HomeMy WebLinkAbout1000-94.-3-4.1 & 4.2, 1000-95.-1-1.1, 2 & 3.1 Bc
20 6
1p _ PIC y j!
HaB
- PIB PI
( , Legend
R "C
Lands of Lowerre
PIC Ag Reserve Area 26 acres
Unprotected Parcels-—113 acres
Residentially Developed Lot-10 acres
S d A Contours(5 feet)
Soil Type
Bc-Beaches
CpC-Carver and Plymouth sands,3-15%slopes
Es-Escarpments
HaA-Haven loam,0-2%slopes(Prime ag soil)
HaB-Haven loam,2-6%slopes(Prime ag soil)
H a B�� CPIB-Plymouth sandy loam,3-8%slopes
,
PIC-Plymouth loamy sand,8-15%slopes
RdA-Riverhead sandy loam,0-3%slopes(Prime ag soil)
RdB-Riverhead sandy loam,3-8%slopes(Prime ag soil)
H ti`� RdC-Riverhead sandy loam,3-15%slopes
f SdA-Scio silt loam, sandy substratum,0-2%slopes(Prime ag soil)
SdA
i
n
RIMA
RdA
H A
't
RdA \
AUG 1 5 hid
R d A Southold Town
Planning Board
dA
r '
RdA
j G
OREGON RD
U 125 250 500 Feet
LL 1 1 1 1 1 1 1
PECONIC LAND TRUST
296 Hampton Road I PO Box 1776Lowerre Lands SCI M4:
Southampton,New York 11969 Lands of Lowerre 1000-94-3-4 1,4 2
(631)283-3195 Town of Southold ERSAP 1000-95--11,2,31
Prepared by Matthew J Swain;15 August 2018 Suffolk County,New York Total Acreage 146 48
www.PecomcLandTnlst org
Suura SuiACuunty Real 1',,(yT..Srvn AWan ,NYS(:IS,Servirvlayer Cnrllts:Swm•5:Fri,HERE NLurm.•Im.•rmal.,n.,e I'Curl+..CERt I).U—.fAU,.NTS.NR(AN.
GeoBax•,IGN.Kaaasler NI„0,d—,Survey,Fsri Japan MEV,Fn China(Hung Kung),swmt,pu,Mapmylmha,0 open54ree r rontnhuturs,ami the GIS User Community
Legend
Lands of Lowerre
Lot Lines
Parcel 1
2 1,75 3.41 3.4 acres 3.52 acres 2.65
- Parcel
acresacres acres acres
' Parcel
Parcel 4
— -- — - Proposed PDR
D v
rea iacresExisting PDR
Parcel 4 Approximate Coastal Erosion Hazard Area CEHA
1.8
Wes PDR:20.00 acres(4A)---- PP ( )
CEHAIBluff:4.04 acres 100'CEHA Building Setback
Development Area:21.70(4B)
Adjacent Protected Lands
Total:45.74 acres _
Lands of Lowerre Analysis
ICurrent Status.
Total Acreage.146.48
Unbuildable Lands:30.09(4.04 CEHA+26.05 acre PDR)
i
Buildable Lands:116.39 acres
75%Preservation Proposal:
I Preserved Lands:87.29
Development Areas:29.10 acres
I Note.All calculations approximate
Numbers to be Verified by Licensed Surveyor
I( I
= I
i
Parcel 3' I" I
PDR(Existing):26.05 acres(3A) I
Development Area: 1.85 acres (3B) 1 r1
Total: 27.9 acres I
--- Parcel 1 "
PDR:40 acres(1A)
- Development Area:3.7 acres(1 B)
Total: 43.7 acres �-
® Parcel2
PDR:27.29 acresTfi
Development Area:1.85 acres(2B)
ITotal:.29.14 acres
rea
Development Area e
_- ----- 3.7 acres
i L--
0 125 250 500 Feet
1 1 1 1 1 1 1 1
PECONIC LAND TRUST
2%Hampton Road l PO Box 9 Lands of Lowerre Lot Line Modification ,x,42
Southampton,New York ll%9 C
(631)M-31195 Town of Southold 7,J�/O Preservation (ODA) 10116'95--11,2,31
Prepared by-Matthew J Swam,19 July 2018 Suffolk County,New York Total Acreage 146.48
www.p--L�dTrust.org
dTrust.org
unry W sl e^M"M Taa Servim Ap.nay NYs(:Iti;Serv:.v 4yvrc'mE¢cuurtec Fsri HENE,11eWrm.In .ml l't�N..r:Flx tI.o—,EAI,NIS,NNUN,
(.NYw I[NNadaarrNLlrnnuw.4u ey.Evil+I++n.
It tluna 111unpFKunNl.wueyn.!.LrynylnAd.a.rt,.nnYmet�4r•^.nmhron am M.tYsll..c�mmw�ry
AUG 1 6 2018
Southold Town
Planning Board
Legend
Lands of Lowerre
Parcel 1
- Parcel
® Parcel
- Parcel
Proposed PDR
Parcel Existing PDR
Deve ea PDR:20.0 acres(4A)
1.85 Acres CEHAIBIuff:4.04 acres ,', Approximate Coastal Erosion Hazard Area(CERA)
Ue� I pment Area:21.70(4B) 100'CEHA Building Setback
-- Total:45.74 acres
.,,..,,, Adjacent Protected Lands
— — Lands of Lowerre Analysis
Current Status:
-- Y Total Acreage:146.48
Unbuildable Lands:30.09(4.04 CEHA+26.05 acre PDR)
1
Buildable Lands:116.39 acres
75%Preservation Proposal.
Preserved Lands:87.29
Development Areas 29.10 acres
Note All calculations approximate
Numbers to be Verified by Licensed Surveyor
I '
I 1
I i 1
[ I
Parcel 3
PDR(Existing):26.05 acres 3A) A
Development Area:1.85 acres(313) I
Total: 27.9 acres
Parcel 1
PDR:40 acres(1A) I
— Development Area:3.7 acres(1 B)
Total: 43.7 acres I
IP.arcel,2
PDR 27.29 acres-(2
Development Area-.'6
rea:1 85 acres(2B)
TotaI-
I4
I I
I i
i
--
;01B
T II
r
-w-
D u to merit rea
Development Area
i
r 3.7 acres
MV
I
�._ Gregori KO
0 125 250 500 Feet
11 I I I 1 I 1 I
PECONIC LAND TRUST
296 Hampton RoadNew orkll%PO Box 776 d.Lands of Lowerre Lot Line Modification 1 3 ,4.2�M�
Southampton,New York 11%9
(631)283-3195 Town of Southold 75% Preservation (4 Farmsteads) 1000-95--11,2,31
Prepared by Matthew J Swain;19 July 2018 Suffolk County,New York Total Acreage 146 48
www.PeconicLaodTn torg
+.n.n,wrNNN['wnry NealPmperry Taz 1e A-,NYSt.11Lrvin1.,,reMn.tiwm.cLrt'11N1.1f.1�n��.Im,�maP.�nmmmrP(.xP.I:ENCn.11Vti FAU.NA NHt AI
4Wav It.N.KaNrur NL UrArwwatiomy F'vi lam.AfFT4 bi tTim Ii1wR KonNl..ww.aPu\IaPmY�u.«.f^aNrmH\IaP wnmW ate,me Me t:I51;,.r t ommwry
AUG 1 6 2018
Southold Town
Planning Board
(1)UNAUTHORIZED ALTERATION OR ADDITION TO THIS SURVEY IS A VIOLATION OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.(2)DISTANCES SHOWN HEREON FROM PROPERTY ONES TO EXISTING STRUCTURES ARE FOR A SPECIFIC PURPOSE AND ARE NOT TO BE USED TO ESTABUSH PROPERTY LINES OR FOR ERECTION OF FENCES.(3)COPIES OF THIS SURVEY MAP NOT BEARING THE LAND SURVEYOR'S INKED SEAL OR EMBOSSED SEAL SHALL
INDICATED HERECN SHALL RUN ONLY TO THE PERSON FOR WHOM THE SURVEY IS PPEPARED AND ON HIS BEHALF TO THE TITLE COMPANY,GOVERNMENTAL AGENCY AND LENDING INSTITUTION LISTED HEREON,AND TO THE ASSIGNEES OF THE LENDING INSTITUTION.CERTIFICATIONS ARE NOT TRANSFERABLE TO ADDITIONAL INSTITUTIONS OR SUBSEQUENT OWNERS, (5)THE LOCATION OF WELLS(W),SEPTIC TANKS(ST)@ CESSPOOLS(CP)SHOWN HEREON ARE FROM FIELD OBSERVATIONS AND ERED TO 13E A VOR DATAAUD OBTAINED Y. 4FROM ROTTHERS�
DUCK PONE)RD
400 Ostrander Avenue, Riverhead, New York 11101
ti tel. 631.?2'1.2303 fax. 631.'72?.0144
admin@youngengineering.com
Ta lie
r 4 4
/ CERTAIN AREAS s -U)
qLVgNE Howard W. Young, Land Surveyor
inn o Thomas G. Wolpert, Professional Engineer
o Douglas E. Adams, Professional Engineer
o S'G•rM o Robert G. Tost, Architect
SLOPES 15/ 4 GREATER S.C.T.M. NO. N to Robert Stromski, Architect
SUflpobebQl�,IS _ u PARCEL # GEHA WOODS LANWARI7 OF GEHA 1000-14-03-4.1 S•c TM oo_9S-ol_✓l
Co• F/eG e/ber„ / I PARCEL 1 O ACRE O ACRE O ACRE S.C. No logo,
PARCEL 2 O ACRE O ACRE O ACRE T Al No 9$'0/`2
\ 4 I PARCEL 3 O ACRE 1.8780 ACRES 0.1406 ACRE Sc /000, CERTAIN AREAS
/ „R S✓baLot / A� I PARCEL 4 4.0365 ACRES 12.2811 ACRES 1.0504 ACRES TM NO
/00o-
o q$-0
S�f f ert Sc�oh N-&-:
�h i
0 o,q�,o a TOTAL AREA = 146.4846 ACRES
3,4 2
w /l ) so\ss✓ o )'lie V(=, /ber„ i uj U 4
S44° 074 �$o N��' p' = 5LOPE5 15% 4 GREATER LANWARD OF GEHA eu
U) A
• /� �1\,l/ \Oo� / �� `�0 CO6� OWNERS 4 SUFF. CO. TAX MAP DES I GNATI ON5
/�, �' I LOWERRE PARTNERS LP
,. f� 605 THIRD AVENUE, FL 54
NEW YORK, NEW YORK 10158
// ✓,o, � o ` 1000-ci4-03-4.1
/ N I rn C
s\ a �8�� /, ��/ LOWERRE PARTNERS LP
605 THIRD AVENUE, FL 54
l _ / \ sD0 Svb Sloe _ Ot NEW YORK, NEW YORK 10158 1000-14-03-4.2
// / I / I S�f� C R b4 t
610 o Town o� o dile er Schr
South ' l/o er
So No e/b LOWERRE PARTNERS LP
I II I / ld 74 605 THIRD AVENUE, FL 34 1000-15-OI-I.I
%
KEY MAP NEW YORK, NEW YORK 10158
/ r► 40 F nt �/ SCALE: I"=I,000'
O / /��% _ \ 9htg� / LITTLE BEAR REALTY, INC.
tr
ry � 1 � /
605 THIRD AVENUE, FL 34 1000-a5-OI-2
NEW YORK, NEW YORK 10158
WOOD \ \� % Ct,�nV - I `\7/-p0, ,S�bq(lVISICot
l l LITTLE BEAR REALTY INC.
l j -; Q bid , \ ✓ \- _ i A�D Flf�O _ I /45.62, \,` Cobert s n _ / 605 THIRD AVENUE, FL 34
Q \ -_� N ry I \, chre/b I NEW YORK, NEW YORK 10158 1000-15-OI-3.1
ry
,Zv l / ,�/l \ \ \ -\ li 56° i N \ - \ \ ��0�) \S44° \-, r- �, ; CERTIFICATION
CO / / T- , -� \ P _ X24 \ �rH, _ ENGINEER'S CERT
y- , ✓ \ - \ ✓ U - CSO O�� ;1_._�_ _ .,L . 1, .i J i _ Il r opng A oml
0 0 /f"l l /i 2S, \ � \ v r ; cCF- \ FOS $ � \` ' _.........._.._<.,._ ..,_.'
J(Do,- / //// o /\I L / o / N4 0 \` �II • I HEREBY CERTIFY THAT THE WATER 5UPPLY(5) AND/OR 5EWASE
— _60� 'u o 46 / tiE AUu 1 6 ZOi8 i_.,�` DI5P05AL SYSTEM(S) FOR THI5 PROJECT WERE DESIGNED BY ME
Q o ( A W l "W '4i eQ Q/`1Ge/ 094'20' \ l37 OR UNDER MY DIRECTION. BASED UPON A GAREFU ROUGH
lzb \,3O _.._W STUDY OF THE SOIL, 51TE AND GROUNDWATER NOITIONS;A
/ C 4 I LOTS, AS PROPOSED, CONFORM TO THE 5uF LK COUNTY
4. l UCTI VATFD 4 FX/ST% 67$•0 00 \ `� I DEPARTMENT OF HEALTH SERVICES CONS UCTION STANDARDS I
;`!C: '.i
Z �EzD
Acre _W, - \
�� ���1/vF 5g5* pRESER�f� S i `
EFFECT AS OF THI5 DATE.
h \\ N43 ` 2,2so�p '��EA m i of oP l$87
�Q�3� °`- V% /;` �`�' PRO _ e \\ r< °�`$"00 �-- �� Mehr TYPICAL PLOT PLAN
Q ry m/ ;) �P FR _ \l \ W 1'8So11 V- p gREq
- / "�- /1) s o� eUl�OjNc i�l \ 5 77S Lot N ` �2 AC �p THOMAS G WOLPERT;Y.5. L.S. NO. 45893n
N.Y.S. P.E. NO. 61485
DOUSLA5 E. ADAMS, N.Y.5. P.E. NO. 80817
�'%/l� l / ��R ;:,,� •- '_ r \ � � � \ Co ie ion , u� m O PROPERTY LINE .
7/ S �� Rj/e s, / $/� s MIN
� - 'rom \ ) 40°o 40° m \ \ �4req �Grc — — No q 8 87" _ (p y WELL Z WELL
�� i RE ` _ ° o „ 4 cry SURI�EYOR S CERTIFICATION
m , l 4 FR . 0 I o xi�r/ e \ 1, \ r J ?p °�S$O N4 _ \ SS$ O m O
0 m // / �> 11 . 7/.l 8��� 0 0 1 '�� p o w - N l9- N
c I 'h i` \ 7 sT/� SFRtr 'gcr '717.q6,
o /'Y ss a 3°3 'n HOUSE $. HOUSE
ogxa-d-yoang
7 \ �Lp 40 FOA eg — — 7/7. /29, cp O 2 I HEREBY CERTIFY THAT ALL LOTS SHOWN ON THI5 PLAT COMPLY
�. fps „ �=/-: � c�' �• � � / \ 83 rL/ oopp R£q 46 II
�0ry 1r — \ \ NF A \ �� z
/ / // 4 D //\ I 4 / 8`39 9 \ N4 \ C �� N 54,200 � z WITH THE BUILDING ZONE ORDINANCE OF THE TOWN OF SOUTHOLD."
