Loading...
HomeMy WebLinkAboutPBA-02/05/2018 OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex ��®v s®���® P.O.Box 1179 54375 State Route 25 �® �_ Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Southold, NY ': n Telephone: 631 765-1938 G , s www.southoldtownny.gov ® y a® PLANNING BOARD OFFICE RECEIVED TOWN OF SOUTHOLD FEB 1 2 2018 PUBLIC MEETING Southold Town Clerk AGENDA ;z February 5, 2018 6:00 p.m. _ Southold Town Meeting Hall SETTING OF THE NEXT PLANNING BOARD MEETING Board to set Monday, March 12, 2018 at 6:00 p.m. at the Southold Town Hall, Main Road, Southold, as the time and place for the next regular Planning Board Meeting. SUBDIVISIONS Re-Issue Final Plat Determinations: Krupski & Zachariadis —This proposed Lot Line Change will transfer 0.62 acres from SCTM#1000-103-5-5/SCTM#1000-97-8-31.2 to SCTM#1000-103-5-1. 8CTM#1000- 103-5-1 will increase from 0.43 acres to 1.05 acres and SCTM#1000-103-5-5. SCTM#1000-97-8-31.2 will decrease from 22.21 acres to 21.59 acres in the R-80 and R-40 Zoning Districts. The property is located at 195 Little Neck Road, approximately 1,684 feet south of Eugene's Road, in Cutchogue. SCTM#1000-103-5-5, 1 & 1000-97- 8-31.2 Conditional Final Plat Determinations: Hazard, David & Barbara —This proposal is for a Standard Subdivision of a 5.14 acre parcel into two lots where Lot 1 = 2.47 acres inclusive of 0.03 acres of wetlands and Lot 2 = 2.67 acres inclusive of 0.08 acres of wetlands located in the R-80 Zoning District. The property is located at 1465 Harbor Lane, in Cutchogue. SCTM#1 000-1 03-2=1 c Southold Town Planning Board Page 2 February 5, 2018 SITE PLANS - STATE ENVIRONMENTAL QUALITY REVIEW ACT SEQRA Type Classifications: Pindar Storage Building — This Agricultural Site Plan is for the proposed relocation and construction of a 1-story 3,259 sq. ft. building for agricultural equipment storage and no basement, located on 70.4 acres in the AC Zoning District where there is 7,151 sq. ft. of existing buildings. The property is located at 39935 Route 25, in Peconic. SCTM#1000-85-2-9.2 SITE PLANS Determinations: Front Street Professional Office —This proposed site plan application is to demolish an existing two story dwelling and construct a 5,804 gross sq. ft. one story professional office building, full basement and 16 parking stalls on 0.8 acres in the Residential Office (RO) Zoning District. The property is located at 75795 Route 25, Greenport. SCTM#1000-45-7-5.3 Set Hearings: Pindar Storage Building — SCTM#1000-85-2-9.2 APPROVAL OF PLANNING BOARD MINUTES • January 8, 2018 • January 22, 2018 OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex �QF SUUrP.O.Box 1179 54375 State Route 25 ��� Ol0 Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Southold, NY Telephone: 631 765-1938 va www.southoldtownny.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 5, 2018 Albert Krupski Jr: 2790 Skunk Lane Cutchogue, New York 11935-1655 Re: Final Approval with Conditions- Proposed Lot Line Modification for'Zacharias and Krupski Location 195 Little Neck Road, Cutchogue SCTM#1000-97-8-31.2 and 1000-103-5-5.1 & 5 Zoning District R-80 and R-40 Dear Mr. Krupski Jr.: The Southold Town Planning Board adopted the following resolutions at a meeting held on Monday, February 5, 2018: WHEREAS, this proposed Lot Line Modification involves the transfer of a 0.62 acre, 50 foot wide right of;way from the Krupski parcel consisting of two tax parcels, SCTM#1000-103-5-5 and SCTM#1000-97-8-31.2 to the parcel owned by Zachariadis, SCTM#1000-103.-5-1. The area to be transferred is entirely located within SCTM#1000- 103-5-5, which was created when this area was excluded from the development rights sale on the adjacent farmland. Lot 1 will increase in size from 19,057 sq. ft. to 46,153 sq. ft. and will be split-zoned R-40 and R-80. A ZBA Variance was granted, #7102; and WHEREAS, the purpose of the Lot Line Modification is to transfer a 50 foot wide right of way from SCTM#1000-97.-8-31.2 to SCTM#1000-103.