Loading...
HomeMy WebLinkAbout41406-Z ��o511frfQt,�cdGy Town of Southold 11/16/2017 P.O.Box 1179 53095 Main Rd Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 39340 Date: 11/16/2017 THIS CERTIFIES that the building IN GROUND POOL Location of Property: 170 Pleasant Pl., Southold SCTM#: 473889 Sec/Block/Lot: 88.-5-48 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 2/28/2017 pursuant to which Building Permit No. 41406 dated 3/9/2017 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: ACCESSORY IN-GROUND SWIMMING POOL, FENCED TO CODE, AS APPLIED FOR The certificate is issued to KDMC Properties LLC of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 41406 11-09-2017 PLUMBERS CERTIFICATION DATED VA, th ed Signature p�SUFFo4co TOWN OF SOUTHOLD t BUILDING DEPARTMENT C, TOWN CLERK'S OFFICE o . SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 41406 Date: 3/9/2017 Permission is hereby granted to: KDMC Properties LLC 380 W 12th St#4E New York, NY 10014 To: construct accessory in-ground swimming pool, fenced to Code, as applied for. At premises located at: 170 Pleasant PI., Southold SCTM # 473889 Sec/Block/Lot# 88.-5-48 Pursuant to application dated 2/28/2017 and approved by the Building Inspector. To expire on 9/8/2018. Fees: SWIMMING POOLS -IN-GROUND WITH FENCE ENCLOSURE $250.00 CO - SWIMMING POOL $50.00 Total: $300.00 Bui �gr4ector For m No. 6 TowN OF SOUTHOLD BUILDING DEPARTMEN"C TOWN BALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: 1. Final survey of property with accurate location of all buildings, property lines, streets, and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage-disposal(S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from-plumber certifying that the solder used in system contains less than 2/10 of I% lead. 5. Commercial building, industrial building,multiple residences and similar buildings and installations,a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings (prior to April 9, 1957) non-conforming uses,or buildings and "pre-existing" land uses: 1. Accurate survey of property showing all property lines, streets,building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied, the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00,Alterations to dwelling$50.00, Swimming pool$50:00,Accessory building$50.00,Additions to accessory building$50.00,Businesses$50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. C6py 6-f-C&rtificafe of Occupancy=$25.-- `- 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy-Residential$15.00,Commercial$15.00 Date. a16. 6, ;Z©/ New Construction:yOld or Pre-existing Building: (check one) Location of Property: 170 Ke'/th-,�r -V House No. Street Hamlet Owner or Owners of Property: / Ce 000 Z Suffolk County Tax Map No 1000, Section ��b Block ,7 Lot Subdivision (� Filed Map. Lot: Permit No. I Date of Permit. Applicant: Xjtjj,,W� Health Dept. Approval: Underwriters Approval: Planning Board Approval: 1/ em Request for: Temporary Certificate Final Certificate: (check one) q P Fee Submitted: $ o pplicant Signature r Town Hall Annex Telephone(631)765-1802 54375 Main Road eos Fax(631)765-9502 P.O.Box 1179 ® �� rog e r.ri ch ert(a-)-town.so uth o Id.ny.u s Southold,NY 11971-0959 ®lyc®U9�� BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICIAL COMPLIANCE SITE LOCATION Issued To: KDMC Properties LLC (Mc Donouch) Address: 170 Pleasant Place city:Southold w New York zip: 11971 Building Permit#: 41406 Section: 88 Block: 5 Lot: 48 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: DBA: JES Electric License No: 4483-ME SITE DETAILS Office Use Only Residential X Indoor Basement Service Only Commerical Outdoor X 1st Floor Pool New Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceding Fixtures HID Fixtures Service 3 ph Hot Water GFCI Recpt 1 Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps Transformer Appliances Dryer RecptEmergency Fixture Time Clocks 2 Disconnect Switches 2 Twist Lock Exit Fixtures 11 TVSS Other Equipment* Inground Swimming Pool to Include: Bonding, 4- Pool Lights (Low Voltage), Control Panel, 3- GFCI Circuit Breakers, Salt Generator, Heat Pump, Pool Cover Motor. Notes: Inspector Signature: ZDate: November 9, 2017 0-Cert Electrical Compliance Form.xIs OSOF so N O cou TOWN OF SOUTHOLD BUILDING DEPT. 765-18®2 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLEIG. [ ] FOUNDATION 2ND [ ] SULAT ON [ ] FRAMING / STRAPPING [% FINAL k� [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) REMAR S: b -- tQA n bx r A t C� DATE O l V Wy' INSPECTOR - IN5,TJL.ATIC)N- i 1,10 O'WN WMIN W&M.rll I M 04 1 Ri 7P,.il I&-A.M 1614 W-%wAwr;'w TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD, NY 11971 4 sets of Building Plans TEL: (631)765-1802 Planning Board approval FAX: (631) 765-9502 Survey So utholdTown.NorthFork.net PERMIT NO. �/ Check Septic Form N.Y.S.D.E.C. Trustees C.O.Application ® V Flood Permit Examined '20a Single&Separate D Storm-Water Assessment Form FEB 2 8 2017 Contact: Approved � ,20� Mail to: CJI 1� i rkn�iP.r Disapproved a/c B�'D�C'D�' �N — ag91 t10)L1 TOWN OF S®7,,7 Phone: Expiration ,20 Buil in ector APPLICATION FOR BUILDING PERMIT Date f��V , 20 l T INSTRUCTIONS a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application,the Building Inspector"will issue a Building Permit to the applicant. Such a permit shal I be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date.If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for,the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York,and other applicable Laws, Ordinances or Regulations, for the construction of buildings,additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances,building code,housing code, and regulations,and to admit authorized inspectors on premises and in building for necessary inspections. (Signature of applicant or name,if a corporation) (Mailing address of applicant) State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber obuilder Name of owner of premises a21K� C;�/ ,5 (As on the Wx roll or latest deed) If appl' i is a corporation, s gnat a of duly authorized officer (Name and title of corporate officer) Builders License No. Plumbers License No. Electricians License No. Other Trade's License No. 1. Loca;ionW land on whic'�ro��posed � HousAe Number b �e: Street WHamlet County Tax Map No. 1000 Section 'Block " ' Lot -- -= -. ,,�-:, ,_ sir >• �" : , ; ,,, _ Subdivision Filed Map No. of 