* * * RECEIPT * * *
Date: 07/25/17 Receipt#: 226429
Quantity Transactions Reference Subtotal
1 Excavation Permits 1219 $54730
Total Paid: $547.30
Notes:
Payment Type Amount Paid By
CK#38681 $39730 National, Grid - Gas Permits
Dept
CK#38764 $15000 National, Grid -Gas Permits
Dept
Southold Town Clerk's Office
53095 Main Road, PO Box 1179
Southold, NY 11971
Name: National, Grid -Gas Permits Dept
175 E Old Country Rd
Bld 3 FI 1
Hicksville, NY 11801
Clerk ID: LYNDAR Internal ID 1219
RECEIVED
Permit No. �o���_ •
TOWN OF SOUTHOLD �4�gUFFot,tco
HIGHWAY DEPARTMENT JUL z 5 Zp)
Pec nic Lane
Peconic,New York 11958
T101966638 (631)765-3140 Southold Town C!
APPLIC6TION/PERMIT FOR HIGIIWAY i-MCAVATIQN AND REPAIR
APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit
pursuant to Chapter 237 of the Code of the Town of Southold,Suffolk County,New York,and other applicable laws,ordinances or
regulations for each individual contiguous excavation project herein described. The applicant,agrees to comply with all applicable laws,
ordinances,codes"and regulations,the attached"General Conditions of Permit"and"Special Conditions",if any and to permit authorized
inspectors to make necessary inspections of tite jab site.
Print orTtmc Keyspan Gas East Corp D/B/A National Grid
Gas Permits Dept. Bldg: 3, FI: 1
1, 516 545 4094 175 E. Old Cduntry Rd Hicksville, NY 11801
Name of Applicant Phone Number Address of Applicant
2.
Name of Contractor Phone Number Address of Contractor
3.
Name,of Property Owner Requesting Service(irapplicable) ' Address of Owner
4 675 HILL RD, SOUTHOLD, N/S, 402' W/0 HARPER RD
Work Description and Location(Street Number,Hamlet,Cross Street)
(a) Is,constniction located within 75 feet of tidal wetlands? *Yes No
*If ycs,other Town permits may be required. , r
Margaret Paglia LGr
NOTE: All information requested by this Signature of Appiic
Application/Permit Form is
Required for a complete aIpplicatlonl 7/12/17
Date
S: (a) Attached plot pian to reasonably and adequately describe the proposed work. Provide accurate schematic site plan showing the
location of all proposed excavations and relationship to adjoining premises,public streets or areas,and give a detailed description'of,
all site and pavement restoration work.
(b) Attach all other necessary permits and licenses for this project. ,
(e) Work covered by this application may not commence before issuance ora Highway Excavation Permit by the
^Town Clerk.
6, Tax.MapNo.: District 1000 . Section_ �__, Block , Lot
7. Starting;Date: 8l Q/1 7 Completion Date: 8/11/17
8. Work Schedule: Phase Completion Mile
Excavation Work Schedule
Facility Installation Nlust'be provided
Backfill&Completion for consideration as a
Pavement Replacement Complete Application.-
9. Under which authority is application being made: Keyspan Gas East Corporation d/b/a National Grid
See Town Code Chapter 237(E)-Provide Resolution by,or authority from,the Utility being modified.
10. Estimated Cost or Proposed Work:
11. Remarks: OPEN (2) 4'X6'X3 1/2' bell holes and (1)1'x191'x3 1/2' trench in the N/S.grass area,
approx 402' W/0 Harper Rd to install gas,main and service.
D-39 1 K`of 3
r �
i
i
12. insurance Coverage:(Attach Copy)
(a) Insurance Company:
(b) Policy{i:
(c)State whether policy of certification on file with the Highway Department:
(d)Coverage required extended to the Town:
Any Loss including Bodily injury,property or commercial injury caused by or attributable to the work performed:
$1,000,000 per Occurrence and S 2,000,000 general aggregate.
13. Security:
(a)Surety Bond or Certified Check provided in the total Amount of$
(b)Maintenance Bond provided: 2 years or 3 years.
14. Fees for Applications and permits:
Basic Application Fee for Each Project Location - $150,00 3 c, ®®
A Project Location would include each Bell Hole and/or every road opening or excavation within any = -
50'Radius whether or not they may be inter-connected by open trench or directional boring.
The total number'of Project Locations shall be subject to the approval of.the Highway Superintendent,
Al. 2 /Service Connections excavations Q 520,00 S40.001
No.
A2. 1 Additional Excavations same service c(Qc 510.00 S
No.