-5-5. The right of way does not serve a use to the current landowner; and WHEREAS, on April 18, 2016, a Lot Line Modification Application was submitted; and WHEREAS, the property card for Zachariadis shows the sale of a .438 acre (SCTM#1000-103-5-1, now Andruski) lot to Dubner-Tagney in 1972 with the same acreage as exists today; and Zacharias and Krupski [2] February 5, 2018 WHEREAS, the applicant submitted an Electric Easement dated April 16, 1973 that established a 10' wide easement area running on the north boundary of the entire length of the 50' wide right of way for the purpose of installing utility poles, mains and equipment. The easement was granted by the landowner at the time known as Zeneski; and WHEREAS, site inspection revealed that utility poles occupy the Electric Easement; and WHEREAS, on January 19, 2017, the Zoning Board of Appeals granted a Variance for lot area for SCTM#1000-103-5-1 (File Number 7012) with the following conditions: 1. Approval of the Southold Planning Board is required; 2. Access rights by the two residential parcels to the East shall be preserved through the creation of an access easement. WHEREAS, the subject area proposed to be transferred is a right of way and no Certificates of Occupancy are required; and WHEREAS, on November 7, 2016, the Planning Board reviewed the application at their Work Session and found the application to be complete; and WHEREAS, on April 10, 2017 the Southold Town Planning Board, pursuant to SEQRA, granted a Negative Declaration for the action; and WHEREAS, on April 10, 2017, the Planning Board held and closed the Public Hearing; and WHEREAS, the Southold Town Planning Board, pursuant to Town Code §240-56, Waivers of Certain Provisions, may waive certain elements of the subdivision review if in its judgment they are not requisite in the interest of the public health, safety and general welfare. After reviewing the information submitted for this application, the Planning Board has determined that it is eligible for a waiver of the Environmental Resources Site Analysis Plan (ERSAP), the Primary and Secondary Conservation Area Plan, the Public Hearing, and the Sketch Plat and Preliminary Plat steps of the subdivision process for the following reasons: 1. No new lots are being created; 2. No changes will occur as a result of this Lot Line Modification that would adversely affect the character of the neighborhood.; and WHEREAS, the Planning Board performed an uncoordinated review of this Unlisted Action pursuant to 6 NYCRR Part 617, Section 617.7 of the State Environmental Quality Review Act (SEQRA); and Zacharias and Krupski [3] February 5, 2018 WHEREAS, pursuant to the Lot Line Modification Policy set by the Planning Board in February 2011, this application is eligible for a decision from the Planning Board prior to receiving approval by the Suffolk County Department of Health Services (SCDHS) as it meets the following criterion set forth in that policy: • Where no new development potential will be created in the parcel to which the land is transferred; and WHEREAS, the Planning Board determined that the proposed action meets all the necessary requirements of Town Code §240-57 for a Lot Line Modification; and WHEREAS, the access easement language included within the draft deeds has been reviewed by the Town Attorney and it was determined that the language upholds the right of access over the 50 ' wide right of way for SCTM#1000-103-5-2.5 and SCTM#1000-103-5-2.4; and WHEREAS, the language satisfies condition 2 of the Zoning Board of Appeals decision; and WHEREAS, on November 8, 2018 , the Planning Board issued Final Approval for this Lot Line Modification with a condition that required a recorded deed be submitted to the Planning Department with 62 days of the date of approval; and WHEREAS, the 62 day timeframe ended on January 10, 2018 and the approval is now null and void; and WHEREAS, on January 4, 2018, the agent for the application submitted a letter explaining the reason for missing the deadline being that they had difficulties in coordinating the parties to sign the new deed; and WHEREAS, the Planning Board has agreed to re-issue the Final Approval as follows; be it therefore RESOLVED, that the Southold Town Planning Board hereby waives the requirements of Town Code §240 to submit the ERSAP, Primary and Secondary Conservation Plans, Sketch Plat and Preliminary Plat steps; and be it further RESOLVED, that the Southold Town Planning Board hereby waives the requirement for Suffolk County Department of Health Services approval prior to Planning Board approval of this Lot Line Modification; and be it further RESOLVED, that the Southold Town Planning Board grants Final Approval with Conditions on the maps entitled "Lot Line Change 1000-103-5-1 and 1000-103-5-5 dated September 19, 2016 and prepared by John C Ehlers Land Surveyor " with the following condition: 1. Submit a copy of the recorded deed showing the change in lot lines to the Zacharias and Krupski [4] February 5, 2018 Southold Town Planning Department within 62 days of the date of Final Approval or such approval shall expire and be null and void. Upon fulfilment of the above conditions, Final Approval shall be granted and the Planning Board Chairman is authorized to endorse the map. Please Note: The Southold