Loading...
HomeMy WebLinkAbout41860-Z ��®�pSUFFQ��COG�� Town of Southold 10/20/2017 0 P.O.Box 1179 o • 53095 Main Rd Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 39301 Date: 10/20/2017 THIS CERTIFIES that the building HOT TUB Location of Property: 495 Cases Ln., Cutchogue SCTM#: 473889 Sec/Block/Lot: 109.-6-9.6 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 8/1/2017 pursuant to which Building Permit No. 41860 dated 8/4/2017 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: ACCESSORY HOT TUB AS APPLIED FOR The certificate is issued to Zablocky,Kim of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 41860 10-04-2017 PLUMBERS CERTIFICATION DATED Mt ed Signature TOWN OF SOUTHOLD BUILDING DEPARTMENT y i TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 41860 Date: 8/4/2017 Permission is hereby granted to: Zablocky, Kim 495 Cases Ln Cutchogue, NY 11935 To: install a hot tub as applied for. At premises located at: 495 Cases Ln., Cutchogue SCTM #473889 Sec/Block/Lot# 109.-6-9.6 Pursuant to application dated 8/1/2017 and approved by the Building Inspector. To expire on 2/3/2019. Fees: SWIMMING POOLS -ABOVE-GROUND WITH REQUIRED FENCING $250.00 CO - MING POOL $50.00 otal: $300.00 i Building Inspector Form No.6 / TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: I. Final survey of property with accurate location of all buildings,property lines, streets,and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage-disposal(S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1%lead. 5. Commercial building, industrial building,multiple residences and similar buildings and installations,a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings(prior to April 9, 1957)non-conforming uses,or buildings and "pre-existing"land uses: 1. Accurate survey of property showing all property lines,streets,building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant.If a Certificate of Occupancy is denied,the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00,Alterations to dwelling$50.00, Swimming pool$50.00,Accessory building$50.00,Additions to accessory building$50.00,Businesses$50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy-$.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy-Residential$15.00, Commercial$15.00'7 Date. / Z 7 11-7 New Construction: Old or Pre-existing Building: (check one) Location of Property: t `' S L 'I'Z �—c/�� of ✓-�_ House No. Street Hamlet Owner or Owners of Property: �/¢I�/L o it 7,&61 oc Suffolk County Tax Map No 1000, Section /01 Block 7( ^ &1 Lot Subdivision Filed Map. Lot: Permit No. Date of Permit. Applicant: Health Dept.Approval: Underwriters Approval: Planning Board Approval: V/ Request for: Temporary Certificate Final Certificate: (check one) Fee Submitted: $ �) ca-, App nt Signature sor Town Hall Annex Telephone(631)765-1802 54375 Main Road C Fax(631)765-9502 P.O.Box 1179 �� roger.richerta-town.southold.ny.us Southold,NY 11971-0959 BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICIAL COMPLIANCE SITE LOCATION Issued To: Kim Zablocky Address: 495 Cases Lane city,Cutchogue st: New York zip: 11935 Building Permit* 41860 Section: 109 Block- 6 Lot: 9.6 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE contractor: DBA: RJ Corazzini Electric License No: 41860-ME SITE DETAILS Office Use Only Residential X Indoor Basement Service Only Commerical Outdoor X 1st Floor Pool New Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures HID Fixtures Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps Transformer Appliances Dryer Recpt Emergency Fixture Time Clocks Disconnect Switches Twist Lock Exit Fixtures �] TVSS Other Equipment: GFCI Protected Power to Self Contained Hot Tub, 1-30A and 1-20A Circuit Breakers. Notes: Inspector Signature: Date: October 4, 2017 