� /•6�, (Y \ '�6 8 O �'\ \ \ —55— — o�' O'• �o SEPTIC
/ I \�(n \ \ 4 `700 , \\ \ _ 5y. (n �\S��� 8$6 ST TANK "I HEREBY CERTIFY THAT THIS MAP WA5 MADE BY ACTUAL SURVEYS
o \ \ \ �NEY — _ '\ 42� J2cT2 0�" 0 2
LEACHING �'�' COMPLETED APRIL 3,2018 AND THAT ALL CONCRETE MONUMENTS 5HOWN
s ? �o S� \ qRD \ ''\ "29 9 LIP �� ��POOL THU5: C ACTUALLY EX15T AND THEIR POSITIONS ARE CORRECTLY
PO I o / Cp NTN. 3 `�� SH NNNGND ALL DIMENSIONAL AND SEODETIG DETAILS ARE
40 \ /
LEACHING
s 04 \ POOL
C'I
54 l
\ °o43p„ / I ROAD
IV
6cl AR \
co
� ° SUFFOLK COUNTY DEPARTMENT OF
HEALTH SERVICES GREAT RIVER, N.Y. HOWARD W. YOUNG, N. .5. L.S. NO. 45813
2g 23 q r S /i o /V4 o O to Dana�n
\,` os AC e 7/q o6 �� � U, now 39'40
\ n
N4o° �/ leve/ \ \ N Rl�hgra or erl I N DATE ------------- 5UR1lEY FOR
\ Ct nod' O 3 \ l4 00„ "try -4reO op�ent \ �N IQCh3 y I I ¢
\\ to To BQrry former $l6.27, /�f \ .S5j0°/4'0 l 3,�00o cr7Q FYgRD 4$ THIS IS TO GERTIIN THE TOFY THAT WNOFF SPOSED REALTY O D WI H A TOTAL HOF OR DE/ELOPMENT FOR
LOTTS AAS LONERRE FARTNERS L F 4
E `\ n o� ly YARD \ 0 e\ 54/°3 03 ITIES
MUST OVED ON T14E ABOVE DATE.GONFORM TO GONSTR rTION STANDARDSTER L IN SUPPLIES AND
AT THE TIME OF GON5C�-=DISPOSAL LTRUGTION SE STANDARDS.71+5
L I TTL BEAR R , LTY
N \\\ UthO/� / \ 94O� .� APPROVAL SHALL BE VALID ONLY IAND ARE SMJECT TO 5EPARATE F PERMITS
RE��A9UBDIVI51ON OR DEVELOPMENT MAP 15 /
De l44 1 0 - DULY FILED WITH THE COUNTY CLERK WITHIN ONE YEAR OF THIS DATE.CONSENT 15 HEREBY at Mattituck Town of Southold
7 2 /�'� m d O ® 61VEN FOR THE FILING OF TH15 MAP ON WHICH HIS ENDORSEMENT APPEARS IN THE ,
`D m OFFICE OF HE COUNTY CLERK IN ACCORDANCE WIH PROVISIONS OF THE PUBLIC HEALTH Buffo Ik County New York
\ Opmen�J a2$�J 0$ \\\ l44$S7, \\ 11)ry� ry' LAW AND THP SUFFOLK COUNTY SANITARY CODE. ,
Q\ ry 0
LOT LINE MODIFICATION
a \ I U) O WALTER DAwYDIAK,JR.,P.E.
a \ V/ DIRECTOR,DIVISION OF ENVIRONMENTAL QUALITY
LEGEND \, NFYARD FIELD SURVEY COMPLETED FEB. 06, 2018
—55---0) MAP PREPARED APR. 05, 201 a
CP = CONCRETE PAVEMENT � \
Record of Revisions
LP = SANITARY LEACHING POOL RECORD OF REVISIONS D,q�
ST = SEPTIC TANK \
PVT = PAVEMENT \ ' \\ \\60\ ecDO �� p �� PLANNING BOARD CERTIFICATIONy RI USDATA PGLS. JUL,�AR24 2018 i
FENCE Alk (n 0 °b Von.. uorog
n = EDGE OF CULTIVATION \ \ DTDR �U) THIS 15 TO CERTIFY THAT THIS LOT LINE MODIFICATION PLAN HAS
= EDGE OF WOODS/EVERGREENS \ P�.
= HEDGE/EVERGREENS \\ BEEN APPROVED BY THE PLANNING BOARD OF SOUTHOLD.
r TOPOGRAPHICAL DATA SHOWN HEREON OBTAINED FROM FIVE EASTERN TOWNS TOPOGRAPHIC \
r MAPS PREPARED FOR THIE COUNTY OF SUFFOLK. \
m DATE OF APPROVAL - __- BY________--
200 O 100 200 400 600
\ CHAI RPER50N
\
(TOWN OF SOUTHOLD PLANNING BOARD) Scale: I" = 200'
Lot. N 42°01'11.4'1
Long. W 0'12°31131.5" JOB NO. 016
= MONUMENT SET ®= MONUMENT FOUND A= STAKE 5E7 ®= STAKE FOUND \\\ la-001
O
DWG. 208-0016_Ilm I OF I �
(1)UNAUTHORIZED ALTERATION OR ADDITION TO THIS SURVEY 15 A MOLATION OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.(2)DISTANCES SHOVM HEREON FROM PROPERTY ONES TO EXISTING STRUCTURES ARE FOR A SPECIFIC PURPOSE AND ARE NOT TO BE USED TO ESTABLISH PROPERTY LINES OR FOR ERECTION OF FENCES.(3)COPIES OF THIS SURVEY MAP NOT BEARING THE LAND SURVEYORS INKED SEAL OR EMBOSSED SEAL SHALL NOT BE CONSIDERED TO BE A VAUD TRUE COPY.(4)CERTIFICATION
INDICATED HEREON SHALL RUN ONLY TO THE PERSON FOR WHOM THE SURVEY IS PREPARED AND ON HIS BEHALF TO THE TITLE COMPANY,GOVERNMENTAL AGENCY AND LENDING INSTITUTION LISTED HEREON.AND TO THE ASSIGNEES OF THE LENDING INSTITUTION.CERTIFICATIONS ARE NOT TRANSFERABLE TO ADDITIONAL INSTITUTIONS OR SUBSEQUENT OWNERS. (5)THE LOCATION OF WELLS(W).SEPTIC TANKS(ST)k CESSPOOLS(CP)SHOWN HEREON ARE FROM FIELD OBSERVATIONS AND OR DATA OBTAINED FROM OTHERS.
DUCK t'ON
400 Ostrander Avenue, Riverhead, New York IIQOI
tel. 631.12-I.2303 fax. 631.12-1.0144
odminl0youngengineering.com
TDW Howard W. Young, Land Surveyor
3�
S gLvgHs` Thomas G. Wolpert, Professional Engineer
Douglas E. Adams, Professlonal Engineer
Robert G. Tost, Architect
S
o er on - Robert Stromski, Architect
e °w
CERTAIN AREAS
Lot r A I
sub /
1
hi
ob�=r m 0No r,,, I i J > Q l TOT?�L ARE,4 = 146.4846 A(GRES
1'c0 I X44° p QOWNERS 4 SUFF. CO. TAX MAP DESIGNATIONS
�- Cl) Q° �� �/ / �(�_ / LOWERRE PARTNERS LP
���� \ i 605 THIRD AVENUE, FL 34
// , / " ,/ Sind/ NEW YORK, NEW YORK 10158 1000-014-05-4.1
`� � /i 4+t'/ i i r� �, / \ So° FIFA (S��Je �Isjon ,LOQ
4 LOWERRE PARTNERS LP
\.�,�/ (, ,, o ct to Suff Ro
l° ° R ii l /Q �� �� ( o+ II �� � TOwn of O F;le ert Schr 605 THIRD AVENUE, FL 54
O 1(� NEW YORK NEW YORK 10158
1107 erl, I000-Q4-03-4.2
LOWERRE PARTNERS LP
�T25' 605 THIRD AVENUE, FL 34 I000-a5-of-I.I
rr/n� f NEW YORK, NEW YORK 10158
:�� 30 � \ i i \ ,_ Agrt O� KEY MAP LITTLE BEAR REALTY, INC.
V / /;�/ I I 147/ Sub Lo SCALE: 1"=600' 605 THIRD AVENUE, FL 34
Z 1 �� I \_oo' d/vs� l / 1000-a5-01-2
% o a I \ \` Rod t On _ NEW YORK, NEW YORK 10158
�) 1328 8 °U�71V4 D II \' SChrelber„ i LITTLE BEAR REALTY, INC.
, AVENUE, FL 54
� wooOS /� NEW YO(505 RK, NEW YORK 1015e,
1►y < l / o S 1000-q5-OI-3.)
.�" qpSubdly Lot 1000_9$, _ \S-4.4.
4° 2'40"
°46$ „\\�� Foo�� S f f C I
° 2 3 _
�► 17` i / /,/ 2. ----60' ` i O
Are O' Flle �cluitle \
(� i ?N.- -- •�) \\ 6 0 �`. i 8 eq a 45 No• 918 s, Inc „ `373
0462 Acre, _ `1\ CP = CONCRETE PAVEMENT
CULT/� \�� _ PVT PAVEMENT
�'Z l / l 1/ 540 o I o q rE°FI£C � \ �5+ \
Q gAj 17
"k Q co �'(ry ,1 I ._ . �\ \ S4 - = FENCE
4,03 / q 9 - N4/°3 , \�� 3°45'0 = EDGE OFEWOODS/EVERGREENS
�Q 0 �/ R g/R _ � `14cJC 01 = HEDGE/EVERGREENS
tory m/ / i I R STORY Bu°i \�� \ K'1 773
Hous NG �4req `\NO. /00 X65+ 92'
0 m
.2 543° >
YgTj� Ss T 1� I /� \�� + �� \ Cre - ' 320 J 0 on TOPOGRAPHICAL DATA SHOWN HEREON OBTAINED FROM FIVE EASTERN TOWNS TOPOGRAPHIC
° 1 s / - MAPS PREPARED FOR THE COUNTY OF SUFFOLK.
I - 78 S - 4 0 0
4 -- 9• o ° m
�p N -` I � I 'S9 � 374 / -_ - __ 30 N4
/\ eq J600, i ' - ' 983' '-- 23' ------ 0 3 32,
(� ` 88?694`103` �) \` _ 6�� ---/ $0 - mss
(JI)
bS3 100"ley to
-\�, �`^e 4� \k0 54000 � �� S•C ��� r------- 7/75(6 \\I � $ 9'
pS \\ //��/' �OOSi j �\ j �CQ�� ,�- -9 �' TM No \\� \\��� / 1 Y `�4 °o ,
o 781 I 1 I 'Ar o + 50 SUR�(EYOR'S CERTIFICATION
eq 32 / 00"15 `• --- --55---,\ �.yo �\ Sg3°5 g5�'� °�+�•n '
WE HEREBY CERTIFY TO LOWERRE PARTNERS LP Sc
'Acre l - --� 4/9g8 43°32 29R �9, LOt I LITTLE BEAR REALTY, INC. THAT THIS SURVEY WAS
o q s
e PREPARED IN ACCORDANCE WITH THE CODE OF PRACTICE FOR
Subdivision - LAND SURVEYS ADOPTED BY THE NEW YORK STATE ASSOCIATION
DAGMT Equities, Inc.." OF PROFESSIONAL LAND SURVEYORS.
5uff. Co. File No. 9182
S
SCT 06' )\
es 39°20� (Su�Je M -60_
\' - be to
\ _ ve/ Coun
5uffo
05 9hts /,� m 45 I cn
\ \ �3 �Cre) , --_-- o3q�3, '�! HOWARD W. YOUNG, N.Y.S. L.S. NO. 458cI3
wO w
IV- /ch r
/y o
r
hs
J �t t 8Q,w or 35 540° �N 5URVEY FOR
\ \ o rohho Berme, / /6.�7 tiMeygRO \\ l4 00'� �ygRD Sa, 450 O
\ South' Qn ' 39'40, 0 ' LONERRE PARThlER5 LP I$ e
!3 d De / /447 - "� v 0 I' , LITTLE SEAR REALTY I SIG.
1
\,` prr�entJ X5905, /44$57, ry� 64 at Mattituck, Town of Southold
N \ Suffolk County, New York
a CERTAIN AREAS \\\ 5 \ �ReygR° \\--55- N� GERTII=IED SURREY
FIELD SURVEY COMPLETED FEB. 06, 2018
MAP PREPARED FEB. 22, 2018
SUFFOLK COUNTY SLOPES 15% d GREATER ``\ \ � CO 0 m0 Record of Revisions
TAX MAP NO. GENA WOODS LANWARD OF GEHA \`60 F�F�FR, e�° V 0' RECORD OF REVISIONS DATE
\ TgNk - m 0 � LATITUDE B LONGITUDE MAR. 2Q, 2018
1000-a4-03-4.1 1.037a ACRES 3.0164 ACRES 0.5308 ACRES \ �� MOTOR GEHA\TORO JUL. 05, 2018
1000-44-03-4.2 O ACRE O ACRE O ACRE \ �\ p� AREAS OF WOODS $ 15% SLOPES JUL. O6, 2018
1000-a5-OI- 1.1 OAO10 ACRE 2.8324 ACRES 0.03Q8 ACRE
1000-1i5-01-02 0.8132 ACRE 2.422Q ACRES 0.0441 ACRE \
1000-Q5-01-3.1
1.2844 ACRES 5.8882 ACRES 0.5765 ACRE 1 I II
- \ ..__..__.. ._. .._._......._ it
Lat. N 42'01'11.4" 1A ij. 1 C) CGi� i...d,`� 200 0 loo 200 400 600
= SLOPES 15% 8 GREATER LANWARD OF GEHA � Long. W 072°31'31.511 ,
\ i sr,_W..,..,,`�;r:;o�., I:...._._...__ EpI Scale: 111 = 2001
JOB NO. 2018-0016
O = MONUMENT SET ■= MONUMENT FOUND = STAKE SET ®= STAKE FOUND \ \\ DWG. 2008_0016_Gs
OFFICE LOCATION: " MAILING ADDRESS:
Town Hall Annex 'I P.O. Box 1179
54375 State Route 25 Southold, NY 11971
(cor.Main Rd. &Youngs Ave.)
Southold, NY Telephone: 631 765-1938
www.s outh of dt ownny.gov
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
September 27, 2018
Ms. Holly Sanford
Peconic Land Trust
296 Hampton Road
Southampton, NY 11968
Re: Lowerre Open Development Area Application
SCTM#1000-94.- 3-4.1 & 4.3 and 1000-95.-1-1.1, 2 & 3.1
4455, 4545, 5205 & 5855 Oregon Road, Mattituck Zoning District: R-80
Dear Ms. Sanford:
The Southold Town Planning Board has reviewed the above-referenced application for
the design of the Open Development Area, and has decided that no comments will be
provided until a complete application is submitted. To make the application complete,
submit a map entitled "Lowerre Open Development Area, Sketch Plan" that shows the
proposed design of the residential lots.
The Sketch Plan should clearly show the proposed lot configuration with all existing lot
lines shown with dashed lines and proposed lot lines shown with solid lines.
If you have any questions regarding the above, please do not hesitate to contact this
office at 631-765-1938.
Respectfully,
Erica Bufkins
Planner Trainee
Southold Town Planning Board Work Session — September 10 2018 — Page 3
Project Name: Mazzoni Standard Subdivision SCTM#: t 1000-13-2-8.2
Location: 500 Soundview Drive, approximately 782' to the north of NYS Route 25
and 256' to the east of Sound View Drive, Orient
Description: This proposal is for a standard subdivision of a 22.94 acre parcel into 5
lots where Lot 1 = 2.34 acres, Lot 2 = 1.78 acres, Lot 3 = 2.18 acres, Lot
4 = 0.56 acres, Lot 5 = 16.06 acres inclusive of a .97 acre right-of-way,
8.58 acres of Open Space and 6 acres of a Conservation Easement
held by the Peconic Land Trust (PLT) located in the R-80 Zoning
Vi District.
Conditional Sk
tionlSketch Approval
Action: Exten _
Attachments: None
Project Name: Lowerre & Little Bear Resubdivision and SCTM#:- 1000-94-3-4.1
ODA/Conservation Subdivision
Locat� lf tion:� The appeaon lication proposes
Mattituck
Descr �
p pplicatioo
p poses to resubdivide four lots, which include 146.5
acres in five tax parcels, into four new lots, preserve at least 75% of the
land for agriculture through a sale of development rights to Suffolk
F County, and allow a future conservation subdivision of up to 9 residential
4 lots, reducing the development yield by at least 75%.
The parcels are SCTM#s 1000-94.-3-4.1 (9.9 acres), 94-3-4.2 (26.1
acres of development rights sold land), 1000-95.-1-1.1 (32.1 acres), 95-
1-2 (33.4 acres) & 95-1-3.1 (45 acres).
As a result of this proposal, Parcel 1 will consist of 40 acres of preserved
agricultural land with a 3.7-acre development area, Parcel 2 will consist
of 27.3 acres of preserved agricultural land with a 1.9-acre development
area, Parcel 3 will consist of 26.1 acres of preserved agricultural land
with a 1.9-acre development area, and Parcel 4 will consist of 20 acres of
preserved agricultural land with a 25.7-acre Open Development Area
(meeting the 75/75 Conservation Subdivision requirements), designated
for development of up to 9 residential lots (including the existing house).
r The parcels are located on Oregon Road, +/- 900 feet east of Alvah's
Lane in Mattituck.
