HomeMy WebLinkAboutPBA-11/06/2017 OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex ��®f S® �® P.O. Box 1179
54375 State Route 25 �® �® Southold,NY 11971
(cor. Main Rd. &Youngs Ave.) s2
Southold, NY Telephone: 631 765-1938
`�-'
www.southoldtownny.gov
Cows
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
PUBLIC MEETING
AGENDA
November 6, 2017
6:00 p.m.
SETTING OF THE NEXT PLANNING BOARD MEETING
Board to set Monday, December 4, 2017 at 6:00 p.m. at the Southold Town Hall, Main
Road, Southold, as the time and place for the next regular Planning Board Meeting.
SUBDIVISIONS
Conditional Sketch Plat Determinations:
Quantuck Properties: This 80/60 Conservation Subdivision proposes to create 3 lots
on 15.43 acres in the A-C Zoning District. Lot 1 equals 40,088 sq. ft., lot 2 equals
41,507 sq. ft. and lot 3 equals 553,500 sq. ft (12.7 acres) including a 52,849 sq. ft.
building area and 11.49 acres which are proposed to be preserved for agriculture.
The property is located at 2155 Mill Lane, Mattituck. SCTM#1000-107-10-8
SEQRA Determination/ Final Plat Determination:
Krupski & Zachariadis —This proposed Lot Line Change will transfer 0.62 acres from
SCTM#1000-103-5-5/SCTM#1000-97-8-31.2 to SCTM#1000-103-5-1. SCTM#1000-
103-5-1 will increase from 0.43 acres to 1.05 acres and SCTM#1000-103-5-5.
SCTM#1000-97-8-31.2 will decrease from 22.21 acres to 21.59 acres in the R-80 and
R-40 Zoning Districts. The property is located at 195 Little Neck Road, approximately
1,684 feet south of Eugene's Road, in Cutchogue. SCTM#1000-103-5-5, 1 & 1000-97-
8-31.2
Southold Town Planninq Board Page 2 of 3 November 6, 2017
l
Final Plat Determination:
Miller & Brinckerhoff Lot Line Change —This re-subdivision proposes to transfer 0.55
acres from SCTM#1000-8.-1-6.5 to SCTM#1000-8.-1-5.1. Lot 6.5 will decrease in size
from 6.7 acres to 6.15 acres, and Lot 5.1 will increase in size from 3.71 acres to 4.26
acres. The property is located on Off East End Road, in Fishers Island. SCTM#1000-8-
1-6.5 & 8-1-5.1
Noone, Margaret- This proposal is for a 2-lot Standard Subdivision of a 21,016 sq. ft.
parcel where Lot 1 = 10,501 sq. ft. and Lot 2 = 10,515 sq. ft. in the R-40 & B Zoning
Districts. The property is located at 210 Sigsbee Road, on the west side of Sigsbee'
Road, 164' south of Main Road, in Mattituck. SCTM#1000-143-1-4.1
SITE PLANS - STATE ENVIRONMENTAL QUALITY REVIEW ACT
SEQRA Determinations:
Front Street Professional Office - This proposed site plan application is to demolish
an existing two story dwelling and construct a 5,804 gross sq. ft. one story professional
office building, full basement and 16 parking stalls on 0.8 acres in the Residential Office
(RO) Zoning District. The property is located at 75795 Route 25, Greenport.
SCTM#1000-45-7-5.3
SITE PLANS
Determinations:
E. Lopez Nursery - This Site Plan is for the proposed outdoor retail and wholesale sale
of nursery products with an 8' x 10' (80 sq. ft.) sales office and 10 parking stalls on 1.48
acres in the Limited Business Zoning District. The property is located at 36660 NYS
Route 25, 270' s/w/o Skunk Lane & NYS Rt. 25, Cutchogue. SCTM#1000-97-3-3.1
North Fork SurniCenter—This Site Plan is for the proposed conversion of an existing
5,564 sq. ft. 1-story building (formerly SCWA office) with a 2,333 sq. ft. basement for
storage, to a professional office (medical) and 16 parking spaces on 1.15 acres in the
Light Industrial (LI) Zoning District. The property is located at 700 Boisseau Avenue,
Southold. SCTM#1000-63-3-2
North Fork United Methodist Church - This Site Plan is for the proposed construction
of a 1-story 7,640 sq. ft. place of worship with no basement and 42 parking stalls
including 4 ADA on 2.45 acres in the Limited Business (LB) Zoning District, Southold..
The property is located at 43960 CR 48, in Southold. SCTM#1000-63-1-15
Sannino Winery - This Site Plan is for the proposed construction of a 2-story building
with a 2,852 sq. ft. first floor for wine production, wine retail area, and a wine education
room), a 438 sq. ft. second floor for an office, and a 3,600 sq. ft. basement with thirty
Southold Town Planning Board Page 3 of 3 November 6, 2017
nine (39) parking stalls on two adjacent parcels (to be merged pursuant to ZBA File
6882) totaling 8.94 acres in the A-C Zoning District, Cutchogue. The property is located
at 7495 Alvahs Lane, ±490' s/w/o Alvahs Lane and CR 48, Cutchogue. SCTM#1000-
101-1-14.4 & 14.6
OTHER
Amendment to Subdivision Map:
Hanoch & Watts Subdivision (location of Sannino Winery) - This proposal is to
relocate the building envelope on Lot 3 of the approved subdivision map of Hanoch and
Watts (filed map number 9059, February 1, 1991) from 100' to 140' from the s/e
property line. SCTM#1000-101-1-14.4 & 14.6
PUBLIC HEARINGS
6:01 p.m. - Northside Beverage - This proposed Site Plan is for the conversion of an
existing two story 5,195 sq. ft. storage building into wholesale/retail beverage
distribution, office and storage on 1.1 acres in the General Business (B) Zoning District.
The property is located at 1795 Old Main Road, Laurel. SCTM#1000-122-7-6.7
6:02 p.m. - Sutton, Alexander& Tracy - This proposal is for a Standard Subdivision
where two parcels, SCTM#1000-78-9-54 (1.82 acres) and SCTM#1000-78-09-78
(0.624 acres) will be re-subdivided into two new parcels. Proposed Lot 1 will be 49,291
sq. ft. and proposed Lot 2 will be 30,000 sq. ft. in the R-40 Zoning District. The property
is located at 1160 North Bayview Road, 111.56 feet northeast of Liberty Lane and
Victoria Drive, Southold. SCTM#1000-78-9-54
APPROVAL OF PLANNING BOARD MINUTES
• October 16, 2017
i
i
I
I
J N,J
OFFICE LOCATION: f MAILING ADDRESS:
Town Hall Annex '�� SKY P.O. Box 1179
54375 State Route 25 ;� a� -awe Southold, NY 11971
15
(cor.Main Rd. &Youngs Ave.) ;�10
Southold, NY Telephone: 631 765-1938
� ) www.southoldtownny.gov
mh .r
UN
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Mr. Robert Sullivan
Quantuck Properties L.L.C.