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy b. Intended use and occupancy, 3. Nature of work(check which applicable): New Building Addition Alteration Repair Removal Demolition Other Work (Description) 4. Estimated Cost nn s=,5 T-ee, (To'be paid on filing this application) 5. If dwelling, number of dwelling units Number of,dwelRng uni't',on each floor If garage, number of cars 6. If business, commercial or mixed occupancy, specifynafuel'g d7extenTof each type of us- 1A. l 7. Dimensions of existing structures, if any: Front 16 x R Depth Height Number of Stories Dimensions of same structure with alterations or additions: Front Rear Depth Height Number of Stories 8. Dimensions of entire new construction: Front Rear Depth Height Number of Stories 9. Size of lot: Front Rear -Depth 10. Date of Purchase Name of Former Owner 11. Zone or use district in which premises are situated 12. Does proposed construction violate any zoning law, ordinance or regulation? YES N O 13. Will lot be re-graded? YES.NO ✓ Will excess ,fill be removed from premises? YE ZNO 14. Names of Owner of premisesSC077"A-itw / Address Q Phone No. �i ~ �`r✓o}llw Name of Architect Address °"�D`" Phone o Name of Contractors f' , 6d Address 2'"E Phone No. lww-r1-1%zcc,k- 15 a. Is this property within 100 feet of-a tidal wetland or a fr'eshwater wetland?.*YES 1 14 O t/ * IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY7EQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical da a on survey. 18. Are there any covenants and restrictions with respect to this property? * YES NO * IF YES, PROVIDE A COPY. STATE OF NEW YORK) SS: COUNTY OFSIAG &1(( �i,l/niOl r0o7* %/W�/ LC��'G being duly sworn, deposes and'says that(s)he is the applicant (Name of individual signing contract) above named, (S)He is the (Contractor,Agent, orporate Off ceer etc.) of said owner or owners, and is duly authorized to perform or have performed the said'Work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief; and th it the work will be performed in the manner set forth in the application filed therewith. Sworn to before me this age h day of F&YUCtA 201-7 TRACEY 1-. DWYER % :)F N tary Pub(Q) r;rw;c,�us9oo Signature ofApplicant .t,ISUFFOLK COUNTY ..w.tviio ilO1V EXPIRES JUNE 30,2.2/_e -1 FQ Scott A. Russell ���° OF /r�� STO]KI��l WAS 1EIK SUPERVISORI�V1[A\1� .G�]E1\M[]EN`]F SOUTHOLD TOWN HALL-P.O.Box 1179 g 53095 Main Road-SOUTHOLD,NEW YORK 11971 Town of So u th o l d CHAPTER 236 - STORMWATER MANAGEMENT WORK SHEET ( TO BE COMPLETED BY THE APPLICANT ) DOES THIS PROJECT INVOLVE ANY OF THE FOLLOWING: Yes No (CHECK ALL THAT APPLY) ❑[, A. Clearing, grubbing, grading or stripping of land which affects more than 5,000 square feet of ground surface. ❑ B Excavation or filling involving more than 200 cubic yards of material ❑;/ within any parcel or any contiguous area. C- Site preparation on slopes which exceed 10 feet vertical rise to 100 feet of horizontal distance. ❑0/1D. Site preparation within 100 feet of wetlands, beach, bluff or coastal erosion hazard area. ❑ Site preparation within the one-hundred-year floodplain as depicted on FIRM Map of any watercourse. ❑ F. Installation of new or resurfaced impervious surfaces of 1,000 square feet or more, unless prior approval of a Stormwater Management Control Plan was received by the Town and the proposal includes in-kind replacement of impervious surfaces. If you answered NO to all of the questions above, STOP! Complete the Applicant section below with your Name, Signature, Contact Information, Date & County Tax Map Number! Chapter 236 does not apply to your project. If you answered YES to one or more of the above, please submit Two copies of a Stormwater Management Control Plan and a completed Check List Form to the Building Department with your Building Permit Application. APPLICANT (Property Owner,Design Professional,Agent Contractor,Other) S.C.T.M. #: 1000 Date: Distuct NAME Pool CW6�6w „i Section Block Lot ,kt: FOR RUIL DING DEP< RTMEN,1_ ONL'1' ,. r Contact Information 1Q3l Reviewed By. Date Property Address / Location of Construction Work: — — — — — — — — — — — — — — — — — o "� Pate to Approved for procesatng Building Permit wStormwater Management Control Plan Not Required /67( ❑ Stormwater Management Control Plan t�,Required (Forward to Engineering Department for Review) FORM SMCP-TOS MAY 2014 I pf S0�/r�o Town Hall Annex 4 Telephone(631)7g65--1802 54375P.O.Main Road vs roger.dchert covin soU-KoInV.Us O.Box 1179 G � �� Southold,NY 11971-0959 5 BUILDING DEPARTMENT TOWN OF SOUTHOLD 'APPLICATION FOR ELECTRICAL INSPECTION REQUESTEDBY: Date: Company Name: Name: D �GCry� License No.: Address: 6/, Phone No.: 31--617-760 3 JOBSITE INFORMATION: (*Indicates required information) *Name: /&4C AbAlrieS &GC, *Address: i `70 ?teA-St0T t 4Ce .cam - /6; 7 J *Cross Street: *Phone No.: r Permit No.: Tax Map District: 1000 Section: D S­-S� Block: �S� _ Lot: *BRIEF DESCRIPTION OF WORK (Please Print Clearly) 4,C. Fey- (Please Circle All That Apply) *Is job ready for inspection: YES O Rough In Final *Do you need a Temp Certificate: YES / NO Temp Information (if needed) *Service Size: 1 Phase 3Phase 100 150 ' 200 300 350 400 Other *New Service: Re-connect Underground Number of Meters Change of Service Overhead Additional Information: PAYMENT DUE WITH APPLICATION 82-Request for Inspection Form l l�� eNq O �� , �_ TOWN OF SOUTHOLD PROPERTY RECORD CARD /didw OWNER - STREET VILLAGE DIST. SUB. LOT SEZ c� (L ^ 4-1 Z,�, plear--,r� Pince FORME E N E AC!3,�; P, pet 4.4.— R. S W TYPE OF BUILDING r CD RES2)6 SEAS. VL. FARM COMM. CB. MICS., Mkt. Value o LAND IMP, TOTAL DATE REMARKS Q — b' :z a f�'a Z�i l 2 L. .. �/3 T f' y ..r .�a'^ IN 4-6) 11g 0/1) lye *Pd- AAPLP � / e/0 Z/a d v ?oe 40 PoL-+(`ne i o- vet-. -- APC- atm A � o -917 R $ Ia $$O$35- l;nej1a -tar - o �-f ��[a-- r� �. J'7G s� -9 �S' `Q t��f�C �. r�s8� rte, r��-�cr�-r`v+��Irz=fo-�D Pto�►e��i'�-�5���'�OrJ J 220 r7 35 PCF -700 b 4 AGE BUILDING CONDITION LO m NEW NORMAL BELOW ABOVE � `O FARM C\ Acre Volue Per Value rn Acre Tillable a FRONTAGE ON WATER m Wflodlandx FRONTAGE ON ROAD C'4 Meadowleov) a o DEPTH LOi m House Plat co BULKHEAD N m Total DOCK F ■ IA -AM 1,-i fil ■■O■M■M■■■■■MMM!■■C�M■■■■■ ■■■ . - ■■■■■■■■■■■■■■■■■■■I■■■■■■■■■ ,r ■■■■■■■MEMO■■■AMMEMO; MUMMENNIM■ ■■■■■ ■■■■■■■■E��E■■ !!��!!■�i■■■■ IMMENEIROWWWWWWAR WOMEN a■■■M■ea■■■■■■■�■■■■®� ■�!E■C■ ■■■M■■ 'OMEN■■■■■■■■1■■■■■i■■ SuFF.