115138 HIGHWAY WORK PERMIT Permit Not 0--84—U 5 5 1 Liability Insurance Deposit Rec. for$ Policy No Expiring Check or M.O No Disability Benefit Coverage Dated Policy No or Permittee Cross Sound Ferry Service Inc. Chargeable to Bond No Address 2 Ferry Street - P.0- Rnx 33 or Undertaking on File City New I nndnn_ State rt_ Zip 06320 Workmen's Compensation Policy No Mailing Address for Return of Bond or Deposit Return of Deposit Made Payable To n.r.r�rr 0"I"I p,n ,..,.r......v............. (Complete only if different from above.) Name Name Address Address City State Zip City State Zip Under the provisions of the Highway Law or Vehicle&Traffic Law permission is hereby granted to the permittee to _nnen thin Stith side of-Rte--25_at_0 Tent--Rai --purpose_-ef install ' IDL-w4de -c-ur4-Buts operated-- t enc-re`te-is4andr-t-it�a} �� P3— to inctall approx-40 _-o-f-_curb.betweea-Eerr-y-- rk]ng jrPa an l _ e��altshau -er shall be installed_ to edge of existing concrete roadwa�r (4" base asphalt; 2" of in the county of Suffolk as set forth and represented in the attached application, at the particular location or area or over the routes as stated therein, if required, and pursuant to the conditions and regulations, whether general or special, and methods of performing work, if any;all of which are set forth in the application and form paft of this permit Dated at Hauppauge N Y Commissi ne of Transportatiory - Date Signed Jan- 7. 1985 / J By — IMPORTANT THIS PERMIT, WITH APPLICATION AND DRAWING (OR COPIES THEREOF) ATTACHED, SHALL BE PLACED IN THE HANDS OF THE CONTRACTOR BEFORE ANY WORK IS STARTED NOTICE - It is absolutely necessary that the permittee notify H.R. THYBERG D.O.T. Permit , (KAMXEngineer, whose address is N.Y.S, -O.FEICE-BLDG—VETS-. MEM.HWY,LIALIPEAV 24 Hr. notification required Tel No 36026 before work is started and upon its completion The issuing authority reserves the right to suspend or revoke this permit, at its discretion without a hearing or the necessity of showing rause arch- before or during the operations authorized. The Permittee will cause an approved copy of the application to be and remain attached hereto until all work under the permit is sarrsfartrn.iy rorn pleted, in accordance with the terms of the attached application (SEE OTHER SIDE) *top; internal drainage, etc. A-194 PERM 33d(31811 RESPONSIBILITIES OF PERMITTEE REVERSE 1. PROTECTIVE LIABILITY INSURANCE COVERAGE Permittee must have protective liability insurance coverage in accordance with Deportment requirements. (See Infor. motion on Protective Liability Insurance Required for Highway Work Permits and/or Special Hauling Permits, Form PERM•27). Expiration of, or lack of, liability insurance automatically terminates the permit. Insurance coverage may be provided by furnishing the Deportment with one of the following: a A Certificate of Protective Liability Insurance for Permits on State Highways (Form PERM 17, NYSDoT) b. A $2.50 remittance (check drawn on a New York State Bank or Certified) for coverage under the Deportmentol Blanket Policy. c, An Undertaking may be furnished by Public Service Corporations and Government Units only and must include the wording required by the Department. 2• COMPENSATION INSURANCE AND DISABILITY COVERAGE The applicant is required to have compensation insurance and disability coverage as notedinthe provisions of the Workmen's Compensation Lawond Acts omendotorythereof forthe entire period of the permit,or the permitis invohd 3. NOTIFICATIONS Notify Commissioner,through Regional Office,one week prior to commencing work, except emergency work by public service utilities which should be reported the next work day. Work must start within 30 days from date of permit. Notify area gas distributors 72 hours prior to any blasting. Notify Utility Companies with facilities in work area (permission must be obtained before doing work affecting utilities' facilities) before starting work, Notify land owners of abutting lands, before disturbing trees Notify Deportment of Transportation at conclusion of work and return original copy of permit to Regional Office Annual Maintenance Permit Notifications: Notify by telephone the District or Resident Office, one week in ocivance rock time regular momtrnnnre wo,d I .^J De perYOnevQ, in emorvenclos, nunricenon 0" reifpnuna ins neer ..w+ ovy d. SITE CARE AND RESTORATION An Undertaking, a bond or certified check in an amount designated by the Department of Trans portati on may berequired by the Regional Office,before a permit is issued, to guarantee restoration of the site to its original condition If the Department is obliged to restore the site of its original condition, the costs to the Department will be deducted from s the amount of the permittee's guarontee deposit at the conclusion of the work. The permittee is responsible for traffic protection and maintenance, including adequate use of signs and barriers during work and evening hours. Anyone working within the R 00 will wear an orange vest and hard hat. No unnecessary obstruction is to be left on the pavement or the right of way or in such o position as to block warning signs during or between work hours. No work shall be done to obstruct drainage or divert creeks, water courses or sluices onto the right of way All folsework must be removed and all excavations must be filled in and restored to the satisfaction of the Regional Traffic Engineer. S. COSTS INCURRED BY ISSUANCE OF THIS PERMIT All costs beyond the limits of the protective liability insurance, surety deposits, etc., are the responsibility of the permittee, a The State shall be held free of any costs incurred by the issuance of this permit, direct or indirect. 6. SUBMITTING WORK PLANS The applicant will submit work plans and/or a map as required by the Department. This shall Inc Jude such detoils as measurements of driveways with relation to nearest corner, positions of guys supporting poles and a schedule of the number of poles and feet of excavation necessary for completion of the work on the State right of way. A description of the proposed method of construction will be included. Plan work with future adjustments in mind, as any relocation, replacement or removal of the installation authorized by this permit and made necessary by future highway maintenance, reconstruction or new construction, will be the respon- sibility of the permittee. The permittee must coordinate his work with any state construction being conducted. 7. TRAFFIC MAINTENANCE Traffic shall be maintained by the permittee on the highway, in a safe manner,during working and nonworking hours until con struction is completed. Suitable safeguards, to reduce conditions dangerous to life,limb and property to a minimum, must be pro vided by the permittee(including flagmen when requested by the Department). 8. COST OF INSPECTION AND SUPERVISION If, in the accounts kept by the Department, costs of supervision are found to be exceedingly high, the Department re- serves the right to bill the permittee for actual expenses incurred by the supervision and inspection of the permittee's project. 9. SCOPE a. Areas Covered Permits issued are for highways, bridges and culverts over which the New York State Department of Transportation has jurisdiction. (Local governments issue permits for their own jurisdiction.) b. Legal The privilege granted by the permit does not authorise any infringement of federal, state or local laws or regulations, is limited to the extent of the authority of this Department in the premises and is transferable and assignable only with the written consent of the Commissioner of Transportation, c. Commissioner's Reservations The Commissioner of,Transportation reserves The right to modify fees and to revoke or annul the permit of any time, at his discretion without a hearing or the necessity of showing cause. d. Locations Work locations must meet approval of the Department (Additional pages to this application vary according to the purpose and type of work to be permitted) A-195 PERM 371(31811 STATE OF NFW YORK orPARTMFHT or TRANSPORTATION PREPARE HIGHWAY WORK PERMIT APPLICATION FOR NON UTILITY WORK 3COPIES Appllcatlen Is hereby rood• (or a highway work permit Highway Permit No. 10-89-0551 1 —1 Effective Data 1/7/85 Cross Sound Fe ENTER NAME AND Ferry Service, Ince 2 Ferry Street P.O. Box 33 MAILING ADDRESS NOW London, Ct. 06320 IN THIS SPACE L 1. Requested duration fee- 19 —thru 19_ to apply to the operation(s) checked below: 2. Protective Liability Insurance covered by Policy No. expires on 19 3. Workmen's Compensation Insurance Policy No expiring d. Disability Benefits Coverage Policy No. Check Type Permit She.I.s.Fee In Total Amevnt Guaremt.a of Operation Fee Amt.or PERM. e(Fee and/ D.P.eil A.*.— 17 pr Under. or Irovronee ewd•'or Fla. ,,kine on(Ile d.Sln,l•job.Permit 1.9.0d for each job a.Driveway or roadway �1Private N C (lO commercial SIOO 2.50 102.50 f 7 Subdivision Street $200 ��Tempary eeceer reed or street S 20 I I b. Improvement r--i P,I.&te N C ^ I I Cemmorelal $20 Cheek additional descelotien below: nlnstali sidewalk,curb,paving, t---1 rubllind sheuldor,dretnap,ere. I Grade,teed,Improv lewd.•.lour, ^clog,land of bush, etc. I I Resurface•eistlmg roadway er drlwway ��Mlssdl�"eoue I.—Tree Werk nPrivate N C MCamtmerclal(net required for pruning If S 20 u11111y hes 0....I meMtewg.c•permit) check 04,11110.01 description 6.10.1 I J Removal or►lewring '�--� _ Pwwln.eou ,applytrln.chemicals to stumps,etc. Jo. Msc.11ens COnruetI; ^l 1_1 Beautifying ROW.(1*,Civic Gaups Only) NC F7 Temporary slims,be"ners,Chrlstmas decorations S 20 UTraffic control signals $200 F-1 worming and entrance signs $20 Mlw*Ilan*ous nS. One permit Issuance which,•,reins in offset Ind.b.it•ly and S 20 requires continuous Insurance for encroachments cowed by DoT acgvlsltian of properly. n6. C"P.1.ery permit rvq.i,od when work performed of the rgwst of Department. Me. Buildings(within State highway right.ol.vey) on State lands when net covered by contract — _ns cllicatiens e1 the Department. Daniell lion n Mavlwg — —— N C It. Improvement le m*et Department standards NC TOTAL PAID 102.50 Walk mey be described briefly as follow., To open the south side of Rte. 25 at Orient Pointe Orient for the purpose of installinn two 15'0" bide curb cuts. operated by a raisdd conerete Island; To Install Intorlor curbing as oer plan; to installapprox. of ewrb betwimn Ferry Parking area and NYS Rte. 25 asphalt shoulder shall be installed to edoia of existing w1—l rAdditte al.ark description Is attached; I_�Plom power end/e. .Mar is Illed shoeing work to be p•,lormed en LOCATION ( en elan ,oxen Wt.Highway No. 8380 between$fail" and station in the Tow.of Sotrthold Cov"ty of SII*folk. known as Acceptant*of the rogwsted mit subjects ssthlIe permittee to therestrictions,regulations and ebligatiens stated on this application and on the permit. Applicant Signature I 6�/I 1104e- Det*of Application 19 App,oval recommended 19 By Resident Engineer D^IC.:. !y R..ian No. ' Approved 19 By Re.wnei La1(tt Engirt— "Concrete roadway (4" baseaasphalt; 2" of top; internal drainage. ate. A-196 -j Iq tJ 19 7 JotrAIA At, q 0' D:Adcrso or' -4 T N L lairr 'o It J. JoL; _411 AFJ .qm Ano Yv ji AM '�-14�- r Sot 0'#duo cm S44exwIt- 'op 'Mv-lor -qmm KWO 10 110 -07 A-197 PERM 41 1b 19:811 METHOD OF PERFORMING WORK WITHIN THE STATE HIGHWAY RIGHT OF WAY I GENERAL CONDITIONS These conditions and rep dstoa apply to Highway Work Permits authorizing work within the State highway right of way for water mains,pas mains,sewer lines and miscellaneous Structures Geerel conditions apply to telephone and telegraph installations as well as Specific conditions on the felting end resetting of polls.These eondrtons,end any special conditions which are added to IMS form,are enforceable by the Department of Torisportatmn. A TIME I Work oder the permit shag be Commenced within thirty 1301 days from the dote of pernut ilsuaoce unless a later starting date is approved by the Regional Traffic Engineer B REOUIREMENTS AN the current requirements of the following Shag apply: Occupational Safely and Health Administration.Factorial Department of Labor.Safely end Heehh Standards 129 CFR 1918119101:Part 131 Title 17,Now York Code of Rules and Regulations,Accommodation of Utilities Within State Right of We;Now York Stale Department of Labor,Industrial Code Rule 23.Protection of Persons Employed in Construction end Demolition Work;Industrial Code Rule 53.Construction,Excavation and Demolition Operations At Or Near Underground Facilities Temporary,soil erosion end water pollution controls shoo be used as required.The final decision on the method of underground installation will be meds by the Regional Director or his reprlsantetive. 1 Work Within Pavement and Shoulder Areas I Installations that CFOs$the pavement and shoulder area.Wherever practical,IN underground installations Shall be placed beneath the pavement and shoulder areas without disturbance to these paved surfaces. it Boring.Jacking,and Tunneling Methods DESIGN at The location of IN excavation$(lacking pits,etc.)shag be shown in plan and profile. Ill The Iasi profile and groundwater conditions shoo be determined by adequate Subsurface exploration cl The location of all other existing utilities shoo be shown. d) The construction equipment and procedures to be used shall be described in the permit application at The design of all excavations,including ground and surface water control whore necessary.Shan be made available for review by the Department f) The underground iWekean shag be described in dotal,i a.lite,length,depth.material,provisions for grouting,etc. gl Pipes shell panorelly be enclosed in Steel or larger pipes.Small dismnster services 12 inch 10.or smapel may be placed wmegt sleeving at the discretion of N.Y.S.0.0.T h) The limits of an open excavation shoo not be closer than 10 feet to the edge of the pavement unless approved by the Department.Open excavations shat be protected With the required controls for safety and for the maintenance and protection of traffic in accordance with the New York State Deportment of Transportation Manual of Uniform Traffic Control Devices. CONSTRUCTION it Grouting operations may be required if surface settlement,Ins of soil or voice around the pipe develop When grout is rp"ited,it shell consist of 1 pen cement to 2 ports sand,by volunw,end sufficient water to produce a consistency suitable for placing the grout Ill Backfill of open excavations shah be as caqutred under 2.) 0 Open Excavetion Method. 1) Open Excavation Method DESIGN at The location of en pavement crossing by the open excavation method shag be Shown in pian and profits b) The soil profile and groundwater conditions shag be determined by adequate subsurface exploration. d The location of all other stisting utilities shah be shown. dI The design of all excevotkos,including ground and surface water control where necessary,shag be meds evaieble fon review by the Department a) When requested.the construction swipment and procedures to be used shoo be described in the permit application. If Pipe installations shall be dna according to the requirements of the appropriate New York State Department of Transportation a Standard Sheets The required granule, material shelf most the material requirements for Select Granular Fig in the current New York State Department of Transportation s Standard Specifications including addends.Exceptions will only be allowed if prior approval is granted by the Regional Soils Engineer. gi Seamans Shan be sew cut at Form lation points of pavement replaeem y. CONSTRUCTION al Pavamam and shoulder removal shoo be done in a memw that Provides(or proper restoration of the repiecement section.Straight,vertical cuts of the pavement win be required.Paverant Surfaces that become undermiad shag be cut back and removed.Alternative repair methods may be used U prior approval is granted III The backfill material shag be placed and compacted according to the reopriemant for backlillirg structure,culverts,lives,conduits and direct burial cable described in Section 200,Earthwork,New York State Department of Transportation a Specifications,including addenda. ch Ganorelly,tins shag be filled at the end of each working day With prior approval,steel cover plate$may be used.Recessing of these plate$may be required dh Temporary pavements and shoulders shah be placed as soon as a crossover installation is completed. b. Installations that are longitudinal to the pavement. 1) Open Excavation Method DESIGN a) The location of all open excavations shop be shown in plan end profile. b) The foul profga and groundwater conditions Shan be detormied by adequate Subsurface exploration. ch The design of an excavations,inchsdmg ground and surface water control where necessary,SNIT be made available for review by the Department d) The location of an other existing utilities Shall be shown. a) Pipe iatehations Shan be done according to the requirommte of the appropriate Now York State Department of Transportation s Standard Sheets.The required granular materiel shat most the material requirements for Select Granular Fill in the current New York State Department of Transportation I Standard Specifications including addends.Exceptions will only be allowed if prior epprovd is granted by the Regional Soils Engineer. CONSTRUCTION al Pmveram and shoulder removal shag be done in a manner that Provides for proper restoration of the replacement Section.Straight.vertical cuts of the pavement will be required.Pavement surfaces that become undemsined Shan be cm back will rammed.Alterative repair methods may be used it prior approval is granted If The backfill material shop be placed and compacted according to the requirements for beckfining structures,culverts,pipes condom and direct burial cable d scribed in Section 200.Earthwork,New York State Department of Treaporlalion s Specifications,including addends cl GeneeAy,cuts Shoo be filed at the and of each working day.With prior approval,at"cove plata may be used.Recessing of these plates may be required III Permammt or temporary pavement shag be placed immedietely Is sections of the total installation are completed to subbase elevation Gravel Surfaces in Shoulder areas may be used if prior approval is granted. 11 Boring,Jacking,and Turetehng Methods DESIGN ah AN the inswiramentt of B.1.a. 1.1 DESIGN at through III shoo apply. CONSTRUCTION el Ag the townenNnts of B.1 e. 1.1 CONSTRUCTION of end b)Shelf apply. bit Open excavations shop be protected with the required controls fm safety and for the maintenance and protection of traffic in accordance with the New York Slate Department of Transportation.Manuel of Uniform Traffic Control Devices. cl The regtmemonn of 8,1,it,1J CONSTRUCTION dI shoo apply, 1. Work Outside the Pavement end Shoukdor Areas I Open Excavation Method DESIGN al AN the requmements of 8.1 b. 1.1 DESIGN shag apply. b) Open excavations shell be protected with the"tied controls for safety and for the maintenance and protection of traffic in accordance with the New Yak Slats Department of Transportation,Manual of Uniform Traffic Control Devices. CONSTRUCTION a) The backfill material shall be placed and compacted according to the requiemants for backfilling structures,culverts,pipes.conduits and direct burial cable described in Section 200.Earthwork,New York State Department of Transportation's Specifications.including addends A-198 I L.—I .r I Ib t91N n r REVERSE It. Baritq.Jac".and Tuarafag Methods el AN the retPuenents of B.I.a.1.1 DESIGN al through fl shed apply. bl Opon escwatim shelf be protected with the squired controls for safety end for the maintenance and protection of traffic in accordance with the Now York Stets Daps"m of Trumpet$tion,Manual of Uniform Traffic Control Devices CONSTRUCTION al AN the r@**Wwmv of B.1.a.1.1 CONSTRUCTION shelf apply. C. SUBBASE,PAVEMENT AND SHOULDER REQUIREMENTS Prockrdmg ms delle I 1 Subbase a. The subbase eouu shag be a mki.of 12 i chae thick wrNss otharwiss approved.The metenat shelf meat the rpuirements of current Department of Transportation sub base teume item a aper in by to Repaid Sols Engineer. IS. Urdu tho Permit,eansm. tion which adversely affects the subsurface drainage of the parement structure shelf be corrected by the addition of surface or subsurface theirs,as required. 2. Pavain i and Shoulders a. per go The hepta-ed pavxemxent sleal be shaper to Ida esbting pavement in composition and feature.The selection of the mefedel type end congmiton$half be subject to the approval of the Repeml Games Of his Is-M Stirs.The limit of paramount replacement shag be such that the replaced pavement n supported by thoroughly compacted subbase material Saw the pavement is mtaed to the prepay grade,Cross slope and smoothness. Wharf bituminous Caeaen mistuas see required for the pane re replace mam,the layers shelf consist of one or a combination of mixture types contained in Table 401 t,Com- Position anPosition of Bituminous Plain AAatrsas in Section 401 of the Now Yak State Department of Transportation s Specification,includeg addenda.The mixture shag be placed of the proper taperelere,whowut segrapelits, end coi scsad thoroughly. When Oatod Camad tsmaete methnes an ssquired for Sees in npfacamin6 the mixtures shell consist of either Coss C or Class F as contained in Table 501 3.Connate Mistuas in Seetim 501 of the Naw Yak State 0 prhham of Transportation u Specifications.inchmdieg eddm a Class F is a high early strength mirtore and should be used whin early Work,to traffic is desied. The eoneme mrtfrses shd be placed without segregation.then consolidated.Finished to the proper elevation,and textured Curing the concrete pavement Shag be in accordance with err of the methods Permitted it Section 502 pertciri g to ctrl g. Pevanartl Shoulders,curbs,posters and ether incidental features shall be replaced in kind mess otherwise signmed by the Regional Director or his representative It. Temporary Pavement that Is repleead tanpersrgy may be pared with either o hot Mttminmos Commit mfsture mentioned above or a cold bituminous patching mixture.When a cold patching mistue is goad R sled consist of aggregate and Ainmineue metwW proportioned and mixed in a biumincon nixing plans or relating paddle shah pupnil.Regardless which pat thing mixture is used it Ad be hid on a prepared foundation and thoroughly compacted.Since cold bitaninous patching mixtures we subject to distortion by traffic,the tam Parxey patch shd be mantawd to prerfde a smooth$uface until the Pavement is pamaenth replaced. 3. Mmol A Maolrele frames and covers Shag have sufficient stror:taal edaerracy to suPPat the roadway traffic.The type of manhole from and cows shag be approved by the Regional Director N his toarawmotiw.The madgsle hangs shd be at Both with the Surface of the roadway unless ethawiss permitted by the Regional Director or his raprasanbtwo. 