Loading...
HomeMy WebLinkAboutZupa, Mary CATHERINE MESIANO, INC:. 12 MILLPOND LANE EAST MORICHES, NEW YORK 11940 631-878-8951 February 13, 2006 Jim King, President Town of Southold Board of Trustees F E 8 3 2006 _ Box 1179 + Southold, NY 11971 Re: Mary S. Zupa �\ �e ,` " •::,.w._._ 580 Basin Road, Southold � SCTM# 1000-81-1-16.7• ZaaC Dear Mr. King: I am the agent for the above referenced applicant who is seeking an emergency Wetlands Permit to dredge an irregularly shaped area of boat basin entrance channel to -4' MLW and place the resulting 190 cu.yd. of material in a temporary drying site on the upland portion of the subject property and place up to 50 cu.yd. of the dried material landward of the line of AHW on the beach seaward of the bulkhead. The shoaled area is presently non-navigable. Permits for the above described activity have been granted by the New York State Department of Environmental Conservation, New York State Department of State and US Army Corps of Engineers, copie's of which are enclosed. d Further, I would also like to remind the Board that the following resolution was made at the 6/24/04 hearing: " RESOLVED, that the Board of Trustees DENY WITHOUT PREJUDICE the application of MARY S. ZUPA because a need was not established and because of the existence of a permit for the same or similar activities, and the permittee has dredged within the last year, pursuant to that permit. If a need arises and the conditions warrant it, an application may be submitted at that time. The Trustees accept applications for maintenance dredging.at any of their 12 (twelve) monthly meetings." Please note that the applicant is the fee title owner of the above referenced property and has authorized no person or entity to make any applications, indemnify any governmental entity or authorize any individual or entity other than the undersigned to act on her behalf. We respectfully request to be heard at the Trustees work session on February 15, 2006 and for the matter to be considered at your monthly meeting/hearing. Very t u y yours, atherine A. Mesiano, President Enclosures Cc: Victor J. and Mary S. Zupa J tS MARY ZOr-k REQUEST FOR EMERGENCY DREDGE PERMIT 2/13/2006 PROPOSED ACTIVITY • Maintenance dredging of approximately 190 cubic yards of shoaled material from the mouth of the Canal at Paradise Point to maintain 4 MLW at a maximum of 1 on 2 slope. • Placement of ±50 c.y dredged'materials along ±100 feet of shoreline (+MHW) of property owned by Mary Zupa. Dredge material to be used for beach re-nourishment. • On-site containment of excess dredge material on a temporary drying- site on the upland portion of the subject property. PURPOSE OF PROPOSED ACTIVITY Maintenance dredging is proposed because the mouth of the Canal into the Basin at Paradise Point is severely shoaled and effectively non- navigable. The purpose of the dredging operation is to maintain a channel depth of 4 MLW to provide for navigational' safety and to prevent disturbance of the bottom by boat traffic. NYSDEC supports use of dredge material for beach re-nourishment because existing jetty has caused diminution of beach to the east and, placement of dredged material as proposed will serve to return natural, indigenous material back into the system from which it was originated. STATEMENT OF EFFECT No significant negative impact on the wetlands or tidal waters of the Town is anticipated as a result of the proposed operation. £1211312006 09:14 691765611 VICTOR ZUPA PAGE 91 FROM C MESIAND' INC FAX NO. 631-978-8951 Feb. 13 2006 88:,21AM PZ spared For: Ma-ti Zupa 10 1000-al-1-I0.7 . Ahold, N&A York , e Rapt 1-2.51+/, tum: KLA ALE llp 40' V 0® 4* M vY el a • 1 �. ,_ �r iALW��LyV� �.' I ' ��1 sa sa;!; r: •�•, ��•, ' •., 1,''' , ,1 aN ;,�qs u a4 4• \+ ,. , •.* 92 ---. ' 11 FEB 13 2006 G-r#100 r - r 4 0t � flor r1 n LattG' �Pw.orlai� 1 - _-..