Status: New Application
Action: Introduction
Attachments: None
Discussion:
Draft Monthly Report for August
OFFICE LOCATION:' "' A AILING ADDRESS:
�k
Town Hall Annex �� '� � '� �� 6 P.O.Box 1179
54375 State Route 25 Southold, NY 11971
(cor. Main Rd. &Youngs Ave.) as
Southold, NY �� Telephone: 631 765-1938
" www.southoldtownny.gov
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
September 5, 2018
Ms. Holly Sanford
Peconic Land Trust
296 Hampton Road
Southampton, NY 11968
Re: Proposed Resubdivision and Open Development Area Application
for Lowerre Partners LP & Little Bear Reality
SCTM#1000-94.- 3-4.1 & 4.3 and 1000-95.-1-1.1, 2 & 3.1
4455, 4545, 5205 & 5855 Oregon Road, Mattituck Zoning District: R-80
Dear Ms. Sanford:
The Southold Town Planning Board has received the above-referenced application
submitted to the Planning Department on August 16, 2018. In order for the application
to be reviewed for completeness, you will need to submit a map entitled "Sketch Plan
for Lowerre & Little Bear Reality".
The Sketch Plan should clearly show the proposed lot design and configuration with all
existing lot lines shown with dashed lines and proposed lot lines shown with solid lines.
A Sketch Plan will be required prior to the application being accepted for review.
If you have any questions regarding the above, please do not hesitate to contact this
office at 631-765-1938.
Respectfully,
Erica Bufki'ns
Planner Trainee
PECONIC LAND TRUST
A _. .. ............
August 16, 2018
Southold Town Planning Department �Cµ�yaLkLATI&E>
Town Hall Annex Building .
54375 Routs 25
i�,IUG 1 (1 201
P.O. Box 1179 �
Southold, NY 11971
To Whom It May Concern,
The Peconic Land Trust is submitting this ODA application on behalf of Lowerre Partners LP
and Little Bear Realty, Inc. Please find attached the following application documents:
1. Cover letter which lists the materials submitted by the applicant and/or agent
2. Transactional Disclosure form
3. Subdivision (ODA) Application Form
4. Authorization Letter from the property owner(s) to enable the applicant to submit
information on their behalf regarding the re-subdivision and ODA application.
5. Copy of property Deeds & Easements for all involved properties
6. Proof the parcels meet the Lot Recognition standard in §280-9 Lot Recognition
7. LWRP Consistency Assessment Form
8. Part I Full Environmental Assessment Form (Long Form)
9. Application Fee— ($500 submitted with Lot Line Modification/Re-subdivision
application.
10. Twelve (12) copies of yield calculation for Conservation Subdivision (ODA)
11. Twelve (12) copies of an ERSAP survey showing existing conditions
12. Twelve (12) ERSAP Concept Plan with soil and topography.
13. Twelve (12) copies of the re-subdivision survey showing proposed lot line modification
14. Twelve (12) copies of concept plan showing the proposed parcel reconfiguration based
upon survey
15. Twelve (12) copies of concept ODA sketch plan showing the potential lot(s) based upon
survey with primary and secondary conservation area
Please do not hesitate to contact us should additional information be needed.
R: rds,
H 11 ord.
ProjManager
296 Hampton Road I PO Box 1776 1 Southampton, NY 11969 1 Phone: 631.233.3195 1 Fax: 631.283.0235
www.PeconicLandTrust.org
r y
..
►S+I UTHOLD rr� � fVi �wh�vu .I� �a �rl18 m
PLANNING
w wuwdcu9R
d Cowin
DEPARTMENT Rmnjtvb Buarc!
Subdivision Application Form - Sketch Approval
APPLICATION IS HEREBY MADE to the Town of Southold Planning Board for
SKETCH APPROVAL for the subdivision described herein.
1. Name of Subdivision LnpwtggL
1 Suffolk County Tax Map# � -`�' -3... M }coD � I" .I� Z t 3. 1
1 Type of Subdivision Standard [ ] Conservation [�]�
4. Hamlet pop—TT-1 I )C-K __.. _..
5. Street Address/
Project Location
6. Acreage of Site l w
T Proposed Yield m PYT141 m n nc nu.J� ?dj;,S#eL 9,
8, Number of Lots Proposed
9. Zoning District sc> .NNNNN__w
10. Date of Submission
IL Please provide the names, addresses and phone numbers for the following
people:
Applicant: C cxyi�c.LPrAv Thr
_-
Agent... l,w„a�,S1—
Sketch Plan Application Form
Property Owner(s): _.
WWX.. .... a. �...
Surveyor: 'ic7�+.�C� � �dc�Sl•
................�... ,,,
Engineer: L?LW.At, �� �............ ............
— �,
Attorney' .....: r
ltss u-P
rCS1_qR4)11Q
G04 ~
12. Has an application for subdivision ever been filed for this property? If so, please
indicate when and whether or not approval was granted by the Planning Board.
m.
13. Has a pre-submission conference been held with the Planning Board? If so, provide
date. �m "
14. Does the parcel(s) meet the Lot Recogiiitioii standard in Town Code §280-9 Lot
Recognition? Yes . No ll`"yes", explain how.
15. Has the owner/applicant met with Land Preservation? If so,provide
date.m. q. l( R .............................. .
16. Is any part of the property in agricultural use? If so, how many acres? ;z
17. Is there an existing or proposed sale of development rights on the property? A&
18. Does the owner own any adjacent properties? If so,please indicate the properties by
SCTM#. � _. �
19. Are there any building permits currently pending on this property? If yes, please
provide permit number(s). VJO
2
20. The site will be serviced by the following special districts or utility companies:
Fire District 1 �S
Post Office ..�� �. .-.....
School District
Water �(
21. Has the relevant Electric Utility Company been notified of the proposed subdivision? �
If so,please provide proof that service will be
provided.
22. Please h dicat:e the type of open space proposed and how it will be managed?
( b
23. Are there any existing structures on the property? If so, please indicate the type of
sstructures rein nn,be removed or altered?
t��b��°t�.�rc an its use(s).. Wi these .,
24. Based on the parcel yield and the affordable housing requirement of the Town Code,
how many Moderate Income Family Dwelling Units are proposed? If the number that
will be built is less than 20% of the yield,please indicate how you intend on satisfying
the requirement(see Town Code §240-10 B (2)(c) for options).
25. Application completed by [ ] owner [ ] agent 1,40ther
Signature of Preparer 1"fOl—l. Date 44,
3
Pleasenote: If ownership is held jointly or in partnership, each owner and/or partner must sign a
separate owner's endorsement. If the owner or owners are making the application,this
endorsement is not required,
OWNER'S ENDORSEMENT
STATE OF NEW YORK)ss:
COUNTY OF,NEW YORK
HOWARD B. PRESANT,
being duly sworn,deposes and says:
I am: (check one)
a part owner in fee; or
the sole owner in fee; or
an officer ofthe corporation which is the owner in fee of the premises
described in the foregoing application
I reside at: 11 Stonehenge Road
Mailing Address
Great Neck, New York 11023
1[am fet—/Post 0 ffi--c c i-Vi-I'J'age,
f have authorized the eco is Land Trust, Incorporated to make application to the Town
of Southold and/or to Suffolk County for consideration under their respective farmland
and open space protection programs,as described in the foregoing letter.
V.P. LITTLE BEAR REALTY, INC,
..........
711.-I eTrIZ Corporation
(if the owner is a corporation,please indicate the name of the corporation and the title of the corporate officer
whose signature appears above.)
4,L
Sworn before me this 2? day of_ /fr
2,01
01 St LO
ll a 1patmc,state of Now ywj4
rotary Ptlblic N&0 1 L06034923
Quafitiod in King,&touni,
CMUSiM Emits O&bw 24,W-9—
IE-/PlanninglrsocumermLVC,)wner's IFwndoirsmeint
Southold Planning a n
Applicant
Transactional Disclosure Form
The Town of Southold's Code of Ethics prohibits conflicts of interest on the part of town officers
and employees. The purpose of this form is to provide information which can alert the town of
possible conflicts of interest and allow it to take whatever action is necessary to avoid same.
Your Name:
Last, First, middle initial
unless you are applying in the name of someone else or other entity, such as a company. If so,
indicate the other person's or company's name.
Nature of Application: (Check all that apply)
Subdivision or Re-subdivision V/ Site Plan
�...............
Other(Please name other activity)
Do you personally(or through your company,spouse,sibling, parent or child)have a relationship with any officer or
employee of the Town of Southold? "Relationship includes by blood, marriage or business interest. "Business
interest"means a business, including a partnership, in which the town officer or employee has even a partial
ownership of(or employment by)a corporation in which the town officer or employee owns more than 5%of the
shares.
Yes No ti
If you answered"Yes"complete the balance of this form and date and sign where indicated.
Name of the person employed by the Town of Southold
Title or position of that person
Describe the relationship between yourself(the applicant)and the town officer or employee. Either check the
appropriate line A through D and/or describe in the space provided.
The town officer or employee or his or her souse,sibling, parent or child is(check all that apply):
.................................................
A.the owner of greater than 5%of the shares of the corporate stock of the applicant(when the
applicant is a corporation);
B.the legal or beneficial owner of any interest in a noncorporate entity(when the applicant is not
a corporation);
C.an officer,director, partner or employee of the applicant;or
-------------- D.the actual applicant
Description of Relationship:
Submitted this day of ,200�
Print Name k
Disclosure Form
�R�Iidldlml�f�XIV�^ff�if�YM�BtlV@Vd�i"OlaJwdwieuurerWorwwwww.^eaw mm ^m w .. ,.oma .,. ...,,_..„..,..,.
—�^�-^.�.�+*axuomw�w rwrww„ o�nlrv'�w�awwTww�v�ww.wauw�uWMumulllUwrof@r
� U
u
a uu
Son � Bi� IIIVV9'IIHd��lll�l Vllflllllll�fU @ �
tuiu or ruolre>Ixlwiu� hl
( ��iZPllC:u�rYWMrvWlWtnWYI� 6' AMI!✓1µsr�f�Jywtrwuie{HAd�p^wpt.Vtiw�NlRNvnwUx�rUaurmwiwmYti"�o"waYA....,
IiIW ANS
i�;-.a.rr✓mr n am.w� avwaw�wa�n �wwrQae.^n^ w�wmaf�j g IIUt VII�V§U�^�61'�� �!m Wn�bwakJ@SII
ww�� uwwio
'Am CO
w
mwuuwwww'wwwuwuwuu�u xluum�rmu'li ' wwua i ii�ouwwa
Moll
I��llli
Mro rouuuumwuwl iuwwuwuuuw iruwwwnuvu iolumnaMor�mnn -uiuuwW�wu�ww
olmmw muuuiwwwuuluNw�mm00000m�mumuw�ulmioioimmmuuwnwwum,lnwwu�wwww,wlluuu�u��i muuuw u��i
uwuvwirl
g
�' " �ro
Wt Awa .aim 1'w Rub K wmmmuumu uummi��wu�mmimiw!w��mm�miu �
2, AW&Wdut
at
w� �wwva � � naluwmmmuww ..rim��m� w
w �
'� Im'ww�.nrvmmmm n� d^Nwri�wd�mx lN�wWWY
rp m TAX M �irvuwuwiWWW uWY
Cum � '. M uuuumw M4 DW:
W�'�99�wUu YWwwwmmy
'
m umnnWwmmmry W°w�mu�uwitoNadn � r u¢wa
9'u'�l ww'wwwmwWW� :w.www 'w�mwwuww'w,w:w �lu�tl '�'B iWW w,
cr
mly
Ate,Cw
h"I wb� � � � I"f mm M a min
�w'WnYNioo
I
IL
u�� w. w�mwuw
m ww mum rrr wnotow NXI oo m�ouwwuuu uu w m io
ov^rlrlrlr poi -
mlu �
uuuuuw���wl �
W uV to a IIII a uu„i �'' I� aNams
w'f�p n oowl^ muol do m mm�Vmw o u
uuWWWumi n ��� uW��ww,nwwiu�w� m� wu o w�w�Ww iw a —pq� oimwm �ww��wwtwwn w wwW�����u u� i aaU o^i uiowow�u�uuwo w,w,t
�i SIB”
is^vmow�vaMrs�mmnaoinnimr�rero�v wu �Nl v ^ mn^mumviU�mm¢amU www�muw�miub�ni�omtt�a^mmummma^W�i
MAIC F
Vo iiV r�i�''ue
�IIV �
�W�WUUWWr�m^m^wwm+uuW.w.�aa
i � IV
iiuVu.. y., d��rrmWaw, mmvwwwa ��nR�W'w'�:mmim � wo�wmmroWo�mmim�rw o,v�u
ds Mw wuue
imoom�muuWm iwmwwiar�ro�.uumwiiwww„�,ruwu�w n�iwwuvw,7ouomuuuuiuimouuur «i�uoulwovl i �miommwo vuwrwoimr^ �uulmuwi��ul nom^ �uw;um�mrcoiommi�immrw�au
i
TMA
wuu uInIN°ou ��urlUfwuywuiUWwW'a�wulu� IIIIIIL�roiUl�wuwwluu Imllllaulm^mlmmmnnnmmllUfamiUm�muIWN a
� uwV��ullluf UU�q
Imp ftm pul of04��olI �W---W� ��� � � �
w'a uw. „ww��owu����,wWo,w ,.a,wwuu N m
r
N '
L
Ilk, ° " �wwwoa� www �w w�Ww���� w^ � � "� �&���'",d���
I
................�_____. _�.,...... ,_.,..,,. .,.._, -,»m. ,_.........�.�...,....,_.........
_....�.,s.._.�, .....—U040 »,.,,��, �„�.., ..�..
4 I1, % 6 Im 'f, 1V"11111111 603or rl'Moe." i 11kam�
ImrimiAvirva irtopso iili�mVia l u t" file Immumplittlealom WAGIVAAWras"W.
N�O
1IN21""Ats my 1:1 31 a
lu
Third nue, R NY 10017
WIT9=31%Um 00 palsy W qko 11SWI Ip Rml, "01101,4110) 0 Tin Wou'll sad Wboll VW494cm.
alliin Itm puly lot m aid PAI°ll,dm hsby Irsol mW scimo amn,tko pagil of Via mtow,
Id hobo Rod U,1*14 W 140 pmNp d 1114 4%xN ]Iml(mi"Im
ALL them arWA*
r or � � f � 4 11alwhV�law m'up"mRm ms
.IVmbd Tib PUCLOU1491y, met facth an fictioduls
Issr9to and mil a part Ihoreog,
86011; Is, tick e resitsm CoRmmd to the � °' this 91ret rt
MAY II fm Oman � '1910 4i ° 8821
page 215,
0114 KAJ 1AW19111i H Lfty W*2 paRlpsl 69 Om earn all,11 m y plilqu
low w4da simil1W dibmio 4m U)Fmalkel$4 IN vommR "Is(44101uh T043aI mU "vkOW 144P;01«
to"m4A1rc l SJOIJ 14 an 0444 said 1 mlI�W Of 00PANY I ml.ld m mr40 W GAMS t 'FIRM �nelr mU TO KAVU AND
mTO Auto tkil 'mkoski faII" i dw pie 04 RW mand,mllmst,�W b0m pumimiss m and seal s
Rom 1%pity k&f Mir MA pu 1444tim
mW arlP m 4� �ui� eRi w
� Rm m flm fell jam has 4 I 'I tR4 11 saphlal
D 04 Ch 4md' s hvill� 4 �m���aRr � �Il ��1�� 441 �a I�� mR4 Im p
� i0 $,$fly d m s 141mIp lm�m R' � m�4 M ittw 13 01914 Ult's mm 014joeums iksl tka Putt f
111441 I'm main rclip'sho 11,1f"10fitcka too 4R irR , Rwr Ian"14 W Los 0#11 to I IS lin �
1m e R mrrw, I4O"d m III I���R�m� mIr leg f pug 01 PIAM1 00 11041 at O'st l sprot mwV and rM
PPIJ AID ICU CI m 10 4t,@ j y%6 .gj m m W 11i W9111"44"m Wfors Wal AII'R '4m 01 OW 1 m4
64134 fal�Any VW90011fi
m ' 0411191 UK$X011M 611,11"Wed "dud ym oem sw vis
5
*#elf
IOI�OUPo ,w ow,wrc... �
�i mow rima��
I
a
....................."....................