0-Cert Electrical Compliance FormAs Irn 1Y O qf SObT�o H O UNi`1,� TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLEIG. [ ] FOUNDATION 2ND [ 1JNSULATION [ ] FRAMING / STRAPPING [ FINAL #97' lrv67 [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) REMARKS: AVft II n DATE S INSPECTOR Of SOplyOlo �'Y�OUNTI,�c� TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY,INSPECTION, [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) REMARKS: DATE, 1 INSPECTOR NS ECTOR FIELD INSPECTION REPORT DATE COMMENTS FOUNDATION(1ST) � y � ------------------------------------ c� rt � FOUNDATION(2ND) ROUGH FRAMING& y PLUMBING � r INSULATION PER N.Y. STATE ENERGY CODE n FINAL ADDITIONAL COMMENTS ," -e I echli c '000 d l'1 T o z m 70 $ y -1A O H d b y TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD,NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 Survey Southoldtownny.gov PERMIT NO. �1�� Check Septic Form N.Y.S.D.E.C. Trustees v D C.O.Application Flood Permit Examined ,20 Single&Separate AUG — 1 2017 Truss Identification Form Storm-Water Assessment Form lam( I BUILDING DEPT. Contact: 20t TOWN OF SOUTHOLD Approved rfT+t0: V m �o Disapproved a/c Phone; Z f,13 �o Expiration ,20 Building I s` or APPLICATION FOR BUILDING PERMIT Date , 20 INSTRUCTIONS a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months.Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws,Ordinances or Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances,building code,ho g code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. (Signatuie of applicant name, f a corporation) (Mailing address of applicant) State whether applicant is owner, les,§.ae, agent, architect, engineer, general contractor, electrician, plumber or builder Name of owner of premises o C� (As or6he tax roll or latest deed) If applicant is a corporation, signature of duly authorized officer (Name and title of corporate officer) Builders License No. Plumbers License No. Electricians License No. Other Trade's License No. 1. Location on which proDosed word will be done: House Number Street ; >•; m Hamlet- County Tax Map No. 1000 Section / Block '� �'�' / .Q• Lot + p 1 Subdivision a / Filed Map No. Lot r 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy b. Intended use and occupancy V� ` 3. Nature of work(check which applicable): New Building Addition Alteration Repair Removal Demolitiori�3 zz;3 Jar ��(�tleIIrWor - �'J 1 CEJ V ��_f,��` �:# a ( escription) 4. Estimated Cost r Fee f a.avl (,To be,pai'on filing this application) 5. If dwelling, number of dwelling units Number"of=dwelling u�lits on each floor If garage, number of cars q.. �•".l'i gds�A 1�•..�.:'...':�...1—il 6. If business, commercial or mixed occupancy, specify xiature.afCUxtenx p,��4q4 type of use. 7. Dimensions of existing structures, if any: Front Rear Depth Height Number of Stories Dimensions of same structure with alterations or additions: Front % ( Rear Depth Height Number of Stories 8. Dimensions of entire new construction: Front Rear Depth Height Number of Stories 9. Size of lot: Front Rear Depth 10. Date of Purchase Name of Former Owner 11. Zone or use district in which premises are situated 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO 13. Will lot be re-graded? YES NO Will excess fill be removed from premises? YES NO 14.Names of Owner of premises Address Phone No. Name of Architect Address Phone No Name of Contractor Address Phone No. 