Loading...
HomeMy WebLinkAboutZip Peconic Wells, Lloyd Zuckerberg Southold Town Board - Letter Board Meeting of January 19, 2016 or-, RESOLUTION 2016-137 Item# 5.27 ADOPTED, DOC ID: 11575 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2016-137 WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON JANUARY 19,2016: RESOLVED that the Town Board of the Town of Southold hereby accepts the security payment' in the-sum of$43,295.00 from the applicant, Lloyd Zuckerberg's attorney, Charles Cuddy, pursuant to Section 240-34 of the Southold Town Code for the approved Conservation Subdivision entitled"ZIP Peconic Wells, Lloyd Zuckerberg", SCTM#1000-86-1-10.9, as recommended by the Southold Town Planning Board, subject to the approval of the Town Attorney. Elizabeth A. Neville Southold Town Clerk RESULT: ADOPTED [UNANIMOUS] MOVER: Robert Ghosio, Councilman SECONDER:Louisa P. Evans, Justice AYES: Ghosio, Dinizio Jr, Ruland, Doherty, Evans, Russell Generated January 21, 2016 Page 39 ­ra t �n(jkc � OFFICE LOCATION: ®F S®(/ MAILING ADDRESS: Town Hall Annex jy® P.O. Box 1179 54375 State Route 25 ® l® Southold, NY 11971 (cor. Main Rd. &Youngs Ave.) v Southold, NY .p Telephone: 631 765-1938 ;.. www.southolcltovviy.gov CDUNT`(,� PLANNING BOARD OFFICE TOWN OF SOUTHOLD RECEIVED JAN 13 2016 January 12, 2016 Southold Town Clerk Charles Cuddy, Esq. P.O. Box 1547 Riverhead, NY 11901 Re: Draft Bond Estimate Approval/Accept Cash Bond: Conservation Subdivision Lloyd P. Zuckerberg, ZIP Peconic Wells Located on the southwest corner of Wells Rd. & NYS State Rt. 25 in Peconic SCTM#1000-86-1-10.9 Zoning District: R-80 Dear Mr. Cuddy: The Southold Town Planning Board adopted the following resolutions at a meeting held on Monday, January 11, 2016: WHEREAS, this approved subdivision is an 80/60 clustered Conservation Subdivision on 32.83 acres of land. Lot 1 equals 65,562 sq. ft., Lot 2 equals 77,694 sq. ft., and Lot 3 equals 29.5416 acres and is preserved through a Sale of Development Rights to the Town of Southold; and WHEREAS, on December 15, 2009, the agent submitted a Draft Bond Estimate in the amount of$43,295.00; and WHEREAS, on December 21, 2009, the Office of the Town Engineer agreed to the Bond Estimate in the amount of$43,295.00 submitted by the applicant's agent; be it therefore RESOLVED, that the Southold Town Planning Board hereby accepts the Draft Bond Estimate for Lloyd P. Zuckerberg in the amount of$43,295.00; and be it further RESOLVED, that the Southold Town Planning Board hereby accepts a Cash Bond submitted by the agent in the amount of$43, 295.00 and recommends the same to the Southold Town Board. } Zuckerberg Pae 12 January 12, 2016 If you have any questions regarding the above, please contact this office. Very truly yours, Donald J. Wil nski Chairman Encl. cc: Elizabeth A. Neville, Town Clerk C SCOTT A. RUSSELL r �C ��ri JAMES A. RICHTER, R.A. SUPERVISOR C IN `: ENGINEER TOWN HALL_ - 53095 MAIN ROAD �` ^• TOWN OF SOUTHOLD,NEW YORK 11971 Fax (631)-765-9015 Tel.(63 1)-765-1560 ]AMIE.RICHTER@TOWN.SOUTHOLD.NY.US OFFICE OF THE ENGINEER TOWN OF SOUTHOLD Martin H. Sidor December 21, 2009 Chairman- Planning Board , v Town Hall, 53095 Main Road Southold, New York 11971 �. l Re: Conservation Subdivision SEG 1 2909 Zip Peconic Wells, LLC r11--1-RA." on-AA-A11%A Dear Mr. Sidor: As per a request from your office, I have reviewed the BoMd',Estimate, dated 12111/09,that has been submitted for the construction related to the Final Road&Drainage Plan that has been reviewed for the above referenced Conservation Subdivision. Please consider the following: 1. The proposed Construction Cost Estimate submitted by the applicant forthe required Drainage Improvements is considered satisfactory. This construction estimate($43,295.00)should be used to establish a Bond for the Project. This item should also include a 6%Administration Feb($2,597.70)made payable to the Town of Southold. 2. C&R's should be established to require the dedication of proposed Drainage areas and/or the legal recording of Easements to the Town of Southold. This item should be reviewed and approved by the Town Attorneys Office. 3. Have C&R's been created and/or established to construct and vegetate the proposed ten (10')foot wide Retention Buffer shown on Lot#1? Will the Planning Board specify the type and quantity of plantings for this Buffer Area? Will there be C&R's established for the annual maintenance of this Buffer? If you have any questions regarding this review, please contact my office. Si er ly, r J es A. Richter, R.A. cc: Peter Harris,Superintendent of Highways Melissa Spiro,Land Preservation Coordinator I i X12/11/2009 10:57 631727Q'44 YOUNG YOUNG PAGE 03 December 11, 2009 Construction Cost Estimate for Certain Drainage Improvements Based on Final Road & Drainage Plan last dated September 17, 2009 prepared for ZIP PECONIC WELLS, LLC at Peconic, T/0 Southold, New York Me m o. tai, Description Dat,Cost Total Cost 1 3 Ea. Catch Basin $2,500,00 $ 7,500.00 2 11 C.Y. Rip Rap - 4" 100.00 1,100.00 .3 850 L.F. Slotted 15.00 12,750.00 H.D,I},E. Drainage Pipe 12" Dia. 4 2,289 CX Excavation, 5.00 11,445.00 Backfill & Grading - 5 5,250 S.Y. Topsoil & Seed 2.00 101500.00 Total = $ 43,295.00 Note: The estimated cost for maintenance of the proposed-drainage system, including cleaning catch basins & mowing grass, is $3,000.00 per year.