No: 39874 Date: 8/29/2018
THIS CERTIFIES that the building ADDITION/ALTERATION
Location of Property: 9165 Route 25, East Marion
SCTM#: 473889 See/Block/Lot: 31.-3-18
Subdivision: Filed Map No. Lot No.
conforms substantially to the Application for Building Permit heretofore filed in this office dated
9/28/2017 pursuant to which Building Permit No. 42066 dated 10/19/2017
was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for
which this certificate is issued is:
alterations and ramp addition to an existing commercial building as applied for.
The certificate is issued to E Marion War Mem Assc
of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL
ELECTRICAL CERTIFICATE NO.
PLUMBERS CERTIFICATION DATED
ho d Signature
y� TOWN OF SOUTHOLD
Q�gU�Fal,��o
BUILDING DEPARTMENT
TOWN CLERK'S OFFICE
oy • o� SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 42066 Date: 10/19/2017
Permission is hereby granted to:
E Marion War Mem Assc
PO BOX 313
East Marion, NY 11939
To: construct addition and alterations to existing commercial building as applied for.
At premises located at:
9165 Route 25, East-Marion
SCTM # 473889
Sec/Block/Lot# 31.-3-18
Pursuant to application dated 9/28/2017 and approved by the Building Inspector.
To expire on 4/20/2019.
Fees:
COMMERCIAL ADDITION/ALTERATION $250.00
CO -COMMERCIAL $50.00
Total: $300.00
Bu ector
Form No.6
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN HALL
765-1802
APPLICATION FOR CERTIFICATE OF OCCUPANCY
This application must be filled in by typewriter or ink and submitted to the Building Department with the following:
A. For new building or new use:
1. Final survey of property with accurate location of all buildings,property lines,streets,and unusual natural or
topographic features.
2. Final Approval from Health Dept. of water supply and sewerage-disposal(S-9 form).
3. Approval of electrical installation from Board of Fire Underwriters.
4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1%lead.
5. Commercial building, industrial building,multiple residences and similar buildings and installations,a certificate
of Code Compliance from architect or engineer responsible for the building.
6. Submit Planning Board Approval of completed site plan requirements.
B. For existing buildings (prior to April 9, 1957) non-conforming uses,or buildings and"pre-existing"land uses:
1. Accurate survey of property showing all property lines, streets,building and unusual natural or topographic
features.
2. A properly completed application and consent to inspect signed by the applicant.If a Certificate of Occupancy is
denied,the Building Inspector shall state the reasons therefor in writing to the applicant.
C. Fees
1. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00,Alterations to dwelling$50.00,
Swimming pool $50.00,Accessory building$50.00,Additions to accessory building$50.00,Businesses$50.00.
2. Certificate of Occupancy on Pre-existing Building- $100.00
3. Copy of Certificate of Occupancy-$.25
4. Updated Certificate of Occupancy- $50.00
5. Temporary Certificate of Occupancy-Residential $15.00, Commercial $15.00
Date. c ✓� q-1-7
New Construction: Old or Pre-existing Building: (check one)
Location of Property: q 5 fA61 lr-
,n P—act d
House No. Street Le e- k-WA Hamlet
Owner or Owners of Property: IZ0,M m on d Z A C0 bS - u5 P-s-f c ,-e—
Suffolk County Tax Map No 1000, Section Block aj Lot /g
Subdivision Filed Map. Lot:
Permit No. Date of Permit. Applicant:
Health Dept. Approval: Underwriters Approval:
Planning Board Approval-
Request for: Temporary Certificate Final Certificate: (check one)
Fee Submitted: $ �
Applicant Signature
• - SOF SOUIyo
��y�OUMY 0�
TOWN OF SOUTHOLD BUILDING DEPT.
765-1802
INSPECTION
[ FOUNDATION 1ST [ ] ROUGH PLEIG.
[ ] FOUNDATION 2ND [ ] INSULATION
[ ] FRAMING / STRAPPING [ ] FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
REMARKS: 6- �41� fOV01-4
0 61A6 -�v jo�r, i -
DATE iI -/ INSPECTOR
-
�0��0 Ulyolo
TOWN OF SOUTHOLD BUILDING DEPT.
765-18®2
INSPECTION
[ ] FOUNDATION 1ST [ ] ROUGH PLEIG.
[ ] FOUNDATION 2ND [ ] I ULATION
[ ] FRAMING / STRAPPING [ FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
REMARKS: y RYA " S on. L*-W-6e�A
Aw l A"-,
Ole
DATE INSPECTOR
FIELD INSPECTION REPORT I DATE rl COMMENTS
FOUNDATION 1ST
( ) y
-------------------------------------
FOUNDATION (2ND)
z
� o
ROUGH FRAMING&
PLUMBING 1,
N i
t�
INSULATION PER N.Y.
STATE ENERGY CODE
FINAL
�y
ADDITIONAL COMMENTS
so
3 _ S L-S
co
� Oz
y
d
TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST
Z BUILDING DEPARTMENT Do you have or need the following,before applying?
TOWN HALL 5113-s ,OC �5 Board of Health
SOUTHOLD,NY 11971 (Dbts of Building Plans
TEL:(631)765-1802 Planning Board approval
FAX:(631)765-9502 / --Suryey y
SoutholdTown.NorthFork.net PERMIT NO. (Q 'Check
�cptmc Form
N.Y.S.D.E.C.
Trustees
---C.O.Application
ood Permit
Examined 20 Single&Separate
5tprm-Water Assessment Form
Contact:
n t o Or'M oA 2& T'k
Approved � 20 � Mail to: fC
Disapproved a/c
Phone: �711o'gY^3S 5(p
E 2
D Lpm !
DID
Spector
SEP 2 8 2017 APPLICATION FOR BUILDING PERMIT q
Date ':1 1 12017
BUMDING DEPT. INSTRUCTIONS
Tow.asspulmf be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4
sets of plans,accurate plot plan to scale.Fee accordingito schedule.
b.Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or
areas,and waterways.
c.The work covered by this application may not be commenced before issuance of Building Permit.
d.Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant.Such a permit _
shall be kept on the premises available for inspection throughout the work.
e.No building shall be occupied or used in whole or in part for any"purpose what so ever until the Building Inspector
issues a Certificate of Occupancy.
f.Every building permit shall expire if the work authorized has not commenced within 12 months after the date of
issuance or has not been completed within 18 months from such date.If no zoning amendments or other regulations affecting the
property have been enacted in the interim,the Building Inspector may authorize,in writing,the extension of the permit for an
addition six months.Thereafter,a new permit shall be required.
APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the
,Building Zone Ordinance of the Town of Southold,Suffolk County,New York,and other applicable Laws,Ordinances or
Regulations,for the construction of buildings,additions,or alterations or for removal or demolition as herein described.The
applicant agrees to comply with all applicable laws,ordinances,building code,housing code,and regulations,and to admit
authorized inspectors on premises and in building for necessary inspections.
( `mature of applicant or n (corporation)
104 Harbor Road,Port Washington,NY 11050
(Mailing address of applicant)
State whether applicant is owner,lessee,agent,architect,engineer,general contractor,electrician,plumber or builder
General Contractor
Name of owner of premises Raymond Jacobs
(As on the tax roll or latest deed)
If applicant is a corporation,signature of duly authorized officer
(Name and title of corporate officer)
Builders License No. 11-2137495
Plumbers License No.
Electricians License No.
Other Trade's License No.
1. Location of land on which proposed work will be done:
9165 MAIN ROAD EAST MARION,NY 11939
House Number Street Hamlet
County Tax Map No. 1000 Section—3 1 Block Lot 1
Subdivision Filed Map No. Lot
2. State existing use and occupancy of premises and intended u"se and occupancy of proposed construction:
a. Existing use and occupancy United States Post Office
b. Intended use and occupancy United States Post Office
3. Nature of work(check which applicable):New Building Addition J Alteration J
Repair Removal V Demolition V Other Work
(Description)
4. Estimated Cost 74.591.78 Fee
(To be paid on filing this application)
5. If dwelling,number of dwelling units Number of dwelling units on each floor
If garage,number of cars
6. If business,commercial or mixed occupancy,specify nature and extent of each type of use.,United States Post Office
7. Dimensions of existing structures,if any:Front Rear Depth
Height Number of Stories 1
Dimensions of same structure with alterations or additions: Front Rear
Depth Height Number of Stories
8. Dimensions of entire new construction:Front Rear Depth
Height Number of Stories
9. Size of lot:Front Rear Depth
10.Date of Purchase Name of Former Owner
11.Zone or use district in which premises are situated
12.Does proposed construction violate any zoning law,ordinance or regulation?YES_NO V
13.Will lot be re-graded?YES_NO V Will excess fill be removed from premises?YES V NO
PO Box 313
14.Names of Owner of premises Raymond Jacobs Address East Marion,NY 11939Phone No. 631-477-0428
Name of Architect Address Phone No
Name of Contractor Cowsay Contracting Address 104 Harbor Road Phone No. 516-883-6484
Port Washington,NY 11050
15 a.Is this property within 100 feet of a tidal wetland or a freshwater wetland?*YES NO V
*IF YES,SOUTHOLD TOWN TRUSTEES&D.E.C.PERMITS MAY BE REQUIRED.
b.Is this property within 300 feet of a tidal wetland?*YES NO
*IF YES,D.E.C.PERMITS MAY BE REQUIRED.
16.Provide survey,to scale,with accurate foundation plan and distances to property lines.
17.If elevation at any point on property is at 10 feet or below,must provide topographical data on survey.
18.Are there any covenants and restrictions with respect to this property?*YES NO
*IF YES,PROVIDE A COPY.
STATE OF NEW YORK)
SS:
COUNTY OF NASSA A )
Ru u$}In o 9 V AJ0/1--j° :31- being duly sworn,deposes and says that(s)he is the applicant
(Nifine of individual sigmng contract)above named,
(S)He is the C00AU C- )2 - GeAeR- 1 fMmn!j-et_
(Contractor,Agent,Corporate Officer,etc.)
of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;
that all statements contained in this application are true to the best of his knowledge and belief;and that the work will be
performed in the manner set forth in the application filed therewith:
Swo 'to befo � h f' 6¢LO '
75jstrpu9
g1alt ' In Nassau pounty :4 &t� 0
pm tics ay Signature of Appli t
r
Augie Dalonzo
From: Merchan, Maria <Maria.Merchan@parsons.com>
Sent: Wednesday, September 27, 2017 5:53 PM
To: augie.dalonzo; Dan Avissato
Subject: USPS East Marion Main Office, NY
Importance: High
Hi Augie,
As per our meeting with David Christensen Program Manager, USPS Facilities Accessibility Compliance, today, he has
requested that you inform the city that properties that are leased or owned by the Postal Service are not subject to local
building codes, and while USPS is willing to provide requested information, they are not willing to delay construction while
a building permit is processed.
If there are questions or concerns from the Building department examiners, David Christensen has asked that they call
him directly. Please provide his the contact information below:
David Christensen
Program Manager
USPS Facilities Accessibility Compliance
475 L'Enfant Plaza, SW, Rm. 2PO20
Washington, DC 20260-3068
202-268-7882
David.L.ChristensenCa.usps.gov
The client has agreed and approved on directing Cow Bay to proceed immediately and without further delay to start and to
complete construction of the LSAP project at this facility.
Thank you once again for being part of this process,
Maria
Maria C. Merchan, LEED AP,Assoc.AIA.
Project Manager, USPS Program
maria.merchan@parsons.com - Ph 973-494-2259
PARSONS-Envision More
www.parsons.com I Linkedin I Twitter I Facebook
mParsons PLUS
envision more
N
SEP
Tows OF s6i&m®LD
1
Nunemaker, Amanda
From: Merchan, Maria <Maria.Merchan@parsons.com>
Sent: Wednesday, October 18, 2017 5:11 PM
To: Nunemaker,Amanda
Cc: O'Leary, Beverly S -Windsor, CT- Contractor, Christensen, Dale; Gumbs, Michael
Subject: USPS EAST MARION-MAIN OFFICE, NY, 352435
Importance: High
Good Afternoon Ms.Amanda,
The subcontractor(Cow Bay) informed about the new request from the building department to provide a floor plan of
the restroom where we are only providing grab bars and relocating a toilet paper dispenser.
Parsons went over the requested information with United State Postal Service (USPS) and this facility complies with the
USPS Lease Facilities Requirements and information for this facility has been already submitted to the building
department and there is no need to submit additional information.This project needs to be completed as soon as
possible and we will need your assistance to expedite this process.
If you have any question or comments, please contact Beverly O'Leary, USPS LSAP Coordinator at(860) 285-7174 or you
can reach me at 973-494-2259.
Thank you,
Maria
Maria C.Merchan,LEED AP,Assoc.AIA.
