Loading...
HomeMy WebLinkAboutTR-9119 s *QF S®(/T�, Michael J.Domino, President Town Hall Annex� Ol0 John M. Bredemeyer III,Vice-President 54375 Route 25 P.O. Box 1179 Charles J.Sanders CIP Southold,New York 11971 Glenn Goldsmith V ® �� Telephone (631) 765-1892 A. Nicholas Krupski lij'C+oU Fax(631) 765-6641 5 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE Pre-construction, hay bale line/silt boom/silt curtain 1 sc day of construction % constructed Project complete, compliance inspection - ----- go' BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD, NEW YORK PERMIT NO. 9119 DATE: NOVEMBER 15, 2017 1 ISSUED TO: RICHARD J. MAY PROPERTY ADDRESS: 1340 CEDAR POINT DRIVE EAST, SOUTHOLD SU-1-Mg 1000-92-1-5 AUTHORIZATION Pursuant to the provisions of Chapter 275 of the Town Code of the Town of Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on November 15, 2017, and in consideration of application fee in the sum of$250.00 paid by Richard J. May and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and permits the following: Wetland Permit to reconstruct the existing 176.0' long timber jetty along the southern shoreline by reducing the overall length to 4:68.01 (to extend to the ALW);jetty is not to exceed 2.5' above grade; the use of vinyl sheathing; 6"x6l'timber walers; and 8"—10"diameter timber pilings staggered on either side; and as depicted on the site plan prepared by Suffolk Environmental Consulting,Inc.,dated August 29,2017,and stamped approved on November 15,2017. IN WITNESS WHEREOF,the said Board of Trustees hereby causes its Corporate Seal to be affixed ` and these presents to be subscribed by a majority of the said Board as of this date. xR -4, A e;e�� Of F01 Ir ,A < C* SIW- Glenn Goldsmith-Absent 41- TERMS AND CONDITIONS The Permittee Richard J May, residing at 1340 Cedar Point Drive East, Southold,New York, as part of the consideration for the issuance of the Permit does understand and prescribe to the following: 1. That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for damages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will,at his or her own expense, defend any and all such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto,to the complete exclusion of the Board of Trustees of the Town of Southold. 2. That this Permit is valid for a period of 24 months, which is considered to be the estimated time required to complete the work involved, but should circumstances warrant, request for an extension may be made to the Board at a later date. 3. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved,to provide evidence to anyone concerned that authorization was originally obtained. 4. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. 5. That there will be no unreasonable interference with navigation as a result of the work herein authorized. 6. That there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. 7. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees, the work shall cause unreasonable obstruction to free navigation,the said Permittee will be required, upon due notice,to remove or alter this work project herein stated without expenses to the Town of Southold. 8. That the said Board will be notified by the Permittee of the completion of the work authorized. 9. That the Permittee will obtain all other permits and consents that may be required supplemental to this permit, which may be subject to revoke upon failure to obtain same. 10. No right to trespass or interfere with riparian rights. This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit. Michael J. Domino, President ® rjF SotfPjZ, Town Hall Annex John M.Bredemeyer III,Vice-President V' 170, 54375 Route 25 P.O.Box 1179 Charles J. Sanders Southold,New York 11971 Glenn Goldsmith G ® Q Telephone(631) 765-1892 A.Nicholas Krupski Fax(631) 765-6641 ��coUM(`I,� BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD November 15, 2017 Bruce Anderson, President Suffolk Environmental Consulting, Inc. P.O. Box 2003 Bridgehampton, NY 11932-2003 RE: RICHARD J. MAY 1340 CEDAR POINT DRIVE EAST, SOUTHOLD SCTM# 1000-92-1-5 Dear Mr. Anderson: The Board of Town Trustees took the following action during its regular meeting held on Wednesday, November 15, 2017 regarding the above matter: WHEREAS, Suffolk Environmental on behalf of RICHARD J. MAY applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, application dated May 19, 2017, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, the LWRP Coordinator issued a recommendation that the application be _._.rrr found Consistent With""the-Local°Waterfront'Revitalization Program policy-standards,- and, olicy-stan ar s,_and, WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on November 15, 2017, at which time all interested persons were given an opportunity to be heard, and, 2 WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the structure complies with the standards set forth in Chapter 275 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOLVED, that the Board of Trustees have found the application to be Consistent with the Local Waterfront Revitalization Program, and, RESOLVED, that the Board of Trustees approve the application of RICHARD J. MAY to reconstruct the existing ±76.0' long timber jetty along the southern shoreline by reducing the overall length to ±68.0' (to extend to the ALW); jetty is not to exceed 2.5' above grade; the use of vinyl sheathing; 6"x6" timber walers; and 8" — 10" diameter timber pilings staggered on either side; and as depicted on the site plan prepared by Suffolk Environmental Consulting, Inc., dated August 29, 2017, and stamped approved on November 15, 2017. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of$50.00 per inspection. (See attached schedule.) Fees: $50.00 Very truly yours, Michael J. Domino Pr_es.ident,.Bo_a..rd of Trustees_._ MJD/dd Michael J. Domino, PrE :nt John M. Bredemeyer, lii,'vice-President to��gllFFdtk-9 . To543751Route 25 Charles J. Sanders �� y<' P.O. Box 1179 Glenn GoldsmithN T,`? Southold, NY 11971 A. Nicholas Krupski y o`�' Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUS'T'EES TOWN OF SOUTHOLD TO: 'T. aq S1JFRLk 61-vwpwt/sfewl� Please be advised that your application dated Mq LQ( ?-O!1 has been reviewed by this Board at the regular meeting of Vy 15E 17 and your application has been approved pending the completion of the following items checked off below. Revised Plans for proposed project Pre-Construction Hay Bale Line Inspection Fee ($50.00) 15t Day of Construction ($50.00) of 'h Constructed ($50.00) Final Inspection Fee ($50.00) Dock Fees ($3.00 per sq. ft.) 30-Year Maintenance Agreement(complete original form enclosed and submit to Board of Trustees Office) The Permittee is required to provide evidence that the non-turf buffer condition of the Trustee permit has been recorded with the Suffolk County Clerk's Office as a notice covenant and deed restriction to the deed of the subject parcel. Such evidence shall be provided within ninety(90) calendar days of issuance of this permit. Permit fees are now due. Please make check or money order payable to Town of Southold. The fee is computed below according to the schedule of rates as set forth in Chapter 275 of the Southold Town Code. The following fee must be paid within 90 days or re-application fees will be necessary. You will receive your permit upon completion of the above. COMPUTATION OF PERMIT FEES- i I'All TOTAL FEES DUE: $ ��� BY: Michael J. Domino, President Board of Trustees AERIAL SITE PLAN No Scale + m O - 4-A 0 V ' 00 0 o � Zi z � , ^ M 00-1 z AI 3 C i p a� �-+ u o 0 0 Cl) E w:aa f M ..•. L w "' ,„,. .,... :��;:... . w ..� ..� - . . ,�+ re,».. gp■� "' a... *" :fir„!k'ti^',�r"q�a.'q�-��+,. -;„°�*. .+ a...+w-*p�:N�w.�ykt o Q t 7,777 EXISTING JETTY (to be 7 a► L reconstructed) L � y im; SITE PLAN'S TOP ELEVATION DETAIL � 1.0" = 20.0' ± 1.0" = L0' ± - - L I C ] C r O SCT# 1000-92-1- ■' �►I # b 1 # 1340 Ceder N Point Drive East ; N r O top OV It V Proposed LU # Reconstructed to O U J etty W W o 20TH r � �° F",., V � W U C, Z I x Z M � .i o o � . cc CL u � a � 3.i � T f arty 3.4 o . � a M wJ O I - [ Proposed Timber Piling {' (8"-io"q)-staggered per side) t � A 05 « See TOP 'lr..s�r.�y rva AL i tLEVATION DETAIL t~ `+wy� I ♦-f 1.4 E LTA a O L Proposed osed Vinyl Sheathing N FE-CONIC AY (C-Loc or similar) M L � � s E NOTE: Site Plan adapted from the Topographic Survey of the - shoreline of subject property, as prepared by ROBERT H. FOX. Extent of Existing Jetty Entire Structure to be removed- 1-75' ± Wetlands Boundary located along seaward face of the existing bulkheading. WESTERN ELEVATION 1.0" = 10.0'± o Proposed Timber Waler i c (6" x 6") 6$ ± Proposed Timber Piling 0 CD Existin Grade (8"-1o" -staggered per side) Jetty Top EI. ria 4.6' Jetty To EI. @a 1.9' i etty Top EI. @a - 0.6' •� "' d-+ o ---- ------ --- ------------------------------------------AHW---- j( (j 'Mr^ o N Existing Bulkheading (Top El. @7.8') AHW 0 o z Cq Proposed Reconstructed Jetty AEWE., Z z Existing Grade kn Wetlands Boundary located along seaward face of the existing bulkheading. -� 9 a M +� F 0 PROTECT DESCRIPTION: � Cu En QJ a o o � Applicant proposes to reconstruct the existing timber M o jetty along the southern shoreline of subject property. �, a jetty is comprised APPROVED �Y The existing � A g • y p sed of timber sheathing, BOARD OF i �U5TEES and measures 76.0' ± in overall length. TOWN OF SOUTHOLD DATE N-0J5- .W 15, 2-0i7 p o orA " The Proposed / Reconstructed Jetty will be comprised 7 L of Vinyl Sheathing sandwiched between Timber Walers (6" x 6") and Timber Pilings (8.0" - 10" - L 3 ` staggered either side), and will be reduced to 68.0' + in CLL overall length (to extend to the ALW). The new Jetty E is not to exceed 1.5' above grade. 6> N Topographic Survey- w E e Surveyed: 10-05-16 Q' Amended: 10-12-16 s Town: Southold Suffolk County, NY _ o SCT# 1000-90-2-22 SCT# 1000-92-1-5 Datum: NAVD'88 # 1280 Cedar o # 134.0 Cedar o Point Drive East ! Point Drive East a 30' top of 4-- MAY 9 2017 ' o e T/BK i � wetlands 5tp5. 