P. O. Box 1045
Quogue, New York 11959
Re: Conditional Sketch Plan Approval — Conservation Subdivision of Quantuck
Properties
Located at 2155 Mill Lane, Mattituck, New York
SCTM#1000-107-10-8 Zoning District: A-C
Dear Mr. Sullivan:
The Southold Town Planning Board adopted the following resolution at a meeting held
on Monday, November 6, 2017:
WHEREAS, this 80/60 Conservation Subdivision proposes to create 3 lots on 15.43
acres in the A-C Zoning District. Lot 1 equals 40,088 sq. ft., lot 2 equals 41,507 sq. ft.
and lot 3 equals 553,500 sq. ft. (12.7 acres) and includes a 52,849 sq. ft. building area
and 500,651 sq. ft. (11.49 acres) which are proposed to be preserved for agriculture,
and
WHEREAS, the Planning Board reviewed the subdivision plan as a concept and on
February 17, 2017 the Planning Board sent a letter to the applicant outlining concerns
about the intensity of the proposed uses, impacts to designated scenic view sheds and
traffic impacts from a potential intense uses; and
WHEREAS, on February 24, 2017 the agent submitted a Sketch Plan Application and
fee in the amount of$1,550.00 with other required materials for submission pursuant to
Article V Sketch Plat Review; and
WHEREAS, the deed recorded on December 23, 2016 filed on Liber D00012893 Page
944 matches the 80/60 Sketch Plan prepared January 19, 2017 and last revised
February 22, 2017; and
Quantuck Properties Pae 12 November 8, 2017
WHEREAS, this application is classified as a 80/60 Clustered Conservation Subdivision
with a split cluster design and permissible yield of 3 lots; and
WHEREAS, on April 10, 2017, the Planning Board reviewed the application at their
Work Session and found the Sketch Plan Application incomplete and required ERSAP
items to be submitted; and
WHEREAS, the parcel has high scenic value supported by the views from Suffolk
County Route 48, a New York Scenic Byway, Mill Road and Wickham Avenue. Since
Suffolk County Route 48 is a NYS Scenic Byway the views from that roadway are
recognized and have greater value to residents and tourists; and
WHEREAS, on May 12, 2017, the Planning Board provided vantage points for a
Viewshed Analysis to the applicant; and
WHEREAS on May 15, 2017 the applicant submitted a new Transactional Disclosure
Form due to new leasing arrangements involving the parcel; and
WHEREAS on June 12, 2017 the applicant submitted revised ERSAP maps; and
WHEREAS, on August 10, 2017 the agent submitted a Visual Impact Analysis; and
WHEREAS, the Planning Board discussed the application at their August 28, 2017 and
September 11, 2017 work sessions; and
WHEREAS, on September 9, 2017, the applicant submitted an amended Full
Environmental Assessment Form via email; and
WHEREAS, on September 11, 2017, the Southold Town Planning Board reviewed the
application for completeness and design and found that the submitted application meets
all the requirements for a conditional Sketch Approval pursuant to Article V Sketch Plat
Review of the Town Code; therefore be it
RESOLVED, that the Southold Town Planning Board hereby grants Conditional
Sketch Plan Approval upon the map entitled "80/60 Conservation Subdivision
Quantuck Properties LLC", dated January 19, 2017 and last revised February 22, 2017,
prepared by Young &Young, Howard Young, Land Surveyor, with the following
conditions:
1. Amend the Sketch Plan as follows for submission:
a. Title the plat "Final Plat of Clustered Conservation Subdivision...";
b. Add a key map;
c. Amend the zoning district from Residential 80 (R-80) to Agricultural Conservation
(A-C);
d. Rename the "Certain Area" table to "Subdivision Calculation Table";
Quantuck Properties Pae 13 November 8, 2017
i. Include the amount of subdivision open space in the table. Subdivision
open space is the difference of the minimum lot size (80,000 sq. ft.) in the
zoning district and the proposed lot size of each lot. The sum of the
differences is the subdivision open space. Once calculated, the
subdivision open space should be included in Lot 4, the drainage
preserve. If the total subdivision open space is greater than the total lot
area of Lot 4, then the residual must be included in the buildable area on
Lot 3. The Town does not pay for subdivision open space when
development rights are sold.
e. Locate the buildable area on lot 3, to location 3 as described in the Visual
Analysis with slight modifications made by the Planning Board at the
September 11, 2017 work session;
f. Label the drainage preserve as Lot 4 "To be dedicated to the Town of
Southold". Also include the notation "Subdivision Open Space is equal to X
acres". This is necessary for future dedication of the area to the Town of
Southold;
g. Label the 50' Wide Buffer to read "50' Wide Vegetated Buffer" and locate the
buffer within the residential lots.
The next step in the process is to file a Final Plat application that meets the conditions
listed above. Upon finding the Final Plat application complete, a review under SEQRA
and agency coordination will begin.
Note that additional map changes may be required upon completion of the
environmental review and receipt of comments from other involved agencies and
the public. Nothing shall preclude or bind the Planning Board from issuing or
changing its recommendations if new information or a change in circumstances
arises at or prior to the next formal application stage.
If you have any questions regarding the information contained in this resolution, please
contact the Planning Board Office.
Respectfully, n
Donald J. Wilcenski
Chairman
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex *®f soU�y P.O. Box 1179
54375 State Route 25 �d ®�® Southold, NY 11971
(cor. Main Rd. &Youngs Ave.) ;
Southold NY ._ Telephone: 631 765-1938
t M,
' www.southoldtownny.gov
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Albert Krupski Jr.
2790 Skunk Lane
Cutchogue, New York 11935-1655
Re: Final Approval with Conditions- Proposed Lot Line Modification for Zacharias and
Krupski
Location 195 Little Neck Road, Cutchogue
SCTM#1000-97-8-31.2 and 1000-103-5-5.1 & 5 Zoning District R-80 and R-40
Dear Mr. Krupski Jr.:
The Southold Town Planning Board adopted the following resolutions at a meeting held
on Monday, November 6, 2017:
WHEREAS, this proposed lot line change involves the transfer of a 0.62 acre, 50 foot
wide right of way from the Krupski parcel consisting of two tax parcels, SCTM#1000-
103-5-5 and SCTM#1000-97-8-31.2 to the parcel owned by Zachariadis, SCTM#1000-
103.-5-1. The area to be transferred is entirely located within SCTM#1000-103-5-5,
which was created when this area was excluded from the development rights sale on
the adjacent farmland. Lot 1 will increase in size from 19,057 sq. ft. to 46,153 sq. ft. and
will be split-zoned R-40 and R-80. A ZBA variance was granted, #7102; and
WHEREAS, the purpose of the re-subdivision is to transfer a 50 foot wide right of way
from SCTM#1000-97.-8-31.2 to SCTM#1000-103.-5-5. The right of way does not serve
a use to the current landowner; and
WHEREAS, on April 18, 2016, a Lot Line Modification Application was submitted; and
WHEREAS, the property card for Zachariadis shows the sale of a .438 acre
(SCTM#1000-103-5-1, now Andruski) lot to Dubner-Tagney in 1972 with the same
acreage as exists today; and
WHEREAS, the applicant submitted an Electric Easement dated April 16, 1973 that
established a 10' wide easement area running on the north boundary of the entire
Zacharias and Krupski [2] November 8, 2017
length of the 50' wide right of way for the purpose of installing utility poles, mains and
equipment. The easement was granted by the landowner at the time known as Zeneski;
and
WHEREAS, site inspection revealed that utility poles occupy the Electric Easement, and
WHEREAS, on January 19, 2017, the Zoning Board of Appeals granted a variance for
lot area variance for SCTM# 103-5-1 (File Number 7012) with the following conditions
1. Approval of the Southold Planning Board is required.
2. Access rights by the two residential parcels to the East shall be preserved
through the creation of an access easement.
WHEREAS, the subject area proposed to be transferred is a right of way and no
Certificates of Occupancy are required; and
WHEREAS, on November 7, 2016, the Planning Board reviewed the application at their
Work Session and found the application to be complete; and
WHEREAS, on April 10, 2017 the Southold Town Planning Board, pursuant to SEQRA,
granted a Negative Declaration for the action; and
WHEREAS, on April 10, 2017, the Planning Board held and closed the Public Hearing;
and
WHEREAS, the Southold Town Planning Board, pursuant to Town Code §240-56,
Waivers of Certain Provisions, may waive certain elements of the subdivision review if
in its judgment they are not requisite in the interest of the public health, safety and
general welfare. After reviewing the information submitted for this application, the
Planning Board has determined that it is eligible for a waiver of the Environmental
Resources Site Analysis Plan (ERSAP), the Primary and Secondary Conservation Area
Plan, the Public Hearing, and the Sketch Plat and Preliminary Plat steps of the
subdivision process for the following reasons:
1. No new lots are being created;
2. No changes will occur as a result of this Lot Line Change that would adversely
affect the character of the neighborhood; and
WHEREAS, the Planning Board performed an uncoordinated review of this Unlisted
Action pursuant to 6 NYCRR Part 617, Section 617.7 of the State Environmental Quality
Review Act (SEQRA); and
WHEREAS, pursuant to the Lot Line Modification Policy set by the Planning Board in
February 2011, this application is eligible for a decision from the Planning Board prior to
Zacharias and Krupski [3] November 8. 2017
receiving approval by the Suffolk County Department of Health Services (SCDHS) as it
meets the following criterion set forth in that policy:
• Where no new development potential will be created in the parcel to which the
land is transferred; and
WHEREAS, the Planning Board determined that the proposed action meets all the
necessary requirements of Town Code §240-57 for a Lot Line Modification; and
WHEREAS, the access easement language included within the draft deeds has been
reviewed by the Town Attorney and it was determined that the language upholds the
right of access over the 50 ' wide right of way for SCTM#1000-103-5-2.5 and
SCTM#1000-103-5-2.4, and
WHEREAS, the language satisfies condition 2 of the Zoning Board of Appeals decision;
be it therefore
RESOLVED, that the Southold Town Planning Board hereby waives the requirements of
Town Code §240 to submit the ERSAP, Primary and Secondary Conservation Plans,
Sketch Plat and Preliminary Plat steps; and be it further
RESOLVED, that the Southold Town Planning Board hereby waives the requirement for
Suffolk County Department of Health Services approval prior to Planning Board
approval of this Lot Line Modification; and be it further
RESOLVED, that the Southold Town Planning Board grants Final Approval with
Conditions on the maps entitled "Lot Line Change 1000-103-5-1 and 1000-103-5-5
dated September 19, 2016 and prepared by John C Ehlers Land Surveyor " with the
following conditions:
1. Submit three copies of a map showing the right of way attached to the SCTM#
1000-103.-5-1. The approved Zoning Board of Appeals map can be submitted
to meet this requirement.