-CO.HIZALTH DOM.APPROVAL H.S No OWN": * VINCE147- 2. 24Y 5z0 /=z41,jK4-lN4VS,. DA;Z JUN -3 ,-, 1918 Ttc, 55, AREA: 18,000 Sqr.f*. to be Dow. (vacant) 00 t"s \• o? _-. -_ - --� - - --- , . A t 4 0 IE/ 0 62' 1- Py ko. -gCA". 10" O=iron pipe cube N 'C THS lUW—,%A I I- 411' C.-M C r NA bf�WNG B"A Tmjg CZRW. Mop of Lor 62 SuammfoIed *a orAwr -r The TMA SLartivifto Cara( arAL 40. and domtkold spirits Oft , (5uff.Co.M4"No Z4Cj0j) 47 MODKII11= VAN TuVL. P. r- ,84yvww" /0 7O' WN 09 SOUT*la-0,N.Y. I=LAND supir.cm Derr.or*irAL-m imTKmr no AppridvAL or comumuancm owy 791X•WATER SUPPLY AND SMAGE DAM DISPOSAL 8VS`MM* FOR TMS RE51- DIkM= VALL CONFORM TO THE H.S.RIF.140 ivAmmium Or BUFFOLK Co. Caw. OF HKALTM. 6KIMCSX. APPROV90; IDS 17' APPLICANr -)o AeA&JT, �NSpEC-TpN REWRED 700 APPRIVED AS NOTED RETAIN STORM WATER RUNOFF PURSUANT TO CHAPTER 236 DATE:nn B.P.# Z_OF THE TOWN CODE. FEE: v� ,06 , NOTIFY BUILDING DEPARTM AT 765-1802 8 AM TO 4 PM FOR THE OCCUPANCY OR t FOLLOWING NAUSE IS UNLAWFU' . OI© - TN?-, REOU+RED FC.'k POURED ' :N CREETF. WITHOUT CERTI F f 2. ROUGH - FRAMINIG & PLUI'vIBING 3. INSULATION OF OCCUPANCY 4. FINAL - CONSTRUC T IC N MUST BE,COMPLETE r'.''; G.O. ALL CONSTRUCTION SHALL BEET THE G� S REQUIREMENTS OF THE CODES OF NEW YORK STATE. NOT RESPONSIBLE FOR DESIGN OR CONSTRUCTION ERROR` COMPLY WITH ALL CODES OF NEW YORK STATE & TOWN CODES AS REQUIRED AND CONDITIONS OF -40UIEQLD-JOWN ZRA qq 56' T ARD A lj9d TI, S9UTH)fli� EES 0 �c,� . . . - �a 14 � 7 /01 W a u-�bm a-�i'� aw e r SQ-� gave com�l� is tw�ti -S�/� ,�134���q Ow" p661 a larrn.r jbill ad- be re u Ive d on doh t v dire(--� aCceJJ- e Koa 6r p06( 0 1 a.YO r'rz Ipev 1. pcoot .o. r E: ' OATS; r �. SIZE. / SHAPE: QMDER PATTERN:.... __ Q� WALL PATTFAN: 0 FLOOR PATYERN: CORNEAS: DEPTH. a HUNCH OVERLAP (cdrde one) 20 GAUGE 27 GAUGE (circle one) �I • C[/gym e D` `t" 4• r y ..F :.!`v fi;... t•., �""+r.`+y tfC'K�i"j{. ..-.,! ;rte.a, air 3 t W t_,{ r_�.! ;Y. Y t.-? at i ; .-i•e f$tl 1.d.riF C?` '>..4-t+ �'•1".Z-�-•c ar 4•-- „4 tri-, ei c P YS. ..-_t ...r.t- -g'- ^�x5,s+g I +¢-.'�...• a' -}..^ y -.^^+^ " •,;° r Cr:sa ,cz1:a 'Rw�- rt'r�,,,�, r�K"''-•-�•.txt +. s�a�sc'`,r, ti`,... f 3�_' �i•r ..1� ',� s �. r � s. 1-3r�o.-.. r r-.�.s i F SYt ti •� T' r' y �z I4,r L fr a y� 1=, ! Zrl�, i t c t ry x r t y S a t 7.�::r Z.f+' '> d af"'a .t�� � ar.f ,". :`Z„rK �i ? .�.Lt-iti,��•:i ,y�`,�•w. ... '�. } 6`w"�,y,�s E�.� Frv,t{�� v+.� .f� '� �.i� ,�"v'.`7�. fz .:r .+• j'_ r r c �� •y { ..q ,, f ,.„J - r*e k. i s. u.r " '�,M !+t �rL.K t f r � [rC. Cy:l ♦ a'•7' s• tt r„7„�f '' �'�w � 'ifh dLTs,•It -tet n:u +,. !w s � � ���75 + .�+ �+, ti. +,. ,�-G.�. e;� �'€ "•, r5 1 +nr iti''awr.-.asmx.u„� ti 3�Y.. •wj fic'k�1 n frf 4 `7 •gn '=. "5+.,1t..y,''. at t if fit .r,�y3`4r• 7 "�+ �� S 3.: ^fn+F .^' "r�•s�_7}.^-' 'S z _ + � t-rP .ti - � ti rt � �r 4i'r"'a r *,:' ��>•Y �"� +may.. tti.,, j..._ JY`!MZ£ v4 a '��a ��Yu� T;�. �' � Ya a•'c .s < �C"'e «3�1 - �'t " e." r F^ "-`'�}'* r t > a� 'c"Z S t• ,��h..^��xy�'C eQ,+4,i x sha i.r,E. < , "4 ,, t { ) �t eS s a ti ak a.� `�� a+ s-=r•�+s .c.,ra _ r`1 .3.7•'} .t. a �',YJ '�.aif''..,..�"..v s`+ S' c� > 1 + y}"'�r� yt,7 s'fi r -, PJ4LY"rf 33arvj7 �n,-x�•#� t" 7�'� ,,,'T' }eC4' t ... �.ys'� +� ��l + •' t .,z, t �k� F Uri' t�y�j f j r� tin3r r kp ti a sq e. s v. 7 stiI s �y -ry''- a�'t�-r -+s S x .�, �' .s...... Rolll 4:• ;r v- a,_ Mi. ✓' ,..- c.lA,..+. .wt,.aw sx�:u," a- '•{i'" .�.• �/`' :, rte..: .� xt'f',.;, a=w y y,., 5 f ly �. ,r ^ ,� t ,Z { r5��. ^""•'s- z.t.3.•3.r,�,.:�' 's.- '" 't ".`' r-.a` t f { �ti 'ii+"f,,r�..Ya <r t '�.C• rL rt �3 -. '` t > - .. t' /c i �,-•+ta ;y `f � L� "( f i '�?e .�". .c"ca,r, ry;': . _ �_�-v�,�a� 2fY�.�.r�i`{ .k`+,t �� ..1",-•.fir,.• J'�...,�� f ���i ..e :_-r+ ",,. `S�a 9�'1`, J k'P Y3 yY'i•.,*' � •/ ::yr x R �, .. ,.. +'!'s- r- 3 'r `� .�„�, r 1" �,s•,..Z. v.. S p yi. rSy 1..��>fs i { _`.f..�;c 4 C• -_ "i' f�. .vYt it?t:1 �--• r .w" - .* �'Sai � +� .N�'-•.2r'St'•� ayt'y ,�' Y s.. J ?. r 3F^a t r _- — a __ -4� }rte 6: +•.>=v ..? y,:�,�.."•# 4� i"s :+'.. r-�: +`r. ',r. .c•�c x111 ' • ! �•• • I I j mer r7 tiaz�Qy.--,«•77 SFT_ u�.^=-'�_�-r��:^�Z�;�- ..�,..tl - �,� I S KTI .N S i f CoverTracks........................................................................................................................................5 Roll-up Mechanism............................................................................ CoverFabric.....................................................................................................................................10 ClassicAluminum Lid...................................................................................................................17 HomeOwner Check•List............................................................................................................. 19 Tools Required 1. Hammer drill or rotary hammer 18. Crescent wrench 2. Masonry drill bit l/4"x6"(1/4"x12"bit) 19. 1 00'tape measure&25'measure 3. Extension cords 20. Chalk line(use white chalk) i 4. #2 and#3 Phillips&standard screw drivers 21. Nut drivers-5/16"3/8",7/16",1/2" I S. Ratchet with 5/16"-3/4"sockets 22. Chisel (wood&concrete) ' 6. Hacksaw 23. Scissors i 7. String line 24. Wire strippers 8. Utility knife 25. Set of box/open end wrenches-5/16"-3/4" i 9. Broom 26. 6"level i 10. Hammer&rubber mallet 27. Set of alien wrenches i 11. Pliers-standard,needle nose&channel lock 28. Wire 12. Files-round,triangular&flat 29. Electrical tape i 13. Matches or cigarette lighter 30. Small sledge hammer i14. Carpenter's square 31. Vice grips I 15. 5/16 hex head driver bit with 12"extension 32. #2 and#3 Phillips drill bits 16. Drill(cordless or corded) 33. Pencil or marker i j 17. Set of drill bits(1/4"down to 1/16") 34. 6-8 clamps I � Optional Power tools Skill saw with carbide tipped blade i Sawzall,Grinder and Angle drill i i 2 Parts Reference Guide O O 1,1 __ —____-_��;< ___— —_s��so-_z• _.—__ -.E•:;,-•t _ _ Tom» __—___ 3_-�_____ __—_ ,aT 4 •S.h<n�� ts 1 '"Cover • Lid Support Bracket Cover 14 " Topwew, 2 . 14/15 Hardware Pam List -_— 24. 25 26 1. IN1000 110V.Baldor Drive Motor Assembly 27 33600 #10 x 1"Red Holob Anchor ! 2 IN2010-L-GLD Infinity 4000 Recessed Left 28. H0294 Carriage bolt 1/4-20 x 3/4" c IN2010-R-GLD Infinity 4000 Recessed Right 29 H0276 Nut Nylock 1/4-20" 3. FT0001 Infinity 4000 Mounting Feet(set) 30 H0501 Balt HHMS 5/16-18 x 1" %4 DS5000-M SS End Casting Assembly Motor End 31 33226 5/16"Lock Washer 27i 28 29 5. DS5000-0 SS End Casting Assembly Opposite End 32 10901. Magnet-7/16 x VAutostop Sensor 6. 