Town Planning Board, in waiving the requirement for SCDHS approval prior to their own approval, is simply waiving a technical requirement of Final Plat Approval under the Town Code and makes no representations as to whether SCDHS approval is required. SCDHS approval of this Lot Line Change may be necessary to be in compliance with the Suffolk County Sanitary Code and to be eligible for future construction or renovations. If you have any questions regarding the above, please contact this office. Respectfully, Donald J. Wilcenski Chairman Encls. cc: Assessors I understand that Southold Town Planning Board approval of this Lot Line Modification does not grant, guarantee or waive an approval, if required, from the Suffolk County Department of Health Services (SCDHS). I understand that I will need to apply separately to the SCDHS for any applicable approvals. Signature of Applicant or Agent Print Name OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex �*rjf SO P.O.P.O. Box 1179 54375 State Route 25 �� l0 Southold, NY 11971 (cor. Main Rd. &Youngs Ave.) Southold, NY Telephone: 631765-1938 CA www.southoldtownny.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 6, 2018 Mr. Charles Southard Jr. 435 Bay Home Road Southold, NY 11 971 Re: SEQR Classification & Set Hearing - Pindar Agricultural Barn 37325 NYS Route 25, ±1,341' w/o corner of Peconic Lane & Route 25, Peconic SCTM#1000-85.-2-9 Dear Mr. Southard: The following resolutions were adopted at a meeting of the Southold Town Planning Board on Monday, February 5, 2018: WHEREAS, this Agricultural Site Plan is for the proposed relocation and construction of a 1-story 3,259 sq. ft. building for agricultural equipment storage and no basement, located on 70.4 acres in the AC Zoning District, where there is 7,151 sq. ft. of existing buildings; and WHEREAS, the Southold Town Planning Board, pursuant to State Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617.5 (c), determined that the proposed action is a Type II Action as it falls within the following description for 6 NYCRR, Part 617.5(c)(3) agricultural farm management practices, including construction, maintenance and repair of farm buildings and structures, and land use changes consistent with generally accepted principles of farming. The action is for the construction of a 1-story 3,259 sq. ft. building for agricultural equipment storage and no basement; be it therefore RESOLVED, that the Southold Town Planning Board has determined that this proposed action is a Type II Action under SEQRA as described above; and be it further RESOLVED, that the Southold Town Planning Board sets Monday, March 12, 2018 at 6:01 p.m. for a Public Hearing regarding the Site Plan entitled "Relocated Steel Pindar Ag Barn Page 2 February 6, 2018 Storage Building for Pindar Vineyards", prepared by Charles W. Southard R.A., dated October 19, 2017. The Public Hearing packet regarding the Town's notification procedure and the sign & post will need to be picked up at the Planning Board Office at the Southold Town Annex when you are contacted to do so. Please return the Affidavit of Posting/Mailing, included in the packet, along with the certified mailing receipts AND the signed green return receipt cards before 12:00 noon on Friday, March 9, 2018. The sign and the post need to be returned to the Planning Board Office after the public hearing is closed. If you have any questions regarding the information contained in this resolution, please contact the Planning Board Office. Respectfully, Donald J. Wilcenski Chairman Encls. OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex *QF SO P.O.P.O. Box 1179 54375 State Route 25 �� l0 Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Southold, NY Telephone: 631 765-1938 va www.southoldtownny.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 6, 2018 Michael Kimack P.O. Box 1047 Southold, NY 11971 Re: Conditional Final Plat Approval & Waiver of Final Hearing Proposed Standard Subdivision for David & Barbara Hazard Located at 1465 Harbor Lane, Cutchogue SCTM#1000-103-2-1 Zoning District: R-80 Dear Mr. Kimack: The Southold Town Planning Board adopted the following resolutions at a meeting held on Monday, February 5, 2018: WHEREAS, this proposal is for a Standard Subdivision of a 5.14 acre parcel into two lots where Lot 1 = 2.47 acres inclusive of 0.03 acres of wetlands and Lot 2 = 2.67 acres inclusive of 0.08 acres of wetlands located in the R-80 Zoning District; and WHEREAS, on August 18, 2016 the agent submitted a Sketch Plan Application along with other material for submission pursuant to Article V Sketch Plat Review; and WHEREAS, on January 5, 