Project Manager, USPS Program
maria.merchan c%,parsons.com- Ph 973-494-2259
PARSONS-Envision More
www.parsons.com I Linkedhi f Twitter Facebook
Parsons PLUS
t nvision more
r
1
Verity, Mike
From: Nunemaker,Amanda
Sent: Monday,July 30, 2018 11:42 AM
To: Verity, Mike
Subject: FW: East Marion Main Post Office building permit and code requirements
From: Fray,Joseph B -Washington, DC [mallto:Joseph.B.Fray@usps.gov]
Sent: Monday, July 30, 2018 11:18 AM
To: Nunemaker, Amanda
Cc: Jarski,John; Del Hierro, Martin J; Duffy, Bill; Silleck, Mary
Subject: East Marion Main Post Office building permit and code requirements
Ms. Nunemaker,
The United States Postal Service is currently performing work on its facility located at 9165 Main Road, East Marion, NY
11939. According to its contractor,the Town of Southold has requested that they apply for building permits and comply
with local building codes. Because the Postal Service is a federal entity, it is not subject to state and local regulation
including permitting and compliance with local codes. This immunity from local authority applies to its lessors and
contractors as well. Please refrain from attempting to enforce these local ordinances against the Postal Service and its
contractors. If you have any questions or would like to discuss further, please feel free to contact me.
Regards,
Joseph Fray
Attorney
United States Postal Service
475 L'Enfant Plaza SW
Washington, D.C. 20260-1127
202-268-6536
Joseph.B.Fray@usps.gov
1
Robert J.
Higgins
Architect
50 Hidden Acres Path
Wading River, NY 11792
631-208-3351
Email: Rarchibob @ Aol.com
March 5, 2018
Town of Southold
Building Department
Town Clerk's Office
Southold,NY
RE; USPS East Marion Handicapped ramp i
Daniel J.Avissato
CowBay Contracting
104 Harbor Road
Port Washington,NY 11050
42 inch high guards are not required under the 2010 Building code of NYS in accordance with
section 1013.1 when the ramp and landings are LESS than 30 inches above grade.
Handrails are required on ramps in accordance with 1010.8 and shall be 34" -38"AFF. The
ramp railings as installed are 36 inches off the top of the ramp and comply with the Building code
of NY.
0
Si rely , d�
Obert Hi i
ArchitectVP
a-a
1FCr
Yo o� 6RRZb
�coW Corvre�e,,. C.or D -��i �- _ . . . ,
ft
Na
i
r'
SHOP DRAWING I SVBMITTAL REVIEW
Q REVIEWED UAEVIEWED WITH CHANGES NOTED
Q REVISE AND RESUBMIT []REJECTED, �GaED A�C�'
SUBMITTAL WASREVIEWED FOR DESIGN CONFORMITYAND VV
GENERAL CONFORMANCE TO CONTRACT DOCUMENTS
ONLY. THE CONTRACTOR IS RESPONSIBLE FOR
CONFIRMING AND CORRELATING DIMENSIONS AT JOBSITE
FOR TOLERANCE,CLEARANCE,QUANTITIES.FABRICATION
PROCESSES AND TECHNIQUES OF CONSTRUCTION,
COORDINATION OF HIS WORK WITH OTHER TRADES AND
FULLCCMAF IANCEWITHCONTRACTOOCUMENTS ` D
BY:�J N Date:
Robert Higgins Architect
Wading River,W 11M O
Wt() k4z�
p4fo��4& It rimf�L-"- cool
APPR IED AS NOTED
DAT .161 B.P.# All exterior lig h.,-
installed, -�?
repaiml ;
NOTIFY BUh. iojG DE?,=--_ * NT AT
765-1802 SAM TO 4 PM FOR THE t^
FOLLOWING INSPECTIONS: o�
1. FOUNDATION - TWO REQUIRED
FOR POURED CONCRETE
2. ROUGH - FP V,+r' A PLUMBING
3. INSULAT;
4. FINAL -• j MUST RETAIN STORM WATER RUNOFF
BE COM,- PURSUANT TO CHAPTER 236
ALL CONST " = SHALL MEET THE OF THE TOWN CODE.
REQUIREMEt, 0,:THE CODES OF NEW
YORK STATE. NOT RESPONSIBLE FOR
DESIGN OR CONSTRUCTION ERRORS.
ELECTRICAL
COMPLY WITH ALL CODES OF INSPECTION REQUIRED
NEW YORK STATE & TOWN CODE
AS REQUIRED AND CONDITIONS OF
!D TOWN ZBA ;p (�� ER CERTIFICATION
RC i L'EA' ONTENT SEi-Gr=i'E
SO ITHOI nTn�an,� RM ES GERTIFICA, OF OCCUPANCY
N YS D€6---- SOL'D6ER U ED 1,lKIA 7-ER,
SUPPL Y SY EIv Cl,lwvo T
EC PX0 OF 1 f LEAD.
CUPANCY OR ALL PL INN
OC NG WASTE .
USE IS UXAWI=M i'";4&W ER LIiVE NEED.
r�sT G BEFORE •ERING
WITHOVT CERTIFICATE
O� OCCUPANCY
R _��SPECTION
EC �9�fp BEFORE
=OPENING,
UNITED STATES POSTAL SERVICE 0
ATTACHMENT-SECTION 01110-SUMMARY OF WORK
FACILITY: EAST MARION: MAIN OFFICE
9165 MAIN RD
EAST MARION, NY 11939-1538
352435-001
The contractor shall verify field conditions of the site prior to starting construction.
Customer Access-Parking Spaces:Vehicle Spaces
The pavement surface shall be cleaned free of grease,oil,mud,dust,dirt,grass,loose gravel,loose or
flaking paint and other deleterious material.The area approx.26'wide x 20'long shall be seal coated with
two coats of asphalt sealant as shown in Sketch 1.Apply the second seal coat after the first coat dries,to
assure proper thickness.
Stripe the row of parking as shown in Sketch 1 to include 1 access aisle that is a MINIMUM of 8'wide and
1 Van Accessible parking space MINIMUM of 8'wide from the inside of both stripes.Access aisle shall
extend the full length of the parking space.Stripe the adjacent left USPS employee parking space to be a
MINIMUM of 8'in width from the inside of both stripes.Paint on the surface of the Van Accessible parking
space the"International Symbol of Accessibility"per State and Local ordinances. Paint shall not be
applied at air temperatures below 50 deg F, Paint shall have min 16 mil dry thickness.
Refer to Sketch 1.See Specifications:Section 02765 W or E.
Customer Access-Parking Spaces:Parking Identification
Provide and install a sign displaying the"International Symbol of Accessibility"and the words"Van
Accessible"on a 16 gage 2"X 2"galvanized steel pole centered in front of the Van Accessible space.The
bottom edge of the sign shall be a minimum of 60"above the surface.The sign shall be attached to the
pole using non-corrosive 3/8"machine bolts with washers, one each at the top and bottom of the sign
In addition,provide and install a"No Parking"sign on a 16 gage 2"X 2"galvanized steel pole centered in
front of the access aisle.The bottom edge of the sign shall be a minimum of 60"above the surface.The
sign shall be attached to the pole using non-corrosive 3/8"machine bolts with washers, one each at the
top and bottom of the sign.
Refer to Sketch 1.See Specifications:Section 10435.
�rbU I Jf Cb, Sm a k� a l�,rnr►S -�
Art 12Y- Ul'she-" p� aa�s c • ,��AEu �c
019010 yOQ�
OF NE'N
l ,
UNITED STATES POSTAL SERVICE 0
ATTACHMENT-SECTION 01110-SUMMARY OF WORK
FACILITY: EAST MARION: MAIN OFFICE
9165 MAIN RD
EAST MARION, NY 11939-1538
352435-001
The contractor shall verify field conditions of the site prior to starting construction.
Customer Access-Entry Doors/Doorways:Dimensions
For the customer entry,remove exterior storm door and associated storm door hardware as shown on
Sketch 2. Return items to the facility Postmaster or OIC.
Remove customer entrance door threshold. Install new threshold to be 1/2"MAXIMUM high and beveled d
greater than 1/4".
Replace the closer on the entrance door with a new unit,so that the door opens with a maximum voluntai}
force of 8.5 lbs,and closes from 90 to 12 degrees in a minimum of 5 seconds. Document door pressure
and closing time achieved in the Door Closer log included in the RFP.
Remove the knob lockset on the entrance door and return to the facility Postmaster or OIC.Replace with
a cylindrical style CLASSROOM lever lockset having the same material as the existing historic locksets
(antique brass finish,field verify.
New lockset cores shall be shipped from the manufacturer directly to the Postmaster prior to construction.
Three keys shall be shipped with the lockset core.The core and keys must be mailed via USPS
REGISTERED MAIL directly to the Postmaster Confirm with the Postmaster that the package has been
received.
Refer to Sketch 2.See Specifications Section- 08710.
Customer Lobby-Service Counter
As facing the service counter from the Customer's point of view,lower an approximate 32"wide section of
the 42-1/2"high service counter in front of the LEFT service window to accommodate a 35-1/2"max high
counterline as shown in Sketch 3.Reuse the existing countertop. Modify/lower cabinet below counter by
removing lowest drawer and trimming to fit under modified counter.Trim front panel and provide new fixed
wood side inserts(finish to match existing wood)above lowered counterline so that exist 20-1/2"wide
window and slide down security panel remain in place. If new countertop becomes necessary finish to
match existing. Round all corners and edges.Patch and repair all exposed surfaces&floor to match
existing materials Adjust electrical&communications connections.
Scheduling of service counter modification must be coordinated with Postmaster,OIC,or Station
Manager.Contractor shall not make changes to proposed accessible counter location,or deviate from
proposed width, unless authorized by Parsons.Contractor shall notify Parsons Construction Manager
prior to construction for any requested changes.
DA
J
Orso��y0�
F NE
UNITED STATES POSTAL SERVICE 0
ATTACHMENT-SECTION 01110-SUMMARY OF WORK
FACILITY: EAST MARION: MAIN OFFICE
9165 MAIN RD
EAST MARION, NY 11939-1538
352435-001
The contractor shall verify field conditions of the site prior to starting construction.
Fumish and install a wood tone(finish to match/approximate existing)security insert box as per
drawing"Retail Counter Modification Insert".The contractor shall order the insert box from
the following supplier:
Hoff Enterprises, Inc. (Kurt Freidhoff)
151 Freidhoff Lane,Johnstown, PA 15902
814-535-8371 tel
814-539-6656 fax
kurt@hoffent.com
http://www.hoffent.com
Refer to Sketch 3.See Specifications Sections:02223,09900, 12358, 12359&16050.
Customer Lobby-Writing Desk
Remove existing 30"high table from in front of the writing desk and return to the Postmaster or OIC as
shown in Sketch 2.
Remove top from existing 38"high writing desk and trim upper portion of legs so that the top of the writing
surface is a MAXIMUM of 34"above the finished floor as shown in Sketch 2. Relocate modified writing
desk to opposite side of entrance door and ensure door opens to 90-degrees(min)when operated. Re-
secure back of writing desk to building wall. Relocate priority mad display stand to other side of door and
offset to be 18"(min)clear of door latch as shown in Sketch 2.
Patch, repair,and restore areas disturbed by work as required to match existing finishes.
Refer to Sketch 2.
Miscellaneous Elements- Ramp:Dimensions
Remove/salvage existing metal handrails on the brick landing in front of Customer entry door and return to
the facility Postmaster or OIC. Remove approximate 177 SF of brickwork as shown inSketch 4 to include
the landing in front of the entry door,the steps,and portions of the brick paver sidewalk as required to
install a new ramp with a top landing, intermediate landing,and stairs as shown inSketch 5 and Sketch
6.Salvage existing gray bricks from sidewalk where feasible for re-use on new portion of landing/sidewalk
at base of stairs.
Install new 4'wide concrete ramp with 8.3%max running slopes and 2%max cross slopes as show
Sketch 5 and Sketch 6. Top landing shall be approximate 10'wide x 6'-10"long a level w' AACy
the entry door.Cover/embed concrete surface of top landing only with new morta d re bric h�
match existing and to have 2%(max)slope in both directions.Intermediate landi g shall a Q� F
5'(min)x 6'with a concrete surface having 2%(max)slope in both directions ting bric yip�,►
sidewalk shall form bottom landing of ramp. Provide smooth transition(s)betwe bottom p ru
existing brick paver sidewalk. * I
sA�rF r O,O yOQ�
O p4
I
UNITED STATES POSTAL SERVICE 0
ATTACHMENT-SECTION 01110 -SUMMARY OF WORK
FACILITY: EAST MARION: MAIN OFFICE
9165 MAIN RD
EAST MARION, NY 11939-1538
352435-001
The contractor shall verify field conditions of the site prior to starting construction.
Excavate and replace any unsuitable base with clean fill.Scarify and re-compact top 12"(min)of
subgrade to 95%relative compaction.Overlay subgrade with a subbase consisting of 6"(min)compacted
crushed stone.Concrete is to be min 3500 PSI after 28 days and 5"(min)thickness. Broom exposed
concrete surfaces on ramp runs and intermediate landing to provide non-slip finish.The joint filler shall
consist of 1/8"width strips of neoprene,synthetic rubber,or approved substitute,extending the full depth
of the slab.Sealant shall be two-part elastomeric type, polyurethane base.
Provide new red brick fascia on both sides of concrete ramp and landings. Provide new red brick topping
on landing in front of entry door.New red brick and fascia shall match existing red brick pavers in form
and color,and shall compliment historic nature of 1940's era facility. Prior to start of construction,
Contractor shall provide rendered shop drawing showing architecture of proposed brick fascia work for
approval.
Install approx 67 LF(total/field verify)of galvanized metal handrails with balustrade and edge protection
on both sides of ramp and landings as shown on Sketch 5,Sketch 6,and per detail Drawing GSK-P-
RAMP-005.Top of handrails to be 34"to 38"from ramp surface.Handrails shall be continuous and
extend 12"(min)beyond top and bottom of ramp runs.Include 1-1/2"diameter edge protection welded to
posts with 3"clearance to concrete surface.Handrails shall be painted black.
Refer to Sketch 4,Sketch 5,Sketch 6,and detail Drawing GSK-P-RAMP-005.See Specifications
Sections:02223;03300;05520; 09900.In addition,see Clay Unit Masonry Specification 042100 and
Masonary Mortaring and Grouting Specification Section 040514.
Miscellaneous Elements-Stairs:Treads and Risers
Install new red brick stairs as shown on Sketch 4,Sketch 5,and Sketch 6.Stairs shall have uniform riser
heights of 4"to 7"high and 11"(min)tread depths as shown on detailDrawing GSK-P-HNDR-004 Form
steps using new red brick and mortar that matches existing.
At base of red brick steps,form 6'-10"wide x 4'-0"long brick landing/sidewalk using removed gray
sidewalk pavers that were previously salvaged as shown on Sketch 4 and Sketch S.Slope of new brick
landing shall not exceed 2%each way.Provide smooth transition along interface with existing brick
sidewalk surfaces.
Install approx 8 LF(total)of galvanized metal handrails with balustrade on both sides of brick stairs as
shown on Sketch 5.Top of handrail to be 34"to 38"from stair nosing as shown on Sketch 6 and per
detail Drawing GSK-P-HNDR-004.At the top of a stair flight, handrails shall extend horizontally above the
landing for 12 inches minimum beginning directly above the first riser nosing.At the bottom of a stair flight,
handrails shall extend at the slope of the stair flight for a horizontal distance at least equal to one tread
depth beyond the last riser nosing.Top and bottom extensions shall return to a wall,guard,or the landing
surface,or shall be continuous to the adjacent handrail. Handrails shall be painte ck.
D Aq
J
,r I
0t90A1
9r�OF NE`I'�y�
UNITED STATES POSTAL SERVICE 0
ATTACHMENT-SECTION 01110-SUMMARY OF WORK
FACILITY: EAST MARION: MAIN OFFICE
9165 MAIN RD
EAST MARION, NY 11939-1538
352435-001
The contractor shall verify field conditions of the site prior to starting construction.
Provide red brick fascia on both sides of brick stairs. New red brick and fascia shall match existing red
brick pavers in form and color, and shall compliment historic nature of 1940's era facility. Prior to start of
construction Contractor shall provide rendered shop drawing showing architecture of proposed stair
brickwork for approval.
Refer to Sketch 4,Sketch 5,Sketch 6,and detail Drawing GSK-P-HNDR-004.See Specifications
Sections:05520;09900. In addition,see Clay Unit Masonry Specification 042100 and Masonry Mortaring
and Grouting Specification Section 040514.
Miscellaneous Elements-Doors:Along Accessible Route
Remove the lobby/workroom door knob lockset and replace it with a cylindrical style STOREROOM (ANSI
F86)lever lockset having the same material as the existing historic locksets(antique brass finish,field
veri . Lockset cores shall be shipped from the manufacturer directly to the Postmaster prior to
construction.Three keys shall be shipped with the lockset core.The core and keys must be mailed via
USPS REGISTERED MAIL directly to the Postmaster.Confirm with the Postmaster that the package has
been received.
See Specifications Section.08710
Men's Restroom(or Unisex)-Doors
Remove the restroom door knob lockset and replace it with a cylindrical style PRIVACY(ANSI F76)
function lever lockset having the same material as the existing historic locksets(antique brass finish,field
venfyj. Use Schlage(Commercial medium duty privacy lockset).
See Specifications Section:08710
Men's Restroom (or Unisex)-Accessible Water Closets and Toilets: Grab Bars,etc.
Install 36"long side grab bar and offset 12"from rear wall so that bar extends 48"from rear wall. Install
24"rear grab bar centered above the toilet.Grab bars to be installed between 33"and 36"AFF to top of
gripping surface.
Provide blocking inside walls if required. Replace or repair damaged substrate&finish wall to match
existing.Contractor shall verify field conditions prior to starting construction.
Relocate toilet paper dispenser to be 7"to 9"in front of WC to the centerline an to 6"below side grab
bar.Patch,repair, and restore areas disturbed by work as required to match a Is
finishes.
Refer to drawing GSK-R-ROOM-001.See Specifications Section: 10810. D Appy/
0 ST SAL
RFP NO.: 0 1
c
(0) {®Q.
fiOF NE`N
POLE MOUNTED GRASS
FENCE ��EMPLOYEE PARKING GRASS .� eNLeFENCE
SIGN TO REMAIN
I I
I I
I I
]BUILDING
o
15 15
GRASS I ASPHALT N GRASS MINUTE MINUTE
I I CUSTOMER CUSTOMER
PARKING PARKING
SPACE SPACE
I I
L - - - - - - J
SEAL COAT 26' W x 201 (APPROX) AREA TO
GRASS PREPARE ASPHALT SURFACE FOR RE—STRIPING.
BRICK
WALKWAY
ASPHALT
ASPHALT
GRASS EXISTING
INSTALL POLE AND
'NO PARKING' SIGN.
44
POLE MOUNTED INSTALL POLE AND
GRASS
EMPLOYEE PARKING f VAN ACCESSIBLE FENCE
SIGN TO REMAIN. +' PARKING SIGNAGE. + EM
VAN
ACCESSIBLE
US POST PARKING
OFFICE GRASS USPS SPACE GRASS 15 15
EMPLOYEE MINUTE MINUTE
BUILDING PARKING CUSTOMER CUSTOMER
SPACE - PARKING PARKING
�� SPACE SPACE
8'-0"-- —8'-0"—.�—8'-0"
(MIN) (MIN) (MIN)
GRASS STRIPE AN 8' (MIN) WIDE EMPLOYEE PARKING
BRICK SPACE, AN 8' (MIN) WIDE ACCESS AISLE, AND AN
WALKWAY 8' (MIN) WIDE VAN ACCESSIBLE PARKING SPACE.
ASPHALT
ASPHALT
GRASS PROPOSED
pA
ITLE REV. DRAWN,
EAST MARION, NY: MAIN OFFICE
Q 001 RK
REAR PARKING AREA
P JECT DRAWING NO.