46 D. MAINTENANCE AND PROTECTION OF TRAFFIC 1, Traffic Is to be malntainN at d tiara winl abe prepssa of this oak and adempnte sipna,henloadn and lights Shah be Presided in aceordacoa with the provisions of Sub chapter G of the N.Y.S.SOMMnMe of Tretrpamdea s Memaf of Uniform Traffic Control Devices.A manternance and protection of traffic Plan may be required.No lams shelf be closed ad I- pdw appteaal 2. The sppAcent Ad arm and NWM@in WAS*baeieedes$mind of trenches while work is in progress for the protection of the public,and they sag be tunably lighted by yellow ABMs at eight.The week shd be Carried we in such sneer that net mom than 100 fast of trench in earth remains as"at and of day s work. 3. No Pasenna, Cuts we to be hR udiAcd aver Slight,except in emergencies,and in such caws,adequetr pracaelions must be exerasad to protect traffic Prior approval must be ob tshrd is we stall pleft 4. No constriction reetwiah of atptipstat shd be holt on the shoulders or pavement after working hours,nor Shag any construction equipment or material be placed in any mcmer or bMion that WIN 468ot NO p or raised warning sips. 5. N open tratteh n the highway tight of way"be barricaded.There shelf be conspicuously drsplped bright red Raps no less than 24"x 24"attached to such barricades and e kanented at mgr with Reefing ydew Wide.N is the jndp nems of the foresmtatwe of the Commissioner of Transportation. I l art on dailyn d lists osNapman as neeesswy,they shell be employed by the Pat during she Oregrn$of the oak so as to drat traffic and maintain yeNpw fiuhirg kphu,etc. S. Soh I A I lips of sdegate she,net len Mas 24"Square.shell be erected and maintained on all backfill tranches within the shoulder aura until the backlil is thoroughly settled. Thai a**Ad be located at segs bepartb 1 of each section of work at intersections and iI a distance not greater then 1000 loot part. T Quip wimar cath I" 119111110 alnaulden shd be maintained Ira of obstructions which would interfere with waw removal and ice control. S. The possesses shd keep that easaled way hse of laeipn objects such as rocks,tuber and other hams that may ISN from transporting vehicles.Spillage of material carried by or dropped from the adar-cerrfop of any exerting paMthe resulting from the permiltett s hseleg operations along at acres any public trawled way shag be removed mvnerkstehy and such traveled srp,bah sshhitt and sutalda of the work Falco.shag he kept Ira of aueh%Ong@ by the prmittw E. COMPLETION OF WORK 1. AN work is to be parts In a sheer spPresed by the Resident Engineer of the State Department of Transportation. 2. AN 6e11Srbed area shad be retumd to disk w*Rd condition in a mamm satisfactory to On Commissioner of Transportation or his repressmative 3. The Pettnitta shd betogas to neat aleuldam and ditches and clean up the highway as hie work progresses.AN driveways shelf be tutored with material in kid end to their original-- -..m. 4. AN Super earth aid ruhhialt did be cleaned up and renaw from the highway right el-way upon completion o1 the work.end the hiphwp left in a nest and erderly condition. S. AS bolt plan shewbq Fad grab of new kMdation and existing underground facilities amoontered shot be provided to N.Y.S.D.D.T if variation from approved design plane occur red duke if -,-I- F NECESSITATED FUTURE WORK I. The appleant agatesthat asp prnem or f etwe byary to a dhtrsbence of the highway,its slops of butters.caused by placing mans and service pipe shop be repaired by the no Cant at his ewe asphn ww in aceerbinei with the requ ier 0 2 of the Stele OsPortmem of Tranponatim. 2. N Maaity auras in the ehn bauxite d do work on she Stam Highway system"or its structwes,hequking the removal,relocation or replacement of the installation authorized by the Perm t,sekf work Shag be dogs a directed by the Com miltioner Of his repressetatira,and seg cast and asperse to incurred shag be the obligation of the said permittee or his goeceaar innnerat. IT. TELEPHONE•TELEGRAPH NISTALLATIONS A. SETTING OF POLES 1. Aur Piths sag be IN easlda the olid Am a tet the paper drainage of the highway will net be interfered with.in case n is kWKticakk to sel poles oro n net to inserters with the NOW Of 0-IN IN the dik-hee,the Shoulder,ditch and epee wound the poles$hag be pored by the applicant to protect against wash. 2. Then shd be to obseroetia to Paivata Ibis So,,connecting highways or roads.paths of sidewalks. 3. a case it a fabs Receseary to tam tray wghn the boundaries of the highway,the hast Possible amount shag be done,and in d cages the consent of the choline property owner NMI be secured beton dgs Pala we sit and true bins old. 4. Polu shd be of sufficient bVis to preside a tlo guars of not INS than Solsen tat between the wire end she crown of the highway,under the waw condtnom of to raw@lure and eadng.Thai shd be sat in In and Properly Plumbed.They shag be well guyed.No guying to tress,utas by spacial permission of owner.Special PracwmionS shag be takes an coves and whirs furs ant train ane side of highway to the other.Poles shot be straight,sound,end the fillings shag be of Sufficient strength to carry wires user the wast con dtion of budeg lin,wind,etel. 5. Where telegraph and t I I, wires crass Mph tension power Imes,aleetric fight or troay win,special precaution shag he taken to mantas proper chaance uta the wast can dnien of tonprahee Said kmbg. B. RESETTING POLES I. If neI itOr arises in oars,because of work on the Mphrray,to raloeate,raplaca or mast poles,cables or conduits.Said work shag be done at the expense of the applicant ITT. SPECIAL CONDITIONS A. In addition to the stw m entienM cenAtions,Hit is found necessary by this Department to add to or otherwise modify the aame,it is to be understood such chwgn shag forma part o1 the penia and be eat I I with inanediaaly upon notice. TV ADDITIONAL SPECIAL CONDITIONS AND SKETCHES Sea Attached Sheat. A-199 PER`( 58 (7/80) NEN YORK STATE DEPARTMENT OF TRANSPORTATION CONSTRUCTION SPECIFICATIONS FOR HIGHWAY WORK PERMIT 1. Highway pavement is not to be opened unless authorized on front sheet (Perm 42b) of this Permit. 2. Sleeves shall be ,jacked under the highway for all highway crossings, unless permission to cross in any other manner is given in writing by the Department of Transportation; and jacking and receiving pits must be kept a minimum of 5 feet from the edge of pavement. As a general rule, the "open cut" method for crossing a highway will W be permitted; the need for any such open cut must be substantiated by the permittee and permission granted from the Depart- ment of Transportation on the basis of satisfactory sheeting, maintenance and protection of traffic, compaction equipment, etc. 3. Any excavation in excess of 5 feet in depth must be sheeted in accordance with Code Rule 23 and OSHA. Any excavation closer than 5 feet to the edge of pave- ment must be sheeted as directed by the Department of Transportation. All backfill must be compacted in a manner satisfactory to the Department of Transportation. 4. Adequate signs, barricades, and lights, in accordance with the standards of the New York State Manual of Uniform Traffic Control Devices, Subchapter G, shall be provided. Barricades, whether in sidewalk or roadway area, shall have prominently displayed, for police convenience, the address and telephone number of 24-hour availabilit of someone who can reset the lights and barricades if it s oun—a-1 ecome necessary. 5. Pedestrian and vehicular traffic is to be maintained and protected at all times. There shall be no unprotected or unlighted drop-offs or obstacles. No pavement openings will be permitted to remain open overnight. They must be backfilled or plated at the end of the workday. Open holes outside the pavement shall be fenced or guarded. The permittee agrees to pay all costs incurred by the State, including man-hours and equipment use, necessary to correct any unsafe conditions on a Permit site. 6. In the event that the permittee has permission from the Department of Transpor- tation to open the pavement, only one lane at a time may be opened provided safe two-way traffic is maintained at all times, with adequate signs and barricades to warn the public whenever work is performed on the highway. As stated above, no pavement area may be left open overnight or on weekends. 7. Adequate access to adjacent properties must be provided. 8. Pavement and Paved Shoulders - Minimum size replacements in finished concrete or asphalt on concrete base shall be 10 feet X width of panel. In all cases, if the replacement is within five feet of a joint, or five feet of a major crack, the replacement must extend to the joint or crack. Any opening in con- crete pavement shall be saw cut and final restoration must be done with High Early Class F concrete mix. in the case of an opening n-asphalt, the minimum size replacement shall be 4 feet X 4 feet or at least 18 inch cutback beyond the size of the hole. Asphalt restoration shall be made by cutting, with a wheel or jackhammer the existing adjacent asphalt square, painting the exposed face with hot asphalt, placing the new asphalt, and compacting with a ten-ton roller. Surface variations in excess of 1/4 inch shall be eliminated or the pavement relaid. Unless otherwise directed by the Department of Transportation, asphalt shoulder restoration shall be 4 inches Item 403 (2 1/2 inch Binde, in" 1 1/2 inch Top) on a sound base. 9. Sidewalk, where disturbed, shall be replaced to full parol; of a 4 feet X 4 feet or as marked when found. Concrete curb where worKed on, as" in the case of the installation of a new curb cut in an area of existing full curb, or vice versa, shall be removed to ics full depth and replaced in accordance with Typical Sections from the Department of Transportation. A-200 hsw sh (4180) REVERSE 10. Cold Patch - A minimum of depth of 2 inches of asphalt concrete, whether cold patch or hot asphalt is used, shall be placed as a temporary surface in any Pavement. shoulder, or sidewalk opening that must be restored to use prior to permanent restoration. Where temporary asphalt is required. the edges shall be cut square and the temporary asphalt placed on a well-stabilized base. It is the permittee's responsibility to maintain any temporary patches in a safe and useable condition. 11. Drainage - There shall be no contribution to, nor interference with, drainage along the State Highway. either during the permit work or after. as a result of such work. Drainage along highway is not to be obstructed. Profile of drive- ways and the cross-section of the finished shoulder shall be such as to follow the drainage cross-section of the highway shoulder. Initial slopes shall be away from pavement of highway. Finished driveways which block or otherwise interfere with the normal flow of drainage shall be removed and replaced by the permittee to the proper grade, or, if permitted in writing, the permittee shall construct the necessary leaching basin to relieve the adverse condition, all to the specifications of the Department of Transportation. 12. No trees within the State right-of-way may be cut or trimmed. either above or below ground without permission in writing from the Department of Transportation. The Regional landscape Architect will be given 72 hours notice and a joint inspection arranged, if the work in any way ,jeopardizes the trees. The permittee agrees, by acceptance of this Permit, to replace any trees damaged without Nmsthe e rfTransportation. OTbePermitt dtobepiantedinthegrassarea betweenn curb nderal esidewalk. 13. The permittee shall keep the roadway free of foreign objects. such as rocks, •" timbers, and other items that may fall from transporting vehicles. Spillage of material carried by, or dropped from the undercarriage of any carrying vehicle resulting from the permittee's hauling operation along or across the public-traveled way shall be removed immediately and such roadway shall thereafter be maintained free of such spillage. 14. All materials must Cale from State approved and inspected sources. All con- crete delivered by transit mix must be shipped in an approved carrier. Asphalt concrete must be within specification temperatures and the load properly covered with a canvas. IS. No official State Department of Transportation signs' elay be disturbed without approval from the Permit Unit. If it is necessary to relocate such signs, the Regional Traffic Section must be contacted for the new location. 16. In Sate Contract areas the permittee must conduct his Wdrk in conformity with the schedule of the State's Engineer-in-Charge and contractor, and all work must be done to the satisfaction of the State Engineer-in-Charge. 17. The permittee shall furnish the Department of Transportation with a telephone number of 24-hour availability, where a demand for emergency repairs will be immediately honored. Furthermore, the permittee agrees to assume all responsi- bility for emergency repairs required, whether the need arises as a result of his contractor's work, by storm damage. or by any other means which renders his contractor's work area unsafe in the opinion of this Department or the Police Department. In the event that it becomes necessary to call out State Highway Maintenance forces to restore a permit site to a safe condition, the permittee will be back-charged for all manpower and equipment charges involved. 18. All work must be done in accordance with New York State Department of Transportation specifications. A-201 i LAT. 1.}I .,��� _,`. = ..� ° � �� .� !. r Ili ,) ,, ' •I' '� ��,,%'� ;S� 1 G� .. _I `i' el •. .....1„rV'. /�, a .. 19 LONG " �r�'.r...•., ` o 10 n 72'14 C . 1•• /1 - ty" VICINITY 1AAP (CI' P,,r' 12:c4) � r�� I Lt-F_verlU,us e�ASLn o�u r�Lw = v � T I I?LS F U OM 1984 ,J D A A °• 3 3 I'UTZrOSL COMMt_tZCiAL FL-12t2Y i 1 ;'':., .; .,�, USE 4 PD.oPOSLn ACTIVITIES 6D ,°,.., , Q Y A 2LNOVAL OF LXIST M.&MY, (,JOT SIIOWN O)J rLA,J) Al- LOCAT)OA) L•I�,ruG �,-"r,_a OF A)E-W ILAMP• TC nr a..+o�,n -70• -'•j� NLIJ b C.OJJSTI2UCTIOA3 OF OLW F10C1CI7UC, n7-rr�L FACILITY 51KA)LA17- TO LXISTW�, POCV_1A)G FACILITY CTO tZF_KAMA ,)) D G INSTALLATION OF 3-NL11j $ 27 -PILE P0j_PH1,Ut), I-A3T_W 45-PILL POLPHIN, A1Jn 1-A)Ll" 1 /�1LW 47 /r L! 20' O CELL. ILL MOVAL OF 7 LM5T I7UG 27- PILL 170LPH1/J5 S &vJO)A-)r_Zb WLST U.t) PLPT. OF AGLLICULTUrF LAST ST,&TL OF N Y I7Lr-r OF ELLA oU�LW ,�L w F LtztzY pOC1�1/�1C7 FACILITY ' ._'_r-- I1J C,b,tZhIA)LC5 13AY Gn ArMCC SGAL20 40 Lc)AJ FLT IST OtZILNT , TOWN OF SOUTNOLP SUFFOLV_ (-C)uNTY , NEW YDV v_ yri 1? /)`�S SC.�I)1J17 FLp_t?_'f SLq'JI� f I,X. 1,1 L A'`D 511(1)LJ1J i \ 1 L ' f 1',C' I)hP_Y 19811 I)IC_t_ �AV_L PA_Ni_LLY C0Nl\)LC7- I CUT SHLLT I OF ?- ) G vrpr?r�•— C�'f' Y' �-II- a4_ ,�- �C�__ F., A-202 ». loop n» m c LAT.4f 10'01 77 fEl f ! I,•:I r••-.,..111 IDr _ _ b..n.... ...• b.1 I 111 �� r. .Y.1 L f..r:•v. I•.!y _- 7// • 7A. IV 39 AL w1 u- p ._0e 1 Lm L.1.,1 1 gi i l i �1,. r1....,n - / � 10� a LONG •,rr 11 •N1.n 1 IS 7214�7 VICINITY 1AAP(CHART'123;4) r r — J/ Rj [ P -rim LI•IILI j »1 On I •J , 1•nr/1'/1N.1.," •11 1 �� IOM ,OrW I�POJ I /Q 0 F F_5 K 1 LI_F_vAVIUA)5 PiASLp OA) MLW to 0 ^• 7. 11PL5 MOM 1984 A).O A A NLW ).i 3 1'UCLT'OSL : COMML12-C14L FLIZtzY 1 o1i, GA G 01 JJEt2S 1 Vol rNl.' USL p� I P12.OPOSLD ACTIVITILS ' 6d I° roL• ,"s UQY A IZLMOVAL OF LX15T [LAMP (NOT L tl�rlatt Lr-wLL SHOWN ON r")Q) AT LOCATION CJLVNIN p ; I cLnon OF )3LW MAMP, TO t. ILMOVC19 f 1•, ,o t ^IL1J I� COA5TIZUCTIO/3 OF .UEW nOCX JW, °ol•""' t r.6 FACILITY SIMILAR TO LXISTWC, C7) POCV 1rUG FACILITY (TO MEMMfia) C. IA35TALLATIOA) OF 3-NLV) e 27 -PILE 17OLPHINS, I-A3E- ) l 45-PILL DOLPHIN, ANP I-Al LW IU_W +5 PILL 20' O CL.LL. _4jr"' -D,1.0NII. h XLMOV.A.L OF 7 LX15TIANG Z7- PILL VOLPHIA5 S 417J01MLV_!b WEST- U.S. PLPT. OF AGRICULTUL'-f NLL!® LAST STy�ATLOf N.Y. fJE.PT OF T V_AJW5. PLAA UILW F • 100 AF_W FLIZCZY 170CICIMC, FACILITY IN CIMZ 71NL1?5 15AY 0 Z'G12ArHIC 5CALL�M FELT NT OCZILA)T , TOWS OF 5OU7HOLP 5UFFOLV_ C.OUIJTY , NEW Y0V V_ `" r,11rt_ICATIOJJ 15Y' P ()`:)S S01J.A3P FEIZO.Y 'bT_1?_v1('_f 1XIC = CAI E Ab 511(JWN • L ' f..11)t,.'AJA12Y 198.1 _ 1)1CL5J\C?L iLNTLLY LAJG17_5 00C "' C""•r?OTON CoIJIN)LCT I CUT ''I IIr 1111 r1I,,:••, , )HLLT I OF Z Cvtit?rti- e)ernA,. ec A-2 03 ITEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Building 40, State University of New York Stony Brook, New York 11794 516-751-7900 May 24 , 1984 Cross Sound Perry Services , Inc. Att : R. MacMurray P. O. Box 33 2 Ferry Street New London, CT 06320 Dear Sirs : In conformance with the requirements of the State Uniform Procedures Act (Article 70, ECL) and its implementing Regulations (6NYCRR Part 621) we are enclosing your permit. Please read all conditions carefully. If you are unable to comply with any condi- tions, please contact the Regional Regulatory Affairs Office, NYS Department of Environmental Conservation, State University of New York at Stony Brook, Building 40, Stony Brook, New York 11794. Also enclosed is a permit sign which you are to conspicuously post at the project site, protected from the weather. Very truly yot4rg, .01 Daniel J./I_rkin Regionalj,�ermit Administrator DJL:11 Encls. A-204 r FRhlll NU. „ NFWYRKI�I %It. I'IT.,IiI kir" H !I ,IFI ,.II-111.1,4"1 \1 ! 1,!I:IR"\ IIO!,J — - -- 10-84-0306 n-7 PERMIT - - -- - - --- - IINnrR IffF rN\iPr)N\(ENfAI. ( r1NSrR\—MON IAW — - ARllclr 15, Iprntertinn n(warn) � ARII( IF 71. (ridal Wrtlandc) ARTH Ir 24, (1techw iter W,•tl.tnd,) APllt IF 1h, ((nrt•:rru(Jinn in Mind II,17ard Arras) MIT I"WED 10 CROSS SOUND FERRY SERVICES ATT: R. MacMurray DRESS i —Elk _ 2 Ferry Street-P. O. Box 33-New London, CT. 06320 ('AllON OF PROIE('T /Srclinn fit -hranp tnl.tl wrll,v"+, •Lt}• Ln,1•( tip) --- _ _Orient, Long Island Sound i( RIPTION(RF PRUIEF 1 Pave existing staging area 210 ' x 115 ' as per supplied plans and ___construct stone lined drainage swale. NMUNITY NAME Wity, Town, \'illaget I Orient Southold 1'NTY [I'. ( Ilk talI!t!li IJrt I I,\U Nn ['FR\11I fXPIRAfI()N HATE. — Suffolk I ( 12/31/85 crNFRAI ( ON III IION$ - The permitter Shall file in the fi(fi(e of til,• .tppr„pr,atp Rpgi,u,al It Ih.,t lilt tl.rtr, of New fork •,hall in no race be liable for any damage mit Administrator, a notice of intention to toinni., ,e ..•,ilk at lea ! as n •rtimi, I„til,• ;fruffine or wnrk herein authorized which may be cawed by or ; in advance of the time of rnmmencement ,told ch.w ,I.,, ,wif% hie, fi •,It film, +,gnrr nprratinm- undertaken by flip Stair for the run-prvallon or plly in writing of the completion of the work. ny•,,,,,•rn,•nl (If n•tn rRalirm, or for other putposps, and no claim or right to The permitted work shall be subject to in-prrtinn h) an amhfirii,.,f ""'`"" ''Iron • I,.rll .,rerun from any such damagr. rrcentative of the Department of Envintnmental ( ttn.erv.tlmr .••1,,, ma: I, I11.11 if till'di•<plty of light,; and signals on any work hprrby authorized the work suspended if flip puhli, interest sn rertnirr•, r ptl,•,.%I•e pr,n•idrd fnr by law, such lights and signals as may be prp- AS a condition of the issuanre of this permit, Ihr .tpl,li,•int 1,•t a,. "'l'r•I h. file I'nil-I (pact (marl shall be in-talirrf and maintained •d expressly, by the exerulion of the application, Ihp fill[ Ir 14.11 r •I,,,,, F„ 'fill it th,• ,,.I,rn•r fit Ilio nwfier. •I;ty for all damages, direct or indirect, of whatever nalorr, ,nod by iNhprn- In All wnrk tarried out under this permit shall be performed in accor- suffered, arising nut of flip proirt'I described herein and ha.. aKlt.,"f In •Ltnr a with t.0L11,11i0hed pngineprinR practice and in a workmanlike manner. inify and save harmless flip Slate from wti1S, at.tnnr;, da,n•tRe" .p„I of every name and desrription rrcultine, flnm live -.girl prnler 1 I1. If Rranled onder Articles 24 or 75, the Department reserves the right In r,vnmcider Ihiti approval a) anv lim,• and after due notice and hearing to Any material drpdgrd in Ihr prosecution of the twit. herein prnmitte,l r,ntnnrt., u-t ind or mollify till!, permit in su(h a manner as may be found to be removed evenly, withuul leaving large rrfose pili•., ridgi•. jr lilt.tilt. h,• ima -till enuilable. If upon the expiration or revocation of this permit, the of the waterway or flood plain or deep holes that mal have a t,n,lt.nt) to nnrlifi(-iron of Ihp wrtland hereby authorized has not been completed, the injury to navigable channels or to flip banks of the w,trrrw•I\•• applit ant •.hall, without expen-r• to the Stair, and to such extent and in Such Any material to he deposited or dumped under Ill,,; i-rmii, either in fltm• 'Ind manner a- flip Drparlment of Environmental Conservation may require, •aterway or on shore above high-water mark, shall he r'ppn,.iletl or domped "•r i,,ve all fir any Iantion of the uncompleted structure or fill and restore the r locality shown on the drawing hereto aflac lied, and, if .o prrs,riht.rf silt. In it,, former condition. No(laim -hall he made against the State of New fin, within or behind a good and substantial bulkhrad fir hulkhrarls, •;w h \firk nn a,(#mnl of any -ur'h removal or alteration. II prevent escape of the material into the waterway, 11. This permit shall not he construed as conveying to the applicant any There shall he no ❑nreasonahlp interfprente with naviRati,+r, Ili. If,,, right to trrspae- upon the lands or interfere with the riparian rights of others herein authnrized. It, prrffinn the prrntitivd work or as aulhnri7ing the impairment of any rights, title fir inlrrrsl in real or per-final property held or vested in a per-nn not a That if future operations by the State of New York require ,ill alteration pall% 11)fiw permit. position of the structure or work herein authorized, or if, in flip npinioti Department of Environmental Conservation it -hall rause finrrasnnal,lr 13. the prrmiltrr is rrspon-rhlr for obtaining any other permits, ap- p+o.•,tls, I110s, r,asrntrnt,; and riRlik-of-way which may be required for this rction to the free navigation of Said waters or flnrwl 11nw•• fir endanger ralth, safety or welfare ill the people of Ihr Stair, fir In•s fir tion emir,t. natural resources of the Stale, the owner may be oirivivil by the Itrl,a,t- 14. If granted under .Article 36, this permit is granted solely on the basis to remove or alter the structural work, fibstnutiom•, fir hared'• rau•ted (if Ilii rpquirrntpniti of %Ili(If• 35 of the Environmental Conservation law and )y without exppnsr to the State; and if, upon file expnallon or if%,,,atimt I'-t.1 :00 of 1. NY( RR it nrtslrfirlinn in rloorl Plain Areas having Special Flood is permit, the structurp, fill, ex(avalion, or other m,vlifiralrnn nt Ih.. Ila .fid laillirfinR Vl,fnult) and in nn way signifies that the project will he ' rnursp hereby authorized -hall not hr frttnplehd, Ili,• „t:•nrr, hill, 1rr•- from f4,n,l rlu ut expense to the Stale, and to Sur 11 exlpni and in ,I,,If ' Department of Environmental (wii eivatcfn, may a quu n„•m., ,ill fit t5 Ily ,fi,,•t,tanr r of Illi', permit the pprmiftee agrees that the permit ,nrlinn of the uncompleted -trustor,• fir fill .rill rr•;In,t. (n rl h,,,,•,,, "'11i+,vr of im(m -trim rompliantr with the -pe(ial rnnditinns on the .1 1011 the navigable and flood ra ,uify of the w.ttwrnfir Nn r nn .t l I ide again-t file State of New York fin ” nil• a(roupt ill any •.n,h 1. lion. •a(9/75) rsrr A-205 E(IAL (ONDIIIONS 1. All surface runoff will be contained on upland portion of project site. A through J and K - P attached. DJL:cg c.c. File attachments TIT ISSUE DATE PERMIT ADMINISTRATOR .