Loading...
HomeMy WebLinkAbout1000-57.-1-10 OFFICE LOCATION: O�*QF SU(/j�01 MAILING ADDRESS: Town Hall Annex P.O.Box 1179 54375 State Route 25 Southold, NY 11971 (cor. Main Rd. &Youngs Ave.) N ,r Southold,NY 11971 • �pQ Telephone: 631 765-1938 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM To: John Bredemeyer, President Town of Southold Board of Trustees From: Mark Terry, Principal Planner LWRP Coordinator Date: April 12, 2016 Re: Local Waterfront Revitalization Program Coastal Consistency Review for MICHAEL.DiLEONE SCTM# 1000-57-1-10 MICHAEL DiLEONE requests an Amendment to Wetland Permit#4771 to replace easterly 60' section of existing bulkhead and return in-place. Located: 940 Tarpon Drive, Southold. SCTM# 1000-57-1-10 The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is EXEMPT from LWRP review pursuant to: § 268-3. Definitions. MINOR ACTIONS items "II" which states: B. Replacement, rehabilitation or reconstruction of a structure or facility, in kind, on the same site (inplace), including upgrading buildings to meet building or fire codes, except for structures in areas designated by the Coastal Erosion Hazard Area (CEHA) law where structures may not be replaced, rehabilitated or reconstructed without a permit and shoreline erosion control structures (including, but not limited to, groins, jetties, bulkheads, filled piers) located within Great Peconic Bay, Cutchogue Harbor, Little Peconic Bay, Hog Neck Bay, Noyack Bay, Southold Bay, Shelter Island Sound, Pipes Cove, Orient Harbor, Gardiners Bay, Long Island Sound, Fishers Island Sound and Block Island Sound (excluding all creeks); Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Town of Southold D E C E LWRP CONSISTENCY ASSESSMENT FORM EAPRf 2016 1A. INSTRUCTIONS Southold Town - Planni q Boa d 1. All applicants for permits* including Town of Southold agencies, sh m�le�e irs�C@A- fo proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated. as to its significant beneficial and adverse effects upon the coastal area(which includes all of Southold Town). 3. If any question in Section C on this form is answered "yes" or "no", then the proposed action will -affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, each answer must be exrplained in detail, listing both supporting and non- supporting facts. If an action cannot be certified as consistent with the L policy standards and conditions,it shall not be undertaken. A copy of the LWRP is available in the following places: onlin t the Town of Southold's website(southoldtown.northfork.net), the Board of Trustees ffice, the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# l000 PROJECT NAME K G4c< �S It & // L 4 i tad The Application has been submitted to(check app opri a response): Town Board ❑ Planning Board❑ Building Dept. ❑ Board of Trustees Ell 1. Category of Town of Southold agency action(check appropriate-response): (a) Action-undertaken directly by Town agency(e.g.capital ❑ construction,planning activity,agency regulation,land transaction) ❑ (b) Financial assistance(e.g.gra t 1"oari,subsidy) (c) Permit, approval,license,certification: Nature and extent of.action: 4 1/14,, � �_ A4 Location of action: Site acreage: �� P�<! W., Present land use: /` ��✓�� Present zoning classification: 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: (b) Mailing address: �425 Z J'�✓� �' t (c) Telephone number:Area Code} 3 ) (d) Application number,if any: Will the action be directly undertaken,require funding, or approval by a state or federal agency? Yes ❑ No F�r If yes,which state or federal agency? C. Evaluate the project to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space,makes efficient use of infrastructure, makes beneficial use of a coastal location,and minimizes adverse effects of development. See LWRP Section III—Policies; Page 2 for evaluation criteria. ❑Yes ❑ No Not Applicable Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III—Policies Pages 3 through 6 for evaluation criteria ❑ Yes ❑ No VNot