7.8 T/BK o blkd. 1 4.r cP_a1O a}dTownR T/BK 5tp5. 7.8 0 Q__.t k(J. T/Jtty 6.1 1 7.9 - --__.___-___ _: .2 '79� 4.8 T/J ty 6.0 2.3 3. T/Jtty 6.0 4.2 4.4 s .3 3.1 4.2 3.3 4.23.6- 2.4 2.4 ------ ------------------ _ T/J y 4-5 _ ----3-0------- .6 T/Jtty_.4T6--- - ----------- ---------- - 1 .7 ------- .5 __ RM --- -------------- .2- - -9; 2.5 ---- ---- - -- 2.9', - - - 1 .7 3.1 -0.9 0.9 -4.4 - 0.6 1 .0 ' a 1 .711 .2 0.1 0.7 1 .1 1 .5? 0.4 T/Jtty 3.4 ; -0.5 T/,stty 2.9 0.7 -0.5 0.4 !� -1 .1 -0.7"C3.3tty 2.8 -1 .4 0'0F -1 .0 -• -0.5 -0.9 -2.7 x-1.7 1 .6- - - ----- __�-.& 1 .2- -2.5 - -1 . i T/Jt }l1.4 - - - -3.0 T/Aty 0.4 ' -3.6 -3.1 T/Jtty 0.7 -2.7 -3.2 -2. -3.6 T J -3.6 -3.8 , cs� / ttY 0.4 -3.9 -3.8 -3.5- -3.9 -3.9 -3.91 " ` g -3.9 -4.0 -3.9 -3.9 -4.0 -4.0 -4.1 -4.1 -4.0 -4.1 {� r, 'I I ti,J -4 -4.1 .2 -4.2 -4.1 i -4.2 -4.3 • : -4.3 -4.2 ,� -4.3 � tea`� •}� P ® N . a i OBER . FOX NYS PLS# 50197 P O Box # 366 Aquebogue, NY 11931 Michael J. Domino,Presi o��SUFFO(,�cOG Town Hall Annex John M. Bredemeyer III,Vice-President � 54375 Route 25 Charles J. Sandersy z P.O.Box 1179 Glenn Goldsmith 1 Southold,NY 11971 A.Nicholas Krupski ���?, p! Telephone(631)765-1892�'a Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD J Date/Time:—// Completed in field by: `j Suffolk Environmental Consulting on behalf of RICHARD'J. MAY requests a Wetland Permit to reconstruct the existing ±76.0' long timber jetty along the southern shoreline by reducing the overall length to ±68.0' (to extend to the ALW); jetty is not to exceed 2.5' above grade; the use of vinyl sheathing; 6"x6" timber waters; and 8" — 10" diameter timber pilings staggered on either side. Located: 1340 Cedar Point Drive East, Southold. SCTM# 1000-92-1-5 CH. 275-3 - SETBACKS WETLAND BOUNDARY: Actual Footage or OK=4 Setback Waiver Required 1. Residence: 100 feet 2. Driveway: 50 feet 3. Sanitary Leaching Pool (cesspool): 100 feet 4. Septic Tank: 75 feet 5. Swimming Pool and related structures: 50 feet 6. Landscaping or gardening: 50 feet 7. Placement of C&D material: 100 feet TOP OF BLUFF: 1. Residence: 100 feet 2. Driveway: 100 feet 3. Sanitary leaching pool (cesspool) 100 feet: 4. Swimming pool and related structures: 100 feet Public Notice of Hearing Card Posted: Y / N Ch. 275 Ch. 111 SEQRA Type: I II Unlisted Action Type of Application: Pre-Submission Administrative Amendment Wetland Coastal Erosion Emergency Violation Non-Jurisdiction Survey <_ 5 years: Y/N Wetland Line by: C.E.H.A. Line Additional information/suggested modifications/conditions/need for outside review/consultant/application c mpI teness/comments/standards: Present were: J. Bredemeyer M. Domino G. Goldsmith N. Krupski Sanders Other Page 1 of 2 Michael J. Domino,Presi 1 �Q$11FF0(,YCO Town Hall Annex John M. Bredemeyer III,Vice-President ,i�� Gym, 54375 Route 25 Charles J. Sanders y z P.O.Box 1179 Glenn Goldsmith %�_i ® Southold,NY 11971 A.Nicholas Krupski ��d?, p! Telephone(631)765-1892�a Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Date/Time: Completed in Work Session by: Suffolk Environmental Consulting on behalf of RICHARD J. MAY requests a Wetland Permit to reconstruct the existing ±76.0' long timber jetty along the southern shoreline by reducing the overall length to ±68.0' (to extend to the ALW); jetty is not to exceed 2.5' above grade; the use of vinyl sheathing; 6"x6" timber walers; and 8" — 10" diameter timber pilings staggered on either side. Located: 1340 Cedar Point Drive East, Southold. SCTM# 1000-92-1-5 Ch. 275-12 - STANDARDS FOR ISSUANCE OF PERMIT MET=X or Comment=* A. Adversely affect the wetlands of the Town: B. Cause damage from erosion, turbidity or siltation: C. Cause saltwater intrusion in the fresh water recourses of the Town: D. Adversely affect fish, shellfish or other beneficial marine organisms, aquatic wildlife & vegetation or the natural habitat thereof: E. Increase the danger of flood and storm-tide damage: F. Adversely affect navigation tidal waters or the tidal flow of the tidal waters of the Town: G. Change the course of any channel or the natural movement or flow of any waters: H. Weaken or undermine the lateral support of other lands in the vicinity: I. Otherwise adversely affect the health, safety and general welfare of the people of the Town: J. Adversely affect the aesthetic value of the wetland and adjacent areas: Ch. 111-9 - ISSUANCE OF PERMIT MET=X or Comment=* A. Is reasonable and necessary, considering reasonable alternatives to the proposed activity and the extent to which the proposed activity requires a shoreline location: B. Is not likely to cause a measurable increase in erosion at the proposed site and at other locations: C. Prevents, if possible, or minimizes adverse effects on natural protective features and their functions and protective values, existing erosion protection structures and natural resources: D. s25% Expansion/Calculation Work Session Notes Application Complete SEQRA Classification Confirmed Coordinated Review Y/N Pos/Neg Declaration CAC: LWRP: Additional information on comments/to be discussed/Public Hearing: Date: Completed By: Present: J. Bredemeyer M. Domino G. Goldsmith N. Krupski C. Sanders E. Cantrell D. Di Salvo Other r Page 2 of 2 Suffolk Environmental Consulting, Inc. Newman Village,Suite E,2322 Main Street,P.O.Box 2003,Bridgehampton,New York 11932-2003 (631)537-5160 Fax: (631)537-5291 Bruce Anderson,M.S.,President Via E-mail and Regular Mailing IECE ET November 3,2017 ED Mrs. Elizabeth Cantrell NOV — Board of Trustees Town Hall Southol P.O.Box 1179 ar of Southold, NY 11971 Re: MAY Property--PROPOSED JETTY RECONSTRUCTION Situate: 1340 Cedar Point Drive East■Southold,New York SCTM#: 1000—092—01-005 Dear Mrs. Cantrell, With respect to the above referenced application, please find attached the New York State Department of Environmental Conservation Tidal Permit (No. 1-4738- 03885/00002), effective October 26, 2017, authorizing to "Remove existing 76'jetty and replace with a new 68'jetty...". Kindly review and retain within your files. Please schedule our pending application regarding same before the next available Southold Board of Trustees' meeting for review and permit issuance. Should you have any questions, please feel free to contact this office at any time. Thank you as always for your attention and consideration. Sincerely, r Matt D.Ivans enc. cc: J.May NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATI �® [� Division of Environmental Permits,Region 1 flD E C E I k1 E ard of Thi SUNY @,Stony Brook,50 Circle Road,Stony Brook,NY 11790 P:(631)444-03651 F:(631)444-0360 www.dec.ny.gov NOV — 3 2017 Southold Town aukm— October 26, 2017 Mr. Jack May 54 Perry Ave Bayville, NY 11709-1304 RE: Permit No.: 1-4738-03885/00002 Dear Permittee: In conformance with the requirements of the State Uniform Procedures Act (Article 70, ECL) and its implementing regulations (6NYCRR, Part 621) we are enclosing your permit for the referenced activity. Please carefully read all permit conditions and special permit conditions contained in the permit to ensure compliance during the term of the permit. If you are unable to comply with any conditions please contact us at the above address. Also enclosed is a permit sign which is to be conspicuously posted at the project site and protected from the weather and a Notice of Commencement/Completion of Construction. Please note, the permit sign and Notice of Commencement/Completion of Construction form are sent to either the permittee or the facility application contact, not both. Sin rel , Sherri L. Aicher Environmental Analyst SLA/Is �ivEwvowc Departmento OPPTOENT�NITV EnvironmentaI Conservation v Aft NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 14738-63885 PERMIT Under the Environmental Conservation Law CL Permittee and Facility Information Permit Issued To: Facility: JACK MAY MAY PROPERTY 54 PERRY AVE 1340 CEDAR POINT DR EISCTM1000-92-1-5 BAYVILLE,NY 11709-1304 SOUTHOLD,NY 11971 (845) 661-5123 , Facility Application Contact: l SUFFOLKAENVIRONMENTAL CONSULTING INC - NOV'r 3 2017 PO BOX 2003 BRIDGEHAMPTON,NY 11932-2003 ,, Southold Town (631y,,,,'537-5160 Boad.pflrustpes r Facility Location: in SOUTHOLD in SUFFOLK COUNTY 'n Facility Principal Reference_Point: NYTM-E: 719 NYTM-N: 4545.3 Latttude: 41-6U- N6.2" Longitude: 72°23'41.9" Authorized Activity:'Remove existing 76'jetty and replace with a new 68'jetty. All work-must,be--:; done in strici accordance with the attached:plan stamped"NYSDEC Approved" on October 26, 2017: Permit Authorizations Y- - Tidal'Wetlands-Under Article 25 Permit ID 1-4738-03885/00002 New Permit- - . - -Effective Date:10/26/2017- - -Expiration Date: 10/26/2022 Excavation&Fill in Navigable Waters-Under Article,15,_Title-5 - Permit ID 1-4738-03885/00003 New Permit Effective Date: 10/26/2017 Expiration Date: 10/26/2022 Water Quality Certification-Under Section 401 -Clean Water Act Permit ID 1-4738-03885/00004 New Permit Effective Date: 10/26/2010 Expiration Date: 10/26/2022 Page 1 of 6 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 14738-03885 NYSDEC Approval By acceptance of this permit,the permittee agrees that the permit is contingent upon strict compliance with the ECL, all applicable regulations, and all conditions included as part of this permit. Permit Administrator:GEORGE W.HAMMARTH,Deputy Regibnal.Permit Administrator Address: ``/ NYSDEC-Region 1 Headquarters J SiaJ>\TY @ Stony BrookJ50 Circle Rd =Stony Brook,NY 11790-340 4 r- , Authorized Signature: ��i`,���'�v�+ Date F- -- -c� `f Distribution List ;E l,• y .1 �1 SUFFOLK ENVIRONMENTAL CONSULTING INCD E C E I V E, Bureau of Marine Habitat Protectionki �- SHERRI L AICHER NOV - 3 2017 Termit- Southold Town Rnard of Tru tees' -_ ' NATURAL RESOURCE PERMIT CONDITIONS WATER QUALITY CERTIFICATION SPECIFIC CONDITION- tf t.' GENERAL CONDITIONS,APPLY TO ALL AUTHORIZED PERMITS j NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS NATURAL-,RESOURCE-'PERNIIT CONDITIONS = Apply to-the Following Permits: TIDAL WETLANDS; EXCAVATION & FILL IN NAVIGABLE WATERS; WATER QUALITY CERTIFICATION 1. Notice of Commencement At least 48 hours prior to commencement of the project,the permittee and contractor shall sign and return the top portion of the enclosed notification form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of project,the bottom portion of the form must also be signed and returned, along with photographs of -the completed work. 2. Conformance With Plans All activities authorized by this permit must be in strict conformance with the approved plans submitted by the applicant'or applicant's agent as part of the permit application. Such approved plans were prepared by Suffolk Environmental Consulting, Inc. last revised August 29, 2017 and stamped "NYSDEC Approved" on October 26, 20017. Page 2 of 6 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-03885 3. Post Permit Sign The permit sign enclosed with this permit shall be posted in a conspicuous location on the worksite and adequately protected from the weather. 