� ADDRESS -ay 24 , 1984 Daniel J. Larkin 1dg. 40 ,SUNY ,Stony Brook , N. Y. 1179 4 -206 New York State Department of Environmental Conservation v NOTICE � The Department of Environmental Conservation (DEC) has a issued permit(s) pursuant to the Environmental Conservation N Law for work being conducted on this site. For further informa- tion regarding the nature and extent of work approved and any Departmental conditions on it, contact the Regional Permit Administrator listed below. Please refer to the permit number shown when contacting the DEC. Regional Permit Administrator Permit No. in-u-n--iati Tw Expiration Date 12/31/85 95.20.1 (11/82) NOTE: This notice is not a permit SUPPLL'HE TTPM SPECIAL C017DITIOUS The following conditions apply to all permits: A. If any of the permit conditions are unclear, the permittee shall contact the Division of Regulatory Affairs at the address and telephone noted belo-i. B. A copy of this permit or approval and approved project plans and supplement- ary conditions shall be available at the project site whenever authorized work is in progress. C. The permit sign enclosed with the permit or a copy of approval letter shall be protected from the weather and posted in a conspicious location at the work site until completion of authorized work. D. At least 40 hours prior to commencement of the project, the permittee shall complete and return the top portion of the enclosed receipt form certifying that he is fully aware of and understands all provisions and conditions of this permit. Within one week of completion of the permitted work the bottom portion of that form shall also be completed and returned. E. For projects involving activities to be accomplished over a period or more than one year, the permittee shall notify the Regional Permit Administrator in writing at least 48 hours to the commencement of resumption of work each year. F. If project design modifications take place after permit issuance, the permittee shall submit the appropriate plan changes for approval by the Regional Permit Administrator prior to undertaking any such modifications. The permittee is advised that substantial modification may require submiss- ion of a new application for permit. G. All necessary precautions shall be taken to preclude contamination of any wetlands or waterway by suspended solids, sediment, fuels, solvents, lubricants, epoxy coating, paints, concrete, leachate or any other environmentally deleterious materials associated with the project work. 1i. Any failure to comply precisely with all of the terms and conditions of this permit, unless authorized in writing, shall be treated as a violation of the Environmental Conservation Law. I. The permittee is advised to obtain an permits or approvals that may be required from the U.S. Department of rmy Corps of Engineers, New York District, 26 Federal Plaza, Hew Yorje PTY 10007, (Attention Regulatory Functions Branch), prior to cocmmenging work authorized herein. J. The granting of this permit does got relieve the permittee of the responsib- ility of obtaining a grant, easeMent, or other necessary approval from the Division of Land Utilization, Office of General Services, Tower Building, Empire State Plaza, Albany, 11Y 12242, which may be required for any encroachment upon State-owned lands under water. Regional Permit Administrator 14YS Department of Environmental Cons. Bldg. 40, SU1TY--Room 219 Stony Brook, PTY 11794 (516) 751-7900 DEC Q 10-84-0306 TW A-208 The following conditions shall apply if checked as applicable by the Regional Permit Administrator: R. All dredging shall be conducted so as to leave a uniform bottom elevation free of mounds or holes. L. All spoil material shall be disposed of either in the Atlantic Ocean or at an approved U.S. Government Dumping Ground, as directed by the District Engineer, U.S. Department of the Army, Corps of Engineers. Any spoil material not intended for such water dis- posal shall be removed from the site and disposed of at an approved upland site. M. All fill and spoil material shall be suitably contained at the work site so as to prevent its eroding, leaching or otherwise entering into adjacent wetlands and waterways. N. All peripheral rip-rap berms, cofferdams, rock revetments, gabions, bulkheads, etc. shall be completed prior to placement of any fill material behind such structures. 0. Allrepairs to existing structures shall be confined to replacement of existing structural elements with no change in design, dimension. or materials, unless specifically authorized herein. .P. . The following Water Quality Certification shall apply if required by one or more agencies of the United States Government and if checked as applicable by the Regional Permit Administrators: In accordance with Section 4O1(a)(1) of the Clean Waters Act--of 1977 (PL 95-217) the New York State Department of Environmental Conservation hereby certifies that the subject project proposal will not contravene effluent limitations or other limitations- or standards .under Sections 301, 302, 303, 306 or 307 or the Act. n DATE, May 24 , 1984 Daniel J. Larkin ` Daniel J. Larkin, P.E. Regional_Permit.Administrator-- - Division of Regulatory Affairs NYS Department of Environmental `DEC# 10-84-0306 Conservation -- Building 40, SUNY—Room 219 Stony Brook, NY 11794 (516) 751-7900 A-209 r'YSDEC, 7e7ional Permit Ldministrator ?lld!t. 40, SU'^'--Poon 219 Stony Trook, 11Y 11794 ^E: Permit Vo. Issued to (Agent) Dear Sir: Pursuant t,.r General Condition Hunber 1 of the above referenced permit you are hereby rzatified that the authorized activity shall commence on This notice is to be sent at least two days in advance of coTmiencement of the. project. The permit sign Will be posted at the site and copy of permit will be available at site for inspection. Subinitted by Failure to notify or post sign rill leave ormer and/or contractor subject to applicable penalties for non-compliance with Permit conditions. ---------------------------------------------------------------------- MiSDFC, Rerional Permit Administrator Mg. 41), SU;'Y--noom 219 Stony Droolc, I•?Y 11794 RE: Permit I?o. Issued to (Agent) Dear Sir: Pursuant,to Ceneral Condition ;runber 1 of the above referenced perrit you are hereby notified that the authorized activity c-•as completed on Submitted by ('this notice is to be sent to above address promntly upon completion of project). Failure to notify grill leave o,tner. and/or contractor subject to aPPlicable penalties for none-compl tams. c•Iith Permit conAi.tions. A-210 New York State Department of Environmental Conservation AM REGULATORY AFFAIRS Henry G. Williams Commissioner r �1 t April 9 , 1984 fit ;I'llII+ Di Cesare-Bentley Re : 10-84-U257 Engineers , Inc. Cross sound Ferry Services 593 Poquonnock Road Groton, Conn. Dear Mr. Schick : Upon receipt of a Check or Money Order for $16 .00 made out to New York State Department of Environmental Conservation processing of the referenced application will be concluded. Very truly yours , RNT:cg ROBERT N. THURBER c.c. File Sr. Environmental Analyst attachments A-211 ITEW YORK STATE DEPAR1MMIT OF ENVIROIRENITAL CONSF,RVATION Building 40, State University of New York Stony Brook, New York 11794 516-751-7900 April. 9 , 1984 Di Cesare-Bentley Cross Sound Ferry Services Engineers , Inc. Re : 10-84-0257 TW PW Wr) 593 Poquonnock Road Groton , Conn. Dear Sir: In conformance with the requirements of the State Uniform Procedures Act (Article 70, ECL) and its implementing Regulations (6NYCRR Part 621) we are enclosing your permit. Please read all conditions carefully. If you are unable to comply with any condi- tions, please contact the Regional Regulatory Affairs Office, NYS Department of Environmental Conservation, State University of New York at Stony Brook, Building 40, Stony Brook, New York 11794. Also enclosed is a permit sign which you are to conspicuously post at the project site, protected from the weather. Very truly your, x) / e f . Daniel J ./lrkin Regionals- Permit Administrator DJL:ll Encls. A-212 �J I K 1 1 1 K 1 (I \I I I,1 1 1 K I A 1(r J l t 11 Irl\ 1 4 I„J,11 'l l�l I lr l',1 1'\ \III• h0 -81 -0_257 PERMIT IINI)fR Fill rN%ICONMENIAI. ( (1N-ERVATION 1.'lw L� ARft( if 1S, (rr,il—lira, of W"10.0 4RTICtr 25, (Tidal wellandc) X Water Quality r ARII( II 24, (rw,hw.urr Wrll,rwl,) 1R11( l! 36, (Cnnkiru►linn In Flnnr) Ilarard Arvak) I'I KAu l I,,sl'T I I I I> CROSS SOUND TERRY SERVICES _ _ 2 Water Street, _New_London , CT 06320 jr)r \tiwJ or I'Rllllr I (se(linn of -trranl, lufal well,nul, dam huildinx) - Gardiner's Bay , Southeast end of State Rte . 25 (Main Rd. ) at existing ferry to-r (leer Ktl•II )rJ of [IRI))f( I - - Remove seven 27-pile dolphins and ferry docking ramp, construct a new ferry ramp. Install 3 new 27 pile dolphins , 1 (45) pile dolphin , 1 new 20 ' diarreter cell. All work to be in accord an_ce -with plans by DiCesare-Bentley- prepared I'ebruary 1984 submitted - - (IMMUNITY NAME(City, Town, VillaRe) TOWN Ori_en_ t _ Southold l)UNIY FIA t UMMIINIfY NU. T)A& NO PERMIT FXPIRAII(pO J Alf Suffolk.- ---- - - -- -- ------I GENERAL - - CONDITIONS I. The permOter shall file in the office of the appropriate Regional 8. That the State of New York shall in no case be liable for any ,lar, emit Admnnistralor, a notice of intention to commence work at least 48 or ininry to the structure or work herein authorized which may he nows in advance of the lime of commencement and shall also nntify him result from future operation- undertaken by flip State for the ,romptly in writing of the completion of the Work, improvement of navigation, or for other purposes, and no claim or rlRhl 2. The permitted work shall be subject to inspection by an authorized rnmlw•ncation -hall accrue from any such damage, )resenlative of the Department of Environmental Consprvalinn who may 9, that If the display of lights and signals on any work hereby autl,nrl -der the work suspended if the public interest so rpquires. is not ntherwisp provided for by law, such lights and signals as may b„ 1, 3. As a condition of the issuance of this Permit, the applicant has ac• scribed by the United Stales Coast Guard shall be inctallpd and m.)Inr.,r, Died expressly, by the execution of the application, the full legal respnn• by and at the expense of the owner, 6lity for all damages, direct or indirect, of whatever nature, and by whom- 10. All work carried out under this permit shall be performed In ar, ver suffered, arising out of the project described herein and has agreed to dance with Pslahliched engineering practice and in a workmanlike manner. lr(emnify and save harmless the State from suits, actions, damages and ;Is of every name and descriptinn resulting from the said project. 11. If granted under Articles 24 or 25, the Department re-rrvr- tl,r rel to reconsider this approval at any time and after due notice and hearing 4. Any material dredged in the prosecution of the work herein permitted continue, rescind or modify this permit In such a manner as may be found "all be removed evenly, without leaving large refuse piles, ridges across the be just and equitable. If upon the expiration or revocation of this permo, 1 ^,1 of the waterway or flood plain or deep holes that may have a tendency to modification of the wetland hereby authorized has not been completed, 1 Ise injury In navigable channels or to the banks of the waterway, applicant shall, without expense to the Slate, and to such extent and in cu S. Any material to be deposited or dumped under this permit, either in lime and manner as the. Department of EnvironmentalConservatinn may requi remove all or any portion of the uncompleted structure or fill and reclnrp I e waterway or on shore above high-water mark, shall be deposited or dumped the locality shown on the drawing hereto attached, and, if so site to its former condition. a claim shall be made againcl the Stair of n• prescribed sijch York on account of any such removal or alteration. ,Pon, within or behind a good and substantial bulkhead or bulkheads, snlrh will prevent escape of the material into the waterway, 12. This permit shall not be construed as conveying to the appin(anl a 6. There sright to trespass upon the lands or inlerfere with the riparian rights of nlhr hall be no unreasonable interference with navigation by the "•k herein authorized. to perform the permitted work or as authorizing the impairment of anynght title or interest in real of t)prcnnal prnperty held or ve-trd in a person not '. Thal it future operations by the Stale of New York require an alteration party In the permit. ,he position of the structure or work herein authorized, or if, in fire opinion 13• The permittee is responsible for obtainingan ether the Department of Environmental Conservation 11 shall cause unrpacnnahlr Y permits, a IructlOn to the free navigation of said wafers or flood flows or endanger project, lands, easements and rights-of-way which may he required for th health, safely or welfare of the people of the Stale, or loss or destruction project. he natural resources of the Stale, the owner may be ordered by the Depnrl- 14. If granted under Article. 36, this permit is granted solely „•, I: h., -^I to remove or aller the slruclural work, nbctructinns, or hazards caused of the requirements of Article 36 of the Environmental Conservation law ., ^ rby without expense to the Slate,; and if, upon the expnralion or revocation fart 500 of 6 NYCRR (Construction in Florid Plain Areas having Spr•clal fl,l Ilii pP(mll, the ctruclure, fill, excavation, or other nlrxflficaliun of Ihr llat,trds - IluildlnR 1'Prml1s) and In no way slRnllies that UIP prnlr(I Ivlll 'rrnur-e hereby authorised shall not be completed, the owners chill, free (nom flooding, "'I'III expense to the State, and to such extent and in such time and manner Department of Environmental Conservation may require, n'move all or 15. By acceptance of this permit the permittee agrees that the pear, I,nrllnn of the uncompleted strurturP or fill and restore to its former is contingent upon strict compliance with the -pecial rondil,,,nc on n, 'ln,n the navigable anrf flood raparity of the watrreouree. No claim shall rrverce side. n.Iril' 11arncl Ihr Starr of New York un arrouni of any curh rrmnval or ral,nn, i-4 (q/751 (SFF RFVFRSF SIM) A-213 through J and K through P ,ttach-d . I I I I I I i i . I - .cg File Attachments 15SUE DATE PERMIT ADMINISTRATORp4 SS i1 9 , 1984 Daniel J. Lark Aldg. 40 ,STINY ,Stony Brook , N . Y - 14-794 " --- A-214 New York State Department of Environmental Conservation AMk AM `iir oboe NqW NOTICE INW The Department of Environmental Conservation (DEC) has N issued permit(s) pursuant to the Environmental Conservation r `1 Law for work being conducted on this site. For further informa- tion regarding the nature and extent of work approved and any Departmental conditions on it, contact the Regional Permit Administrator listed below. Please refer to the permit number shown when contacting the DEC. Regional Permit Administrator Permit No. 10-84-0257 TW PW 140 ,%�'3t� DAN IE�J. LAP.KIN Expiration Date 'In/R, 95-20.111182) NOTE: This notice is not a permit The fo11ouin,^, conditi,,r, 1)1v r.o rJ I ►'r•it:. A. If nn; of the perr�,t ronciittnlir .►rc unr:l ',ir , ► 're prrrdttoe s►,r►II roil tic t the Division of 1:oc-ul.ntnry nt thr ndJr(,r,s :incl Lefollhoric notc-11 helow. (1. A cors of this pert^it or n`^rov,nl ind ar7)rovod protect plants incl surrlr;!,ent ary conditions shall he avnilnhle at the projc'Ct site sihrnover nuthorl ;-od work is in Progress. C. The permit sign enclo.ned siith thn remit or n copy of npprovnl letter sh:►I1 be protected from the s,cnther and I)ogLed in n conspicious location At the work site until completion of authnrized work. (7. At least 4u fours prior to co-iioncenent of the pro.jc!ct, the permittee Ghal i complete and return the top portion of the enclosed receipt form certifying that lie is fully asiare of and understands all provisions and conditions of this permit, l'ithin one tyeek of completion of the pernitted ►;ork the bottom portion of that form shall also he completed and returned. E. For projects involving activities to be rtccoi,n.lfrhed over a period or more than one year, the permittee shall notify the Regional Permit Administr.ntor in writing at least 48 hours to the cormnencement of resumption of work each year. F. If project design modifications take pincn after permit issuance, the permittee shall submit the spprorriste plan changes for approval by tl►e Regional Permit Administrator prior to undertal.ing any such modification-. The permittee is advised that substantial modification may rewire submiss- ion of a new application for permit. a . r,. All necessary precautions shall be taken to preclude contamination of any wetlands or waterway by suspended solids, sediment, fuels, solvents, lubricants, epoxy coating , paints, concrete , lnachate or any other environmentally deleterious materials associated with the project work. 1, Any failure to comply precisely with all of the terms and conditions of this permit, unless authorized in writing, shall be treated as a violation of the Environmental Conservation Law. �. The permittee is ,advised to obtain any permits or approvals that mny be required from the U.S . Deparr.ment of Array Corps of Engineers, New York District, 26 Federal Plaza, 1'cw York ITY 10007 , (Attention Regulatory Functions Branch) , prior to commencing work authorized herein. The granting of this permit does not relieve the permittee of the responsib- ility of obtaininn A rront , easement, or other necessary approval from the Division of Land Utilization , Office of Cenernl Services, Tower Building, Empire State Plazn , Albany , 1'Y 12242 , which may be required for any encroachment upon State-o�,ned lands under welter. P.egionnl. Pcrnit Administrntor i4YS Department of Cnvironment.zl Cons. Bld-, 40, SUIlY--Room 219 Stony Brook, iTY 11794 (516) 751-7900 7 .,_ P !� Ci .ZVr' � ' A-216 The follovino condition:; .911.111 Ipply if checked as nrplicahle by the Regional Permit Administrator: K. All dredginp. shall be conducted so as to Leave n uniform bottom elevation free of mounds or holes. L. All spoil material shall he disposed of either in the Atlantic Ocean or at an approved U.S. Government Dumping Ground, as directed by the District Engineer, U.S. Department of the Army, Corps of Engineers. Any spoil material not intended for such water dis- posal shall be removed from the site and disposed of at an approved upland site. M. All fill and spoil material shall be suitably contained at the work site so as to prevent its eroding, leaching or otherwise entering into adjacent wetlands and waterways. N. All peripheral rip-rap berms, cofferdams, rock revetments, gabions, bulkheads, etc. shall be completed prior to placement of any fill material behind such structures. 0. All repairs to existing structures shall be confined to replacement of existing structural elements with no change in design, dimension, or materials, unless specifically authorized herein. P. The following Water Quality Certification shall apply if required by one or more agencies of the United States Government and if checked as applicable by the Regional Permit Administrators: In accordance with Section 401(a) (1) of the Clean Waters Act of 1977 (PL 95-217) the New York State Department of Environmental Conservation hereby certifies that the subject project proposal will not contravene effluent limitations or other limitations- or standards under Sections 301, 302, 303, 306 or 307 or the Act. DATE Daniel J. Lai:in,. P.E. Regional-Permit-Administrator Division of Regulatory Affairs j NYS Department of Environmental DECD_f C� —f - �� �-�J' Tw17_oQ Conservation {Building 40, SU*TY—Room 219 Stony Brook, NY 11794 (516) 751-7900 A-217 IiYSD':C ^erl, i crmf t Ad :iir,.i^tr,!tor oldy. 4n, noc r 1]9 Su:;Y carpus `Tony Br,)o!{ , N.Y. 11794 ne: Pc rrn' t "ro. to ---- _ D,ar Sir: Pursuant to Cen?ral Condtition Ho. 'I of the above referenced ,ou are herethy notified that the auth'rirized activity shall c()t!mcucp on _ This notice in toy - — L'— �c seat at. least ttoo days in aclv,incr� of con- r.c•tccmcnt of the project. The permit sir,--i will be poetd^d at the site and copy of pe-mit a•i.11 be avail- able at site for inspection. --y Submitted by Failtire to notify or post sign will leave owner and/or contractor subject to applicable penalties for tion-compliance w{.th permit ccnditions. ------------------------------------------------------------------------- ------- NY'SDF.0 Reg. Permit Administrator Bldg. 40, Room 219 SIMY Campus Stony Brook, N.Y. 11794 Re: Permit No. Issued to (Agent) Dear Sir: Pursuant to General Condition Pio. 1 of the above referencee permit you are hereby notified that the authorized activity was completed on Submitted by (This notice is to be sent to above address promptly upon completion of project) . Failure Lo uctify will leave ocmer and/or contractor subject to apPl.lr- -able penalties for non-compliance with permit uutdiLion. A-218 A STATE OF NEW YORK DEPARTMENT OF STATE ALBANY N Y 122;31 C nil C Sr,Ar r t w SI 41 rAur 1q SVA rf December 4, 1985 Mr. Roy L. Haje, President En-Consultants , Inc. 1329 North Sea Road Southampton , NY 11968 Re: F-85-363 U.S. Army Corps of Engineers/NY District Permit Application X85-458-L5 (Cross Sound Ferry Services , Inc. ) Dear Mr. Haje: The Department of State has completed its evaluation of your Federal Consis- tency Assessment Form and certification that the above proposed permit activity complies with New York State's approved Coastal Management Program, and will be conducted in a manner consistent with this program. Pursuant to 15 CFR Section 930.63, and based upon the project information submitted, the Department of State concurs with your consistency certification subject to the following conditions: 1 . To prevent stormwater runoff from the parking area from directly enter- ing coastal waters , a french drain or similar device shall be installed along the landward edge of the proposed steel ramp. This drain or de- vice shall laterally divert any stormwater runoff that reaches the ramp from the parking area. 2. To protect the ramp and the intertidal beach in front of the ramp from potential erosion-related damage , rip rap shall be placed at the toe of the ramp along its entire waterward edge and along both sides of the ramp for a distance of at least 15 feet from its waterward edge. This concurrence is without prejudice to, and does not obviate the need to obtain all other applicable licenses, permits, and approvals required under existing State statutes. A-219 Mr. Roy L. Haje December 4, 1985 Page 2 The U.S. Array Corps of Engineers is being notified of this decision by copy of this letter. Sincerely, i George R. Stafford Coastal Programs Administrator GRS:WFB:dlb cc: New York District, U.S. Army Corps of Engineers D. Foster, Town of East Hampton Planning Board A-220 �Ev "CAM ST\TE 0EPfRTaat`41 OF :NVr;0.4a.t%I 4L SERV I tbN FORM "D" FOR A STATE POLLUTANT DISCHr1Rr2E EL;,11;JaT10PJ SYSttt31 (SPCpS) PERMIT (Becomes A SPCES Permit When Signed 3y Permit Issuing Olfici�t�) �"t ��S �IrrT es T!'T�1 7T°! to"'E'VAL CR MCOIF:CA-.0h. LIVE PtEVICUS 40. S C Pl-FT OF o► ' .e,. �lene.al : yaauic,Iioa+ NT — 7 SOS' l(X'S 4AME(Carvate. P,nnersara or I-VaVotim"I HEALTH $En i It•�.: oss Sound Ferry Services, Inc. 7"_YPWSOF OWNERSHIPER'S MAIUNG ADDRESS(Street,City,UjsW lie cogq aroorate ❑Indl•idwl p PaiTnersAro Q f "t D.Box 33 - New London, Ct. 06320 ALL CORRESPQNDENCE TO:(Nass,~Title aad AAdttwU -rd Associates P.C. - 100 Arrival Ave. - Ronkonkoma NY 11779 7O-F'"OIIE Na(IncluOe Art,Cady LRT NAME FA43L TT LOCATION(St1en wRo4,di 516 588-2626 ass Sound Ferry Services, Inc. Main Road �'•TOWN OR v111.ACE 'm' GIVE ERTUUT DdLECnOHS TO LOCATtOtt.IF NEC;— XT Orient folk C: Terminus of Route 25 (NYS Orient, NY RE OF 3USINESS OK_M OF FAUTT POPULATION SERVED(See Inst"Antanst --t;ENCT OF OISLNARG6 Ferry Terminal 800 ± C stoners i Te,rt'aTh Q No K-'Wt!';StredtrNwF of All Wspe"OMF (7�Te: Q leer If"'. isr SoecttT Na,of oars YOUR TISCMARGE CONTAIN lX IS IT FOSSIQ>:FOR TatJt DISCltARGs:TO COMAIN ONE OR r+OXZ OF TME FO=wING SU4STAr+CES ADDED AS A RESULT 0i CPQATIONS.AC711I1T1�OR IR:ICESSESi ease Cheek; G cres ntWr Q Lea"nooM 0>teTints Q CatlWtesF Q Cldoriwe Q ChrodlsWr Q CDOW Q Cranider Grease Q f Q Nletef call Q PMtols C:Se(etdla Zane_ 93 Mmor of Them- iARtO:DATA IV"additlsmy fma„t,i!arett�!sere fr�WtrCfretsl. .. Wx a Aaaes0tl Q wa vissc rw n M WASTI!`. rm cr nmArMENT' Q Esisttwwas r G Esiew Sani tory D ESIGN fiOw ICE DISC IA It ,rraareo aecemns watts a tic Tank 8 LeachingPools Gs1/ow yes C No Ciasaatiottow(nasal Ina"Me. ,.(FACE DISCHARGE :I-Tt•S'•,..44,00 at nearest S�taQ wanr . res 0 w f Gardiner's B Di:sance soil T"°E Doom to waar;aei.. • v Ptaeosae C3 Rawacentsr TTM_or WASTE (Ad'. 2 L.I. Sand I _ 0-6 e Q Esistla: TYPE of TREA;Ti,Er{► Q Estattes,ar. oEsiG11 FI CW CE OtSCltwRG& It-Ter,.taa,i�at rt0ear.tes Wan. Citt>�»♦_ res ❑w Cl4,a dtfesriow waters Iwats loot I .. ...-_ w..c♦ 1•:..y'�r•-'a rJtw.N•..a.ryyN�4,v... '4,.a. «u• - ..-- .+ RFACE DISC?!AnC-.EL 11-Tes:' sotrTypr.-r.r —�1 .r•r ..-�._. .e. •!!y. Q Fbl ..• �,�Y ,L�••-14�t'Ja _,..a-. 