HomeMy WebLinkAboutZip Peconic Wells, Lloyd Zuckerberg Southold Town Board - Letter Board Meeting of January 19, 2016
or-,
RESOLUTION 2016-137 Item# 5.27
ADOPTED, DOC ID: 11575
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2016-137 WAS
ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON
JANUARY 19,2016:
RESOLVED that the Town Board of the Town of Southold hereby accepts the security payment'
in the-sum of$43,295.00 from the applicant, Lloyd Zuckerberg's attorney, Charles Cuddy,
pursuant to Section 240-34 of the Southold Town Code for the approved Conservation
Subdivision entitled"ZIP Peconic Wells, Lloyd Zuckerberg", SCTM#1000-86-1-10.9, as
recommended by the Southold Town Planning Board, subject to the approval of the Town
Attorney.
Elizabeth A. Neville
Southold Town Clerk
RESULT: ADOPTED [UNANIMOUS]
MOVER: Robert Ghosio, Councilman
SECONDER:Louisa P. Evans, Justice
AYES: Ghosio, Dinizio Jr, Ruland, Doherty, Evans, Russell
Generated January 21, 2016 Page 39
ra
t �n(jkc
�
OFFICE LOCATION: ®F S®(/ MAILING ADDRESS:
Town Hall Annex jy® P.O. Box 1179
54375 State Route 25 ® l® Southold, NY 11971
(cor. Main Rd. &Youngs Ave.) v
Southold, NY .p Telephone: 631 765-1938
;.. www.southolcltovviy.gov
CDUNT`(,�
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD RECEIVED
JAN 13 2016
January 12, 2016
Southold Town Clerk
Charles Cuddy, Esq.
P.O. Box 1547
Riverhead, NY 11901
Re: Draft Bond Estimate Approval/Accept Cash Bond: Conservation Subdivision
Lloyd P. Zuckerberg, ZIP Peconic Wells
Located on the southwest corner of Wells Rd. & NYS State Rt. 25 in Peconic
SCTM#1000-86-1-10.9 Zoning District: R-80
Dear Mr. Cuddy:
The Southold Town Planning Board adopted the following resolutions at a meeting held
on Monday, January 11, 2016:
WHEREAS, this approved subdivision is an 80/60 clustered Conservation Subdivision
on 32.83 acres of land. Lot 1 equals 65,562 sq. ft., Lot 2 equals 77,694 sq. ft., and Lot 3
equals 29.5416 acres and is preserved through a Sale of Development Rights to the
Town of Southold; and
WHEREAS, on December 15, 2009, the agent submitted a Draft Bond Estimate in the
amount of$43,295.00; and
WHEREAS, on December 21, 2009, the Office of the Town Engineer agreed to the
Bond Estimate in the amount of$43,295.00 submitted by the applicant's agent; be it
therefore
RESOLVED, that the Southold Town Planning Board hereby accepts the Draft Bond
Estimate for Lloyd P. Zuckerberg in the amount of$43,295.00; and be it further
RESOLVED, that the Southold Town Planning Board hereby accepts a Cash Bond
submitted by the agent in the amount of$43, 295.00 and recommends the same to
the Southold Town Board.
}
Zuckerberg Pae 12 January 12, 2016
If you have any questions regarding the above, please contact this office.
Very truly yours,
Donald J. Wil nski
Chairman
Encl.
cc: Elizabeth A. Neville, Town Clerk
C
SCOTT A. RUSSELL r �C ��ri JAMES A. RICHTER, R.A.
SUPERVISOR C IN `: ENGINEER
TOWN HALL_ - 53095 MAIN ROAD �` ^• TOWN OF SOUTHOLD,NEW YORK 11971
Fax (631)-765-9015 Tel.(63 1)-765-1560
]AMIE.RICHTER@TOWN.SOUTHOLD.NY.US
OFFICE OF THE ENGINEER
TOWN OF SOUTHOLD
Martin H. Sidor December 21, 2009
Chairman- Planning Board ,
v
Town Hall, 53095 Main Road
Southold, New York 11971 �. l
Re: Conservation Subdivision SEG 1 2909
Zip Peconic Wells, LLC
r11--1-RA." on-AA-A11%A
Dear Mr. Sidor:
As per a request from your office, I have reviewed the BoMd',Estimate, dated
12111/09,that has been submitted for the construction related to the Final Road&Drainage
Plan that has been reviewed for the above referenced Conservation Subdivision. Please
consider the following:
1. The proposed Construction Cost Estimate submitted by the applicant forthe
required Drainage Improvements is considered satisfactory. This construction
estimate($43,295.00)should be used to establish a Bond for the Project. This item
should also include a 6%Administration Feb($2,597.70)made payable to the Town
of Southold.
2. C&R's should be established to require the dedication of proposed Drainage
areas and/or the legal recording of Easements to the Town of Southold. This item
should be reviewed and approved by the Town Attorneys Office.
3. Have C&R's been created and/or established to construct and vegetate the
proposed ten (10')foot wide Retention Buffer shown on Lot#1? Will the Planning
Board specify the type and quantity of plantings for this Buffer Area? Will there be
C&R's established for the annual maintenance of this Buffer?
If you have any questions regarding this review, please contact my office.
Si er ly,
r
J es A. Richter, R.A.
cc: Peter Harris,Superintendent of Highways
Melissa Spiro,Land Preservation Coordinator I
i X12/11/2009 10:57 631727Q'44 YOUNG YOUNG PAGE 03
December 11, 2009
Construction Cost Estimate
for Certain Drainage Improvements
Based on Final Road & Drainage Plan
last dated September 17, 2009
prepared for
ZIP PECONIC WELLS, LLC
at Peconic, T/0 Southold, New York
Me m o. tai, Description Dat,Cost Total Cost
1 3 Ea. Catch Basin $2,500,00 $ 7,500.00
2 11 C.Y. Rip Rap - 4" 100.00 1,100.00
.3 850 L.F. Slotted 15.00 12,750.00
H.D,I},E.
Drainage Pipe
12" Dia.
4 2,289 CX Excavation, 5.00 11,445.00
Backfill &
Grading -
5 5,250 S.Y. Topsoil & Seed 2.00 101500.00
Total = $ 43,295.00
Note: The estimated cost for maintenance of the proposed-drainage
system, including cleaning catch basins & mowing grass, is $3,000.00
per year.