HomeMy WebLinkAboutColony Rd ��a�EajK�P�
TOWN, OF SOUTHOLD
HiGt-tWAYDEPARTMENT
Peconic Lane 4
j J �"o • �r
b
/r��1 o Peconic,Nevv York 11955
.J l�/ (631)765-3140
APPI.ICATIO`i/PF'ENUT FOR I31G1(tiV:\Y' L\C':1V:ITION AND RLP:![R
helssuance Of
Excavation
r BY made to the Superintendent ofHighways of t`le TNe w Yorkwn of uand otherhold for tappl cable ordinances
applicable laws,
APPL[CAT'ION ,S HEREBY
puisualit to Chapter 23 7 of the Code of the Town of Southold,Suffolk County, and to permit authorized
Conditions of Permit"andlis '`Special Conditions",if any
reoulal
ations for each individual contiguous excavation project herein described. The applicant agrees to comply with a app
le
ttached
er
nldpectoi s,codes make necessary inspect ons of the jobis site.
Pi int pr l�v c l l �U vLN Q� s _V&hal_ `®'
a-0
• � Applicant
I � Phone Number Address of
Namc of Applicant
tor
Phone Number Address of Contrac
Name of Contractor
3 nesting Service if applicable) Address of Owner gas/KewP
�!line oCProperty Own�r R q Sof C�do� ��
G , s Cl.
if art°l � -r f
der,Hamlet, ross Street) No
cl i tion a d Location to e N"um wetlands? *Yes
9I'Vork Des p
(a) Is construction located within 75 feet of tidalwetlands
if yes,other Town permits may be req
iigg�n'aat'uur'e of Applicant
NOTE: All information requested by this q
Application/Permit Form is
Required for a complete application!
Date
remises,public streets or areas,and give a detailed description of
Attached lot plan to reasonably and adequately describetheproposed work. Provide accurate schematic site plan showing the
5. la1 A P
location of all proposed excavations and relationship to adjoining p
all site and pavement restoration work.
(b) Attach all other necessary permits and licenses for this project f a Highway Excavation Permit by the Town Clerk.
Work covered by this application may not commence before issuance o
(c) , Lot
�
Block I 12-1 I��
(, Tax Map No: District 1000 Section l!,Completion Date: Jo
7 Startutg Date.
Phase Compietion Date Work Schedule
g Work Schedule Must be provided
Excavation
n for consideration as a
Facility Installatio
Backfill &Completion
Complete Application.
Pavement Replacement
9, Under which authority is application being made:
See Town Code Chapter 237(E)-Provide Resolution by,or authority from,the Utility beiing modified.
10. Estimated Cost of Proposed Work:
11. Remarks:
--------- 1 of S
D-39
12 Insurance Covet age-(Attach Copy)
(a) lnsuiancc Company_
(b) Policy#: -- _--
(c)State whether policy of certification on file with the Highway Department:
(d)Coverage required extended to the Town:
Any Loss including Bodily injury,property or commercial injury caused by or attl ibutable to the work performed:
- $1,000,000 per Occuirence and$2,000,000 general aggregate.
13. Security: or Certified Check provided in the total Amount of$
(a)Su
(a}Surety Bond •
ears.
(b)Maintenance Bond provided:_ 2 years or 3 y
14. Fees for Applications and permits-
Basic
Basic Application Fee for Each Project Location -
A Project Location would include each Bell Hole and/or every road opening or excavation within any
50"Radius whether or not they may be inter-connected by open trench or directional boring.
The total number of Project Locations shall be subject to the approval of the Highway Superintendent.
Al. I /Service Connections excavations @$50.00
$-!�o•00
No. $
A2 /Additional Excavations same service @$20.00
No.
B. Trench Excavations 18"in depth or less $10.00 $
Total Lineal Footage of Excavation; L.F.@ h
C. Trench Excavations 18"in depth to 5'in d th L.F.@$30.00 $ �'0 Oy
Total Lineal Footage of Excavation; 1!5 JS
D. Trench Excavations 5' in depth and over L.F. $50.00 $
Total Lineal Footage of Excavation; @
E. Utility Repair Excavations @$1,000.00/Each $
No.
Additional Repairs of Same Service @$500.00/Each $
No:
TOTAL$ 5)20 0 O
F. Official Notice to public utilities-proof must be provided and
Shall be attached to this application prior to issuance of permit.
Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Ex avation permit to:
in accordance wit
this application and subject to the"General Conditions"and"Special Conditions"of permit(' any) ac re .
SUPERINTE E 1 YS
TOWN OF U W ORK
intent M.O d
Date
Date Received by the To n(C�I rkp
Date Permit issued ` 1`' o Permit No.to Q u s
NOTE: Permit expires one(1)year from date of issuance.