2017, the Zoning Board of Appeals granted a variance for insufficient lot width under application number 6997 subject to the following conditions (as amended): 1. Create a 100' non-disturbance buffer landward from the edge of wetlands on proposed Lot 2; 2. Any new residential structures must have an onsite decentralized wastewater treatment system that, at a minimum, is designed to reduce total nitrogen in treated effluent to 19 mg/L, and further regulated by Article 19 of the Suffolk Hazard Subdivision Page 12 February 6, 2018 County Sanitary Code and consistent with the conditions set forth by the LWRP Coordinator in his comments of November 21, 2016; 3. This variance is subject to approval by the Southold Town Planning Board; and WHEREAS, on March 13, 2017, the Southold Town Planning Board granted Conditional Sketch Plan Approval upon the map entitled "Survey of Property Situate Cutchogue", dated December 8, 2015 & last revised January 23, 2017 prepared by Nathan Taft Corwin, III, Land Surveyor; and WHEREAS, at their work session on June 26, 2017, the Preliminary Plat application was found complete; and WHEREAS, on July 10, 2017, the proposed action was classified as an Unlisted Action under SEQR and the Public Hearing was set for August 14, 2017; and WHEREAS, on July 18, 2017, referrals were sent out to all applicable agencies and SEQRA Lead Agency was coordinated; and WHEREAS, on August 2, 2017, the New York State Department of Environmental Conservation responded to the referral request; and WHEREAS, on August 7, 2017, the Cutchogue Fire District responded to the referral request; and WHEREAS, on August 14, 2017, the Preliminary Plat Public Hearing was held and closed; and WHEREAS, on August 16, 2017, the Suffolk County Planning Commission found the application to be a matter for local determination; and WHEREAS, on August 22, 2017, the Office of the Town Engineer responded to the referral request; and WHEREAS, on August 24, 2017, the Suffolk County Water Authority responded to the referral request; and WHEREAS, at their work session on September 11, 2017, the Planning Board found that pursuant to Chapter 240-53 G, the proposed subdivision plat presents a proper case for requiring a park for recreational purposes, however a suitable park cannot be properly located on such subdivision, and a fee of$7,000 is required in lieu thereof,; and Hazard Subdivision Page 13 February 6, 2018 WHEREAS, on October 17, 2017, the Southold Town Planning Board, as Lead Agency, pursuant to SEQRA made a determination of non-significance for the proposed action and granted a Negative Declaration; and WHERES, on October 17, 2017, the Southold Town Planning Board granted Conditional Preliminary Plat Approval upon the map entitled "Preliminary Map of East Creek Esatates", dated July 27, 2015 and last revised June 1, 2017, prepared by Nathan Taft Corwin III, Land Surveyor; and WHEREAS, at their Work Session on October 30, 2017, the Planning Board accepted the draft Covenants and Restrictions; and WHEREAS, pursuant to §240-32 Performance bond, a performance bond based upon the Town Engineering Office's estimate of the total cost of the required capital improvements; and WHEREAS, the application did not present a proper case to require a performance guarantee, as no road clearing or drainage improvements were proposed, and boundary monuments were installed on the property; and WHEREAS, at their Work Session on November 14, 2017, Planning Board accepted nine existing trees on site to fulfill the requirement for street trees; and WHEREAS, on January 8, 2018, the applicant submitted a Final Plat application and a request for a waiver of the Final Plat Hearing; and WHEREAS, at their Work Session on January 22, 2018, the Planning Board found the Final Plat Application complete; and WHEREAS, pursuant to §240-24 Action on final plats which are in substantial agreement with approved preliminary plats, the Planning Board has the ability to waive the requirement of a Final hearing; and WHEREAS, at their Work Session on January 22, 2018, the Planning Board found that the changes between the approved Preliminary Plat and the submitted Final Plat are minor, and the Final Plat is in substantial agreement with the approved Preliminary Plat; therefore be it RESOLVED, that the Southold Town Planning Board waives the Public Hearing on the Final Plat pursuant to §240-24 Action on final plats which are in substantial agreement with approved preliminary plats, and be it further RESOLVED, that the Southold Town Planning Board grants Conditional Final Plat Approval upon the map entitled, "Final Plat for East Creek Estates" dated