7 ., "= "+:'rte"• ,r-- i •Dec=to w>trl Tahjf Fl- Q ReCfaorwwt I"M OP WAST!: _ TT►1:OF TREATt+aENf •• Q EsisgttE Q Eip, OF-SIGN FLOW =E OfSCHARGE. It"Tib'.nave as ROtargme WM-W-9 �.aVCN .K Q we I - ICLrssilitzliow l WWW N Imper 1'b- 4ACE DtSC}tARCi It-yes' at wes,sr" el me i ISUMt SOIL."M I Oestw to s►at±r ►,� +e+cin,lnriw wWer malty or Oe+fR t►at W=m111113e6 Orvoided an at,lora a"any attectled >�o st"1al breis is true to the test of my trvrriedEe ,M beritt. sr,len+ertts nude Itererw are M2'sbaett ass Class A misceo,eawa►VM-jant 10 Section 210.45 of the U_V%IM� l It ►renal Lir. nnted Name Tir10 fo-•t-sr ( V. chard MctcMurray P• Attolt st:G.jOW R' (� Ea+ttism aalalCommIaslem,tawD APNT nOrr nO. _ oar;._.�.:.�.. NT— 7-6 4 5-" '+z SMET Distort is;now if tsrpllatsi waste Zltltt i df'/trtlett ITtI!tlsw Eftvirors�l: EFffCTTvE DAT7E. . '`''tion La�wetttiew Yom _ ,. EnFIRAnoy oAEE Stree and ee.e wwaaa r YAM ON plonisiert=of Me Fedwat WNei ''1'y 1 — �D 'o CMUVS AM as:eetaar!by"X-Ftdw►Rater PtltGetlae Cowtrat'Iles r d' n-�R QGl110lP lt„tS72 to t2.LG:)f2il tri ls�' ATTAC!(Mt�.., �T+d Idject to ttse altaC,ad uriT l *s1[a telened!its as"lass •- r -.. i two a pemit Imspr Ofool iis►:tt I fTaroIt I, IO�itatt s CA ^tt=on$:Dwty War ISuSub in Craerlr-1 tt: ICAIDILatitudeOwe Lai :ewe CARD l Lis .M 4,Its :c74 • ; r l v - r A-221 Ilia) I'mu, ST Ari: 1):"PAP1"U,;I'f OF G IV "0:1!SaITAL CO IU:I ' Regulatory Off airs Unit Rlcll;. 40, SU,+�-- Room 219-- - - Stony Brook, "rY 11794 1 (516) 751-79')0 RE: l 1 Dear 'IT\;� , A review has been made of your proposal to: Location: ( �) New York State Department of trivironmental Conservation has found the Ipnrcel project to be: Greater than 300' from inventoried tidal wetlands. ('7>> �1 Landward of a substantial man-made structure greater than 103' in length constructed prior to September 20, 1977. I Landward of 10' contour elevation above mean sea level on a gradual, nat- ural slope. Landward of topographical crest of bluff, cliff or dune in excess of 10 feet in elevation above mean sea level. Therefore, no permit under Article 25 (Tidal Wetlando of the Environmental Conservation Law) is required at this time since the current proposal is beyond State mandated jurisdiction pursuant to this act. lloirever, any idditionnl work or modifications to the project may require n permit. It is your responsibility to notify this office, in writing, if such additional work of modifications are contemplated. Very truly yours, T n Daniel J. Larkin Rer�ionnl Supervisor of negulatory Affairs A-222 New York State Department of Environmental Conservation Regulatory Affairs Unit Whole ' Bldg. 40, SUNY, Rm. 219 IRMW Stony Brook, NY 11794 Thomas C. Joriing (5 16) 751-7900 Commissioner August 22, 1988 Cross Sound Ferry Services Inc. ' c/o Richard MacMurray 2 Ferry St . P.O. Box 33 New London, CT 06320 1 ' Re: 10-88- 1164 Dear Sir: ' In conformance with the requirements of the State Uniform Procedures Act (Article 70, ECL) and its implementing regulations (6NYCRR, Part 621) we are enclosing your permit. Please read all conditions carefully. If you are unable to comply with any conditions, please contact us at the above address. Also enclosed is a permit sign which is to be conspicuously posted Iat the project site and protected from the weather. Very truly yours, I Joseph B. Hall Environmental Analyst enclosure A-223 95-20-o(q'86i-25c Ni��, Gkk STA It Df PARI'At N 01 IN\IRW Ot NlAi i,-ON"I KbAI ION DEC PERMIT NUMBER Am LFFECTIVE DATE 10-88- 1164 am 8/22/88 FACILITY PROGRAM NUMBER(s) PERMIT EXPIRATION DATE(s) Under the Environmental Conservation Law N/A 12/31/90 Article 15, Title 3; 6NYCRR 327, N 6NYCRR 608: N Article 25: 328, 329: Aquatic Pesticides Water Quality Certification Tidal Wetlands Article 15, Title 5: Article 17, Titles 7, 8: Article 27, Title 7; 6NYCRR 360: N Protection of Water SPDES Solid Waste Management' Article 15, Title 15: Article 19: Article 27, Title 9; 6NYCRR 373: Water Supply Air Pollution Control' Hazardous Waste Management Article 15, Title 15: Article 23, Title 27: Article 34: Water Transport Mined Land Reclamation Coastal Erosion Management Article 15, Title 15: Article 24: Article 36: Long Island Wells Freshwater Wetlands Floodplain Management Article 15, Title 27: N—New, R—Renewal, M—Modification, Articles 1, 3, 17, 19, 27, 37; Wild, Scenic and Recreational C—Construct ('only), 0—Operate ('only) 6NYCRR 380: Radiation Control Rivers PERMIT ISSUED TO Cross Sound Ferry Services Inc. ADDRESS OF PERMITTEE c/o Richard MacMurray, 2 Ferry St. , P.O. Box 33, New London, CT 06320 AGENT FOR PERMITTEEXONTACT PERSON TELEPHONE NUMBER NAME AND ADDRESS OF PROJECT/FACILITY(If different from Permittee) Gardiners Bay (Orient Point) STM 1000- 15-9-3.5 UTM COORDINATES LOCATION OF PROJECTiFACILITY COUNTY TOWNiCITY/VILLAGE Orient Suffolk Southold DESCRIPTION OF AUTHORIZED ACTIVITY maintenance dredge the ferry landing site (approximately 380'x315' ) to 15' below 7 mean low grater by clam shell bucket. Resultant 5,000 cubic vards spoil to be Iplaced on adjacent upland property. All work st;hall be in accordance with the + attached NYSDEC approved plans. IGENERAL CONDITIONS By acceptance of this permit, the permittee agrees that the permit is contingent upon strict compli- ance with the ECL,all applicable regulations and the conditions specified herein or attached hereto. The permittee shall file in the office of the appropriate regional permit administrator,or other office designated in the special conditions,a notice of intention to commence work at least 48 hours in advance of the time of commencement and shall also notify himiher promptly in writing of the completion of the work The permitted work shall be subject to inspection by an authorized representative of the Department of Environmental Conservation which may order the work suspended if the public interest so requires pursuant to ECL §71-0301 and SAPA §401(3). The permittee has accepted expressly,by the execution of the application.the full legal responsibility for all damages,direct or indirect,of whatever nature.and by whomever suftered.arising out of the project described herein and ha:agreed to indemnify and save harmless the State from suits,actions,damages and costs of every name and descrip- tion resulting from the said project + The Department reserves the right to modify, suspend or revoke this permit at any time after due notice, and, if requested, hold a hearing when a) the scope of the project is exceeded or a violation of any condition of the permit or provisions of the ECL and pertinent regulations are found: or b) the permit was obtained by misrepresentation or failure to disclose relevent facts:or c) newly discovered information or significant physical changes are discovered since the permit was issued The permittee is responsible for keeping the permit active by submitting a renewal application.including any forms,fees or supplemental information which may be required by the Department. no later than 30 days(180 days for SPDES or Solid or Hazarduous Waste Management permits)prior to the expiration date c This permit shall not be construed as conveying to the applicant any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the Permitted work or as authorizing the impairment of any rights. title or interest in real or personal property held or vested in a person not a party to the permit The permittee is responsible for obtaining any other permits. approvals lands. easements and rights-of-way which may be required for this project - Issuance of this permit by the Department does not,unless expressly provided for modify supersede or rescind an order on consent or determination by the Commissioner issued heretofore by the Department or any of the terms. conditions, or requirements contained in such order or determination. Any modification of this permit granted by the Department must be in writing and attached hereto RE';ULA'TCGitY AFtAIK3 PER-MIT ISSUANCE DATE PERMIT ADMINISTRATOR ADDRESS RE(-;ION I EJ,(1[LDJNC. 40 8/22/88 Bebert A. Greene S1-%TF. UNIVER^ITY 01= vT•t 1��!!R AL-THORIZED SIGNATURE .�()."j 1' F!It( s(`h. Fw y(IR k t 1794 �'.-C� Page 1 of cc: BMHP A-224 �5.20'6a(1!861-25c rJOITIONAL GENERAL CONDITIONS FOR ARTICLES 15 (Title 5), 24, 25, 34. 36 and 6 NYCRR Part 608 0 That if future operations by the State of New York require an al- other environmentally deleterious materials associated with -,ne teration in the position of the structure or work herein authorized, or project I if, in the opinion of the Department of Environmental Conservation 14 Any material dredged in the prosecution of the work herein permittec it shall cause unreasonable obstruction to the free navigation of said shall be removed evenly,without leaving large refuse piles,ridges across waters or flood flows or endanger the health, safety or welfare of the bed of a waterway or floodplain or deep holes that may have a the people of :he State, or cause loss or destruction of the natural tendency to cause damage to navigable channels or to the banks or resources of the State.the owner may be ordered by the Department to a waterway remove or alter the structural work, obstructions, or hazards caused 15 There shall be no unreasonable interference with navigation by the worK thereby without expense to the State, and if, upon the expiration or herein authorized. revocation of this permit, the structure, fill, excavation, or other 16 If upon the expiration or revocation of this permit, the project herew, modification of the watercourse hereby authorized shall not be com- authorized has not been completed,the applicant shall,without expense pleted, the owners, shall, without expense to the State. and to such to the State, and to such extent and in such time and manner as the extent and in such time and manner as the Department of Environmental Department of Environmental Conservation may require,remove all or Conservation may require,remove all or any portion of the uncompleted any portion of the uncompleted structure or fill and restore the site ' structure or fill and restore to its former condition the navigable to its former condition. No claim shall be made against the State or and flood capacity of the watercourse.No claim shall be made against New York on account of any such removal or alteration. the State of New York on account of any such removal or alteration. 17 If granted under Article 36, this permit does not signify in any wa% 11 That the State of New York shall in no case be liable for any damage that the project will be free from flooding. ' or injury to the structure or work herein authorized which may be caused 18 If granted under 6 NYCRR Part 608, the NYS Department of Environ- by or result from future operations undertaken by the State for the mental Conservation hereby certifies that the subject project will not conservation or improvement of navigation,or for other purposes.and contravene effluent limitations or other limitations or standards under no claim or right to compensation shall accrue from any such damage. Sections 301, 302, 303. 306 and 307 of the Clean water Act of 1977 '2 Granting of this permit does not relieve the applicant of the responsi- (PL 95-217) provided that all of the conditions listed herein are met bility of obtaining any other permission, consent or approval from 19 All activities authorized by this permit must be in strict conformance the U.S.Army Corps of Engineers. U.S. Coast Guard, New York State with the approved plans submitted by the applicant or his agent as par. Office of General Services or local government which may be required. of the permit application. ,3 All necessary precautions shall be taken to preclude contamination Cross Sound Ferry Svcs. pgs. of any wetland or waterway by suspended solids, sediments, fuels, uch ap roved 3/38lens were pre un b date 3; Howard 7�oung survey t 'Do: solvents,lubricants,epoxy coatings,paints,concrete, leachate or any -,100 on approved—dztted-8;✓-� SPECIAL CONDITIONS i 1 . Dredge spoil shall be placed no closer than 50' from mean high water to ' to a maximum depth of 6' . The seaward toe of the deposited spoil shall be no steeper than 1 :3 slope. I Supplementary special conditions (A) thru (J) attached. i Additional supplementary special conditions (K) (L) (M) attached. I i i i DEC PERMIT NUMBER 10-88-1164 'ROCRAWFACILITY NUMBER N/A Page 2 of 4 I A-225 i SUPPLEMENTARY SPLCIAL CONDITIONS 'rhe following condi Lions apply Lo all perwits: A. 11 any of Lhe permit conditions are unclear,the permittee shall con- tact the Uivision of Regulatory Affairs at the address and telephone noted below. ' B. A copy of this permit or approval and supplementary conditions shall be available at. the project site whenever authorized work is in progress. C. The permit sign enclused with Lhe permit or a copy of letter of ' approval shall be protected from the weather and posted in a con- spicuous location at the work site until completion of authorized work. D. At: least 48 hours prior to commencement of the project, the permittee shall complete and return the top portion of the enclosed receipt form certifying that he is fully aware of and understands all provisions and conditions of this permit. Within one week of completion of the permitted work, the bottom portion of that form shall also be com- pleted and returned. ' E. For projects involving activities to be accomplished over a period of more than one year, the permittee shall notify the Regional Permit Administrator in writing at least 48 hours prior to the commencement ' of resumption of work each year. r. If project design modifications take place after permit issuance, the permittee shall submit the appropriate plan changes for approval by ' the Regional Permit Administrator prior to undertaking any such modi- EicaLions. The permittee is advised that substantial modification may require submission of a new application for permit. G. All necessary precautions shall be taken to preclude contamination of I any wetlands or waterway by suspended solids, sediment, fuels, solvents, lubricants, epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials associated with the project work. I If. Any failure to comply precisely with all of Lhe terms and conditions of this permit, unless authorized in writing, shall be treated as a violation of the Environmental Conservation Law. I I. The permittee is advised to obtain any permits or approvals that may be required from the U.S. Department of Army Corps of Engineers, NY DistricL, 26 Federal Plaza, New York, NY 10278, (Attention: Regulatory Functions Branch) , prior to commencement of work authorized herein. J. The granting of this permit does not relieve the permittee of the responsibility of obtaining a grant, easement, or other necessary approval Erom Lhe Division of Land Utilization, Office of General Services, Tower Building, umpire State Plaza, Albany, NY 12242, which may be required for any encroachment upon State-owned lands underwater. Regional Permit Administrator NYS Dept. of Environmental Conservation Bldg. 40, SUNY-Room 219 Stony Brook, NY 11794 (516) 751-7900 A-226 ' TF:E FOLLO?7IT:G COI�ITIOi'S S11-ALL APPLY IF CEECIMLAS APPLICABLE BY TIIE R.EGIO17AL PM1IT ADi__TI':CSTP.ATCI:: K. All dredging shall be coueucted so as to leave a ur_iforn bottom elevation free of mou-ads or holes. ' L. All spoil material shall be disposed of either in the Atlantic Ocean or at an approved U.S. Co-ernment Dumping Ground, as directed by the District Engineer, U.S. Depart- ment of the Army, Corps of Engineers. Any spoil ma„-erial not intended for such water disposal shall be removed f-cm / the site and disposed of at do approved upland site. i:. All fill and spoil material shall be suitably cor_=aine(I at the work site so as to prevent its eiodin", leachin^ or o_:_er- ' wise entering into adjacent wetlands and wateruays. 11. All peripheral rip- rap berms, cofferdams, rock revetments, ' gabions, bulkheads, etr. shall be completed prior to plscemc::t of any fill material be;iind such structures. 0. All repairs to existing structures shall be confined to re- placement of existing structural elements with no change in design, dimension, or materials, unless specifically authorized herein. I I REGIONAL PEM= ADI'-IITISTRATOR Division of Regulatory Affairs DATE- I7YS Dert. of Environmental Conservation Blda. 40, SUNY, Room 219 Stony Brook, VY 11794 DEC # (516) 751-7500 Page 4 of 4 1987 A-227 1 � LDNG 1lLAI•ID SpL1ND a"0 •"G ORIENT POINT /� LDGuS IT ova� If ' P•` CP VICINITY MAG �i \ 0 loon 400o a000 acnc FQOM "AGST211M SUFFOLK COUIJT`( AT"' Bo P 0 •! ;�v- y���fv011 APPROVED \ i y '\D-ATE Ole 6 t, ° C;1� a , a��`��ops � ,• PLAN ya' 0 � 100 TS SO 25 0 100 O PURPOSE COMMERCIAL FERRY DATUM MEAN LOW MATER III? 1983 PROPOSED SHEET PILING BULKHEAD e 0AK FENDER PILINGS ADJACENT OWNERS �' �' D. C• RE^ L4TORY Af FAIRS, RC �� I IN GARpINERS e•r (�I HENRY eLAUVLIT AT ORIENT O MARY NICKS COUNTY OF SUFFOLK STATE OF NEW YORK APPLICATION BY CROSS SOUND PERRY SERVICES. INC SMEET I Or 2 DATE 3 / 30/83 A-228 • � J`is �r .. , NOTE! A*FROKIN>TLY q09 Qr. Tog. TO K EKCAMTi9 NISS1 90CM AREA 9 PLACED A911S11)t. - . ;• �dYSDEC APPRGVED . :�• :. .. ; ' DATE � _►_ LJLIIT• O -00SQ61MG w c C Z[>!..'Sb1=T nLE CE1.l. rl :i J mow • ♦.�i.f-j?i'. ��.'���3.t �Jy,�Lf.r •e��.•�T��S�:T1�: ' ♦ •�. C' D. C. f1,1 J,J :�• , -,j VIS, n .' L` • '' �'.v 'a K• , . I�Ion I Y AF ,:• t»%iR�l..,:e :'+;, G .,. . ►. � FAIRS, fp `��;. ;•• i i .tit'. yl 7 11 1 • `.Sw1.N f,t +its\Mid'4t .ti+••�fj+�iµ C��!'1'j l• �. 1' PV"W SED SNEtT HLM1. 9ULK1ft I1 OAN►[NON MLINSS Y , 111 M00MERS say AT ORIENT •f •4. _ •j.. . COUNTY OF SUFFOLK STATE OF NEW YORK ti APPWGATN1N 9Y CN9mS"Koo FENNY SawtatS.INC. $MEET 2 f1F 2 _ _i OAT[ _ 3 / 30/03 A-229 Ot 01 e04 JUN 12 7 1988 ;o N t tojONo�`� foo ri Y. S. 1, moo,�� �o� o G�.1�` �� pE 29 � �GIII.AT�IRY. i.►r;ars tttGtll�r —� ON \6 Zoo j Js Ara a o 2 0 E Pp oa6 Of, 01, � t o PSN e' T, ep oA P3o '" 2 \ \ 0 po p s�, ` �Z#\ \tea, + O c�6 o J �, ao \ zj Ire 10 \ maces 'AO s- �• dap � /�.vlzpv"� Aw A��'�DVEQ OG . T 4.-38.40 ,yTIN M v r �_ 0 � C) ^rQ�� �gTE¢iaL its VV �eE14 1 slope �L'T P' Q 19- C6 01 04 ct 0� v SURVEY FOR CROSS SOUND FERRY SERVICES ,INC. AT ORIENT DATE: MAY 25,19813 TOWN OF SOUTHOLD SCALE i"=60 ' 1 ' SUFFOLK COUNTY 9 NEW YORK No. 88-0560 NOTES' I ■= MONUMENT K UNAUTHORIZED ALTERATION 011 ADDITION TO THIS SURVEY IS A VIOLATION OF SECTION 7209 Of THES�r�E OF NE1y y 2. SUFFOLK CO.TAX MAP NEW YORK STATE EDUCATION LAW V COPIES OF THIS SURVEY NOT KAROO THE LAND 0 DIST 1000 SECT.M BL 9 LOT 3_5 SURVEYOR'S INKED SEAL OR EMBOSSED SEAL SHAL4 ��u W. }O t NOT of CONSIDERED TO BE A VALID TRUE COPY MGUARANTEES INDICATED HEREON $HALL RUN ONLY TO p G THE PERSON FOR WHOM THE SURVEY IS PREPARED AND ON NIS BEHALF TO THE TITLE COMPANY,GOVERN- MENTAL AGENCY AND LENDING HEREON,AND TO THE AS!ONEES OF THETUTILENDING LISTED # To�001T10NAL INSTITUTIONS ARE HOT ' OWNERS N y 5 "DISTANCES SHOWN HEREON FROM PROPERTY LINES I FOR A SPECIFIC TO PURPOSEI AND ARE NORT TO BEE USED TO ESTABLISH , 11y1' lANn 00-4Ei��' PROPERTY LINES OR FOR THE ERECTION OF FILMS OSTRANDER YOUNG a YOUNG RRIIVOERHEAD, NEWAYORKE ALDEN W YOUNG,PROFESSIONAL ENGINEER AND LAND SURVEYOR N.YS.LICENSE NO.12845 HOWARD W.YOUNG, LAND SURVEYOR N.Y S.LICENSE NO.45893 ••^•Nh19 L SONS INC. COASTAL MANAGEMENT PROGRAM Federal Consistency Assessment Form An applicant,seeking a permit,license,waiver,certification or similar type of approval from a federal agency which is subject to the New York State Costal Management Program ICMP,shall complete this assessment form for any proposed activity that will occur within and/or directly affect the State's Coastal Area. This farm is Intended to assist an applicant in certifying that the proposed activity Is consistent with New Yak State's CMP as required by U.S.Department of Commerce regulations(15 CFR 930.57)• It should be completed at the time when the federal application la prepared. The Department of State will use the completed form and accompanying information In its review of the applicant's certification of consistency. A. APPLICANT 1. Name: Cross Sound Ferry Services, Inc. Iplesse prim) 2 Address: c/d Inter Science Research Associates, Inc. P.O. Box 1201; Southampton, New York 11969 3. Telephone: Area Code( )516 - 283 - 5958 B. PROPOSED ACTIVITY 1. Brlaf deaaiption of activity Construction of 155 space parking area I2. Purpose of activity. To meet demand of the public for parking spaces in association ...i►h *tic tr...p=+.ti.n of rho —hlic . R the Lona Island Sound. I3. Location of activity: ------ Suffolk Southold Orient Point County City,Town or Village Street or Site Description I 4. Type of Is I pNrrlMOoenrs raghiad: nrnr n..,.i 5. Federal a on number,If known: 6. If a state permiWotme was Issued or is required for the proposed activity,Identify the state agency and provide the ' application or par d number,if known: C. COASTAL ASSESSMENT Check either'YES"or'NO'for each of the following questions. The numbers following each question refer to the policies described In the CMP document(see footnote on page 2)which may be affected by the proposed activity, 1. 1Afl0 the proposed activity[011l&In erry of the following. a. Large physical chenge to a site within the consul area which will require the preparation of an environmental 6UPact statement? 111,22,25,32,37,38,41,43)...................... X _ ' b. Physical alteration of more then two acres of land along the shoreline.lend under water or coastal — waters? (2,11,12,20,28.35.44) x c RevitalizatiorWedevellopment of a deteriorated or underutilized waterfrort oke) 111 .............. .2L — d. Reduction of existing or potential public access to or along coastal waters) (19,20) ............ — ,L e. Adverse aNect upon the commercial or recreational use Of coastal fish resources? (9,10) ......... f. Siting of a facility assentW to the exploration.development and production of energy — �L ' m8ft"es In Costal watara or on the Outer Continental Shelf? (29) ......... = X til p, St Of s fsdRty euw"to the gsreratim ortransmission of energy? (27) .... ...... % h. Mining,excavation,Or dredging acdvitles,or the placement of dredged or fill material in costal waren? (15,351 _ Y ....................................... ....... I. Diactu08 Of twdo,hWWdous and ONVIOea Or other pollutants Into coastal waters) (8,15,35) ... — 1. Draining of stormwater runoff or sewer overflows into coastal waters) (331 ... — ' k. Transport,stroge,treatment,or disposal of solid wastes or hazardous materials? (36.39)........ — if I. Adverse affect upon land or water uses within the State's small harbors? (4) — 2. Will the proposed activity Affl=or be Ind in,on,or adjacent to any of the fallowing: ' a. State designated freshwater or tidal -designated (ed x X b. Federally dealllneted rood and/or state designated erosion hazard area) 111,12,17,1 X — c. State designated significant fish and/or wildlife habkat7 17) X I State designated significant scenic resource or area) (24). ......... ...... ..... .. . _ X e. State des WMW important agricultural lands? (261 ............................... .. _ y I. Beach,due or banter Ward? (12) ................................. ........ .. ' p. Mala ports of Albany,Buffalo.Ogdensburg. Oswego or New York) 13! ................ ...: — -ice h. State,tarty.or local park? 119,201 -it — 1. Historic resource gated on the National a State Register of Historic Places? (23) ............ I A-231 YES NO 3. Will the proposed activity require any of the following a. Waterfront site? (2,21,22) .. ..... . .. .......... . ... X _ b. Provision of new public services or infrastructure in undeveloped or sparsely populated sections of the coastal area? 15) ..... . ... .... .. .. .. _ -Z- c. Construction or reconstruction of a flood or erosion control structure? 113,14,16) y d. State water quality permit or certification? (30,38,40) .......... . ..... .. _ e. State air quality permit or certiflaation? 141,431 . -*- 4. Will the proposed activity occur within and/or affect an area covered by a State approved local waterfront revitalization program? (see policies in local program document') •........ .. D. ADDITIONAL STEPS 1 If all of the questions in Section C are answered'NO%then the applicant or agency shall complete Section E and submit the documentation required by Section F. 2. If any of the questions in Section C are answered'YES',then the applicant or agent is advised to consult the CMP,or where appropriate,the local waterfront revitalization program document% The proposed activity must be analyzed in more detail with respect to the applicable state or local coastal policies. In the space provided below or on a separate page(s), the applicant or agent shall: (a)Identify,by their policy numbers,which coastal policies are affected by the activity,(b) briefly assess the effects of the activity upon the policy; and,(c)state how the activity Is consistent with each policy. Following the completion of this written assessment,the applicant or agency shall complete Section E and submit the documentation required by Section F. E. CERTIFICATION The applicant or agent must certify that the proposed activity is consistent with the State's CMP or the approved local waterfront revitalization program, as appropriate. If this certification cannot be made,the proposed activity shall not be undertaken. If this certification can be made•complete this Section. I 'The proposed activity complies with New York State's approved Coastal Management Program,or with the applicable approved local waterfront revitalization program,ane will be conducted in a manner consistent with such program.' XApylpCip?pP,gent's Name: Tn -C innrn Raenarrh Ace 'alae, TNf Address: P.O. BOX 1201; Southampton, New York 11969 I Telephone:Area Code( 1 516-283-5958 r� �/���; Applicant/Agent's Signature: / i/r'i`�,_.(_ Data: 10/97 ' F SUBMISSION REQUIREMENTS 1. The applicant or agent shall submit the following documents to the New York State Department of State,Division of Coastal Resources and Waterfront Revitalization, 162 Washington Avenue,Albany,New York 12231. a. Original signed form. b. Copy of the completed federal agency application. c. Other available information which would support the certification of consistency. 2. The applicant or agent shall also submit a copy of this completed form along with Ns/her application to the federal agency. ' 3. If there are any questions regarding the submission of this form, or. ct the Department of State at(518)474-6000. I 'These state and local documents are available for inspection at the offices of many federal agencies,Department of Environmental Conservation and Department of State regional offices•and the appropriate regional and county planning agencies. Local program documents are also available for inspection at the offices of the appropriate local government. IFCAF Revised 12/6/93 I A-232 INTEI�-SCIENCE RESEARCH ASSOCIATES, INC. ENVIRONMENTAL PLANNING&DEVELOPMENT CONSULTANTS RICHARD ERIK WARREN.AICP President July 24, 1997 Chief Joseph Conway Southold Town Police Main Road Southold, New York Re: Police Protection/Service for the Cross Sound Ferry, Orient, Town of Southold Dear Chief Conway: As required by the Southold Town Planning Board, our office is preparing a Draft Environmental Impact Statement (DEIS) for the Orient Point Ferry (Cross Sound Ferry Services Inc.) With respect to several of the police-related issues that the Town wants addressed, I am requesting that either you or your staff provide us with some background information. As you may be aware, the owners of the Cross Sound Ferry wish to construct a 150 car parking area (gravel surface) located adjacent to the existing in-use parking lots which are owned and operated by the ferry. Upon reviewing the site plan application for the proposed parking area, the Town issued a Positive Declaration which required the preparation of a DEIS The Town then prepared a ten page Scoping Outline which defines all the issues the DEIS must address The proposed projects relationship to police protection is one of the issues that the town wants us to address. I have enclosed the page from the Towns Scoping Outline which identifies exactly what police issues the Town considers important with respect to the project site As you can see, the Town want the DEIS to discuss the following: "Police Protection-discuss level of public service being provided and include description ofservice(ie. speed enforcement,parking, violations, accidents, etc)" To simplify the above quoted passage, I offer you the following list of questions • What Police services are considered necessary as a result of the ferries existence at Orient? In other words, if the entire Ferry operation never existed, would less services be necessary/provided to the residents of Orient? POST OFFICE BOX 1201 • 36 NUGENT STREET •SOUTHAMPTON, NEW YORK 11969-1201 • 516-283-5958 • FAX. 516-283-5974 A-233 it • How often in the last five years has the Police Department been called to the Ferry site to resolve a traffic, parking, accident or other dispute9 • Can Southold Town Police Officers issue parking violations to ferry patrons that have parked on the shoulder of Route 25 due to lack of parking space on the ferry property? • In your opinion, would the construction and use of an additional 150 car parking area at the ferry site cut down on the number of cars parked on the shoulder of Route 25? i • In your opinion, would the construction and use of an additional 150 car parking area at the ferry site contribute to an increase in crime at Orient or result in the need for more police service in the Orient area? I Thank you for your time and effort in responding to these questions I sincerely appreciate your help in addressing the Town Planning Boards concerns Respectfully Submi Scott Dobriner Sr Environmental Planner and Landscape Architect INTER-CIENCE A-234 INTEI -50ENCE RESEARCH ASSOCIATES, INC. ENVIRONMENTAL PLANNING&DEVELOPMENT CONSULTANTS RICHARD ERIK WARREN,AICP President July 25, 1997 Charles Woznick, Superintendent of Schools Orient Public School 23405 Main Road Orient, New York 11957 Re: Educational Facilities at Orient and their Relationship to the Cross Sound Ferry, Orient, Town of Southold Dear Superintendent Woznick: As required by the Southold Town Planning Board, our office is preparing a Draft Environmental Impact Statement (DEIS) for the Orient Point Ferry (Cross Sound Ferry Services Inc.). With respect to several of the issues concerning educational facilities that the Town wants addressed, I am requesting that you provide us with a few of your opinions and as well as some background information. As you may be aware, the owners of the Cross Sound Ferry wish to construct a 150 car parking area(gravel surface) located adjacent to the existing in-use parking lots which are owned and operated by the ferry. Upon reviewing the site plan application for the proposed parking area, the Town issued a Positive Declaration which required the preparation of a DEIS The Town then prepared a ten page Scoping Outline which defines all the issues the DEIS must address. The proposed projects relationship to existing educational facilities is one of the issues that the town wants us to address. I have enclosed a page from the Towns Scoping Outline which identifies exactly what issues i concerning education facilities that the Town considers important with respect to the project site As you can see, the Town wants the DEIS to discuss the following- "COMMUMTYSERVICES- This section should discuss each resource and determine Potential impacts of the proiect with regard to each resource" "Educational facilities-discuss existing.facilities and location relative to the site and access road." POST OFFICE BOX 1201 - 36 NUGENT STREET•SOUTHAMPTON, NEW YORK 11969-1201 • 516-283-5958 • FAX. 516-283-5974 A�5 To simplify the above quoted passage, I offer you the following list of questions • My inventory of educational facilities at Orient only includes the Oysterponds Public School. Are there any other facilities in Orient that I should include9 • In your opinion, would the construction and use of an additional 150 car parking area at the ferry site contribute to an increase in use of any of the inventoried educational facilities? • In your opinion, would the construction and use of an additional 150 car parking area at the ferry site result in a reduction of quality at the inventoried educational facilities9 i • In you opinion, would the construction and use of an additional 150 car parking area at the ferry site create an unsafe environment at the inventoried j educational facilities? i Thank you for your time and effort in responding to these questions I sincerely appreciate your help in addressing the Town Planning Boards concerns Respectfully Submitted, Scott Dobriner Sr Environmental Planner and Landscape Architect I i I i INTEk5CIENCE A-236 INTERSCIENCE RESEARCH ASSOCIATES, INC. ENVIRONMENTAL PLANNING&DEVELOPMENT CONSULTANTS RICHARD ERIK WARREN,AICP President July 25, 1997 Ken Reeves, Recreation Supervisor Southold Town Recreation Department P.O. Box 267 Peconic, New York 11958 Re: Park/Recreation Facilities in Orient and their Relationship the Sound� p to e Cross S Ferry; I Dear Mr. Reeves: As required by the Southold Town Planning Board, our office is preparing a Draft Environmental Impact Statement (DEIS) for the Orient Point Ferry (Cross Sound Ferry Services Inc.). With respect to several of the park/recreation issues that the Town wants addressed, I am requesting that you provide us with some background information. I As you are aware, the owners of the Cross Sound Ferry wish to construct a 150 car parking area (gravel surface) located adjacent to the existing in-use parking lots which are owned and operated by the ferry. Upon reviewing the site plan application for the proposed parking area, the Town issued a Positive Declaration which required the preparation of a DEIS The Town then prepared a ten page Scoping Outline which defines all the issues the DEIS must discuss. The proposed projects relationship to local parks and recreation facilities is one of the issues that the town wants addressed. I have enclosed the page from the Towns Scoping Outline which identifies exactly what park/recreation issues the Town considers important with respect to the project site As you can see, the Town wants the DEIS to discuss the following "COMMUMTYSERVICES- This section should discuss each resource and determine Potential impacts ofthe Proiect with respect to each resource" "Recreation facilities-discuss status and location of recreational facilities in Orient, including State and Count,Roads" POST OFFICE BOX 1201 • 36 NUGENT STREET •SOUTHAMPTON, NEW YORK 1 1 969-1 201 • 516-283-5958 • FAX. 516-283-5974 A-237 With respect to the quoted passage as taken from the Towns Scoping Outline, I offer you the following list of questions: • My own inventory of recreational facilities (public and private) at Orient includes the following Truman Beach, Orient Point County Park, Orient Point State Park, Orient by the Sea Marina, Narrow River Marina, Orient Yacht Club and the Orient School Playground. Do you know of any other parkland or recreational facilities that I should include9 • In your opinion, would the construction and use of an additional 150 car parking area at the ferry site significantly contribute to an increase in use of any of the inventoried parks/recreation facilities? • In your opinion, would the construction and use of an additional 150 car parking area at the ferry site result in any reduction in the quality of the inventoried parkland and recreational facilities? I Thank you for your time and effort in responding to these questions I sincerely appreciate your help in addressing the Town Planning Boards concerns Respectfully Submitted, Scott Dobriner i Sr Environmental Planner and Landscape Architect i I I I INTERSCIENCE A-238 INTEI�-50ENCE RESEARCH ASSOCIATES, INC ENVIRONMENTAL PLANNING & DEVELOPMENT CONSULTANTS RICHARD ERIK WARREN AICP President July 25, 1997 Jim McMahon, Director Southold Town Community Development Southold Town Hall Main Road Southold, New York 11971 Re: Park/Recreation Facilities in Orient and their Relationship to the Cross Sound Ferry; Dear Mr. McMahon: As required by the Southold Town Planning Board, our office is preparing a Draft Environmental Impact Statement (DEIS) for the Orient Point Ferry (Cross Sound Ferry Services Inc ) With respect to several of the park/recreation issues that the Town wants addressed, I am requesting that you provide us with some background information. As you are aware, the owners of the Cross Sound Ferry wish to construct a 150 car parking area (gravel surface) located adjacent to the existing in-use parking lots which are owned and operated by the ferry. Upon reviewing the site plan application for the proposed parking area, the Town issued a Positive Declaration which required the preparation of a DEIS The Town then prepared a ten page Scoping Outline which defines all the issues the DEIS must discuss The proposed projects relationship to local parks and recreation facilities is one of the issues that the town wants addressed. I have enclosed the page from the Towns Scoping Outline which identifies exactly what park/recreation issues the Town considers important with respect to the project site As you can see, the Town wants the DEIS to discuss the following. "COMMUNITY SERVICES- 77iis section should discuss each resource and determine potential impacts of the proiect with respect to each resource" "Recreation facilities-discuss status and location of recreational facilities in Orient, including State and Counth Roads" POST OFFICE BOX 1201 • 36 NUGENT STREET •SOUTHAMPTON, NEW YORK 11969-1201 •516-283-5958 • FAX 516-283-5974 A-239 i With respect to the quoted passage as taken from the Towns Scoping Outline, I offer you the following list of questions: • My own inventory of recreational facilities (public and private) at Orient i includes the following Truman Beach, Orient Point County Park, Orient Point State Park, Orient by the Sea Marina, Narrow River Marina, Orient Yacht Club and the Orient School Playground. Do you know of any other parkland or recreational facilities that I should include? • In your opinion, would the construction and use of an additional 150 car parking area at the ferry site significantly contribute to an increase in use of any of the inventoried parks/recreation facilities? i • In your opinion, would the construction and use of an additional 150 car parking area at the ferry site result in any reduction in the quality of the inventoried parkland and recreational facilities? Thank you for your time and effort in responding to these questions. I sincerely appreciate your help in addressing the Town Planning Boards concerns. Respectfully Submi , i Scott obriner Sr. Environmental Planner and Landscape Architect I I i INTECIENCE i A-240 INTEI�-SCIENCE RESEARCH ASSOCIATES, INC. ENVIRONMENTAL PLANNING&DEVELOPMENT CONSULTANTS RICHARD ERIK WARREN,AICP President July 24, 1997 Edward Loper, Orient Fire Chief Orient Fire Department Orient Fire House Orient, New York 11957 Re: Police Protection/Sen�ice./or the Cross Sound Ferry, Orient, Town of Southold Dear Chief Loper: As required by the Southold Town Planning Board, our office is preparing a Draft Environmental Impact Statement (DEIS) for the Orient Point Ferry (Cross Sound Ferry Services Inc.). With respect to several of the fire safety/prevention-related issues that the Town wants addressed, I am requesting that you provide us with some background information. As you may be aware, the owners of the Cross Sound Ferry wish to construct a 150 car parking area (gravel surface) located adjacent to the existing in-use parking lots which are owned and operated by the ferry. Upon reviewing the site plan application for the proposed parking area, the Town issued a Positive Declaration which required the preparation of a DEIS The Town then prepared a ten page Scoping Outline which defines all the issues the DEIS must address. The proposed projects relationship to fire protection is one of the issues that the town wants us to address. I have enclosed two pages from the Towns Scoping Outline which identify exactly what fire- protection issues the Town considers important with respect to the project site As you can see, the Town wants the DEIS to discuss the following- "COMMUNITY SERVICES- This section should discuss each resource and determine potential impacts of the project with regard to each resource." "Fire protection-discuss status of fire protection facilities at Orient and suitability of same to handle level of hazard at the site" POST OFFICE BOX 1201 • 36 NUGENT STREET •SOUTHAMPTON. NEW YORK 11969-1201 • 516-283-5958 • FAX. 516-283-5974 A-2 1 To simplify the above quoted passage, I offer you the following list of questions • What Fire Department services are considered absolutely necessary as a result of the ferries existence at Orient? In other words, if the entire ferry operation never existed, would fewer Fire Department services be necessary/provided to the residents of Orient? • Approximately, how often in the last five years has the Fire Department been called to the Ferry site in response to a fire or other emergency? I • Within the past five years has the ferry been cited or warned against any activity/practice that the Fire Department considered unsafe? • In your opinion, would the construction and use of an additional 150 car parking area at the ferry site contribute to an increase in fire hazard potential? • In your opinion, would the construction and use of an additional 150 car parking area at the ferry site result in the need for more Fire Department service in the Orient area or threaten the existing level of service to the degree that residents would no longer be receiving sufficient protection from the Fire Department? f i Thank you for your time and effort in responding to these questions I sincerely appreciate your help in addressing the Town Planning Boards concerns. Respectfully Sub ' ted, i Scott obriner Sr. Environmental Planner and Landscape Architect I INTER-SCRENCE POLICE DEPARTMENT Administrative TOWN '; OU`THOI,D (516) 765-2600/2601 PEC ; NY11958 JOSEPH CONWAY Fax(516) 765-2715 Chief of Police Telephone'Emergency Dial 911 TO: Scott B. Dobriner, Sr. Environmental Planner & Landscape Architect FROM: Chief Joseph Conway DATE: September 10, 1997 RE: Cross Sound Ferry The information rcqucSted in your letter of July 24, 1997 is -listed below. If you have any further questions feel free to contact me. Joseph Conway Chief of Police Question #1 . What Police services are considered necessary as a result of the ferries existence at Orient? In other words, if the entire Ferry operation never existed, would less services be necessary/ provided to the residents of Orient? Answer #1 . The Police services most necessary as a result of the Ferry are traffic and parking control . If the Ferry never existed the need for Police services in Orient would not change. Question #2. How often in the last five years has the Police Department L een called to the Ferry Site to resolve a traffic, parking, accident or other dispute? Answer #2. The Southold Town Police responded to 323 calls for service in the last five years. Question #3. Can Southold Town Police Officers issue parking violations to Ferry patrons that have parked on the shoulder of Route 25 due to lack of parking space on the Ferry property? Answer U. Yes. A-243 Question #4. In your opinion, would the construction and use of an additional 150 car parking area at the Ferry site cut down on the number of cars parked on the shoulder of Route 25? Answer #4. An increase in off road parking should reduce the number of cars parked on Route 25. Question #5. In your opinion, would the construction and use of an additional 150 car parking area at the Ferry site contribute to an increase in crime at Orient or result in the need for more Police service in the Orient area? Answer #5. 150 additiunal cars shuuld riot increase the crime level at Orient Point, nor increase the need for Police service. A-244 I L'b:P3 blb 3d3 y'1L1b HHIEN I f-lHt LItF'HH I MEN 1 ORIENT FIRE DEPARTMENT_ P.O. BOA; 761 ORIENT, N.Y. 11957 E Q=111 j+'jU PIPARTWNT FAX TR ANSMITTAL f. TO., 1 N j Eg - 5C 16 ti'GQ FROM: C\41 ,ElE 60 L{9r2g Z, - DATE• 01� K MBER OF PAGES: IF THERE ARE ANY PROBLEMS WITH THIS TRANSMISSION PLEASE CALL 516-323-2445 AND LEAVE A MESSAGE. ` k I � r A-245 20: 16 E16 22Y 9'-106 ORIEHT ;:iRE DEPhRTf1EkT f I To sim ify the above quoted passage, I offer you the following list of questions: What Fire Department services are considered absolutely necessary as a result of the ferries existence at Orient. In ether words, if the entire ferry rry o peration never existed, would !ewer Fire Department services be necessarylprovided to the residents of Orient? Approximately, how often in the last five years has the Fire Department been f called to the Ferry site in response to a fire or other emergency? t Within the putt five 3192rc hac tho furry boon oitod or tt,arnod againa t any activity/practice that the Fire Department considered unsafe? ' • In your opinion, would the construction and use of an additional ISO car I! parking area at the ferry site contribute to an increase in fire hazard potential? S �p In your opinion, would the construction and use of an additional 150 S car parking area at the ferry site result in the need for more Fire Department service in the Orient area or threaten the existing level of service to the deee that residents would no longer be receiving sufficient protection from the Ful Department? 4 r f f r Thank you for your time and effort in responding to these questions. I sincerely appreciate your help in a ldressing the Town Planning Boards concerns Respectfully Su ed, Cott obriner Sr. Environmental Planner and Landscape Architect INI' - CE a A-246 09-19-99 20:16 516 323 9306 ORIENT FIRE DEFARTMEHT 331 r � I f�� +..��Cis•Amy / Priv , veo -rcn. ;lig' Q+m. D�P%TT-% of o? EST 7 Nc>. G ti�� OSP CA L-L-S TJ=> 'T' C401MW--s moo, Y E^fep No C-►c.L,S • �'1 6 - AM VV lA NC` CAULS �1q'1 �-�• c�P+'►� S- Annt�vLA�c` cq t..�.s a " 4 1- To MA-T'l c P % P-Q A LARXt5 5=4ETQy 'l`CMtNAL NJ M�E A-tzti.� VJ E AA D NsEPT tsar. l ' A-247 f,'I�i-I^i-�T ^G'I I rT S i{`-, T'�? g1iTA r1RTFl•,IT FTFF �iFFnFTI IFI,IT FTq O N , T 6-14j-= en f}PO T o►J A�. t c y� PP�2 tL.r•3 t L-cYr- 15 S= o F A F �� — T-}-}�cZ� 1S p► L•�G�L o F W A- _.. _ • - �� fZC,��s- AVA�tA1� A-'r T'��' F.��IC�f �N OL �� TTL."`_ I r I A A-248 --- - - 09-11-99 20:19 516 323 9906 ORIENT FIRE DEPARTMENT 331 PO4 r 'SLS Tyre, '�'3�1cS l+�4'�1+4Y�'� �...�r� 4 t�'O CaCC �-,3�ftJ..��4 1SC,•ak t tJ:.�['' �►Ny hc-t.v.� / P3�+c-rt i�� Rsy i� F t '��. _per_.___- __ It-' MY opt sa a 1J -- �� '� Gd�,re AT Ly CL�lJ���t E AN t NG F-s� ^tsl 1�3 t �lj�►2rr�A Vow r�:.AL — '-C�f� _-.--- �E"�2�..� 5 tT� �— v�1�►t�� cry nn �"tS i��S _ 1 4>i` A 1$� C (c'1C t NEs- LCAT wow C..