2. Submit a copy of the recorded deed showing the change in lot lines to the
Southold Town Planning Department within 62 days of the date of Final
Approval or such approval shall expire and be null and void.
Upon fulfilment of the above conditions, Final Approval shall be granted and the
Planning Board Chairman is authorized to endorse the map.
Please Note: The Southold Town Planning Board, in waiving the requirement for
SCDHS approval prior to their own approval, is simply waiving a technical
requirement of Final Plat Approval under the Town Code and makes no
representations as to whether SCDHS approval is required. SCDHS approval of
Zacharias and Krupski [4] November 8, 2017
this Lot Line Change may be necessary to be in compliance with the Suffolk
County Sanitary Code and to be eligible for future construction or renovations.
If you have any questions regarding the above, please contact this office.
Respectfully,
Donald J. Wilcenski
Chairman
Encls.
cc: Assessors
I understand that Southold Town Planning Board approval of this Lot Line
Modification does not grant, guarantee or waive an approval, if required, from the
Suffolk County Department of Health Services (SCDHS). I understand that I will
need to apply separately to the SCDHS for any applicable approvals.
Signature of Applicant or Agent Print Name
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex *oF S® �® P.O. Box 1179
54375 State Route 25 �® �� Southold, NY 11971
(cor. Main Rd. &Youngs Ave.)
Southold, NY r r Telephone: 631 765-1938
www.southoldtownny.gov
coul `1,�
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Stephen L. Ham, III, Esq.
38 Nugent Street
Southampton, New York 11968
Re: Final Approval & SEQRA Determination — Proposed Lot Line Modification for
Miller & Brinckerhoff
Located at 2348 & 2851 Middle Farms Pond Road, Fishers Island
SCTM#: 1000-8.-1-5.1 & 6.5
Zoning District: R-120
Dear Mr. Ham, III:
The Southold Town Planning Board adopted the following resolutions at a meeting held
on Monday, November 6, 2017:
WHEREAS, this re-subdivision proposes to transfer 0.55 acres from SCTM#1000-8.-1-
6.5 to SCTM#1000-8.-1-5.1. Lot 6.5 will decrease in size from 6.7 acres to 6.15 acres,
and Lot 5.1 will increase in size from 3.71 acres to 4.26 acres; and
WHEREAS, the parcel identified above as SCTM#1000-8.-1-5.1 was created from the
merging by deed of SCTM#1000-8.-1-4.16 and SCTM#1000-8.-1-5, recorded in Liber
12901 Page 124; and
WHEREAS, on February 28, 2017, a Lot Line Modification Application was submitted to
the Planning Board; and
WHEREAS, on March 31, 2017, the Planning Department notified the applicant that
required information had not been submitted; and
WHEREAS, on April 11, 2017, the applicant submitted the required information; and
Miller & Brinckerhoff Pae 12 November 8, 2017
WHEREAS, at their Work Session on May 22, 2017, the Planning Board found the
application complete; and
WHEREAS, on July 10, 2017, the Public Hearing on the application was held and
closed; and
WHEREAS, the Southold Town Planning Board, pursuant to Town Code §240-56
Waivers of Certain Provisions, may waive certain elements of the subdivision review if
in its judgment they are not requisite in the interest of the public health, safety and
general welfare. After reviewing the information submitted for this application, the
Planning Board has determined that it is eligible for a waiver of the ERSAP, the Primary
and Secondary Conservation Area Plan, the Sketch Plan and the Preliminary Plat steps
of the subdivision process for the following reasons:
1. No new lots are being created;
2. The lots involved are already developed;
3. No changes will occur as a result of this lot line change that would affect the
character of the neighborhood; and
WHEREAS, the Planning Board performed an uncoordinated review of this Unlisted
Action pursuant to 6 NYCRR Part 617, Section 617.7 of the State Environmental Quality
Review Act (SEQRA); and
WHEREAS, pursuant to the Lot Line Modification Policy set by the Planning Board in
February 2011, this application is eligible for decision from the Planning Board prior to
receiving approval by the Suffolk County Department of Health Services (SCDHS) as it
meets the following criterion set forth in that policy:
• Where no new development potential will be created in the parcel to which the
land is transferred; and
WHEREAS, on September 25, 2017, at their Work Session, the Planning Board,
determined that the proposed action meets all the necessary requirements of Town
Code §240 for a Lot Line Modification; be it therefore
RESOLVED, that the Planning Board, pursuant to SEQRA, hereby makes a
determination of non-significance for the proposed lot line modification and grants a
Negative Declaration; and be it further
RESOLVED, that the Planning Board hereby waives the requirements of §240 to submit
the ERSAP, Primary and Secondary Conservation Plans, Sketch Plan and Preliminary
Plat steps; and be it further
RESOLVED, that the Planning Board hereby waives the requirement for SCDHS
approval prior to Planning Board approval; and be it further
Miller & Brinckerhoff Pae 13 November 8, 2017
RESOLVED, that the Southold Town Planning Board grants Final Approval on the
map entitled "Proposed Lot Line Change Prepared for Robert J. Miller &Adrienne A.
Miller, Peter R. Brinckerhoff APRT & Susan C. Brinckerhoff' prepared by Richard H.
Strouse, Land Surveyor, dated February 14, 2017, and authorizes the Chairman to
endorse the map.
Please submit a copy of the recorded deed to the Southold Town Planning
Department within 62 days of the date of Final Approval, or such approval shall
expire and be null and void.
Please Note: The Southold Town Planning Board, in waiving the requirement for
SCDHS approval prior to their own approval, is simply waiving a technical
requirement of Final Plat Approval under the Town Code and makes no
representations as to whether SCDHS approval is required. SCDHS approval of
this lot line change may be necessary to be in compliance with the Suffolk
County Sanitary Code, and to be eligible for future construction or renovations.
If you have any questions regarding the above, please contact this office.
Respectfully,
Donald J. Wilcenski
Chairman
Encl. Endorsed Final Map
Negative Declaration
cc: Assessors
I understand that Southold Town Planning Board approval of this Lot Line
Modification does not grant, guarantee or waive an approval, if required, from the
Suffolk County Department of Health Services (SCDHS). I understand that I will
need to apply separately to the SCDHS for any applicable approvals.
Signature of Applicant or Agent Print Name
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex "Of SOUTy� P.O. Box 1179
54375 State Route 25 �Q �® Southold, NY 11971
(cor.Main Rd. &Youngs Ave.)
Southold, NY Telephone: 631 765-1938
css ac www.southoldtownny.gov
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Patricia C. Moore; Esq.