No work to start without 24 hour notice to Superintendent of Highways.
Permit must be available at all times for inspection,on site,during construction.
2 of S
D-39
c..py
Distribution- Perinit# 4 "
Highway Department
Engineer(with page 3)
applicant
Towr.Clerk(Original)
INSPECTOR'S RECOItI3S
code) Applicant Notified
Inspection Date Findings use
l
St
Tid
�rd
0 — (To Permit Clerk)
REl
CODE
IB Improper Barricades
IL Improper Lights
ST Sunken Trench or Excavation
UTNI Unable to Measure(due to backfilling)
BUC Building Under Construction
Wlp work In progress
DB Improper Backfill(too high,not sufficient)
HFS Inspector Holding for Final Settlement of Excavation
RFR Ready for Repair
3 of 5
D-39
ORNEI'A1L CONDITIONS OF PR1Z.i UT
,�gf'LICATION/PERiVJIT FOR III+GI3'� N'
EXCAVATION ANIS REPAIR
responsible for
contractors,employees,agents and assigns of their responsibility to comply with
1 1'ermittee's Contractors toCoiv with Permit['e uirements: The Permittee n
in its independent c
general conditions imposed by the Highway
this permit, including all special/site specific and 5
Su erinnit, int while acting i the pemittee's agent with respect to the permitted activities,and suc a
p
persons shall be required to comply with all permit requirements.
prope owners in order to perforin the permitted o
2
No Ri ht to Tt es ass or interfere with Private Pro er p P ahts: This permit does not convey to the
permittee any right to trespass upon the lands•
vork nor does it authorize the impairment of any rights,title,or interest in teal or porsonal property
vested in a person not a party to the permit.
Southold require an alteration in the position of the utility,structure
under
3. Protection of the[li hwav and Future Hi hwav N[aintcnance: if future operations of rk highway
maintenance projects by the Town of Sou q
of work herein authorized, or if, in tileopinio of on to
requiredhiglway hway iimta1°�znanlce or end the health,
this peri-nit shall cause unreasonable o permit shall'be revoked and the utility,
safety and/or welfare of vehicular or pedestrian traffic,
this p
structure, fill,excavation,or other modification of t1ea i Superintendenttay hereby `filndsithat the zed l issuance of ht be ecompleted.
Additionally,the perinit may be revoked if the H g Y
permit was illegal or unauthorized o237that
oflle he Tolwn icant C deed to comply with any of the terms an
conditions of the Permit or Chapter
. deems it
applicant
4. ent
!'evocation of the Permit by the Hiahwav Sul}C ebt authorized has nothbeen completedway ,
p licantnt
necessary to revoke this pennit and the project Ytime and
shall,without expense to the Town and tf such the uncompleted extentninsucutility,structure iorfill and the
estorepthe site to its
may require,remove all or any portion o
former condition. encement of
5 Notice of Commencement: At least 24 hours ar for to n writing that they tare fully he aware of and or
contractor shall notify the Town Highway 1GrDepartment and request a Final
understand all terms and project conditionsted work to heiTown Highway Dep of the work,the contractor
is Penn
shall provide photographs of the completed
inspection.
uction equipment and/or materials
6. storage of E ui ment&iV[atk are: The storage adjacent areas twherre permission/legal access has been e
confined within the project work arca and/or adjacent
traffic.
obtained in a manner that does not interfere with normal highway
Utilit Ntari:-Outs: The Applicant/Contractor shall be responsble for ve
existingutilities sl all bef all theexisting utility
7 Y —
mark-outs and shall take all precautions to protect swine. Damage
responsibility of the contractor and shall be repaired at the contractor's expense.
royal of the Highway
d Town
8. road Closures: All scheduled road closures closures maybepermitted with the appy n permission from tae of the Highway
Board prioi•'to closing a road. Temporary Lane clo ro irate signage
and
Superintendent. This item will
t luded but n allow for single lane traffic. Road 1Cloisures due to unforeseen
flag men i stop and start traffic
emergencies require immediate notification of the Highway Department and shall be limited to immediate
and/or expedited restoration of the Work Zone
ruction
ebris
l be removed
rn the
ll
�.
No Construction Debris in Road Shoulder Area: Aotl e�n rtoject materials tl atlwill be staged within the
b
site on a daily basis. All stockpiled soil as well as a r
Right-of Way must be delineated with reflective signage or other means to meet the ininimuin requirements
of the NYS DOT Construction Standards.
�t of
r
GENERAL CONDITIONS OF PERMIT
APPLICATION/PERMIT FOR ,HIGNVAY Continued) EXCAVATION AND REPAID
10 Install, hlair►t:►in Frosiun Controls.
uibed a ealeTtEs sediment baon rrier as to be put in placesures(i.e.silt ibefore a ye placed
on the downslope edge of any dist
disturbance of the ground occurs and is to be maintained in good functional condition until thick vegetative
cover is established.