�4 jJoT I—)t�N'�. t i s A-249 05, lg,� 13: 1,4 51b-3'23-3713 9 ETERFONDS-U.F.S.D. FAGE 01 To simplifp• the abnvr rlunted pAssAgr I offer you tiK f9flowing list of questions. • My invontory of educational facilities at Orient only includes the Oysterponds PO Public Schopl Are there any other facilities in Orient that I should include? I • In your opinion, would the construction and use of an additional 150 car parkinb area at tltc ictvy aatr- WiltribUte to an increase in usv of uny of Lhe inventoried educational facilittcV • In your opinion, would the con-iti iiulli m mill uar�of a!1 additianW 150 oar 00 parking area at the ferry site result in A reduction of quality at the inventoried ed-'at;v'41 taziluiis' In you opinion, would the construction and use of an additional 150 car 0 parking area at the ferry site create an unsafe environment at the inventoried educational facilities 1 Rol Thank yuu fui yuttt wits and effort to responding to these questions I sincerely appreciate your help in addressing the Town Planning Boards concerns Respectfully Submitted, colt Dobriner Sr Environmental Planner and Landscape Architect i i I INTEIz5CIENCF A-250 AUG 18 '97 01:53PIl SOUTHOLD TOWN HALL 516 765 1823 P. 1 �§jFFQjjt JAMES C. MCMAHON �� - Town Hall,53095 Main Road Administrator P.O.Box 1179 Telephone (516)765-1892 Southold,New York 11971 Fax(516)765-3136 TOWN OF SOUTHOLD COMMUNITY DEVELOPMENT OFFICE August 18, 1997 Mr. Scott Dobriner Inter-Science P.O. Hoz 1201 Southampton, NY 11969 Dear Scott: Your list covered all of the public and private recreational facilities in Orient, however, YOU may want to include the Oysterponds Historical Society property, in the hamlet of Orient, since they use the property for a variety of activities The Town of Southold does not own, operate or manage any of the park or recreation facilities you have ldentiied, therefore, I can not assess the impact of the ferry on the use or quality of those facilities. If you have any questions or need additional information on the above, please give me a call. Sincerely, Ja McMahon Town of Southold Community Development Office A-251 o�OgtFFOt/r KENNETH REEVES �� Gy 970 Peconic Lane RECREATION SUPERVISOR c P.O. Box 267 TOWN OF SOUTHOLD v' x Peconic,New York 11958 p Telephone: (516)765-5182 Fax: (516)765-1823 TOWN OF SOUTHOLD RECREATION DEPARTMENT September 5, 1997 Inter-Science Research Associates, Inc. Mr. Scott Dobriner P.O. Box 1201 36 Nugent Street Southampton NY 11969-1201 Dear Mr. Dobriner: I am in receipt of your request of my opinion on the impact the construction of an additional parking facility at the ferry site would have on local park & recreation facilities. I respectfully decline to answer your questionnaire for two reasons. First, I live in East Patchogue and am not all that familiar with the local area. Second, I feel that since I work for the Town of Southold as recreation supervisor, it poses somewhat of a conflict of interest. Thank you for your understanding regarding this matter. Sincerely, Ken Reeves Recreation Supervisor A-252 I®WN OF SOUTHOLD REGISTER OF DESIGNATED LANDMARKS 1 9 8 3 - 1 9 9 6 Town of Southold Landmark Preservation Commission Design:Illuminations Graphic Design,Greenport,New York Printing and Binding-Academy Press,Southold,New York A-253 o`�g�FFO(,�c0 w = LANDMARK TO«'%' OF SOUTHOLD LANDMARK PRESERVATION COMMISSION Our Town's Landmark Preservation Commission was created by the Town Board on January 1, 1983 The commission includes seven VOILInteer members, all having been appointed for a set term by the Town Board. All members have a sincere interest in their mission, each having unique expertise to make their individual and collective contributions. The commission's purpose Is clearly spelled out in the Torun Code Chapter 56.2, which is namely to "rrs,r;r Sowhold To-,cu and o7viler, of places, sites, buildings and sti-tictures m order to conserve, proteer and prc',erve such places, sites,structures and buildings, thereby preserving the uuuluc character of Southold Town, which 70111 sub- stantially improve property and commercial values in the t07un and make its hamlets even better places in which to live," e As provided by Tozun Code Chaptcr 56 5, the duties of the commission are to: "1. Encourage preservation nflandl,urr{, through education. 2. Promote and encourage historic awareness and p idicious corrccrrr fol designated landmarks." One of three criteria is used to designate a town landmark: 1. The structure or building is architecturally unique. 2. A site where an historic event took place 3 A building or site associated with an historic personage. The application for landmark status must be initiated by a property owner or other members of the community who may sponsor a public landmark site. It should be noted, as provided by the Town Code, that when a property is designated as a landmark, the commission cannot dictate or control the owner's treatment or use of such site or property Current 1996 commission membership includes: Clifford Benfield" John Stack Eric Haesche Ralph Williams Robert Kassner Deborah Winsor 'ChRrl"IIIaII A-254 DESIGNATED LANDMARKS -- FRANK J. MCINTOSH - = ° RESIDENCE Greenport ppearing today as a grand Victorian cottage, the interior of the house reveals framed major timbers in post and beam fashion which is characteristic of the 17th, and early-18th cen- turies. Yet all is not in its original configuration.The earliest structure was only 11/2 story, and at some point a second story was sandwiched between the first floor and the roof. This structure is intimately related to the Youngs-Guerlain-Coyle house with its Frank 1.Alchitosh Residencc, late-17th Century incorporation of the other half of Colonel John Youngs'home,but alone it has played a significant ifild"Favorite Place" part in Greenport, keeping up with the transition from 2345 Alain Road, Grccnport Colonial port to 19th century bustling town. Ozvncr:Frank McIntosh ° SHAW HOUSE ° == Orient uilt by Richard Shaw who also built and oper- ated a wharf nearby.The house is mentioned ID _ 3- - by Augustus Griffen, in his famous "Griffen's Journal" in regards to his father's famous jump from a second story window to escape from the British dur- ing the Revolution. A large, central chimney with _ -- - - many hearths, removed sometime after 1917, was rebuilt when the house was renovated after the 1976 ; i1011il!!itll(E11 ;•-- -- American Bicentennial. Also associated with this house is the tale of the "Widow Shaw" whose funeral Shaiv House,c. 1730 service turned out to be premature. 1970 Villap,Lanc, Orient A-255 TOWN OF SOUTHOLD ° TERRY—MULFORD HOUSE ° -= Orient nteresting clues to the house's long history were revealed during renovations and archaeological excavations. It is now thought that the house may date to as early as 1639 and it's speculated that in its earliest years, the house may have been the headquar- ters for a Massachusetts Bay Colony logging camp's operations on the North Fork. Further attesting to the early building date is the presence of White Oak siding. White Oak was used less and less for anything but structural members as the supply of this strong Terry-Mid/ord lloase,c. 76,39 wood quickly diminished. Also found on the site was lead used for 17th-century window caming, coins and nearly 60,000 ceramic shards. Land sale deeds dated 1805 describing the farm, when superimposed on the 1838 coastal map,indicate the configuration of the farm, which included the house and several outbuildings including two servant/slave quarter buildings.These two structures have been located by a resistivity survey but neither has been excavated.In 1807,when Elisha Mulford II rebuilt the existing unstable chimney stack,he apparently partook of the ancient English tradition of hiding an old boot and a smoked cat in the wall of the parlor next to the fireplace.The original part of the house has never been electrified. It has remained in the Terry family since 1713.The Terry-Mulford House is also designated as a National Landmark. J ° TERRYWOLD Orient he east wing dates from 1684, and the main section from 1700.The east wing is believed to be the second oldest structure in Orient after the Terry-Mulford House.The earliest Terry on rec- ord is Jonathan Terry Sr., who died in 1732. "Terry- wold"has never been out of the family and is now under the ownership of the 10th generation. Present are pegged, hand-hewn beams,wide floorboards, Terrywold,c.1730 some H &L hinges, a wide original chair rail and a small fieldstone cellar. In the kitchen, a trap door 36505 Roitte 4S, Orieiit opens into a hole with a 7' diameter, lined with metal. Its original use is unknown. A-256 DESIGNATED LANDMARKS VILLAGE HouSE - - - - : Orient ow the headquarters and principal museum of the Oysterponds Historical Society. Augustus Griffen,Orient's early historian, lived here operating a tavern in this Federal-era house.Not only did the Long Island stage line stop here,but the building served as a school and a store. In 1807 the building was enlarged, and in 1832 a sec- ond story was added. Griffen died at age 90 in 1856. Samuel Gilson Vail bought the house in 1853 and enlarged it. In the 1870s it acquired its present grace- ful proportions and picturesque ornamentation.The Oysterponds Historical Society acquired Village House from the Vail family in 1944. -_ EBB HousE ° c� Orient - oved here in 1955 from its second location in Greenport.Augustus Griffen s journal -_` tells of Colonel George Washington, enroute between Virginia and Boston, visiting the tap room of this house when the structure was located in Greenport and operated as Lt.Constant Booth's Inn. Folklore has it that the young colonel charmed the local young ladies with his elegant Virginia manners and conversation. Orange Webb, Booth's son-in-law, succeeded him as Webb I lousc, c. 1740illso knoiun as "Constant Booth Inn" innkeeper. Later the house became known as the Poituatuck Park, 1440 Village 1.anc, Orient Orange Webb House.A sizable amount of informa- tion about the building's history and the collection of furniture now housed in it is available through the Oysterponds Historical Society. A-257 TOWN OF SOUTHOLD ° HIGH—THEIL HOUSE,, - Orient uilt in 1790 on the site of a 1646 house which was one of the five first houses in all of Orient. In his journal, historian and innkeeper Augus- tus Griffen,born in 1766, remembers seeing General David Wooster's British troops, who came over from Connecticut to train in Orient, parading here in 1775. However,the handsome facade and style of the house apparent today were built during the mid-19th centu- ry. "'1135 Kill,,,,; Ilighwaly, 01-iclit X11 1111d 13111-toll 'Illeil GIDEON YOUNGS HOUSE Orient ehind 19th-century dormers and bay windows hides what is probably the oldest existing —__ house in the Orient Historic District. Original- ___==- ly deeded to Jonathan Youngs by L.T Gideon Youngs =_ DESIGNATED LANDMARKS - NATHAN B. SEIDMAN RESIDENCE Orient -` he American Villa movement is evident in the design of this house through elements such as Sam the Gothic lancet windows.This movement emphasized eye-pleasing connections between archi- tecture, man and the natural world.The porch,which became popular at this time, was intended as a place for observing nature. Meanwhile,balloon framing, millwork technology and industrial production meth- ods evident here allowed carpenters a wider range of design possibilities.As with many North Fork houses of antiquity, a small cellar constructed of field stone can be found under a portion of the house, suggesting a previous dwelling on the site. A-259 TOWN OF SOUTHOLD DESIGNATED HISTORIC SITES ° BENJAMIN FRANKLIN'S MILESTONES c.1755—Town of Southold,New York State,Suffolk County _ Colonial postal rates were promulgated by distance.The 30 miles from central Riverhead to Orient Point were precisely measured by Postmas- ter General Benjamin Franklin himself,using a"weasel" device on his carriage wheel.When one mile was measured off,the bell sounded to --- stop the carriage and a stake was placed,later to be replaced by a stone monument.In the Town of Southold,22 of the 24 monuments are still in place on the"King's Highway",which included the Main Road,Bois- seau Avenue and North Road: #7 Laurel; #9, #10, #11 Mattituck; #12, #13, #14 Cutchogue;#15 Peconic(Franklinville); #16, #17, #18, #19 Southold; #20, #22 Greenport(Stirling); #23, #24, #25 East Marion; #26, #27, #28, #29, #30 Orient. The stones became important reference points as inns,taverns and other places could be accurately located between or near a marker.Later,citi- zens serving government had accurate points of reference as they were paid according to the number of miles travelled. THE COMMONERS' 'RESERVE Proprietors of the Common and Undivided Lands of Southold Town As of 1661,the permanent population of Southold had stabilized to 51 families,each of whom had received four homesite acres and"rights"to land as shareholders in all the undivided lands.Rights were given,from one to seven,in proportion to financial and other contributions to the l - community. lk� 14_%m Rightholders alone could participate in the"Great Land Divisions": Fe Nova 5W.. Oysterponds,Corchaug and Occabuck"dividends".The present"Com- tat Cynk-Va. Amfttmd IM-Ilk A -Aim moners'Preserve"was part of the"Corchaug Dividend" and is the last c� �_V remaining parcel of undeveloped dividend land.In 1796 the remaining LS owners incorporated themselves as"Proprietors of the Common and Undivided Lands and Meadows of Southold Town". The 13 surviving members of the corporation continue the preservation of the remaining 34 virgin acres of the original commoners'land for pos- terity,and as a reminder of its place in the historic annals of Southold. A-260 Post It"bmrid fax transn11 W me= as Pie► F An � t v Cm. A tft. Phone. • e s OC j p� s a. Gy' r; Subject Property Pam 0•�,t �l,ewtwe.se ; tt•.�� - • 1 • . AWA• ;. ,��Orient . ti: Point t, is rd Pt •�. • A& ••� .� 1r� } •iiiii•iii�� � ♦ • .�. ; •iii••�••� is + ��� g ti 9 � .: � , air rcRR''•• � • Orient' • Cew+ L . E hint . :•' (c.t VLACH STATl' 110.kx 43 State Parkland Pt e ,, _ :.`„ y 1167A. IVR l:F.ICH BAY • Z E E N Q - � i Milo Property , State PuklaW •� i t3=MP1 ORIENT POINT t A-261 6 I ` PECONIC ESTUARY PROGRAM EXISTING LAND USE INVENTORY :10 I Suffolk County Department of Planning 220 Rabro Drive P. U. Box 6100 ` Hauppauge,New York 11788-0099 IJanuary 1997 I A-262 1 Peconic Estuary Program Existing Land Use Inventory METHODOLOGY Data Management and Scale The Suffolk County Planning Department's GIS was employed to link land use data with Parcels shown on the Suffolk County Real Property tyTax Map. ['this GIS consists of ESRI ARC/INFO GIS software running on a Data General Aviion 8500 dual processor UNIX server with a HP 650C color inkjet plotter. Back up copies of all hard copy maps are archived plotter output (GRA and HPG files) on 8mm tape in TAR format. To access digital land use maps on a PC with ARC/VIEW requires 16 meg of main memory and 1 gig of disc memory.] Land use data were collected at tax map scale. Although the scale of the Suffolk County Real Property Tax Maps for the towns bordering the Peconic Bay System varies, it is typically 1" = 300'. The existing land use display maps that accompany this report have been greatly reduced, i.e., the scale of these maps (1" =2000') is an order of magnitude smaller than that of the tax maps. However, tax map parcel boundaries were not altered in any way by GIS manipulation. This preserved the sanctity of the parcel line work and land use data base. The extent to which small parcels can be visually distinguished depends on the scale selected for GIS map plotting. Land Use Classification System Use of town tax assessor code data expedited the attainment of PEP land use inventory objectives. These data sets were available in electronic format and keyed to Suffolk County tax map parcels. They provided a starting point for the land use inventory work. Aepared by Suffolk Coumy DMwuncru of Planning A-263 January 1997 Peconic Estuary Program Existing Land Use Inventory Tax assessor codes are assigned to parcels for the purpose of raising revenue through real property taxation. There are literally scores of codes assigned to ratable property. To facilitate interpretation, the PEP land use methodology grouped these codes under the following 13 general land use categories that are commonly used for regional planning purposes: low density residential, medium density residential, high density residential, commercial, industrial, institutional, recreation and open space, agriculture, vacant, transportation, utilities, waste handling and management, and surface waters. Table 1 shows the general land use categories and the property type classification and ownership codes assigned to each category. The groupings in this table do not necessarily reflect the divisions in the assessor's manual (New York State Division of Equalization and Assessment 1991). The 13 general land use categories are more suitable for characterizing community layout and function, determining land available for development, estimating future population levels and preparing master plans. Each and every parcel on the tax map was assigned to one (and only one) of the general categories. Land Use Study Area Boundaries A U.S. Geological Survey(USGS)map showing the boundaries of the groundwater contributing area of the Peconic Estuary System on the north and south forks and Shelter Island, as well as the boundaries of its constituent sub-watersheds, was used as the primary source of information for defining the upland area subject to land use inventory and analysis (Christopher E. Schubert pers. comm.). The groundwater divide was superimposed on the tax map base for the Towns of Brookhaven, Riverhead, Southold, Shelter Island, Southampton and East PreWed by Suffolk County Department of Planning A-264 January 1997 Peconic Estuary Program Existing Land Use Inventory Table 1. Land Use Classification System for the Peconic Estuary Program (p.1 of 5) Low Density Residential (sl d.u./acre)* - High Density Residential (z 5 d.u./acre)* - attribute code 1 -symbol#83-yellow** attribute code 3 -symbol#92 -peru** 210 One Family Year-Round Residence 210 One Family Year-Round Residence 220 Two Family Year-Round Residence 220 Two Family Year-Round Residence 230 Three Family Year-Round Residence 230 Three Family Year-Round Residence 240 Rural Residence with Acreage 260 Seasonal Residences 250 Estate 270 Mobile Home 260 Seasonal Residences 271 Multiple Mobile Homes 270 Mobile Home 280 Multiple Residences 312 Residential Land Including a Small 312 Residential Land Including a Small Improvement(not used for living Improvement(not used for living accommodations) accommodations) 316 Waterfront Vacant Land Including a 316 Waterfront Vacant Land Including a Small Improvement(not used for Small Improvement(not used for living accommodations) Iiving accommodations) 439 Small Parking Garage 410 Living Accommodations 483 Converted Residence 411 Apartments 416 Mobile Home Parks (trailer Medium Density Residential(>1 to<5 parks,trailer courts) d.u./acre)* - 439 Small Parking Garage attribute code 2-symbol#84-gold** 483 Converted Residence 210 One Family Year-Round Residence *Parcels designated as residential require lot 220 Two Family Year-Round Residence size calculation to determine residential density 230 Three Family Year-Round Residence classification(low,medium or high density). 260 Seasonal Residences **The symbol# and color assigned to each 270 Mobile Home land use category were selected from the shadeset 312 Residential Land Including a Small of Colornames in ARCANFO Ver 7.04. Improvement(not used for living accommodations) 316 Waterfront Vacant Land Including a Small Improvement(not used for living accommodations) 439 Small Parking Garage 483 Converted Residence Prepared by Suffolk County Deparcnen[ofPlannrng A-r65 January 1997 Peconic Estuary Program Existing Land Use Inventory Table 1. Land Use Classification System for the Peconic Estuary Program (p.2 of 5) Commercial- 473 Greenhouses(retail sales) attribute code 4-symbol#110-red** 474 Billiards 414 Hotel 480 Multiple Use of Multi purposes 415 Motel 481 Downtown Row Type(with 417 Camps, Cottages,Bungalows common wall) 418 Inns,Lodges,Boarding&Rooming 482 Downtown Row Type Houses,Tourists Homes,Fraternity& (detached) Sorority Houses 484 One Story Small Structure 420 Dining Establishments 485 One Story Small Structure - 421 Restaurants Multi-occupant 422 Diners&Luncheonettes 486 Minimart 423 Snack Bars,Drive-Ins,Ice 510 Entertainment Assembly Create Bars 511 Legitimate Theaters 424 Night Clubs 512 Motion Picture Theaters 425 Bar 513 Drive-in Theaters 426 Fast Food Franchises 514 Auditoriums,Exhibition& 430 Motor Vehicle Services Exhibition Halls 431 Auto Dealers- Sales& Svc. 515 Radio,T.V. &Motion Picture 432 Service&Gas Stations Studios 433 Auto Body,Tire Shops, Other 520 Sports Assembly Related Auto Sales 521 Stadiums,Arenas,Armories, 434 Automatic Car Wash Field Houses 435 Manual Car Wash 522 Racetracks 436 Self-Service Car Wash 530 Amusement Facilities 437 Parking Garage 531 Fairgrounds 438 Parking Lot 532 Amusement Parks 450 Retail Services 533 Game Farms 451 Regional Shopping Centers 534 Social Organizations 452 Area of Neighborhood 540 Indoor Sports Facilities Shopping Centers 541 Bowling Centers 453 Large Retail Outlets 542 Ice or Roller Skating Rinks 454 Large Retail Food Stores 543 YMCAs,'YWCAs, etc. 455 Dealerships- Sales&Services 544 Health Spas (other than auto with large 545 Indoor Swimming Pools scale operation) 546 Other Indoor Sports 460 Bank&Office Buildings 550 Outdoor Sports Activities 461 Standard Bank/Single 554 Outdoor Swimming Pools Occupant 555 Riding Stables 462 Drive-in Branch Bank 556 Ice or Roller Skating Rinks 463 Bank Complex w Office Bldg. 557 Other Outdoor Sports 464 Office Building 570 Marinas 465 Professional Building 583 Resort Complexes 470 Miscellaneous Services 691 Professional Associations 471 Funeral Homes "The symbol 4 and color assigned to each 472 Dog Kennels, Veterinary land use category were selected from the shadeset Clinics of Colornames in ARC/INFO Ver 7.04. ''maned by Suffolk CwM Depam em of Planning A-266 January 1997 Peconic Estuary Program Existing Land Use Inventory Table 1. Land Use Classification System for the Peconic Estuary Program (p.3 of 5) Industrial - Institutional- attribute code 5-symbol#127 -purple" attribute code 6-symbol 945-deep sky blue** 440 Storage, Warehouse&Distribution 610 Education Facilities 611 Libraries 441 Gasoline,Fuel, Oil,Liquid 612 Schools Petroleum Storage and/or 613 Colleges&Universities Distribution 614 Special Schools & Institutions 442 Bottled Gas,Natural Gas 615 Other Educational Facilities Facilities 620 Religious 443 Grain&Feed Elevators, 630 Welfare Mixers, Sales Outlets 631 Orphanages 444 Lumber Yards, Sawmills 632 Benevolent& Moral 445 Coal Yards,Bins Associations 446 Cold Storage Facilities 633 Homes for the Aged 447 Trucking Terminals 640 Health 448 Piers, Wharves, Docks& 641 Hospitals Related Facilities 642 All Other Health Facilities 449 Other Storage, Warehouse& 652 Office Building(Government) Distribution Facilities 653 Parking Lots(associated with 475 Junkyards government building) 710 Manufacturing&Processing 660 Protection 720 Mining and Quarrying 661 Army,Navy,Air Force, 721 Sand& Gravel Marine& Coast Guard 740 Industrial Product Pipelines(non- installations,Radar, etc. utility companies) 662 Police&Fire Protection, 741 Gas Electrical Signal Equipment& 742 Water Other Facilities for Fire, 743 Brine Police, Civil Defense, etc. 744 Petroleum Products 670 Correctional 749 Other 680 Cultural and Recreational 681 Cultural Facilities (museums, art galleries) 693 Indian Reservations 694 Animal Welfare Shelters "The symbol#and color assigned to each land use category were selected from the shadeset of Colornames in ARCIINFO Ver 7.04. Prepared by Suffolk County Depamment of Planning A-2 67 January 1997 Peconic Estuary Program Existing Land Use Inventory Table 1. Land Use Classification System for the Peconic Estuary Program (p.4 of 5) Recreation & Open Space- attribute code 7-symbol#70-green" Agriculture - 190 Fish, Game& Wildlife Preserves attribute code 8-symbol#69 -lawn green" 552 Public Golf Courses 105 Agricultural Vacant Land(Productive) 553 Private Golf Country Clubs 110 Livestock&Products 560 Improved Beaches 111 Poultry&Poultry Products 580 Camps, Camping Facilities and 112 Dairy Products Resorts 113 Cattle, Calves, Hogs 581 Camps 114 Sheep& Wool 582 Camping Facilities 115 Honey&Beeswax 590 Parks 116 Other Livestock: donkeys, 591 Playgrounds goats 592 Athletic Fields 117 Horse Farms 593 Picnic Grounds 120 Field Crops 682 Nature Trails, Bike Paths, etc. 129 Acquired Development Rights 695 