__l. _.. .. i \.� .. r 1 1 1 :!•.; •I.Ip .1$ All { • - � WA=W. . :r°t LEVEL � � � k, �'N YORK STATE DEPARTMENT OF ENVIRONF ,rAL CONSERVATION t DEC PERMIT NUMBER EFFECTIVE DATE 1-4738-03029/00005 Aril 15, 2005 FACILITY/PROGRAM NUMBER(S) PERMIT EXPIRATION DATE(S) Under the Environmental April 30, 2010 Conservation Law TYPE OF PERMIT■'New ❑ Renewal❑Modification'❑ Permit to Construct ❑Permit to Operate ■ Article 15,Title 5: Protection of Waters ❑ Article 17, Titles 7, 8. SPDES ❑ Article 27,Title 9, 6NYCRR 373 ❑ Article 15,Title 15'Water Supply ❑ Article 19 Air Pollution Control Hazardous Waste Management ❑ Article 34 Coastal Erosion ❑ Article 15,Title 15 Water Transport ❑ Article'23,Title 27' Mined Land Management Reclamation ❑ Article 15,Title 15' Long Island Wells El 36 Floodplain Management ❑Article 24 Freshwater Wetlands .❑Article 15,Title 27- Wild, Scenic and ❑ Articles 1, 3, 17, 19, 27, 37; 6NYCRR Recreational Rivers ■ Article 25'Tidal Wetlands 380: Radiation Control ■ 6NYCRR 608.Water Quality Certifica- ❑ Article 27, Title 7;•6NYCRR 360' tion' Solid Waste Management PERMIT ISSUED TO TELEPHONE NUMBER Mary Zupa (631) 765-6112 ADDRESS OF PERMITTEE 4565 Paradise Point Road, Southold, NY 11971 CONTACT PERSON FOR PERMITTED WORK TELEPHONE NUMBER Catherine Mesiano Inc., 12 Mill Pond Lane, Center Moriches, NY 11940 631 878-8951 NAME AND ADDRESS OF PROJECT/FACILITY Zu a Property, Paradise Point Association Boat Basin, 580 Basin Road, Southold SCTM# 1000-81=1-16 7 COUNTY TOWN WATERCOURSE NYTM COORDINATES Suffolk Southold Southold Ba DESCRIPTION OF AUTHORIZED ACTIVITY: Maintenance dredge an irregularly shaped area of boat basin entrance channel to-4 mean low water and pum the s resulting 190 cubic yards of material�o a temporary drying site on the upland portion of the permittee's property Place up to 50 cubic yards of the dried material landward of the line of apparent high water on the beach seaward of the perm itteeIs bulkheading. The remaining material will be removed to an upland location for final disposal All work must be done in accordance with the attached plans stamped NYSDEC approved on 4/15/05. By acceptance of this permit, the permittee agrees that the permit is contingent upon strict'compliance with the ECL, all applicable regulations, the General Conditions specified (see page 2 & 3) and any Special Conditions included as part of this permit. PERMIT ADMINISTRATOR: ADDRESS George W. Hammarth Region 1 Headquarters, Bld . #40, SUNY, Ston Brook, NY 11790-2356 AUTHORIZED SIGNATURE DATE Page 1 of 4 �/ - April 15, 2005 - . NEW YORK STATE DEPARTMENT OF ENVIRONM-,_..1'CONSERVATION SPECIAL CONDITIONS 1. Dredging is prohibited from June 1 -September 30 of each Year to protect'spawning shellfish and/or spawning finfish. 2. Excavated sediments shall be placed directly Into the approved disposal site or conveyance vehicle No sidecasting (double dipping) or temporary storage of dredge material is authorized 3. During the dredging operation, the permittee and his contractor shall prevent spillage of sediment during excavation and haulage. Dredging'shall be accomplished with a clam shell,or other closed "bucket" equipment 4 Dredging shall be undertaken no more than once in any Calendar year unless specifically authorized by the Department. 