STATIVINSOTM,90UPIVY00 W411,641111 k0s i"In'NOW T011014 WUM of
omavao Im uref, Ontober 199 7 111 IV A11114*um, 0,3 0 1* del i W�vkol ONO
plow"mid"'It"WTVA
to,Ros lk"Ro'N'm to 1 11116 its pwua lhtwolm W(m Cho OrWHAld Al vd, Vim
am'dolood glom A........pqpA'h%"@ ipMe"Ammmool, mrd I'll as az"A#p�'4 lihn, dmo
—04�&I
STATI,so MM lair. ft ITATS or paw TOM C*Qffrvl of
om oil WIC M m on ths W 11119 0 M114
C
W
q'imma
'4 be
rMikom 19 1111*mig"k 01 OWM WA W%�,Odj 149MARIA, l
my ON ho I �il Wtv Wtv, by tin
ftt IN b sin his';U001,211
lilt to kml of
In Wd
km"S tin W to dirocghw Iml
smarm
"W WfummA 11M4 I'll" su WUM4, was 1"'Adal 444 S&W
smas'd emaht"of m1mc KIWI I IN old,141ramo
Q6;;; imfol,
81 a," now dim, mr"AW,is ft"W" %A
AW ASM CW.
1$ 106 WN=
WIN M I"ifix
ING em
1111��IJJRWM
11111181111WO Jd&"moo JWNWlR1kj*11"$'MN'Aft
of By MAU 110
9IM4 110 Jilr* RAW*Ihom ivo uou o"Amnift
IWWAicld 11), P'Ves4ink, xg4�11'
MAN, o(Alutow & ovam"uW1 IRW
M l jk'veirtulo
IN Luolll?
immomommoo
. M�. .... ... _._. ,, _..w wwww ..... ...�..... „
Obblii "f � R
�e•^N'A'NwawxtlRN'AMwMO U4 i4WNM W'MV&WM`a'WrrrvHm'gUUWUU wMC.uIJl dean Por ,.m ,Mrvrw➢O',Mb.P i Ae gI0A o+t
[v�c.o ,.yr n.E nr is ani u w al+sw7'Iem rar mewsw AAo arc
u, lath t �t a 4 �" M� IAp h USG
341a 3 Lar mo 116 243 drsolked, Mudtvogloo and
411 south "
stag 0 n r all tolI
� south a `
to be U114VU44 arktitle ° 'v , laid
palint of ' I an the h u a of S o
w aphi � r Po � the
scrob �u�
Il v Logo o" bellowing also
h *Cave
mat
Ue rah IAds of M on
1044 er all' buck 10441 u 1 ee
n 16114 a formerly 0I 9101; M
the a e 401M,144 4,11,10110601 ( ) � 1141 , 00,
t, ,447, I ill March 400' 01111 1m� ua ial 1,330,06
114011 (3) venh 4611 OP 001 Wast, � 4Ihl flat his aV F
'dad 11Max aJ as ' Sad � �� aAM gla A SOS a" bis
Vorth 04
U � .57 feet ivd now or gamerilly, of, snarl 4,2011ifillp
thSAGO 0414 11afla'aaw a 101morly, of Mr, ftith 41, 301
40, illX100,47 94101SMAIlLng thene'slira b of ttw
o tV U9C 0 ( ) 6011th 140
000 301 Wept, X73*00 pasta 10) 4outh 411"39, 0011 Mot, 400.03
list, on MIMI 141=116 along thill;
Sidesof �a� lo aid gal
inksom a Wi 441 , ��" ' a O 000.00 t � � Scoth 511
401 00 HIMN L35 feet to ths poLat or plea# ViGINNIMM
m � °
M
P
IAV ir.
ar tl N +
�W u 9 e n x. Pomi m
@a W W
m u.
P
l
PFCORDEn
All
24 1W I
Moran of j 17
IPI ' 1� �.
0o40om�� oI�� ��, ROMAINE
r14 ' OLS
' mmt
Ift CM05083
m
�io�wwrmmum�mu uwsuuuoiR¢�rrmw�mm�wumnm u��n�oo�ur�orn��wua wuimo�romo�roNn�o�rmoiwuwo�owmm�.uro,�nimwrvi iwoimuw�wmr�mim�owuowmowem�oMoio� wwr�����mrmimwr�,amu�mmm�rmr �o ww owmv�w„ama�
m�u......nwmm�rowvercu mum. uoims�wxu�u�.oivawmnu � �w�mw�w�w�oms��uw��erorom�w,wmNio�urv%mmwuwam� mm: -.. �ww�nuuw,�wu^�r��� uruw�w.w.wmm�oww��m�mmi �wusysvuauwwmmm��asr�romo��r.
U,�vXWum'18tdbftp mwsi#gp�pono���! oorvwm'�wunm nww owmmW�ooww�:00000ul01NN0om�e�mc000vmiwwuu� oo moo u�uWwwww p�ww aq�o �w�wrvni�w.aaw�ipuawWOWUIIWW',NW��W Oim�u�4'u4PPo@...
IPwFq mn n�kmmo mw.wdxo W+ww.mmmi �ng �wMpw
Awwmw�wwm'mw+wwuiwm' awpmw.rn
wdlM'�'mmimMlYmil m�maw Mw O�wIU 11111111141'& �'mm xwbrmmmnwwwnw "maim.
131, A
Ut O n
M'1 ISMS
ItRUA, Mi,IMM,TAX
N �I nn
110'ad, mmm Mfg
b
13,
CI III
Will r 1OV641 by a 403 w two
� n mmmmuuuouuummiW I� � �`
Oki
GRAND TOTAL A I �
lM"INIVttf&'—Olf"@YNimiMm iwumup Ift Scam m" I 10�lp uliPolgiUl0101NJ�PGVmM^+WAh44;2tnNl�nNtdt�.
immNuiemV�9mrrrnmiw,+�wdaiw�mi �eau�nowr+� nu�uuw�rc,.... w�mw.+n�wwanu�.wsi mhdm7�
W��u uo umm�en�i �
Ad MGkM5hY MrNlf ouimfi4➢ 'mmm'bbW"NI�UFmm-r'JJ ro 'm
„mn o rvw U! no unry u4 W u mI
� o mmmP Mw mll Huai wlluu uof�@ arrp uemmm mPi mrvmono vm�mm nl(l 'nMq fi'mmM+vr1F �bommmwremmm'�iV�luW'w'uWUV+'w.�M �'mmm!'W�m�'��o�.waOotiY Mf+awm.w.w�.w,wY
finmP �mri;Ma+k!+waR�GYu7i.0.7�u�981�mr,�W�d..tWriYU�uu�N,bi,�ir��y,�'�p,�yrmid�r�ur u,�r�u'��ltumivprnWrel�ifi NrJ+mr�Y�m,�+g�j�r �.+'mi n
+me�Su1mfv r, w,�y.r,�umnn.wm��b'+d��nrvrwrwuun n.nna�mmi�nun�w,wumor�ai�,al�uuaw<m�urvmtirt�eve
nem tir PA 4Y
nv�rD ���ru�u�a
Call he in � v � �I� m�nM��II' §0111111111111, �nm
" manc a A,
'fro If d1flaputO
u
H
oeMit SO
IN ADDRM.
mill MOIN
nmtew�fl. ,m,,rrsn+�r uawuTam iumunu �nr<um'm cnrw r m^ � vx n.�m.;vwnmmaurm ria uammum ma uaum ummrnmrtm mr e mwm r�auou nor wrummrnummun+rArr avrunupi..urcau rap no wa�arrm'maa�nngff"
Eilidorserne
4.4 tiUW IIIlli oil'"
Y�rvtPm, / rm�'i1UFf�h1Yb5WMM14Y�v�4�Miuu£'WNJW nfgYS'R VrvfmpWdNrrnT✓JAmmom�A6N�9P,mW ru�wa4 bO NMNWAUR"M F�w.tlxw wnA'apr�UMCbUW!am mvT9tiY f �IWUW�m rs✓M6A.
AP�i�%'Jm^lb muWl�l9N�W/ mamrrd ndmewxuewwwm6fr�U.W JNf�ry�(>ydMt
l nawle br,
MY Ir",a OF 1018 Ili RIw6
'Its pxmba he"I"is pbruml i
P n �IIR,Ma OURm w m
—J,
Ill
Ill the VILLAIM
n.i�mmw� ................................ OPoarmm mm'm'moowwm-:wm�rWpadW�ymwWn WImp W'W � " I�L�,pIry�„„,wr�m uomwwoupwmeui
&WU mlllmu�md�ll'uW�tl reurvMww�mmµpmw
mm s"jutu 9 mus, vii SII wK onyi
Obi IUImNNIUUUIInIul0li �NOInnYNWwWI�MIOiUIWi.IUm�UIW �IWWG�m iq
m� mWw'm��m�clNrorNNYwp�wmwiwmw�wumm �mwwu�u*mnry
IN 1I M mph m � �whItomm Now
TwWommmuision
* 7 t bi w
CSW Mao IGN&JAm's at, 66 ,5SAINVIM Ala., ' 3 my, all
to an ndbf*4 113rd fists,"styULTES J1, RM 'x4 AWIMS " ncMLqj
at 3 rA , t 11447 i %, BVI 116th ,
MAMIx w 'i hauslobvid W.0 It, I00, o
t* 01 UNUVA"d I1163h o and COM CAMD, 99SMIAN Ot 69 helones An.,
Wiltboal, UT, as to so U04tirld,141140 Sagoft,5111
AM 1 W "
tv o auk 'u ' 4IN � 10017,
W
Pitt
4
E=441
is
Von 904t ft, flon, Swio tab,
0 At' 4 Plist 05 tib a '� 01' WSPU ftW s Asn
aste"ted by ku Mide of 14314 ftw at lamdp of Amn, Uvikes'MI
IMUM IMM, 04*4 549A 1AU* Wth 410 "1 W Vast 42J61,1YO jggg ,'
1 j
601 US 2mg, ftrith W I' Ir Cast #6.23 i1mat tAp
of `ash 314ANGM, 16"Mrly ROW& Wkervil }
dtat=81al
4th 4 "1 SS, IV 9489, 144,40 rilotj
kath 421, 46, 04 mat SUM lem
713,14 Restj
w ", 4,30 twt,717444 IIsul
Iftsib 4311, 72, Lut 432.39tosiza
7) both 42* W, bat 0.601 Radit to 1 7 Iu � T i�,
TREM alacts tbe sculpmeafty Me cliongn,kaoto , W On% A7. 7
14"Atu to, ON plat of plea of INIM114o
Wim An INI ' 'TO 7 uu AKA dirmyst to ON palt"? 7 ths first put
1py pead AMA July Up IM, awl to the Nuffoikmi o W on
19, It", 14 Libor M11 at 114p 494,
i I1ow ��. di 11111, OIL wa 0 ' vW 4 Ir,
T011307111011W10111 0I��1h Ord Luton,11 ,01 "fly t��� 7�� it 1 1 � u a,u
WI
414 NIMN bbl obw lu u 7 � �u� � � � a �4�� � � �
wad 47 ���
HOW) � f oo�� �ls'd pmt I7 , !fir W &Mod 14110 64 DO,allivor 's ASW Aulva
01i�l�l i of the WwW pug fawtlsv a.
AND
� � - ^�I�rlu� II u� Ii�n�i Iiliu � M
�, 1vieWoiu� �� �
ap WAN i' I Opti �la Aar
% fml7�l
�V pp,,pG� Mm II �W IN1I F lu u�II .I 7 „SII ��
amw
aw wit o III
IMS I 49 1110 Dd 1611 Ulu „� ru
lit ton 4we
p, Wmuvu� awWWVlbm
mwmrww�µ., � 4W
�.awwwggwomlW�Wuwwlm�mml �.ire;�w;uuw�auureuuw��mn
ISop MW
M "y 00, fdfttk all
Do 60 Mb d MZ f' Awns to 917 Wir"m
to " &WO 4ukms 4, owmaks
ftfou 1. Snob Wm amf%fso Uttar we lowask,
w oil i to ba [ W I ft bRAITWwo 44101w, woo
1AMMOVA, MW imim"Wow dot
ohm WA Imm
a
van 'so 61MU 00 'Iar
lbs Ay 164 to .% On k &V m 19 Won
V
aw
W "%Idw 1kirm
my 1410*01
Ito, Im boo
id, All ho kom
t on t loo
imlpmtt VW dw It In to 010Wi, tow awc,714 VAAAM Well Susi I'm
u
�0
BROWN
ar � Uu" MUIUL-Moulm =Iwo
V. OMM, PAMA it. VAM, MIA
lug
WOW
MA U'
ar
'QUI SSM WV MAX ft
ml f� ��
0 to
F
�Now�� 1111@arar lmi Vo� 4"
�mei lI ' ��'M1 ifii�'iidl'arY�Y�; 'd'idl im��miw���m�w�amr�mam�m"ma",wiw�uwmww.wmuwmur��owo�m�owoua"w�uw�raim,�w�;ro�mnumu�ramurio�u �u�v�ontii�wv�
rtvD�uaw,a+ Wlpwwr;�,Nfva�vdrr�,p'INIGIW'MrtoWaM1w�Gla 4"�.N�10"Uu�!gNNJUWOi�ftll'J� ��i�u',�PoONOiNVGtlI001:zWupyvN�v''D��NIOiPI mmm mrvmm�mam rup;n�uluNWW,uNN�go�Nl�^�I''��'u'9iA;sAvw;f¢ vh1CMc�0iN�ld�'d'aua'i xxonmmWvnav�rvrtmu�m!fi;,ma�Jl!a� u'll'a ="f�wiYMUOt�rowNONetW emu
(I
ll�
O I
� S
mOnrWrnmmma��+�ww, +»'.,�...�..,.,.A•. —..,—a...w. .... w-w.•....�...w—w��.��.w.,.w�w w.aaiiiiwrvw�,wxwirviMmm4wiww�mmiiiiwMyuu+umnpYllNiWPnY�APoPo. I I.
06100 RI
11809267
"'RUNS sto 17 11,97 axamm NNS h
NONWi � � � � IIII
Nn� nNNnnIN N ��
MIBNM�N X01111111111 �INnnnnnllluuuu�i N � ANO 111111.
�m
��� 'imam��� � i �uwam�wmmn�wrouM ��uxa�Notiw�umm
MAI
1.mulm To
^' uw ww,wNry m�wN�' m numm..
Oil
MM TAX
V4111 TM
�m
I �amumw m.
�m rw w,.www m �
`'
II !N =11.N'MUNiwwal Nk
Will
1I�
uouVuumolNUNN00000umvl Nw�NuwwwuuuwmN IIUOI
"?In,
NIVIiVUI�DWWW OVNNNiuINON0110NgW
ISO Imniummmommo
Lammmu°
NVwn'nmwow wvwwwmmrNW NAiN!�w MUN �� nen UN�W I �
MI11
'[
v ''n nw✓u�Nwmowuow.�mNNnma iNNogremomNwwwwwo� �� orNp9�rowv��W,W,N wNwNwww,m ;'�"wuawmmdNaniwmmFrxwwrn'rww u I �i�m��u�.w.avuaamNwn'a'ww.0
o. ACV w VWU m'b'O'JWW,n,V��tlPB101GMNIVLIIIIUU'� Ifk Ilpm"M=m1�l0lIN NIIW
cul
VIII e
DID
�a
m
� �mnm
IUI �� �,I'I �� IVIi�I'iN � k''!illfl ^u'WNfW � NpWWdYUN'�N�VIM1 � ��U1�yryN�Wf IU1V�ItlGINtliCYOtlG'�6Vlf'rv'
mreui ^N V,�
�mm NiNi Ilii am�I�NeG`w !'�Nmm'bs Ymn�ulN�owl� lrtrlr!�!wttw�u�,iiwuvu,�u�wef¢re�lxumux'!UI��'IPmmtiNav��l�ow ro N ��4�I P I a
� I11WIuuNNNIi,NIN1INIYNnfiNhl fNih»a+Wwwo„�OUNNNa�dWntivWltP
Palo 1Iwm P10A Of 010 UMOMW
wa:a»mwwwa';aa k!SLo m rw.rmmmuw o� m� mmmmnio� lrv�w�xomn'N �wax'iw'Na«Nmm ''I
IIMpmbuIII�IIVVIV'� tt�FN�
W�III�"H'I'CIA � m
un�mio �,�uwmNm�aami ua'pm a6ruvwm�,wrm ��umvm m,Nvnromnnma'um-� MN 'ma
m
w
m � mmlim'� �mm�� ��� VI mo a��m�a'Fa� gum �iw omwwwmwwxMa +ammm n;m»rcum
N �N�
lit ft
jm o �vl Po
w1iAfMLffof—&:k+i�4
:f1j cliff
i I
0
WIG INOMTUM.MM*0% q*W d SWAMWi0
, IrMn IN
HW", BWMV,
Lmns eon m wa.a omwo copmomooa
IMl Allow,No Yok
IY ow, pady Id the orst OwL in Omweeft 01 To DORAM Ow Mfw
Owl 00
Vis
ALL ft 400 PWI.AN of p"144 WA11 1
WU
l a POPA Mi lhto w0mlate
1
1
7745 1w as Mmum n4oft *vVON is f:j OMM Road IMM Ah,*Mt
, I t
he panhwsmoy 1,W d
at fwmtO al Am HStar,
l l mulland left the foftw4l,.