4. No Construction Debris in Wetland or Adjacent Area Any debris or excess material from construction of this project shall be completely removed from the adjacent area(upland) and removed to an approved upland area for disposal. No debris is permitted in wetlands and/or protected buffer areas. 5. No Disturbance to Vegetated Tidal Wetlands There shall be no disturbance to vegetated tidal wetlands or protected buffer areas as a result of the permitted activities. 6. Storage of Equipment,Materials -The storage of construction-equipment and materials shall be confined within the project.woik area and/or upland areas greater than 56 li 6ar„feet from the tidal wetland boundary. 7. Groin Construction The authorized groin shall not exceed 18" in height over the existing grade of the downdrift,beach and shall not extend seaward of apparent low water. t_ 8. Extent-df Groin The authorized groin shall not extend beyond property lines,interfere with navigation, and/or interfere with other landowners riparian rights. ,� r ,1, 9. NOtructures on Groin No permanent structures shall be installed on the authorized groin without first�btaining written department approval (permit,modification,amendment). ,i{ t� 10. No Interference With Navigation There shall be no unreasonable interference with navigatiodby the work-herein authorized. !y 11. State May Order..,Removal or.Alteration of Work If future operations by the State of New York require an-alteration in the position of tfie•,structure or work herein authorized, or if,in the-opinion of the Deparhnent of Environmental Conservation"ii-shall.cause unreasonable obstruction-16 the free navigation of said waters or flood flows or endanger the health;safety or welfare,ofthe people of the State,or cause loss?or destruction of the natural resources of the State,the owner may be ordered by the Department;to remove or alter the structural work,obstructions, or hazards caused thereby without expense to the State, and ifssupon the expiration or revocation of this permit, the structure, fill, excavation, or other modification of the watercourse hereby authorized shall not be completed,the owners, shall, without expense_.t_oyth_e State,and to such-extent_and in such time and_manner as the_Department of Environmental Conservation may require,remove all or any portion of the uncompleted structure or fill and restore 6 its'former condition the navigable and`16-116capacfiy�of the watercourse.-No claim shall be made against the State of New York on account of any such removal or alteration. 12. State May Require Site Restoration If upon the expiration or revocation of this permit,the project hereby authorized has not been completed,the applicant shall,without expense to the State, and to such extent and in such time and manner as the Department of Environmental Conservation may lawfully require, remove all or any portion of the uncompleted structure or fill and restore the site to its former condition. No claim shall be made against the State of New York on account of any such removal or alteration. 13. Precautions Against Contamination of Waters All necessary precautions shall be taken to preclude contamination of any wetland or waterway by suspended solids, sedim.11 f-010l nt,V E lubricants,epoxy coatings,paints,concrete,leachate or any other environmentalerroa�nis associated with the project. Pag 3 o 6 NOV v 3 2017 Southold Town Board Tr show NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION 14W Facility DEC ID 14738-03885 14. State Not Liable for Damage The State of New York shall in no case be liable for any damage or injury to the structure or work herein authorized which may be caused by or result from future operations undertaken by the State for the conservation or improvement of navigation, or for other purposes, and no claim or right to compensation shall accrue from any such damage. WATER QUALITY CERTIFICATION SPECIFIC CONDITIONS 1. Water Quality Certificati-ori,,The authorized project, as conditioned pursuant to the Certificate, complies with Section 3001;402, 303, 306, and 307 of the Federal Water Pollution Control Act, as amended and as implemented by the limitations, standards, and criteria of state statutory and regulatory requirements set If in 6 NYCRR Section 608.9(a). The authorized project, as conditioned,will also comply with applicable New York State water quality standards, including but not limited to effluent limitations,best usages and thermal discharge criteria, as applicable, as set forth in 6 NYCI jA Parts 701, 702; 703,aii`d 704-. r GENERAL CONDITIONS -Apply to ALL Authorized Permits: 1. Facty Inspection by_The Department The permitted site or facility,including relevant records;is � _�,� subject to inspection at reasonable hours ancl�'intervals by an autfiorizecl'represeritafive of the Department of Environmental_Conservation-'(the-Department)to determine whether the permittee is complying with this permit.arid`the ECL. Such representative.,may order the work suspended pursuant.to ECL 71- 030.1 and,SAPA 401(3). The".permittee shall provide a person to accompany the Department's representative during an inspection to the permit area when requested by the Department. A copy of this permit,including all referenced maps, drawings and special conditions,must be available for inspection by-the-Department at,all;timesz-atwthe project.site,or facility..Failure to produce a copy of the permit upon request by a Department representative is a violation of this permit. 2. Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department,issuance of this permit does not modify, supersede or rescind any order or determination previously issued by the Department or any of the terms, conditions or requirements contained in such order or determination. ,]D ECEIVE NOV - 3 2017 Southold Tom Board of Tru tees Page 4 of 6 Alm NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-03885 3. Applications For Permit Renewals,Modifications or Transfers The permittee must submit a separate written application to the Department for permit renewal,modification or transfer of this permit. Such application must include any forms or supplemental information the Department requires. Any renewal,modification or transfer granted by the Department must be in writing. Submission of applications for permit renewal,modification or transfer are to be submitted to: Regional Permit Administrator _ NYSDEC Region 1 Head'q"iiarters SUNY @ Stony Brookj50 Circle Rd Stony Brook.-NY 11790-3409 4. Submission of Renewal Application The permittee must submit a renewal application at least 30 days before permit expiration for the following permit authorizations: Excavation&Fill-,in Navigable Waters,Tida�l�Wetlands,Water Quality Certification. 5. Permii� odifications, Suspensions and Revocations by the Department The Department reserves4f ie right to exercise all available authority to modify, suspend or revoke this permit. The, grounds i r modification, suspension or revocation include: *j materially false or inaccurate statements in the permit application or supporting papers; k� b� failure by the permittee to comply with any terms or conditions of the permit; c. exceeding the,scope-3ofthe.,project as described in the permit application; „- a:,.;newly discovered material information or.a material change in environmentadconditions,relevant technology or applicable law or regulations since the issuance of the-existing permit; ,1 e. noncompliance with previously issued permit conditions, orders of the commissioner,any provisions of the Environmental Conservation Law or regulations of the Department related,'to the permitted activity. '' 6. Per mifT'ransfer-Permitsare transferrable unless specifically prohibited by statute;regulation or another perinit=conditiiori:-Applications for permit transfer-should be submitted--prior-to,actual-transfer of ownership.';, EGE � E NOV - 3 2017 Southold Town Board of Trustees Page 5 of 6 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-03885 NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The permittee,excepting state or federal agencies, expressly agrees to indemnify and hold harmless the Department of Environmental Conservation of the State of New York,its representatives, employees, and agents("DEC")for all claims, suits,-actions,and damages;fo'the_extent attributable to the permittee's acts or omissions:in connection with the permittee's undertakiiig;of activities in connection with, or operation and maintenance of,the facility or facilities authorized by tli�permit whether in compliance or not in.compliance with the terms and conditions of the permit. This'indemnification does r not extend to anyyclaims, suits,actions, or damages to the extent attributable to DEC's`own negligent or intentional acts;aor omissions,or to any claims, suits,or actions naming the DEC and arising under fa Article 78 of;the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision under federal or state laws. Item B:`iPermittee's Contractors to Comply with Permit The permittee is responsible for informing its independent contractors,employees, agents and assigns of their responsibility to comply with this permit,including all special conditions while acting as the pernditee's agent with respect to the permitted activities, and such persons shall be subject to the same sanctions for violations of the Environmental Conservation Law as those prescribed for the permittees, Item C: Permittee Responsible for Obtaining Other Required Permits The permittee is�responsible foi'obtaining any other permits,approvals,lands, easements and;rights='of way that.niay be required to carry out the activities that are authorized by this permit .