USPS LSAP NE REGION
01901 ROJECT N0. DATE SCALE SKETCH 1
352435-001 09/07/2016 N.T.S.
WORKROOM INTERIOR DOOR AND
EXISTING AREA FRAME TO REMAIN.
REPLACE DOOR CLOSER
AND ADJUST TO 8.5 LB
(MAX) OPENING FORCE
AND 5 SEC (MIN) CLOSING
SPEED. REPLACE THE
REMOVE 30" HIGH DOOR THRESHOLD WITH
WRITING TABLE ANDCUSTOMER COMPLIANT THRESHOLD.
RETURN TO FACILITY LOBBY INSTALL A LEVER TYPE
POSTMASTER. LOCKSET. NEW LOCKSET
SHALL BE OF THE
MATERIALS AS THE
HISTORIC LOCKETS (FIELD
VERIFY). RETURN ITEMS TO
FACILITY POSTMASTER.
RELOCATE PRIORITY MAIL
DISPLAY STAND TO
REMOVE TOP FROM 38" HIGH OPPOSITE SIDE OF ENTRY
WRITING DESK AND TRIM UPPER DOOR. PROVIDE 18" (MIN)
PORTION OF LEGS AS REQUIRED TO OF LATCH CLEARANCE ON
MODIFY TOP OF DESK TO BE PULL SIDE OF DOOR.
33-1/2" AFF. RELOCATE LOWERED
DESK TO OPPOSITE SIDE OF ENTRY REMOVE EXTERIOR STORM DOOR,
DOOR AND RE-SECURE BACK OF FRAME, AND ASSOCIATED
DESK TO BUILDING WALL. HARDWARE. RETURN ITEMS TO
FACILITY POSTMASTER.
WORKROOM REPLACE DOOR CLOSER
PROPOSED AREA AND ADJUST TO 8.5 LB
(MAX) OPENING FORCE
AND 5 SEC (MIN) CLOSING
SPEED. REPLACE THE
DOOR THRESHOLD WITH
COMPLIANT THRESHOLD.
INSTALL A LEVER TYPE
CUSTOMER LOCKSET. NEW LOCKSET
LOBBY SHALL BE OF THE
MATERIALS AS THE
HISTORIC LOCKETS (FIELD
18" VERIFY). RETURN ITEMS TO
(MIN) FACILITY POSTMASTER.
WRITING DESK LOWERED
TO 33-1/2" AFF AND
PRIORITY MAIL DISPLAY STAND RELOCATED TO OPPOSITE
RELOCATED TO OPPOSITE SIDE SIDE OF ENTRY DOOR.
OF ENTRY DOOR. OFFSET STAND ENSURE DOOR PROVIDES
AS REQUIRED TO PROVIDE 18" 90-DEGREE (MIN)
(MIN) OF LATCH CLEARANCE ON OPENING. RE-SECURE
PULL SIDE OF DOOR. BACK OF DESK TO
BUILDING WALL.
��D RCh
r�° 0��► EAST MARION, NY: MAIN OFFICE REV
E001 DRAWN
NTRY DOOR & WRITING DESK
PAJ T DRAWING N0.
USPS LSAP NE REGION
qT�OF„ JECT 352435-001 DATE 09/07/2016 SCALE N.T.S. SKETCH 2
EXISTING SECURITY
WINDOW AND FRAMED
OPENING TO REMAIN.
CUT COUNTERTOP, REMOVE
BOTTOM DRAWER, AND TRIM
20.5" BOTTOM OF CABINET AS REQUIRED
(APPROX) TO LOWER APPROX. 32" WIDE END
SECTION OF EXISTING COUNTERTOP
TO 35.5" AFF. INSTALL 2x
BLOCKING AS REQUIRED TO
SUPPORT COUNTER. IF NEW
z to COUNTEROP SHALL BECOME
o e e NECESSARY THEN
Z c M e e MATCH/APPROXIMATE EXISTING
c MATERIALS AND FINISHES.
0= RELOCATE EQUIPMENT AS
CL REQUIRED.
77" (APPROX) EXISTING REAR ELEVATION
EXISTING SECURITY
WINDOW AND FRAMED
OPENING TO REMAIN.
WALL
LOWER APPROX 32" WIDE
SECTION OF EXISTING 20.5"
COUNTERTOP TO 35.5" AFF. (APPROX)
IF NEW COUNTERROP
BECOMES NECESSARY THEN
MATCH/APPROXIMATE EXISTING —
MATERIALS AND FINISHES.
REMOVE SECTION OF I/ (/ 0 6 0
SERVICE COUNTER FACING. /r— 32 �( Q M 0
(APPROX/ N
FIELD VERFIY) o= W
0
a-
a
`yc�AiD �y��F, EXISTING FRONT ELEVATION
TLE REV DRAWN
EAST MARION, NY: MAIN OFFICE
SERVICE COUNTER (Page 1 of 2) 001 RK
O ROJECT DRAWING NO
USPS LSAP NE REGION
PROJECT NO DATE - SCALE SKETCH 3
352435-001 09/07/2016 N.T.S.
EXISTING SECURITY
WINDOW AND FRAMED
OPENING TO REMAIN.
0 0
20.5" (APPROX)
NEW WOODEN FILLER TO MATCH
EXISTING MILLWORK.
W o LOWERED COUNTERTOP SECTION.
o WOOD TONE (APPROX. EXISTING
Z 0 o M o o FINISHES) SECURITY INSERT
N o BLOCK.
00
RE–CONFIGURED DRAWER CABINET.
— 77" (APPROX) PROPOSED REAR ELEVATION
EXISTING SECURITY
WINDOW AND FRAMED
OPENING TO REMAIN.
WALL
WOOD TONE- (APPROX. 20.5"
EXISTING FINISHES) (APPROX)
SECURITY INSERT BLOCK.
LOWERED SECTION OF EXISTING
COUNTERTOP AT 35.5" AFF. IF
NEW COUNTERROP BECOMES
NECESSARY THEN MATCH/
a 0 N
APPROXIMATE EXISTING MATERIALS NEW WOODEN 0 M 0
ti
AND FINISHES. ROUND ALLf 32» FILLER TO MATCH Z
CORNERS AND EDGES. /I /I EXIST MILLWORK. a
(APPROX/
RESTO ERVICE COUNTER FIELD VERFIY)
FACING. a lz
PROPOSED FRONT ELEVATION
EAST MARION, NY: MAIN OFFICE REV. DRAWN
SERVICE COUNTER (Page 2 of 2) 001 RK
O � RO.IECT DRAWING N0.
USPS LSAP NE REGION
PROJECT NO DATE SCALE SKETCH 3
352435-001 09/07/2016 N.T.S.
�•x
Qfiri`_rit I iSt Pm,7 v �<
' } .�A:ti;��:'•��$��� �:t��Lpm��.J?��'1�;���[kiuR�;�3#�A�, •fir
.rixu��_ssaia�tkop�nrpeps�oxe�atw' u?* ' .
,tlri1YS:
"�fn�svaoar>ttilgwti?��dteiQ+,�n!'�u�.�7igxu:} �;:
�o�_H¢oP'���;�a��toi•�i�ctx�ij;ta��r.� er
vio�fio$}�ip?i
•+ia�+�rr�n7�1?k1a�£v+�z+4�k�1�!+�it�l�lt 'E�
= ` = '.�lo�FcasttN��YA�nv`3�.A'p?•,S±;o ,._, .� , •`..
'os�rpEai�y.!"•,-u�i4gdo��4�tG�F.�po'�P��!►�:kna" � '" �:ar _ ,•
alk,alk'sa�h4.0o ' �� ,r,,tr;P'prp? ,.p Ts—
;aaa � tij
� :arsro4�. ppinuyi, •iIlk -.
prow Pair sgudoi'Jist ,y altrsef,� "£ ' d: ('Q '3}1�ir'I Aft;" .
., . ••,�&�;;�iaiiagw�aaaatala.[a -t��•' ,,•. .,• - ,. .f
s,r. ?tiir?Iri F 5•,,
., •s�nt� 4 ii}k`�3��tt{Z:II�`° ,.
,. i�CC?t,L�t/t�`I� C7 �3��'4921S�I�dna���� ;',; ., •�;, ��,
• � •.z, --�= "� ��' "�. � * X6'0
tom= =r�% re`ac r o,;.-.y; - x. ► r ,IL
f►� t� CO)
'�•snt'e►�s.kt�,a�� �'fis7t�� ..��• - �'!'111�• li�',.,�.�.�<. - ��
SCREEN DOOR----,,,
?<v
LANDING & STEPS
EAST MARION EMPLOYEE
o VOLUNTEER FIRE ENTRY DOOR
Q� DEPARTMENT 0
�\ o
mf-r-o
o �
v _Z
Q
�'-Z� BASEMENT SCREEN
WELL, TYP.
-REMOVE STORM DOOR &
CUSTOMER HARDWARE - RETURN
ENTRY DOOR E = TO POSTMASTER
WINDOW 0.&"4WINDOW
GRASS & DEMO GRAY BRICK
LANDSCAPING DEMO RED BRICK PAVER �� EZ . GRASS & + PAVER SIDEWALK -
LANDING -2.0 REUSE PAVERS AS
REMOVE SUPPORTS & - - - - LANDSCAPING C° NECESSARY FOR NEW
RAILS - BOTH SIDES - - - - - - - - - - - - - - N LANDING/SIDEWALK AT
RETURN TO REMOVE APPROX. BASE OF STEPS
POSTMASTER /
DEMO RED BRICK EL = 174 SF BRICK
NOTES: -16.0" PAVERS
PAVER STEPS
1. DIMENSIONS, SLOPES, AND SPOT
ELEVATIONS ARE APPROXIMATE. V.I.F. DEMO GRAY BRICK LI
PAVER SIDEWALK -2. ARROWS INDICATE DOWNWARD SLOPE. REUSE PAVERS AS +
NECESSARY FOR NEW I o
3. REUSE GRAY BRICK PAVERS AS LANDING/SIDEWALK AT
NECESSARY. BASE OF STEPS `r GRASS &
LANDSCAPING
4. R N ALL DOORS, HA AND BRICK
RAILS TO P
SIDEWALK
.a TITLE REV. DRAWN
EAST MARION, NY: MAIN OFFICE
EXISTING SITE PLAN 001 GR
Z o
O ` PROJECT DRAWING NO.
� �c� USPS LSAP NORTHEAST REGION
05 � PROJECT NO. DATE SCALE SKETCH 4
* �,7 352435-001 09/13/2016 N.T.S.
SCREEN DOO
LANDING & STEPS
EL =
-16.0"
EAST MARION EMPLOYEE
o VOLUNTEER FIRE ENTRY DOOR
Q� DEPARTMENT C-)
�\ 3o m o
= 0 v>
z
4
BASEMENT SCREEN
WELL, TYP. 36" MIN.61
CLEAR
CUSTOMER a
ENTRY DOOR L`
WINDOW 0. WINDOW z o RAMP RUN WITH
IL o st` + NEW RED BRICK
GRASS & 14- MlIN. 18MIN L'� tFASCIA ON BOTH
LANDSCAPING NEW CONCRETE LANDING is SIDES
CCLEAR z
GRASS & Z
WITH NEW RED BRICK Ln LANDSCAPING60" MIN.
FASCIA & TOPPING - 2%
m MAX. SLOPE IN ALL EL „ CLEAR EA. NEW HAND RAIL
DIRECTIONS 0'0 z DIRE TION o WITH EDGE
' NEW HAND RAIL WITH o NEW CONC. RAMPo: co PROTECTION AND
EDGE PROTECTION & 1 MAX SLOPE 1:12 _ -L BALUSTRADES
NOTES: BALUSTRADES M C) -10.0"
1. DIMENSIONS, SLOPES, AND SPOT NEW CONCRETE STEPS `" RAMP RUN ITH NEW
ELEVATIONS ARE APPROXIMATE. V.I.F. WITH NEW RED BRICK c" RED BRICK FASCIA ON NEW CONCRETE
FASCIA & TOPPING N BOTH SIDES LANDING WITH NEW
2. ARROWS INDICATE DO ARD SLOPE. " RED BRICK FASCIA
6'-10 10'-5"+/- VIF 6'-0" ON ALL SIDES -
3. BRICK PAV AS REUSE REMOVED GRAY 2% MAX SLOPE IN
SSARY. PAVERS FOR NEW ELEV= GRASS & ALL DIRECTIONS
LANDING/SIDEWALK AT 1B.p" LANDSCAPING
4. RETURN DOORS, lid RE, AND BASE OF STEPS
RAILS TO R /� TERICK
EWALK ELEV A
TITLE REV. DRAWN
„ m c EAST MARION, NY: MAIN OFFICE
001 GR
Z _ PROPOSED SITE PLAN
PROJECT
USPS LSAP NORTHEAST REGION DRAWING NO.
PROJECT NO. DATE SCALE
SKETCH 5
352435-001 09/13/2016 N.T.S.