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO * IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO * IF YES, D.E.C.PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES NO ✓ * IF YES, PROVIDE A COPY. STATE OF NEW YORK) SS: COUNTY OFA el- 14 UL being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contrao above named, (S)He is the (Contractor,Agent, Corporate Officer, etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be performed in the manner set forth in the application filed therewith. Sworn to before me thi s+ da of U 20��� VEL.GATZ-SC -7 tN ublic NOTA 1C.STATE OF VE Registration No.OIGA6274028 Signature of Applicant Qualified in Suffolk County . Commission Expires Dec.24,20,1 I � d y C�;� 51C'OIKIAWA F EI Scott A. - Russell ~��`_ -,r -� SUPERVISOR } � ± �ti J i AWANA\(GJENHENT SOUTHOLDTOWN HALL-P.O.Box 1179 u iv�s Town of Southold 53095 Main Road-SOUTHOLD,NEW YORK 11971 CHAPTER 236 , - STORMWATER MANAGEMENT WORK SHEET ( TO BE COMPLETED BY THE APPLICANT ) DOES THIS PROJECT INVOLVE, ANY ®F THE E FOLLOWING: (CHECK ALL THAT APPLY) Yes No ❑ A. C earing, grubbing, grading or stripping of land which affects more than 5,000 square feet of ground surface. ❑ B. Excavation or filling involving more than 200 cubic yards of material within any parcel or any contiguous area. ❑ ite preparation on slopes which exceed 10 feet vertical rise to 100 feet of horizontal distance. i ❑jD. e preparation within 100 feet of wetlands, beach, bluff'or coastal erosion hazard area. ❑ E. Ite preparation within the one-hundred-year floodplain as depicted ` ==en=E� Al ap.-of-airy-wateFc-our_sE:-..-- - t F. Installation of new or resurfaced impervious surfaces of 1,000 square feet or more, unless prior approval of a Stormwater Management Control Plan was received by the Town and the proposal includes = in-kind replacement of impervious surfaces. If you answered NO to all of the questions above, STOP! Complete the Applicant section below with your Name, Signature, Contact information, Date & County Tax Map Number! Chapter 236 does not apply to your project. If you answered YES to one or more of the above, please submit Two copies of a Stormwater Management Control Plan and a completed Check List Form to the Building Department with your Building Permit Application. S.C.T.M. "#: 1000 Date- APPLICANT: ate APPLICANT: (P perty Owner,Design Professional,Agent.Contractor,Other) District NAME /d'1 �' ' N - Se� Block Lot FC;.' BL11LD1NG uL-' ART IE NT USL G,tiLY Contact Information: 0 Reviewed B )� M - - - - - - - - - - - Date: (0),7_7L Property Address / Location of Construction Work: — — — — — — — — — — — — — — — — Y9; � Lo — — Approved for processing Building Permit. — — P Stormwater Management Control Plan Not Required - n �A� ❑ Stormwater Management Control Plan i�Regwred: (Forward to Engineering Department for Review.) FORM SMCP -TOS MAY 2014 ( MP 0 c-4 LN� sof sa�r � Town Hall Annex Telephone(631)765-1802 54375 Main Road N ,ax(631)765-99502, P.O.Box 1179 G Q roger.richertCiown.sout-go nV us Southold,NY 11971-0959 BUILDING DEPARTMENT TOWN OF SOUTHOLD APPLICATION FOR ELECTRICAL INSPECTION REQUESTED BY. Date: r '51- 17 Company Name: olrAZV� ,�, Name: License No.: — /V1 E Address: Phone No.: JOBSITE INFORMATION: (*Indicates required information) *Name; k17An ''oru o c- *Address: r' *Cross Street: 0_,',J 5-r *Phone No.: �-0 3 (o [ c`� Del �' ^ Permit No.: I&V Tax-Map District: 1000 Section: Block: Lot: , *BRIEF DESCRIPTION OF WORK(Please Print Clearly) (Please Circle All That Apply) *Is job ready for inspection: YES/ NO Rough In Final *Do-you need a Temp Certificate: YES/ NO Temp Information(if needed) *Service Size: 1 Phase 3Phase 100 150 200 300 350 400 Other *New Service: Re-connect Underground Number of Meters Change of Service Overhead Additional Information: PAYMENT DUE WITH APPLICATION I S 82-Request for Inspection Form r I .�..•'�" `ter ,y: '' '�� � _- - "' __ �•�—tet-"y,� �.: '.�tk,�S�'��:y` ,.,. g,�h;.,�'�:,,"'?*:::?'y.,.u'."_,�`�� �,,'���''W,�a� .....�.. � -t•r � t M''� 'Y � "��'." ,mss. *-es Val �{ jY yw A1C, cl Ct t�'i ` by 4 P � '�• tj t ZD a15 wti � 11 0 151r M-141-V Ga r Y ;'r kQ- 7�, CIO,;� .tea •� � j PIZ Ar �• ..e—'jar' p`:. � b� �. C's.si� �___�,�- w,�.alw'L:..u�..rm:"vw:..w<,.