55089 Extruded Aluminum Keyed Tube 33.33356 1/4-20 x 5/8"Phillips Pan Head 7. IN2011-R Infinity O.E.Recessed Assembly Right 34.33213 1/4 x 5/8"Washer j IN2011-L Infinity 0 E Recessed Assembly Left 35 H0152 Screw PPMS 10-32 x 1" __ _ ----31'i - 32 8 IN1103 [DEC Key Switch Assem w/Installation box 36 10815 Cable Tie Miniature 30; 9. UT01016 Slider Assembly for 2-1/2"LE 37. H0313 Screw HHWSM tek 10 x 1/2"SS 10. 54806-20 Extruded Leading Edge Tube 38 E1086 Bonding Lug Copper L35 11 Cover Cover fabric 39 24004 2009 T-Slot Bolt Lock i 12 87701 PCS Standard Rope-Silver Tracer 40 H0512 Nut 5/16"-18 ------------- ------------—----- - -35 13 55031 Outside Slider UnderIrack-22'- 41 33248`#12x1=1/2'PhdhpsPan Head Screw - ------- 331— 34-- 14 UT01800 Under Track Pulley Cartridge Assembly 42 H0310 Screw PPSM lox 1/2 SS `+ I 15. UT1010 Under Track SS Speed Guide Kit 43 33407 #10-32 Nylock Nut ; 16.54809 Standard Aluminum Lid Extrusion 24' 44.33250 in Phillips Pan Head Screw 17.54807 5"Lid Hinge 13' 18.54812 7"Lid Hinge 13' 36, 37 ' 38 19.22078 Standard 34"Motor Lid End 20 22077 Standard 18-Opposite Lid End 21.22423 Standard UT Lid Bracket 22 LD2104 Drop in Anchor Plate Kit 23 MH232 Little Giant cover pump&instructions " 39; 40, 41 24.22008 Splice,Under Track(outside slider) -25-H0075 Rope Loop Black Plastic 26 33314 Ring Pin _ The parts list above is typical for most pools up to 20'x 40'and includes all parts necessary to install the PCS system However,parts will vary for longer or wider pools and according to your specific order 42 43 ! 44 i I 3 a Step By Step Instructions .T _ _ k�-.'+,1;E,•viai:i�»liar;��5'✓:w1': Y'.t•-.if<�;M"' yci, �� _�s'J ei„ ':4r"vi;Fn-.-_- ;�v-�_+,^�L::,.z-.zr�' �:+-w '�.':w>•:.. ...-.. :yn'"?'f, ::a. '.T_�;5+-. � ..:,t•;i=•.yiN� ;i!^•'A":i:ak:' • '_ ,. t'f a �^..K,a1F�,��Y:7as'•#^�.K'.;•*�:'Crl.er_ +..; •��,� ._ ,�YlY 3 Lw "'-'°_ ��cx�.-_�..- a w w.,-�,,•:•-s ,•�4-x.-`-� %fin•rte yrei,..a�'�:�i-�. •-�+- s:U,.;!��`. . --*. rs .. r -t :'9'•y �:::w..',r�;;i*t.5>.a��:sc'�.a- ±,.,fT;-%<.' v, .rt _ 3'ti•�4't�''.'s r Sf;<•' -?��F`•>���:�`` na;y._ r9+:t-.w-,.#Wim" 'ifr�`�`'`»3;�+..-'r�.':Y '"t'""a=-f-r-:.ih >,'-''rR-�.�^- :F"��.+?a=a;x �'� s rc-._. .Lt.p..�•.,r,,.�.=.ri7.`a."-.-5�: - Pi';i~','+tp'i_ .�r�,F�2�F=` .' L �'''t;$,+4'ins.'-'•-,�;:7:�".�{r>Sr "�"7s�—;-�Jxi_��'+aj�:i`;..q ;,«:k:k''*�,`.��'?;-ate,:.. ,r c.v,';�., "tKa-z> "t�a?7 .s'F ss;-�q Z _.5. " a•,z .,zY>>•,�r;4 x:,»—': +� � .."d-1'�° fi'•,y.-,+. �.,z 3 ^-Z+44.. �' uK'...a.e^'4"°ri M-.a>•.. aU`•}l,i-�Fv:-., x. ' �. � - n.v.'... �.Ar:. 3;L^t>7-a ;u.3_.st"v:•..+:os:.._.i'�-s ��a�'l.xn'.-:Y" Gr .S. - .r!f N'•.^.-� _- .. _ xr..:�.r,..:;;.s'-...,�,_.t�'�,rFr.^, ..,c'.y.:.,xa.i=�::,~.,"<.;�-�a-r".7...W��;-n�'.:•�.Za� �u-f. � _ ��.�t:"�{-.,^^-:�.":.z.,�«r' - _. -:COVER`(RACKS Step'By Step Instructions Page/Step Step by step installation instructions....................5/1 4 Numbers in parenthesis refer to parts shown on page 3. , 7 In,tullutio,n'G tide Step By Step Instructions To clkdrmine if the cover system.was ordered- Cuf�`the leiigtli"of t6e.track onxeaeh`side;of�the Beforesplicing;the:'sectioris of tr1 1. - ether, correctly for-the,,pool,the length,of,the'roll P901-so it will exterid�1;;mch.,pasf ttieiend ofs F file;all.traek erids'thoroughly,rounding, up'tube should:li6-6,inches shorter_than.the_`'--th'e-retainer and;into the coyer box __�allredges and removing-all tiurrsr . :- trackspace: __ _ : metal shavings from the track.This•step is For example,foran-8 ft^track space,-the------•--------�--- -" -- =extremely impiirtantl= If the.track isn_tfiled-- correct length of rollup,tube is 7 ft'6 in.- smooth,damage can occur to the ropes, slider and cover. _`c"s.7'Jl^ NTn�eJ..�y Y�31 •S£.��'��s-YI� _ .;r '' .:rte» �.,• '�N. � _ Slide the center splice(24)into the center Lay the sections of track on the deck and tap Continue tapping the end of the track until channel of the track. them together using a rubber mallet so-the the two sections of track are tight together so center splice interlocks with each section of there is no gap between the lengths of track. track. 8 9 When retainer is being used,the track Using a 5/32"allen wrench,loosen the screw While holding the guide firmly,use a drill is normally installed during the cover on the top of the guide(15). Insert the guide with a 3/16"bit to drill through the hole in installation. With the track installled,make on the end of the track that will extend into the guide and through the track.'Remove the sure it is flush with the end wall at the shallow the housing. guide. Do this for the track on both sides of end. (See cover installation section page 11, the pool. step 9). 5 Step By Step Instructions `;; .�}tom - � 'r r�, }• c�.� _ _Oto E MEC HA N]S .t Step By St6p Instructions Page/Step Cover Box Preparation.......................................7/1 Connecting the Roll-up Tube...........................7/2 Adjusting Mechanism Height..........................7/4 Positioning the Mechanism..............................7/7 Anchoring the Mechanism Feet..................8/12 Extending the Pulley Brackets......................8/13 Anchoring the Pulley Brackets.....................8/18 Wiring the Electrical Switch..................................9 6 Numbers in parenthesis refer to parts shown on page'3, Step By Step Instructions h li 11 `i W" �"'�� ' m Cove'r'Mox;Preparatlon .a :a Conn ectiq :the Roll='up'tUbe Aitech the,tube`inserrt,Te roll up tubd�cih, Use a;garden-hose-to clean out'the cover box. Attarfi theaiab"e'insert to_the roit Uu tube fhe motor'end of the mechanism using;t 1e lint Duririgaliis'process,-.make sure�t116,W ter_is =�,on t ie non=motor e`n'd-using the 5/16'==18'-- ` —5 16=18 X 1"_bolts=(30j,and_5/16"lock=washers- drair ing froii ihe•cover box-,Atiscritical,tliat_ bolts: 0 an , 1'6'I'ock.viieshers�(3 _ (31)provided. Tghten,,these bolts;with'a_' - _( )the cov',er box has=aoequate`drainage provided: Inadequate drainage may,void the mechanism'war�anty.lftherelsno•drain - .a ter,-t ....•: .. "' Z ,�'3us° - _ r1=;"Y..'"„t�, .',7,- fti' J.t:i..�. or inadequatedrain thecover box, •• ,- y f r Yom;��. ''YA f '^�'s w�'�I '°' F *):\�°"•..` ' _ '`j'";Imo,` v h tt - _ ' :'l.•f. t{`:�', vii �!''.° rSY i:S •rX SC47. - ')• =Jc.Y..^_—,:,!'