HomeMy WebLinkAboutOYSTER FARM ASSOCIATEDFRANK A. KUJAWSKI, JR., President
ALBERT J. KRUPSKI, JR., Vice-President
JOHN M. BREDEMEYER, III
JOHN L. BEDNOSKI. JR.
HENRY P. SMITH
TELEPHONE
(516) 765-1892
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Town Hall, 53095 Main Road
P.O. Box 728
Southold, New York 11971
November 7, 1988
Mr. Robert A. Greene/
Alternate Regional Permit Administrator
New York State D.E.C.
Bldg. 40, SUNY, Room 219
Stony Brook, New York 11794
Re: Oyster Farm Associated App. No. 614
Dear Mr. Greene:
Please be advised that this office has received a partial
application in the above referenced matter. Pursuant to the Code
of the Town of Southold, the Board of Town Trustees will not act
upon an application until it is deemed complete by the submission
of documentary proof that all other necessary permits and
approvals have been received.
Please keep this office informed of your progress in this
matter. We wish to be involved in your environmental review
under the S.E.Q.R.A. Legislation.
Feel free to contact this office at (516) 765-1932 should
you have any questions in regard, to this matter.
Very truly yours,
Frank Ao Kujawski, Jr., Pres.
Board of Town Trustees
FAK: jas
cc: Neted of America-Oyster Farm Assoc.~
C.A.C.~-
Board of Appeals~
Building Dep ' t.~
Army Corps of Engineers~/~
FRANK A. KUJAWSKI, JR., President
ALBERT J. KRUPSKI, JR., Vice-President
JOHN M. BREDEMEYER. III
JOHN L. BEDNOSKI, JR.
HENRY P. SMITH
TELEPHONE
(516) 765-t892
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Town Hall, 53095 Main Road
P.O. Box 728
Southold, New York 11971
October 14, 1988
To Whom It May Concern:
Attached hereto is a Long Environmental Assessment Form
submitted by Oyster Farm Associates in connection with their
application for a wetland permit to dredge & completely bulkhead
addition to existing marina basin on property located on east
side foot of Shipyard Lane, East Marion.
President
Board of Town Trustees
FAK:hk
posted: October 14, 1988
FRANK A. KUJAWSKI, JR., President
ALBERT J. KRUPSKI, JR., Vice-President
JOHN M. BREDEMEYER, III
JOHN L. BEDNOSKI, JR.
HENRY P. SMITH
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Town Hall, 53095 Main Road
P.O. Box 728
Southold, New York 11971
October 14, 1988
TELEPHONE
(516) 765-1892
Mr. John Holzapfel, Chairman
Southold Town Conservation Council
Southold Town Hall
Main Road
Southold, New York 11971
Dear Mr. Holzapfel:
Transmitted herewith is application No. 675 for a Wetland
Permit submitted by Oyster Farm Associates.
Please prepare a written report of findings and recommenda-
tions with respect to this application.
FAK:hk
Attachment
_cc: Bldg. Dept.
Very truly yours,
Frank A. Kujawski, Jr.
President
Board of Town Trustees
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
Town Hall, 53095 Main Road
P.O. Box 728
Southold. New York 11971
TELEPHONE
(516} 765-t892
APPLICATION [$ HEREBY MADE TO THE TOWN TRUSTEEB OF THE TOWN OF
SOUTHOLD, BUFFOLK COUNTY, NEW YORK FOR THE ISSUANCE OF A PERMIT
PURSUANT TO THE LAWS, ORDINANCES AND REGULATIONS GOVERNING THE
COASTAL AND INTERIOR WETLANDS, FLOOD PLAINS AND DRAINAGE AREAS
OF THE TOWN OF SOUTHOLD, AND THE ISSUANCE OF PERMITS PURSUANT
TO CHAPTER 32 OF THE CODES OF THE TOWN OF SOUTHOLD.
10/14./88
298-8420
IDENTITY OF APPLICANT Oyster Farm Associates by Neted of PHONE NO
America, Lt~T
ADDRESS OF AmPLICANT C/O Henry E. Raynor, Jr., P. O. Drawer A,
Jamesporu, New York 11947
TAX MAP NO. t000--38--7--7.1
298--8420
AGENT Henry E. Raynor, Jr. PHONE NO.