= " Item D: No Right to Trespass or Interfere with Riparian`'Rightsr= This,,permit does not convey to the permittee any right to trespass upon the lands or interfere with the, riparian rights of others in order to perform the permitted work nor does it authorize the impairment,of any rights,title, or interest in real or personal property held or vested in a person not a party to the permit: • E E I V E NOV - 3 2017 Southold Town Board of Trustee Page 6 of 6 L NOTICE OF COMMENCEMENT OF CON-;/_.�IICTION AmRETURN THIS FORM TO:COMPLIANCE Or Fax to: 631-444-0297 Bureau of Marine Habitat Protection-NYSDEC 50 Circle Road Stony Brook,NY-1 1790-3409 PERMIT NUMBER: EXPIRATION DATE: PERMITTEE NAME&PROJECT ADDRESS: CONTRACTOR NAME&ADDRESS: TELEPHONE: Dear Sir. Pursuant to the special conditions of the referenced permit,you are hereby notified that the authorized activity shall commence on . We certify that we have read the referenced permit and approved plans and fully understand the authorized project and all permit conditions.We have inspected the project site and can complete the project as described in the permit and as depicted on the approved plans. We can do so in full compliance with all plan notes and permit conditions.The permit,permit sign,and approved plans will be available at the site for inspection in accordance with General Condition No. 1. (Both signatures required) PERMITTEE: DATE CONTRACTOR: DATE THIS NOTICE MUST BE SENT TO THE ABOVE ADDRESS AT LEAST TWO DAYS PRIOR TO COMMENCEMENT OF THE PROJECT AND/OR ANYASSOCIATED ACTIVITIES. FAILURE TO RETURN THIS NOTICE, POST THE PERMIT SIGN, OR HAVE THE PERMIT AND APPROVED PLANS AVAILABLE AT THE WORK SITE FOR THE DURATION OF THE PROJECT MAY SUBJECT THE PERMITTEE AND/OR CONTRACTOR TO APPLICABLE SANCTIONS AND PENALTIES FOR NON-COMPLIANCE WITH PERMIT CONDITIONS. Cut along this line X X X X X X X NOTICE OF COMPLETION OF CONSTRUCTION RETURN THIS FORM TO:COMPLIANCE Or Fax to: 631-444-0297 _ Bureau of Marine Habitat Protection-NYSDEC 50 Circle Rd. Stony Brook, NY 11790-3409 PERMIT NUMBER: EXPIRATION DATE: PERMITTEE NAME&PROJECT ADDRESS: CONTRACTOR NAME&ADDRESS: , TELEPHONE: Pursuant to special conditions of the referenced permit,you are hereby notified that the authorized activity was completed on We have fully complied with the terms and conditions of the permit and approved plans.(Both signatures required) PERMITTEE: DATE CONTRACTOR: DATE THIS NOTICE, WITH PHOTOGRAPHS OF THE COMPLETED WORK AND/OR A COMPL Sy'�Vi; AtF[�A ST BE SENT TO THE ABOVE ADDRESS WITHIN 30 DAYS OF COMPLETION OF THE PROJE 61� aJ + NOV - 3 2017 Southold Town Board of Trustees 95.20-1 (818-n-9d New York State _ Department of Environmental Conservation L N N $ .Y � F= 1 c � domeOTIC ,,E - o - N. ® z The Department of Environmental Conservation (DEC) has issued permit(s) . pursuant to the Environmental Conservation Law for work being conducted at this site. For further information regarding the nature and - extent of work approved .and any Departmental conditions on it, contact the Regional Permit Administrator listed below. Please. _refer to * the. permit number shown when contacting the DEQ. . Regional Permit Administrator Permit -Number - i��•/� ROGER EVANS� J �J Expiration Date NOTE: This notice is NOT a permit e ; � > z rr/� �w t � L z t . x. f ( a Dzz� UX 12 Oo O> Orr zD O n "1 m 0 0 i MAY Property— Proposed Jetty Reconstruct NON Situate: 1340 Cedar Point Drive East•Southold•New York-SCTM if:1000-092-Ol- Date: February Z7,2017,Aur,.zs,zo 17 SUFFOLK ENVIRONMENTAL Scale: As per View CONSULTING,INC. j Slit h Tow Drawn by: mdi P O.Box 2003•Bridgehampton•New York•11932 'f Ot f Comments: Prepared for regulatory su6mi5510n. (631)537-5160(office)•(631)537-5291(facsimile) SITE PLAN'S TOP ELEVATION DETAIL IF M if C� Cr) o cc ` w � Sly#1000-92-1-5 � o ° # 1340 mar ° s Point Drive East ; N top of 51 O Proposed „a � `•iJ � N j Reconstructed 3; Jetty °;i tb Cdr✓ SYS- T 81 6 w z M a at wax z� 2 6.1 4 4o,' �' O Z o F 3. - _4.6 j �4r a z gn-S�-- -- _ --- ------------------- --- ---- - 3.1 .2 •y m O g — 1 p T/Aty 3.4 ® 0 M o PQ a� 0' i 11 01 ;� , Proposed Timber Piling ,[ ,f (8"-lo"4-staggered per side) i q I ` - - - ----- 4.5 tt. See TOP r� (ELEVATION DETAIL a p° 1. T/AW X1.4 --2.1 T/Jtty 0.4 --3.5 in '° Proposed Vinyl Sheathing N � 12 FECO N 1 C SAY ��.� p (C-Loc or similar) o E 16 2 . .r t,. NYSDEC e PPROVED AS PER TERMS *NOTE: Site Plan adapted from the Topographic Survey of the i AND CONDITIONS OF shoreline of subject property,as prepared by ROBERT H.FOX. Extent of Existing Jetty I I o PERMIT A RE IT NO /-y93�O i -Entire Structure to be removed- Wetlands Boundary located along seaward face of the existing bulkheading. 1.75' IPF r\ -1 0 WESTERN ELEVATION m O Proposed Timber Waler rL-- (6"x 6") 68' ± Proposed Timber PilingExistin Grade (8"-10"0-staggeredperside)etty Top EI.@ 4.6' JettyTop El.@ t9' G etty Top EI.@-o.6' ."4 o c V -- ------------------------------------------ 0-1� o t•��r�t:,�t tl t?j Ott}f• �! t i 1 i(t�•{l t'�fi,l•t(i�,( �`,1 10, Exista`ing Bulkheading, r,is ti, ft' 1 j, {, 5 i( _ .- .-,-, •.. ,., - - - tai' i(�#�I -- --. _._ _.__ .. -.--- m•- — -- - - - �� AHW� ' , :i e j '•i'. r . -• ' Pr`opo'sed'� ,`� � „ C J Aeconstniddd jetty AMExisting6Grade Z z z Wetlands Boundary located along seaward face of the existing bulkheading. xt AG Z MM PROTECT DESCRIPTION: .� U ' Applicant ^ AS QnA a Q m b Q 7 Q N N Applicant proposes to reconstruct the existing timberrA c jetty along the southern shoreline of subject property. The existing jetty is comprised of timber sheathing, A and measures 76.0' ±in overall length. d N E The Proposed /Reconstructed Jetty will be comprised p., N bl 5f Vinyl Sheathing sandwiched between Timber ' K JRWalers (6" x 6") and Timber Pilings (8.0" - 10" - s staggered either side), and will be reduced to 68.0' ±in 2 overall length (to extend to the ALW). The new Jetty is not to exceed 1.5' above grade. d crno � i 66 y DAVID J.KAPLAN 25 Woodgreen Lane Roslyn Heights,NY 11577 June 20,2017 Board of Trustees D Town of Southold Town Hall 53095 Route 25 JUN 20 2017 Southold,NY 11971 Re: Application to Reconstruct Jetty Southold Town 1340 Cedar Point Drive East, Southold SCTM# 1000-092-01-005 Ladies and Gentlemen: It has come to my attention,that an application has been submitted to the Board of Trustees for the reconstruction of a timber jetty at the above-referenced property. My family owns a home at 1700 Inlet Way, Southold,which is located approximately 100 feet to the east of the above-referenced property and the jetty in question. While I have no objection at all to the applicant reconstructing their jetty, I do believe that a 68 foot jetty is too long and disproportionate to the size of the other jetties located on either side of the applicant and would have a very detrimental effect to the beach to the east,including ours. hi 2002,my family applied to the Board of Trustees to reconstruct our 65 foot jetty. In response to our application,we were only allowed to reconstruct a 50 foot,low profile jetty. This was based on the determination that only 50 feet of our 65 foot jetty was deemed to be functioning and therefore we were only allowed to reconstruct the functioning 50 feet. Although initially disappointed by the determination, it has proved to be the correct decision. Our 50 foot jetty has done a good job protecting the eastern half of our beach and at the same time has not depleted the beach to our east very much if at all. It should be noted that part of the reason that our beach has been in good condition these past few years has been due to the state of disrepair of the applicant's jetty. Based on a visual inspection,it does not appear that 68 feet of the applicant's 76 foot jetty is currently functioning. Allowing a 68 foot jetty to be re-built would certainly have a negative impact on the beaches to the east. Based on the example of our own jetty,a shorter,low profile jetty can be very effective and have much less of an adverse effect on neighboring property owners. I hope that the Board of Trustees will take this into consideration in making its determination. Respectfully, f David.. Ian S1DIK-P-aRSomhold Npa1t)20170616Tn of Southold Board­­­,ofjrnydo June 15, 2017 Joseph & Maureen Frazzitta CEE 1420 Inlet Way Southold, NY 11971 JUN 7 6 2017 Town of Southold outhold Town Please be advised that we received notice of the Mays' application to Boar f Tr make improvements/repairs to their jetty. We are the next door neighbors, due east, of the Mays. We object to any proposed improvements/repairs to the jetty as it o exists. o The attached photos evidence the state of disrepair of the jetty. The photos also evidence the effect this oversized jetty has on the degradation of my beach and the Kaplans' beach which is due east of our beach. If any improvements/repairs are made to the betty, those things done should only be to shorten the remaining jetty to the same length of 50 feet as the jetty recently installed by the Kaplan's east of my property. We would also request that the height of the jetty be reduced to the beach height. One can clearly see the height of the jetty is well above the beach height. Thank you for your consideration of this objection. Joseph Frazzitta Maureen Frazzitta �5 f C, -.I r y , NLI y ti t� '_ •r •fir �" _", r, - x 'r Michael J. Domino,Pre: $UFF(1(�-Co ;q. Town Hall Annex John M. Bredemeyer III,Vice-President r�� G22, 54375 Route 25 Charles J. Sanders