~ 'A� i§ `i.J'Yi,as` S" ^.i':+"ter'.::., r�"5�': confact=`ouPCS;e s Adjusting Mechanism Height With the motor end`positioned upside down, Install fhe'mbuntirig feetbh the non motor Measure from the bottom of the housing to the install the mounting Teet using a 7/16"wrench -end''using:the•1•/4-20 x-3/4'-,carriage bolts(28) top of the track.The top of the mechanism should to secure the 1/4-20 x 3/4"carriage bolts(28): and 1/4-20",nylock nuts(29),provided. The be installed so it is at the same height as the top ofand 1/4-20"nylock nuts(29)provided. top of the pulley bracket on the non motor the track. end'should be flush with'tlie top of the track. Because the top of the mechanism is adjustable, use the feet fo position the roll-up tube-as-high-as---- -- -----_---•----------------•—_----�----- --.-----�---------`�----------- �------.-___._._ --_ _. possible in the cover box,but allowing clearance so = the cover won't rub on the lid brackets. _ i• :14a -; Positioning the Mechanism With the mechanism and tube assembled and Position the mechanism in the cover box so Lower the assembled mechanism with set in place in the housing,check the roll-up that the roll-up tube is centered in the cover attached roll up tube into the cover box and tube for level.This is crucial to proper opera- box front to back and properly aligned with place it roughly in the position where it will tion of the cover. Position a level across the the track.The rope should travel straight be anchored. housing. Measure from the roll up tube to the from the track to the pulley. Note: If the cover box isn't square to the pool, bottom of the level on both the motor end It may be helpful to mark the center of the position the mechanism in the cover box so it and non motor end of the mechanism. Adjust roll up tube and mark the center of the bond will be square to the cover track. height of the non-motor end feet if needed to beam. Position the mechanism so the marks level the roll-up tube. are in alignment. 7 Step By Step Instructions z _ 13L 10 11 12 �� tini Align the mechanism on the motor side first On the non motor end,make sure the rope Anchoring the Mechanism Feet by using a length of rope and extending it will travel straight from the track to the pulley. With the mechanism centered between the from the back side of the cover track to the tracks and centered in the cover box front pulley to make sure the rope will feed directly to back,anchor the mechanism mounting into the pulley. feet into the cover box. Use the appropriate screws and anchors depending on the type of cover box being used. L Extending the Pulley Brackets Raise the pulley brackets up so that the top of With the.brackets in position;place a small Use a 1/2"wrench/socket to loosen the the bracket is even with the top of the encap- level across them to make sure they are level. nuts in the four positions on the adjustable sulation.This insures the ropes will be level. Place the small level on the motor to make brackets of the motor end of the mechanism. sure it is level. If the motor isn't level,it may Spread the brackets outward against the Tip: Before raising the pulley brackets,make sure affect the shifting of the drive mechanism. walls of the cover box. the feet for the mechanism are set as high as Tighten the eight nuts on the adjustable possible,while still allowing the clearance needed motor end brackets. under the lid brackets for the cover. - .;in Loosen the bolts and nuts using a 1/2"wrench With the brackets-on the non motor end Anchoring the Pulley Brackets /socket on the adjustable brackets on the in position,place a small level across the Anchor the motor mechanism brackets into non motor end of the mechanism. Spread brackets to make sure they are level.Tighten the cover box in as many places as possible. the pulley brackets outward against the walls the 4 mounting arm bolts on the adjustable When using the flush lid,use a wrench to of the cover box. brackets. tighten the,mounting bolts. When mounting the mechanism in other applications,use the appropriate screws and anchors depending on the type of cover box being used. 8 Step By Step Instructions "n"a'1U"t%-a%" r1'rlA Wiring the Electrical Switch The control switch•must be mounted in an all=weather box,in a location where 100%of the pool is visible. Connect the control switch according to the diagram below, .B8idor EledriCa( (With°Quick-Connects) External Wiring.Schematic 120/240 volts AC_ }> G GREEN r Quick Connector IN1000-xx- __ WHITE Motor Assembly. • _ BLACK Aluminum;Canister.;: Quick Coniiecto%Colds. - N" te.4ettresiimt aui from.t6e.hopsingtailie :i;; K _. sw 3eh.`imctlonbag=aie:sll uet fi e' , _i' :T- �I ; er_...,;»:...c.... �atcl�5. ' .bluldeir�rr electriel�aniima no� kHe�;}�� -• _ , . - .- � . ._� :m`a�c�1�sure:tgama#c�tbecalot'sai:�aclrend;�`'� - .;'•� _ •`;. -,?t �=i:SS'. k:'«.✓F.ti�, ^-Rei..:;:�:,", tt n t'.v: _ `" D¢aoonh" BLACK ,Pt „ Quick Connector RED— Comm GREEN ~. ` 5. DC. WHITE � KWh cd� •7;� Quick Connector '•�� P r�;t>'-.H -d_'z_-M Whitevnkeused ForwiringTouch- ' pad Touchpad/Key switch Hall Effect Sensor 'Nom:='.- � • , V. Jumperwir" \ �F�_r:•'�"`' CBnbeil]serteEtt7R� - ,Z�\` n ' ' , - �," _° Top or Boftoins�' � • �` X (Color not®po i ;r•� ` �- p� , i- �� wires color to color I Red&Black duet- ' tional wires mayCOPfRIGFfr®2016 i ri need to be reversed iPOOL COVER SPECIALISTS NATIONAL,Inc.I� ALL RIGHTS RESERVED i 9 Step By Step Instructions 774 � _ ,4 v ' NOR w "M:«r.c„c4" •.t'•'•xY -:� ,:'��s `•rr-'a:�.,,,,, �� .. ;5t, ice""' Ne Co f I Step by Step Instructions Page/Step i OpOning_the•Cove`r.Box....:....... 1'1%1 j Running°Ropes,inVtheTracks... . ; _ „ .:'11`/4 Installing the Cover Tracks........................... 1.1/9 Routing the Ropes ......:.12/11 Track Retainer...................................................12/15 Magnet Installation........................................12/18 I Attaching the Leading Edge Tube............13/21 Attaching the Ropes to the Reels..............14/32 Running out the Cover.................. ...15/42 Attaching`the Cover and Bonding Wire..15/43,. Mechanism Adjustments I Adjusting the Ropes.............................:.........16/52 i • I I 10 Numbers in parenthesis refer to parts shown,on page 3 I atinn (moi iiAn Step By Step Instructions "'J` } hi d tlie}fiotisiri lookin ''ovei=:', " Uricoilsthe ropes to,remove twists and kinks. Opening�the Cover`Box Standing be ,r, . ; g.,_..,r g.., To°o en'the cover box,Use, cut the' the pool,unroll.th&^ over from;left'to.right:v', Ruri'the ropes:ttirougFi`thet`r'acks. There are -P— box---, 'This will,ensure the cover will be right side'up two.