HomeMy WebLinkAbout01/2017 SOUTHOLD PLANNING BOARD Monthly Report Summary, January, 2017 Planning Board Applications Currently Processing Subdivisions: 17 Site Plans: 22 New this Month Subdivisions: 1 Site Plans: 1 Application Fees Collected: $9,840.90 Park & Playground Fees Collected: $14,000.00 Site Plan and Subdivision Application Concept Meetings: 4 Site Plan and Subdivision Application Pre-submission Meetings: 1 Counter Visits: 29 Phone Calls: 149 Actions Taken at Public Meeting Public Hearings: 2 Subdivision Decisions: 6 Referrals for Comments from Other Boards ZBA: 1 LWRP Consistency Reviews: 21 Planning Board Monthly Report - Subdivisions IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦĻ œƚƓĻ{ƷğƷǒƭ SubmittedRecent Activity/ƚƒƒĻƓƷƭ /ǒƷĭŷƚŭǒĻ Big Bing & Little Bing95.-1-7.2 CONSERVATION AC R-PENDING ВΉЊЉΉЋЉЊЎЋΉЋАΉЊА Work session SUBDIVISION 80 discussion re: road design & location Hazard Subdivision103.-2-1 STANDARD R-80 PENDING БΉЊБΉЋЉЊЏЋΉЊАΉЊА Review for SUBDIVISION completeness Joint Industry Board & 83.-2-17.1 RESUBDIVISION AC PENDING ЋΉЊЋΉЋЉЊЏАΉЊЊΉЊЏ Waiting on new design (LOT LINE McBride MODIFICATION) Krupski & Zachariadis 97.-8-31.2 RESUBDIVISION R-80 PENDING ЍΉБΉЋЉЊЏЎΉЋΉЊЏ Waiting on applic (LOT LINE revisions & ZBA MODIFICATION) Martz, Theodore C., Jr.104.-12-6.1 STANDARD R-40 CONDITIONAL ЍΉЋЋΉЋЉЊЎЋΉЊАΉЊА Responded to SUBDIVISIONPRELIMINARY applicant's requests APPROVAL re: drainage SUBDIV installation & performance guarantee 9ğƭƷ ağƩźƚƓ Philippou & Vallas31.-2-7 RESUBDIVISION R-40 PENDING ЊЋΉЊЍΉЋЉЊЎЊΉВΉЋЉЊА Set hearing for Feb. (LOT LINE MODIFICATION) CźƭŷĻƩƭ LƭƌğƓķ Miller & Brinckerhoff8.-1-4.16 RESUBDIVISION R-120 PENDING ЊΉЊБΉЋЉЊАЋΉЊАΉЊА Reviewing for (LOT LINE completeness MODIFICATION) Friday, February 24, 2017Page 1 of 3 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦĻ œƚƓĻ{ƷğƷǒƭ SubmittedRecent Activity/ƚƒƒĻƓƷƭ Ridgway6.-1-3 STANDARD R-80 CONDITIONAL ЊЋΉЋЌΉЋЉЊЌЏΉЏΉЊЏ Waiting for applic to SUBDIVISIONPRELIMINARY submit Final Plat APPROVAL Applic. SUBDIV ağƷƷźƷǒĭƉ Estates at Royalton113.-7-19.23 STANDARD AC CONDITIONAL ЏΉЊЊΉЋЉЊЎЋΉЋЊΉЊА Waiting for revised SUBDIVISIONFINAL Final Plat APPROVAL SUBDIV STANDARD B CONDITIONAL ЋΉЊБΉЋЉЊЍЊΉЋЌΉЊА Harold R. Reeve & Sons140.-1-6SEQR review for SUBDIVISIONSKETCH subdivision and APPROVAL change of zone in SUBDIV process. Koehler Family Limited 115.-10-1 STANDARD R-80 CONDITIONAL ЍΉЏΉЋЉЊЋБΉБΉЊЏ Waiting for applic to SUBDIVISIONSKETCH Partnershiprespond to required APPROVAL map changes SUBDIV Noone, Margaret143.-1-4.1 STANDARD B and CONDITIONAL ЊΉБΉЋЉЊЉЊЉΉЊΉЊЏ Waiting for applic to SUBDIVISION R-40 PRELIMINARY submit Final Plat APPROVAL Applic SUBDIV hƩźĻƓƷ Mazzoni, 500 Soundview 13.-2-8.2 STANDARD PENDING ЌΉЊЋΉЋЉЊЍЋΉЏΉЊА Reviewed Report on SUBDIVISION Drive, LLCWater quality from applicant Orient Acres14.-2-25 STANDARD R-80 PENDING ЎΉЊАΉЋЉЊЏЏΉЏΉЊЏ Applic. incomplete SUBDIVISION Tuthill Conservation 17.