51020 Main Road
Southold, NY 11971
Re: Final Plat Approval - Proposed Standard Subdivision for Margaret Noone
Located on the west side of Sigsbee Road, 164' south of Main Road, Mattituck
SCTM#1000-143-1-4.1 Zoning Districts: B & R-40
Dear Ms. Moore:
The Southold Town Planning Board, at a meeting held on Monday, November 6, 2017,
adopted the following resolutions:
WHEREAS, this proposal is for a standard 2-lot subdivision of a 21,000 sq. ft. parcel
where Lot 1 = 10,501 sq. ft. and Lot 2 = 10,500 sq. ft. in the R-40 & B Zoning Districts;
and
WHEREAS, the proposed lot sizes are below the minimum required in the zoning
district; and
WHEREAS, the Zoning Board of Appeals granted an Area Variance on March 13, 2008
(reference ZBA#6107); and
WHEREAS, on April 11, 2011, the Southold Town Planning Board granted Sketch Plan
Approval upon the map entitled "Minor Subdivision Map Prepared for Margaret A. &
Thomas E. Noone, Mattituck", dated March 27, 2009 and last revised December 1,
2010 prepared by Nathan Taft Corwin, III, Land Surveyor; and
WHEREAS, on June 11, 2015, the applicant submitted a Preliminary Plat application;
and
WHEREAS, on July 6, 2015, the Preliminary Plat application was found complete; and
Noone Page 2 of 3 November 8, 2017
WHEREAS, on August 31, 2015, the Planning Board determined that the action was an
Unlisted Action under SEQRA; and
WHEREAS, on September 28, 2015, the Suffolk County Planning Commission
responded to the Board's referral request; and
WHEREAS, on October 5, 2015, the Preliminary Plat Public Hearing was held and
closed; and
WHEREAS, on November 2, 2015, the Southold Town Planning Board reviewed the
referral responses from the LWRP, Office of the Town Engineer, SCPC, Mattituck Fire
District, NYSDEC, and SCDHS; and
WHEREAS, on December 7, 2015, pursuant to the State Environmental Quality Review
Act (SEQRA) 6 NYCRR, Part 617 the Planning Board, at their Public Meeting, issued a
Negative Declaration; and
WHEREAS, on April 4, 2016, the Planning Board found the action Consistent with the
Local Waterfront Revitalization Plan; and
WHEREAS, on April 4, 2016, the Southold Town Planning Board granted Conditional
Preliminary Plat Approval; and
WHEREAS, on December 6, 2016, the applicant requested an extension of the
Conditional Preliminary Plat Approval granted on April 4, 2016; and
WHEREAS, on January 10, 2017, the Planning Board granted an extension of the
Conditional Preliminary Plat Approval from October 4, 2016 to April 4, 2017; and
WHEREAS, on January 10, 2017, the applicant submitted a Final Plat application; and
WHEREAS, on May 19, 2017, the Planning Board requested additional information
regarding the SCDHS exemption stamp on the plat titled, "Standard Subdivision
Preliminary Plan Prepared for Margaret A and Thomas E. Noone" last revised
December 5, 2014; and
WHEREAS, on May 25, 2017, the applicant provided justification for the SCDHS
exemption stamp by email; and
WHEREAS, on June 5, 2017 the Planning Board found the Final Plat Application
complete; and
WHEREAS, on June 12, 2017 Covenants and Restrictions as required by the Planning
Board were filed with the office of the Clerk of the County of Suffolk under Liber
D00012916 and Page 23; and
Noone Page 3 of 3 November 8, 2017
WHEREAS, on August 14, 2017, the Southold Town Planning Board granted
Conditional Final Plat Approval upon the maps entitled "Standard Subdivision Final Plat
Prepared For Margaret A. & Thomas E. Noone" dated March 27, 2009 and last revised
April 27, 2017, prepared by Nathan Taft Corwin III, Land Surveyor last revised April 27,
2017; and
WHEREAS, on September 29, 2017, the applicant submitted a revised Final Plat; and
WHEREAS, on October 30, 2017, the Planning Board, at their Work Session, reviewed
the submitted documents and found that all conditions of the Conditional Final Plat
Approval were met and that all requirements of Final Plat pursuant to §240-21 Technical
Requirements have been met; be it therefore
RESOLVED, that the Southold Town Planning Board hereby grants Final Plat
Approval upon the map entitled "Standard Subdivision Final Plat Prepared for Margaret
A. & Thomas E. Noone" dated March 27, 2009 and last revised April 27, 2017, prepared
by Nathan Taft Corwin III, Land Surveyor, and authorizes the Chairman to endorse the
map.
Upon endorsement of the Final Plat by the Chairman, the mylars and paper prints
must be picked up at this office and the Final Plat filed with the Suffolk County
Clerk by the applicant within 62 days of the date of Final Plat Approval, or such
approval shall expire. Final Plat Approval shall be determined in accordance with
§276 of the New York State Town Law.
Final Plat is void if revised after approval. No changes, erasures, modification(s),
or revisions shall be made to any Final Plat after it has been approved by the
Planning Board, and such approval has been endorsed in writing on the plat,
unless the said plat is first re-submitted to the Planning Board and the Planning
Board approves any modifications. In the event that any such Final Plat is filed
without complying with this requirement, the same shall be considered null and
void, and the Planning Board shall institute proceedings to have the Final Plat
stricken from the records of the Suffolk County Clerk.
If you have any questions regarding the information contained in this letter, please
contact the Planning Board Office.
ectfull ,
Donald J. Wilcenski
Chairman
cc: Elizabeth A. Neville, Town Clerk
Tax Assessor
Building Department
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex ��of soUryo P.O. Box 1179
54375 State Route 25 �Q �® Southold, NY 11971
(cor. Main Rd. &Youngs Ave.)
Southold, NY Telephone: 631 765-1938
cs> >r www.southoIdtownny.gov
cQUNI`t,��
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Mr. Charles Southard Jr.
435 Bay Home Road
Southold, NY 11971
Re: SEAR Determination: Site Plan for Front Street Professional Office
820 Front Street, ±340' n/e/o Moore's Lane & Route 25, Greenport
SCTM#1000-45-7-5.3 Zoning District: Residential Office (RO)
Dear Mr. Southard:
The following resolution was adopted at a meeting of the Southold Town Planning
Board on Monday, November 6, 2017:
WHEREAS, this proposed site plan application is to demolish an existing two story
dwelling and construct a 1-story 2,902 sq. ft. building for a professional office with a
2,902 sq. ft. basement for related storage and 16 parking stalls on 0.8 acres in the
Residential Office (RO) Zoning District. The property is located at 75795 Route 25,
Greenport; and
WHEREAS, the Southold Town Planning Board, pursuant to State Environmental
Quality Review Act (SEQRA) 6 NYCRR, Part 617, has determined that the proposed
action is an Unlisted Action as it does not meet any of the thresholds of a Type I Action,
nor does it meet any of the criteria on the Type II list of actions; be it therefore
RESOLVED, that the Southold Town Planning Board, as Lead Agency pursuant to
SEQRA, hereby makes a determination of non-significance for the proposed action and
grants a Negative Declaration.
Enclosed is a copy of the Negative Declaration for your records.
I
Front Street Professional Office — November 8, 2017 - Page Two
If you have any questions regarding the information contained in this resolution, please
contact the Planning Board Office.
Very truly yours,
Donald J. Wilcenski
Chairman
Encls.
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex *0f SUUry® P.O. Box 1179
54375 State Route 25 �Q �� Southold, NY 11971
(cor.Main Rd. &Youngs Ave.)