`methods that can b"e•used' :- bands.that,hold the two halves`of the - e-- - - ---to ether._N-ever_cut*hetia ofahe"boz;opetiRa`8= =when if is unrolled., Doing this could easily damage-the cover-' ins e.`This kind of damage-isnot covered under th'e'66iic warianty:>:Witl;the•6ands a rmove te to"`of"ttie'boz: cut-lih ft and.a p : Running Ropes In The Tracks Hold the rope outside the.trackand,pull the- -Feed the;rope.through the pulley'cartridge The preferred method of running the rope is rope along the length of track toward the end assembly(14).-Insert the pulley with the rope to allow a short length of the rope to extend of the pool. onto the erid of the'track. outside of the track.The portion of rope outside the track will be pulled as the rope is ----ran in-thetrack.-- ._------------------ - - --------•-- \ -----------_------v-----=----=--:----------`. yup ", � � ,;a�.�.�, - - :x."-f�?'f '�'�r-::•,^_ 'J` _ 'tea:'+.-3��;uag� _ _ P" '=_.��yf•,; ,z._. .i.»ahyy ',S sem,,,.�Yy�`'�: t £�i� ata{F+c���c�x: .. - 'rt-`;•..ji.i W"J. SeW.li.,, r �a17�!a'{�*�—00`'vn . •T�"Y-+: .- p I Pull the rope down-the back side of the track Alternate Rope Feeding Method Install Track in the Retainer toward the cover box. Another,common method of running rope Begin at the shallow end of the pool and in the track is to pierce the rope with a small -insert the track into the retainer.,Lift the track piece of wire.This wire then becomes the so the tongu&and groove between the track pulling handle as you feed the rope into the and retainer will interlock. Make,sure the track is flush with the end wall of the shallow end of the track.This is especially useful if retainer isn't being used and the tracks are end of the pool. Make sure track at the already installed. mechanism end extends 1"past the retainer into the cover box. 11 Step By Step Instructions p_�-s�s;�����ra.`s > r: - ��.$fli:'-3.6.�:�"�^:_.r`a,^'•2;.;5._;'.t•.�"i�r=i£�'�... Insert and tap the locking strip into place Routing the Ropes This'rope will continue from the first pulley to underneath the track along the entire length the second pulley. Pull the rope so it comes of the track. Make sure a locking strip is Begin a the motor end of the mechanism. out along side the second pulley. placed at all track spices.Do this along both Run the rope from the track so it travels sides of the pool.The shim needs to end at straight from the track to the first pulley. the inside edge of the cover box. Extend the rope out the back side of the pulley. 3 .1»; run:":1`.!»: _ 1 f i_ c-.`•.£ zr.= r_ t" 1 5 tv`a On the non motor end,'run the rope around Insert the rope from the non motor;end into Track Retainer the pulley and out the backside of the pulley the channel behind the first pulley on'the With retainer installed on the pool,and assembly. Pull this rope along the back of the motor end. This rope will travel behind all extended one inch into the cover box,it is cover box to the motor end pulley assembly. three pulleys and come out along side the used to keep the track from being pulled into Be sure to route the rope in front of the lid third pulley. Pull the rope toward the rope the cover box. r; brackets. reel. F F (. Drill through the center of the retainer and, Insert the locking ring pin(26)through the Magnet InsWlMi6h track using a 1/4"drill bit. retainer and the track.This will lock the track Test the polarity of the 7/16 x 6 autostop into thd retainer so it-can't slide into the cover sensor magnet(32)by running it past the box as the cover system is operating. sensor while the motor is running in the uncover position. When the motor success- fully shuts off from the magnet passing the sensor,the side of the magnet facing up will need to be inserted into the webbing in that same orientation. This may need to be reversed if the sensor needs to be mounted 12 under the guide. Numbers in parenthesis refer to parts shown on page 3. Step By Step Instructions installation Guide i 7- 19 On the front corner of the cover,that is on the Apply the supplied grease to the magnet. Attaching the Leading Edge Tube. same•side-as the-motors insert a screw-driver - - This will help it slide-in-the webbing easier. File the edges of the rope channel before- into the end of the webbing to open it up and Slide the magnet(32)into the webbing with sliding it onto the rope hem of the cover. -"^"create a pocket.-- = = = the same side facing"up that shut the-motor- 'If the leading=edge-lube wiill-remain exposed,- off when it was passed in front of the sensor. slide the tube on to the bead on the front of the cover. % Mt`: yt Attach the leading edge inseHa'nd sliderOn one'side•of=the coVdr,`pulR"tile rope as''IV- On the opposite}side of the:cover that hasn't+ plate to the cover bythreading(2)420x 5/8 comes>out of the track-asyou:feed the,slider' . been•pulled in the:tra&yet slidethe leading two screws`(33) and the 1/4-x 5/8"washers and cover into.th'e track:;Ke�p� ulling until edge tube or ithe`rope hem along the front, (34)that come attached to the slider plate,• , the slider is,in the track"a few inches. Having edge of the cover Pull tight on the cover. through the pre punched holes in the cover the slider on one;side,of,the cover,in thetrack to help slide,the`leading-edge bar.onto•the - arid into-the slider plate.---Repeat this-orfboth-- -will help"withthe-installation-of-the-leading--- - -cover.--- —-- --- - - ----- sides of the cover. Use caution if using a drill edge bar to attach these screws. _ R4_ iz 1 r'4 �3_ 6 27 Slide the nylon leading edge inserts into the Insert the side of the coyer that isn't in the^ With the'cover and slider in the track;insert ends of the leading edge tube. Note,one of track.yet. Pull the rope as it comes out of the the guide on the end of the track. Use an these insert assemblies is in the track while- cover track S/32"alien wrench to tighten the screw that the other is outside of the,track.',Make sure connects the two sections of guide together. the inserts can slide freely inside the leading edge tube. If they don't,clean off any burrs', Tip: To prevent the screw and nut from seiz- that may be causing them to bind. r ing,get it wet before tightening. Step By Step Instructions N�+ F Drill a 3/32"pilot hole through the top of the Drill a second hole using a 3/16"bit in the flat Connect the bonding wire that is attached to rope channel of the leading edge tube. Do section of the leading edge just behind the the front corner of the cover to the leading this on both ends of the leading edge tube. rope channel.This is where a bonding lug will edge tube by first securing a bonding lug to be attached.Do this on both ends of the lead- the bar,using the 10-32 x 1"screw (35)and ing edge tube. 10-32 nylock nut provided(43). Then, insert and tighten the bond wire in the bonding lug. Do this on both sides of the leading edge tube. t_ ` k sY"•±^.:,"oy �t ,s�!' �'..: - •.;h .. +..cwt-.f.,?:.. i•X.