Loading...
HomeMy WebLinkAboutO'BRIEN, DENIS TRUSTEES John M. Bredemeyer, III. President Henry P. Smith, Vice President Albert J. KrupskL Jr. John L. Bednoski, Jr. John 13. Tuthill Telephone (516) 765-1892 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD SCOTt L. HARRIS Supervisor Town Hall, 53095 Main Road P.O. Box 1179 Southold. New York 11971 Fax (516) 765-1823 Telephone (516) 765-1800 November 16, 1990 Glenn E. Just J. M. O. Consulting P.O. Box 447 Quogue, NY 11959 RE: Waiver request / Denis O'Brien SCTM ~1000-3-3-3.1 Dear Mr. Just: The following action was taken by the Board of Town Trustees during its regular meeting held on November 15, 1990: RESOLVED that the Town Trustees APPROVE the request of J.M.O. Consulting on behalf of DENIS O'BRIEN for a waiver to construct a freshwater pond and establish plantings of emergent vegetation within a freshwater wetland; plant the area around the pond with upland shrubs and construct two gravel paths, based on the approved plan of the N.Y.S.D.E.C. A waiver fee of thirty-five ($35.00) dollars is due. Please return to the Building Department for a determination on the need for any other permits which may be required for this project. Very truly yours, Bredemeyer, III President, Board of Town Trustees JMB:jb cc: Bldg. Dept. CAC File BOARD OF TOWN TRUSTEES TOWN OF $OUTHOLD Town Hall, 53095 Main Road P.O. Box 728 Southold, New York 11971 TELEPHONE (516) 765-1892 APPLICATION IS HEREBY MADE TO THE TOWN TRUSTEES, TOWN OF SOUTHOLD, SUFFOLK COUNTY, NEW YORK, FOR THE ISSUANCE OF A PERMIT PURSUANT TO THE LAWS, ORDINANCES AND REGULATIONS GOVERNING THE COASTAL AND INTERIOR WETLANDS, FLOOD PLAINS AND DRAINAGE AREAS OF SOUTHOLD TOWN, AND THE ISSUANCE OF PERMITS PURSUANT TO CHAPTER 32 OF THE CODE OF THE TOWN OF SOUTHOLD. ? APPLICATION NO. /{/~--'-. DATE November 8, 1990 APPLICANT'S NAME: Denis 0'Brien TEL. NO. 788-6676 MAILING ADDRESS: P.O. Box 516, Fishers Island~ N.Y. 06390 AGENT: Glenn E. Just/ J.M.0. Consulting TEL NO. AGENT ADDRESS: P.O. Box 447, Quote NY 11959 PERMIT REQUESTED TO: 653-0607 construct a freshwater pond and establish plantings of emergent vegetation within a freshwater wetland. Plant the area around pond with uplands shrubs and construct two gravel access paths. All work shall be accordance with attached LPo1cO n s · ATION OF PROPERTY FOR REQUESTED PERMIT: HAMLET:- _ Fishers Island TAX MAP NO: 1000- 3-3-3,1 CREEK, BAY OR HARBOR FRONTING PROPERTY: SIZE OF PROPOSED WORK: LENGTH: Please see enclosed plans WIDTH: Please see enclosed plans un-namad frashwatar wetlaod8 , Construct a freshwate~ pond and establish plantings of em~rgenq vegetation within a freshwater wetland. Plant the area aroond pond with upland shrubs and construct two gravel access paths. All work shall be accordance ~ith attached plans. App. Page 2. ,, approximately YDS. TO BE EXCAVATED~: YDS. TO BE FILLED: MANNER IN WHICH MATERIAL WILL BE REMOVED OR DEPOSITED: with clamshell crane WIDTH OF CANAL, CREEK OR BAY FRONTING PROPERTY: n/a DEPTH AT LOW TIDE: n/~ AVER. RISE IN TIDE: DISTANCE TO NEAREST CHANNEL: n/a n/a DISTANCE PROJECT EXTENDS BEYOND SIMILAR PROJECTS IN AREA: AREA ZONING: ~-]40 IS PROJECT FOR PRIVATE OR BUS. USE: Private INTENDED USE OF PROPERTY: Priv~t~ DESCRIBE KNOWN PRIOR OPERATIONS CONDUCTED ON PREMISES: site previous disturbed and reRraded HAS ANY PRIOR LICENSE OR PERMIT BEEN ISSUED TO ERECT STRUCTURES, DREDGE, OR DEPOSIT FILL ON SAID PREMISES: Yes, for single family residence, cottage, tennis court pool decking. HAS ANY LICENSE OR PERMIT EVER BEEN REVOKED OR SUSPENDED BY A GOVERNMENTAL no AGENCY: DESCRIBE FULLY THE REHABILITATION OF PROPERTY: Please note enclosed plans DESCRIBE PROPOSED CONDITION OF PROPERTY AFTER WORK IS COMPLETED. INCLUDE AN ADDITIONAL SURVEY OF PROPERTY SITE IF NECESSARY: Please note enclosed plans ARE THERE ~Y COVENANTS OR RESTRICTIONS IN YOUR DEED WHICH WOULD PROHIBIT THIS PROJECT: no WRITTEN CONSENT OF OWNER IF NOT THE SAME AS APPLICANT: no / / I I / / / / / / POND NOTES: A. Emergent Plants: NOTES: EXISTING CONTOURS -PROPOSED CONTOURS t I I Il I (2)--2"x2"X3' STAKES EACH BALE ~' ,, If phragmite roots are encountered during the excavation operation, alt roots and soil shall be trucked off the site os unsuitable material. HAYBALE BARRIER NOT TO SCALE WETLAND PLANT LISTS: A. Upland Shrubs: 1. duniperus conferta - Japanese Shore Juniper Spacing - 3 ft. O.C, Size - 18"-24" Spread Quantity - 98 each 2. Rose rugosa - Rugosa Rose Spacing - 3 ft. 0.0. Size - 2'-,3' Hr, Quantity- 20 each 3. Myrica pennsylvanica - Bayberry Spacing - 4 ft. O.C. Size - ,3'-4' Hr. Quantity - 20 each 4. Vaccinium cormybosum - Highbush Blueberry Spacing - 4 ft. O.C. Size - 3'-4' Hr. Ouantity - 50 each B. Emergent Plants: 1. iris pseudocorus - Yellow Water Iris Plant up to 5" in water Spacing - 2 ft. O.C. 2. Lythrum lineare - Lythrum Plant up to water's edge Spacing - 2 ft. O.C. 3. Acorus calamus - Sweet Flag Iris Plant up to 3" in water Spacing - 2 it, O,C. 4. Iris versicoia - Blue Flag Iris Plant up to 3" in water Spacing - 2 ft. O.C. 5. Poiygonum muhlenbergh - Nodding Smartweed Plant up to 10" in water Spacing - 2 ft. O.C. Before beginning work in the area of the pond, a temporalry fence shall be erected five (5) feet from the limit of excavation. Hay bales shall be stacked so that the top of the hay bates are a minimum one (1) foot above the water surface. The hay bales shall be secured place with a wood stake or a steel pin extending through the hay bales at least one (1) foot into the groundwater. 