Southold, NY jW Telephone: 631 765-1938
�s �e www.southoldtownny.gov
C®U ,�
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Mr. Robert Barratt
4295 Vanston Road
Cutchogue, NY 11935
Re: Approval - Site Plan for E. Lopez Nursery
36660 Main Road, ±150' w/o Skunk Lane & Main Road, Cutchogue
SCTM#1000-97.-3-3.1 Zoning District: Limited Business
Dear Mr. Barratt:
The following resolutions were adopted at a meeting of the Southold Town Planning
Board on Monday, November 6, 2017:
WHEREAS, this Site Plan is for the proposed outdoor retail and wholesale sale of
nursery products with an 8' x 10' (80 sq. ft.) sales office and 10 parking stalls on 1.48
acres in the Limited Business Zoning District, Cutchogue; and
WHEREAS, on June 23, 2016, Robert Barratt, authorized agent, submitted a Site Plan
Application for review; and
WHEREAS, on July 1, 2016, Robert Barratt, authorized agent, submitted additional
prints of the proposed Site Plan for review; and
WHEREAS, on July 25, 2016, the Planning Board found the application incomplete for.
review and required additional information and revisions to the site plan; and
WHEREAS, on July 26, 2016, Robert Barratt, authorized agent, submitted revised site
plans and other information as required by the Planning Board; and
WHEREAS, on August 22, 2016, the Planning Bound accepted the application as
complete for review; and
WHEREAS, on September 12, 2016, the Southold Town Planning Board, pursuant to
State Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617.5 (c), determined
that the proposed action is a Type 11 Action as it falls within the following description for
E Lopez Nursery Page 2 November 8, 2017
6 NYCRR, Part 617.5(c)(7) construction or expansion of a primary or
accessory/appurtenant, non-residential structure or facility involving less than 4,000
square feet of gross floor area and not involving a change in zoning or a Use Variance
and consistent with local land use controls, but not radio communication or microwave
transmission facilities; and
WHEREAS, on September 14, 2016, the Planning Board, pursuant to Southold Town
Code §280-131 C., distributed the application to the required agencies for their
comments; and
WHEREAS, the proposed action is exempt from review by the Suffolk County Planning
Commission (SCPC); and
WHEREAS, on October 3, 2016, a Public Hearing was held and closed; and
WHEREAS, on October 11, 2016, the Southold Town Fire Inspector reviewed and
determined that there was adequate fire protection and emergency access for the site;
and
WHEREAS, on October 13, 2016, the Cutchogue Fire District determined there was
adequate fire protection for the site; and
WHEREAS, on October 14, 2016, the Town of Southold Local Waterfront Revitalization
Program Coordinator reviewed the proposed project and determined it to be consistent
with Southold Town LWRP policies with recommendations to the Planning Board; and
WHEREAS, on October 28, 2016, the Southold Town Engineer reviewed the proposed
application and determined revisions were required in order to meet the minimum
requirements of Chapter 236 for Storm Water Management; and
WHEREAS, at a Work Session on October 24, 2016, the Planning Board reviewed
comments from referrals and staff analysis requiring revisions to the site plan, and
determined that a Highway Work Permit from the New York State Department of
transportation (NYSDOT) remained outstanding along with revisions to the site plan and
additional information; and
WHEREAS, on September 6, 2017, the NYSDOT issued Highway Work Permit
#2507041580 for the subject site; and
WHEREAS, on September 12, 2017, Robert Barratt, authorized agent, submitted
revised site plans; and
WHEREAS, at a work session on October 30, 2017, the Planning Board reviewed the
revised site plans; and
WHEREAS, on October 30, 2017, the Southold Town Planning Board determined that
all applicable requirements of the Site Plan Regulations, Article XXIV, §280 — Site Plan
Approval of the Town of Southold, have been met; and
E Lopez Nursery Page 3 November 8, 2017
WHEREAS, on November 3, 2017, the Southold Town Chief Building Inspector
reviewed and certified the proposed Retail Business (§280-41A(2)(b)) as a permitted
use in the Limited Business (LB) Zoning District; therefore be it
RESOLVED, that the Southold Town Planning Board has determined that this proposed
action is consistent with the policies of the Town of Southold Local Waterfront
Revitalization Program; and be it further
RESOLVED, that the Southold Town Planning Board approves the Site Plan with
conditions as shown on the plan entitled "E Lopez Nursery", prepared by Robert
Barratt P.E., dated March 18, 2016 and last revised October 16, 2017, and authorizes
the Chairman to endorse the Site Plan with the following conditions:
Conditions:
1. This site plan is for the nursery business only.
2. The site plan does not include use of the area of the property to the south of the
fenced retail area.
3. Customers of the business and the general public are not permitted to enter the
site beyond the retail area shown on the site plan, nor are they allowed in or
around the existing buildings on the property.
4. The nursery business may use the area immediately to the south of the fence for
limited accessory outdoor storage of reserve inventory of plants and trees.
5. This site plan does not include the use of the existing buildings on site. Use of
the existing buildings is not permitted without an amended site plan and would
require a review under zoning due to the non-conforming lot size.
6. No exterior lights have been approved for this site. Any exterior lighting must be
reviewed and approved by the Planning Board prior to its installation.
7. Sign to be constructed as approved by the Planning Board. Any changes require
previous written approval by the Planning Board.
Please also note the following requirements in the Southold Town Code relating to Site
Plans:
1. Any new lighting fixtures beyond those approved as part of the Lighting Plan
must conform to the Code and may require Planning Board approval depending
on their number, size, intensity and location. Fixtures shall be shielded so the
light source is not visible from adjacent properties and roadways and shall focus
and direct the light in such a manner as to contain the light and glare within
property boundaries and conform to §172 of the Town Code.
E Lopez Nursery r Page 4 November 8, 2017
2. All storm water run-off from grading, driveways and gravel areas must be
contained on site.
3. Proposed storm water run-off containment systems must be inspected by the
Town Engineer at the time of installation. Please call the Southold Town
Engineer prior to beginning this work.
4. Approved Site. Plans are valid for eighteen months from the date of approval,
within which time all proposed work must be completed, unless the Planning
Board grants an extension.
5. Any changes from the Approved Site Plan shall require Planning Board approval.
6. Prior to the issuance of a Certificate of Occupancy, the Planning Board must
inspect the site to ensure it is in conformity with the Approved Site Plan, and
issue a final site inspection approval letter. Should the site be found not in
conformance with the Approved Site Plan, no Certificate of Occupancy may be
issued unless the Planning Board approves the changes to the plan.
A copy of the Approved Site Plan is enclosed for your records. One copy will also be
sent to the Building Department and the Town Engineer/Highway Department.
If you have any questions regarding the above, please contact this office.
Respectfully, Ir
/, I\
Donald J. Wilcenski
Chairman
Encl.
cc: Building Dept. w/map
Town Engineer w/map
By signing this letter, the applicant acknowledges that there are Town Code
requirements and conditions, including those listed above, that must be satisfied prior to
the issuance of a Certificate of Occupancy.
Print name: , Applicant/Agent
Signature: Date:
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex ��®f s®�Ty® P.O. Box 1179
54375 State Route 25 �� �� Southold, NY 11971
(cor. Main Rd. &Youngs Ave.) Telephone: 631 765-1938
Southold,NY jW
C www.southoldtownny.gov
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Mr. Robert M. Fischette, Esq.