B. Excavations 18"in depth or less
0-100 L.F.=$10.00;Additional L.F.@$0.10 S
C. Excavations IS"in depth to 5' in depth
0-100 L.F.=$30.00;Additional 991 x.30 L.F.®S0.30 S 57.30
D. Excavations 5'in depth and overt
0-100 L.F.=$50.00;Additional L.F.Q$0.50 $
E. Utility Repair Excavations t@$10.00 5
No.
Repairs same service Q$5,00 $
Additional --]]
TOTALS rpp7,-'3
F. Notice to public utilities proof must be provided and
Shall be attached to this application prior to issuance of permit.
Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excava' n permit to:
accordance tiv'th
this application and subject to the"General Conditions"and"Special Conditions"of permit(if a )n tacked h e
SUPERINTEN F
TOWN OF S •W
inceni M o
Date i
Date Received by the Town Clerk
Date Permit Issued a —1 Permit No.
NOTE: Permit expires one(1)year from date of issuance.
No work to start without 24 hour notice to Superintendent of Highways,
Permit must be available at all times for inspection,on site,during construction,
D-39 2 of 3
r
Copy Distribution:
Permit# _
Highway Department
Engineer(with page 3)
Applicant
Town Clerk(Original)
INSPECTOR'S RECORDS
Inspection Date Findings(use code) Applicant Notified
l st
2nd
3rd
4th
(To Permit Clerk)
REMARKS
CODE
IB Improper Barricades
IL Improper Lights
ST Sunken Trench or Excavation
UTM Unable to Measure(due to backfilling,)
BUC Building Under Construction
WIP Work In Progress
DB Improper Backfill(too high,not sufficient)
HFS Inspector Holding for Final Settlement of Excavation
RFR Ready for Repair
D-39 3 of 3
GENERAL CONDITIONS OF PERMIT
APPLICATIONMERMIT FOR HIGHWAY EXCAVATION AND REPAIR
I. Permittees Contractors-to Cont 1 witli Permit Re uireniciits: The Permittee is responsible for
informing its,independent contractors,employees,agents and assigns of their responsibility to comply with
this permit, including all speclaUsite specific and general conditions imposed by the Highway
Superintendent while acting as the permittees agent with respect to the permitted activities,and such
persons shall be required to comply with all permit requirements.
2. No Richt to Trespass or Interfere with Privnte Property Riahts: This permit docs not convey to the
`permittee any right to trespass upon the lands of adjacent'property owner's in order to perform the permitted
work nor does it authorize the impairment of any rights,title,or interest in Teal or`personal propertyheld or
vested in a person riot a party to the permit.
3. Protection of the Ilighwnv and Tuture IIighway Maintenance: If future operations or highway
maintenance'projects by the Town of Southold require an alteration in the position of the utility,,structure
or work herein authorized,'or if,in the opinion of the Highway Superintendent the work performed under
this permit shall cause unreasonable obstructionto required highway maintenance or endanger the health;
safety and/or welfare of vehicular or'pedestrian`traffic,this permit shall be revoked and the utility,
structtire,'fill,excavation,or other modification of the highway hereby authorized shall not be completed.
Additionally,the permit may be revoked if the Highway Superintendent finds that the issuance of the
permit was illegal or unauthorized or that the applicant failed to comply with any of the terms,and
conditions of the permit or.Chapter 237 of the Town Code.
4. Revocation of the Permit by the Highway Superintendent:_If the Highway Superintendent deems it
necessary yto revoke this'permit and the project hereby authorized has not been completed,the applicant
shall,without expense to the Town and to such extent and in such time and manner as the Superintendent
rraay-require,remove all orany portion of the unconipieted utility,structure or fill and restore the site to its
former condition.
5.' Native of Commencement: At least 24 hours prior to commencement of the project,the permittee and/or
contractor-shall notify the Town Highway Department in writing that they are fully aware of and
understand all terms and project conditions of this permit. Upon completion of th6work,the contractor
shall provide photographs of the completed work to the Town Highway Department and request a Final
inspection.
6., Storaee df Equipment&Materials: The storage of construction equipment and/or materials shall be
aonfned within the project work area and/or adjacent areas where permission/legal access has been
obtained in a mariner that does not interfere with normal highway traffic.
7. Utility Mark-Outs: The Applicant/Contractor shall be responsible for verification of all existing utility
mark-outs and shall take all precautions to protect same. Damage'to existing utilities shall be'the
responsibility of the contractor and shall be repaired afthe contractor's expense.
8. Road Closures: All scheduled road closures must first receive written permission from the Southold Town
Board prior to.closing a road. Temporary lane closures may be permitted with the approval of the Highway
Superintendent. This item will included but not be-limited to the installation of appropriate signage and
flag men to stop and start traffic to allow for single lane traffic. Road Closures due to unforeseen
emergencies require immediate notification of the Highway Department and shall be limited to immediate
and/or expedited restoration of the Work Zone.