-4-16 CONSERVATION R-80, PENDING АΉЋΉЋЉЊЍЍΉЍΉЊЏ Waiting on DEIS SUBDIVISION R-200 Subdivision tĻĭƚƓźĭ Beninati, Lee & Marie74.-3-15 STANDARD RO CONDITIONAL ЎΉЊЌΉЋЉЊЍЌΉЋЊΉЊЏ Waiting for requested SUBDIVISIONSKETCH items to be APPROVAL submitted. SUBDIV Friday, February 24, 2017Page 2 of 3 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦĻ œƚƓĻ{ƷğƷǒƭ SubmittedRecent Activity/ƚƒƒĻƓƷƭ {ƚǒƷŷƚƌķ Stanton, Phil & Jennifer64.-1-29 STANDARD R-40 CONDITIONAL ЊΉЊБΉЋЉЊЋЊЉΉЌΉЊЏ Waiting on applicant SUBDIVISIONFINAL to fulfill conditions. APPROVAL SUBDIV Sutton, Alexander & Tracy78.-9-54 STANDARD CONDITIONAL ЎΉЋЉΉЋЉЉБЍΉЍΉЊЏ Waiting for applic to SUBDIVISIONPRELIMINARY submit Final Plat APPROVAL Applic SUBDIV Friday, February 24, 2017Page 3 of 3 Planning Board Monthly Report - Site Plans IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦϜƚƓĻ{ƷğƷǒƭ{ǒĬƒźƷƷĻķbĻǣƷ {ƷĻƦƭͲ /ƚƒƒĻƓƷƭ /ǒƷĭŷƚŭǒĻ Ackermann Agricultural Barn 102.-4-6.1 SITE PLAN AC PENDING 8/29/2016Public hearing 10/3/16 held AGRICULTURAL open to 11/7/16 and extended for written comment to 11/21/16 then closed. PB sent ZBA a request to interpret the proposed use of the barn 12/2/16 Chris Mohr Lawncare Shed 96.-1-20.1 SITE PLAN LI PENDING 2/13/2017Amended application to be Amendedreviewed for completeness at PB's 3/13/17 work session E. Lopez Nursery97.-3-3.1 SITE PLAN LB PENDING 6/23/2016Referral review conducted 10/24/16; NYSDOT permit needs to be obtained; PB required revisions to site plan and have not been submitted as of 2/23/17 SITE PLAN LB PENDING East End Tick & Mosquito 97.-3-23/30/2015Revised plans reviewed by PB Pest Control12/19/16; revisions required Heritage at Cutchogue 2015102.-1-33.3 SITE PLAN HD PENDING 1/2/2015Approved with 43 conditions RESIDENTIAL 11/7/16; Conditions must be met before the Chairman can endorse the site plan Friday, February 24, 2017Page 1 of 5 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦϜƚƓĻ{ƷğƷǒƭ{ǒĬƒźƷƷĻķbĻǣƷ {ƷĻƦƭͲ /ƚƒƒĻƓƷƭ Sannino Winery & Tasting 101.-1-14.4 SITE PLAN AC PENDING 8/25/2015Two primary concerns about Roompotential impacts regarding proposed building/parking location and traffic safety were discussed at PB's 1/23/17 and 2/6/17 work sessions. The Planning Board and staff have since been working with the applicant and their design team to revise the site plan to provide mitigation for these concerns. Revised site plan not submitted as of 2/23/17. Terp Retail102.-5-4 SITE PLAN HB PENDING 5/23/2016Visual impact analysis required by PB not yet submitted as of 2/23/17. Threes Brewing East83.-3-4.9 SITE PLAN LI PENDING 7/29/2016SCDHS approval outstanding and applicant needs to provide proof of filing C&R's as of 2/23/17 CźƭŷĻƩƭ LƭƌğƓķ Fox Lane Residences12.-1-1.2 SITE PLAN AHD PENDING 2/1/2016SCDHS approval outstanding as of 2/23/17 DƩĻĻƓƦƚƩƷ Matchbook Distillery48.