__-�___._..___....,._� -__ __.__.__.- _. •fir ,:N.�t•,{s'C..�� v'!" :i�'° 'b' ',t... -h „ttp ',1�{�"z•.r moi' '•!i :fir `t"'� ,4u. �`� �„r ,ti%.'- i. xi} -"r.t.+ �' _ .3, ._ +a'r ^r- _ ..5. tp 5'�3' -��. �R'� ,.. s-S• 7. �:t Yti ���`.�� :•: ,:'a-� ,.rn:m..��.,�_ r:' �;,.'�`s�.is k'.="�' A:<. ,rv: „�'' ^'s'-.'" „y;±w »,y`"-'qr�.::''r,`;'tvr,,., a w^,�.Tu+'S r•f' - e' �4•' to a(�?.: `V<"` -i}Yr,..:•+,. Ces - p V1 Pat + a...� _ ;•'. �t, `y.;:n";by3'�i ,a"�'? !fie b �' `•g., �s:" ^`.`r, .}F:. .}:`..Q rr,wjr,;tt'•�. ,iµ;'y'.� ..a:,n,>. .�,.qn <- ^i. ,Y J„i "h.:,' '.i„ .$ i'�'`^,.'�',ity���._�a s pl ''}',, M`Y',r.,,}`•�' v�.v. �`?�if,r'"�"� ff=a.)� . »pay- :»,•('",T -'E'..Y• .K^'-` .rY�y k<�a.t'; -.3 ..3,1,`.1.x,... ;:�1^"r,F wF _t_{5 °"n:'�-! d• yYw•ry '� _ , 4r �`�y�r .s .,}�. ``�,��� :,��+5.,•:�Yt.Ct�:�.i;'xge»�i'•�.i`:::i+l:.'vT•s'=L�i't=;s t " t.� Sa, APPROVED AS N01'ED 1 4 Iq R,P. Cov, ,rlLYVflT-1 ALL CODES OF -- - c-"'�iTE & TOWN CODES NEW YOf AT AS RE-QUIRED NOTIFY BUILDING D'EPARTMENT AT 765-18,02 8 ANI TO A. PM FOR-THE FOLLOWING INSPECTIONS: LL I 1. FOUNDAT]ON - TWO REQUIRED ------- FOR POURED CONCRETE P. 2. ROUGH - FRAMING &, PLUMBING -I�Lv 3. INSULATION 4. FINAL - CONSTRUCTION-MUST ' BE COMPLETE FOR C-O-. ALL CONSTRUCTION SHALL' MEET THEy OR () - %' REQUIREMENTS OF THE CODES OF NEW tjCUPANC YORK STATE. NOT RESPONSIBLE FOR USE IS UNLAWFUL DESIGN OR CONSTRUCTION ERRORS. WITHOUT CERTIFICATE ELECTRICAL OF OCCUPANCY IM-SPECTMN' REGURPRET) „I MEDIATELY" RETAIN STORM WATER RUNOFF : POOL M000E- ENCLOSE PURSUANT TO CHAPTER 236 UPON COMPLETION BEFOREOF THE TOWN CODE. e; j,ructions . °Y �i.i^tr hs•,-. b: ...... •�;, ah",. � gym. CalderaSpass ,Come to Life Please take the time to read this booklet carefully, as it will provide you with the information you will need to ensure the safe,secure,and timely installation of your new spa.The following sections are guidelines on how to prepare for delivery and set-up of your new spa.Specifically covered are site selection,delivery access,ground preparation,and electrical requirements. Remember to carefully read the Owner's Manual that accompanies your spa and to complete the warranty card within ten days of delivery.These items,along with other valuable information,are included in the Owner's Packet which can be located in the equipment compartment of°your spa.You will also find your serial number in the equipment compartment. Watkins Manufacturing Corporation reserves the right to change features,specifications,and design without notification and without incurring any bligati j. DATE PURCHASED: DATE INSTALLED: DEALER: ADDRESS: I!PS u I TELEPHONE: �7 Z 2, S� In most cities and counties, permits will be required for the installation of electrical circuits or the construction of exterior surfaces(decks and spa enclosures). V addition,some communities have adopted residential barrier codes which may require fencing and/or self-closing gates on the property to prevent unsupervised access to a pool(or spa)by children under 5 years of age.Your Caldera®spa is equipped with a locking cover that meets the ASTM F1346-91 Standard for Safety Covers, and as a result, is usually exempt from most barrier requirements.As a general practice,your local Building Department will inform you of any applicable barrier requirements at the time a permit is obtained for the installation of an electrical circuit.Your CALDERA dealer can provide information on which permits may be required. Pre�Delivety, Instrucdons SITE SELECTION AND PREPARATION IMPORTANT:Site selection and preparation are your responsibility.Carefully read these instructions and consult your authorized CALDERA dealer if you have any questions. You