c/o Fernan & Fischette, LLP
320 Hampton Road
Southampton, NY 11968
Re: Approval - Site Plan for North Fork SurgiCenter
700 Boisseau Ave., e/s/o Hummel Rd. & Boisseau Ave., Southold
SCTM#1000-63.-3-2
Dear Mr. Fischette:
The following resolutions were adopted at a meeting of the Southold Town Planning
Board on Monday, November 6, 2017:
WHEREAS, this Site Plan is for the proposed conversion of an existing 5,564 sq. ft. 1-
story building with basement (formerly SCWA office) to a professional office (medical)
and 16 parking spaces on 1.15 acres in the Light Industrial (LI) Zoning District; and
WHEREAS, on May 16, 2017, Robert Fischette, authorized agent, submitted a Site Plan
Application for review; and
WHEREAS, on May 19, 2017, Robert Fischette, authorized agent, submitted revised
site plans and other information as required by the Planning Board; and
WHEREAS, on May 22, 2017, the Planning Board found the application incomplete for
review and required additional information and revisions to the site plan; and
WHEREAS, on June 5, 2017, the Planning Bound accepted the application as complete
for review; and
WHEREAS, on June 5, 2017, the Southold Town Planning Board, pursuant to State
Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617.5 (c), determined that
the proposed action is a Type II Action as it falls within the following description for 6
NYCRR, Part 617.5(c)(2) replacement, rehabilitation or reconstruction of a structure or
facility, in kind, on the same site, including upgrading buildings to meet building or fire
North Fork SurgiCenter Page 2 November 8, 2017
codes, unless such action meets or exceeds any of the thresholds in section 617.4 of
this Part. The action is for the conversion of an existing 1-story building and basement,
no footprint expansion, to include a medical center for examinations and out-patient
procedures/surgeries; and
WHEREAS, on June 16, 2017, the Planning Board, pursuant to Southold Town Code
§280-131 C., distributed the application to the required agencies for their comments;
and
WHEREAS, the proposed action is exempt from review by the Suffolk County Planning
Commission (SCPC); and
WHEREAS, on June 27, 2017, the Southold Town Fire Inspector reviewed and
determined that there was adequate fire protection and emergency access for the site;
and
WHEREAS, on July 3, 2017, the Southold Fire District determined there was adequate
fire protection for the site; and
WHEREAS, on July 6, 2017, the Architectural Review Committee reviewed the
proposed project and approved it as submitted; and
WHEREAS, on July 10, 2017, a Public Hearing was held and kept open; and
WHEREAS, on August 14, 2017, the Public Hearing was continued and closed; and
WHEREAS, on August 24, 2017, the Southold Town Engineer reviewed the proposed
application and determined the site plan met the minimum requirements of Chapter 236
for Storm Water Management; and
WHEREAS, on August 30, 2017, the Town of Southold Local Waterfront Revitalization
Program Coordinator reviewed the proposed project and determined it to be consistent
with Southold Town LWRP policies with recommendations to the Planning Board; and
WHEREAS, on September 25, 2017, the Suffolk County Water Authority (SCWA)
provided a letter of water availability for the proposed site plan; and
WHEREAS, at a Work Session on October 16, 2017, the Planning Board reviewed
comments from referrals and staff analysis requiring revisions to the site plan, and
determined that approval from the Suffolk County Department of Health Services
(SCDHS) remained outstanding; and
WHEREAS, on October 26, 2017, the Suffolk County Department of Health Services
(SCDHS) granted approval to reference C10-17-0006 for a Medical Office @ 538GPD;
and
WHEREAS, on November 3, 2017, Robert Fischette, authorized agent, submitted
revised site plans; and
North Fork SurgiCenter Page 3 November 8, 2017
WHEREAS, on November 3, 2017, the Southold Town Chief Building Inspector
reviewed the proposed use for a medical office and certified the use as permitted under
"Professional Office" in the Light Industrial Zoning District; and
WHEREAS, at a Work Session on November 6, 2017, the Planning Board reviewed the
revised site plans; and
WHEREAS, on November 6, 2017, the Southold Town Planning Board determined that
all applicable requirements of the Site Plan Regulations, Article XXIV, §280 — Site Plan
Approval of the Town of Southold, have been met; therefore, be it
RESOLVED, that the Southold Town Planning Board has determined that this proposed
action is consistent with the policies of the Town of Southold Local Waterfront
Revitalization Program; and be it further
RESOLVED, that the Southold Town Planning Board approves the Site Plan with two
(2) conditions entitled "North Fork SurgiCenter", prepared by Richard J. Pierce R.A.,
dated November 2, 2017 and last revised October 30, 2017, and authorizes the
Chairman to endorse the Site Plan.
Conditions:
1. The basement is for storage only and any other use will require an
amended site plan application.
2. This medical office is for use by no more than two physicians/dentists at
any one time. More than two at any one time will require an amended site
plan to evaluate parking requirements.
Please also note the following requirements in the Southold Town Code relating to Site
Plans:
1. Any new lighting fixtures beyond those approved as part of the Lighting Plan
must conform to,the Code and may require Planning Board approval
depending on their number, size, intensity and location. Fixtures shall be
shielded so the light source is not visible from adjacent properties and
roadways and shall focus and direct the light in such a manner as to contain
the light and glare within property boundaries and conform to §172 of the
Town Code.
2. All storm water run-off from grading, driveways and gravel areas must be
contained on site.
3. Proposed storm water run-off containment systems must be inspected by the
Town Engineer at the time of installation. Please call the Southold Town
Engineer prior to beginning this work.
North Fork SurgiCenter Page 4 November 8, 2017
4. Approved Site Plans are valid for eighteen months from the date of approval,
within which time all proposed work must be completed, unless the Planning
Board grants an extension.
5. Any changes from the Approved Site Plan shall require Planning Board
approval.
6. Prior to the issuance of a Certificate of Occupancy, the Planning Board must
inspect the site to ensure it is in conformity with the Approved Site Plan, and
issue a Final Site Inspection Approval letter. Should the site be found not in
conformance with the Approved Site Plan, no Certificate of Occupancy may
be issued unless the Planning Board approves the changes to the plan.
A copy of the Approved Site Plan is enclosed for your records. One copy will also'be
sent to the Building Department and the Town Engineer/Highway Department.
If you have any questions regarding the above, please contact this office.
R ectfull Ir
I Q5"Pal, r
)tc2o
Donald J. Wilcenski
Chairman
Encl.
cc: Building Dept. w/map
Town Engineer w/map
By signing this letter, the applicant acknowledges that there are Town Code
requirements and conditions, including those listed above, that must be satisfied prior to
the issuance of a Certificate of Occupancy.
Print name: , Applicant/Agent
Signature: Date:
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex ®F so(/py P.O. Box 1179
54375 State Route 25 Southold, NY 11971
(cor.Main Rd. &Youngs Ave.) T' �_
=.z Telephone: 631765-1938
Southold NY P
;4 www.southoldtownny.gov
um,�
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
William D. Moore; Esq.
51020 Main Road
Southold, NY 11971
Re: Approval - Proposed Site Plan for North Fork United Methodist Church
Located at 43960 CR 48, corner of Hortons Lane & CR 48, Southold
SCTM#1000-63-1-15 Zoning District: Limited Business (LB)
Dear Mr. Moore:
The following resolutions were adopted at a meeting of the Southold Town Planning
Board on Monday, November 6, 2017:
WHEREAS, this Site Plan is for the proposed construction of a 1-story 7,640 sq. ft.
place of worship (no basement) and 42 parking stalls including 4 ADA on 2.45 acres in
the Limited Business (LB) Zoning District, Southold; and
WHEREAS, on February 17, 2016, William D. Moore, authorized agent, submitted a
Site Plan Application for review; and
WHEREAS, on February 17, 2016, the Planning Board provided a letter to the applicant
notifying them that a Notice of Disapproval was required from the Building Department
prior to the Planning Board reviewing the application for completeness; and
WHEREAS, on March 10, 2016, William D. Moore, authorized agent, submitted a
revised Site Plan Application with a Notice of Disapproval for review; and
WHEREAS, on March 21, 2016, the Planning Board found the application incomplete
for review and required revisions to the site plan along with additional information to be
submitted; and
WHEREAS, on November 11, 2016, William D. Moore, authorized agent, submitted
revised site plans and materials for review; and
NF United Methodist Church Pia e_2 November 8, 2017
WHEREAS, on December 13, 2016, the Planning Department notified William D.