P.O.Box 1179 Glenn Goldsmith 0 Southold,NY 11971 A.Nicholas Krupski ply Telephone(631)765-1892 Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD 1 Date/Time: i `1 c��l �� Completed in field by: Suffolk Environmental Consulting on behalf of RICHARD J. MAY requests a Wetland Permit to reconstruct the existing ±76.0' long timber jetty along the southern shoreline by reducing the overall length to ±68.0' (to extend to the ALW); jetty is not to exceed 2.5' above grade; the use of vinyl sheathing; 6"x6" timber walers; and 8" — 10" diameter timber pilings staggered on either side. Located: 1340 Cedar Point Drive East, Southold. SCTM# 1000-92-1-5 CH. 275-3 - SETBACKS WETLAND BOUNDARY: Actual Footage or OK=4 Setback Waiver Required 1. Residence: 100 feet 2. Driveway: 50 feet 3. Sanitary Leaching Pool (cesspool): 100 feet 4. Septic Tank: 75 feet 5. Swimming Pool and related structures: 50 feet 6. Landscaping or gardening: 50 feet 7. Placement of C&D material: 100 feet TOP OF.BLUFF: 1. Residence: 100 feet 2. Driveway: 100 feet 3. Sanitary leaching pool (cesspool) 100 feet: 4. Swimming pool and related structures: 100 feet Public Noti7Ch.'l eaing Card Posted: Y / N Ch. 27511 SEQRA Type: I II Unlisted Action Type of Application: Pre-Submission Administrative Amendment Wetland Coastal Erosion Emergency Violation Non-Jurisdiction Survey <_ 5 years: Y/N V, Wetland Line by: C.E.H.A. Line Additional information/suggested modifications/conditions/need for outside review/consultant/application completeness/comments/standards: Present were: J. Bredemeyer . Domino -- `./ G. Goldsmith N. Krupski C. Sanders Other Page 1 of 2 guFF04 Michael J. Domino, Pre; Q C'®G Town Hall Annex John M. Bredemeyer III, Vice-President �� �� 54375 Route 25 Charles J. Sanders co P.O.Box 1179 Glenn Goldsmith di Southold,NY 11971 A.Nicholas Krupski �o gyp! Telephone(631)765-1892 Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Date/Time: Completed in Work Session by:, Suffolk Environmental Consulting on behalf of RICHARD J. MAY requests a Wetland Permit to reconstruct the existing ±76.0' long timber jetty along the southern shoreline by reducing the overall length to ±68.0' (to extend to the ALW); jetty is not to exceed 2.5' above grade; the use of vinyl sheathing;-6"x6" timber waters; and 8" — 10" diameter timber pilings staggered on either side. Located: 1340 Cedar Point Drive East, Southold. SCTM# 1000-92-1-5 Ch. 275-12 - STANDARDS FOR ISSUANCE OF PERMIT MET=X or Comment=* A. Adversely affect the wetlands of the Town: B. Cause damage from erosion, turbidity or siltation: C. Cause saltwater intrusion in the fresh water recourses of the Town: D. Adversely affect fish, shellfish or other beneficial marine organisms, aquatic wildlife & vegetation or the natural habitat thereof: E. Increase the danger of flood and storm-tide damage: F. Adversely affect navigation tidal waters or the tidal flow of the tidal waters of the Town: G. Change the course of any channel or the natural movement or flow of any waters: H. Weaken or undermine the lateral support of other lands in the vicinity: I. Otherwise adversely affect the health, safety and general welfare of the people of the Town: J. Adversely affect the aesthetic value of the wetland and adjacent areas: Ch. 111-9 - ISSUANCE OF PERMIT MET=X or Comment=* A. Is reasonable and necessary, considering reasonable alternatives to the proposed activity and the extent to which the proposed activity requires a shoreline location: B. Is not likely to cause a measurable increase in erosion at the proposed site and at other locations: C. Prevents, if possible, or minimizes adverse effects on natural protective features and their functions and protective values, existing erosion protection structures and natural resources: D. :525% Expansion/Calculation Work Session Notes Application Complete SEQRA Classification Confirmed Coordinated Review Y/N Pos/Neg Declaration CAC: LWRP: Additional information on comments/to be discussed/Public Hearing: Date: _Completed By: ,Present: J. Bredemeyer M. Domino G. Goldsmith N. Krupski C. Sanders E. Cantrell D. Di Salvo Other Page 2 of 2 Richard -0 Cedar Point Drive East,Southold 000 6/13/17 Q_W- 11 r TL� ` t lit" t ` t . s yy,° ► • s ,ter — APO 1 �. sj f - r� MAY Property Situate: 1340 Cedar Point Drive East ■ Southold ■ New York SCTM #: 1000—092—01 —005 (Photo taken on May 8, 2017) a WIN <yv y. YFfi✓ 4 , # Y Photograph indicating the current conditions of the existing Timber Jetty (arrow) located along the southerly shoreline of subject property. Photograph taken west of the jetty, facing east, along Little Peconic Bay. MAY Property Situate: 1340 Cedar Point Drive East ■ Southold ■ New York SCTM #: 1000—092—01—005 (Photo taken on May 8, 2017) r� r " � 6 r ,w s�s44a Nxr`�s�c��s9�i �, x ,. s � a 5P 3}old s A 6 � t �w Photograph indicating the current conditions of the existing Timber Jetty located along the southerly shoreline of subject property. Photograph taken west of the jetty, facing east, along Little Peconic Bay. MAY Property Situate: 1340 Cedar Point Drive East ■ Southold - New York SCTM #: 1000—092—01 —005 (Photo taken on May 8, 2017) 41 Ag " trr, .�'"" �_.. . ♦tie. _ Of l t 8 � 10, i is A�.✓� �' k a a �� �rp Photograph indicating the current conditions of the existing Timber Jetty located along the southerly shoreline of subject property. Photograph taken atop the landward end of the jetty, facing south, overlooking Little Peconic Bay. MAY Property Situate: 1340 Cedar Point Drive East ■ Southold ■ New York SCTM #: 1000—092—01— 005 (Photo taken on May 8, 2017) 04, 41 41 �'�s'" "��` '�- #. :w rs to �§ "{; rte, ✓"^ �, �"-€xe*7a� '*. .,�aa���rrr� � ,S �M er" •„- "yF^. r � 4 �� x X. r- r�y ,.. t � �V6 i L- Photograph indicating the apparent High Water Mark along the shoreline of subject property. Photograph facing west. MAY Property Situate: 1340 Cedar Point Drive East ■ Southold • New York SCTM #: 1000-092-01 -005 Derby N.uWt �^ sF + , t � � t• ►a0i SUBJ ECT _,yam ct i AK P"WI RD .N& T WAY y.� 1 CEDAR POWDR .. \ 1700 CEDAR POW DR E12E0D anR PaNI t" \ i'i•CEDAR f?gNT DRE f 11",WILETAM 1700 MtET WAV i SUBJECT PROPERTY CEDAR BEACH HARBOR xl 3 14A(c) CEDAR1p 6 12A(c) fo v HOG NECK BAY 1 ' Suffolk Environmental Consulting, Inc. Newman Village, Suite E,2322 Main Street,P.O. Box 2003,Bridgehampton,New York 11932-2003 (631) 537-5160 Fax: (631) 537-5291 Bruce Anderson,M.S.,President Via E-mail and Regular Mailing D E C E I V E November 3, 2017 Mrs. Elizabeth Cantrell NOV - 6 2017 Board of Trustees Town Hall Southo!d Town BgaW of Trustees- P.O. Box 1179 Southold, NY 11971 Re: MAY Property-PROPOSED JETTY RECONSTRUCTION Situate: 1340 Cedar Point Drive East■ Southold, New York SCTM #: 1000-092-01 -005 Dear Mrs. Cantrell, With respect to the above referenced application, please find attached the New York State Department of Environmental Conservation Tidal Permit (No. 1-4738- 03885/00002), effective October 26, 2017, authorizing to "Remove existing 76'jetty and replace with a new 68'jetty...". Kindly review and retain within your files. Please schedule our pending application regarding same before the next available Southold Board of Trustees' meeting for review and permit issuance. Should you have any questions, please feel free to contact this office at any time. Thank you as always for your attention and consideration. Sincerely, Matt D. Ivans enc. cc: J. May OFFICE LOCATION: ®��OF SO(/�y®� SLING ADDRESS: Town Hall Annex '` ® P.O.Box 1179 54375 State Route 25 Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) c®s Telephone: 631 765-1938 Southold,NY 11971 � ® �O P ®IyCOUNT`I,�� LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM To: Michael Domino, President Town of Southold Board of Trustees From: Mark Terry, Principal Planner LWRP Coordinator Date: June 14, 2017 Re: Local Waterfront Revitalization Program Coastal Consistency Review for RICHARD J. MAY SCTM# 1000-92-1-5 The structure is a groin. Suffolk Environmental Consulting on behalf of RICHARD J. MAY requests a Wetland Permit to reconstruct the existing ±76.0' long timber jetty along the southern shoreline by reducing the overall length to ±68.0' (to extend to the ALW);jetty is not to exceed 2.5' above grade; the use of vinyl sheathing; 6"xT timber walers; and 8"— 10" diameter timber pilings staggered on either side. Located: 1340 Cedar Point Drive East, Southold. SCTM# 1000-92-1-5 The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is CONSISTENT with the LWRP policies and therefore CONSISTENT with the LWRP provided the following is required for further Policies 5 and 6. 1. Require a vegetated non-turf buffer landward of the bulkhead incorporating existing, native, salt tolerant vegetation.' Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. 1 Peter Young,Chairman ti Town Hall,53095 Main Rd. Lauren Standish,Secretary P.O.Box 1179 !