probably have a spot picked out for your new spa,whether it's indoors or outdoors,on a patio or on a deck.Just make sure you check the following: • Always put your spa on a structurally sound,level surface.A filled spa can weigh a great deal. Make certain that the location you choose can support the weight of your filled spa. • Don't forget to level your spa. (See the Ground and Spa Leveling Preparation section on the next page.) • Locate your equipment compartment,which houses all of the electrical components, in a place where water will drain away from it.Allowing water into the equipment compartment can damage the electronics, or may result in tripping your house's circuit breaker. • Leave yourself easy access to the circuit breakers in the subpanel. • Never let water get into the subpanel.Your 230 volt spa's subpanel is raintight when installed correctly with the door closed. • Leave access to the entire front of the spa(the removable panel provides access to the spa's equipment) for periodic spa care and maintenance. INDOOR/EASEMENT INSTALLATION Be aware of some special requirements if you place your spa indoors.Water will accumulate around the spa,so flooring materials must provide a good grip when wet. Proper drainage is essential to prevent a build-up of water around the spa.When building a new room for the spa, it is recommended that a floor drain be installed.The humidity will naturally increase with the spa installed.Water may get into woodwork and produce dry rot,mildew,or other problems.Check for airborne moisture's effects on exposed wood,paper,etc, in the room.To minimize these effects, it is best to provide plenty of ventilation to the spa area.An architect can help to determine if more ventilation must be installed. CALDERA spas are equipped with a jet pump shroud to remove excessive heat from the equipment compartment. Find this vent,and be sure it is not blocked by anything, including carpeting. Your CALDERA dealer can help you with local information such as zoning regulations and building codes. DECD INSTALLATION To be certain your deck can support your spa,you must know the deck's maximum load capacity. Consult a qualified building contractor or structural engineer before you place the spa on an elevated deck or indoors.To find the weight of your spa, its contents and occupants,refer to the Spa Specification chart(on back cover).This weight per square foot must not exceed the structure's rated capacity,or serious structural damage could result. OUTDOOR AND PATIO INSTALLATION No matter where you install your new spa,it's important that you have a solid foundation to support it. Structural damage to the spa resulting from incorrect installation or placement on an inadequate foundation is not covered under the spa's limited warranty. (See next page for specifics) GROUND AND SPA LEVELING PREPARATION Your CALDERA spa has been engineered to perform on several types of common yard surfaces.While a concrete slab is best for long-term use*,other foundations are acceptable as long as a level base is prepared prior to delivery. Three foundation base pictures,shown on following page,represent examples of alternatives to a concrete slab for spas installed without gazebos or other accessories. Page 2 *NOTE:A reinforced concrete pad at least four inches thick or structurally sound deck able to support the"dead weight"found in the FOUNDATIONS FOR SPAS spa specification chart is required for the Cantabria', Geneva®, Niagara®, WITH GAZEBOS and Tahitian®.The reinforcing rod or mesh in the pad should be attached to a bond wire. • Concrete sloped at 112 inch per 10 feet is preferred so that rain water and water spillover will run off and not puddle CONCRETE PADS underneath the spa,(water under the spa for long periods of time