PERMIT REQUESTED TO dredge, enlarge & bulkhead existing marina basin
LOCATION OF PROPERTY FOR WHICH PERMIT WANT~m east side foot of
Shipyard Lane, East Marion
HOME ADDRESS OF PERMIT APPLICANT IF DIFFERENT FROM AFORESAID LOCATION
CREEK, BAY OR HARBOR FRONTING PROPERTY
SIZE OF PROPOSED WORK 300' X 250'
LENGTH 450
Gardiners Bay
~IDTH
250'
HEIGHT ABOVE HIGH WATE~ ......
DEPTH BELOW LOW WATER
YAROS TO BE EXCAVATED
39,000 square yards
YARDS TO BE FILLED
WIDTH OF CANAL, CREEK OR BAY FRONTING PROPERTY
+ 7'
DEPTH AT LOW. TIDE --
+ 3'
AVERAGE RISE IN TIDE --
n/a
DISTANCE TO THE NEAREST CHANNEL FT.
+ 1/2 mile
DISTANCE PROJECT EXTENDS BEYOND SIMILAR PROJECTS IN THE AREA
0 FT
IS THIS FOR PRIVATE OR BUSINESS USE?
business
AREA ZONING C heavy __
MANNER IN WHICH MATERIAL WILL BE ~~ OR DEPOSITED
INTENDED USE OF PROPERTY marina
DESCRIBE ANY KNOWN PRIOR OPERATIONS CONDUCTED ON THE PREMISE
mazina_~Q~_packiDg & proces$in~m_~.rine construction & repair
AND WHETHER ANY PRIOR LICENSE OR PERMITS HAVE SEEN ISSUED TO ERRECT
STRUCTURES OR TO DREDGE OR DEPOSIT FILL ON SAID PREMISES AND WHETHER
ANY PERMITS OR LICENSES WERE EVER SUSPENDED OR REVOKED BY A GOVERNMENTAL
AGENCY DEC Maintenance Permit in effect
DESCRIBE FULLY THE REHABILITATION AND PROPOSED CONDITION OF THE
PREMISES AFTER THE WORK tS COMPLETED INCLUDE AN ADDITIONAL SURVEY OF
THE PROJECT Site If NECESSARY __dredq~ & com~lete!~_~ulkhead
marina basin
WRITTEN CONSENT OF THE OWNER OF THE PROPERTY, IF NOT THE SAME AS THE
APPLICANT.
ARE THERE ANY COVENANTS OR RESTRICTIONS IN YOUR DEED THAT WOULD
PROHIB3iT THIS PROJECT? none of record
COUNTY OF SUFFOLK )
STATE OF NEW YORK )SS:
Oyster Farm Associates by
Neted of America, Inc.
/lY / ,'-hO
BEING DULY SWORN DEPOSES
AND SAYS THAT HE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMITS,
AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST
OF HIS KNOWLEDGE AND BELIEF, THAT THE WORK WiLL BE DONE IN THE
MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY
THE TOWN BOARD OF THE TOWN OF SOUTHOLD. THE APPLICANT AGREES TO
HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND
FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY
VIRTUE OF SAID PERMIT, IF GRANTED. /
in completing this application I h~eby authorize ~he.Trust~e~,,
agent 0r representative to enter ~to my proper~y to tnspec~ ~ne
premises in conjunction with re~ of tJ%i%--~Qlication. /~
· SIGNATURE.~F A~/PLICANT
JEAN ANN ROGERS
Notary Public, State of New ¥o~
No. 4791821, Suffolk County
EXAM I NED Commission expires He,ch 30, 198~
APPROVED "WETLANDS" PERMIT (CHAPTER 97)
APPROVED "BOAT,DOCKS, WHARVES" PERMIT (CHAPTER 32)
DISAPPROVED "WETLANDS PERM'iT" (CHAPTER 97")
DISAPPROVED "BOATS,DOCkS, WHARVES" PERMIT (CHAPTER 32)
CONOITIONS, IF ANY
EXAMINING BODY
SIGNATURE OF CHAIRMAN
COMPUTATION OF FEES
Approved 2/27/85
PAR7 1--PROJECT INFOF,.~ATION
Prepared by Project Sponsor
NOTICE: This document is designed to assist in determining whether the action proposed may have a significant elf
on the environment. Please complete the entire form. Parts A through E. Answers to these questions will be consid~
as part of tneappiication for aooroval and may be subject to further verification and public review. Provide any addkio
informauon you believe will be needed to complete Parts 2 and 3.