Cemeteries 130 Truck Crops-Mucklands 920 Private Hunting&Fishing Clubs 140 Truck Crops-Not Mucklands 930 State Owned Forest Land 150 Orchard Crops 932 State Owned Land Other Than 151 Apples,Pears, Peaches, Forest Preserve Cherries, etc. 940 Reforested Land& Other Related 152 Vineyards Conservation Purposes 160 Other Fruits 941 State Owned Reforested Land 170 Nursery& Greenhouse 942 County Owned Reforested 180 Specialty Farms Land 182 Pheasants 960 Public Parks "The symbol#and color assigned to each 961 State Owned Public Parks, land use category were selected from the shadeset Recreation Areas,and Other of Colornames in ARC/INFO Ver 7.04. Multiple Uses 962 County Owned Public Parks and Recreation Areas 963 City/Town/Village Public Parks and Recreation Areas 970 Other Wild or Conservation Lands 971 Wetlands,Either Privately or Governmentally Owned, Subject to Specific Restrictions as to Use 980 Taxable State Owned Conservation Easements 990 Other Taxable State Land Assessments 993 Transition Assessments for Taxable State Owned Land 994 Transition Assessment for Exempt State Owned Land Repamd by Suffolk Com+ry Depam entof lanniog A-2 68 January 1997 Peconic Estuary Program Existing Land Use Inventory Table 1. Land Use Classification System for the Peconic Estuary Program (p.5 of 5) Vacant- 816 Gas Generation Plant attribute code 9-symbol#26-white** 817 Electric Transmission& 310 Residential Distribution 311 Residential Vacant Land 818 Gas Transmission& 313 Waterfront Vacant Lots Distribution 314 Rural Vacant Lots s 10 Acres 820 Water 320 Rural 822 Water Supply 321 Abandoned Agricultural Land 830 Communication 322 Residential Vac.Land>10 A. 831 Telephone 323 Other Rural Vacant Lands 832 Telegraph 330 Vacant Land Located in Commercial 833 Radio Areas 834 TV other than Community 340 Vacant Land Located in Industrial Antenna T.V. '`meas 835 Community Antenna T.V. 350 Urban Renewal or Slum Clearance 836 Telecommunications 910 Private Wild& Forest Lands 847 Pipelines(used by utility companies) 911 Forest Land 860 Special Franchise Property 912 Forest Land 861 Electric& Gas 862 Water Transportation- 866 Telephone attribute code 10-symbol#33-light grey** 867 Miscellaneous 650 Government 868 Pipelines 651 Highway Garage 869 Television 692 Roads, Streets,Highways& Parkways,Express or Otherwise Waste Handling&Management- including Adjoining Land attribute code 12-symbol#28-dk.slate grey** 821 Flood Control 850 Waste Disposal 840 Transportation 851 Solid Wastes 841 Motor Vehicle 852 Landfills&Dumps 842 Ceiling Railroad 853 Sewage Treatment& Water 843 Nonceiling Railroad Pollution Control 844 Air 854 Air Pollution Control 846 Bridges,Tunnels& Subways Surface Waters- Utilities- attribute code 13-symbol#52-pale attribute code 11 -symbol#31 -It slate grey** turquoise*" 810 Electric & Gas 183 Aquatic: oysterlands 812 Electric Power Generation- 315 Underwater Vacant Land Coal Burning Plant 845 Water(canal) 813 Electric Power Generation- 972 Land Under Water,Either Privately or Oil Burning Plant Governmentaliv Owned 814 Electric Power Generation- "The symbol#and color assigned to each Nuclear Plant land use category were selected from the shadeset 815 Electric Power Generation- of Colornames in ARC/INFO Ver 7.04. Gas Burning Plant Prepued by Suffolk County Depamnent of Planning January 1997 A-269 Peconic Estuary Program Existing Land Use Inventory Hampton. The land use study area boundary was then drawn using a combination of tax map parcel boundaries -primarily road right-of-ways-that approximated the location of the groundwater divide. Care was taken to be inclusive of the upland area defined by the divide lines. The resulting land use study area boundary lines in the towns are primarily linear and angular, as opposed to curvilinear, since they mirror surveyed land parcel boundaries and roadways. Parcel boundaries were not split in order to avoid the problem of changing the parcel data base, which is indexed by tax map identification number. U.S. Census maps showing census block boundaries were then used to delineate the approximate location of sub-watershed boundaries in each of the towns. This source of information was used to expedite the population analysis component of the PEP, which is contained in a separate report(Suffolk County Dept. of Planning 1997). Care was taken to avoid splitting block boundaries, i.e., sub-watershed boundaries were drawn to include entire Census blocks. A map of each town was prepared that shows the boundary of the land use study area and the sub-watershed boundaries within same as determined above. Numerical land use acreage data and population estimates are keyed to the areas delineated on the map set. Land Use Inventory Process The following is a brief listing of the steps in the process used for conducting the inventory of existing land use. ''eoared by Suffolk County Deparmrenr of Planning A-270 January 1997 Peconic Estuary Program Existing Land Use Inventory ■ Using the GIS, combine tax map parcel line work with the three digit, tax assessor property code data and prepare a coverage at tax map scale for each town showing 13 general land use category attributes based on grouped assessor code data and residential density criteria. ■ Prepare large scale plots of all tax map sections located within the Peconic Estuary watershed area in each township. These plots show the land use attribute code numbers for the 13 general land use categories listed in Table 1, one of which is assigned to each tax map parcel. ■ Verify parcel attribute codes via field inspection, aerial photo interpretation, use of Real Property Tax Service Agency property data and owners list files, etc., and manually correct same where necessary on the tax map section plots. ■ Correct the GIS data base. ■ Merge the tax map section sheets and prepare preliminary, color-coded GIS existing land use maps for each township. Inspect and correct parcel line work and attribute codes, where needed. ■ Plot final, color-coded existing land use maps at desired scale. ■ Use the GIS to tabulate acreage figures by general land use category,jurisdiction and sub- watershed zone. The steps in the process are conceptually simple. However,the level of effort required to prepare usable GIS coverages, verify and correct land use codes, and produce an accurate parcel- Prepued by Suffolk County De===offtming A-271 January 1997 Peconic Estuary Program Existing Land Use Inventory specific land use data base was quite substantial given the extent of the Peconic Estuary watershed, the magnitude and complexity of the data bases involved, the inconsistent quality of the digitized tax map coverages among the towns, and the need to conduct extensive field verification. Land Use Classification Conventions Experience gained with the initial phases of the land use inventory and field check process resulted in the establishment of several conventions that were used to simplify and expedite the work, and help assure that land use code attributes were being assigned in a consistent manner by the several staff members involved. These conventions are summarized below. ■ When more than one use was found to occur on a single parcel, the primary use of that parcel was determined and assigned to that parcel. Primary use is based on the relative intensity of the use in comparison with that of the other use(s) in question, with consideration also given to the areal extent of the use on the parcel. Typical examples follow: - A 100-acre parcel is used for both residential and agricultural purposes. Crops are grown on about 80 acres, 15 acres are in woodlands, and a house is located on site. Even though the parcel accommodates three uses (including vacant), it is assigned a classification of agriculture, since most of the parcel is dedicated to this use. Preoared by Suffolk County Depa=ent of planning January 1997 A-272 Peconic Estuary Program Existing Land Use Inventory -A two-story structure is located on a 10,000 sq. ft. lot in the retail portion of a central business district. A hardware store occupies the first story of the building and the second floor is used for an apartment. While used for both commercial and residential uses, this parcel is classified as commercial, given the relative intensity of the uses in question and the prevailing nature of neighboring retail uses. -A country estate is located on an 18-acre parcel, some of which is wooded, with the remainder used as pasture. This parcel is classified as low density residential, given the fact that it falls within the density criteria of< 1 d.u./acre. -A road right-of-way parcel traverses a bay, but the improved portion of the parcel does not extend over the water. The entire parcel is classified as transportation. ■ Dedicated common areas on tax map parcels in condominium/townhouse projects were classified as recreation and open space, since such areas are not available for development in the future. Small,privately owned parcels that are the sites for residential structures in these projects were classified as high density residential . ■ Agricultural land that had reverted to old field habitat due to non-use was classified as vacant. Actively cultivated lands and those recently left fallow were classified as agriculture. ■ When structures on improved parcels are unoccupied, the parcels are not classified as Pmpved by Suffolk Canny Depemnent of Palming A-273 January 1997 Peconic Estuary Program Existing Land Use Inventory vacant. They are classified according to the type of structure present, i.e., commercial, industrial, residential, etc. ■ Whether a parcel is publicly owned or privately owned does not necessarily determine how that parcel is classified. For example,parcels classified as recreation and open space can be owned by property owners associations, private conservation groups, or private clubs, as well as public entities. ■ Privately owned, commercially oriented, intensive recreational activities, such as bowling alleys and sports complexes, are classified as commercial. ■ All publicly owned parks and conservation lands, whether actively or passively used, are classified as recreation and open space. ■ Parcels owned by the Suffolk County Water Authority were classified as utility, regardless of whether the parcels were improved or not. ■ The existing zoning designation of a parcel is not a factor in how that parcel is classified as to existing land use. ■ The number of residential structures on a parcel, as opposed to the number of dwelling units, was used in conjunction with parcel acreage to determine density, and hence, the classification of the parcel as low, medium or high density residential. ■ The context within which a parcel is located, i.e., the uses found on adjacent and nearby parcels, can often help in making judgments in the field as to how to classify that parcel. PrMamd by Suffolk County Depament of Planning A-274 January 1997 Peconic Estuary Program Existing Land Use Inventory ■ Parcels that are adjacent to commercial uses in business districts and are used as parking lots in connection with these uses were classified as commercial. Parcels used for parking that are directly related to a nearby transportation use, e.g.,ferry or railroad,were classified as transportation. The tax map base shows property boundaries, and not geographical features,the extent of various "surface covers" or datums. Hence,the boundary of a parcel located on the shoreline may, or may not, coincide with the location of the land/sea interface. The apparent shoreline on the existing land use maps,i.e.,the boundary between parcels classified as surface waters and adjacent parcels classified as one of the 12 upland land use categories, should not be interpreted as the water's edge or mean sea level, etc. Overlay of the tax map base on appropriate maps, such as USGS topographic maps, can indicate the extent to which the shorelines replicate each other. A lake or pond located within a larger tax map parcel will not be shown on the existing land use map as surface waters. If the lake/pond is a separate parcel, i.e.,the shoreline is a property boundary,then it will be classified and shown as surface waters on the map. Existing Land Use Map Accuracy The Existing Land Use maps series shows thousands of parcels, each assigned to a land use category. In evaluating the accuracy of these maps, one has to consider two types of potential error. The first type is judgment error,resulting in the assignment of the wrong classification category to a particular parcel. The second type is attribute error, where the wrong classification is assigned to a parcel in the GIS data base, and this error is not detected in review of preliminary frepamd by Suffolk County Depacwm[off laming A-275 January 1997 Peconic Estuary Program Existing Land Use Inventory maps. Given the extensive level of effort devoted to the PEP land use inventory, the staff is confident that the incidence of both types of error is very low. Users of the Existing Land Use map series and the acreage tabulations by land use category that are derived from the GIS data base should be aware of the methodology employed, so that proper interpretations can be made. In addition to being assigned to a land use category, each parcel of property was assigned to a specific sub-watershed zone. All parcels assigned to a land use category, other than transportation, lie entirely within a specific sub-watershed zone. The transportation category was assigned to town-wide railroad and public right-of-ways that traverse sub-watershed zone boundaries. In order to maintain the integrity of the tax parcel data base, transportation right-of- ways were not segmented to conform to sub-watershed boundaries. As a result, the GIS was only capable of calculating a town-wide PEP acreage figure for the transportation category. Transportation acreage figures for each sub-watershed zone were estimated by multiplying the town-wide PEP transportation acreage total by the percentage of town-wide PEP study area acreage found in each sub-watershed zone. Since the parcels assigned to the other 12 land use categories were entirely located within a sub-watershed zone, the acreage calculations generated by the GIS for these categories did not have to be manually adjusted. Further explanation may help to reduce confusion with respect to the differences between preliminary maps showing uses determined by assessor codes and existing land use maps prepared by using the land use methodology described herein. Each municipality can assign assessor codes to parcels in different ways according to local practice. In almost all towns, it is Prevred by Suffolk County Depa=cnt of Planning A-276 January 1997 Peconic Estuary Program Existing Land Use Inventory evident that publicly owned parcels and other non-ratables often are not assigned any category. In addition,the assessor code data sets vary greatly by town in the extent and frequency of update. The use of this methodology and field verification assured comparability of inventory results across the watershed and their accuracy and suitability for planning purposes. Time Frame The staff conducted the field verification of land use for the six towns in the PEP land use study area in a sequential fashion over an 18 month period beginning in 1994. During the process of GIS file correction and map preparation,changes in the use of a few major parcels were noted after completion of field work. For all intents and purposes, the pattern of land uses as portrayed on the Existing Land Use map for each of the six towns should be considered as representative of 1995 conditions. This"snapshot"view of land use is, of course, static and will not reflect those incremental changes that have occurred as a result of more recent development activities. Pn:pued by Suffolk canny Depwnau of Pla rung A-277 January 1997 CROSS SOUND FEIMY SF1QR SCOPING OUTLIN17 nr,dt Dccember 16, 1996 This outline provides a scoping document for use by the Planning Board of the Town of Southold in determining the content and format of the Draft Environmental Impact Statement for Cross Sound Ferry. Attached, and wade a part of this outline is the Positive Declaration for the proposed action, which provides a brit-f description of the project, and lists the potentially significant environmental impacts which Formed tile basis for the Positive Dechtratiorr. This outline Inas been preJared with input from the consultant to tine Planning Board, Plazurin Board mentbers, ancI members of the Southold Boaz•d of Zoning Appeals. Ln audition, relevant and substantive cotnn_ients from coordination letters (received up nnttl date of preparation of this outline) have been incorporated into the scope where appropriate. EtUally, la egg Jncor r r' igs .U1.p11S frr.Qrn the DslJJ)li; Scs?p.Zn.g h d fu T7wn 1W 12=Mb§19. 194(, The applicant should recognize and contact each agency that is a separate permitting entity, and file applications with each jurisdiction and obtain techzucal comments. 'Ilre EIS process is intended to provide comprehensive and importwit information for the decision making process for use by involved agencies in preparing their own findings and issuing decisions on their respective permits. In S.o.a . . Qr.-d_ r IQ �_o,' '01 hJilt o S-zQn f�riIl1��ti=pn 1rUr Ca�tae1Sins.mcocep rn.rziliaclluitAlx��_z& 1 Faust �o.ns.t.c��s 1;1I.Q irrrpa�ts 1ssai�ted with pr=i .alld v-Lt?51s2.4�s� �SS?�_LL: I s'L11 mul's ill 11?.� l.�rrnin.dl juLlb� The document should be co'ne:ise but thorough, well docurnented, accul'ate, and consistent. Technical information may be surnrnarized in the body of the document and attached as an. /appendix. Review for acceptance or certification of the Draft EIS will involve review of content for conformance to the final scope, and accuraot to ensure that correct information is incorporated into the doctiment for initial review. Kcview after acceptance will deal in more detail with the specific technical information presented and the azialYsrs provided. Ba.,ed on review, substantive cornrnerits received from involved agencies and parties of interest, the public hearingprocess, and appropriate direction from the lead agency, a Final EIS will be prepared which will respond to all substantive comments on the Draft EIS. The Planning Board will be responsible for the preparation, content and accuracy of the Fina.1 EIS, and this document will be used as a basis for each agency to prepare a Statement of Findings and Facts for use in structuring permit or approval decisions. Overall, the Planning Board seeks a detailed Descri )tion of the Proposed Project including doctrnzentation of the following: background andhhistory,$ location, design grid layout, recharge handling, water supply, swlitary disposal, quantities of site coverage, ;ite access, mechanisms for open space preser-vation, and site access. The Environmental Setting a.rtd Potential Significant Impacts section may be combined, to discuss existing, no-build and build conditions. Impacts should be identified as short term or long term. In addition, a section should be rovtcled whicb identifies cumularive impacts of the proposed project. Consistent with SEQI� Draft EIS guidelines, additional chapters of the Potential Si�rufrcant Impacts section should include Growth Inducing Aspects, Irreversible and Irretrievable Commitment of Resources, and Effects on the t:onset,✓ation of Energy Resources where appropriate. AdverseImpacts which can not be avoided shall be identifiecin a separate section. Co.:tsideration of one or more Alternatives will be required to address other scenarios regarding key resources. The following outline. provides .in uhclaterl form (or the content and preparation of a Draft PIIS. A-278 Dross Sound Ferry Dra[l EIS Scoping Outline T.ULE OF CON'T'ENTS AND SUNINIARY A Table of Content; and a bricl summary are rquircd for the Draft EiS. The Table of Cr)ntcnts and summary will include: A. Brief description of thr. action. B. Significant, adverse and beneficial impacts (issues of controversy must be spec.Mcd). C. Mitigation measures proposed. D. Alternatives considered. E. Mutters to be decided (permits, ahpiovals, st:itu., fundiii& I. DESCRIPTION OF TILE PROPOSED kCTION A. PROJECT PURPOSE, NEED,WD BENEFITS 1. Background and History•- History of ownership and use, extant strw:tures, past use(s), and prior site plan applications. Describe history of terminal building improvements and puking arca r-hanges and history of snack bar parcel. Provide history of underwater land including ownership and legal (include survey of underwater land) permitting and dredging history including placement of spoil and fill ,)f wetlands. r vi ,Ur hi i ri rn crvicw r(cnvirnnmc� r4vicws nM 1h Jubjoq Property. 2. Public need for the project, and municipality objectives based on adopted community development plans •- sumararize municipal objectives from land use Maus and establish -aced for the project. 3. Objectives of the project sponsor in expanding business and in changing nature of services offered (i.e. addition of high speed ferry, passenger only service:) over the past 2 years. Discuss I%! idcn ify eM knrnyn future business plans, possible:e:rpansion, etc. 4. Buncfits of the Action -- Transportation services, economy. B. LOCATION 1. Establish geographic site boundaries -- Provide location map of upland and underwater lands. Identify arca of public land which appears on tax maps in center of subject property, and public access to this site as appropriate. 2. Description of site access -- Road frontage and water access. Dcscrii)e inter- relationship of State Road 25 and all four parcels. 3. Description of cxisling zoning on subject properties and on eastern•c,ost parcel. $�1Siiu Ymvid f ldiu,DIU iQ_S:DiS Liq sjLQ in iplsltlsw 10 laasis Within 1.W C. DESIGN AND LAYOUT 1. Total Site Area -- describe existing and potential site use and describe design features incorporated into clic proposed plan, is 1La limilgtion of situ iZuivaut as a function Qf rki Q, 2. Site Coverage Quantities-- Use table to present building, driveway, road, recharge, landscaping, natural area,and other site coverage quantities. 3. Structures -- Describe expected structures, including the proposed parking and relocated staging areas. Describe existing lighting: type, wattage, locations. Describe existing traffic management procedures, if any. Describe moving of.;sack bar and combining with existing residence for waiting room and snack restaurant. 4. Parking -- Describe existing and proposed parkins, eAsling and proposed parking surface type and area, circulation, design and layout. S. Recharge -- Present method of stormwater recharge, capacity and dosign requirements. Describe proposed drainage and measures to minimize overland flow and provide adequate stormwatcr recharge capacity. A-279 Cross Sound Ferry Draft E-IS Scoplug Outline 6. Sanitary Disporal -- Describe sanitaq disposal methods, design now, aeeded additional capacity, as appropriato. Describe sanitary design now of ferry terminal building, snack bar and residcrrce.. 7. Wafer Supply--Ability to mce( Article 4, private water system standards and water quality, 8. Landscaping •. Dencribe proposed landscaping to improve or visual and aesthetic site qualities. 9.• il' ' ,_Pvri ;ihsa it1iULu g_\L!;1kg and P►Q=Qd JB connull2a-\Yiw 11to proggic prrlw. D. CONSTRUCTION AND OPERATION 1. Construction a) Anticipated period of construction. b) Schedule of construction activities-- i.e. Wildlife sensitivity and any wetlands resources. 2. Operation -- discuss flllnte management of proposed project following construction, I.e.maintenance of buildings, roads, recharge, etc. E. AGENCIES A14D APPROVA.L.S --list Icad agency, involved agencies and biterested parties separately, followed by their jurisdiction or interest, and the status of each pc:rnik or approval application. Describe permit history where appropriate. I. Town Planning Board 2. Southold To%%m Board 3. Town Board of Trustees 4. Town Zoning Board of Appeals S. Suffolk County Department of Health Services - 6. Suffolk County Department of Public Works 7. Suffolk County Department of Parks, Recreation and Conservation. 