Loading...
HomeMy WebLinkAboutPermit TERMS AND CONDITI®NS The Permittee Mattituck Park District, 5155 Breakwater Road, Breakwater Beach,Mattituck, New York as part of the consideration for the issuance of the Permit does understand and prescribe to the following: 1. That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for damages, of suits arising directly or indirectly as a result of any operation perfonned pursuant to this permit, and the said Permittee will,at his or her own expense,defend any and all such suits initiated by third parties, and the said Permittee - -- —- assumes full liability-with-respect-thereto,to the complete exclusion of the Board of Trustees of the Town of Southold. 2. That this Permit is valid for a period of 24 months, which is considered to be the estimated time required to complete the work involved,but should circumstances warrant,request for an extension may be made to the Board at a later date. 3. That this Permit should be retained indefinitely,or as long as the said Permittee wishes to maintain the structure or project involved,to provide evidence to anyone concerned that authorization was originally obtained. 4. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. 5. That there will be no unreasonable interference with navigation as a result of the work herein authorized. 6. That there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. 7. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized,or if, in the opinion of the Board of Trustees, the work shall cause unreasonable obstruction to free navigation,the said Permittee will be required,upon due notice,tb remove or alter this work project herein stated without expenses to the Town of Southold. 8. That the said Board will be notified by the Permittee of the completion of the work authorized. 9. That the Permittee will obtain all other permits and consents thatmay be required supplemental to this permit,which may be subject to revoke upon failure t6 obtain same. 10. No right to trespass or interfere with riparian rights. This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit. no President So(/ry® Town Hall Annex Michael J.Domino, �� �� John M.Bredemeyer III,Vice-President 54375 Route 25 P.O.Box 1179 Charles J.Sanders v, Southold,New York 11971 Glenn Goldsmith ® ^�JQ Telephone(631) 765-1892 A.Nicholas Krupski �l���UNTY���v Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD January 18, 2017 Christopher F. Dwyer L. K. McLean Associates 437 South Country Road Brookhaven, NY 11719 RE: , MATTITUCK PARK DISTRICT 5155 BREAKWATER ROAD, BREAKWATER BEACH, MATTITUCK SCTM# 1000-99-2-19.1 Dear.Mr. Dwyer: The Board of Town Trustees took the following action during its regular meeting held.on Wednesday, January 18, 2017 regarding the above matter: WHEREAS, L. K. McLean Associates on behalf of MATTITUCK PARK DISTRICT applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, application dated September 9, 2016, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations,-and, WHEREAS, the LWRP Coordinator recommended that the proposed application be found Inconsistent with the LWRP due to noncompliance to Chapter 111 of the Southold Town Code, Coastal Erosion Hazard Areas, and, WHEREAS, the Board of Trustees has furthered Policies 4 and 6.3 of the Local Waterfront Revitalization Program to the greatest extent possible through the imposition of the following Best Management Practice requirements: the proposed steel shade shelter was relocated to an area accessed more by the public in order to help protect the existing beach grass and vegetation that is located around the originally proposed location; and 2 WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on October 19, 2016 and again on January 18, 2017, at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, _ WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the structure complies with the standards set forth in Chapter 275 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOLVED, that for the mitigating factors and based upon the Best Management Practice requirement imposed above, the Board of Trustees deems the action to be Consistent with the Local Waterfront Revitalization Program pursuant to Chapter 268-5 of the Southold Town Code, and, RESOLVED, that the Board of Trustees approve the application of MATTITUCK PARK DISTRICT to install a 25' wide by 40' long steel shade shelter supported by six (6) foundation columns over a proposed 4" (25'x40') concrete slab; and to install an approximately 12'x24' timber deck fastened onto the existing concrete slab that is attached to the existing lifeguard building; and as depicted on the site plan prepared by L. K. McLean Associates, P.C., last dated November 17, 2016, and stamped approved on January 18, 2017. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of$50.00 per inspection. (See attached schedule.) Fees: $ 50.00 Very truly yours, Michael J. Domino President, Board of Trustees MJD/eac John M.Bredemeyer III,President o� S® yo Town Hall Annex Michael J.Domino,Vice-President �O l0 54375 Route 25 P.O.Box 1179 Glenn Goldsmith Southold,New York 11971 A.Nicholas Krupski G ® @ Telephone(631)765-1892 Charles J.Sandersy00U01 'O Fax(631) 765-6641 � �� BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE 4A Pre-construction, hay bale line/silt boom/silt curtain qA 1 st day of construction Y2 constructed Project complete, compliance inspection Via aOUTHOL.D NFs57C) Issued Tcda*Aack PoeDade THIS NOTICE MUST BE DISPLAYED DURING CONSTRUCTION TOWN TRUSTEES OFFICE,'FOWN OF SOUTHOLD SOUTHOLD, N.Y. 11971 TEL: 765.1892 Michael J.Domino,President OQrotFFOIA,'0� , Town Hall Annex John M.Bredemeyer III,Vice-President �� Gy 54375 Route 25 Charles J.Sanders y P.O.Box 1179 Glenn Goldsmith Southold,NY 11971 A.Nicholas Krupski � gyp@'�S Telephone(631)765-1892 Fax(631)765-6641 �rcrz-xuv BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD TO: 4.k, fVcl_e4�_.n AS C_ am_/rJQf-F GP Mo- Pa!'��is7T`c� Please be advised that your application dated 5 Ger- ?CIW/61 has been reviewed by this Board at the regular meeting of and your application has been approved pending the completion of the following items checked off below. Revised Plans for proposed project Pre-Construction Hay Bale Line Inspection Fee ($50.00) 1St Day of Construction ($50.00) % Constructed ($50.00) Final Inspection Fee ($50.00) Dock Fees ($3.00 per sq. ft.) The Permittee is required to provide evidence that the non-turf buffer condition of the Trustee permit has been recorded with the Suffolk County Clerk's Office as a notice covenant and deed restriction to the deed of the subject parcel. Such evidence shall be provided within ninety (90) calendar days of issuance of this permit. Permit fees are now due. Please make check or money order payable to Town of Southold. The fee is computed below according to the schedule of rates as set forth in Chapter 275 of the Southold Town Code. The following fee must be paid within 90 days or re-application fees will be necessary. You will receive your permit upon completion of the above. COMPUTATION OF PERMIT FEES: 4S0 0 0 ��� MO IP TOTAL FEES DUE: $ O o,i i Iv�l I BY: Michael J. Domino, President Board of Trustees r John M. Bredemeyer III, Presi Town Hall Annex Michael J. Domino, Vice-Presse urn y���0 ooGy�:., — 54375 Route 25 Glenn Goldsmith i= 3 P O. Box 1179 A. Nicholas Krupski o *h Southold, NY 11971 Charles J. Sanders 9 ® p�` Telephone (631) 765-1892 �o� �a Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Date/Time: V17/19 Completed infield by: L.K. Mclean Associates on behalf of MATTITUCK PARK DISTRICT requests a Wetland Permit and a Coastal Erosion Permit to install a 25' wide by 40' long steel shade shelter supported by six (6) foundation columns over a proposed 4" (25'x40') concrete slab; and to install an approximately 12'x24' timber deck fastened onto the existing concrete slab that is attached to the existing lifeguard building. Located: 5155 Breakwater Road, Breakwater Beach, Mattituck. SCTM# 1000-99-2-19.1 CH. 275-3 - SETBACKS WETLAND BOUNDARY: Actual Footage or OK=� Setback Waiver Required 1. Residence: 100 feet 2. Driveway: 50 feet 3. Sanitary Leaching Pool (cesspool): 100 feet 4. Septic Tank: 75 feet 5. Swimming Pool and related structures: 50 feet 6. Landscaping or gardening: 50 feet 7. Placement of C&D material: 100 feet TOP OF BLUFF: 1. Residence: 100 feet 2. Driveway: 100 feet 3. Sanitary leaching pool (cesspool) 100 feet: 4. Swimming pool and related structures: 100 feet Public Notice of Hearing Card Posted: Y / N Ch. 275 Ch. 111 SEQRA Type: 1 II Unlisted Action Type of Application: Pre-Submission Administrative Amendment L.,,/Wetland —Coastal Erosion Emergency Violation Non-Jurisdiction Survey <_ 5 years: Y/N Wetland Line by: C.E.H.A. Line Additional information/suggested mod ifications/cond itions/need'for outside review/consultant/application completeness/comments/standards: 41, \.,A�_VN A� Co,,r, '� o.ppToye_ unolac Cosslcxl Eco5ion F10.ce S411COC UTe_ I Cv<'11c�__11412/ fJ&_n!5 U$= 40 ' Sw;r45 Present were: ✓ J. Bredemeyer ,/ M. Domino /G. Goldsmith A. Krupski JC. Sanders Other Page 1 of 2 John M Bredemeyer III, Presi� �ogOFFO(o Town Hall Annex Michael J. Domino, Vice-Presiia&hl �� Gym, 54375 Route 25 Glenn Goldsmith o P.O. Box 1179 A. Nicholas Krupski o Southold, NY 11971 Charles J. Sanders Telephone (631) 765-1892 Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Date/Time: Completed in Work Session by: L.K. Mclean Associates on behalf of MATTITUCK PARK DISTRICT