(t) Nft 1110 ftees so ftWes 1
a IMMU 110 Mlwde WNW,MM f"t
( ) a 717. W
( ) Nam 32 divm So MUM is wool W"L Ma 1W11
O, 31 degreu1 M
fift of LCAO I i a surveyOu"pre Wed
MM
THUCE 411"UM Woh walst 1104 ef L"bland Ooft ths go Wo d wfth is N
ftafm 42'Rod" 10 80MOM avg.45139to I
Aito C4 1,
Dl&1*V uW list mrUjonsd W the 1 ry,
(1) Wh 9 OOMS 4 MMOBiu 10 Uolids Ent, 1.264.60 lool;
(3) 9wh 33 ftofw M t. 11471
ulMInUtill
, a l
1110 Of OMW AM 61 Ow pc1M w plan al P'I'E T
ALL ft csftO PK FW4 of M=1 104 WO, 1091OW vAh Ove i � end
b
a
Mo 6AIWAV&P of ACWr$11M9 of Now
IInc."140 In to Suffolk CMM,GI&M,
It"a map 091M V#&h low M Is mm,OWWA441 bmidad&M ftsvibW as
1 w cold p*j
114"In"lo Map;
UI
I 14 I"r
RUNNINGNCEWast,
RUNMNQ THINCR NoM 0 dopas 42 i1wes so swaWs OW,924.119 lo.,
RUNNINGTHFINIDE oto 344AS:1W to ft
�I the s0d of 0,M of DEOINNNS.
p"Mis"an rM le"'w"wo by a*wt HMO r"w*GS
Me P"d iho 11111
WMIMOUS owiwl CAI to 40 118 lM
GGING ANO IWIN040 1 I0Iwi� Q I
l , In Ubw
1009THER'WITH all dqN, 01I VW,I $,
t 10 OA,04MISr Am th&W�
dwrlowim em all the et 1 ft
Port�A WWI to the said pi=Waic TO HAVE ID TO,HOLD ths uldI
MIS 1110AM4 W,f f,
MO the ths Pon wwwwts that to I I Or
,
� wAmy ,
MD the wAy al ft 11
(hit th'I PAY 0 I fiffi'Rd vA11 MINI,ft Mlldnftn f )
hod to fmftl 4wh 0"ftolka as a tMal IvM W tM 8(414d t
W,boare Uft any pall of I'w tol let the
' any chal ?
furs 40 Mqwr#&
01 WMfM MIERKOF.Ihs1he ft part has
In 1,4000 0m
AM M � �
ago
w�n���m� waw oiuww�mu
Alynqq of k
y
» w• »...» "i" mb�""ry;'"'�rv&ir +„,m�wwa w u e..� s° w.a»... ....,».,-................»,�,.,.,,.A».,.,.,,,.... �
110 1267
w n
CMV d NO YcNk
on ft 4w d
,
IW,bdom me Arg" ma
01h
f aOft ft w�ft out.
y
ilftwv Pu*
A*ln
i
slim, Mon"a
w
r
" , a
GU ThW Avimrl Pm no WAI NN?a
N MY 10017 amosm
p,
I
rwanwuuM �wuuwww�mnwuuuNwwwwwlamrvuwuw uww. �v� w�ry «��� .„.” .mm--...., .�.....,
IN IIIIll NAgo e ^w w
118�44 933Q4'
lot
4 SUIN 'NAI
POW"W, AY
00184 ,
owl mmop Iftalumm
u
W•�
MMIVV 'Nm W
4WA
m W
��W uu nnmmmlm w R L
orspa#AW
id
W
nnnNn W p&
W
N I
X
�4
�. M &uwuWNylNuuN
w W NWwu
GRA"TWAm N wpm
LN
o .I
I �
Waw
�" ql' pwa�I N WilNwwk „�,wumwiwxmuuuuw��wl'IuNN o uww um II uy�uuwwunWrvm
IW W r 1' II
MR—I w !W
µYoh �Pam, MW W ON
@N W
Mw"' nswuwwwuuw k
mll www ��w��wm� � �wuvuuw�w�
lioluuwuluumm w noowi w'Imwwmmwl wwwwwFW�.w�wmaWwWw�N�m�Walwul�ui w,W'WWu uualw�Wwwu
W Suffolk Ciouk,!Z
Itt=jW e t a
I u uuo iWWul
(SPOCIFY MABOF4N X11
www w a w�w �m N
"I pmmsa bmin to Idolod in
SVPMA Ilo
uwFmW wN���ww�W WWw�� w�llwwww mmwWwWW�w " 1 .
'
W th *AVA July Po mit
I
ALAN A. CARDINALE, %in% iRoad 11.0, box x w hattt ucko NY 11933
pony of dw Uma Pon,ad
L
WITNMV%ON dV Poly Offt nP4 FV11.1QVMUftM mit 11ft C 1 u ) Rapers
sw M40 of ON r of
NA do Maim IP of W.wish &.
Int HattitUck, TOM of SaMtholdo County tt
oft , bwaded and dascribed as tallowss
F
ammma
L int the northimsetiorlyLomaca
(North) w 418TAU 401 R scuthwascleM
cmer gonad by the intermaction of rho narthietotarly 0i a of
ftricj4 end R R R R , Raid int
t Rter � the
� r26
of 01c4iliO60the, i nwascittimof
the isms the
scuthweeterl comer lot land now Or formcky of Antan krkallcl and
from said aint of beginning)
AMIN =MR South A
Ra 396.74 geat
R 00 n0vthw1Vt9V1Ylgamrly 92
0mvia Lilame Cm s
THMM Horth 39, deq. 30 � 30 A aAR 101 �L d ,
sontioned W4 &W land now to , 4,205
to 181VA Wundo
Scud, the tie
of whiCh rMAO 1I � Rant, 319.12 foot to landor
gormarl, at, Anton Gatkaskt
lost m ;land, sous
lmd Rii�
( ) hath 40 dogs 00 min. RR Rena last, Lw 'R -
( ) L 40 401g. 04 min. AR osq, w 1,330144 Ll
1 ) wt410 da
, L4 min, 00 3 . Imait 3m433,3 , goat to the
Road at tho point or place at
L,
411 Anstrumts oe record.
BUNG AM IMMO To 83 the saw gremlemmcony o
R 3' ted 3/9/89 R 3 3/31/ L R 33 244,
m ry
ro
t s ro
TOGM14 V46 do 4"uft=m 4
lm P&MW We do pW of On vw,14ON.
V f
,MI 4 Ow 004 040 111www"do do�Mvty of 16A pogo Pon ha VAS hi4w Offesw V
AND Biu POY al 416*4 O d IN 4014wm MWRA,ON ft y ,Y Oldw RM4
Wool thij fcw ft pdtpmw 0 poira dw mot oma do Wpmvai m 1 aflAy Me HIM MW In Sm PMP
ON rt On a*of 00 knWim"19 farvAtvAn 11111VI 140 A'on UtA 0 on wat W off odwr popm
Ie"® w boa It' whmms On am@ of ab ILII,
III w"IMINWRMCF, go low I'hm Pim bw MY RIM104dItb dMID 114old ytw film ohm woos,,
@ i��aTM min
wo
�74
�� ro�
i
11844 P9,339
STABOOK"VOWCOMOO SUIPPOl.k eft ITA all
MIN 16th YmmtJuly 1107 hs m ow dq of MAW mW
ALAR A. CANDIN&LE p4mumilly
to ame Loran 40 tv dw IVA 4WI *%,nbw m mw WIWI 41,Ow Imomm be dw nbV1411 In a u
CAMW 1014 m ,w. 141 I r m y trIA w
60aw µ
4 9�ta 7
OVJogmmmiky- d
OlIkka
PATI of WIN WOE alum OF OF NO TOMS C=Nfv
1 ft mq mmf qla ON ��m sluff'm �
Rftlmlly
h%rm m yr %tqkv, My mI dw*PWwpm datum , mm mm.dW dipbA scold my
dw be
mm,
In BW wtmt rv%mw
meq
IN mum=M �ads'grumed+fir mP a
' Ehro �u m„m�V 'rc � m d � � a� mtln�u�� m� a, q
m cps m,OW 11 m ft"
II by My mkmr, WOO hy 114 mmks,
°
a um MOM
MW
V, I
lmm °
ALAN A. CARDUALK m�wma nm m mmo
LETTLI BUR REALM INC.
w ,
m m m Ouva °d By Pir°em ntm N.
Solon. Narrow, & Dyckman, LLP
663 Third Avonva
Norm ° rkm NY 10017'
mmnlmnmmmnimmum anpnpn
iwmwuwwnrn a mmwo romwuw.warou�m arvuwmum mmmre�wummmmuewwuw uwanm.. omr i i�n�mmommmm ww��muwiwwm
/r ;'A' m
49
`r
i
I
14=3 m r r gym, may of 1986
411M 11A
ERA— ���a�.R �n CLAIRS air mrr amAdi t 4.1,
l a , Lit ,�l� Reek,, 19,r, Tori 113631, p*xty of flu fixist amrrrr
WSMICT
7 " to off ice andrE iK �l lar: LUM14"mmrm mm r 'OWr'r CAn rrr, "to or , m r Mqm York., p4rty olf the rrm;MCOM ,
C
thmt tho Parry ` rhr ftrrr rt, L n conalideraition1 ?. 0 and
amrw r &Q041 Arml valwimble T grim wrrrmutI;;nL by On parry of the
r W part, WWS MCKM ' uuito the parry of
W r•r , Ir mmrw°commamrr ramal i raga arraver�
. ' I ' r rw mm�rirra it amamr r"mreera rammumrar Ir an
TIZ
, rera4 right., mmi authorimed by M47 oC Om H fork Strum
p r� l auamir l 4 mr r rarmaa ,� Tru ar i r rm gmtr or r amrri r..
a1rhe ase the pr r r xclumlmwrl usm r marlrar� 1 ro4ucrtoaso
a r m arr ra ram r� 0 m:�rr Nam or Bram
the rL far to prahlbit our rumtrict the area of the pr it is 'm
° IMI WimrPooeother than agricoltural production, to Ow property
fdowortitped as fr l�l ov m
iCllr„ eartaLim lWrt , pEoce or r"mrrw1 of' land,
Wmaiug at liatf.Atuck, Town of Smtkkold, County of Suffolk And
e f Now York. "nwn%dit1 and dimmexibed as follows:
AMOMMAW sit a a lwwr ora TAS di i �,orrmmmarxrsmrly k1dim of Oregon Karan,,
,41ateat 483" 3 fmu r mor"r or Iii &A sm mrr alm-,�
r, rAvithwastairly sida of Origm,% Road from the corn r°� for mai by 11
timmere"tLao of the arra r rh*er ra r 4 r J of Ora oii load WON it'ho
r � r r 6m of thick Foie am , riimf.d potnt being also rrmai r
toot rmrmr a�rmrrr � r r� momr�m art rly rias of mad �oi��ra am�r
9firm"'irly of Nary, '+ 'kiUmin r an evaraar�rd r1 rant, the virtbwestarly aj,d � a
of wmmm Road;
AlA
Ir , Omace alonjotta nor 'mrrmrvrr,:amrr1 m of Oivam!mr Road South j,
40 :oaf Ill mJ i 45 mm or "gar es rural mmam rvt Barry rr"� 71gym r gar .�mmm marmrm.a�a mrr mar SLI �
r r r ja q rr rM land, ttmiii it'h 39 dogremora0 rm�rwutmrm �Il1(l11i1 mmuru)armdr umr�
Worth 5" 11!!! dia,%iii°&iiii,m (1119 mmi,mrar'm;mmr 57 ru 1i!!:a u4E�rrm v 98 A,,hl'!'m,�rww,u 11
OmT-,ce Srrmtih 40 w, m, a^°ter il'Illi"!? mm mmmmrrr '30 ra ummmdr East 939.81,1111
rad ai r � ��rr^ � ��rm��m � � r ��mrmr � rrmra
mIII°�i�rum�t L23 ,�AIll15mart°, rF
a mid
t1m
t ee t 1mmrr � im' �� mu�w'14 r11111� rrr 011111°1 G&C m 1uruuui1�r 1144 u.r e m uww
r a m lura
��IIII" m r mmr uuuu r� r r
raa�rmr rm
mmmAM41: R'FA
a .. X,lb:ir'r
✓�r�� �F?1i� 0, 6 a�✓� nu t"�V r✓m� �iF���Mw}fir p
..1
DTZ AND TO MW the said Developmewit Ri.ghts 1.1r% the
PrON1808 herein granted unto the PArtY Of the meco ad part, tt f �
p Auc ar ora and gram Eorever; p
90V the party Of the first snort r.aawatarrarnts thaut the party of
tkw fust parr^ Ilea not done or nuffered an(thing h r' y t1w laid,
t�xrt�rw rar aup r y tmt trio ttrart an cook A uarrrrir
Promises have �rrru a�a"arru brre Ln any rartaver apt 0
prd r
iA perpetuity, Nrt�rrr cazu"eau rutaa ars ,r r for t1re �V
r p rt, O tht ir�art part, <", tSaa hiptrn p 1r, *"1 r1awzar gent tIv a
arra a~ar a$ a4t of t Party o he ftra pari;, to Ufi maf
,
the pr t ae on and after thu_ date of this trnkat^.tment aalr y dor
tha purpose of prre¢Iwr ttraar. �p
rrr development r,ighta conveyed herein aurae subject to tlie furr:ber
n t army provisions ca
set forth in certain in contract l
dant rrarl t pa rties h r t dated Hauch 7, 1 84 n th Ian UALar
°
recorded to the off ice got t'Rrru SufLO �u G arraty � r � ��� rrr "; 4a
Ap ru 292, portions of wh car cora wr otarined herein 11arrar auld wilt
ozurvtva the *jliv ry of tKaa iwwdt,'Aw rt of conveyara e.
e �r aaprurt as Abell c ra to'Jaws as if Lt real m p rts"
r � r t1.r ercrr�r
Of this lr ax ture so requ"„r*rr..
kf
w the pert of'41t411fir t r"'Ars a � a i a pa
aexacut d this ut1ta div aird your- grit nb*,v* war tt a�mm r" may, 'A
/Ilf
1�
I
a
vl
q i
J
w 'r
or M�i16 � 41
Dili the j ar'r ami � ti � 1 II
pr"ba Rb � mfr rwrParma "ry I
c
ry' ryv ,y �Q� ry mam a.m a`r
akw,4" r rJI 14 mWuaun M1wol V mL'.,'"aN "m+
rw Illllllllaapwtuw111�rtrwaum,a
tuumlmauraluwarttatam that wv mlaa,. trawrwrl,a"iia
a
t"rr erg 1� �.urr e�r,wrr�rV:e
G
"
tttrtrt Ilyaµ
rrlw ar MW ho � ,{
p� tate atFr ml
d'a '�ryNoiww�oa�Nuiuiar m�imlm" :�✓
i
l""N
✓f
d 1 ✓ r� Q� � / r ���N ti�z G•" �� f�Gfim
t urs
r
f
�r v
01'. LLAT
"
LIAM O
tv
h Ip
Ic
ri
on
n r'
v
r
aba•
J
RECORDED �k� 'E A KINiE11J1
Che, al sullalk Lo aly
tll n nmx .—�
l
Y
Ir
lot,"
" ,
e .e e I
° r 4 'F
el R
� ,l i
11110
I
�
r
155
x
d
oCO
.ON 0323 a.:n
M
Mon NO
t &w
4611)n
OR
nen
Is:o
I:
RI
u.... ................
Town of Southold
LAVRP CONSISTENCY ASSESSMENT FORM
A. INSTRUCTIONS
I All applicants for permits* including Town of Southold agencies, shall complete this CC AF for
proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law, This
assessment is intended to supplement other information used by a Town of Southold agency in
making a determination of consistency. *Except minor exempt actions inchiding Building Permits
and other ministerial per mits trot located within the Coastal Erosion HazardArea.
2- Before answering the questions in Section C, the preparer of this form should review the exempt
minor action list, policies and explanations of each policy contained in the To of Southold Local
Waterfront Revitalization Program. A' prpp. iia wil'I be eva'luated as to its signifiggnj
be fioial 1wid ad s,,�,rstgj egIN.,, 1g) coaslal,.�Lre hich includes all Of SQUtliold To
3 If any question in Section C on this form is answered "yes" or "no", then the proposed action will
affect the achievement of the LWRP policy standards and conditions contained in the consistency
review law. Thus. each answer must be em)lained ira detail, listing both sung!IhI&W 11011-
both sy
If an action cannot be certified as consistent with the LWRP policy standards and
conditions, it shal I not be undertaken.
I ..... .... ....
A copy oft e LWRP is available in the following places: online at the Town of Southold's website
(southoldtown,norlhfork-net),the Board of Trustees Office,the Planning Department, all local
libraries and the Town Clerk's office,
B. DESCRIPTION OF SITE AND PROPOSED ACTION
4--2—
SCTM#-AE, i a 3. 1
PROJECT NAME L4D
The Application has been submitted to(check appropriate response)®
Trd own BoaEl Planning Board Pr Building Dept. El Board of Trustees El
1, Category of Town of Southold agency action(check appropriate response):
(a) Action undertaken directly by Town agency(e g. capital
construction, planning activity, agency regulation, land transaction)
(b) Financial assistance(e.g. grant, loan, subsidy)
(c) Permit, approval, license,certification-
Nature and extent of action:
or--
CX4 cov- (0Z ,L
c9i.-IC) Ames cx-- WffiNAViz�% TL.>
A'5 A-,1 CCYPA) UU MO -M t, M A" 1"NO M CC 'R L0-J'%
Attach additional sheets if necessary
Policy 3. Enhance visual qualityprotect scenic resources throughout the Town of Southold. See
LWRP Section Policies es 6 throughr evaluation criteria
l es Applicable
Attach ad d iiior"Lal sheets if neccssary
NATURALX
Policy i ize loss of life, structures, a r resources from erosion. e LWRP
Section III-- Policies Mages 8 through 16 for evaluation criteria
...d Yes 11 No beat Applicable
Attach additional s is if necessary
Policy 5. Protectimprove ter quality and supply in the Town of Southold. See LWRP Section
—Policies Pages 16 through 21 for evaluation criteria
_ �,,7
Yes I No [YlN at Applicable
Attach additional l sh is if necessary
ry
Policy a Protect and restore the quality and functione Town of Southold ecosystems including
Significant oastal Fish and Wildfire Habitats and wetlands. See LWRP SectionPolicies; Pages 22
through for evaluation criteria
11 Yes [:] NO t Applicable
Policy 10. Protect out of 's water-dependent uses and promote siting of new water-dependent uses in
suitable locations. See LWRP Section III—Policies; Pages 47 through 56 for evaluation criteria®
Yes No Not Applicable
Attach additional shects if rres r.
Policy 1® Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary
and o n waters.See LWRP Section I —Policies; Pages 57 through for evaluation criteria®
E] Yes No Not Applicable
Attach additional sheets if neccssan
Policy 12. Protect agricultural lands int e Town of Southold. SSection III®Policies; Pages 6
through or evaluation criteria®
'es 1:1No Not Applicable
..... .. _....e _.... ,....,. .. .... _. .__..._ ., .... . .
Attach additional sliects if r►ccessan
Policy 13m Promote appropriate use and development of energy and mineral resources. See LWRP
Section III — Policies; Pages 65 through for evaluation criteria.
YesEl N �Not Applicable
PREPARED ICI 111 .... I I"ISI. .,
�t �
Planning Board decision resolution containing the waiver of the requirement for SCDHS
approval:
'The Southold Town Planning Board, in waiving the requirement for SCDHS approval
prior totheir own approval, is simply waiving a technical requirement of final plat
approval under the Town Code and makes no representations as to whether SCDHS
approval is required. SCDHS approval of this lot line change may be necessary to be in
compliance with the Suffolk County Sanitary Code, and to be eligible for future
construction or renovations.'
The following clause will also be inserted at the end of the resolution and the applicant required
to sign a copy for our files:
`I understand that Southold Town Planning Board approval oft is lot line modification
does not grant,guarantee or waive an approval, if required, from the Suffolk County
Department of Health Services. I understand that I will need to apply separately tothe
SCDHS for any applicable approvals.'
Signature o Applicant
2
Full Environmental Assessment Form
Part 1 -Project and Setting
Instructions for Completing Part 1
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
or is not reasonably available to the sponsor; and,when possible,generally describe work or studies which would be necessary to
update or fully develop that information.
Applicants/sponsors must complete all items in Sections A& B. In Sections C, D& E,most items contain an initial question that
must be answered either"Yes"or"No". If the answer to the initial question is"Yes",complete the sub-questions that follow. If the
answer to the initial question is"No",proceed to the next question. Section F allows the project sponsor to identify and attach any
additional information. Section G requires the name and signature of the project sponsor to verify that the information contained in
Part 1 is accurate and complete.
A. Project and Sponsor Information.
Name of Action or"'.....
Project: ........
Lowerre
---- ......-- ........
Project Location(describe,and attach a general location map)
4455,4545,5205&5855 Oregon Road, Mattituck, NY 11952
Brief Description of Proposed Action(include purpose or need)o � -
Re-subdivison(Lot Lie Modification)Reconfigure existing lots in order to preserve 75%farmland and create more marketable parcels as farmsteads.
Waterfront parcel to seek ODA approval with maximum development of nine(9)residential lots.
Name of Applicant/Sponsor: Telephone:631-283-3195
John v.H. Halsey, President Peconic Land Trust E-Mail': JHalsey@PeconicLandTrust.org
�. 1111 1111..—. —
Address:296 Hampton Road
.............-.......
City/PO:Southampton State:NY Zip Code:11968
1111.. a.-w
Project Contact(if not same as sponsor; give name and title/role): Telephone:631-283-3195
Holly Sanford,Project Manager Peconic Land Trust E-Mail:
HSanford@PeconicLandTrust.org
.Address. ......... .............. .. 1111. .. .� ..............,,,,,,,,,,,,,,_.__,.,,,.. ,1111., ......�......... 1111. _ .. .........
296 Hampton Road
City/PO: State: Zip Code:
Southampton NY 11968
Property Owner if not same............P ) P 64.,....._.. ..._. m.
ass onsor : Telephone: 3400
@DH.0
Lowerre Partners LP&Little Bear Realty E-Mail: HBP@DHCLegal.com
Add res"'s..........
.................................._ ..
605 3rd Ave.,34th floor
City/PO: State: Zip Code:
New York NY 10016
Page 1 of 13
B. Government Approvals
B. Government Approvals,Funding,or Sponsorship. ("Funding" includes grants, loans,tax relief,and any other forms of financial
assistance.)
Government Entity If Yes: Identify Agency and Approval(s) Application Date
Required (Actual or projected)
a. City Council,Town Board, E]YesONo
or Village Board of Trustees
b. City,Town or Village [:]YesONo
Planning Board or Commission
c. City Council, Town or E]Yes[Z]No
Village Zoning Board of Appeals
d. Other local agencies Yes No
e. County agencies OYes[--]No County Farmland Protection Program 2018
f. Regional agencies Yes No
g. State agencies Yes No
h. Federal agencies Yes No
i. Coastal Resources.
i. Is the project site within a Coastal Area,or the waterfront area of a Designated Inland Waterway? E--]YesONo
ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? El YesONo
iii. Is the project site within a Coastal Erosion Hazard Area? 0 Yes[:]No
..........
C. Planning and Zoning
C.I. Planning and zoning actions.
Will administrative or legislative adoption,or amendment of a plan, local law,ordinance, rule or regulation be the Yes No
only approval(s)which must be granted to enable the proposed action to proceed?
• If Yes,complete sections C, F and G.
• If No,proceed to question C.2 and complete all remaining sections and questions in Part I
C.2. Adopted land use plans.
a. Do any municipally-adopted (city,town,village or county)comprehensive land use plan(s) include the site EZ]YesE]No
where the proposed action would be located?
If Yes,does the comprehensive plan include specific recommendations for the site where the proposed action [Z]YesE]No
would be located?
b. Is the site of the proposed action within any local or regional special planning district(for example: Greenway E]YesONo
Brownfield Opportunity Area(BOA);designated State or Federal heritage area;watershed management plan;
or other?)
If Yes, identify the plan(s):
........................................................ .......................................----------------------------.............................. ..........
.......................................................................................................................
........................... .............................................................................................................
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, OYesE]No
or an adopted municipal farmland protection plan?
If Yes, identify the plan(s):
lig:-sub djvisioin of fogf.(4),pArp!k1s to pro p,s�q Fqpr,pptqqtsal farmsteads an a�,o M dr v 8 pM@pt.1rqpQPA)
_ Withw
)nAbe, aterfront parqpl wijll,a
maximum potential development of nine(9) residential lots.
....................................... ................ .................. .............................................
..................................................................................................... .... ... ... .......................... ....... ............. .......................................................................................................................................... ...
Page 2 of 13
C.3. Zoning
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. 0YesE1No
If Yes,what is the zoning classification(s)including any applicable overlay district?
R-80&AC
.................... ....... """" .................................. -------------------------............ ............. ........................
.................
b. Is the use permitted or allowed by a special or conditional use permit? Yes No
c. Is a zoning change requested as part of the proposed action? [:]YesONo
If Yes,
i. What is the proposed new zoning for the site? ............................................. ..................................................
CA. Existing community services.
a. In what school district is the project site located? a
Mttituck
------------- ..................................
b. What police or other public protection forces serve the project site?
'Southold Town Police . ... ........ .. .............
c. Which fire protection and emergency medical services serve the project site?
Maftituckfire Departmwit ................
d. What parks serve the project site?
N/A
......................... .......... .........................—---------
D.Project Details
D.1.Proposed and Potential Development
a.What is the general nature of the proposed action(e.g.,residential, industrial, commercial,recreational; if mixed, include all
components)? Land Conservation& Residential
........................................
b. a.Total acreage of the site of the proposed action? 146.4856 acres
b.Total acreage to be physically disturbed? 28-46 acres
...................................
c. Total acreage(project site and any contiguous properties)owned
or controlled by the applicant or project sponsor? 146.4846 acres
c. Is the proposed action an expansion of an existing project or use? El Yes O No
i. If Yes,what is the approximate percentage of the proposed expansion and identify the units(e.g.,acres,miles,housing units,
square feet)? %........... Units: -—--------------------
d.Is the proposed action a subdivision,or does it include a subdivision? OYesONo
If Yes,
i. Purpose or type of subdivision?(e.g.,residential, industrial,commercial; if mixed,specify types)
Residential ODA with potential of 9 lot maximum
. .................. ............—------- ......................... ................................................ ..............................
H. Is a cluster/conservation layout proposed? OYes E]No
iii. Number of lots proposed? 9 in ODA 05 LOTS 'ftff-M%Trt0
iv. Minimum and maximum proposed lot sizes? Minimum .................... 1 .................. Maximum 9
e. Will proposed action be constructed in multiple phases? Yes No
i. If No, anticipated period of construction: months
ii. If Yes:
• Total number of phases anticipated TBD
• Anticipated commencement date of phase I (including demolition) TBD month year
• Anticipated completion date of final phase TBD month ____year
• Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
determine timing or duration of future phases: ......................
Lot Line Modification submitted in colijj..!nc�tiorvo with 0DA, ODA-TBD
........................................ ...............
Page 3 of 13
E Does the project include new residential uses? OYesE]No
If Yes,show numbers of units proposed.
One Family Two Family Three Family Mulnjfle Family four or more
Initial Phase 4 presently
.................................................---..
At completion
of al I phases TBA
............. ....................................
g. Does the proposed action include new non-residential construction(including expansions)? E]YesZNo
If Yes,
i. Total number of structures
ii. Dimensions(in feet)of largest proposed structure: height; width; and length
W. Approximate extent of building space to be heated or coole& .................................................. .... ,square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any E]YesONo
liquids,such as creation of a water supply, reservoir, pond, lake,waste lagoon or other storage?
If Yes,
i. Purpose of the impoundment:
.. .............................................----------------------------------------------------
ii. If a water impoundment,the principal source of the water: El Groundwater E]Surface water streams F]Other specify:
... ............................— ---------- ----------------11-1-111111111--.............................
N. If other than water, identify the type of impounded/contained liquids and their source,
.................................... ------------ ...................
iv. Approximate size of the proposed impoundment. Volume, ................................—million gallons;surface area: acres
v. Dimensions of the proposed dam or impounding structure: height;_length
vi. Construction method/materials for the proposed dam or impounding structure(e.g., earth fill, rock,wood,concrete):
—------ ...................................................... ... ..................
D.2. Project Operations
a. Does the proposed action include any excavation, mining, or dredging,during construction,operations,or both? []YesE]No
(Not including general site preparation,grading or installation of utilities or foundations where all excavated
materials will remain onsite)
If Yes:
i.What is the purpose of the excavation or dredging? ............................................................................................
ii. How much material (including rock,earth,sediments,etc.) is proposed to be removed from the site?
• Volume(specify tons or cubic yards): ------------------------
• Over what duration of time?
iii. Describe nature and characteristics of to be excavated or-dredged,and"p-l'ansto'use, manage or dispose of them,
............... ........ . ....................................... ---------------- -------- --- ----------............ ............-
- -------- ....... .................................
....................... ................ ----- ...
iv. Will there be onsite dewatering or processing of excavated materials? E]YesE]No
If yes,describe.
. .........................................................-------------------..................................................................................
v. What is the total area to be dredged or excavated? ... ............-acres
vi. What is the maximum area to be worked at any one time?----—--------- ..... ...... acres
vii. What would be the maximum depth of excavation or dredging? ----------- feet
viii. Will the excavation require blasting? E]YesE]No
ix. Summarize site reclamation goals and plan: -----
............................................................... ............ .............. .............................................................................-
---------------------------------
b. Would the proposed action cause or result in alteration of, increase or decrease in size of,or encroachment E]YesoNo
into any existing wetland,waterbody, shoreline, beach or adjacent area?
If Yes:
i. Identify the wetland or waterbody which would be affected(by name,water index number,wetland map number or geographic
description): ..... ........................................................-,, ,,,................ ......... . --- ---- -- ----- ...................................... ................................................................................................................................................. ... ...........
...................................................... .......... ........................................................................... . ............................ ...... ...... ............. ........................................................................................................ ........... .......
Page 4 of 13
ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation,fill, placement of structures,or
alteration of channels,banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
. ... ................................................ .... --------------
............. .................................................... .... — -----............................................. ---- ���......................
iii. Will proposed action cause or result in disturbance to bottom sediments? 1i YesEbNo
IfYes,describeF . ...................................................... ---------- .......................................................................................................... ........... ...........................................
iv. Will proposed action cause or result in the destruction or removal of aquatic vegetation? El YesEJNo
If Yes:
0 acres of aquatic vegetation proposed to be removed: .... .. ...............................
0 expected acreage of aquatic vegetation remaining after project completion:__�,__...... .... ............... .... .....................--------------- --
0 purpose of proposed removal(e.g. beach clearing, invasive species control, boat access): ......................... ------------------............
---------------------------------------................................. 11-111,11, -------------------------------------------------------------------------------------------------------------------------------------------------------------------...........................................................
0 proposed method of plant removal: ..... ------------------ —-------
0 if chemical/herbicide treatment will be used, specify product(s): . .............................
v. Describe any proposed reclamation/mitigation following disturbance: .. .......... ................ --------- -----
........... ------------------------------........................................ . ........................................
c. Will the proposed action use, or create a new demand for water? Oyes E]No
If Yes:
i. Total anticipated water usage/demand per day: 4 Dev,lots/farmsteads X 1 00=400.. gal tons/day
ii. Will the proposed action obtain water from an existing public water supply? E]Yes E]No
If Yes: I-Is ID
• Name of district or service area: Suiffol County water--—--- .......