It is exoected that completion of the full EAF will be dependent on information currently available and will not inve
new studies, research or investigation, If information requinng such additional work is unavailable, so indicate and spec
each instance.
NAME OF ACTION
Oylster Farm Associates by Neted of America, Ltd.
LOCATION OF ACTION dncluQe Street Address, Municipahty aha County)
e/s Shipyard Lane, East Marion, Town of Southold, County of Suffolk
NAMEOFAPPLICANT/SPONSQR BUSINESSTELEPHONE
Oyster Farm Associates by Neted of America, Ltd. , (516) 722-4990
ADDRESS ~
'c/o Henry E. Raynor, Jr., P. O. Drawer A
~RI~P~Os pO r t STATE ZIP CODE
NY 11947
NAME OF OWNER fit dJfferent) BUSINESS TELEPHONE
, f )
ADDRESS
CITY/PO i STATE I ZIP CODE
DESCR~PT~O~ oF ACTION
Dredge and en~arge existing marina basin and bulkhead area
Please Comp|ere Each Question--Indicate N.A. if nor ausHcabie
A. Site Description
Physical setting of overall projec:. Dom deveiot;eD and undeveloped areas.
~Cc mmerciai
"-;Other
1. Presen~ Jand use: ~Urban ~Industrial
~Forest F-]Agricu Iture
2. Total acreage of pro~ect area: 18. 7 acres.
APPROXIMATE ACREAGE
Meadow or Brushland (Non-agricultural) 16.1
Forested 0
Agricultural (includes orchards, cropland, pasture, etc.} 0
Wetland (Freshwater or tidal as per Articies 24, 2.5 of ECL)
Water Surface Area 1.8
Unvegetated (Rock, earth or fill)
Roads, buildings and other paved surfaces .8
Other (indicate type)
3, What is predominant soil type(s) on proiect site? loam
?Residential (suburban)
topsoil,
~Rura[ (non-fart
· PRESENTLY AFTER COMPLETION
acres 14.0 acres
acres 0 acres
acres 0 ·
acres
acres acres
acres 3.9 acres
acres acres
acres o 8 acres
acres acres
& sand (on information &
a. Soil drainage: '~WeJl drained ] C)O 9/0 of site r~Moderatel¥ well drained belief)95 of site
~Poorly drained % of site
b. If any agricukur~i land is involved, how many acres of soil are classified within soil group 1 through 4 of the NY
Land Classification System? acres. (See 1 NYCRR 370).
4. Are there bedrock outcroppings on project site? ~Yes ~aNo
,~. What ~s depth to bedrock? (in feet)
5. 'Approximate percentage of ')posed project site with slopes: x~_0-1k !00 % Ei0-t5% '
..... ~ E15% or greater %
6. Is proiect substantially contiguous to, or contain a building, site, or district, listed on the State or the Nation;. ·
Registers of Historic Places? []Yes [~No
7. Is proiect substantially contiguous to a site listed on the Register of National Natural Landmarks? []Yes EH
8. What is the depth of the water table? + ]:5 (in feet)
9. Is site Iocated over a primary, principal, or sole'source aquifer? []Yes ~No
10. Do hunting, fishing or shell fishing opportunities presently exist in the project area? ~Yes F~No
11, Does project site contain any species of ptant or an'imal life that is identified as threatened or endangered
I~Yes [~No According to
Identify each species
12. Are there any unique or unusuat land forms on the proiect site? (i.e., cliffs, dunes, other geological formations
[Yes ~No Describe
13. 'is the project site presently used by the community or neighborhood as an open space or recreation areal
ENo If yes, explain
14. Does the present site include scenic views known to be important to the community? EYes ~No
15. Streams within or contiguous to project area: yes
a. Name of Stream and name of River to which it is tributary Gardiners Bay
16.
~7.