Applicable Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III—Policies Pages 6 through 7 for evaluation criteria ❑ Yes ❑ No 0 Not Applicable Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III—Policies Pages 8 through 16 for evaluation criteria PT Yes ❑ No ❑ Not Applicable Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III —Policies Pages 16 through 21 for evaluation criteria ❑ Yes ❑ No Not Applicable Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III—Policies; Pages 22 through 32 for evaluation criteria. ❑ ❑ Yes No Not Applicable Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section In — Policies Pages 32 through 34 for evaluation criteria. Yes [] No UNot Applicable Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III—Policies; Pages 34 through 38 for evaluation criteria. ❑ Yes ❑ No VNot Applicable PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III—Policies; Pages 38 through 46 for evaluation criteria. Pr F] Yell No U Not Applicable Attach additional sheets if necessary WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III-Policies; Pages 47 through 56 for evaluation criteria. ❑ Yes ❑ No ff Not Applicable Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III-Policies; Pages 57 through 62 for evaluation criteria. ❑Yes ❑ No 2Not Applicable ` Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III-Policies; Pages 62 through 65 for evaluation criteria. ❑ Yes ❑ No 2Not Applicable Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III-Policies; Pages 65 through 68 for evaluation criteria. ❑ Yes ❑ No dNot Applicable PREPARED BY V�J� Q l�i�� TITLE_ -c-y KV DATE ,�`� a�. .rte, .�® �. ,�, Y /�'- . e .. 4.R.._ .. .. ._,. .., ..... _.. / t, .��,. g{ - ,.�,-. 7 � �� ,. i+ a � y",• �%':, _. ,.�g t !, ty :'y� ` �. . 1�'�� t � � 1 � t -Irw ,, is t \ �}!, 441; f'•q'{ f �� ., _: `,1,{fes k e'{ira-k d r • Z'i, � V Y.1411..��'�+y(•1�.�1yy��{�{�,}X '� t�.'^ (r`lvfwj„{\y���1� ��f ITTl ��1 ���, \ iii�y�,l� �1 C g� i�� '1C\lit S i4� T!" t '�� �P��y�> •'C��i �+� rti„ ae �ia��'��ysh � k,'� ��� ��,,e£y�`fC t��)) r��"nA►'5*,,Y 'd �tti�s #r'<�if�i ' }� YP �,�.�ar+...'.t� F.�� °~ Vii.• i+,�-. , \�->!- � d:, «� L C +gam r s^ �C ',ys 7A-RPON W (o o j Cy l.lfy� cc o STREET ADDRESS OF PROJECT SITE: Z) –i 940 TARPON DRIVED VIEW RD. 2 SOUTHOLD, NY 11971 QZ w Z 1000-57-1-10 tn o p N w 1 MICHAEL Di LEONE / CO 0 ,0 > 940 TARPON DRIVE DSINA\W`� Gt?P\T7FP- *- w Lo 0 SOUTHOLD, NY 11971 - tx(5TI N� �(OUai= k VEGETATED WETLANDS BOUNDARIES �UkK}\E * DELINEATED BY J.E. FITZGERALD,JR. I2 �72oM SE ON 6/10/97. co2�of 6Ae'btC-+- —� �t-PLAOEHSNT- I KIP / �CISTINC-c�U�Kt{1 � "'9 15S,AOI—EPWFLOLA NOTES REGARDING DREDGING i YIELL6AR IAL CIANP L.. (S Colt GUFF UN NA C.I t L M� C°{�N�l___ Imo VIEu1J SC�,ItiE: CORPS OF ENGINEERS DATA PROJECT PLAN HONG AND PROPOSED DEPTHS IN DREDGE AREA Application regarding the ppro petty of DISTANCE FROM EXISTING PROPOSED PURPOSE: Replace several sections of bulkhead in 11,Iic ael DiLeone, SC` V # 1000-5' -1-10 BULKHEAD DEPTH DEPTH order to maintain integrity of the structure a a-c" 11-7 Represented by r U-4' z-a• PROPER-T PERMIT SPRY-ICES z a-ir z-9- LN Canal/basin off Shelter Island Sound P.O. Box 617. Cutchogue,IST- 11935 a' z-Ir V-3" James E Fitzgerald, Jr - 516-734-5800 4' 3 -T g-T DATUM: 1`7Z��' AT: Southold COUNTY: Suffolk STATE: New York July 10; 1997 on EE Qw� f0i,,ZO z o F�-G6R WITIA OF- 910�E 8 bbb � M 0 3411 x to, LID L - -1N (11 fl=i) ------ Tt7-- Edi E — i MATERIALS TO BE USED SHEATHING - _.- - A rq L ALL OTHER DIMENSIONAL LUMBER.TIMBER,AND PILES ARE CCA-TREATED.ALL HARDWARE IS _ GALVANIZED STEEL. l zi CORPS OF ENGINEERS DATA SECTION VIEW Al'plication reg d' th_e pro petty of PURPOSE: Replace several sections of bulkhead in Mic ael DiLeone, SC"lM 1#100)-57-1-10 order to maintain integrity of the structure. Represented by PROPF,R-T PERI\IT SERVICES IN: Canal/basin off Shelter Island Sound. P.O Box 617, Cutchogue, NZ 11935 DATUM: 1\41.W AT: Southold James E. Fitzgerald, Jr. 516-734-58001 COUNTY: Suffolk. STATE:New York July 10, 1997