-'w _.`.. —.v.v•... -,,._...,...., � �..-.,....a.t..-.>s r._.. . '�` . - — a's� r i�`�Y: `.i'�:�F..u1e:r^,." Position the fabric on the leading edge so,it AttdChlrlg the,Ropes-to the RC'C'IS While pulling both ropes tight,use a lighter is in line with the edge of the rope C-Chan- The cover must be open when cutting and or torch to burn the rope in the location'it will nel. Pin the rope hem to the leading edge fiy attaching the ropes. Pull the cover back be cut. This will help them not fray after.they placing a#10 x 5/8"pinning screw(44),in the" until the sliders are against the guides. Pull have been cut. Cut the ropes so they are at drilled hole and through the`rope hem. Do the ropes tight as they come off the pulleys least 8 ft long. Use the lighter to reburn the this on both ends of the leading edge bar. on the mechanism to eliminate the slack in cut ends of the rope if needed. the rope. .: : �• , 1• i i t' � F n !' l yr�( 34 35 36 _ Bring the ropes-back to the mechanism. Attach each ropetothe;rope reel by:tighen- The attached ropes will look like this. Attach the ropes to the rope reel by inserting, • ing the screw.(42)in therope to the.mountng a screw(42)through the end of each.of the holes in,the rope reel. ropes. 14 Step By Step Instructions ll lbLd iaLlon Guide While'holdirig the ropes over the me'cha'nism, As the excess rope is wrapped around the Installing the•Sensor' run the key switch in the cover position. rope reel,make sure it goes on straight with- Thread the sensor into the mounting hole on -out getting crossed with each other. the cover"side of-the'gui&.The webbing o -----__._ _ . _ _ -__. ._._______ _ ___ _ __ _ _ _._ __ _the-cover-will pass under the sensor. If a stone lid is being used,the sensor may need to be mounted on the underside of the guide. The orientation of the magnet will need to be reversed. .;z��i-v- r�`� JT Y a':` `�S.n-+�1�s-',, �§�zr;•::�•- 4 4`:+`,`n.�.y'S�. .;f• �.i.Y d., �,.�'.ii•�,.y .�a., 'ii"<::. ^`•SC.-.i iq':;••; :`. ..C: , .:3^.-37: _ t.," Use cable ties,(36)to`secure:the senor wire: - Connect tFie sen"soMire to-the motor wires`� Runnin, out th Covefy to the motor end,of the mechansim to*eep it by pressing the wire connections together. Operate,the keyswrtch in the cover position to run the,cover over the pool. Assistthe cover secure'and-frorn-getting caught.in the cover- . • %. , r or ropes.` '. t, as it is being pulled over th'e'pool by helping a unfoId'h and'4411 into the,�over track. F I{ I rs� il���•Y i I. _ - Attaching the,Cover&Bonding Wire - Attach the bond wire from the tail of the Distribute the slack ofthe cover evenly Make sure the webbing continues straight as cover to the bonding lug(38)that is attached between each screw across the length of the it travels from the track to the roll-up tube. to the end casting. tube. Secure the cover to the roll-up'tube- Attach the cover to the roll-up tube using using#10 x 1/2"SS tek screws(37)every 2-3ft. #10 x 1/2"SS tek screws(37).The first screw on each end of the tube needs to be 3 inches from the end of the tube. As the cover rolls up on the tube,the webbing will be rolling up over the end casting. �S Ste B Step Instructions 4�6 48 With the cover in the fully closed position;, Measure back 6-1/2 inches from the mark that Using a utility knife,carefully cut a slit in the mark the webbing where it is inline with the was made•on the webbing. webbing long enough for the magnet to be sensor that is mounted on the guide. slid through. Be careful not to cut through the bottom layer of webbing. 49 5 a 51 Insert a screw driver through the slit in the Apply the supplied grease to the magnet. Run the key switch in the uncover position to webbing to create the pocket for.the magnet. This will help it slide in the webbing easier. roll the cover up on the roll-up tube. Check Insert the magnet(32)through the slit in the cover to be sure it rolls up evenly. Run the webbing. Push it forward until it is the cover 6-10 times to make sure it opens completely inside the webbing and in line and closes.evenly.The cover fabric installa- with the mark on the webbing. tion is now complete. i { Adjusting the Ropes If one of the ropes is longer than the other If both ropes are the same length,and the When opening the cover,if both sides of the rope,loosen the set screw that secures the cover doesn't close squarely,shorten the cover don't open squarely,one of the ropes rope to the rope reel lug. Shorten this rope, rope for the side of the cover that doesn't may need to be adjusted. To adjust the rope, by moving the screw that secures it to the close all the way. The amount that the rope open the cover all the way. Pull the excess rope reel further up the rope,until it is the is shortened is equal to the distance that the rope off the rope reel. Pull on the rope that same length as the other rope. Re-attach the cover needed to travel to close all the way. will adjust the side of the cover that is closest rope to the rope reel. After shortening the rope,run the switch in to the cover box so it will be straight with the the cover position while holding the ropes. other side of the cover. 16 Step By Step Instructions Installation louide 211111.11-M-10� is 2 g, tv- 51—P 'r�":— T3, =Ml S —Z N" R ,, . ,l. .. � ' _ , 1- )k U M S TA w, L Steb By Step InstructionsPa6e/Step -t'Installin-g'the'Lid"Bra-'ckefs..:..........................:.........18/1' ?Ass em6ll in9' ��`"16m"'Rnum i Lid...............................18/4 . :. Attaching the Lid to Z, 17 Step By Step Instructions Numbers in parenthesis refer to parts shown on page 3. . 1 2 3 Installing'the Lid Brackets Install rope loops(25)on the,rope a►ong the ' Slide'fhe'standard lid bracket into the'drop.in back of the cover box. Secure the loops to anchor plate. Space the drop-in anchor plates.