Lakes, ponds, wetiand areas within or contiguous to project area:
a. Name
Is the site served by existing public utilities? ~Yes [No
a) If Yes, does sufficient capacity exist to allow connection?
b) If Yes, will improvements be necessary to allow connection?
b. Size (In acres)
?No
~Yes ~No
18. Is the site [ocated in an agricultural district certified pursuant to Agricuiture and Markets Law, Article 25-AA.
5ecuon 303 and 304? ~,Yes ~No
19. Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Articfe 8
of the ECL, and 6 NYCRR 6177 ,~Yes ~No
20. Has the site ever been used for the disposal of solid or hazardous wastes? ~Yes ~No
B. Project Description
1, Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled by project sponsor
b. Project acreage to be developed: ]:8 o 7 __ acres initially;
0
c. Project acreage to remain undeveloped acres.
d. Length of project, in miles: n/a (If appropriate)
.7 acres. ..
18.7
acres ultimately.
e. If the project is an expansion, indicate percent of expansion proposed 50 %;
f. Number of off-street parking spaces existing ; proposed per Sh!d Town Code
g. ,Maximum vehicular trips generated per hour 20* (upon completion of project}?
.*marina use
h. ]r resident:al: Number and type of housing units:
One Family Two Famiiy Multiple Family
Ultimately
i. Dimensions (in feet) of largest proposed structure height; width:
j. Linear feet of frontage along a public thoroughfare prolect will occupy i~?
3
Condominium
length.
ft.
a How mucn natural mate~
3. Wit aisturbed areas be reclaimed? []Yes []No
a. If yes. for what intend._.~ purpose is the site being reclaimed?
b. Wiil topsoii be stockpiled for reclamation? []Yes F'lNo
c. Will upper subsoil be stockpiled for reclamation? F-lYes
,~i.e, rock. earth etc.) will be removed hv, n the site?
motel
_ to /cubm.~V~'
(No
4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site? + 2 acres.
5. Will any mature Forest ('over 100 years old1 or other locally-important vegetation be removed by this project?
(l-lYes [~No - -
6. If single phase project: Anticipated period of construction 36
7. If multi-phased:
a. Total number of phases anticipated 1 [number).
b. Anticipated date of commencement phase I 4
c. Approximate completion date of final phase
d. ls phase I functionally dependent on subsequent phases?
8. Will blasting occur during construction? FTYes [[]No
9. Number of jobs generated: during construction 20
0
10. Number of fobs eliminated bV this project
1'I. Will project require relocation of any projects or facilities?
months, (including demolition),
month 1989 year, (including demolition).
month year:
i~Yes
; after project is compiete 5
EYes ~No If yes, explain
'12. ls surface [iouid waste disoosm involved? []Yes GNa
a. If yes. indicate type of waste (sewage, industrial, etc.i and amount
b. Name of wa[er body mto which effluent will be discharged
13 ls suosurface liouid waste disposal involved? EYes ENo Type
14. Wilt surface area of an existing water body increase or decrease by proposal?
Explain marina basin expansion
~Yes ~No
15. is project or any portion of project located in a 100 year flood plain? ~k'Yes
16. ',Viii the project generate solid waste? L~Yes
a. If )'es, what is the amount per month tons
' b. If yes, will an existing sotid waste facility be used? [Yes ~No
c. If yes, give name location
d. Will any wastes not go into a sewage disposal system or into a sanitary landfill?
e. If Yes, explain
ENo
EYes ENo
'17.
18.
19.
20.
Will the project involve the disposal of solid waste?
a. If yes, what is the anticipated rate of disposal?
b. If yes, what is the anticipated site life?
Will project use herbicides or pesticides? EYes
EYes [~No
tons/month.
years.
Ei~No
Will project rOutinely produce odors [more than one hour per day)? fqYes ~No
~Vill project produce operating noise exceeding the local ambient noise levels? ~Yes
21. Will prolect result in an increase in energy use? '~es ENo
If yes , indicate type(s) _ electricity (eventually at docks)