July 25, 2015 and last revised January 7, 2018, prepared by Nathan Taft Corwin III, Land Surveyor with the following conditions; Hazard Subdivision Page 14 February 6, 2018 1. Obtain approval from the Suffolk County Department of Health Services; 2. File the following with the Suffolk County Clerk's Office and submit proof of filing to the Planning Board; a. Covenants and Restrictions as approved by the Planning Board; b. Common Driveway Easement; 3. Submit 12 paper copies and 4 Mylars of the Final Plat including the stamp of approval from the SCDHS; 4. Provide an Administration Fee in the amount of$4,000 pursuant to Southold Town Code §240-37; 5. Provide a Park & Playground fee of$7,000, pursuant to §240-53 G of the Southold Town Code. The applicant shall have 180 days to meet the conditions. The Planning Board may extend this time for no more than two additional periods of 90 days each. Upon a finding that all conditions have been met, the Planning Board will schedule the application for a Final Plat Determination at the next available Public Meeting. If you have any questions regarding the above, please contact this office. � ' (Sa)�j ectfu ly, Donald J. Wilcenski Chairman cc: David Hazard OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex �F�� � ���P� � � P.O. Box 1179 54375 State Route 25 ���"�" w� Southold, NY 11971 (cor. Main Rd. &Youngs Ave.) Southold, NY 7f Telephone: 631 765-1938 i y g �, � www.southoldtownny.gov � z PLANNING BOARD OFFICE TOWN OF SOUTHOLD February 6, 2018 Mr. Charles Southard Jr. 435 Bay Home Road Southold, NY 11971 Re: Approval - Site Plan for Front Street Professional Office 820 Front Street, ±340' n/e/o Moore's Lane & Route 25, Greenport SCTM#1000-45-7-5.3 Zoning District: Residential Office (RO) Dear Mr. Southard: The following resolutions were adopted at a meeting of the Southold Town Planning Board on Monday, February 5, 2018: WHEREAS, this proposed Site Plan Application is to demolish an existing two story dwelling and construct a 1-story 2,902 sq. ft. building for a professional office with a 2,902 sq. ft. basement for related storage, a 744 sq. ft. garage for accessory storage, and 16 parking stalls on 0.8 acres in the Residential Office (RO) Zoning District. The property is located at 75795 Route 25, Greenport; and WHEREAS, on June 9, 2017, Charles Southard, authorized agent, submitted a Site Plan Application for review; and WHEREAS, on June 26, 2017, the Planning Board found the application incomplete for review and required revisions and additional information; and WHEREAS, on July 5, 2017, Charles Southard, authorized agent, submitted the required materials for review; and WHEREAS, on July 24, 2017, the Planning Board formally accepted the Site Plan Application as complete for review with revisions to be made immediately; and Front Street Office Page 2 February 6, 2018 WHEREAS, on August 1, 2017, Charles Southard, authorized agent, submitted a portion of the required materials for review; and WHEREAS, on August 9, 2017, Charles Southard, authorized agent, submitted a portion of the required materials for review; and WHEREAS, on August 14, 2017, the Southold Town Planning Board, pursuant to State Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617, determined that the proposed action is an Unlisted Action as it does not meet any of the thresholds of a Type I Action, nor does it meet any of the criteria on the Type II list of actions; and WHEREAS, on August 28, 2017, the Planning Board, pursuant to Southold Town Code §280-131 C., distributed the application to the required agencies for their comments, and performed a coordinated review under SEQRA; and WHEREAS, on September 6, 2017, the Southold Town Fire Inspector reviewed and determined that there was adequate fire protection and emergency access for the site; and WHEREAS, on September 11, 2017, a Public Hearing was held and closed; and WHEREAS, on September 19; 2017 the Suffolk County Planning Commission (SCPC) determined the proposed action as a local determination; and WHEREAS, on September 22, 2017, the Greenport Fire District determined there was adequate fire protection for the site; and WHEREAS, on September 22, 2017, the Architectural Review Committee (ARC) approved the proposed action as submitted; and WHEREAS, on October 27, 2017, the Town of Southold Local Waterfront Revitalization Program Coordinator reviewed the proposed project and determined the project to be consistent with Southold Town LWRP policies with recommendations to the Planning Board; and WHEREAS, on November 6, 2017, the Southold Town Engineer reviewed the application and required revisions to