NEW HAND RAIL WITH
�a It c�at�
EDGE PROTECTION
BALUSTRADES r� Q
w
NEW CONCRETE STEPS WITH
NEW RED BRICK FASCIA &
r700TOPPING. RISER HEIGHTS
SHALL BE UNIFORM.
1�t
M REUSE REMOVED GRAY PAVERS FOR NEW
NEW CONCRETE + LANDING/SIDEWALK AT BASE OF STEPS
LANDING WITH NEW RED
BRICK FASCIA & l 0'-0" 2'-0" 4'-0"
TOPPING - 2% MAX.
SLOPE IN ALL
DIRECTIONS AND RAM P ELEVATION — B
ELEVATED TO BE FLUSH
WITH BUILDING ENTRY.
NOT TO SCALE
NEW HAND RAIL WITH
EDGE PROTECTION &
BALUSTRADES Sp
00 NEW CONCRETE Or�
STEPS WITH NEW RED Q r
BRICK FASCIA & I r,
TOPPING
\
+
'-10" 10'-5" VHF 6'-0" CONCRETE LANDING
WITH NEW RED
BRICK FASCIA
ELEVATION — A CONCRETE RAMP WITH NEW
RED BRICK FASCIA
NOT TO SCALE
TITLE REV, DRAWN
�9`c EAST MARION, NY: MAIN OFFICE 001 GR
z bo RAMP ELEVATIONS
O QA •, PROJECT DRAWING NO.
PROJECT NO
• ��'9k . 7�y� SPS LSAP NORTHEAST REGION
* 352435-001 09/13/2016 N.T.S. SKETCH 6
HANDRAIL GRIPPING SURFACES
1 J" POST EVERY 5'-0" O.C. SHALL HAVE AN OUTSIDE
MAX. DIAMETER OF 1 1'.
�' EXPANSION JOINT
NEW 4" CONCRETE SLAB
RAMP RUNNING SLOPE LESS
THAN 8% AND CROSS SLOPE
-I LESS THAN 2%
i7
6x6 WELDED WIRE MESH
6" GRAVEL
,.
Vt
J.1-
#4 REBARS ® 8"
' #4 REBARS ® 8"
GRADE :f
s J di
�I U
M� •2'
CONCRETE:3,000 PSI
CV boli
#4 ® 8" O.C. 2'-6" ��RED AgL,y
BOTH WAYS
Section
t
01 u yoQ
F
TITLE REV. PAGE
INTERIOR ELEVATIONS & PLANS 000 1 of 2
CONCRETE RAMP
P R 0 1 E C I SPS LSAP - RE-4 DRAWING N0.
PROJECT N0. UG, 2016 SCALE N.T.S GSK-P-RAMP-005
A
PICKET BARS 1/2'IN
DIAMETER SPACED 4'
APART MAX.
1 F OUTSIDE DIA. 02
IIIIIIIWWuI� 1��111��
12'
e9
5' MIN. X* I I
LANDING CROSS& X' RAMP RUN 5'MIN. LANDING RAMP RUN-CROSS 5' LANDING
RUNNING SLOPE SHALL SLOPE SHALL BE LESS
THANBE LESS THAN 29 AN 2A AND RUNNING
SLOPE LESS THAN SX
RAMP-SIDE PROFILE
I —i I
LANDING RAMP RUN LANDING RAMP RUN
LANDING
STRAIGHT RAMP RUN 1n
z
AT LEAST ASWIDE
AS RAMP RUN RAMP-PLAN VIEW
a
RAMP WITH
LANDING AT
NOTES. CHANGE N
1. MAXIMUM RISE FOR RAMP SHALL BE 30'.
2. CLEAR WIDTH BETWEEN HANDRAILS SHALL BE 35' (MIN).
3. HANDRAIL
SN SHALL UOF Eo A
THE LANDINGG URFA R CONTINOUS TO HANDRAILAcy
AN ADJACENT RAMP RUN.
t
TITLE REV.
INTERIOR ELEVATIONS & PLANS 00 PAGE
GG of 2
CONCRETE RAMP
PROJEGUSPS LSAP — RE-4 DRAWING N0.
GSK-P-RAMP-005
PROJECT N0. DATE AUG, 20161s 0 A L E N.T.S
•v
PICKET BARS 1/2" IN
DIAMETER SPACED 4"
APART MAX.
TOP OF HANDRAIL
EXTENSION THIS APPLY TO
HANDRAIL POST AT 3'-0" 2"MIN; ANY TYPE OF STAIRS
MIN.D.C. (WOOD, STEEL)
RISER
MAXIMUM 7"
MINIMUM 4"
METAL SLEEVE
M
11"
DEPTH OF
1 1/2- MIN. 1 1/2- MIN.
Stairs With Metal Handrails
Z
HORIZONTAL PROJECTION
N
N
Metal Handrail
M Cross Section
NOTES:
1.- ALL STEPS ON FLIGHT OF STAIRS SHALL HAVE
UNIFORM RISER HEIGHT AND 'TREAD DEPTHS.
1"
X= TREAD 2.- RISERS SHALL BE 4" HIGH MINIMUM TO 7".HIGH
SIZE MAXIMUM. TREADS SHALL BE 11" DEEP MINIMUM
Handrail Extension 3.- HANDRAILS SHALL BE CONSTRUCTED OF METAL
CONTRACTOR OR ADHERING
APPROPRIATE SPS SPEICIIFCATIONS
TO THE
TIT REV. PAGE
+► AIRS WITH METAL HANDRAILS 000 1 OF 1
OJ CT DRAWING NO
USPS LSAP- RE-4
PROJE N DATE SCALE GSK-P-HNDR-004
500000-000 SEPT,2016 N.T.S.
5 A �
�y
ti
o
� � r
rn
,-� o
� rnlz
a
{
m iTt a Q., ntnNs
Z
i
HI-
`Q7
r
GENERAL NOTE-9
m
P 9.= NEW STAINLESS STEEL GRAB BARS•SHALL HAVE AN
'OUTSIDE.'DIAMETER OF 4,Y4 MIN„TO 2" MAX;
C 2,— IF IfISIP Q�CIIUG pN4Y"ONE'OF-THE TWO"GRAB BAMS,
THE'CIUTSItlE DIAMETER QF THE NEIN'DRAB' BAR SHALL
MATCH THAT QF THE EXISTING_
Ro p 3.- THE SOW BETWtEN THE'WALL AND 'GRAB EARS
or'. ,{ -. SNALL:BF 1 V.
4.- 'TI'iE.REAR:GRAB"BAR MAYBE 247:LONQ'MIK.
Q N c� CENTEI2�D .AOOVE--THit, WATER cLb§ET .IF SPACE,DOES'
-* o
"-:T— .NOT PERMIT A�3.6"'LONG'GRAB BAR.
Q