,9. No Construction Debris in Road Shoulder Area: All Construction Debris shall be removed from the job
site on a daily basis. All stockpiled soil as well as all other project materials that will be staged'within the
/tight-of Way must-be delineated with reflective signage or other means to meet the minimum requirements
of the NYS DOT Construction Standards.
r ti •
GENERAL CONDITIONS OF PERMIT
APPLICATIONMERNIIT FOR HIGHWAY EXCAVATION AND REPAIR
(Continued)
10. Install.Maintain Erosion Controls: Required Erosion Control Measures(i.e.silt fencing)is to be placed
an the downslope edge of any disturbed area. This sediment barrier is to be put in place before any
disturbance of the ground occurs and is to be maintained in good functional condition until thick,vegetative
cover is'established.
11. Clean Fill Only: All project back-fill shall consist of clean sand,gravel or soil(NOT asphalt,slag,flyash,
broken concrete or`demolition debris). All unsuitable soils excavated at the site(i.e.Clay,Bog,etc)are to
be removed from the site and not used to backfill any excavation within a Town Highway.
12. All Areas of Soil Disturbance: All areas of soil disturbance resulting from the approved project shall be
stabilized to the satisfaction of the Highway Superintendent immediately following project completion. If
the project site remains inactive for more than 48 hours or planting is impractical due to the season,then
the area shall be stabilized with straw,hay mulch and/or jute matting until weather conditions favor
germination.
13. nue'lcGll&Compaction of nil Excavation's Back Fill shall consist of clean fill or soils which exhibit a
well-defined moisture density relationship as determined to be in accordance with ASTMD 698. Fill shall
be placed in maximum lifts of twelve(12')inches thick and shall be mechanically compacted to a Ninety-
five
inety-
f ve(95%)percent maximum dry density. Suitable hydraulic compaction by water jetting at three-foot
intervals will also be permitted subject to a project specific approval by the Highway Superintendent.
14. Restoration of the Road Shoulder Ar6: All man-made improvcmenls located within existing road
shoulder areas must be protected to the greatest extent practical. Items would include but not be limited to
driveway&private road aprons,mail boxes,sprinkler systems,trees and ornamental plantings..
Excavations through driveways and private road pavements must be reconstructed to meet al]requirements
ay
of Southold Town HighwSpecifications, All pre-existing.road shoulder improvements that have been
disturbed during construction must be replaced or repaired by the contractor to the satisfaction of the
Highway Superintendent.
15. Sctrentntic Plans with nil Technical information and Scene of Work: To reasonably and adequately
describe the proposed•work,accurate schematic site plans must be provided to show or indicate all
proposed construction activityrequired under this-permit. All Pavement surfaces scheduled for excavation
must be saw cut to the full depth of asphalt and/or concrete pavements. Accurate size of bell holes or width
of trenching must be indicated by dimension or labeling. This schematic site plan must provide details on
all restoration required to meet the requirements of these General Conditions and requirements found in the
Southold Town Highway Specifications.
16. Pavement Reconstruction: All Pavement sections must be reconstructed in the following manner,
(mote:When Concrete Pavements are Present.Please review Restoration requirements with the Highway Superintendent)
a) Complete all back-fill&soil compaction work as needed to provide a suitable sub-base;
b) Over-cut existing asphalt bell hole or trench by twelve(12")inches on all sides;
C) Install a compacted lift of 4"thick Stone Blend base(RCA Blend must meet NYS DOT Specification);
d) Install a two and one half(2.5")inch compacted lift of Asphalt Base Course;
c) Install a one and one half(1,5")inch of Asphalt(Type 6)Wearing Course. (Provide AC at all joints)
All work listed herein must meet the minimum requirements of the Southold Town Highway
Specifications.
17. Trenchine of Pavement Surfaces Exceeding One Hundred(1001)Fcet in Length: All trenching of
pavement surfaces exceeding 100' in length must first be reconstructed to meet the requirements of Item
#f 16 as noted above. Once all pavement reconstruction is completed to the satisfaction of the Highway
Superintendent,the entire road section and/or width of road over the entire length oftrench shall be
repaved with a two(21) inch lift of Asphalt(Type 6)Wearing Course(Typical,shoulder to shoulder).
sJ,y
y
Road Opening Permit Request nationalgrid
Municipality ot✓�f df So Work Order1p� jl'
Location: fo' 4;U Grid. /.0,S-/o- 3
Town: -ba&laa Requested By- A/,et&f r2-
Reason For Excavation: i�i%l+tL ZA5 M;4 A'R -56eVi6L