Moore, authorized agent, via email of the outstanding information required still to be
submitted; and
WHEREAS, on December 16, 2016, William D. Moore, authorized agent, submitted a
letter to the Planning Board formally withdrawing the former 2006 Approved Site Plan
on the subject site; and
WHEREAS, on January 31, 2017 and February 15, 2017, William D. Moore, authorized
agent, submitted the remaining revised plans and materials as required; and
WHEREAS, on February 27, 2017, the Planning Board formally accepted the
application as complete for review; and
WHEREAS, on March 13, 2017, the Southold Town Planning Board, pursuant to State
Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617, determined that the
proposed action is an Unlisted Action as it does not meet any of the thresholds of a
Type I Action, nor does it meet any of the criteria on the Type II list of actions; and
WHEREAS, on March 21, 2017, the Planning Board, pursuant to Southold Town Code
§280-131 C., distributed the application to the required agencies for their comments,
and performed a coordinated review under SEQRA; and
WHEREAS, on March 27, 2017, the Suffolk County Water Authority (SCWA) provided a
letter of water availability for the proposed project; and
WHEREAS, on April 3, 2017, the Southold Fire District determined there was adequate
fire protection for the site; and
WHEREAS, on April 10, 2017, a Public Hearing was held and kept open; and
WHEREAS, on April 20, 2017, the Architectural Review Committee reviewed the
proposed project and approved it as submitted with certain landscaping
recommendations to the Planning Board; and
WHEREAS, on April 20, 2017, the Town of Southold Local Waterfront Revitalization
Program Coordinator reviewed the proposed project and determined the project to be
consistent with Southold Town LWRP policies; and
WHEREAS, on April 21, 2017, the Southold Town Fire Inspector reviewed and
determined that there was adequate fire protection and emergency access for the site;
and
WHEREAS, at their Work Session held on May 8, 2017, the Southold Town Planning
Board reviewed all input from the Public Hearing, recommendations from agencies and
staff and required revisions to the site plan and additional information; and
NF United Methodist Church Page 3 November 8, 2017
WHEREAS, on May 8, 2017, the Southold Town Planning Board, as Lead Agency
pursuant to SEQRA, made a determination of non-significance for the proposed action
and granted a Negative Declaration; and
WHEREAS, on May 8, 2017, the Public Hearing was continued and closed; and
WHEREAS, on May 9, 2017 the Office of Parks, Recreation and Historic Preservation
(OPRHP) reviewed the project in accordance with the New York State Historic
Preservation Act of 1980 ,(Section 14.09 of the New York Parks, Recreation and Historic
Preservation Law) and determined that the project will have no impact on
archaeological and/or historic resources listed in or eligible for the New York State and
National Registers of Historic Places; and
WHEREAS, on May 9, 2017, the Southold Town Engineer reviewed the proposed
application and determined that the proposed drainage meets the minimum
requirements of Chapter 236 for Storm Water Management; and
WHEREAS, on May 10, 2017, the Suffolk County Planning Commission (SCPC)
reviewed the proposed project and considered it to be an action for local determination
as there appears to be no significant county-wide or inter-community impact(s); and
WHEREAS, on June 7, 2017, the Suffolk County Department of Health Services
(SCDHS) granted approval C10-16-0013 for"House of Worship with meeting rooms" @
981 gpd; and
WHEREAS, on August 7, 2017, the applicant submitted multiple prints of a revised site
plan and supplemental information as required; and
WHEREAS, all input from the Public Hearing and recommendations from agencies
listed above were considered and incorporated into the plans to the satisfaction of the
Planning Board; and
WHEREAS, at their Work Session, held on September 11, 2017, the Southold Town
Planning Board reviewed the proposed Site Plan and determined that all applicable
requirements of the Site Plan Regulations have been met with exception of a
determination from the Zoning Board of Appeals for a Place of Worship in the LB zone
and a use certification from the Chief Building Inspector; and
WHEREAS, on September 25, 2017, the Zoning Board of Appeals (ZBA) issued a
determination granting a Special Exception for a Place of Worship File No. SE 6936
with three (3) conditions; and
WHEREAS, on October 27, 2017, the Southold Town Chief Building Inspector reviewed
and certified the proposed Place of Worship as a permitted use in the Limited Business
Zoning District pursuant to ZBA File No. SE 6936; therefore be it
NF United Methodist Church Page 4 November 8, 2017
RESOLVED, that the Southold Town Planning Board has determined that this proposed
action is consistent with the policies of the Town of Southold Local Waterfront
Revitalization Program; and be it further
RESOLVED, that the Southold Town Planning Board hereby grants approval to the
Site Plan entitled "North Fork United Methodist Church", prepared by David Clark
Harvey R.A., dated November 30, 2015 and last revised July 31, 2017, and authorizes
the Chairman to endorse the Site Plan.
Please also note the following requirements in the Southold Town Code relating to Site
Plans:
1. Any new lighting fixtures beyond those approved as part of the Lighting Plan
must conform to the Code require Planning Board approval and must conform
to §172 Lighting of the Town Code.
2. Proposed storm water run-off containment systems must be inspected by the
Town Engineer at the time of installation. Please call the Southold Town
Engineer prior to beginning this work.
3. Approved Site Plans are valid for eighteen months from the date of approval,
within which time all proposed work must be completed, unless the Planning
Board grants an extension.
4. Any changes from the Approved Site Plan shall require Planning Board
approval.
5. Prior to the issuance of a Certificate of Occupancy, the Planning Board must
inspect the site to ensure it is in conformity with the Approved Site Plan, and
issue a final site inspection approval letter. Should the site be found not in
conformance with the Approved Site Plan, no Certificate of Occupancy may,
be issued unless the Planning Board approves the changes to the plan.
If you have any questions regarding the above, please contact this office.
Very truly
Donald J. Wilcenski
Chairman
By signing this letter, the applicant acknowledges that there are Town Code
requirements and conditions, including those listed above, that must be satisfied prior to
the issuance of a Certificate of Occupancy.
Print name: , Applicant/Agent
Signature: Date:
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex �'®F so P.O. Box 1179
54375 State Route 25 Southold,NY 111
971
(cor. Main Rd. &Youngs Ave.) N',r
Telephone: 631 765-1938
Southold, NY .v - www.southoldtownny.gov
®�yI'OUNTy,� '
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Mr. Anthony Sannino
7490 Alvahs Lane
Cutchogue, NY 11935
Re: Site Plan Approval (Final): Sannino Winery
Located at 7495 Alvahs Lane, ±490' s/w/o Alvahs Lane and CR 48, Cutchogue
SCTM#1000-101-1-14.4 & 14.6 Zoning District: AC
Dear Mr. Sannino:
The following resolutions were adopted at a meeting of the Southold Town Planning
Board on November 6, 2017:
WHEREAS, this Site Plan is for the proposed construction of a 2-story building with a
2,852 sq. ft. first floor for wine production, wine retail area, and a wine education room,
a 438 sq. ft. second floor for an office, and a 3,600 sq. ft. basement with thirty nine (39)
parking stalls on two adjacent parcels (to be merged pursuant to ZBA File 6882) totaling
8.94 acres in the A-C Zoning District, Cutchogue; and
WHEREAS, on June 5, 2017, the Planning Board granted Conditional Approval to this
Site Plan application; and
WHEREAS, on June 22, 2017, Anthony Sannino, owner, submitted a request to modify
the language of certain conditions approved by the Planning Board; and
WHEREAS, the Planning Board, its staff and the Southold Town Attorney coordinated
with Mr. Sannino and his counsel to provide a comprehensive list of conditions to be
filed as Covenants & Restrictions with the Office of the Suffolk County Clerk; and
WHEREAS, on October 19, 2017, the Suffolk County Department of Health Services
(SCDHS) granted approval C10-16-0012 for "Mixed Use as per plan" @ 3,130.28gpd
Total Flow— 2,850.28gpd Sanitary Flow + 280gpd Process Water Flow; and
Sannino Winery 2 November 8, 2017
WHEREAS, on October 31, 2017, Anthony Sannino, owner, submitted proof of filed
Covenants & Restrictions with the Office of the Suffolk County Clerk to the Planning
Board; and
WHEREAS, on November 3, 2017, Anthony Sannino, owner, submitted five (5) copies
of the revised site plan, storm water/ sanitary plan and supporting plans; and
WHEREAS, at their Work Session on November 6, 2017, the Planning Board reviewed
the revised plans and compared them with their conditional approval from June, 2017;
and
WHEREAS, on November 6, 2017, the Southold Town Planning Board reviewed the
revised plans and determined that they meet the Board's conditions, and that all
applicable requirements of the site plan regulations in Southold Town Code, Article
XXIV, §280 Site Plan Approval, have been met under the conditions listed below;
therefore be it
RESOLVED, that the Southold Town Planning Board hereby grants Approval with
Conditions, listed below, of the site plan entitled "Sannino Vineyard" prepared by
Robert J. Gruber, dated June 22, 2016, and last revised October 5, 2017, and
authorizes the Chairman to endorse the site plan.
Conditions:
1. A Suffolk County DPW Curb Cut Permit must be obtained and executed prior to
the issuance of a Certificate of Occupancy from the Building Department;
2. The maximum number of patrons and/or visitors on the winery site is limited to
235 people at any given time. This limitation does not include employees of the
winery, the related farming operation ("Farm"), or the Bed & Breakfast ("B&B")
located on the subject property. The limitation also does not include guests of
the B&B that are not present at the winery site.