5. Any debris or excess material from construction of this project shall be completely removed from the adjacent area (upland)and removed to an approved upland area for disposal. No debris Is permitted in tidal wetlands and or protected buffer areas 6 The storage of construction equipment and materials shall be confined to within the project work site and or upland areas landward of the existing driveway. DEC PERMIT NUMBER PAGE 2 of 4 1-4738-03029/00005 N NEW YORK STATE DEPARTMENT OF ENVIRONMENIMONSERVATION ADDITIONAL GENER CONDITIONS FOR ARTICLES 15 (TITL ), 24, 25, 34 AND 6NYCRR PART 608 (TIDAL WETLANDS) 1. If future operations by the State of New York require an alteration in the position of the structure or work herein authorized, or if, in the opinion of the Department of Environmental Conservation it shall cause unreasonable obstruction to the free navigation of said waters or flood flows or endanger the health, safety orwelfare of the people of the State, or cause loss or destruction of the natural resources of the State, the owner may be ordered by the Department to remove or alter the structural work, obstructions, or hazards caused thereby without expense to the State, and if, upon the expiration or revocation of this permit, the structure, fill, excavation, or other modification of the watercourse hereby authorized shall not be completed, the owners, shall,without expense to the State, and to such extent and In such time and manner as the Department of Environmental Conservation may require, remove all or any portion of the uncompleted structure or fill and restore to Its former condition the navigable and flood capacity of the watercourse. No claim shall be made against the State of New York on account of any such removal or alteration. 2. The State of New York shall in no case be liable for any damage or injury to the structure or work herein authorized which may be caused by,or result from future operations undertaken by the State for the conservation or improvement of navigation,or for other purposes, and no claim or right to compensation shall accrue from any such damage. 3. Granting of this permit does not relieve the applicant of the responsibility of obtaining any other permission,consent or approval from the U.S Army Corps of Engineers, U.S. Coast Guard, New York State Office of General Services or local government which may be required. 4. All necessary precautions shall be taken to preclude contamination of any wetland orwaterway by suspended solids, sediments, fuels, solvents, lubricants, epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials associated with the project 5 Any material dredged In the conduct of the work herein permitted shall be removed evenly, without leaving large refuse piles, ridges across the bed of a waterway or floodplain or deep holes that may have a tendency to cause damage to navigable channels or to the banks of a waterway. 6 There shall be no unreasonable interference with navigation by the work herein authorized. 7. If upon the expiration or revocation of this permit, the project hereby authorized has not been completed, the applicant shall, without expense to the State, and to such extent and in such time and manner as the Department of Environmental Conservation may require,remove all or any portion of the uncompleted structure or fill and restore the site to its former condition No claim shall be made against the State of New York on account of any such removal or alteration. 8 If granted under 6NYCRR Part 608, the NYS Department of Environmental Conservation hereby certifies that the subject projectwill not contravene effluent limitations or other limitations or standards under Sections 301,302,303, 306 and 307 of the Clean Water Act of 1977 (PL 95-217) provided that all of the conditions listed herein are met 9. At least 48 hours prior to commencement of the project, the permittee and contractor shall sign and return the top portion of the enclosed notification form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of project, the bottom portion of the form must also be signed and returned, along with photographs of the completed work and, if required, a survey 10. All activities authorized by this permit must be In strict conformance with the approved plans submitted by the applicant or his agent as part of the