8. Suffolk County Planning Commission and Dcpartmcnt of Planning 9. New York State Dcpartmcat of Environmental Conservation. 10, New York Stat. Department of Transportation 11. Now York State Department of State 12. New York State Office of Parks, Recreation & Historic Preservation 13. U.S. Army Corps of Engineers 1-1. federal Ennergency Management Agency 15. Southold Citizens for Safe Roads 16. North fork Environmental Council 17. U.S. Department of Agriculture&ILM h!anA Centgr) 18. Other Il. EXISTING,NO-BUILD AND BUILD ENVIRONMENTAL CONDITIONS This section should describe emstirrg environmental conditions, future cmironmcatal conditions if the project is not implemented, and future conditions once the project is completed. Identify thole resources that may be adversely or beneficially affected by the proposed action and require discussion. Discless all emirorunental conditions in sufficient detail to determine if significant adverse or beneficial impacts are expected. Identity impacts 35 long or short term where possible and provide separate chapter including discussion of cumuladve impacts. Consistent kith SFQR Draft EIS guidelines, additional chapters of th'; Potential Significant Impacts section should include Growth Inducing Al.pects, Irreversible and Irretrie,,able Commitment of Resources, and Effects on the Conscr.ation of Energy Resourecs where appropriate. An appropriate design ycar should be selected for building traffic•, ]ir and noise conditions. A-280 Cross Sound Ferry Dr•a(t US Seoplug Outllne ' in view of thea fact that the current operation includes a passenger/vehicle ferry and a passenger only ferry, existing cund;dous will inJude the inirrcnt operation, in addition, certain additional lapis including the easterly parcel and puts of the State right-of-way arc in use for harking and circulation, and therefore should be described. Further, other information roncerning environmental conditions contained in flus section shall include all four parcels and the Slatc right-of-way where it scparates the rwo westerly parcels from the two easterly parcels. Nuturnl Resources A. GEOLOGY • 'I ltis ;•r LfM jh2lI!dJ &1LLrW SxQij-rsgS Ind irn pact allati1ii1J MiLh geology 1. Subsurface a) composition and thicktccss of subsurface material • To depth of 17 feet or groundwater; provide a summary of test hole information. 2. Surface a) List of soil types per Suffolk County Soil Survey, b) Discussion of soil clraracicristics/limitations c) Dictributioa of soil types at project site d) Wentify inJpoitant dune, tidal marsh or special feature soils as a resource. Describe dune and beach formations on the subject site and Iheir proximity to lltc proposed activity. in4lude SUCCifi Crow Sound Ferry Drnft FIS Scoping Outline • characteristics and uses l:) Pis::res Bay -C-twarSL_dvul h the silo sls:Slg3tation ansl Ujiatiau LQ ft Pc " i .tilk St U3—r Y., 3, Drainage • Jcnraihc existing drain:rpr, lr tttcrna ou silo and in the arca. • make note of drainage swales and natural collection atcas. • determine effect of the proposed action on increased runoff and pollution front (lie Main road into the storm drains on the adjacent property of the Plum Island Animal Disease Research Laboratory into Gardiners Bay. �IS�Ll11inC�f�SL On V oL)QS.�i�l!SL8 o gLpjign galtUn , AIW snsuie JJW �tf2�crosioI1 is mitigated 4. Flooding • locate flood zones on the subject site and describe limitations, features, jurisdictional issues, and special requirements. C. -TERRE5'I RifkL AND AQU:VrIC ECOLOGY -- 'hie action should Jkty;is zuh Lcmuree imid ` nLIQ pgjS Ln i•i iMpsIC.0 or"h Qoktil M111 Lpurd to f6=Q.=r. 1, Vegetation a) list vegetation types on the project site and within the surrounding area; classify into habitats. b) discussion of site vegetation characteristics • species presence and abundance size distribution • community types • unique, rare and endangered spccics value as habitat for wildlife C) Contact NYS Natural Heritage Program for information concerning uniquc vegetation, habitats or wildlife species on site or in the arca, and provide discussion/analysis in text as necessary, d) Describe habitat needs and biological characteristics of all r:ndangered species, threatened and species of special concern e) discuss uniquc flora in marine environment in relation to subject site and activities conducted,at the subject site. 2. Wildlife: a) Provide a list of wildlife utilizing site habitats or expected on site. Indicate dates of surveys and distinguish species identified on site. Consult references to determine species expected on site based on habitat type. b) Contact Natural Heritage Program for file review of site and area, C) Identify Endangered,Threatened or Species of Special Concern. d) Describe habitat needs and biological characteristics of all-:ndangered species, thruatened and species of special concern. 3. Wetlands a) Describe wetlands (vegetated and unvegetatcd) and adjacent areas as and characteristics. b) Indicate method of delineation and agencies contacted for-verification or agencies with jurisdiction. Specifically contact Town Trustees, NYSDEC and USACOE. C) Identify valuable functions of wetlands on site and adjacent site. D. AIR RESOURCES section "Ch Lgsnurce;1n_d deter in potential " Q lb;.ILLI'=It with Wf rd 12 S1ch Lqt r A-282 L1 L- Cross Sound Ferry Draft EIS Scoping Outline 1. Meteorological Conditions - describe existing uietcorological conditions in proximity to Orient, including seasonal «finds, ternperatures, etc. 2, Ambient Air Quality- determine existing ambient air quality. 3. Air Quality Standards - describe and list air quality standards a. Aar Quality Impact • determine key parameters of concern and conduct air quality impact ;tnalysis for existing and build conditions in order to predict impact. At a mininttum conduct analysis to deturnri.ne impact of existing and proposed conditions regarding carbon monoxide using quantitative; rncthods recognized and accepted in the field, Human Resources A. TRA.NSFORTATION --This section shall include the State right-of-way(ROW), and the 2 ROWS through the residential parcel and the private ROW on the northerly boundary of the two easterly parcels, Describe and identify all parties having right to access the northerly ROW. Identify boundaries of said ROW and deed restrictions to use of same, if any. 1. Existing Transportation services- Separate passenger only service data from vehicle and passenger service. Describe origin/destination of clientele. Describe peak activity periods (i.e. heavy truck traffic, Boy Scout outings, etc.). a) Description of access to the site and internal road circulation. b) Description of current level of use of services. • peak, hours of use vehicle mix • source of existing traffic C) Obtain latest traffic volume data for Route 25, in the vicinity of the projec(, from the N:w York State Department of Transportation(NYS DOT). d) Obtain State :accident Surveillance System (SASS) data for the latest available three year period. Accident data to include all accidents along Route 25 fmm file li!.Lk! a Q(NYS Rt2UM 2�an-d 1vlrViu S.Lr1:S?!1r .=nYaw III lk caste Old Qf Route 21 C) Conduct traffic volume counts on Route 25 immediately west of the proposed project for it seven day period, f) Obtain trip information from Cross Sound Ferry regarding schedules, trip passenger and vehicle data, and other historical Information needed to develop trip generation data for the existing conditions. g) Research available public transportation Qasl gf Ih4 intC=-Zjjan of LYS.ILQULi 9 its [ lel S.truai Wsewn 1Q&sari=MW 9!K=r,2.1 the uutcr$ection of cast of Greenport. h) Calculate existing levels of service on Route 25=of lhc Intersection QflM iyjr, S,moi Marn SSj= (QrmnnArt) 10 th4=ern s'n 11f Route 21 D-4rminc carr jngs4w& .�y—of M-S.ls u-7,5 f- m the intersection of NYS Route 25 and Main Street (Greenport) to the ferry termintrl. i) Anilyte the accident data ga&t of Q1jg InterseslLgn of NM k:o= 25 and Main S1fs-,;g (SOS'' ^ or IQ Lhtt:astern er Q�ldlS and corn.pare the rate and frequency to the currcrit NYSDOT average accident rates. 2. Transportation System impacts a) Estimate the increased hourly traffic volume to be generated by the pLQje:t SI 'ff.1c n jAjjpg S4.r=jn ,2lh4 W_2I..CZ b) Determine the arca traffic growth factors used by the NYSDOT for Route 25 ;►l�I elf L ^IL'S:4s" i ret Qf N'r 1?S.t114 itjJl SILssl l�rcenyottl IQ lust eastern QQd (if Be=25 A-283 Croa9 Sound Ferry Drith EIS Scoping Outline C) Calculate the future levels of service for Route 25=Qf Jkc ia=j iQn Qi UY-1&'=2-101 Main 51st (Orer,19011) LQ the U=n snsi a!R=?ia d) Quantify site generated traffic impacts based upon the level of service calculations. C) Determine other uupacts, such as uninterrupted traffic now.Tong Route 25 resulting from vehicles unloading at the terminal. f) Describe site c;rcul ation,impacts and roethods of handling traffic from peak use. g) distinguish between vehicular flow(projccted) and passenger flow from long- term parking areas to the ferry. h) discuss adequacy of existing and proposed sitz; improvements to handle existing artd projected volume over next S.10 years. 1) determine traffic flow on Route 25 to insure bike safety and to provide resident crossing that is available and sate 3. Public Transportation Services --Describe public transit ridership and the type of service (schedules) available(i.e. bus, tari, LIRA, casino bus). 4. Pedestrian Environment --Describe pedestrian environment, bike use, circulation, safety, etc. Jag.Wdu pedestrian flows from termitasal t )gats: boats to Cpr pick• uU reas: D'ark:m to bgagh 1 . The cxis in 'tnd Dr s' rgLQZAW 4.s and measures LQ ensure Q4d=Lr1aa af.;U�b_Q disillSS i B. LAND USE AND ZONING •-This ss1&ji akQu!d is S tach.cc�silus�and dUCXMiuo potent id impacts%(the oroiect and h Land LQ_;,ish rcs.4ltuc. 1. Existing land use and zoning a) Description of the existing land use of(lie project site and the surrounding arca. b) Description of tvdsting zoning of site and surrounding area. C) Describe existing ownership on the site and in the area, reJaiing ownership, use and zoning to future land use trends, and open space. d) Dg5cribc non-conforming 1'ggs which LrLav Oxy;U 4n Lg sll}Z is silt;, e) Provide Sl1Door fai YUL=r.l,Q 1ST Lc Ucintial parcel jQL Iw:kWz. consider preceduct Setting njU r,Qi ggtion u.1 potential impact. Ca sider i rti^¢ impact on adjacgnt land use and conformance or nflp•confor-MA —with ZUamt pses and landja W rte, 2. Land use plans a) description of any land use plans or master plans which include project site and surrounding arca;isvib4 ei).nformanct Qs a2D•coyjMUZO yikh SQDroQriatC l d"s ularts. • 1 WRPrdJ;iLQ Coastal Mm •m •n Programs JiUM 5 pr&ct in alliiM Ig 444 St,jLtt Coast Politics in Article 42. Fcconi BU E8YA r m• discuas DLQguai. recom,&Ddatim specific L4 3itc and Iim-Chdoll A=5JAWL and in QgLjsi g i n 2f poi n i im4la , • ri n L,&nd�?slrl5 llesi¢4d19�;dts."s)?�1ts1 in L;1jh2tt IQ dcsiQnation &nJ in S9isiduration d potentia 1ml2.&=, C. CONVNIUNiTY SERVICES •-111iS section S.hu d disjc . j ch LCsou=bpd determine potgntial iau7aCls of Iht=9L9i ct with–rqgud IQ t;qh resource, 1. Educational facilities - discuss e.,aatiag facilities and location relative to the site and access road. 2. Police protection - discuss level of public scnice being provided and include description of service (i.e. speed enforcement, parking, violations, accidents, etc.) 3. Fire protection • discuss status of fire protection facilities in Oricat surd suitability of A-284 gross Sound Ferry Draft Ei:S Scoping Oudlne same to hinLllc lc%-cl cf hazard at the site. Ld .n ify;any rSStrictlons Jhish may S2dg 411 4. Recreational facilities - discuss status and location of recreational facilities in Orient, including State and County Roads. S. Utilities - discuss location of any public utilities on or adjoining the subject site. D. CULTURAL RESOURCES --Tlut sectign Lh=j�. is=n6i=py=wi determine Asls�atial;mvart,�Q!Ih� Acct sYiih i�.gacd 1Q soh rss.4�� 1. Visual resources - describe visual impact by night as well as by day(particularly with regard to site lighting c)(parking areas, pedestrian walkways,dock areas and staging areas. a) description of the physical character of the community b) description of site from viewsheds along nearby roadways and nearby surface wa(ers. 2. Historic/Pre-historic Resources a) Looation and description of historic areas or structuzes listed on State or National Register or designated by the cotuntunity or included on Statewide Inventory. Include Society for Preservation of Long Island A,ndgttides data on Orient. b) Determine significance of any existing historic structures on site C) Unless substantial send Ii Aur�_aosa rru I= documented->radcluko a Slate I hnolUpcgil syryy ID d_qcLm_h&Ihs 2Ec$Cr1CC of abscnce:;zf archaeological Qr Qthut skw1 rCSOUr-qu w ft=!"b arca Of oot LLL sdl=L 3. Noise Resources A) Identity potential nearby sensitive receptors and determine existing sound levels on site:and at property line of nearest receptor. b) Establish appropriate guidelines for use in determining potential impact with regard to noise increases. C) Identify noise sources associated with subject use and condu.:t analysis to determine increase above ambient noise based on e:dsling and build conditions. Other Resources and Impacts A. CUMULATIVE IMPACTS B. GROWTH INDUCING ASPECTS C. IRREVERSIBLE A.ND IRRETRIEVABLE CO1vfMITNIalT OF RESOURCF-S D. EFFECTS ON THE USE.IND CONSERVATION OF ENERGY RESOURCES III. ,MITIGATiON ME,0URES TO MINIMIZE ENVIRONMENTAL IMPACT Describe measures to reduce or avoid potential adverse impacts identified in Section IV. The following is a brief listing of typical measures used for same of the major areas of Impact. Natural Resources A. GEOLOGY 1. Subsurface a) use excavated material for land reclaruatioa 2. Surface a) use topsoil stockpiled during construction for restoration an-1 landscaping--identi ua storag lad mj&adgn 2 Jr(Jiq_0 i(a2aro riatg, b) addicts protecdon of dune and beach formations during and after construction, and in general minimize disturbance of non-construction sites C) design and itnplement soil erosion control plan A-285 i'ross Sound Ferry Draft EBS Scoping Outllne 3. Topography 8) avoid construction on areas of steep slope b) design adequate soil erosion deices to protect areas of'steep slope B. WATER RESOURCES 1. Groundwater a) design systems to provide adequate leaching of wastewater and stormwater. b) maintain permeable areas on the site C) maximirc natural areas, reduce fertilized areas d) design systems to provide adequate mitigation of oil/grease from parked vehicles and traffic on site. 2. Surface water a) ensure use of soil erosion control techniques during construction anti operation - to avoid siltation examples: - bay bales temporary resturatiou of vegetation to disturbed areas landscaping b) design adcquatc stormwater control system C) increase wetlands setbacks and provide covenants where possible d) provide: setback from beach and protection of dunes. C. TERRESTRIAL ANI? AQUATIC ECOLOGY 1. Vegetation/wildlife A) restrict clearing to only those areas necessary b) preserve part of site as a natural area C) after construction, landscape site wit)i naturally occurring vegetation d) preserve cross section of natural habitat areas. e) provide linkages to other sites and habitats f) preserve all wetlands and wetland functions through setbacks D. NOISE RESOURCES 1. Buffers,barriers, operational mitigation, traffic mitigation, etc. shall be incorporated into the project as necessary to minimize noise impacts Human Resources A. TRANSPORTATION 1. Transportation systems, parking, circulation, etc. a) discuss internal circulation patterns proposed and mitigate problems. b) discuss management of traffic flow to and from the Immediate terminal operations and parking site Lai NAYS 93&.2, in terms of regulating speed and spacing of ears. c) design adequate and safe access to project site to handle projected traffic flow B. LAND USE AND ZONING 1. Existing land use and zoning a) design project to comply with existing land use plans b) design functional and visually appealing facility to set stand2td and precedent for future surrounding land use C. CO1MMUNITY SERVICES 1, police/Fire Protection/Safety a) discuss how adequate access ISI miu and LQ E4.Lid= belwc;,a rccan r VellavQ md Igri ,r is l v4ill be maintained in order to provide police,fire A-286 Cross Sound Ferry Draft MIS Scoping Outline and other emergency protection scr%ices. b) discuss mitigation measures to improve safety during transport of school children. 3. Utilities a) install utility services underground b) incorporate water saving fixtures into facility design e) ineorporate energy-saving measures into facility design D. CULTURAL RESOURCES 1. Visual resources a) provide buffering to improve aesthetics,particularly on the north side of residential parking lot(if approved by ZBA),ad MiLlgats-,banal im.Qact f= baqh 91 QZI>SSt'g&Ws&tW .L_y terminaL b) minimize road surface arca and significant land disturbance. C) nravidq Mslrl_s)9u '' lllC itilviib aolu lm Lan 14[W in hc. zk d) SS_4r's'n lgW-.SSR&t1 U Q awdLgµdl.h `t=rkt w1m 1 ndscavinlr, 2. Historic/Archaeological -- prescwc adequate portion of site to pro4de for archaeological resource use, research and management. Other Resourers and Impact Mitigatlon A. CUMU1_4T1VE IMPACTS B. GROWTH INDUCING ASPECTS C. IRREVERSIBLE AND IRRE'T'RIEVABLE• COMMITNIENT OF RESOURCES D. EFFECTS ON THE USE AND CONSERVATION OF ENERGY RESOURCES IV. ADVERSE ENVIRONMENTAL EFFECTS THAT CANNOT BE AVOIDED IF THE (PROJECT IS IMPLEMENTED Identify those adverse environmental effects is Section IV that can be expected to occur regardless of the mitigation measures considered in Section V. V. ALTERNATIVES This section contains categories of alternatives with examples. Discussion of each alternative should be at a level sufficient to permit a comparative assessment of costs,benefits and environmental risks for each alternative. It is not acceptable to makc simple assertions that a particular alternative is or is not feasible, T1.e No Action Alternative must be discussed. A. ALTE14NATIVE SITE LOCATIONS -- Pro%isiDn Qf v r�_kiu sw alterniltiv I&=W SILM Parkins 15 S4motc l t i n with ctisl'amel5}fits IQ 1h 1 ferry terminal, B. ALTERNATIVE SiZE--Froykion Qf a S aU", Darkilig;1=IdWa reduced numl:L Qf 12arking s12aces• C. ALTERNATIVE DESIGN--RCconriguration Df jellloi,s f--ra terminal, D. ALTERNATIVE USE --12 ydwatml of J,site!.Qt its residential zQncsi.US, E. NO-ACTION ALTERNATIVE -- Con&;&nperation w3ih current SCryj,ce wid fAciE(jes, 12esgribe poten6a 10 degrease intcn6t gf o115L'r bg IQ Ler iW providgd DLL JQ high ayss'd passenger ferry. VI. REFERENCES AND CONTACTS Provide complete list of references and contacts utilized in preparation of lite report. V)1, APPENDICES Following is a Est of materials typically used in support of the EIS. A. List of underlying ;ludics, reports and information considered and relied on in preparing statement. B, Technical exhibits (if any) at a legible scale, C. Relevant correspondence regarding the projects may be included. A-287 Cross Sound Ferry services, Inc. 2 Ferry St. - Main Office (860)443-7394 P.O.Box 33 Fax (860)440-3492 New London,CT 06320 i Reservations (860)443-5281 Long Island Cotmnuaity Organizations that Cross Sound Ferry regularly contributes to either with in-kind donations or cash contributions • American Lung Association • American Red Cross,Babylon, NY • Boy Scouts of America • Boy Scouts of America,Cub Pack 229, Selden • Community Action of Southold Town, Inc. • Ducks Unlimited,Peconic Bay Chapter • East End Surf Fishing Club • Eastern Suffolk BOCES • East Marion Fire Department and Ladies Auxiliary • East Moriches Fire Department • Elom Society • Fleet Reserve Branch 71,Riverhead • Friends for Long Island's Heritage • Friends of the Southold Free Library • Girt Scout Troop 1244, Sayville • Great South Bay Power Squadron • Greenport Fire Department Ladies Auxiliary • Greenport Maritime Monument • International Education Forum, Inc. • Ladder Rescue 4 Terryville Fire Department • Leukemia Society of America • Little Flower Children's Service of New York • Little Flower Children's Services, Wading River • Living Water Full Gospel Church, Riverhead • Long Island Head Stats Child Development Services, Inc. • Lyme Disease Foundation Inc. • Maryhaven Center of Hope • Mercy High School,Riverhead • Mid-Island YJCC • Montessori School of Lindenhurst • Muscular Dystrophy Association • Nassau County Fireman's Association Ladies Auxiliary • Nassakeag Elementary School PTA • North Fork Head Start • North Fork Parish Outreach, Southold A-288 • North Fork Volunteer Fireman's Association • Northport/East Northport Union Free School District • Northport Nursery School Inc. • Okeanos Ocean Research Foundation • Orient Beach State Park • Oystetponds Historical Society, Inc. • Oysterponds Parents Guild • Plum Island Animal Disease Center Blood Drive • Railroad Museum Long Island, Greenport • Church of the Resurrection • Riverhead Central School District • Smithtown Nursery School • Southold Historical Society • Southold Police Benevolent Association • Southside Hospital/Babylon Auxiliary • St. Isodore's Parents Club, Riverhead • Tehan Family of Shelter Island • The American Cancer Society • The Children's School at Southampton Campus/LIU • The Nature Conservancy • Thomas J. Lahey Elementary School,PTA • Tooker Avenue Parent Teachers Association • United Cerebral Palsy Association of Greater Suffolk • United Way/Adults and Children Learning Disabilities • Untied Cerebral Palsy Association, Roosevelt, NY • Veterans of World War II • Vietnam Veterans Agent Orange Victims • WLIW Long Island Public Television The following organizations have been beneficiaries of Cross Sound Ferry's Annual Fireworks Benefit Cruise held each July. The event has been running for eight straight years and has netted slightly over$100,000 including the funds raised from 199719 event. • Town of Southold 3506 Anniversary Fund- 1990 • Orient Fire Department&Ladies Auxiliary- 1992, 1994, 1995 - Repcat Beneficiary • Eastem Long Island Hospital and Ladies Auxiliary- 1991,1994- Repeat Beneficiary • The Marsha Kulakowski Fund- 1993 • Greenport/Southold Chamber of Commerce - 1994, 1995 - Repeat Beneficiary • Orient Community Activities - 1994 • Oysterponds School District in Orient - 1995, 1996 (Sole Beneficiary. Built school crossing mechanism on Route 25 in Orient with funds. Total donated: $13,%0) A-289 • Save Stephie Fund- 1995 • Suffolk County Special Olympics - 1994, 1995 - Repeat Beneficiary • Overton -Rich Community Playground at Tasker Park in Southold - 1997 • Deborah Gibson-Freethy Fund- 1997 • Our Lady of Mercy School in Cutchogue- 1997 • East End Seaport Museum and Marine Foundation's Greenport Maritime Festival - 1997 Recipients of other thndraising cruises held at various times throughout the year • Suffolk County Special Olympics- 19%, 1997 -Total$5,000 • Orient Community Activities- 1995, 1996-Total$2,500 • Eastern Long Island Hospital and Ladies Auxiliary- 1995 - Total$1,000 • Southold Town Fire Chiefs Council- 1995 -Total$2,000 • Gridiron Parents of Porters Football-Town of Southold - 1996- Total $2.000 • Greenport Fire Department Ladies Auxiliary - 1996- Total$1,000 • Cross Sound has also donated a ferry in each of the last two years, 1996, 1997 to the East End Seaport Museum and Marine Foundation for its now annual Lighthouse Tour. The Foundation has raised over$20,000 from these two cruises. A-290 i i INTER-5CIENCE