• Does the existing public water supply have capacity to serve the proposal? [:1 Yes[Z]No
• Is the project site in the existing district? 0 YesE]No
• Is expansion of the district needed? V1 YesEl No
• Do existing lines serve the project site? El Yes O No
iii. Will line extension within an existing district be necessary to supply the project? [Z]Yes E]No
If Yes:
• Describe extensions or capacity expansions proposed to serve this project: ------------------------------
If development of nine(9)lots within ODA otherwise well water may suffice.
..................................................................... .... --------------------------------------------- ......
• Source(s)of supply for the district: .............
i,. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No
If, Yes:
• Applicant/sponsor for new district: ---------------------—-—-—----------------------------------- ------------------------------------------------
• Date application submitted or anticipated ----------------------
• Proposed source(s)of supply for new district� ----—-------------------------------------------------------------------------------------------
v. If a public water supply will not be used,describe plans to provide water supply for the project:
If develop h ey
Merl!remains 4 lots or less within the(ODA).then.well.wat r,rna suffice,
.............. .................................................................. .
Vi. If water supply will be from wells(public or private), maximum pumping capacity: TBD gallons/minute.
d. Will the proposed action generate liquid wastes? OYes
If Yes:
i. Total anticipated liquid waste generation per day: TBD gallons/day
ii. Nature of liquid wastes to be generated(e.g.,sanitary wastewater, industrial; if combination,describe all components and
approximate volumes or proportions of each): --------------------------------------------------------------------------.....................
Sanitary Wastewater
................................... --------------- ................................—
iii. Will the proposed action use any existing public wastewater treatment facilities? E]YesoNo
If Yes:
,a Name of wastewater treatment plant to be used: --- -------------
0, Name of district:
• Does the existing wastewater treatment plant have capacity to serve the project? F-lYesE]No
• Is the project site in the existing district? []YesE]No
• Is expansion of the district needed? E]YesE]No
Page 5 of 13
• Do existing sewer lines serve the project site? []YesF]No
• Will line extension within an existing district be necessary to serve the project? []YP,-,FJNn
If Yes:
• Describe extensions or capacity expansions proposed to serve this project: ------------ ------
--— --------------- ----—--- --- —------------
.............. ------------------------------- ................
iv. Will a new wastewater(sewage)treatment district be formed to serve the project site? E]Yes[:]No
If Yes:
• Applicant/sponsor for new district: .. ......... ...
• Date application submitted or anticipate&
• What is the receiving water for the wastewater discharge? ...... ...... ...... ...........
v. If public facilities will not be used,describe plans to provide wastewater treatment for the project, including specifying proposed
receiving water(name and classification if surface discharge,or describe subsurface disposal plans):
------------------------ ........................... ----------------- -----------
---------- --------------------------- ...................------------------------------------------------------------------------------------------- -------------------
Vi. Describe any plans or designs to capture, recycle or reuse liquid waste: .. ... .... ....................................................... ------------
.................................................................... ....................---------------------
........... -------
e. Will the proposed action disturb more than one acre and create stormwater runoff,either from new point E]YesZNo
sources(i.e. ditches, pipes,swales,curbs,gutters or other concentrated flows of stormwater)or non-point
source(i.e. sheet flow)during construction or post construction?
If Yes:
i. How much impervious surface will the project create in relation to total size of project parcel?
Square feet or acres(impervious surface)
Square feet or acres(parcel size)
ii. Describe types of new point sources. ..............._ , ----------------------------........................................................................................................................................................................................................................................................................................
------
--- -------- -- - - -
------------- __ .. ........— ' -------------- --------------- -- __ ____ - --------------------------- --- -- -- ----
iii. Where will the stormwater runoff be directed(i.e. on stormwater management facility/structures,adjacent properties,
groundwater, on-site surface water or off-site surface waters)?
---------------- ......................................................................................................................-----------------------------------------------------------------------------.........................................
................................. ................ ... ........ ................................................................................................................... ------......................................................
• If to surface waters, identify receiving water bodies or wetlands: -----—--------- ......
...........
• Will stormwater runoff flow to adjacent properties? El YesEl No
iv. Does proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? El YesEl No
f. Does the proposed action include,or will it use on-site,one or more sources of air emissions, including fuel E]YesONo
combustion,waste incineration,or other processes or operations?
If Yes, identify:
i. Mobile sources during project operations(e.g.,heavy equipment, fleet or delivery vehicles)
-------------------—--------. ...... ... ...... ...... ------
ii. Stationary sources during construction(e.g.,power generation, structural heating, batch plant,crushers)
...............----------------------------- --—-----
iii. Stationary sources during operations(e.g.,process emissions, large boilers,electric generation)
................................. ..................... .......... ...... '--11111111111 11-1 1....................... ........... ...... ...... ...... ...................... ...... ...... ...... ...... ..................... ................ —----
g. Will any air emission sources named in D.2.f(above),require a NY State Air Registration,Air Facility Pen-nit, E]YesONo
or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet E]YesZNO
ambient air quality standards for all or some parts of the year)
ii. In addition to emissions as calculated in the application,the project will generate:
• Tons/year(short tons)of Carbon Dioxide(CO,)
• Tons/year(short tons)of Nitrous Oxide(N20)
• Tons/year(short tons)of Perfluorocarbons(PFCs)
• -------------Tons/year(short tons)of Sulfur Hexafluoride(SF6)
• ...........................................................Tons/year(short tons)of Carbon Dioxide equivalent of Hydroflourocarbons(HFCs)
e Tons/year(short tons)of Hazardous Air Pollutants(HAPS)
Page 6 of 13
h. Will the proposed action generate or emit methane(including,but not limited to,sewage treatment plants, [-]YesONo
landfills,composting facilities)?
If Yes:
i. Estimate methane generation in tons/year(metric): ------------- . .................................. .......
ii. Describe any methane capture,control or elimination measures included in project design(e.g.,combustion to generate heat or
electricity, flaring) ,,,....................... -----------------------------------..................................................................... ...... ....... .... ... 11-11111111 ...................
___........... .......... ...................................... —------------------ -----—-- -------- .................................................. .......... .... ............. -..............____
i. Will the proposed action result in the release of air pollutants from open-air operations or processes,such as [-]Yeso No
quarry or landfill operations?
If Yes: Describe operations and nature of emissions(e.g.,diesel exhaust,rock particulates/dust):
.................................................................................... —--------------------------------................................. ...... ... ---------------------
.
j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial [-]Yes Z No
new demand for transportation facilities or services?
If Yes:
i. When is the peak traffic expected(Check all that apply): El Morning Evening E]Weekend
El Randomly between hours of to
ii. For commercial activities only,projected"number--o-f-se m- i--trailer truck trips/day°
iii. Parking spaces: Existing Proposed......................................... ........ Net increase/decrease
iv. Does the proposed action include any shared use parking? F]YesF]No
v. If the proposed action includes any modification of existing roads,creation of new roads or change in existing access,describe.
------.................................................. ------------------- .......... .. ........... - ----- ------____ --------------...............
.............. -------------- --- ------ --- -------
--------------------
vi. Are public/private transportation service(s)or facilities available within '/2 mile of the proposed site? E]Yes[]No
vii Will the proposed action include access to public transportation or accommodations for use of hybrid,electric E]YesE]No
or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing E:]YesE]No
pedestrian or bicycle routes?
k. Will the proposed action(for commercial or industrial projects only)generate new or additional demand E]YesZ No
for energy?
If Yes:
L Estimate annual electricity demand during operation of the proposed action: ......... ------------- ---
---------—--- ----- ------ -------------------------------- ..... ........... - I------- -----------------------------------------------------------------------------------......
U. Anticipated sources/suppliers of electricity for the project(e.g.,on-site combustion,on-site renewable, via grid/local utility,or
other):
------ ------ -—---------------------------------------- "I.-......'ll,....'ll""I'll""I'll",I,,"",',,",—"'I.......... .................................................
iii. Will the proposed action require a new,or an upgrade to,an existing substation? E]YesF]No
I. Hours of operation. Answer all items which apply.
i. During Construction: ii. During Operations:
• Monday- Friday: ................... 0 Monday- Friday: --------------------
• Saturday`m Saturday: .................................................. ...... ...... ..................................... --------
• Sunday: -------------------------------- 0 Sunday: _1...................................................
• Holidays: ......................................................... ... a Holidays: -------
Page 7 of 13
m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, El Yes No
operation,or both?
If Yes:
i. Provide details including sources,time of day and duration:
... .......... .... . .................. ........... ... .... .... ........... ------
............................. ........... ........................ ...........
ii. Will proposed action remove existing natural barriers that could act as a noise barrier or screen? D Yes 0No
Describe:
.............................................................................................................................. .....................................................................................................................................................................................................................................................................................................................................................
n.. Will the proposed action have outdoor lighting? 0 Yes 0 No
If Yes:
i. Describe source(s), location(s), height of fixture(s),direction/aim, and proximity to nearest occupied structures;.
---------------------------------------------------- - ------------------------------------------------..................------------------------------------------------------------------------- --- --- ---------......... ...........
.......
....... ....... ...... --- ---------------------- --- -- --_ -----—---------------- - _---------- ---- ................ ...........
ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? El Yes No
Describe:
---------------------- ............... ...... ........................ ..........-
------------------- ---------
o. Does the proposed action have the potential to produce odors for more than one hour per day? E]Yes No
If Yes,describe possible sources,potential frequency and duration of odor emissions,and proximity to nearest
occupied structures: --------------------------------- ...............
................................................................ --------------------
..................................................................
p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) El Yes®No
or chemical products 185 gallons in above ground storage or any amount in underground storage?
n
If Yes:
i. Product(s)to be stored ------------------------------ -------- ----- --- ------------------ ...... ....................................... ---------------------------------------------
ii, Volume(s) per unit time mmPm (e.g.,month,year)
iii. Generally describe proposed storage facilities: ---------
............................................................................................... 1111111-1111111111 -------------------- ............... ....... .......................................................----------------------------------
q. Will the proposed action (commercial, industrial and recreational projects only)use pesticides(i.e., herbicides, El Yes No
insecticides)during construction or operation?
If Yes:
i Describe proposed treatment(s):
The ODA is onl reauestina a Town Board_resolution reservingffig.rightJo obt in final subdivision approval in the future,
_y.........I.............. -----— -11, _@ _9 , _m_
....... --- ----- ----------- ........... ........... --------------
------------—--- --------- ..... ...... ------------- ......... ................
_"'..........______________ ...... ...... ...... ................ .....
ii. Will the pr020sed action use Interated Pest Managernent Practices? E] Yes E]No
r. Will the proposed action(commercial or industrial projects only) involve or require the management or disposal El Yes No
of solid waste(excluding hazardous materials)?
If Yes:
i, Describe any solid waste(s)to be generated during construction or operation of the facility:
• Construction, tons per .......................... (unit of time)
• Operation : � ..............................----- -------- tons per .................... (unit of time)
ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
• Construction:
I---------------I.................................................................................... .............................................................................................................................................................................. -----... . ..................................... ...
• Operation: .. ........... ... ............... ........... ... ........... ...........
. .......... ...... ...... ............. ... ...... ...................... ................................
iii. Proposed disposal methods/facilities for solid waste generated on-site:
• Construction:
-----------------------................................................. ... --------------------------------—-------------- ........................................................................................
• Operation: -----------------------------
.................................................................................................................................. ... ... ... —--------------------------------
Page 8 of 13
s. Does the proposed action include construction or modification of a solid waste management facility? Yes 0 No
If Yes:
i. Type of management or handling of waste proposed for the site(e.g., recycling or transfer station,composting, landfill,or
other disposal activities):
--
ii. Anticipated rate of disposal/processing:
• Tons/month, if transfer or other non-combustion/thermal treatment, or
• Tons/hour, if combustion or thermal treatment
W. If landfill,anticipated site life: years
t. Will proposed action at the site involve the commercial generation,treatment, storage, or disposal of hazardous ❑Yes®No
waste?
If Yes:
i. Name(s)of all hazardous wastes or constituents to be generated,handled or managed at facility:
...- ... .... ................. ---------------------------------------
ii. Generally describe processes or activities involving hazardous wastes or constituents;
W. Specify amount to be handled or generated tons/month
iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents
...... -.-.- ___ _ m. .,.n.n.n.
V.
Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? '[]Yes[]No
If Yes: provide name and location of facility
....... .. _
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility;
E. Site and Setting of Proposed Action
E.I. Land uses on and surrounding the project site
a. Exi'sti.........n.......g la.....nd uses. .......
i. Check all uses that occur on,adjoining and near the project site.
El Urban El Industrial El Commercial 0 Residential(suburban) 0 Rural (non-farm)
El Forest 0 Agriculture Aquatic Other(specify);
ii. if mix of uses,generally describe:
.. ... ----------------------- __ ---
........... ........... ...................................................... ..... ......... .
Land uses and covertypes on the project site.
...........w
Land use or Current Acreage After Change
Covertype Acreage Project Completion (Acres+/-}
• Roads, uil
bdings,and other paved or impervious
surfaces approxi.l acre approx.6 acres if fully Dev, +5.41
........ .............
For.
N/A
• Meadows,grasslands or brushlands(non-
agricultural, including abandoned agricultural)
approx. 18 acres approx.2 acres if fully dev, -16
• Agricultural
approx.90 acres 87.29 acres approx.2.71 acres
(includes active orchards,field,greenhouse etc.)
• .....
Surface water features
. . _ ..._ _._.__
atures
(lakes,ponds,streams, rivers,etc.) N/A
• Wetlands(freshwater or tidal) N/A
............
• Non-vegetated(bare rock,earth or fill) N/A
..........
• Other
Describe,
Page 9 of 13
c. Is the project site presently used by members of the community for p ublic recrey ���� a ������
ateon? ❑Yes❑✓ No
i. If Yes: explain _. .... _..... -_
d. Are there any facilities serving children,the elderly, people with disabilities(e.g.,schools, hospitals, licensed ❑Yes®No
day care centers, or group homes)within 1500 feet of the project site?
If Yes,
i. Identify Facilities:
e. Does the project site contain an existing dam? ❑Yes No
If Yes:
i. Dimensions of the dam and impoundment:
• Dam height: feet
• Dam length: feet
• Surface area: acres
• Volume impounded: gallons OR acre-feet
ii. Dam's existing hazard classification
iii. Provide date and summarize results of last inspection:
f WHas the project site ever been used as a municipal,commercial or industrial soli
d waste management facility, ❑Yes®No
or does the project site adjoin property which is now, or was at one time,used as a solid waste management facility?
If Yes:
i. Has the facility been formally closed? ❑Yes❑ No
• If yes,cite sources/documentation:
ii. Describe the location of the project site relative to the boundaries of the solid waste management facility:
W. Describe any development constraints due to the prior solid waste activities.
Have hazardous wastes been generated,treated and/or disposed of at the site,or does the project site adjoin
g. YesO No
property which is now or was at one time used to commercially treat,store and/or dispose of hazardous waste?
If Yes:
i. Describe waste(s)handled and waste management activities, including approximate time when activities occurred:
h. Potential contamination history. Has there been a reported spill at the proposed project site,or have any [-]Yes No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site F1 YesNo
Remediation database? Check all that apply:
Yes—Spills Incidents database Provide DEC ID numbers)
Yes—Environmental Site Remediation database Provide DEC ID number(s)
Neither database
ii. If site has been subject of RCRA corrective activities,describe control measures
........ ........ .... ........ m„ ...... ........ ..---- ......... .........
W. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? ❑Yes❑No
If yes,provide DEC ID number(s)'
iv. If yes to(i), (ii)or(iii)above,describe current status of site(s):
Page 10 of 13
..........
v. Is the project site subject to an institutional control limiting property uses? F-]Yes[Z]No
• If yes,DEC site ID number: - ........................................................................ ... ................................................—--------I.,...............................................................-
• Describe the type of institutional control (e.g.,deed restriction or easement): ................ ......... ... ............ .................................................
• Describe any use limitations ..............................- ...................._ .......................
• Describe any engineering controls: ..❑...................................
• Will the project affect the institutional or engineering controls in place? [:]YesE]No
• Explain: —----- ..............................................................1111111111
.................................. . .............. .................... ...............
..................................................———-------------------
.......... ..............