(22)evenly across'the back of the'cover box,beginning the coyer.box using appropriate'screws and at lea'st-10"from the track. Secure-the anchor anchors,depending on the type of cover box plate to the back of the coverbox using that is used: „ appropriate•screws,and anchors,depending „ on the type of cover,boz thatis used._ Via§ iu3,c'��5'ds'd. „5. 'Y{4 c>•r •�`}' , pµ; F } �1 ',astd`.,F3�ry3ti`'���."s:v`ss'e,'!�•� ';t.�,(�i�r�''4r,� .'•�.+�i��'- „y.' •� � _ Y t.���� - Assembling the Aluminum Lid Slide the motor 09)and non motor lid(20) Position the lid over the top of the housing. Assemble the lid by sliding the hinge-(14/15) ends onto the hinge. The motor end and non-motor ends should onto the main section of lid(16). extend past the cover housing 1-2':If they extend more and do not lay flat on the deck, it may be necessary to cut the lids.Mark the lid with a square at the 1"overlap point and cut it to length with a hacksaw or power saw with carbide tipped blade, �' p;,''�'t'i,•j•i;yti'+y.~Ae�j _ _r v7' ;e.,� '2 :r - - ..�_ .,.: �;^, �,' 3?" ��k"` h'�$'jrsx'k'sr };• t ..n� r, •.'F•,•�J',i a �'��:L" - jy «3{+�,:w7'L-:'+.t•'a,;'•�'++��9.�1J �`:b.�q...� y •'t1 .�q�� - ,M�Sk'� lr S�..A nr.w • "�-�f.%`'S! v; '->' .<r•`�.y',.,�5,2';.7 �'�..!1,, .' 'ttr -, _ l•;�•r i��SXv1r;�^'�: hi R, ����-= fN} ;'�'"�Y' t14.� "y, 4„`�.'•.`1;ak5.y.:;ti'`tF','t, �'L ���;f.'+ .��i°ti�'',�> -`,�.'=t -'r ;zy pi,[`:,{�,r+"A1� ?!s:e. >S"'_ is„�� ,�v. x. '+•", _ �`.i&,�'���: - - s.d'�� r i'1�.,•."'•=.n'-� ��" .;.:S s9•"^w- " _^�.<':,."-.e�..7.�a� .r._... .,.a'^..�Mrr.."��4"'» t-';,r r ',.•5y'f°t'sFn�v^•n,'`'�'`'ts�:i 'aw+'`'" 'tt,}�'t�... r-�•�'s:se:��'��:"'+.- L .,ys,'�i'''.v:r �,�r..,,,yy..,�.u'!• _ �. X' i_ldG•, °i -wf'44_,,..., •�r'�.aS"r%=•�:'^'x�'-'..'',Y- y - _ �f p'iv (fd. ,sy:.�.... „s`Rin _ '"�::_ _ �3,`'�'•F#;"'�'p�t �F`,{`i�tJ"�`'-,;^.,.- Attaching the Lid To The Deck Insert plastic anchors(27)into the holes and Measure across the hinge to evenly space Drill through the lid hinge along the back tap with a hammer so they are flush with the the screws. Continue drilling and anchoring edge every 2r-3'using a 1/4"drill bit.Then, deck.Fasten the lid to the deck with#12 pan the hinge in this manner until the entire lid is drill through these holes and into the head screws(26). attached to the deck. The safety pool cover concrete deck using a 1/4"masonry bit. installation is now complete. Now instruct the home owner using the home owners guide and the checklist on the next page. 18 installation Guide ��'rt`6'd& X tiSi' �*.4.�.b"�• -�-�-�~" Y:'.'rly3 w�ycL�S.M:... '2�. ' `�. ': :rte." �_' _^�,. I �r �.�::.- 3r� :a."�z '-x-F• , �-�` ,�j :�a��" - y `�-�,� `°�:.=sem''�=u•a �r, HK4= s� Y .r.r� Y.-••YYS�l.. j � -+1� ®e��=J-��� ==��--�. ��•iq-�- �:: .C� t�!�y- After the cover system is installed,it is critically im,- I j portant to instruct the home owner on how to oper- ate the cover system safely and do routine mainte- nance.Use the following check list and the Infinity 4000 Owner's Manual and Safety Information guide as your primary instruction source. _ ---- - - ----- - ---- -- ---- • ~,l -JOwners.Manual �age't; 0 eratiri^"'Instructions: ........... „ .............. -[] Annual-,'Maintenance............:.:.......................a.........:.....4-:- ."Fltiare(Fabric .......................................4 El-Patching-a Hole inAhe Fab'r'ic -.❑ Rain Water Removal............................................................5 ❑ Covering the-Pool Manually ' ❑,Cfie`rriicals........ ..........:.......................... ,• ...........:......7 I I I I - �n Installation Checklist Tracks ❑ All track ends filed. This is extremely important ❑ Does the track space measurement match how the cover system was ordered? ❑ Cover goes through the trackjoints smoothly. ❑ All track screws are tight and flush. ❑ Pulleys are flush against the end of the track. ❑ The guides are snug against the track ❑ Guides bolted in and are tight. ❑ Splices used when joining the tracks,evewin retainer. Mechanism ❑ Mechanism installed level in the box. ❑ Tube level in housing. ❑ Tube centered between the tracks. ❑ Enough clearance top,bottom,sides for the fabric. No rubbing of webbing on sides or bottom of box. ❑ Tube atthe right height?The ideal location isto install the cover in the box so thatthe cover is coming off atas small an angle as possible. This reduces stress on the mechanism and reduces wear on cover guides at the end of the track. ❑ Tube either centered in the box or positioned slightly more towards the front of the box,so that the cover is unlikely to rub on the lid brackets. ❑ System mounted at right angle to the track. ❑ Ropes coming back straight out of the track. An excessive angle will cause wear on the cover guides at the end of the track. ❑ Ropes are not rubbing on any brackets or the deck. ❑ Ropes are run correctly(see page 12,steps 11-14). ❑ 8 feet of rope left on rope reel. ❑ System bonded according to electrical code. Cover bonded to leading edge and roll-up tube. ❑ Rope loops installed on or near each lid bracket so rope cannot droop and snag on cover or lid brackets(see page 18, step 3) ❑ Make sure the system is electrically bonded to meet the National Electrical Code. ❑ Make sure there is adequate drainage from the cover housing. Cover ❑ Fabric pinned to the take-up tube without pinned folds. ❑ Cover runs smoothly. ❑ Cover properly aligned when it closes or retracts. Note: An inch or two out of square is not uncommon and is not a concern as it will not effect the operation of the cover. Because of the size of the fabric roll,and changes in operating conditions the cover may vary slightly in alignment as it is run. ❑ The leading edge inserts move in and out freely the whole length of the pool. ❑ Cover does not rub in the housing as it rolls up. Cover Lid ❑ All sharp edges have been filed ❑ Ali areas where the lid is not flat on the deck have been screwed down to eliminate any potential hazards ❑ There is enough clearance between the lid brackets and the cover to avoid rubbing Misc. ❑ Key switch is in full view of the pool ❑ Cover pump tested by putting it in the water and operate it in front of homeowner ❑ The cover box is clean and clear of debris so that the drains are not easily clogged ❑ Pool area cleaned up ❑ Homeowner has been instructed(see page 19) 20