1 l Clean Fill Only: All projectbac shall consist of clean sand,gravel or soil (NOT asphalt,sl tg,taiesto
broken concrete or demolition or wiis). All unsuitable soils sed to backh sit
fill any excavation n within t a Town(H gi Highway.
Bog )
be removed from the site and n
12. All Areas of Soil Disturbanbe
ce : All
Highway Suoeriil�tendentcmmediesulately folng loweng pr jecdt project shall
If
stabilized to the satisfaction of the H b p -ie season,
the project site remains inactive fore than 48 and/or urs r pe matlantintg until weather conditions favor
then
the area shall be stabilized with straw, Y
germination.
ll consist of clean fill or soils
13. Backtill&Com action ofall FnBerminledll st abe n accordance with ASTMDwhich exhibit
698. F Fill
well-defined moisture density relationship as dbe
be placed in maximum lifts Oftwelv
e
2')inches Suitable'ick 1 ydratdil cl1colmpaction by wlat r jettngtaatl�e toot Ninety-
Five
Five(9s%) percent maximum dnsi y Y
intervals will also be permitted subject to a project specific approval by the Highway Superintendent.
vernents located
ng
14. Restoration of the Road Shoulder ed to heei extent practical. Items would include ibut not ibe limited to
shoulder areas must be protect greatest
driveway&private road aprons,mail boxes,sprinkler systems, trees and ornamental plantings
Excavations through driveways Specifications.sand trAllp evexisting road ements must be
improvements em ntsto tthatall rhave been equiremnts
of Southold Town Highway
disturbed during construction must be replaced or repaired by the contractor to the satisfaction oft e
Highway Superintendent.
15. Schematic Plans with all Technical information and Sco a of Worl;:
To reasonably and adequately
describe the proposed work,accurate
riust be provied to show or i All Pavement surfaces scheduled for all
proposed construction activity required under this permit holes or
must be saw cut to the full depth obasphalt esion oa/or]abelingetTl�isyschemati Accurate ite size of
pbovlide details on of trenching must be indicated by
all restoration required to meet the requirements of these General Conditions and iequirements found in tile
Southold Town Highway Specifications.
16. Pavement Reconstruction: All Pavement sections must be reconstructed in the following manner;
(Note:When Concrete Pavements are Present,Please review Restoration requirements with the Highway Superintendent)
a) Complete all back-fill &soil compaction work as needed to provide a suitable sub-base;
b) Over-cut existing asphalt bell hole or trench by twelve(12")inches on all sides;
c) Install a compacted lift of 4"thick Stone Blend base(RCA Blend must meet NYS DOT Specification);
d) Install a two and one half(2.5") inch compacted lift of Asphalt Base Course;
e) Install a one and one half(1.5")inch of Asphalt(Type 6)Wearing Course. (Provide AC at all joints)
All work listed herein must meet the minimum requirements of the Southold Town Highway
Specifications.
ct tin
17. Trenching of Pavement Sur IOU' E length muing Ost first►be reconstructed ndred LlowLAll trenching of
cto meet the equirements of Item
pavement surfaces exceedingin
# 16 as noted above. Once all pavement reconstruction is completed to the satisfaction of the Highway
Superintendent,the entire road section and/or width of road over the entire lengtshodh fttrench
er to shshall
ber).
repaved with a two(2")inch lift of Asphalt(Type 6) Wearing Course(Typical,
,rc�5
(Fey, a118?
POLE#5-40'P
I-CUT-OUT F-8T)
I-PHASE L A
I-GROUND MATERIAL
UG NOTES:
1-2/C#2AL POTHEAD
POLE 6-35'P 1-3'-U-GUARD, PRIMARY RISER
655' -
3/C#4 �
® . . ® 6 .
1/OALPE
GUIDE DRILL o I-C/O(F-8T)
COLONY RD. 2/C#2ALPE
115'
y� LBF XXXXX
OPEN TRENCH
2/C#2ALPE
z io
N
cef
LiI—
LOT#1 LOT#3
BG#107834
1-50KVA-GRP.234
I-SPLICE BOX
GRID#107-29
I-SPLICE BOX BUS#6413
40'
o OPEN TRENCH
OPEN TRENCH o 3/C3/OAL CIC
3/C3/OAL CIC
Ln
LOT#2 z LOT#4
m
I-SPLICE BOX
LOT#5
TOWN: SOUTHOLD
PSEGLI DESIGNER: KEN MUCCI
GRID 107-29
NOTI ICATION #900000067510