350 emergent plants shall be planted as per the above limt according to seasonal availability with no more than 30% (~f one variety planted two feet on center. The proposed pond/wetlands shall be excavated to a minir-num depth of four feet. Within five feet of the final shore line, the Ipond depth will be two feet sloped @ 1:4 to meet the existing topography in the shortest distance to preserve existing vegetation. Pond AerotTon: Aerating nozzles will be used at o minimum of one location within the limits of the new pond. Aerotfon will reduce the algae and slime growth while speeding along the process ~of balancing the pond. All electrical shall be connected to ground fault interrupter 2 pole, 3 wire grounding duplex receptacle Aeration systems shall conform to the following table of underwater connections and assembled os detailed by Lilypon Water Gardens, Lilypons, Maryland 21717-0010. Pump required to aerate the pond shall be of the following specifications: Cai-pump - 115 volts A.C. - 352 watts Model 600V-20 Number 65620 1200 gaHan per hour Pump wit1 lift up to 20'-0" 1" tubing required at 5/4" ht Horse power is 1/8 hp - 52 amps REVISIONS DATE DESCRIPTION SCALE: I = I0' I SHEET I OF I PLANT~NG LOCATIONS AS SHOWN ON gLANS: Size of Pits: The depth of pits for container grown shrubs shall be adequate to provide o minimum of three inches of soil under the bails. Plante: Container grown plants with root ball 25% or less In diameter and depth than that specified for B & B moteri~ will be acceptable for plants specified as B & B. A 15~ tolerance will be allowed In diameter and depth provided that the volume of the resultant root boll is not tess than the volume of the root ball spceifled, Container grown shrubs moy be planted In existing soil with the incorporation of an approved organic material equal to one quarter (1/4) the pit volume. Planting Soil: Shall consist of topsoil and approved organic material pre-mixed In the proportion of one part organic material to seven parts topsoil. Fertilizer: MAG AMP (7-40-6) and Triple Superphosphote (0-46-0) shall be placed in each plant pit before setting plants at the following rates: One pound of MAG AMP and one-half (1/2) pound of triple superphosphote for each major tree. One-half (1/2) pound of MAG AMP and one quarter (1/4) pound of trl le superphoephate for each minor tree and evergreen tree. One eighth ~1/8) pound of MAG AMP and one eighth (1/8) pound of triple superphosphote for each shrub. Up to three waterings for the compaction of the planting soil after satang plants and before applying mulch shall be provided. Saucer depth sh~ll be three (3) Inches. Mutchlng: A six-inch (6) layer of shredded wood of wood chip mulch shall be uniformly placed in the area of ~11 plant pits and planting beds. After mulching, fertilizer shall be evenly applied to all mulched areas at a rate of 0.15 pounds of fertilizer per squore foot. A second applicotlon of 10-6-4, at the same rate, shall be made on the mulched ~re~s at the end of the period of establishment. Care of Planting: Care of planting shaft consist of keeping the plants In a healthy growing condition by watering, weeding, culUvotlng, pruning, spraying, with Insecticides, tightening of guys, re-mulching, applying approved anti-desiccants as directed, and by any other necessary operations. All plants shall be watered to provide not less than five gallons of water per square yard (1" foyer of water) of plant pit and bed areas. Unless otherwise approved, all plants shall be sprayed with a~ anti-desiccant. ]'ne anti-desiccant shall be applied occordlng to the manufacturer's directions to thoroughly cover all above ground parts. The time of application shell be ~s follows unless otherwise approved: Evergreen: Apply within 10 doys following pleating. Deciduous: Spring planting-Apply when leaves have reached at least seventy-five percent (75%) of mature size. FaTI planting-Apply in October or November when the temperature Is 40 degrees Fahrenheit or over. Ail dead, unhealthy, or badly Impaired plants shall be promptly removed from the project. In the event of the threat of serious damage from insects, dlse~ses, or rodents, the plants shall be treated by preventive or remedial measures approved for good horticultural practice. PROPOSED POND DENIS 0 BLOCK 1 8 FISHERS ISLAND, NEW YORK CHANDLER, PALMER & KING ARCHITECTS, ENGINEERS & SURVEYORS 110 BROAD'CAY, NOR~iICH, CONNECTICU~ 06360 (203) 889-3397 FAX # (203) 886-7801 NOV - 9 1990