may cause the wood to deteriorate). If stepping stones or railroad ties are selected for the spa i yri foundation,they should be placed and leveled below the entire spa to maintain even distribution of the spa weight. BRICK SURFACES • It is important to note that soft surfaces,even when stepping stones are used to distribute the weight of the spa as evenly as possible,will still have a tendency to settle unevenly, resulting in an unlevel spa. WOOD DECKING 6 Remember, placing the spa on grass or dirt may increase the amount of debris which is inadvertently brought into the spa water on the user's feet. If you are purchasing a deck package or a spa enclosure with your spa,a solid foundation becomes mandatory. Placing them on any surface other than a single level pad could create problems with their installation. Pictured at right are a few of the recommended surfaces. As a homeowner, it is your responsibility to provide a suitable, level foundation for your spa. Keep in mind that most delivery crews are not equipped to level and prepare spa sites. If you are interested in having a concrete slab,brick surface,or wood deck installed,your CALDERA dealer should be able to suggest a qualified,licensed contractor. DELIVERYACCESS First, locate the dimensions of your spa on the chart that is found on the next page.The dimensions shown are the measurements of the spa in the vertical position, laid on its side. Next,contact your dealer to find the height and width added by the delivery cart which the dealer will use to deliver your new spa. Use the height of the cart plus the dimension shown as H to determine the vertical clearance required to pass the spa and cart. Use the width of the cart,or dimension W,whichever is greater,to determine the maximum width of clearance necessary. NOTE:It is strongly recommended to keep the spa in its original factory protective packaging particularly when loading,moving or handling the spa in a vertical position.It may be necessary to allow for additional over-head clearance if the spa will be rolled up or down an incline or moved up or down a short flight of stairs. Use the information in the picture on next page to'determine the requirements for access to your desired location. It may be necessary to remove a gate, part of a fence,or other movable obstructions in order to roll the spa to its installation site.About ten percent of the time, a crane is the only way to install the spa by lifting it to its final destination. If the spa has to be taken off of the cart to go over a wall(either because the entry area is too narrow,the eaves are too low,the corner is too tight,or the stairway is too steep),a crane will be required. Don't be alarmed! Page 3 The crane has a truck-mounted boom which can fit right in your driveway. It is run by a licensed and insured operator. For a charge, the crane operator will lift your spa over walls, buildings,or any other obstruction and place it as close to the installation site as possible.The CALDERA spa delivery personnel will supervise the crane delivery and complete the spa installation. If your spa delivery requires the use of a crane,you may be required to pay for its services at the completion of the delivery. H m W SPA DIMENSIONS CANTAI3RIA 38" Igo- T r GENEVA 38" 71511 71511 NIAGARA` 38" T 5" r 5" TAHITIAN 36" 71011 71011 ONX V.Ak- How is your width and height clearance? Vp BACK YARD Check all gates I Protruding electric meters Gas meters A/C units I it Do you have sufficient overhead clearance? p Check low roof eaves, overhanging branches, = i rain gutters ' ; A I HOUSE ; f Is the path clear? � ?{ € P Move away branches,dog houses,firewood,etc. t ) O If there is a 90°turn,can we clear it?(The spa will not bend) . 