permit application. Such approved plans were prepared by: One sheet prepared by Robert Fox, L S. dated amended 4/23/04 and stamped "NYSDEC Approved 4/15/05." DEC PERMIT NUMBER PAGE 3 of 4 1-4738-03029/00005 V NEW YORK STATE DEPARTMENT OF ENVIRONMI CONSERVATION ® NOTIFICATION OF OTHER PERMITT - -)BLIGATIONS Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The permittee expressly agrees to Indemnify and hold harmless the Department of Environmental Conservation of the State of New York, Its representatives, employees, and agents ("DEC")for all claims, sults, actions, and damages, to the extent attributable to the permittee's acts or omissions in connection with the permittee's undertaking of activities In connection with, or operation and maintenance of, the facility or facilities authorized by the permit whether in compliance or not In compliance with the terms and conditions of the permit This Indemnification does not extend to any Claims, sults, actions, or damages to the extent attributable to DEC's own negligent or Intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision under federal or state laws Item B: Permittee's Contractors to Comply with Permit The permittee Is responsible for Informing Its Independent contractors, employees, agents and assigns of their responsibility to comply with this permit, Including all special conditions while acting as the permittee's agent with respect to the permitted activities, and such persons shall be subject to the same sanctions for violations of the Environmental Conservation Law as those prescribed for the permittee Item C: Permittee Responsible for Obtaining Other Required Permits The permittee is responsible for obtaining any other permits, approvals, lands, easements and rights-of-way that may be required to carry out the activities that are authorized by this permit Item D: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the permittee any right to trespass upon the lands or Interfere with the riparian rights of others In order to perform the permitted work nor does It authorize the Impairment of any rights, title, or Interest In real or personal property held or vested in a person not a party to the permit GENERAL CONDITIONS General Condition 1: Facility Inspection by the Department The permitted site or facility, including relevant records, Is subject to inspection at reasonable hours and Intervals by an authorized representative of the Department of Environmental Conservation (the Department) to determine whether the permittee is complying with this permit and the ECL Such representative may order the work suspended pursuant to ECL 71-0301 and SAPA401(3). The permittee shall provide a person to accompany the Department's representative during an Inspection to the permit area when requested by the Department A copy of this permit, including all referenced maps, drawings and special conditions, must be available for Inspection by the Department at all times at the project site or faculty Failure to produce a copy of the permit upon request by a Department representative is a violation of this permit General Condition 2: Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department, issuance of this permit does not modify, supersede or rescind any order or determination previously Issued by the Department or any of the terms, conditions or requirements contained In such order or determination General Condition 3: Applications for Permit Renewals or Modifications The permittee must submit a separate written application to the Department for renewal, modification or transfer of this permit Such application must include any forms or supplemental information the Department requires Any renewal, modification or transfer granted by the Department must be in writing The permittee must submit a renewal application