� Southold,NY 11971 �f Telephone(631)765-1889 Fax(631)765-1823 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held Wed., June 14, 2017 the following recommendation was made: Moved by John Stein, seconded by Greg Williams, it was RESOLVED to SUPPORT the application of RICHARD J. MAY to reconstruct the existing timber jetty along the southern shoreline of subject property. Existing jetty is comprised of timber sheathing, and measures 76' in overall length. Proposed/reconstructed jetty will be comprised of vinyl sheathing sandwiched between timber wales and timber pilings, and will be reduced to 68' in overall length. The new jetty is not to exceed 2.5' above grade. Located: 1340 Cedar Beach Road East, Southold. SCTM#92-1-5 Inspected by: John Stein, Peter Meeker, Keith McCamy The CAC Supports the application with provisions for lateral access across the shoreline. The CAC questions the need for raising the height of the jetty and recommends the new height be no higher than 1 Y2 ', which will allow for pedestrian access. Vote of Council: Ayes: All Motion Carried i d• LF x John M.Bred8meyer III,President ",' .. Town Hall Annex Michael J.Domino,Vice-President • " •' ' 64375 Main Road Y '' P.O.Box 1179 James F.King,Trustee x „� Southold,Boor York 11971-0959 Dave Bergen,Trustee �, xi Telephone(631) 765-1592 Charles J.Sanders,Trustee ". " ° ° x a as Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Office Use Only Coastal Erosion Permit Application X Wetland Permit Application Administrative Permit Amendment/Transfer/Extension Received Application: �dd9a 7 Received Fee:$ zS0 Completed Application: Incomplete: ": E-a SEQRA ClassificatioO9— Type I Type II Unlisted Coordination-(date sent) I "•j LWRP Consistency Assessment Form: `07 MAY 1 9 2017 CAC Referral Sent: Date of Inspection: -13,B y }Sot;itiaid Town Receipt of CAC Report: .parcdQf Tusl Sj••---, ._, • J Lead Agency Determination Technical Review: Public Hearing Held: I? Resolution: Name of Applicant RICHARD J. MAY Address 54 Perry Avenue - Bayyille - New York- 11709-2617 Phone Number: ( 845 ) 661 - 5123 Suffolk County Tax Map Number: 1000—092—01 —005 Property Location: ' 1340 Cedar Point Road East - Southold - New York (provide LILCO Pole#, distance to cross streets, and location) AGENT: Matt D. Ivans, Suffolk Environmental Consulting, Inc. (If applicable) Address: P.O. Box 2003;Bridgehampton,NY 11932 Phone: (631) 537—5160 4t' `Ix p„ Board of Trustees Application GENERAL DATA Land Area(in square feet): 34, 410 square feet± Area Zoning: R - 40 Previous use of property: Residential Intended use of property: Residential Covenants and Restrictions: Yes X No If "Yes", please provide a copy. Will this project require a Building Permit as per Town Code? Yes X No If"Yes",be advised this application will be reviewed by the Building Dept.prior to a Board of Trustee review and Elevation Plans will be required. Does this project require a variance from the Zoning Board of Appeals Yes X No If"Yes",please provide a decision. Will this project require any demolition as per Town Code or as determined by the Building Dept.? Yes X No Does the structure (s) on property have a valid Certificate of Occupancy? Yes No N/A Prior permits/approvals for site improvements: Agency Date N/A N/A N/A N/A No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? X No Yes If yes, provide explanation: Project Description (use attachments if necessary): Applicant proposes to reconstruct the existing timber jetty along the southern shoreline of subject property. The existing jetty is comprised of timber sheathing, and measures 76.0' ±in overall length. The Proposed /Reconstructed Jetty will be comprised of Vinyl Sheathing sandwiched between Timber Walers (6" x 6") and Timber Pilings (8.0"-10" -staggered either side), and will be reduced to 68.0' ±in overall length(to extend to the ALW). The new Jetty is not to exceed 2.5' above grade. Board of Trustees Application WETLAND/TRUSTEE LANDS APPLICATION DATA Purposes of proposed operations: Reconstruct existing shoreline stabilization structure i.e.,Jetty to protect beach. Area of wetlands on lot: N/A square feet Percent coverage of lot: N/A % Closest distance between nearest existing structures and upland edge of wetlands: 0.0± feet (existing jetty) Closest distance between nearest proposed structures and upland edge of wetlands: 0.0± feet (proposed reconstructed jetty) Does the project involve excavation or filling? X No Yes If Yes, how much material will be excavated? N/A (cubic yards) How much material will be filled? N/A (cubic yards) Depth of which material will be removed or deposited: N/A feet Proposed slope throughout the area of operations: N/A Manner in which material will be removed or deposited: N/A Statement of the effect,if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachments if appropriate): No impact to the wetlands are anticipated due to this project simply replacing(and reducing in size) what has harmoniously existed hereon for over fifty(50) years. 1L�.+ Board of Trustees Application COASTAL EROSION APPLICATION DATA Purposes of proposed activity: N/A Are wetlands present within 100 feet of the proposed activity? No Yes Does the project involve excavation or filling? No Yes If Yes, how much material will be excavated? (cubic yards) How much material will be filled? (cubic yards) Manner in which material will be removed or deposited: Describe the nature and extent•of the environmental impacts reasonably anticipated resulting from implementation of the project as proposed. (Use attachments if necessary) F s 617.20 Appendix B Short Environmental Assessment Form Instructions for Completing Part 1 -Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding,are subject to public review,and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part 1 -Project and Sponsor Information Name of Action or Project: MAY Project Project Location(describe,and attach a location map): 1340 Cedar Point Drive East,Southold,New York Brief Description of Proposed Action- Referring to the attached Project Description,applicant proposes to reconstruct the existing timber jetty along the southern shoreline of subject property The existing jetty is comprised of timber sheathing,and measures 76 0'±in overall length. The Proposed/Reconstructed Jetty will be comprised of Vinyl Sheathing sandwiched between Timber Walers(6"x 6")and Timber Pilings(8.0"—10"c staggered either side),and will be reduced to 68 0'±in overall length(to extend to the ALW). The new Jetty is not to exceed 2.5'above grade Name of Applicant or Sponsor: Telephone: (631)537-5160 Matt D Ivans-Suffolk Environmental Consulting, Inc E-Mail: mdivans@optonline net Address: P O Box 2003 City/PO: State: Zip Code: Bndgehampton NY 11932 1.Does the proposed action only involve the legislative adoption of a plan, local law,ordinance, NO YES administrative rule,or regulation? If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that W1 F may be affected in the municipality and proceed to Part 2. If no,continue to question 2. 2. Does the proposed action require a permit,approval or funding from any other governmental Agency? NO YES If Yes, list agency(s)name and permit or approval: ❑ ❑ Army Corps of Engineers Authorization,New York State Department of State Concurrence,Town of Southold Board of Trustees Permit 3.a.Total acreage of the site of the proposed action? 0 79 acres b.Total acreage to be physically disturbed? <0 1 acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 0.79 acres 4. Check all land uses that occur on,adjoining and near the proposed action ❑Urban ❑Rural(non-agriculture) [:]Industrial ❑Commercial m Residential(suburban) ❑Forest ❑Agriculture OAquatic El Other(specify): ❑Parkland Page 1 of 4 5. Is the proposed action, NO YES N/A a.A permitted use under the zoning regulations? ❑ ❑✓ ❑ b. Consistent with the adopted comprehensive plan? ❑ ❑✓ ❑ 6. Is the proposed action consistent with the predominant character of the existing built or natural NO YES landscape? ❑ ❑✓ 7. Is the site of the proposed action located in,or does it adjoin,a state listed Critical Environmental Area? NO YES If Yes, identify: ❑✓ ❑ 8. a. Will the proposed action result in a substantial increase in traffic above present levels? NO YES 7 EL b.Are public transportation service(s)available at or near the site of the proposed action? ❑ ❑ c.Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action? ❑✓ ❑ 9. Does the proposed action meet or exceed the state energy code requirements? NO YES If the proposed action will exceed requirements,describe design features and technologies: 10. Will the proposed action connect to an existing public/private water supply? NO YES If No,describe method for providing potable water: ❑✓ ❑ N/A 11. Will the proposed action connect to existing wastewater utilities? NO YES If No,describe method for providing wastewater treatment: ❑ ❑ N/A 12. a.Does the site contain a structure that is listed on either the State or National Register of Historic NO YES Places? ❑✓ ❑ b. Is the proposed action located in an archeological sensitive area? ❑✓ ❑ 13. a. Does any portion of the site of the proposed action,or lands adjoining the proposed action,contain NO YES wetlands or other waterbodies regulated by a federal,state or local agency? ❑ b. Would the proposed action physically alter,or encroach into,any existing wetland or waterbody? ElIf Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: The reconstructed Jetty will extend 40.0'below AHW however it will be shorter in overall length by 8.0'than the existing Jetty 14. Identify the typical habitat types that occur on,or are likely to be found on the project site. Check all that apply: m Shoreline ❑Forest ❑Agricultural/grasslands ❑Early mid-successional ❑ Wetland ❑Urban ❑Suburban 15. Does the site of the proposed action contain any species of animal, or associated habitats, listed NO YES by the State or Federal government as threatened or endangered? W1 ❑ 16. Is the project site located in the 100 year flood plain? NO YES 17. Will the proposed action create storm water discharge,either from point or non-point sources? NO YES If Yes, a. Will storm water discharges flow to adjacent properties? ❑NO EJYES ❑✓ ❑ b.Will storm water discharges be directed to established conveyance systems(runoff and storm drains)? If Yes,briefly describe: F]NO AYES Page 2 of 4 18.Does the proposed action in'11,a�e construction or other activities that result in the impoundment of NO YES water or other liquids(e.g.retention pond,waste lagoon,dam)? If Yes,explain purpose and size- ❑ ❑ 19.Has the site of the proposed action or an adjoining property been the location of an active or closed NO YES solid waste management facility? If Yes,describe: Z ❑ 20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES completed)for hazardous waste? If Yes,describe: Z ❑ I AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor name,-, v -Suffolk Environmental Consulting, Inc Date: March 1,2017 Signature: - - Part 2-Impact Assessment. The Lead Agency is responsible for the completion of Part 2. Answer all of the following questions in Part 2 using the information contained in Part 1 and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept"Have my responses been reasonable considering the scale and context of the proposed action?" No,or Moderate small to large impact impact may may occur occur 1. Will the proposed action create a material conflict with an adopted land use plan or zoning Elregulations? 