3. The vehicles used by visitors and patrons to the winery may only be parked in
approved areas as depicted on the approved Site Plan, The maximum number
of such vehicles permitted on site for winery operations, is 39. This limitation
does not include the vehicles of employees of the winery, the Farm or the
employees or guests of the B&B that are not parked in the area designated for
winery parking on the approved Site Plan., There is no additional parking
permitted on site or on adjacent properties for visitors or patrons of the winery
operation. The winery operator, its agents, or employees shall not direct people
to park on public streets, including CR48;
Sannino Winery 3 November 8, 2017
4. Limousines and Buses must park in the oversize spaces on the west side of the
winery, and are permitted in the following numbers and combinations:
a. Maximum number of limousines at any one time is five (5);
b. When 4 or 5 limousines are on site, no buses are permitted;
c. Maximum number of buses at any one time is two (2);
d. One limousine is permitted when two buses are on site;
e. Up to three limousines are permitted with one bus on site.
5. All vehicles must remain on site at all times while their patrons are on site. No
drop-off permitted except for ride sharing, public transit or taxi;
6. Parking in designated parking areas only, as shown on the approved Site
Plan;
7. The 17 gravel parking stalls facing the building are to be the primary parking
stalls;
8. A traffic routing plan is required to be distributed to all driver/livery companies
ahead of time and shall be provided/displayed for all potential patrons on the
company website;
9. There shall be no more than 12 Special Events, as defined by the Southold
Town Code, at the winery in a calendar year, subject to the following
conditions:
a. Nothing contained herein shall waive the requirement that the Declarant
make an application for a Special Event Permit as required by the
Southold Town Code;
b. The covenants and restrictions set forth in paragraphs "1" through "6"
shall not apply to Special Events at the winery for which Declarant has
applied for and received a Special Event Permit as required by the
Southold Town Code;
c. Notwithstanding the foregoing, nothing contained herein shall restrict a
body, board or official responsible for reviewing and/or approving special
event permits from recommending and/or requiring that any reasonable
conditions be placed on the approval of a special events permit that an
aforementioned body, board or official deems appropriate based on the
Sannino Winery 4 November 8, 2017
submitted application and the criteria for reviewing Special Event
Applications set forth in the Southold Town Code.
Please also note the following requirements in the Southold Town Code relating to Site
Plans:
1. Proposed storm water run-off containment systems must be inspected by the
Town Engineer at the time of installation. Please call the Southold Town
Engineer prior to beginning this work.
2. Approved Site Plans are valid for eighteen months from the date of approval,
within which time all proposed work must be completed, unless the Planning
Board grants an extension.
3. Any changes from the Approved Site Plan shall require Planning Board
approval.
4. Prior to the issuance of a Certificate of Occupancy, the Planning Board must
inspect the site to ensure it is in conformity with the Approved Site Plan, and
issue a Final Site Inspection Approval letter. Should the site be found not in
conformance with the Approved Site Plan, no Certificate of Occupancy may
be issued unless the Planning Board approves the changes to the plan.
A copy of the Approved Site Plan is enclosed for your records. One copy will also be
sent to the Building Department and the Town Engineer/Highway Department.
If you have any questions regarding the above, please contact this office.
Respectfully,
Donald J. Wilcenski
Chairman
cc: Michael Verity, Chief Building Inspector
James Richter, Office of the Town Engineer
By signing this letter, the applicant acknowledges that there are conditions above that
must be satisfied.
Anthony Sannino, Owner
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex ®F S®(/fy P.O. Box 1179
54375 State Route 25
Southold, NY 11971
(cor.Main Rd. &Youngs Ave.) W p
Southold, NY Telephone: 631 765-1938
www.southoldtowrmy.gov
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Mr. Anthony Sannino
7490 Alvahs Lane
Cutchogue, NY 11935
Re: Proposed Amendment to the Subdivision Map of Hanoch and Watts
Located at 15975 CR 48, ± 515's/w/o County Road 48 &Alvah's Lane, Cutchogue
SCTM#1000-101-1-14.6 Zoning District: A-C
Dear Mr. Sannino:
The following resolutions were adopted at a meeting of the Southold Town Planning
Board on Monday, November 6, 2017:
WHEREAS, this proposal is to relocate the building envelope on Lot 3 of the Approved
Subdivision Map of Hanoch and Watts (filed map number 9059, February 1, 1991) from
100' to 140' from the s/e property line for the Sannino Winery; and
WHEREAS, on August 25, 2015, Anthony Sannino, owner, submitted a Site Plan
application to the Planning Board for review; and
WHEREAS, this Site Plan is for the proposed construction of a 2-story building with a
2,852 sq. ft. first floor for wine production, wine retail area, and a wine education room,
a 438 sq. ft. second floor for an office, and a 3,600 sq. ft. basement with thirty nine (39)
parking stalls on two adjacent parcels (to be merged pursuant to ZBA File 6882) totaling
8.94 acres in the A-C Zoning District, Cutchogue; and
WHEREAS, the two subject lots were created by the Planning Board in the 3-lot
subdivision map of Giora Hanoch and Harold Watts, filed map number 9059, February
1, 1991. The subdivision created a 110' x 110' building envelope for Lot 14.6 (aka Lot
#3) setback 1 00' feet from County Route 48 and a common driveway with the adjacent
lot to the west (aka Lot#2). The building envelopes and common driveway were created
for a presumed future residential use, however the uses for the two lots are now a
Southold Town Planning Board Page 2 November 8, 2017
church and this proposed winery Site Plan. Neither the building envelopes nor the
common driveway are practical for the proposed winery and existing church; and
WHEREAS, the Planning Board has considered the original purpose of the common
driveway and the building envelopes, as well as the new locations of the existing and
proposed structures and found that any impacts are being addressed in this site plan
process. The proposed winery building is located further back for the benefit of scenic
quality, to provide a greater setback from County Route 48, a greater setback from
existing homes on County Route 48 and adjacent residential parcels; and
WHEREAS, the Southold Town Planning Board considered the relocation of the
building envelope and the removal of the requirement for a common driveway and
determined that no impacts to the site or the surrounding properties will result; be it
therefore
RESOLVED, that the Southold Town Planning Board hereby approves the new location
of the building envelope on SCTM#1000-101-1-14.4 (Lot 3 of the approved Subdivision
Map of Hanoch and Watts), as well as the requirement for a common driveway as
described above.
This approval is for the relocation of the building envelope only.
If you have any questions regarding the above, please contact this office.
Very truly yours,
Donald J. Wilcenski
Chairman
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex ��0* S0UT�0 P.O. Box 1179
54375 State Route 25 �O l0 Southold, NY 11971
(cor. Main Rd. &Youngs Ave.)
Southold, NY Telephone: 631 765-1938
cn ac www.southoldtownny.gov
0,0UNTV,�1c�
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Mr. Richard Searles
P.O. Box 286
Wading River, NY 11792
Re: Northside Beverage
1795 Old Main Road, ±275' s/w/o Old Main Road & NYS Route 25, Mattituck
SCTM#1000-122.-7-6.7
Dear Mr. Searles:
A Public Hearing was held by the Southold Town Planning Board on Monday,
November 6, 2017 regarding the above-referenced application.
The Public Hearing was closed.
If you have any questions regarding the above, please contact this office.
Respectfully,
Donald J. Wilcenski
Chairman
OFFICE LOCATION: MAILING ADDRESS:
Town Hall Annex ��®f SOU�y® P.O. Box 1179
54375 State Route 25 Q �� Southold, NY 11971
(cor.Main Rd. &Youngs Ave.)
Southold,NY Telephone: 631 765-1938
N www.southoldtownny.gov
I'OUNN,�`�
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
November 8, 2017
Patricia C. Moore, Esq.
51020 Main Road
Southold, NY 11971
Re: Proposed Standard Subdivision Alexander and Tracy Sutton
Located 111.56 feet northeast of Liberty Lane and Victoria Drive, Southold
SCTM#1000-78-9-54 Zoning District: R-40
Dear Ms. Moore:
A Public Hearing was held by the Southold Town Planning Board on Monday,
November 6, 2017 regarding the above-referenced application.
The Public Hearing was closed.
If you have any questions regarding the above, please contact this office.
Respectfully,
Donald J. Wilcenski
Chairman