at least a) 180 days before expiration of permits for State Pollutant Discharge Elimination System (SPDES), Hazardous Waste Management Facilities (HWMF), mayor Air Pollution Control (APC) and Solid Waste Management Facilities (SWMF), and b) 30 days before expiration of all other permit types Submission of applications for permit renewal or modification are to be submitted to NYSDEC Regional Permit Administrator, Region 1, SUNY Bldg #40, Stony Brook NY 11790-2356 General Condition 4: Permit Modifications, Suspensions and Revocations by the Department The Department reserves the right to modify, suspend or revoke this permit In accordance with 6 NYCRR Part 621 The grounds for modification, suspension or revocation include a) materially false or Inaccurate statements in the permit application or supporting papers; b) failure by the permittee to comply with any terms or conditions of the permit, c) exceeding the scope of the project as described In the permit application, d) newly discovered material information or a material change In environmental conditions,relevant technology or applicable law or regulations since the Issuance of the existing permit; e) noncompliance with previously issued permit conditions,orders of the commissioner,any provisions of the Environmental Conservation Law or regulations of the Department related to the permitted activity DEC PERMIT NUMBER PAGE 4 OF 4 1-4738-03029/00005 c 94010 awl®-40-61-40 UIvu�39�'7 hMbO'9L'b i00L/EL/4 �� LblOs 01-1 S.IN 'xod •H 12138016 , Si 1 40 1 Iae45 60-IZ-ZI d0 S kaA2VS W016=1o ', Oblfil AN'(Wa 3FR13/Ud J 43d0'12A-30 S`VM 10-Id GIRLfu• s 12-aus NIHW 1SV3 9 ip�z-eo ,���,� � JNIdd�1W - pvpuewy �� L6 k.", r' °'1 -13A31 9 a2Md3 S f •• q�1 1 fq � ' A 1 11 ; O d f ; 1 1 I I Q'O 1 gel peWld Lnim i 1 d 1 1 : cb deop 9eeA oml 1 1 1 1 r6pfi ro xcw) I! d 1 1 YF 6•` \ eal4 W ®�e�1.lY...............i .................... .... .. °11 11 l9 Tr 1 1 J1 IO a\ U �........ 3 •1 yiiOJvm oo o �9�1(`Q jeAWl� - ;¢1 1 1 0'r vv'' ,• 1�° 1 I O1 pya �o5 � OOO�� X1�yd n .. i I i ll'91'10. ILasgP° I "et. 7O55d JU0 p1%11 ' 01O1 10 0175 _____ 1 •L 1 bi 0p1 - ,�Er v� � - 19 O I Od a j - •1't --------------- 't--•.� O ` 111 9, IIop=q*a6 111 v 4 4 4� 4 spil•o os•xoxddi) °6 0 !� gAoqv 11v C., is �01:1 •Xvm um gosaq gsunoual - ` V i 1 b • 1 OL •6ulfijp JG j4, ' - 9316440 POIS'"a eq 01 Inlueaow `--_.-__ E b bO -Z+' 16 If Lt deep IT a IGpfi � ogL xow ,f _Z----'iz• £- epoib 6U144IXG egls 6ul4hup IvluejnW cope in bf --Ir- ----- -- Lf LF Tf Lf Le Gojogfioq d-V uoqa M rr of pouuid (•spri•0 061•xoidd8) „ .,b6 b6 9, � tlE b6 M-1 PogPmQxlsivd os MHW S fi •7 OS g (WMH enogn 110) Inlunw pe6pGJp 9 asp � 9 os JIM uepq ioa1o1goe4epjeq Hop O/S X0 �6 ktu , n0f', �Eb Secdop Z uo I - 109 =111 1`dO5 T_ XDW 7M7HH7! p>lg g,) C-11 - , n-1 L��� XB .:"Let4om M07 UVGH unloo ZZ-EZ-ZL 16uo� .1; -/+IS'Z =e6ur� epLL "�: �1uOA MGN-'p1OLRnO5 �► d - - 1 O eo11dd s L '91-19-0001 #1.')5 uneN of YI 3 rd�s UOI b I�bN 6�t7Cj '6SOdJncJ 3 M 5uo��oaC 5�a,�� 6u1 peuQ IpGsodoj'j N N121/� U L ld DEPARTMENT OF THE ARMY NEW YORK DISTRICT, CORPS OF ENGINEERS 11 JACOB K.JAVITS FEDERAL BUILDING NEW YORK, N.Y. 10278-0090 REPLYO O 20 ATTENTION OF � JAN �J Eastern Permits Section SUBJECT: Application No . 2004-00115-1-L2 by Mary S . Zupa Mary S'. . Zupa c/o Catherine Mesiano, Inc . 