2. Will the proposed action result in a change in the use or intensity of use of land? ❑ 3. Will the proposed action impair the character or quality of the existing community? ❑ 4. Will the proposed action have an impact on the environmental characteristics that caused the ❑ establishment of a Critical Environmental Area(CEA)? 5. Will the proposed action result in an adverse change in the existing level of traffic or ❑ affect existing infrastructure for mass transit,biking or walkway? 6. Will the proposed action cause an increase in the use of energy and it fails to incorporate ❑ reasonably available energy conservation or renewable energy opportunities? 7. Will the proposed action impact existing: ❑ a.public/private water supplies? b.public/private wastewater treatment utilities? 8. Will the proposed action impair the character or quality of important historic,archaeological, architectural or aesthetic resources? 9. Will the proposed action result in an adverse change to natural resources(e.g.,wetlands, ❑ waterbodies,groundwater,air quality,flora and fauna)? Page 3 of 4 No,or Moderate small to large impact impact may may occur occur 10. Will the proposed action result in an increase in the potential for erosion,flooding or drainage 1:1problems? 11. Will the proposed action create a hazard to environmental resources or human health? UZ 1:1 Part 3-Determination of significance. The Lead Agency is responsible for the completion of Part 3. For every question in Part 2 that was answered"moderate to large impact may occur",or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact,please complete Part 3. Part 3 should, in sufficient detail, identify the impact, including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant.Each potential impact should be assessed considering'its setting,probability of occurring, duration, irreversibility,geographic scope and magnitude. Also consider the potential for short-term, long-term and cumulative impacts. ❑ Check this box if you have determined,based on the information and analysis above, and any supporting documentation, that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required. Check this box if you have determined,based on the'information and analysis above,and a y supporting documentation, that the roped action will not result ny signi cant adverse environmental imp cts. �q n „ Name of Le g cy Dam Print or Type Name f Responsib e Officer in Lead Agency Title of Responsible Officer Signature of Responsible bfficer in Lead Agency Signature of Preparer(if different from Responsible Officer) PRINT Page 4 of 4 Board of Trustees Application, County of Suffolk State of New York RICHARD J. MAY BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF,AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR REPRESENTATIVES(S), TO ENTER ONTO,MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF THIS APPLICATION. Signature SWORN TO BEFORE ME THIS DAY OFf �C l Notary_Pubbi , ANTONIETTA PROVENZANO NOTARY PUBLIC OF NEW JERSEY MY'C WISSION EXPIRES JUNE 17,2020 ' I Board of Trustees Application AUTHORIZATION (where the applicant is not the owner) I, RICHARD J. MAY residing at �kc 61e /I,!-" ((YOGI does hereby authorize Suffolk Environmental Consulting Inc. to apply for permit(s) from the Southold Board of Town Trustees on my behalf. (Own r' si` at e) • � I ly APPLICANT/AGENT/REPRESENTATIVE TRANSACTIONAL DISCLOSURE FORM The Town of Southold's Code of Ethics prohibits conflicts of interest on the part of the town officers and employees. The purpose of this form is to provide information which can alert the town of possible conflicts of interest and allow it to take whatever action is necessary to avoid same. YOUR NAME: MAY, RICHARD, J. (Last name,first name, middle initial,unless you are applying in the name of someone else of other entity, such as a company. If so,indicate the other person's or company's name.) NATURE OF APPLICATION: (Check all that apply.) Tax grievance Building Variance Trustee X Change of Zone Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning Other (If"Other," name the activity.) Do you personally(or through your company,spouse,sibling,parent,or child)have a relationship with any officer or employee of the Town of Southold?"Relationship"includes by blood,marriage,or business interest. "Business interest"means a business, including a partnership,in which the town officer or employee has even a partial ownership of(or employment by)a corporation in which the town officer or employee owns more than 5% of the shares. YES NO X If you answered "YES," complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicant/agent/representative)and the town officer or employee.Either check appropriate line A)through D)and/or describe in the space provided. The town officer or employee or his or her spouse, sibling, parent, or child is (check all that apply): A) the owner of greater then 5% of the shares of the corporate stock of the applicant (when the applicant is a corporation); B) the legal or beneficial owner of any interest in a non-corporate entity (when the applicant is not a corporation); C) an officer, director, partner, or employee of the applicant; or D) the actual applicant. DESCRIPTION OF RELATIONSHIP Submitted thi s f� day o �� 201, Signature Print name: RICHA J. M 'TM' U.S. Postal Servilce,l 'EIYIVIAW� REOE IPT ,CE,RT'F'i, r . ; . i I ru —0 Domestic Ma Only:: ru = — SCA� TUGK,-i ME�-04%7+Q 4g� SOUTHOLO W, �1i�73V,-, U - /11 R "I ' A C3 Certified Mail-Fee ,r3 Certified Mail Fee -n $3.35 $3.35 S $ 09 MExtra Services&Fees M Extra Services&Fees(checkbox,add fee add fee ❑Return Receipt(hardcopy) $ ❑Return Receipt(hardcopy) $ 1 rXI ❑Return Receipt(electronic) Z— r-1 E]Return Receipt(electronic) $ Postmark C-3 $ Postmark 0 1-1 Certified Mall Restricted Delivery $ JUp4 9,201, C3 C-rtdled Mall Restricted Delivery $ ere 0 C3 M r Postmark k 017 M []Adult Signature Required $ _3 El Adult Signature Required $ C UN : U []Adult SignaturoRestricted Delivery$ 2017 m []Adult Signature Restricted Delivery$ C3Postage c3 Postage -q rq $13.70 r $ $0.70 $ - I L/rOj9/2 C3 Total Postage and Fees Ob/09/20 4-Y try r-3 Total Postage and,Fees M M $6.80 $ $6.80 AA $ 11. Ln Sent To Lr7 Sent To 41-1 P Rc,-V.VA4"% -q )"X"-.L&11.14- MCI*---------- ... ----------------------------- et an pt N0 Box No. -------------- 0 �rl Ri6i!Zid-AjYK*No.,or PW B-Ox---ME D- ir r%- -----(ross;--- ------ ----------------------------------- (4164-V---------------------------------c----------------------------- -------------------- 21f Y,State,Z%P+4® A 0 0 C11; ho k C) 0404 1-19 rovqk. lid R U. Posta] ServiceTm CERTIFIED MA0IL. RECEIPT Er DomesticMair'l Qnly' M • EA X11( 06 OY )V E3 Certified Mail Fee $ $3.35 SEs P M Extra Services&Fees(bheckb.,eddf,,.! 5 El Return Receipt(hardcopy) $ r-1 El Return Receipt(electronic) $ Y-Q Postmark C3 E]Certified Mall Restricted Delivery $ Here 1:3 E]Adult Signature Required $ C-3 E]Adult Signature Restricted Delivery$ M Postage JUN - 9 2017 M r-1 $ $0.70 C3 Total Postage and Fees 06/09/2017 M $ $6.80 Ln Sent To r-9 !��4 _get*& A411V CLA4, TV C3Street ------------------- - --------- --- ------------------------------------------------------------------ /JY i PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS Name: 9a � f I ® � 1 STATE OF NEW YORK COUNTY OF SUFFOLK residing at being duly sworn,deposes and says that on the day of , 20 , deponent mailed a-true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite there respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at , that said Notices were mailed to each of said persons by CERTIFIED MAIL/RETURN RECEIPT. Sworn to before me this Day of , 20 i i Notary Public PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS Name: Address: See attached List or Adjacent Property Owners 92.-1-6 Joseph and Maureen Frazzitta 279 Cherry Pl, East Meadow,NY 11554 90.-2-22 David and Robert Pettit 2 Crossing Dr., Scarborough, ME 04074 90.-3-18.1 Jeanne P. Harmon 1175 Cedar Point Dr E.,Southold,NY 11971 STATE OF NEW YORK COUNTY OF SUFFOLK Bruce A. Anderson, residing at Suffolk Environmental Consulting, Inc, P. O. Box 2003, Brid eg hampton, NY 11932, being duly sworn, deposes and says that on the 9th day of June, 2017, deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite their respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at Bridgehampton, that said Notices were mailed to each of said persons by CERTIFIED MAIL/RETURN RECEIPT. J Sworn to before me this Day of�j'".r. , 20 /7 Notary Public Matthew D. Ivens Notary Public of New York No. Ol IV6053859 Qualified in Suffolk County Commission Expires January 22, 20�1 ! .rte✓-',.," 1 � Michael J. Domino, res ucui UFFO� P � NQS SCD Town Hall Annex John M. Bredemeyer III,Vice-President ,{,,moo G�'�r 54375 Route 25 Charles J. Sanders C.13 P.O.Box 1179 Glenn Goldsmith Southold,NY 11971 A.Nicholas Krupski '�,h�l Telephone (63192 )65 6648 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD BOARD OF TRUSTEES: TOWN OF SOUTHOLD --------------------------------------------------------------- In the Matter of the Application of RICHARD J. MAY COUNTY OF SUFFOLK STATE OF NEW YORK AFFIDAVIT OF POSTING TO BE COMPLETED AFTER POSTING REMAINS INPLACE FOR AT LEAST SEVEN DAYS PRIOR TO THE PUBLIC HEARING DATE �,�2,��: •/ � =j1-s� residing at/dba SUFFOLK ENVIRONMENTAL CONSULTING,INC, 20. BOX 2003 BRIDGEHAMPTON,NY 11932-2003 being duly sworn, depose and say: That on the q qday of-,TLf 0-'- , 2011 I personally posted the property known as a� by placing the Board of Trustees official poster where it can easily be seen, and that I have checked to be sure the poster has remained in place for eight days prior to the date of the public hearing. Date of hearing noted thereon to be held Wednesday,June 21,2017. Dated: G/2 11, -.7 (signature) Sworn to before me this P-r day of T ,(-20 (7 NoV Public Matthew D. Ivans Notary Public of New York No. 0 i IV6053859 Qualified in Suffolk County Commission Expires January 22, 201 N U U '1�; H 't- A K I N G ' ' T1 -- I NOTICE IS HEREBY GIVEN that a Public Hearing will be held by the Southold Town Board of Trustees at the Town Hall, 53095 Main Road, Southold, New York, concerning this property. OWNER(S) OF RECORD: RICHARD J . MAY SUBJECT OF PUBLIC HEARING : For a Wetland Permit to reconstruct the existing ±76.0' long timber jetty along the southern shoreline by reducing the overall length to ±68.0' (to extend to the ALW); jetty is not to exceed 2.5' above grade; the use of vinyl sheathing; 6"x6" timber walers; and 8" — 10" diameter timber pilings staggered on either side. Located: 1340 Cedar Point Drive East, Southold. SCTM# 1000-92-1-5 TIME & DATE OF PUBLIC HEARING : Wednesday, June 21, 2017 — at or about 5 :30P. M . If you have an interest in this project, you are invited to view the Town file(s) which are available for inspection prior to the day of the hearing during normal business days between the hours of 8 a.m. and 4 p.m. BOARD OF TRUSTEES * TOWN OF SOUTHOLD * (631) 765-1892 Form TS 1 Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS 1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C,the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to its significant icant beneficial and adverse effects upon the coastal area(which includes all of Southold Town). 3. If any question in Section C on this form is answered"yes" or"no",then the proposed action will affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus,each answer must be explained in detail,listing both supporting and non= supporting facts.. If an action cannot be certified as consistent with the LWRP policy standards and conditions,it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's website (southoldtown.northfork.net),the Board of Trustees Office,the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# 092 - 01 - 005 The Application has been submitted to (check appropriate response): Town Board ❑ Planning Dept. ❑ Building Dept. ❑ Board of Trustees 1. Category of Town of Southold agency action (check appropriate response): (a) Action undertaken directly by Town agency(e.g. capital construction, planning activity, agency regulation, land transaction) ❑ (b) Financial assistance (e.g. grant, loan, subsidy) ❑ (c) Permit, approval, license, certification: Nature and extent of action: Applicant proposes to reconstruct the existing timber jetty along the southern shoreline of subject property. The existing .jetty is comprised of timber sheathing, and measures 76.0' ± in overall length. The Proposed / Reconstructed Jetty will be comprised of Vinyl Sheathing sandwiched between Timber Walers (6" x 6") and Timber Pilings (8.0" — 10" — staggered either side), and will be reduced to 68.0'±in overall length(to extend to the ALW). The new Tetty is not to exceed 25 above grade. Location of action: 1340 Cedar Point Drive East■Southold■New York Site acreage: 0.79±acres Present land use: Residential Present zoning classification: R-40 2. If an application for the proposed action has been filed with the Town of Southold agency,the following information shall be provided: (a) Name of applicant: RICHARD J.MAY (b) Mailing address: 54 Perry Avenue■Bayville■New York■ 11709-2617 (c) Telephone number: Area Code(845) 661 -5123 (d) Application number, if any: N/A Will the action be directly undertaken,require funding, or approval by a state or federal agency? Yes ❑ No ® If yes,which state or federal agency? Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space,makes efficient use of infrastructure,makes beneficial use of a coastal location,and minimizes adverse effects of development. See LWRP Section III—Policies;Page 2 for evaluation criteria. ® Yes ❑ No ❑ Not Applicable Subject proposal is consistent with the policy in that the siting/utilization of the reconstructed jetty will maintain the character of the surrounding neighborhood, which currently consists of many similarly-improved residential lots with similar shoreline structures (i.e. jetties). In addition, subject proposal will be in harmony with the"...beneficial use of a coastal location..." in that the legally created residential waterfront (i.e. coastal) lot will be enhanced by the reconstructed ietty in order to maintain the protection &stabilization of the beachfront. Accordingly, we believe that this project is consistent with this policy. Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section IH—Policies Pages 3 through 6'for evaluation criteria ❑ Yes ❑ No ® Not Applicable Not Applicable. Attach additional sheets if necessary t Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III—Policies Pages 5 through 7 for evaluation criteria ® Yes ❑ No ❑ Not Applicable Subject proposal will not adversely impact the visual quality of the surrounding area in that the surrounding area is currently comprised of properties improved with similar structures (i.e. jetties) of similar size and scope. Scenic resources assumedly views of Peconic Bay, are not at risk due to the length of the reconstructed jetty being reduced in length and the height being no greater than 2.5' over grade Accordingly,this proposal will comply with Policy 3 Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life,structures, and natural resources from flooding and erosion. See LWRP Section III—Policies Pages 8 through 16 for evaluation criteria ® Yes ❑ No ❑ Not Applicable Subject proposal will fully comply with Policy 4 in that the reconstructed jetty is designed to be almost identical in design and scope as that of the surroundinq jetties which have not resulted in loss of life, structures, and natural resources within this area. Accordingly,this proposal will comply with Policy 4. Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold.See LWRP Section III -Policies Pages 16 through 21 for evaluation criteria ❑ Yes ❑ No ® Not Applicable Not Applicable Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III—Policies; Pages 22 through 32 for evaluation criteria ® Yes ❑ No ❑ Not Applicable Subject proposal will maintain the quality of the surrounding ecosystem in that this structure has existed herein for many years harmoniously within the immediate environment, and which represents a typical structure found within this area and which have not resulted in significant effects to the surrounding ecosystem. Accordingly, this proposal will comply with Policy 6 Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III -Policies Pages 32 through 34 for evaluation criteria ❑ Yes ❑ No ® Not Applicable Not Applicable. Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III—Policies; Pages 34 through 38 for evaluation criteria. ❑ Yes ❑ No ® Not Applicable Not Applicable f Attach additional sheets if necessary PUBLIC COAST POLICIES Policy 9. Provide for public access to,and recreational use of,coastal waters,public lands,and public resources of the Town of Southold. See LWRP Section III—Policies; Pages 38 through 46 for evaluation criteria ❑ Yes ❑ No ® Not Applicable Not Applicable. Attach additional sheets if necessary WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependence uses in suitable locations. See LWRP Section III—Policies; Pages 47 through 56 for evaluation criteria ❑ Yes ❑ No ® Not Applicable Not Applicable. Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound,the Peconic Estuary and Town Waters. See LWRP Section III—Policies;Pages 57 through 62 for evaluation criteria ❑ Yes ❑ No ® Not Applicable Not Applicable. Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III—Policies;Pages 62 through 65 for evaluation criteria. ❑ Yes ❑ No ® Not Applicable Not Applicable. Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III—Policies; Pages 65 through 68 for evaluation criteria. ❑ Yes ❑ No ® Not Applicable Not Applicable. Attach additional sheets if necessary f Suffolk Environmental Consulting, Inc. Newman Village,Suite E,2322 Main Street,P.O.Box 2003,Bridgehampton,New York 11932-2003 (631) 537-5160 Fax: (631) 537-5291 Bruce Anderson,M.S.,President HAND DELIVERED May 16, 2017 {_° '} - ' t '3 L , .. Mr. Michael Domino, President `�! MAY 9 Board of Trustees 2017 ! Town Hall P.O. Box 1179 tSouthold town Southold, NY 11971 Re: MAY Property PROPOSED JETTY RECONSTRUCTION Situate: 1340 Cedar Point Drive East ■ Southold, New York SCTM #: 1000—092—01 -005 Dear Mr. Domino, This Firm represents the owner of the property referenced above, who is seeking all required regulatory approval to reconstruct the existing jetty thereon. Consequently, approval from your Board is required. Please find enclosed herewith for your review: (1) Town of Southold Trustees Wetlands Permit Application (original and three [3] copies); (2) Local Waterfront Revitalization Program application (original and three [3] copies); (3) Short Environmental Assessment Form (original and three [3] copies); (4) Location Map for reference (four [4] copies); (5) Photographs of subject property, indicating the conditions thereon, (four [4] sets); Hammarth/ 2 (6) Proposed Plans, prepared by Suffolk Environmental Consulting, Inc., dated February 27, 2017, indicating all project specifications (four 4] sets); (7) Hydrographic Map of subject property, prepared by ROBERT H. FOX, L.S., last dated October 12, 2016, indicating the conditions thereon (four [4] prints); and (9) Check made payable to the Town of Southold in the amount of$250.00 covering the requisite application fee. By way of this correspondence, and on behalf of the owners, I request that you commence review of this application and schedule before the next available Trustees Board meeting for discussion and subsequent permit issuance. Should you have any questions regarding this matter, or require additional information, please feel free to contact this office at any time. Thank you in advance for your cooperation. Sincerely, Matt D. Ivans enc. cc: R. May