0 No more than 6 consecutive ®` stairs without a landing ®®i' -� STREET Page 4 CANTABRIA NOTE.All dimensions are approximate;measure your spa before making critical design or pathway decisions. Cabinet 108.0"(274 cm) 79 - 32.5" 38" (Front View) 61.5"(156 cm) (83 cm) (97 cm) Door Opening Electrical Cut-Out (both sides) 4"(10 cm)up from 93.375"(237 cm) bottom of spa Drain Front Panel (Center of Spa) Air Vent Air Vent DOOR SIDE Air Vent Electrical Cut-Out Do Not Block Do Not Block Do Not Block (both sides) 13" (33 cm) —J— (Bottom View) 85.125" Base Pan Side Walls 102.0"(259 cm) Base Pan Side Walls NOTE:Watkins Manufacturing Corporation requires that the CANTABRIA be installed on a minimum 4"(10 cm)thick reinforced concrete pad or structurally sound deck able to support the"dead weight"found in the spa specification chart. WARNING:The CANTABRIA must not be shimmed in any manner. Page 5 Pre-Delivety Instructions GENEVA and NIAGARA NOTE.All dimensions are approximate;measure your spa before making critical design or pathway decisions. 89"(226 cm) Cabinet 32.5" 38" M625" 2 (83 cm) g7 cm (Front View) ( ) Electrical Cut-Out 75"(190 cm) (both sides) / Front Panel 4"(10 cm)up from Dram bottom of spa (Center of Spa) AirVent AirVent DOOR SIDE Air Vent Do Not Block Do Not Block Do Not Block Electrical Cut-Out (both sides) 13" (33 cm) 83.5" (212 cm) (Bottom View) Base Pan Side Walls - - - - - - - - - - - - 0ai I i 83.5"(212 cm) Base Pan Side Walls NOTE:Watkins Manufacturing Corporation requires that the GENEVA and NIAGARA be installed on a minimum 4" thick reinforced concrete pad or structurally sound deck able to support the"dead weight"found in the spa specification chart. WARNING:The GENEVA and NIAGARA must not be shimmed in any manner. Page 6 TAIIITIAN NOTE.All dimensions are approximate;measure your spa before making critical design or pathway decisions. 84.0"(213 cm) Cabinet 31" 36" 37.875"(96 cm) (79 cm) (91 cm) (Front View) Door Opening Electrical Cut-Out (both sides) 4"(10 cm)up from 69.5"(177 cm) bottom of spa Drain / Front Panel (Center of Spa) Air Vent Air Vent DOOR SIDE Air Vent Do Not Block Do Not Block Do Not Block Electrical Cut-Out (both sides) 13" (33 cm) 78.25" (199 cm) Base Pan (Bottom View) Side Walls 78.25"(199 cm) Base Pan Side Walls NOTE:Watkins Manufacturing Corporation recommends that the TAHITIAN be installed on a minimum 4"thick reinforced concrete pad or structurally sound deck able to support the"dead weight"found in the spa specification chart. WARNING:The TAHITIAN must not be shimmed in any manner. Page 7 P Ah DOOR Control Panel The illustrations are to be used as a reference only(your spa may look different). Locate the two buttons below the front panel on the same side as the Main Control Panel Push up and hold one of the Safety Lock Safety Lock buttons using an Allen wrench less than%"(6 mm)in width or small screwdriver into the center of the safety lock then pull the door panel away from the spa next to that button location. Repeat procedure Button Button on second button. Pull bottom away from spa, lower slightly and remove from spa. Place door panel in cool shaded place. ------------------------------------------------------------------------------------------------ Raise door panel placing top under Stainless border with bottom slightly away from spa. Push door panel against spa allowing " it to rest above the wood frame. =b Repeat on other side of door panel 171 Push bottom of door panel all the way in making it even with existing panels. If necessary,slide door panel from side to side making the spacing even on both sides of the door. y. ;. - Page 8 ELECTRICAL REQUIREMENTS To ensure you will have an opportunity to use your spa soon after delivery, it is very important that the required electrical service has been installed. Unless otherwise stipulated by your dealer,THIS IS YOUR RESPONSIBILITY. IMPORTANT:All electrical circuits must be installed by a qualified, licensed electrician. 