E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site? N/A .-feet
.....................
b.Are there bedrock outcroppings on the project site? L]YesONo
If Yes,what proportion of the site is comprised of bedrock outcroppings? %
c.Predominant soil type(s)present on project site: HaA:Haven Loam 0-2%slope approx.70 %
.
-................... .
....
HaB:Haven Loam 2-6%slope approx.3.5 %
CpC:Carver&Plymouth Sands approx.5 %
d. What is the average depth to the water table on the project site? Average: 50-65 feet AS ?*-IL i_)�......PILVIN
..............................
e.Drainage status of project site soils:O Well Drained: 99%of site
0 Moderately Well Drained: 1-%of site
El Poorly Drained .................%of site
f.Approximate proportion of proposed action site with slopes: El 0-10%: .......,".%of site "ZLM 0 ql.�
D 10-15%: .........................%of site I A I AC4ULS
0 15%or greater- .......... of site
.............................. ..........
g.Are there any unique geologic features on the project site? E]YesEZ]No
IfYes,describe: . ......... ...............................................................................................
.....................———____-- ..............
h. Surface water features.
i. Does any portion of the project site contain wetlands or other waterbodies(including streams,rivers, [-]YesONo
ponds or lakes)?
ii. Do any wetlands or other waterbodies adjoin the project site? OYesE]No
If Yes to either i or ii, continue. If No, skip to E.21
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, OYesE]No
state or local agency?
iv. For each identified regulated wetland and waterbody on the project site,provide the following information:
0 Streams: Name Classification
0 Lakes or Ponds: Name Long Island Sound,Suffolk County East, 170 2-0266 Part 6 Classification SA
... ................ """'................... ................._.....
0 Wetlands: Name Approximate Size .............................................................................................
0 Wetland No. (if regulatedbyDEC)
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired E]Yes[Z]No
waterbodies?
Ifyes,name of impaired water body/bodies and basis for listing as impaired-, ..................................................................... ..... ..... ...... ...........
........................ —-------------------- '...............
._.................._.__..........n.... ......................... ........._.
i. Is the project site in a designated Floodway? A&tA of M I sit fn oh�I:Lg3m ApeLjVW Rj%IA.E]Yes EZ]No
................
j. Is the project site in the 100 year Floodplain? E]Yes ONo
............. ............... ..........
k. Is the project site in the 500 year Floodplain? Elyes[Z]No
..................................................
1. Is the project site located over,or immediately adjoining,a primary,principal or sole source aquifer? OYes E]No
If Yes:
i. Name of aquifer: Long Island Aquifer
..............-------------------------------------.............. .......................... ..........................................—-----.............................
Page 11 of 13
m. Identify the predominant wildlife species that occupy or use the project site: ........................
.................. ............. ................................................................................................................... ........................................................................................... ...... ...... ........... ............................................................. ..........
.................................... .............................................. ..................................................................................................... ....................................................................................................... .............................................
n. Does the project site contain a designated significant natural community? Yes No
If Yes:
i. Describe the habitat/community(composition, function, and basis for designation):
.............. ------------------.................................... ..................................... ......
ii. Source(s)of description or evaluation: ................................... ................. ..... .......................----—-----------------------------------—-----..................
iii. Extent of community/habitat:
• Currently: --------------------------.............— acres
• Following completion of project as proposed, ...... ..... ................ acres
• Gain or loss(indicate+or ........................................... acres
..........................................................
o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as El Yes No
endangered or threatened,or does it contain any areas identified as habitat for an endangered or threatened species?
.......................... ........... ................... -..........
p. Does the project site contain any species of plant or animal that is listed by NYS as rare,or as a species of 0YesWINo
special concern?
q. Is the project site or adjoining area currently used for hunting,trapping, fishing or shell fishing? E]Yesg]No
If yes,give a brief description of how the proposed action may affect that use: ..... .......................................................................... .....
... ... .......................................................................................
E.3. Designated Public Resources On or Near Project Site
a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to YesNo
Agriculture and Markets Law,Article 25-AA, Section 303 and 304?
IfYes, provide county plus district name/number: ..................—-------------------- ........... ...... ...... ............................................................ ......
................................ ....................... ..................---
b. Are agricultural lands consisting of highly productive soils present? Yes No
i. If Yes: acreage(s)on project site. approx.2 acres
U. Source(s)of soil rating(s): .............. ... ................. ...........................................-----------------------------------
—-----—------...............................................
c. Does the project site contain all or part of,or is it substantially contiguous to,a registered National E]Yesg]No
Natural Landmark?
If Yes:
i. Nature of the natural landmark: El Biological Community El Geological Feature
ii. Provide brief description of landmark, including values behind designation and approximate size/extent:
...............................................................................................................................................................................................................................................................................................................................................................................................................
..................................................... ------------------------------------------- ..............................
.................. ....
d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? F]Yesg]No
If Yes:
i. CEA name:
................ .....................................------------------------------------------ ---------------
ii. Basis for designatiow ...................................................................................................-
iii. Designating agency and date: ....... ... ........................................................................................
........... ................... ..................................................
Page 12 of 13
e. Does theect site contain, �
p J or is it substantial ❑
substantially contiguous to,a building,archaeological site,or district Yes No
which is listed on,or has been nominated by the NYS Board of Historic Preservation for inclusion on,the
State or National Register of Historic Places?
If Yes:
i. Nature of historic/archaeological resource: El Archaeological Site Historic Building or District
ii. Name:
W. Brief descriptio.
n of attributes on which listing is based:
f. Is thero'ect site or an portion of it �
p � y p , located in or adjacent to an area designated as sensitive for Yes ONo
archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site inventory?
g. Have additional archaeological or historic site(s)or resources been identified on the project site? ❑Yes No
If Yes:
i. Describe possible resource(s)° , ,
ii. Basis for identification:
h. Is the project site within fives miles of an officially desi ...r l � _..
y y gnated and publicly accessible federal, state,or focal Yes ZNo
scenic or aesthetic resource?
If Yes:
i. Identify resource:
ii. Nature of, or basis for,designation(e.g.,established highway overlook, state or local park, state historic trail or scenic byway,
etc.):
iii. Distance between project and resource; miles.
i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers ❑Yes No
Program 6 NYCRR 666?
If Yes:
i. Identify the name of the river and its designation:
ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? ❑Yes No
F. Additional Information
Attach any additional information which may be needed to clarify your project.
If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any
measures which you propose to avoid or minimize them.
G. Verification
I certify that the information provided is true to the best of my knowledge.
Applicant/Sponsor Name Date .... ( l.m.....
7
Title
Signature pili e.. Ck?.w�
g �'
PRINT FORM Page 13 of 13
Parcel Data
Total Yield
Calculation
Unbuildable Buildable Total (buildable
lands/80,000 s.f.
Name TaxyMap#(s) Lands Lands Acreage per lot=#lots
94-3-4.1, 4.2
1 Lowerre & 95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
2 0.00 0.00
....... ... ......
3 0.00 0.00
4 ....._.. ..., m.,.._..... ..... ...
...�........................
0.00 0.00
75/75 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
(75%buildable lands) (25%buildable lands) calculation # Lots
.. .... ...... ............................ ..... _
1 87.29 29.10 15.84 15
2 0.00 0.00 0.00 _.._________ -......................�..�.�._..._._._._._. ---
... ....... __ _._._._._ ....._.. _._._._. _ ....��. -_.... ....... .
3 0.00 0.00 0.00 0
11,11,11,11,11-..—-. ......... ..... __......... - ----------
4
________4 0.00 0.00 0.00 0
Parcel Data
Total Yield
Calculation
Unbuildable Buildable Total lan(buildable
ds/80,000 s.f.
Name Tax Map# s Lands Lands Acreage my ,er lot=#lots
94-3-4.1, 4.2
1 Lowerre & 95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
_. - ---._._...
2 .r ........ ..� .._.u.. 0.00 0.00
30.00 0.00
...
4 m ___ .._. .. .. m........ 0.00 _ 0.00 .._ .....
75/75 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
�75%buildable lands (25%buildable lands)
calculation # Lots
0
1 87.29 29.10 15.84 15
________________________ _-_......
2 0.00 0.00 0 00 0
---- - m................ ....... _.. ... — - —.--- —
3 0.00 0.00 0.00 0
... ........ . .. _ .----... -- - ......
4 0.00 0.00 0.00 0
Parcel Data
Total Yield
Calculation
Unbuildable Buildable Total lan(buildable
ds/80,000 s.f.
NameTax Map# s Lands Lands Acreage der dot #lots) y
......... - 94-3-4.1, 4.2
1 Lowerre & 95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
2 �..._ a� .._ ................ ..m....... 0.00 .- �.....m..
0.00
3 —�.�� .. ... .... � ...,.. _...�................0.00 .. ......... 0.00
.,...._ 4._._._� w_ ...................... .....__mm...� 0.00 0.00...
75/75 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
# Lots
(75%buildable lands calculation
(25%buildable lands) ....
......
1 87.29 29.10 15.84 ..15......... .. .............................................
......... ....... —
2 0.00 0.00 0.00 0 ________________.�._
30.00 0.00 0.00 0
........, -----
4 0.000.00 0.00 0
... ......................-- ......
Parcel Data
Total Yield
Calculation
(buildable
Unbuildable Buildable Total lands/80,000 s.f.
Name
Tax Ma # s
Lands Lands Acreage e
per lot-
#lots
94-3-4.1, 4.2
1 Lowerre & 95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
- ,�..... ... .�.r.� _ _...��.....�..._. � .. ...a__
2
0.00 ....... 0.00.. .. ...........
0.00 0.00
_ 4W .. m m.. — 000.. n.m.0.00
75/75 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
75%buildable lands 25%buildable lands calculation # Lots
- ---...�.......... ) _ -.�.�...�� .. �.... ..............
1 87.29 29.10 15.84 15
2 0.00 .. ._�...... 1...�.. .. ...... .............._.. ......,. . .-
00 0.00 0
3 0.00 0.00 0.00 0
....... ....... .. ..—
4 0.000.00 0.00 0
Parcel Data
Total Yield
Calculation
Unbuildable Buildable Total (buildable
lands/80,000 s.f.
�. Name Tax Map #�s) Lands Lands Acreage per lot=#lots)
94-3-4.1, 4.2
1 Lowerre & 95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
m ... _. �— — .m ...
20.00 0.00
3,..... m ..... ._._
0.00 0.00
40.00 0.00
75/75 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
75/° buildable lands) X25%buildable lands) calculation # Lots
° .........
187.29 29.10 15.84 15
--. ....,... ........ . ...... __...... -
2 0.00 0.00 0.00 0
3 0.00 0.00 0.00 0
4 m .......... ..0.00... ___ .._.____.......... ... ........
0.00 0.00 0
Parcel Data
Total Yield
Calculation
(buildable
Unbuildable Buildable Total lands/80,000 s.f.
Name Tax Ma # s Lands Lands Acreage per lot=#lots)
94-3-4.1, 4.2
1 Lowerre & 95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
m.2......... .......... ..._............. ..........._.... _ 0.00............. 0.00. ..�m....
3......... _ 0.00 ...... 0.00'.
4 �__......_....�............................................._..._ 0.00..... .._. 0.00
75/75 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
_ ) ( %buildable lands) calculation # Lots
75/°buildable lands 25..................—.......... .....l.w.w,,. .. ,,,. --.._ ............. .......
......... ...................... ................ .......
1 87 29 29.10 15 84 15
....................--- ......... ...._____..� .......... ......... ........_ .........
2 0.00 0.00 0.00 0
3 0.00 0.00 0.00 0
— ...._.—_. .... —— — - ......... ...................
4 0.000.00 0.00 0
Parcel Data
Total Yield
Calculation
Unbuildable Buildable Total (buildable
Iands180,000 s.f.
Name Tax Map#[sem Lands Lands Acreage per lot=#lots
94-3-4.1, 4.2
1 Lowerre &95-1-1.1, 2 &3.1 30.09 116.39 146.48 63.37
..........w—.......--.---n_-----------...,------..������n.. _.._ m.. �� w ...... ......
-.-
2 .. 0.00 0.00
3 _ — —......, . ... .._... �..a. . ._mm.nn...................... - _ .__.a.. .. ..........�............... mm... 0.00...... ......0.00--
.. ........ _—_ .._...... ... .....
4 0.00 0.00
75175 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
(75%buildable lands
! %buildable lands calculation #Lots
25 .... . _....... ....
1 87.29 29.10 15.84 15
2 0.00 0.00 0.00 0
3 0.00 0.00 0.00 0
4 0.00 0.00 0.00 0
Parcel Data
Total Yield
Calculation
Unbuildable Buildable Total (buildable
Iands180,000 s.f.
Name Tax MaLands Lands Acreage per lot=#lots
94-3-4.1, 4.2
1 Lowerre & 95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
_. _ �...
2
0.00 0.00
.www ....�ww� . ...... ... �.......,. ' . .. .. .........mm...�..........� _.�._.m�._ ____- ---- — ��� ......
30.00 0.00
. ....._ ...... __-- _..... _. .. �0 00 .. 0..0.
. 0
75175 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
buildable ands calculation # Lots
0 0
Idable lands � 5 o ui a e �
1 87.29 29.10 15.84 15
2 0.00 0.00 0.00 0
3 0.00 0.00 0.00 0
4 0.00 0.00 0.00 0
Parcel Data
Total Yield
Calculation
Unbuildable Buildable Total (buildable
Iands180,000 s.f.
Name Tax Map.#(s) Lands Lands Acreage.. per lot=#lots
94-3-4.1, 4 2
1 Lowerre &95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
. ... �.w...�.......m ._____ ------- ._______ �.. .
2 0.00 0.00
3 0.00 0.00
4 0.00 _ 0.00
75175 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
(75/°buildable lands) 25/°buildable Ian # Lots
° ds calculation
1 87.29 29.10 15.84 15
2 0.00 0.00 0.00 0
0 0.00 0.00 0
4 0.00 0.00 0.00 0
Parcel Data
Total Yield
Calculation
Unbuildable Buildable Total (buildable
lands/80,000 s.f.
Name Tax Map# sem Lands Lands Acreage per lot=#lots
94-3-4.1. 4.2
Lowerre & 95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
2 0.00 .. ..0.00 .... ..00
.......... ------------------------.—............ ...................... ..
.......
30.00 0.00
4 0.00 0.00
75/75 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
_A75%buildable Ian s) g�Z*o buildable lanqs),,, calculation # Lots
1 87.29 29.10 15.84 15
............ ..............
.................................
....
2 0.00 0.00 0.00 0
3 0.00 0.000.00 0
0.00 0.0
4 �ww0.00 0- 0
...........F - __j
Parcel Data
Total Yield
Calculation
Unbuildable Buildable Total (buildable
Iands180,000 s.f.
..................... # s Lae�ac a der lot=#lots
Name Tax MapLands Lands Acreage........� _.. ..........._�... ............................................
94-3-4.1, 4.2
1 Lowerre & 95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
�� . ..... ._.........._— ...� �_.�. .�_.
_.. ..... ...... .. ._n_... .. - --- --- --------- -...._ __m. . ................... .. ...
0.00 0.00
3 0.00 0.00
4 0.00 0.00
75175 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
(750/.buildable lands),mmm X25%buildable lands calculation # Lots
1 87.29 29.10 15.84 15
00 0.00 0.00 0
3 0.000.00 0.00 0
� ._ ................W.. . .. _..._._ ..............................
....m.._ .�..�
4 0.00 0.00 0.00 0
Parcel Data
Total Yield
Calculation
Unbuildable Buildable Total (buildable
Iands180,000 s.f,
Name... Tax Map#(sJ Lands Lands Acreage per lot=#lots .........
.._ �����..._...... ..e..
94-3-4.1, 4.2
1 Lowerre & 95-1-1.1, 2 & 3.1 30.09 116.39 146.48 63.37
.... — — ........ .� .... ..._......... ..._......_..-.__. __ -._ _.. .. ..... ......�.......
20.00 0.00
3......................................................_...__.. --------. ................................................... ... ... ..... ._...........____ _.. ,n._. 0.00 0.00
............. _ . ._ ._...� __._ . —– _..........
4 0.00 0.00
75175 Conservation Subdivision Calculations
75% Reduced
Preserved Land Development Area Density
75%buildable lands 25%buildable lands calculation # Lots
1 87.29 29.10 15.84 15
2 0.00 0.00 0.00 0
3 0.00 0.00 0.00 0
4 0.00 0.00 0.00 0