-2-44.3 SITE PLAN LI PENDING 9/23/2016Public hearing closed 1/9/17; referral review conducted 1/23/17 with revisions to site plan and photometric plan required; not submitted as of 2/23/17 \[ğǒƩĻƌ Friday, February 24, 2017Page 2 of 5 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦϜƚƓĻ{ƷğƷǒƭ{ǒĬƒźƷƷĻķbĻǣƷ {ƷĻƦƭͲ /ƚƒƒĻƓƷƭ Country Car Wash Additions125.-1-19.5 SITE PLAN B PENDING 6/17/2016Amended site plan application requires special exception and an area variances as per the revised notice of disapproval issued 11/16/16; ağƷƷźƷǒĭƉ 13400 Main Road Corp.114.-11-9.6 SITE PLAN HB PENDING 11/10/2015Public hearing closed 1/9/17, PB conducted referral review 1/23/17 and required revisions to the site plan; hƩźĻƓƷ Verizon Wireless at MGH 15.-9-8.1 SITE PLAN MII PENDING 6/2/2016Public hearing held and WIRELESS Enterprisesclosed 9/12/16; referral review forthcoming; ZBA area variance required and Special Exception by PB for a co-location extension of 20'; tĻĭƚƓźĭ SITE PLAN B PENDING Berry & Berry, LLC75.-5-1312/2/2014Public hearing held and closed 6/1/15; referral review conducted 7/6/15; SCDHS approval outstanding as of 2/23/17 {ƚǒƷŷƚƌķ Lucas Ford59.-3-32.1 AMENDED SITE B PENDING 12/10/2014Applicant working on new PLAN design with Ford Company after preliminary (positive) review with ARC Friday, February 24, 2017Page 3 of 5 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦϜƚƓĻ{ƷğƷǒƭ{ǒĬƒźƷƷĻķbĻǣƷ {ƷĻƦƭͲ /ƚƒƒĻƓƷƭ North Fork United Methodist 63.-1-15 SITE PLAN LB PENDING 2/10/2016Application found Churchincomplete for review 3/21/16 and 12/5/16; application materials and photometric plan required have been submitted to be reviewed for completeness at PB's 2/27/17 work session North Fork Woodworks61.-1-15.3 SITE PLAN HB PENDING 3/9/2016Application found incomplete at PB's 3/21/16 work session; revisions and additional information required and not submitted as of 2/23/17 Polak Agricultural Barn55.-6-34 SITE PLAN R-80 PENDING 2/17/2017 Purita Winery51.-3-5 SITE PLAN AC PENDING 8/2/2016Referral review conducted 1/9/17 with revisions to site plan required along with approval from SCDHS; not provided as of 2/23/17 SITE PLAN B PENDING Southold Gas Station & 55.-5-2.23/31/2015DEIS found inadequate for Convenience Storepublic review on 10/24/16 and for a second time on 1/23/17; required information (including visual impact analysis) not submitted as of 2/23/17 Surrey Lane Vineyard69.-5-18.1 SITE PLAN AC PENDING 8/29/2016Public hearing adjourned 12/5/16 and request sent by PB to ZBA for code interpretation on winery & tasting room Friday, February 24, 2017Page 4 of 5 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦϜƚƓĻ{ƷğƷǒƭ{ǒĬƒźƷƷĻķbĻǣƷ {ƷĻƦƭͲ /ƚƒƒĻƓƷƭ The Enclaves63.-3-15 SITE PLAN HB PENDING 1/31/2017New site plan application requires special exception from ZBA; PB and ZBA to discuss most efficient process on 3/1/17. ZBA may take lead agency for SEQR with support help from Planning Board/staff who would also manage (possible) consultant Friday, February 24, 2017Page 5 of 5