230 VOLT INSTALLATION Your spa contains a control box designed to operate at 230V,60Hz. Installation of a 50 amp.dedicated circuit is recommended. The control box must be hard wired directly to a subpanel protected by a Ground Fault Circuit Interrupter(GFCI).The subpanel containing GFCI breakers is included with the spa. IMPORTANT NOTE:All electrical connections to the control box must be accomplished by a qualified electrician in accordance with the National Electrical Code and in accordance with any local electrical codes in effect at the time and place of installation. All electrical connections must be made in accordance with the wiring information contained in this manual and on ^ the back of the field wiring access panel of the control box.A licensed electrician should install a four-wire electrical service(two line voltages,one neutral,one ground)from the main electrical service panel to the subpanel.The equipment pack requires a MINIMUM of 112 volts per line under load. The grounding conductor must be at least#10 AWG.Your electrician should mount the subpanel in the vicinity of the spa but it should not be closer than five(5)feet from the spa water edge(NEC 680-38 to 41-A-3). INSTALLATION NOTE:After the spa has been installed,your electrician can connect the conduit from the subpanel to the spa's control box and then complete the wiring connections in the control box. NOTE: Complete step-by-step Installation and wiring instructions for all models are included in the Owner's Manual and with each sub-panel,which can be obtained from your dealer. WARNING: Removing or bypassing the GFCI breakers in the subpanel at any time will result in an unsafe spa and will void the warranty. 230 VOLT CONVERTED CANTABRIA (OPTIONAL) The CANTABRIA requires an additional 20 amp breaker in order to operate the heater at the same time as the lounge pump#3. This subpanel requires a 70 amp,single phase,230 volt,four wire service(two line,one neutral, one ground).The ground wire must never be less than#10 AWG. Use NEC 250-122 (table)and local codes for more information.A minimum#6 AWG solid copper bond wire is also required. NOTE: Complete step-by-step Installation and wiring instructions for the CANTABRIA are included in the Owner's Manual and with each sub-panel,which can be obtained from your dealer. SEE ABOVE FOR IMPORTANT ELECTRICAL INSTALLATION NOTES. POWER CONNECTION To connect power to the spa,refer to"230 VOLT WIRING SCHEMATIC DIAGRAM"and "POWER CONNECTION ACCESS"illustrations.When supplying power, remove the equipment door. NOTE:The 230V wiring diagram is located on the inside of the Control Box Cover. Page 9 POWER CONNECTION ACCESS MAIN CONTROL PANEL :t I E)O(jR 1 220-240 VAC >`' = ;, # ." . 220-240 VAC WIRING ACCESS WIRING ACCESS MIA DRAIN See page 8 for Door Panel Removal Instructions WIRING DIAGRAMS GENEVA, TAHITIAN & NIAGARA WIRING ILLUSTRATION 230 VAC, 40A, 60Hz O �— o 23OVAC, 50 Amp 2—POLE N 0 CIRCUIT BREAKER (NON GFCI) N = 0 #B AWG WHITE,NEUTRAL L1 ti FJ: L2 L1, HOT, 12 AWG BLUE c X10 AWG GREEN, GROUND L2 HOT 12 AWG RED /�8 AWG BLUE, L1 GRD 20A A 0 SOA B AWG RED, L2 U. HOT, 10 AWG BLUE cn 0 30A L2 HOT 10 AWG RED M 0 MAIN SERVICE N,NEUTRAL,#10 AWG WHITE ELECTRICAL 0 PANEL LESS THAN 100 FT. LOUND,J10 AWG GREEN"x O z SUB—PANEL" I MORE THAN 5 FEET o WITH GFCI THE SUB—PANEL MUST BE CONTROL BOX BREAKERS WITHIN SIGHT OF THE SPA ••Refer to NEC 250-122(table) DO NOT EXCEED 50 FEET NOTE The wire connections to GFCI breakers are for relerence only Always ensure the while neutral wire is wnnected to the load neutral of the 30 amp breaker *PROVIDED WITH SPA. NOTE: ALL WIRING SHOULD BE COPPER. Page 10