12 Mill Pond Lane East Moriches, New York 11940 Dear Ms . Zupa : In response to your letter dated November 4 , 2005, regarding the subject project previously authorized by the New York- District of the U. S'. Army Corps of Engineers on August 1 , 2005 , which authorized Mary S . Zupa to dredge approximately 190 cubic yards of •clean sand within the mouth of the existing boat basin, to be dredged to a . depth of four feet below mean low water in an area approximately 30 feet wide by 140 feet long . Approximately 50 cubic yards of the dredged material would be placed along a 60 foot wide by 100' foot long area as beach nourishment east of the dredged site; and installation of a 60 foot long geotube would be placed at the toe of the easterly section of the existing bulkhead for temporary storage of approximately 150 cubic yards of dredged material . The site .is located in Southold Bay, Shelter Island Sound in the Town of Southold, Suffolk County,. New York. By letter dated November 10 , 2005 , the applicant ' s agent Catherine Mesiano, requested a modification to eliminate the 60 foot long geotube and include the installation of a 52 linear foot low-sill bulkhead, replace, in-place approximately 500 linear foot long timber bulkhead, install a 4-foot wide by 4 -foot long step-down steps leading to the beach and place along 112 foot section 1000-1500 , pounds of- rock at the easterly section of the existing jetty. Also, re-vegetation of- approximately 640 square feet would occur landward of the new low-sill bulkhead with Spartina Alterniflora 18-' inches on center plus a section of ' buffer area . We hereby reconfirm that the proposal is still permissible under Department of the Army Nationwide Permit Nos . 3 and 19 until August 1, 2007 . This remains subject to the terms and conditions of Nationwide Permit No . 3 and 19 , the revised drawings dated November 3 , 2005 , the attached Regional Conditions, the Nationwide Permit General Conditions listed in Section C of the January 15 , 2002 Federal Register, Final Notice of Issuance, Reissuance and Modification of Nationwide Permits (67 FR 2020) , and the following special condition. i ' N Propased, Dred ing Cr000 Scot(on5 Plan 1 V YV W-.E Purpose) Safe Navlgaio_n Near 5CT# 1000-81-I6,� g Applicant - SCALE I'= lo' 5outhold, New York A Tide Range, 2.5'+/- " ` Long, '12-23-22 MUIAI Datums eon LOw bkd. MHN I"= 60' pL_ :� max. 50ALE Ion 2 slopes -4 (MLN Southold Say B 't��Qk. B 9° 70 drift ex.bkd. g'O e dredged mat erial(all above HWM) 43- ab ,b Sp 43 - 50 C. y s. MHN ,I b° Amato be Dredged LW �f ,b Gut to-4 M.L.W. Sa 34 S4 •• 4. ,b 34 „•• ,4 (approx.190 C.yds.) pinned _ ,- I - see section A-A haybales 9 7 S.1 j • S 41 • C ,7 " '� •-37 �^ 97 ---97-- Dredge Material dr i site existing grade 21 .21 - Z ; , max 150 c yds. a Z' dee material to be trucked offsite ' 04 A after dNing. 7A °7 ;% R , Dredged material to renourlsh beach area MLW(ELOO) g = max. 1:10 slopes •�q° `�' --3 all above MHW !A ,I ,rel - °j ,6 7C (approx.50 c.yds.) I 4,6;1 Bee section B—B Vi n 1,l/ 1°•• c -2' ---------------- � x - 1 ° 1,2 Al2PJJi �,b x;111 •{x� _ "�� .I♦'7.I� i II -d 1 ,b,b 431 t ' 0-�1r1 9 I I I t I' 1 '-/�------------------- ------------- -'-', �Tq 10Cd OF 99oGtatlotl A i�' 1 „• 1,1 •Qft - -fl �odl90 V&lt p161`��� , .i 46 4b ,91�1'i po p,0 N(114 ,I.,i , 11 i QIt OL U M t`rt`�er b�lepd �. 5o�ty1o4d, i 14P 4b 4'J� i`1` 1001/ N C \� oil i°I 1 4, 41 i',jjO l.......................................... d �� *` o 4 I+ "D!e o Material" �n / to '1 1,' d In site \ 31 1 I P' 1 )max 15d c.yydgJ ! ' two Peet do. 11 with pine haybalea I i2 0-fO�i 1 ......... .. .... .................:... O /�l - f PREPARED BY, 11 1 SEA LEVEL 4 MAPPING `°. ti997 .�° Amended 4 EAST MAIN STREET % 04-23-04 THIS PLOT WAS DEVELOPED PHONE 531-X21-EAD,NY 11901 S O1 PHONE FROM 5URVEY5 OF 12-21-03 Sheet I Off I ROBERT H. FOX, NYS Llcp 50141 'S I 4/T9/]004 4.10.04AM GViBinah A6-IG11d-.t.nlnnnlndl...... s Special' Condition (A) The permittee understands and agrees that, if future operations by the United States require removal, relocation, or other alteration, of the structure or work herein authorized or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States . No claim shall be made against the United States on account of any such removal or alteration. If you should have any questions regarding this