requests a Wetland Permit and a Coastal Erosion Permit to install a 25' wide by 40' long steel shade shelter supported by six (6) foundation columns over a proposed 4" (25'x40') concrete slab; and to install an approximately 12'x24' timber deck fastened onto the existing concrete slab that is attached to the existing lifeguard building. Located: 5155 Breakwater Road, Breakwater Beach, Mattituck. SCTM# 1000-99-2-19.1 Ch. 275-12 - STANDARDS FOR ISSUANCE OF PERMIT MET=X or Comment=* A. Adversely affect the wetlands of the Town: B. Cause damage from erosion, turbidity or siltation: C. Cause saltwater intrusion in the fresh water recourses of the Town: D. Adversely affect fish, shellfish or other beneficial marine organisms, aquatic wildlife & vegetation or the natural habitat thereof: E. Increase the danger of flood and storm-tide damage:. F. Adversely affect navigation tidal waters or the tidal flow of the tidal waters of the Town: G. Change the course of any channel or the natural movement or flow of any waters: H. Weaken or undermine the lateral support of other lands in the vicinity: I. Otherwise adversely affect the health, safety and general welfare of the people of the Town: J. Adversely affect the aesthetic value of the wetland and adjacent areas: Ch. 111-9 - ISSUANCE OF PERMIT MET=X or Comment=* A. Is reasonable and necessary, considering reasonable alternatives to'the proposed activity and the extent to which the proposed activity requires a shoreline location: B. Is not likely to cause a measurable increase in erosion at the proposed site and at other locations: C. Prevents, if possible, or minimizes adverse effects on natural protective features and their functions and protective values, existing erosion protection structures and natural resources: D. :525% Expansion/Calculation Work Session Notes Application Complete r SEQRA Classification Confirmed Coordinated Review Y/N Pos/Neg Declaration CAC: -L-WRP: Additional information on comments/to be discussed/Public Hearing: Date: Completed By: Present: J. Bredemeyer M. Domino G. Goldsmith N. Krupski C. Sanders E. Cantrell D. Di Salvo Other Page 2 of 2 _ ` t Cantrell, Elizabeth From: Chris Dwyer <cdwyer@lkma.com> Sent: Tuesday,August 30, 2016 9:57 AM To: Bredemeyer,John Cc: Cantrell, Elizabeth; Domino, Michael Subject: FW: NYSDEC Tidal Wetland Approval for Breakwater Beach Pavilion Attachments: Permit Plans - Breakwater Beach - Stamped by NYSDEC.pdf,Tidal Wetlands Permit- Breakwater Beach.pdf Good morning John, Our office will be hand delivering the hard copies of the plans for your review and use. We will also complete the required applications as defined in your email. Our office received a tidal wetlands permit issued by the NYSDEC for this project. We thought the Trustees Office may want a copy of this approval. Regards, Christopher F. Dwyer,Associate L.K.McLean Associates PC 437 South Countiy Road Brookhaven, New York 11719 Phone: (631)286-8668 Fax. (631)286-6314 Cell: (516) 779-4776 From: Chris Dwyer Sent: Monday, August 29, 2016 3:16 PM To: 'Lydia Tortora' Cc: grammyoftwins@gmail.com; 'mike ryan'; Nicholas Deegan (nicholasfdeegan@gmail.com) Subject: NYSDEC Tidal Wetland Approval for Breakwater Beach Pavilion Good afternoon, Attached you will find the Tidal Wetland Permit for the pavilion at Breakwater Beach. We are providing the Town Trustees with more information in order for them to send the submission to the Town Board for a decision. Regards, Chris 1 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATIC I Division of Environmental Permits,Region 1 SUNY @Stony Brook,50 Circle Road,Stony Brook,NY 11790 I P:(631)444-03651 F:(631)444-0360 AUG 3 0 2016 www.dec.ny gov Southold lawn BQaW f Tr August 25, 2016 Mattitwck Park District _-- - P.O. Box 1413 = Mattituck, NY 11952-0997 AUG 2 9 2016 RE: Permit No.: 1-4738-01061/00003 Dear Permittee: In conformance with the requirements of the State Uniform Procedures Act (Article 70, ECL) and its implementing regulations (6NYCRR, Part 621) we are enclosing your permit for the referenced activity. Please carefully read all permit conditions and special permit conditions contained in the permit to ensure compliance during the term of the permit. If you are unable to comply with any conditions please contact us at the above address. Also enclosed is a permit sign which is to be conspicuously posted at the project site and protected from the weather and a Notice of Commencement/Completion of Construction. Please note, the permit sign and Notice of Commencement/ Completion of Construction form are sent to either the permittee or the facility application contact, not both. Sincerely, - G2�� Laura J. Sc azzo Permit Administrator LJS/Is NEwYoeK I Department of NE odm Environmental Conservation