22. If water supply is from wells, indicate pumping capacity gallons/minute.
23. Total anticipated water usage per day 450 gallons/day.
24. Does prolect involve Local, State or Federal funding? []Yes :[~]No
If Yes, explain
~No
25.,~Approvais Required:
Type
Submittal
Date
City, Town, Village Board []Yes rZNo
City, Town, Village Planning Board []Yes I-lNo
City, Town Zoning Board r-lYes ~rNo
City, County Health Department ~Yes l-lNo
Other Local Agencies []Yes [No
Other Regional Agencies l~Yes r-INo
State Agencies []Yes i-lNo
Fedora] Agencies []Yes r-lNo
site plan
SCPC Review
DEC
Corp of Eng!neers
C. Zoning and Planning Information
1. Does proposed action involve a planning or zoning decision? -1Yes ~,No _
If Yes, indicate decision required:
tTzoning amendment [zoning variance F-IsoeciaJ use permit []subdivision FTsite plan
F-lnew/revision of master plan []resource management plan E~other
2. What is the zoning cJassification(s)of the site? C heav'¥
3. What is the maximum ootentJal development of the site if develooed as permitted bv the sresent zoning?
defined by use and zoning code
4. What is the proposed zoning of the site? C heavy
$. What is the maximum potential development of the site if developed as permitted by the proposed zoning?
defined bv use and zoninq code
Is the proposed action consistent with the recommended uses in adopted tocat land use plans? ~Yes
What are 'the predominant iand use(s) and zoning classifications within a ¼ mile radius of proposed action?
C-i, M-i, AR40, ARS0
8. Is the proposed action compatible with adjoining;surrounding land uses within a ~¼ mile? [~Yes
9. If the proposed action is the subdivision of land, how many lots are proposed?
a. What is the minimum lot size proposed?
10. Will proposed action require any authorization(s) for the formation of sewer or water districts? il-lYes
'FI. Will the proposed action create a demand for any community provided services (recreation, education, police
fire protection)? ~Yes
a. If yes, is existing capacity sufficient to handle projected demand? l~;Yes
12. Will the proposed action result in the generation of traffic significantly above present levels? ~Yes ~Nc
a. If yes, is the existing road network adequate to handle the additional traffic? E~Yes [No
D. Informational Details
Attach any additional information as may be needed to clarify your project. If there are or may be any adverse:
impacts associated with your proposal, 3lease discuss such impacts and the measures which you propose to mitigate o
avoid them.
E. Verification
I certify that the information provided above is true to the best of my knowledge.
AppI cant/S~ensor Name Henry E. Ravnor, Jr. Date 9/22/88
ignature ~ !,~ ~ , c~ff/'~t,,~;.,~,.~ ~,*~ Title Aqent
I~ the action is in the Cd I Area, and u are a a~e agency, complete the Coastal Assessment [orm be/ore proceeding
with this assessment.
5
flOW or
Russel~
~>.
Z~
for merl¥
H. Reeves
N 54°48 51
-- Richard McKenzie 5Others '/ RoDe,'" - I~ I, tie Ke~ ~ VNion Ke~W-
II
joseph Chef epOWl'~
~ 860.0d
6¸9
0
o S'64°06'2 "~ 79.54'
STORY
o ~0, o~."V~
$.47 '
6,%
T,4
DOCK
4.7
o
BASIN
DREDGED
$2.14'
5.1
F
ILl
NOTE.
I. TOTAL AREA : 18.7047 ACRES ( TOrlE LINE )
ELEVATIONS ARE REFERENCED TO N~V.D
S. · = MONUMENT
4. SUFFOLK COL~TY TAX MAP
DISTIOOO SECT~ BL 7 LOT
GARDINERS
BAY
TOPOGRAPHICAL SURVEY FOR
LONG ISLAND OYSTER FARMS, INC.
AT EAST
TOWN OF
SUFFOLK
MARION
SOUTHOLD
COUNTY, N. Y
400 OSTRANOER AVE,~ RIVERHEAD~ N.Y,
ALDEN W. YOUNG, ~YS. RE. & L.$. LIC. NO. 12845
HOWARD W. YOUNG, N,Y.[ L.$. LIC. NO. 4589:5
£&tI££PTUAL 14.,~t~IAIA ?LAM
!00 -~ ~OA 7' ,~ OC/~IN~ AMEA
0 >'5 T£,~ FM,~M5 A 5.~ 0 ~1~ T~5 PROJE~ T
~.z~-.4~7'.z/.,q,4:??-:-y,/ ,,~.]C //fl~, 7
// /
~DOE~ I~OT£
.eoc__Z dE-YT-y'