matter, please contact Ms . Denise Butts, of my staff, at (917) 790-8513 . Sincerely, Michael G. Vissichelli ��✓ Chief, Eastern Permits Section 2 1 ' I .mss STATE OF NEW YORK DEPARTMENT OF STATE 41 STATE STREET ALBANY, NY 12231-0001 GEORGE E. PATAKI RANDY A. DANIELS GOVERNOR May 6, 2005 SECRETARY OF STATE Catherine Mesiano 12 Mill Pond Lane East Moriches,NY 11940 Re: F-2004-0402 U.S. Army Corps of Engineers/New York District Permit - - Application#2004-00115012 4 Mary Zupa -maintenance dredge; beach nourishment; bulkhead replacement;bulkhead installation Southold Bay,Town of Southold, Suffolk County DEC#1-4738-03029/00005 General Concurrence-Proposal Modified To Be Consistent Dear Ms.Mesiano: The Department of State received your modified proposal regarding this matter on January 3,2005. The modified proposal involves replacement of 500'bulkhead in place;installation of 52'of low-sill bulkhead;wetland planting; 4'x4'steps to beach; maintenance dredge approximately 190 cubic yards;place 50cy of dredged material on beach above mhw as nourishment with remaining dredged material to be used as backfill for bulkheading. The Department of State has determined that this proposed activity,which has been modified to be consistent with the New York Coastal Management Program, meets the Department's general consistency concurrence criteria. Therefore,further review of the proposed activity by the Department of State,and Department's concurrence with an individual consistency certification, are not required. When communicating with us regarding this matter,please contact Bridget Kennedy at(518)486-7670 and refer to our file#F-2004-0402. Sincerely, appieriV Supervisor of Consistency Review and Analysis Division of Coastal Resources c: COE/New York District-Denise Butts NYSDEC/Region 1 -George Hammarth WWW.DOS STATE.NY.US • E-MAIL' INFOgQ DOS.STATE.NY US Albert J. Krupski, President Town Hall James King,Vice-President 53095 Route 25 P.O. Box 1179 Artie Foster Southold, New York 11971-0959 Ken Poliwoda ; Peggy A. Dickerson Telephone (631) 765-1892 Fax (631) 765-1366 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD June 24, 2004 Ms. Catherine Mesiano Catherine Mesiano, Inc. 12 Mill Pond Lane East Moriches, NY 11940-1222 Re: Mary S. Zupa Application to dredge channel into Paradise Point Basin, Southold SCTM#81-1-16.7 Dear Ms. Mesiano: The Board of Trustees took the following action during its regular meeting held on Thursday, June 24, 2004 regarding the above matter: WHEREAS, Catherine Mesiano on behalf of MARY S. ZUPA applied to the Southold Town Trustees for a permit under the provisions of the Wetland Ordinance of the Town of Southold, application dated April 27, 2004, and WHEREAS, said application was referred to the Southold Town Conservation Advisory Council for their findings and recommendations, and, WHEREAS, Public Hearings were held by the Town Trustees with respect to said application, the last of which was on June 24, 2004, at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, 2 NOW THEREFORE BE IT RESOLVED, that the Board of Trustees DENY WITHOUT PREJUDICE the application of MARY S. ZUPA because a need was not established and because of the existence of a permit for the same or similar activities, and the permittee has dredged within the last year, pursuant to that permit. If a need arises and the conditions warrant it, an application may be submitted at that time. The Trustees accept applications for maintenance dredging at any of their 12 (twelve) monthly meetings. BE IT FURTHER RESOLVED that this determination should not be considered a determination made for any other Department or Agency, which may also have an application pending for the same or similar project. Very truly yours, Albert J. Krupski, Jr. President, Board of Trustees AJK:Ims cc: Mary S. Zupa r