the Site Plan in order to meet the minimum requirements of Chapter 236 for Storm Water Management; and WHEREAS, on November 6, 2017, the Southold Town Planning Board, as Lead Agency pursuant to SEQRA, made a determination of non-significance for the proposed action and granted a Negative Declaration; and WHEREAS, at,a Work Session on November 6, 2017, the Planning Board reviewed comments from the Public Hearing, referral responses and staff analysis for the proposed application and required revisions to the Site Plan and additional information; and Front Street Office Page 3 February 6, 2018 WHEREAS, on January 5, 2018, Charles Southard, authorized agent, submitted revised Site Plans and additional information as required; and WHEREAS, on January 5, 2018, the Suffolk County Department of Health Services (SCDHS) granted approval C10-17-0008 for a "non-medical office space and storage garage" @ 203.88gpd; and WHEREAS, on January 22, 2018, the Southold Town Planning Board determined that all applicable requirements of the Site Plan Regulations, Article XXIV, §280 — Site Plan Approval of the Town of Southold, have been met; and WHEREAS, on January 25, 2018, the Planning Board sent a request for a use certification to the building department for the proposed action; and WHEREAS, on February 1, 2018, the Southold Town Chief Building Inspector reviewed and certified the proposed professional office as a permitted use in the Residential Office (RO) Zoning District; be it therefore RESOLVED, that the Southold Town Planning Board has determined that this proposed action is consistent with the policies of the Town of Southold Local Waterfront Revitalization Program; and be it further RESOLVED, that the Southold Town Planning Board hereby grants Approval with Conditions, listed below, of the site plan shown on the site plan entitled "820 Front Street LLC", prepared by Charles W. Southard, R.A., dated May 17, 2017 and last revised January 23, 2018, and authorizes the Chairman to endorse the site plan. Conditions 1. The garage and basement are for accessory storage to the office use only and any other use of these areas will require an amended site plan application; 2. A truck apron shall be implemented for the construction period with a landscape fabric bottom then larger stone on top, for protection of the sidewalk and existing apron ramp; 3. Before the support of an issuance of a Certificate of Occupancy (CO) by the Planning Board, the sidewalks and driveway apron shall be inspected for any damage and repaired if necessary. Please also note the following requirements in the Southold Town Code relating to Site Plans: 1. Any new lighting fixtures beyond those approved as part of the Lighting Plan must conform to the Code and may require Planning Board approval depending on their number; size, intensity and location. Fixtures.shall be shielded so the Front Street Office Page 4 February 6, 2018 light source is not visible from adjacent properties and roadways and shall focus and direct the light in such a manner as to contain the light and glare within property boundaries and conform to §172 of the Town Code; 2. All storm water run-off from grading, driveways and gravel areas must be contained on site; 3. Proposed storm water run-off containment systems must be inspected by the Town Engineer at the time of installation. Please call the Southold Town Engineer prior to beginning this work; 4. Approved Site Plans are valid for eighteen months from the date of approval, within which time all proposed work must be completed, unless the Planning Board grants an extension; 5. Any changes from the Approved Site Plan shall require Planning Board approval; 6. Prior to the issuance of a Certificate of Occupancy, the Planning Board must inspect the site to ensure it is in conformity with the Approved Site Plan, and issue a final site inspection approval letter. Should the site be found not in conformance with the Approved Site Plan, no Certificate of Occupancy may be issued unless the Planning Board approves the changes to the plan. A copy of the Approved Site Plan is enclosed for your records. One copy will also be sent to the Building Department and the Town Engineer/Highway Department. If you have any questions regarding the above, please contact this office. Respectfully, NJ Donald J. Wilcenski Chairman Encl. cc: Building Dept. w/map Town Engineer w/map By signing this letter, the applicant acknowledges that there are Town Code requirements and conditions, including those listed above, that must be satisfied prior to the issuance of a Certificate of Occupancy. Print name: , Applicant Signature: Date: