Loading...
HomeMy WebLinkAbout41660-Z SOR14cpG Town of Southold 8/4/2017 0 P.O.Box 1179 53095 Main Rd Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 39108 Date: 8/4/2017 THIS CERTIFIES that the building SHED Location of Property: 4050 Delmar Dr, Laurel SCTM#: 473889 Sec/Block/Lot: 125.4-20 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 5/12/2017 pursuant to which Building Permit No. 41660 dated 5/24/2017 - was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: ACCESSORY SHED AS APPLIED FOR The certificate is issued to Garcia,Edgar&Milian,Thelma of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. PLUMBERS CERTIFICATION DATED /Autho,kid Signature o�sy a��ca TOWN OF SOUTHOLD �� ay BUILDING DEPARTMENT z TOWN CLERK'S OFFICE • SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 41660 Date: 5/24/2017 Permission is hereby granted to: Garcia, Edgar& Milian, Thelma 4050 Delmar Dr Laurel, NY 11948 To: construct an accessory shed as applied for. At premises located at: 4050 Delmar Dr, Laurel SCTM # 473889 Sec/Block/Lot# 125.4-20 Pursuant to application dated 5/12/2017 and approved by the Building Inspector. To expire on 11/23/2018. Fees: ACCESSORY $196.00 CO -ACCESSORY BUILDING $50.00 tal: $246.00 Building Inspector Form No.6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: , A. For new building or new use: 1. Final survey of property with accurate location of all buildings,property lines,streets,and unusual natural or topographic features. 2. Final Approval from Health Dept.of water supply and sewerage-disposal (S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1%lead. 5. Commercial building, industrial building,multiple residences and similar buildings and installations, a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings(prior to April 9, 1957)non-conforming uses,or buildings and "pre-existing"land uses: 1. Accurate survey of property showing all property lines,streets,building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant.If a Certificate of Occupancy is denied,the Building Inspector shall state the reasons therefor in writing to the applicant. i C. Fees 1. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00,Alterations to dwelling$50.00, Swimming pool$50.00,Accessory building$50.00,Additions to accessory building$50.00,Businesses$50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy-$.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy-Residential $15.00, Commercial $15.00 / Date. New Construction: Old or Pre-existing Building: (check one) Location of Property: 405-0 TIJ Ma a- Dt'iu.JL House No. StreetHamlet //11 Owner or Owners of Property �.s�a,- f� 1 �, ' r C; �t-FCl l-A4i M o 1 tlt1-,_ Suffolk County Tax Map No 1000, Section Block 4- Lot Subdivision Filed Map. Lot: Permit No. Date of Permit. Applicant: Health Dept.Approval: Underwriters Approval: Planning Board Approval: Request for: Temporary Certificate Final Certificate: V (check one) Fee Submitted:$ jJ Applicant Signature SOUlyo y 0 0 My,O TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING / STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] EL ICAL (FINAL) REMARKS: DATE 94lINSPECTOR �O��pE SOUlyolo o�y000NTY,�� TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLEIG. [ ] _FOUNDATION 2ND [ ] SULATION [ ] FRAMING / STRAPPING [ FINAL Stf4,:b [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) C REMARKS: J - DATE Y � INSPECTOR FIELD WPE m!�orer 0I PI , ®. FOUnD4 tON(IST) _ ..,._... .�. , ._.:............. Fo'UND�,TION;(art15) � ROUGH FR IiQ INSULATION,?,,,EA N,Y. H STATE EIDE-ROY C-ODB Y ! Ami i • FINAL' I tzz 1 r i ail TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD, NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 Survey SoutholdTown.NorthFork.net PERMIT NO. (A I(®(v0 Check Septic Form N.Y.S.D.E.C. Trustees C.O.Application Flood Permit Examined 120 Siifigle&Separate Storm-Water Assessment Form Contact: Approved '20--\47 Mail to: A.�Of,57 ,s' � �f�r�� �y tiff Disapproved a/c � _ r' 1 I Phone: Expiration 23 Building Inspector MAY 2 2017 APPLICATION FOR BUILDING PERMIT $gni,DlN®DO� Date , 20 TOWN O INSTRUCTIONS a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale.Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this applicaflod'the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date.If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk.County,New York,and other applicable Laws, Ordinances or Regulations, for the construction of building's, additions,or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws,'ordinances,building code,housing code,and regulations,and to admit authorized inspectors on premises and in building for necessary inspections: (Signatureo applicant or name,if a corporation) �(7 � 5 Jr-6.M4 00A), RJ C 1X39 (Mailing address of app 'cant) State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder 0+,,e-v-- C vl+n e-a r Name of owner of premises C�gG�r Ga-r-6 Gi v (As on the tax roll or latest deed) If applicant is a corporation, signature of duly authorized officer (Name and title�of'cor'p'orate officer) Builders License'No';'' Plumbers License No. Electricians License No. YX (yl T Other Trade's License No. 1. Location of land on which roposed work will be done: yes® DIS r -a�-�re,1 House Number Street Hamlet County Tax Map No. 1000 Section Z Block Lot a(') Subdivision Filed Map No. Lot i 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy b. Intended use land occupancy �� D 7 , 3. Nature of work(check which applicable):New Building Addition Alteration Repair Removal , Demolition Other Work (Description) 4. Estimated Cost Fee (To be paid on'fling this application) 5. If dwelling, number of dwelling units Number of dwelling units on each floor If garage, number of cars -6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. 7. Dimensions of existing structures, if any: Front Rear Depth Height Number of Stories FcJ e g � { w.xl � CrF�^r . U•;3'it..��i �'''..<^f S f SRRii 2 I Dimensions of same structure with alterations or additions: Front i Rear ~- ` Depth Height Number of S or'ies 8. Dimensions of entire new construction: Front,' Rear Depth Height Number ofIStories 4' " .s a .. 'r.a#u .c 9. Size of lot: Front Rear Depth 10. Date of Purchase Name of Former Owner ' 1 I . Zone or use district in which premises are situated ' 11. Does proposed construction violate any.zoning law, ordinance or regulation?YES NO 1.3. Will lot be,re-grade4? YES , :.NO (Will excess fill.b,e removed from premises? YES NO "t'helma, 01)ACL, 1 . Names of Owner of premiseAddress Phone No. Name of Architect 4 s Address ' Phone No, Name of Contractor ` Ad'dress -Phone No. 1 a. Is this property within 100 feet of a tidal `wetland or a freshwater wetland? *YES NO IF YES, SOUTHOLD,TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED. r , b. Is this property wit hin`300 feet of a tidal wetland? * YES NO f IF YES, D.E.C. PERMITS MAY BE REQUIRED,* „ 1( . Provide survey, to scale, with accurate foundation plan and distances to property lines. Y . If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. 1 . Are there any covenants and restrictions with respect to this property? * YES NO IF YES, PROVIDE A COPY. S ATE OF NEW YORK) SS: COUNTY OF ) being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract)above named, CONNIE D.BUNCH Notary Public,State of New York (S)He is the No.01BU6185050 (Contractor,Agent, Corporate Officer,etc.) ua Commission Expires APrI 14,2_0X 0 of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application; th t all statements contained in this application are true,to the best of his knowledge and belief, and that the work will be performed in the manner set forth in the application filed therewith. S orn,tp before me this ; day of M 20 g� Notary Public Signature of Appli 1 Scott A. Russell SUFFq�-,�� ST�O)]E�I��[���A��C')E]E� SUPERVISOR A'ALAWA (Gr]EAMUEN T SOUTHOLD TOWN HALL-P-O.Box 1179 p 53095 Main Road-SOUTHOLD,NEWYORK 11971 � � Town of Southold CHA PTER 236 - STORMWATER MANAGEMENT WORK SHEET (TO BE COMPLETED BY THE APPLICANT) JDto �i�Pfl�®fit '—mwo F—fH`bO1�OWIN(i ---==--- -— Yes -No (G EIX ALL THAT APPLE ` El 1;9 A. CIearing, grubbing, grading or stripping of land which affects more than 5,000 square feet of ground surface. EJ B. Excavation or filling involving more than 200 cubic yards of material within any parcel or any contiguous area ❑� C. Site preparation on slopes which exceed 10 feet vertical rise to 100 feet of horizontal distance_ ❑ ] D. Site preparation within 100 feet of wetlands, beach, bluff or coastal erosion hazard area. t ❑P, E. Site preparation within the one-hundred-year floodplain as depicted on!-.FIRM-Map of any watercourse.. ®�d F. Installation of new or resurfaced impervious surfaces of 1,000 square feet or more) unless prior approval of a Stormwater Management Control Plan was received by the Town and the proposal includes in-kind replacement of impervious surfaces. If you answered NO to all of the questions above, STOP! Complete the Applicant section below with your Name, Signature, Contact Information, Date & County Tax Map Number! Chapter 236 does not apply to your project. If you answered YES to one or more of the above, please submit Two copies of a Stormwater Management Control Plan and a completed Check List Form to the Building Departmfnt—WW1-your Building Permit Application. APPLICANT. (Property owner,Design Professional,Agent,Contractor Other) - S.C_T lvl. OOO Date.- 1Q5 Q5 _Ljntrict NAME rfla, a. Section Block Lot Iro Conrac, )n(orrtunort 4-16 3 66 3 Reviewed By_ 1 —7 — — — — — — — — — — Date: Property Address / Location of Construction Work- — — — — — — — — — — — — — — — — - -�^�� CA n �n �/] Approved for ana emen Building l Perm,t U 7,a�JJ J W 1 F� I`-7�'I Stormwater Management Control Plan Not Required SiGrrn:Vater PAa ager e„t Control P;aoLJ ;s RcG ,red (Forward to Engineering Depzwmeni for Rei-,e-J FORM - SMCP - TOS N)AY 2014 i to �a � ' � r 11 �5•'►' ^lam' N�� , li1 ,n 1t � Q 31 f II S� .� ate• p t ' E I Y No rE NJ4NUhfENr i TRE LOCATtON SUDDIVIS 101VMAP FILED IN rNE OFFICE' SHOW14 HEREIN ARE 1•ROM•1'IELn OBSERVATIONS OF rNE CLER9 O•FSUFFOI-KCOUNrrON BINDIOB,1'Ti014DATAOTTAIREDT1.0t4OWERS JUNE22, 1974ASF/LEND. 5486. REVISIONS b O U N(`. & YOUNG pts h�E� E r� MAR. 14, 1974 400 OSTRANDER AVENUE, RIVERHEAD 4��1W YD `�' ALDEN W. YOUNG PROFESSIONAL ENGINE3ER AND _ N�7fI'UI V£,YtOJt� t, LAND SURVEYOR. N.Y.S. LIC, NO. 17_643 Y.S�,.L'��ti,�rV�t'r,��X893 w 11 1 SURVEY,FOR: 14ALITHMZCD ALTERATION OR ADDITION TO I TwS SURVEY IS A VIOLATION OF SECTION INLAND HOLME�,iNG. � I-��: d 9 OF THE NEW YORK STATE EDUCATION fi LOT NO. 30, LAUREL COUNTRY ESTA s �'p i 2sa� o I :"D;ES OF THIS SURVEY MAP NOT BEARING , roNAI 'M= t.ANO SURVEYOR'S INKED SEAL OR f EVOOSSEO SEAL SHALL NOT BE CONSIDERED i BE A VALID TRUE COPY AT GVARANTEE:D TO: LAUREL SECURITY TITLE a GUARANTY CO. I S�AR&NTEES 'NDICATED HEREON SHALL RUN SOUTHOLD SAVINGS BANK 'v,r TO *mE PERSON FOR WHOM T"E TOWN OF •T,.ET IS PREPARED, AND ON HIS BEHALF J cOI {I LJOt V F I L YNE TITLE. COMPANY, GOVERNMENTAL r� r .rgEOV, AVO TO'f APO OTIHF, SIGNEE$ OFNG IN3YITVTION THESUFFOLK CO., N. Y. EY =�I \3 'NSTITUTION GUARANTEES ARE ti" ''4A',?IE9ASLE '*0 ADDITIONAL SCAI..F'i 11 1 DATA: ; ,;•, UT '%.q OR SUBSEQUENT OWNERS. 1 - 40 " NOV.-15, 1973 7 3 - d� ',i'%1 5_73 40500• APPROVED ,5 'N"TES � � ft �'l� ,��1r�.. CODES OF 2�f 17B. # d 6 C;OI',fj L'("� I s DATE: �� — �. - TO�iV�� CODES �� NEVv YORK C T.��fr. u OF FE �� By:.- p,5 REQUIRED NO41 ',Y, BUILDING DEPAR i HENT AT 755-1802 8 ANI TO 4 PI`A FOR THE so i I RD FOLLOWING INSPECTIONS: �so 1. FOUNDATION - TWO REQUIRED I NINTROFES FOR POURED CONCRETE 2. ROUGH - FRAMING & PLUMBING 3. INSULATIONy" 4. FINAL - CONSTRUCTION MUST BE COMPLETE FOR C.O. ALL CONSTRUCTION SHALL MEET THE I��CUPANCY ®� REQUIREMENTS OF THE CODES OF NEW YORK STATE. NOT RESPONSIBLE FOR �� UNLAWFUL DESIGN OR CONSTRUCTION ERRORS. WITHOUT CERTIFICATE OF OCCUPANCY r" ® .• r Best Barns USA , SNS Assembly Book " Revised September 26, 2016 ,a'i,�:dam",ayq^.,�r .� ,R:„aa;.t',a;,t`'r•�-:•-g E..-fra,;.y.;r.-,.;-tr.-gz{^'S� �c= ,���°��°31 vr ^;4 �* D.�.s714 ".*.,'.:a,w;?:K�� ter: ,,p�5.,, 't?iy`f'��•f{.p,.s' t•�' er =i iti'� :P � ��.-:i".'e%it<s 4.;;;�:a. 3 " _ �'"���..,a13,'�-# `n��;`'y��ajy t;�?r'1<.='+'`�,'." Y�,i;:.,f•rf;;rii - Ai �{ •jit —& y�r3�Sr$�tt(�.�JYF �'��,�`,.%,1��,y"71.r '�JK:�Ssy3f. •/'iJ^r�'�V �;'r ;^�,., r. �_1.�iT.-r>Y[ppCr���.(pXy7�[u!�gs H.i •r"•:.'�.fY ,J ' }^ i ,,.; ^'j++ — [w.l iiiYtl ,� ''��.».�ti�"' n ✓"z.^ rl�r�y.�a�ty^'�,� Garage Door by Owner K !p� .wa•x�� y� (y ib^;,�"�<.�;+Yrf"r^°'tK::it�`a 'I'✓",�s_''�: •r..�> � .• / ,;a:'^ �'�"�.,`:" Zi'. �9i� �x;'^� 1 s� `A�.?.. L- ..;,y�'•:r,r-1-•i�r,;,�,,;+,i-fid Tahoe- R 12 'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville,PA 16125 724-646-3775 This manual is copyrighted. Under the copyright laws, this manual may not be copied, in whole or in part, without consent from Reynolds . Building Systems, Inc. © Copyright 2010 ; I I � IMPORTANT INFORMATION ABOUT YOUR SHED KIT Thank you for purchasing our Tahoe shed kit.These instructions will construct a 12'x20' building.If you received two books,use the one with the latest revision date. If you have any questions about assembling the kit, call 800-245-1577. If you are calling after normal business hours, call 724-866-HELP(4357) or email to help@barnkits.com. Before you begin construction, be sure to study this assembly manual. Obtain a building permit and check all pertinent building code regulations. Some 2x4 wall framing, siding and roof sheathing,along with the optional floor package will be supplied by a local supplier. The material breakdown is listed on the back page. Our component kit does not include the shingles,giving you a choice of color and quality. The breakdown of the material you need to supply is listed on back page. The door opening is for an 8' wide x 7' high garage door. You will need to order your garage door with a 6" low headroom kit. Some of the framing lumber was used in the shipping pallet. Unpack the material from the pallets,then unscrew the 2x4s.The bit for the screws is packed in the hardware bag. The , 2x4s will be used for wall bracing. The siding is primed. You will need to apply a finish coat using latex acrylic paint. Paint the bottom edge of the siding,this is very important. Stacking the boards, according to size, will make them easier to find when needed. Do' Not discard any material,no matter hoer,small. until your building is complete.Anything leftover may have been used as packing blocking. ; Good luck with your project. Bill Rinella,President LAP Edge To identify which edge we want you to use,we 1: will refer to the edge as either the'LAP' Edge ; or the Tongue Edge.Nail siding with 8d galv. i nails, spaced 12" apart. Tongue Edge , r �- measure from here —>I When measurements are given for a board length or width, it is from the longest side. Tool List ❑ Hammer&Hand Saw ❑ Power Drill/screwdriver ❑ Framing Square&Level Measuring Tape ❑ Power Circular Saw ❑ 2-8' Step Ladders Always wear safety glasses when cutting or nailing! I I Optional.Wood Floor System Shown below is a typical wood floor. Depending on your area,the construction may have to be changed to meet local codes.The foundation size should be 12' - 0" x 20' - 0". 1. Cut(2)two treated 2x4-8' boards in half. 2. Butt 4x4-10'treated runners together. Use one of the 4' long 2x4s to secure them together. 3. Repeat to join the other 4x4 runners.' 2' Long 2x4 4x4 Treated Runners 4. Cut(2)two 2x4-12'joist headers to 12' - 0". ,5. Layout for 12" on center joist spacing. 'X'marks where floor joist will be placed. Detail 1 2x4- 12 0" X ix ix Ix Joist Header Ix Ix ix ix 11-1/4" E 12" 12" -I I 6. Cut all the 2x4-12' boards to 11'-9".These boards will be the floor joist. Treated lumber may be thicker than 1-1/2". Take this into account when cutting the length offloor joists. Shorten joist measurements if necessary to obtain 12'-0"building width. 7. Install floor joist boards between the joist headers. Install this section over the 4x4s. 2x4-12' Joist Header 2x4-11' 9" Floor Joist 4x4 Runners I I I I 8. Cut(2)two 2x4-8'treated boards to 8' - 0". 9. Layout for 12" on center joist spacing, see Detail 1. 10. Assemble another floor section. Install over the 4x4s and nail both floor sections together. 11. Square the floor. See note below.The angle measurement should be 23' -4".Nail several floor joist to the 4x4 runners to hold the floor frame in place. 4x8 4x8 4x4 4x8 , 12. Install floor using 8d spiral nails. Notes To Floor Material Description 12' x 20' shed It is important that the floor be level and square. Square the floor as follows:before nailing the flooring, 2x4 Treated 4 cs. 8' measure the floor diagonally(corner to corner).Then 2x4 Treated 24 pes. 12' measure the opposite corners. These measurements 4x4 Treated Runners 8 pcs. 10' will be the same if the floor is square. When using a concrete slab for a floor,use the same Flooring 5/8" or 3/4" 8 pcs. 4x8 overall foundation measurements. Install foam sill Screw Floor Nails 5 lb. 8d sealer as a moisture barrier between the concrete and the wall plates. Foam sill sealer is available in rolls, Galv. Box Nails 5 lb. 16d 3-1/2" or wider. I I i I Step 1 Assemble Loft Beams 1. Locate(2)two 36" long 2x6 boards with a notch on one end and a 2x6 board without a notch. Position these 2x6 boards on a flat surface as shown below. 2. Apply a coat of glue to the top surface using wood glue supplied in kit. 3. Locate(2)two 72" long 2x6 boards with a notch on one end. Install these 2x6 boards over the bottom boards. 72" Long 2x6 w/Notch 72" Long 2x6 w/Notch v v 36" Long 2x6 w/Notch 72" Long 2x6 r without notch 36" Long 2x6 w/Notch 4. To provide additional strength,install 2-1/2"wood screws spaced 16"apart as shown below. 16" 16" 1 16" ® ® ® ® ® 2x6 Beam 5. Repeat steps to assemble another 2x6 beam. Step 2 Assemble Door Header 1. Cut (2)two 2x10-10' boards to a length of 8'-3" 2. Locate(2)two pre-cut 9"x 48" OSB fillers. 3. Install fillers in the center of the 2x10 boards.Nail header together with 1 Od sinkers.Use(16)sixteen nails on each side. For additional strength apply glue between the fillers and 2x10 boards. ; v 9"x48" OSB Filler 0 1-1/2" Space Both Ends I I I I Step 3 Assemble Trusses Building Tip: To aid in the assembly of the trusses, temporarily screw 2x4 blocks to the floor. There are short 2x4s, that may have an angle on one end, supplied in kit. This will insure that all the trusses are assembled the same. 4. Framing lumber may be shipped long; cut(2)two 2x4-12' boards to 12' - 0". Position one on the floor with the narrow edge side down. Use 2x4 blocks to hold the 2x4 plate straight. 2. Position(2)two truss halves (2x4s connected with a metal plate)with the short legs against the 2x4 Gable Plate: DO NOT attach the Gable Plate to the truss. It is temporarily used to help hold the 2x4 truss parts in place. It will be attached later when building the roof gables. 3. Secure 2x4 blocks around the perimeter of truss to hold truss parts in place. 32" Top Gusset Truss Half Metal Plate .F: w�,f�.:..0 j„i-::��-:•a.,r„tr . _ .;� � }�. ”"t5 i t.}. m4Y.'�.7�. t: w�l"i'."}'itg,*a F>•" t"'•ifi';ti.: c^ ,-r{`4. - 'f:5:+:rr� »�?r,, ':�R:�' ,�:•. „;''d' . rt.s 4r� { >1;,. ',,'``''t w,f\..x.;.r ..µii;-t,v:E3�Yjj':Jv"«w•_�'" G5`:. i.Si.. ,.#!°w�5..k 4• �•ry ,ia.4, i1."jyj✓ ,,z`;+'L'r , t`nt ..r`�r. i S {�f..{erj x: <:y,'-Yi i.i',ry '.— s•i�L-.v. ✓ '� --- ;,, ` 32" Long 2x3 Block 2x4 Block 2x4-12' Gable Plate •-e 2x4-12' Gable Plate ,t = 2x4 Block Do Not Fasten Truss begs to the 12' Board 4. Nail the 2x3-32" board where the trusses meet at the top. Secure with a 32" wood gusset: Apply wood glue between the gusset and 2x4s.Nail gusset using(20)twenty 6d common nails. 5. Turn the truss over and install a gusset to the other side of the truss. 6. Repeat to assemble(8) eight more trusses. I I Step 4 Assemble Roof Gables 1. Place (2)two truss halves together and secure the top with a 1"x4" barbed metal plate. 2. Nail a 32" long 2x3 board to the truss at the ridge with I Od sinkers. 3. Cut a 45" long 2x4 to fit and install in the center of the gable.Nail through gable plate with (2)two l Od sinkers. Secure the top with a barbed metal plate. 4. Place(2)two 40-3/4" long 2x4s 42-3/4" apart, (+)or(-) 1/4". Secure the bottom to the 2x4 gable plate by nailing through plate with l Od sinkers. Secure the top with barbed plates. 5. Install(2)two 30-3/4" long 2x4s with barbed plates and nails. 6. Nail truss leg to 12' Gable Plate with 10d sinkers.------ 45" Long 2x4 Cut to Fit 40-3/4" Long 2x4 :z ''w t:`:':t,;ra.=� ,° :"u. •:•: u. " 30-3 4 / Long 2x4 „r,'r•:�t-�Y.�� :.•�.�`zj,a;5'�"• .,:�,.`."=i�:"•� �s Gia:.,:-,�.d• y'Jaj 3y:",�s"k,.'=ao is�r.. •.. 1-�,�.".Fry 3: 'h�`.,':.�`'`` -.cv-`'j "- i M r. Yzl. p �..4'�"ik4y�.=„r- :,`• . tr'�x.V"15N;... ;.r.rq".. T'�<' "�: 32" Long 2x3 Block VW" Drive-on Plate 7. Position 2nd gable plate and repeat steps to assemble the front roof gable.Read note below: � If you want the loft doors to open, repeat steps 1-6 substituting number 3 with directions below: 3. Cut a 45"long 2x4 gable stud and install i-,r%�� r°`'"� �:.:,"';;.';tic;#' tom, r,�•,�. between the center gable studs. Secure �,.,,. yr 4 `x.•: 32-3/4" b plates. Install . .. with 1x4 metal barbed•., ,,. o., he this board 32-3/4" from t 2x4 plate.. ,'!a�'.;:., o-rti=. „-^• o:%.,fix;;. .moi; r:m•. �� ^':tzar "' i,'y";t i$;�'-,,,?. -.._<' Step 5 Apply Siding to Rear Roof Gable 1. Remove 2x4 blocks and turn gable frame over. \� 2. Install pre-cut siding on rear gable. First piece will have a'Tongue' edge. Start from left and " install siding extending 3/4" below gable plate. LAP Siding must not extend above the top frame. Use 8d galv.nails along gable plate and 6d galv. nails v on studs and truss frame. Space nails 12" apart. ;1 . Y 'Tongue' Edge ° Siding Extends 3/4" Below Plate ' k Step 6 Apply Trim to Rear Roof Gable 1. Install(2)two 61" long 1x4 gable trun flush with the top edge of the gable. Install the ends with blue marks together. Install trim with 8d galv. nails. 2. Install(2)two 42-1/2" long 1x4 gable trim flush with the side edge of the gable. n Blue Marks on End 61" Long 1x4 42-1/2" Long 1x4 j 1 I I Step 7 Apply Siding to Front Roof Gable 1. Install siding on right working left. Lay out the first(2)two pieces of siding on frame. Important: Do not nail to frame. Mark and cut so siding is flush with top and right side of opening. Cut to bottom of siding below gable plate.Nail first two pieces of siding to frame. Lay out next siding panel,do not nail, and repeat cut for left side door opening.Nail last two pieces of siding to frame. 2. Install(2)two 61" long 20 with blue marking at one end. Install this end at the top of front gable ony. Insure 20 is flush with gable frame. Use 10d sinkers. Blue ends 3. Install(2)two 42-1/2" long 2x3s. 61 Long 2x3 42-1/2" Long 2x3 .'"yam ''':"'.• t;• .i, � !. i V 4. Assemble the loft doors.The loft door frames are temporarily held together with corrugated fasteners, v this is the back side of the door frame.Place the doors on level surface,face side down.Cut the siding from above step to the size of the door frame. Secure the siding panel to the frame with 1"screws provided. EW Important Information on Framing and Siding Walls If installing the building on a cement slab cut the siding flush with the bottom plate. Square wall frame before installing siding. Measure diagonally (corner to corner)., The measurements will be the same when the wall is square. Pre-cut wall stud will measure 92-5/8" or 92-1/4" in length. If you are installing the optional walk-in door see the instructions at Step 24. I I a I I Step 8 Assemble Front Wall 1. Cut(2)two 2x4-12' boards to 11'- 5" in length. 2. Install(4)four pre-cut wall studs between the plates as shown below. 3. Install the 2x10 door header assembled in Step 7. 11're-cut wall studs and install under the door header. 2x - 4. Cut 2 ( )two p � 2x4 Plate x10 Door header --------- Assembled in Step 7 2x4 Header Supports E cut to fit Pre-cut Wall F Studs --------- 11' -5" > 2x4 Plate 17-1/2" 17-1/2" 417-1/211 99"Opening Between Wall Studs ' I IE ► 0 5. Cut a 4x8 siding panel in half and install the siding with the tongue edge on the left end.The siding will extend 3-1/2"beyond the end of the wall stud. Siding should extend 3/4" below the I bottom plate unless installing building on concrete slab. 6. Install(2)two 3-1/2" x 48" OSB fillers under the door header. 7. Install pre-cut siding from our kit over the door opening. ' •"X41: _. s 8. Install remaining siding panel on right side. v Tongue Edge Cut Edge 0513 Filler Siding Extends 3-1/2" Past 2x4 Stud I I - i I I i Step 9 Assemble Back Wall 1. Position(4)four 2x4x68-1/2"boards together and indicate with'X' marks where the wall studs will be located. Mark the ends that will butt together with the letters'A' and 'B'. 2. Install (8) eight pre-cut wall studs, between the 2x4 plates, over the'X' marks and where the plates butt. Use(2)two IOd sinkers at each end of stud.Nail walls together using l Od sinkers. 68-1/2" Wall Plate 68-1/2" Wall Plate X k A I B X X R Ix B X 19-3/4" rE 24" I 23-1/4" 24" 68-1/2" Wall Plate Pre-cut" Wall Studs 3. Install the 1st siding panel with the'LAP' edge extending 3-1/2" past the wall frame.The bottom will extend 3/4" below the bottom plate.Tip:Use 3/4" trim board as a gauge. 4. Install the other siding panels. Cut the last panel to extend 3-1/2" beyond the wall frame. E LAP Edge Siding Extends 3-1/2" be Past 2x4 Stud ' I I I I Step 10 Assemble Sidewalls 1. Position (2)two 2x4-48" boards and(2)two 2x4-72" boards together and indicate with'X' marks where the wall studs will be located. 48" Wall Plate 72" Wall Plate X N X1 I x N N x X Ix 1 X LX ix x 23-1/4" I I 23-1/4" j,F 24" 48" Wall Plate 's 72" Wall Plate 2. Install (7) seven pre-cut wall studs between the wall plates. Use(2)two l Od sinkers at each end of stud.Nail the frames together with 10d sinkers. 3. Repeat to assemble(3)three more 10' long sidewall frames.You will need to cut(2),two 64" long 2x4s to a length of 48" to assemble the last 48" wall frame. 4. Cut one of the 48"wide siding panels in half lengthways. 5. Select the 2'wide panel,with the 'tongue'edge,and install this panel with the'cut' edge 'flush with the end of the wall and extending 3/4" below the bottom plate. 6. Install(2)two more siding panels. Cut the siding flush with the bottom plate if installing the building on a cement slab. r f Tongue Edge / , • , r' r_: .. is r,F..-•' t -.1 Cut Edge Siding Extends 3/4" Below Plate: 7. Select(1)one of the 10'wall frames and repeat to apply siding to another sidewall 10' frame. I I r I ,f Step 11 Assemble Sidewalis Continued 1. Select one of the 10' sidewalls assembled in Step 10. Butt-a 10' wall frame against the wall with siding. DO NOT nail these frames together so they can be separated later. 2. Square the wall frame. Install a full width siding panel but do not nail along the long edge that overlaps the 10' wall frame.You can nail this edge after the wall panels are installed. This will enable you to separate the wall panels making them easier to handle. Do Not Nail Along This Edge -•..J, is , 6' Wall•Plate i 10' Wall Panel from Step 10 { t1( ,7 r- V ' 3. Install another full width siding panel and f the 2' wide siding panel. 4' Wall Plate i 4. Repeat to apply siding to the other 10'wall frame. I I Step 12 Set Walls 1. Set the back wall panel between the sidewalls. Secure wall panels together at the corners. Use(4)four l Od coated nails per corner.Nail wall panels to the floor.Nail through the bottom plate. Space 10d sinkers 24" apart. 2. Install the front wall frame between the sidewalls. 3. Nail along the siding edge where the sidewall siding panels overlap. 4. Remove the 2x4s from the shipping pallet and use them to brace the wall to hold them straight. i :F r ! \ - i••F rI .{,J•°y,`.•j .# i•J„ .r ~,tl r s�\'~ �g Nail Alan 2x4 Wall Siding Edge h • Brace 2x4 Bottom Plates { ' 4 5. Cut and remove the bottom 2x4 in the door opening. Step 13 Layout Loft Joist Spacing on 2x6 Beam ; Layout both beams for the spacing of the loft floor joists. The'X' marks where the floor joist will be placed. F. 4 I I Step 14 Install Loft Joist Pleaders & 2x6 Loft Beams •t 1. Install(2)two 68-1/2" long 2x4s on the back wall to support the floor joist. Install the 2x4s flush with the top of the 2x4 wall plate. Secure to wall studs with l Od sinkers. 2. Use the beam as a reference to mark where the floor joist will be placed. The 2x4 floor joist,when installed, will be aligned with the wall`studs. " 68-1/2" Long 2x4, 3 3. Repeat to install joist header support boards on the front wall. it 4. Install the rear 2x6 beam, 84" from the 2x4 joist header boards,with the'X' marks 0'in•the: beam facing the back wall.You can use a 2x4-7'board as a gauge to properly space the beam. ,t Refer to Step 15 to see how the loft floor joist will be installed. Place the notch under the top plate and support the beam by cutting a pre-cut wall sjudd aiid placing under the beam. Further secure the beam with a 3"wood screw through the;top of the wall plate. } 841, to 2X4 Joist Header 2*b g2 t: Back Wall f ------------------►► • r 2x4 Cut to Length 5. Repeat to Install the other beam with the'X' marks on the beam facing the front wall. When the front beam is installed there will be 56" between the beams , • 0 Step 15 Install Loft Floor Joists_ Install 84" long 2x4s between the front and 2x4 er Han rear beams and the 2x4s joist headers. Use 9 ' 2x4 hangers with hanger nails. Cover 'X' Marks on 2x6 Beams — - ' L y, r f Z Step 16 Install Loft Flooring 1. Install 7/16" OSB loft flooring on back loft floor joists. Loft flooring is flush with outside of ; top wall plate. Use 7d sinkers spaced 12"apart.See layout pattern below: 3-1/2"x 66" Ffl'ler X4 q8 AN' X96„F\oor 9 v 6"�o ring Ae r AN"A45A F\oor` ; • `f Y f T . s1 2. Repeat to install loft flooring at the front of the building. 3. Install 3-1/2"x 56"floor fillers on top of side wall plates between the loft flooring. I I ' I I Step 17 Install Wall Trim 1. Install (2)two 1 x4-8' corner trim on the back wall, flush with the siding on the sidewall and flush with the top of the loft flooring. Use 8d galy. nails. 2. Install (2)two 1x4-72"trim boards across the top of the back wall. Cut to fit. Install the 10 boards flush with the top of the loft flooring.See diagram below. f 3. Repeat steps for front wall trim. i A . Loft Floor 1x4 Trim _ • , - j; - .i• 1x4 72" Top Trim Cut to Fit Back and Front Walls Side' - - - - i 1 1x4-8' Corner Trim ; ,r ;i t , 1 •t I} I I a Step 18 Set Rear and Front Gables 1. Install the rear gable on the rear wall. The siding on the gable must extend over the I x4 trim i board, not behind it.See detail below. Nail gable to loft flooring. Use 10d nails. y 5 WARNING: The gable end's are heavy ' and awkward.You'll need helpers to lift and set gables in place. ; ♦ 3 t, f A T s: Bottom Edge of Gable Siding Overlaps Top Wall Trim Rear Gable & Wall ; a Step 19 Install 2x4 Truss Plates 1. Install a 72" long 2x4 tie plate against the rear t gable and flush with outside edge of wall plate' Rear Gable Cut a 2x4-12' board to finish. Use l Od nails. { 2. Repeat to install tie plates on the opposite side.' i , I 72"Tie Plate Cut 2x4-12To Fit ,t t r • i 3. Layout the truss spacing. Measure from the inside face of the 2x4 gable plate to rn,azk the } location of the first truss.The last truss space will be more than 24". t ; Important: When marking the opposite wall,place the'X'mark on the same side of line , so your trusses are parallel when they are installed. Rear Gable Measure from Rice,! of Gable Plate liti 18-3/4" 24" } { » i • I t i } 1 1� I I Step 20 Install Trusses & Soffit Boards 1. Place trusses over the'X' marks and secure ; trusses to 2x4 tie plate using 2x4 hangers and 1-1/2" hanger nails. 2. Locate 84"long soffit boards that have a beveled edge. Install one of these boards flush with the top of the siding and butting against the rear 4 gable trim. Secure soffit boards to the top wall plate with 3" long screws. Cut to length and Install the last soffit board to fit behind 2x3 boards on the front gable. Metal Truss Han er Before installing the overhang to tMo !,. sidewall,use a straight edge to make- sure the trusses are align with the beWel cut on the overhang board.Adjust 6p ' or down if necessary. Soffit Board Flush With Siding i( ?r'•' s Step 21 Install Roof Sheathing • 'i Straight Edge i 1. '4 3 1 ` 1. Install a 42"x 96"OSB roof panel flush with the face of the rear gable trim.Use a straight edge to align the top of the sheathing with the top of the truss. Continue adding sheathing following the layout on the next page. Use 7d sinkers, spaced 12" apart. % w' 2. Repeat step for opposite side. Ugg' To prevent the nails from protruding thought the bottom of the soffit board, do not nail at an angle when nailing roof sheathing to the soffit boards. '