Loading...
HomeMy WebLinkAbout12/2016 SOUTHOLD PLANNING BOARD Monthly Report Summary, December, 2016 Planning Board Applications Currently Processing Subdivisions: 18 Site Plans: 20 New this Month Admin./Inspection Fees Collected: $4,000.00 Site Plan and Subdivision Application Concept Meetings: 2 Site Plan and Subdivision Application Pre-submission Meetings: 3 Counter Visits: 24 Phone Calls: 156 Actions Taken at Public Meeting Public Hearings: 3 Site Plan Decisions: 9 Subdivision Decisions: 2 Referrals for Comments from Other Boards  ZBA: 2 LWRP Consistency Reviews: 18 Planning Board Monthly Report - Subdivisions IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦĻ œƚƓĻ{ƷğƷǒƭ SubmittedRecent Activity/ƚƒƒĻƓƷƭ /ǒƷĭŷƚŭǒĻ Big Bing & Little Bing95.-1-7.2 CONSERVATION AC R-PENDING ВΉЊЉΉЋЉЊЎЊЉΉЋАΉЊЏ Appl.revising plans SUBDIVISION 80 for County PDR Hazard Subdivision103.-2-1 STANDARD R-80 PENDING БΉЊБΉЋЉЊЏЊΉЋЏΉЋЉЊА New plans submitted SUBDIVISION RESUBDIVISION AC PENDING ЋΉЊЋΉЋЉЊЏАΉЊЊΉЊЏ Joint Industry Board & 83.-2-17.1Waiting on new design (LOT LINE McBride MODIFICATION) Krupski & Zachariadis 97.-8-31.2 RESUBDIVISION R-80 PENDING ЍΉБΉЋЉЊЏЎΉЋΉЊЏ Waiting on applic (LOT LINE revisions & ZBA MODIFICATION) Martz, Theodore C., Jr.104.-12-6.1 STANDARD R-40 CONDITIONAL ЍΉЋЋΉЋЉЊЎЊΉЋЌΉЊА Reviewed applicant's SUBDIVISIONPRELIMINARY requests re APPROVAL conditions SUBDIV 9ğƭƷ ağƩźƚƓ RESUBDIVISION R-40 PENDING ЊЋΉЊЍΉЋЉЊЎЊΉВΉЋЉЊА Philippou & Vallas31.-2-7Set hearing for Feb. (LOT LINE MODIFICATION) CźƭŷĻƩƭ LƭƌğƓķ Miller & Brinckerhoff8.-1-4.16 RESUBDIVISION R-120 PENDING ЊΉЊБΉЋЉЊА (LOT LINE MODIFICATION) Ridgway6.-1-3 STANDARD R-80 CONDITIONAL ЊЋΉЋЌΉЋЉЊЌЏΉЏΉЊЏ Waiting for applic to SUBDIVISIONPRELIMINARY submit Final Plat APPROVAL Applic. SUBDIV ağƷƷźƷǒĭƉ Monday, January 30, 2017Page 1 of 3 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦĻ œƚƓĻ{ƷğƷǒƭ SubmittedRecent Activity/ƚƒƒĻƓƷƭ Estates at Royalton113.-7-19.23 STANDARD AC CONDITIONAL ЏΉЊЊΉЋЉЊЎЊΉЊЋΉЊА Mtg re conditions. SUBDIVISIONFINAL Waiting for revised APPROVAL Final Plat SUBDIV Harold R. Reeve & Sons140.-1-6 STANDARD B CONDITIONAL ЋΉЊБΉЋЉЊЍЊΉЋЌΉЊА SEQR review for SUBDIVISIONSKETCH subdivision and APPROVAL change of zone in SUBDIV process. STANDARD R-80 CONDITIONAL ЍΉЏΉЋЉЊЋБΉБΉЊЏ Koehler Family Limited 115.-10-1Waiting for applic to SUBDIVISIONSKETCH Partnershiprespond to required APPROVAL map changes SUBDIV Noone, Margaret143.-1-4.1 STANDARD B and CONDITIONAL ЊΉБΉЋЉЊЉЊЉΉЊΉЊЏ Waiting for applic to SUBDIVISION R-40 PRELIMINARY submit Final Plat APPROVAL Applic SUBDIV hƩźĻƓƷ Mazzoni, 500 Soundview 13.-2-8.2 STANDARD PENDING ЌΉЊЋΉЋЉЊЍЊЊΉЋЉЊЏ Applic on hold at SUBDIVISION Drive, LLCrequest of applicant STANDARD R-80 PENDING ЎΉЊАΉЋЉЊЏЏΉЏΉЊЏ Orient Acres14.-2-25Applic. incomplete SUBDIVISION Tuthill Conservation 17.-4-16 CONSERVATION R-80, PENDING АΉЋΉЋЉЊЍЍΉЍΉЊЏ Waiting on DEIS SUBDIVISION R-200 Subdivision tĻĭƚƓźĭ Beninati, Lee & Marie74.-3-15 STANDARD RO CONDITIONAL ЎΉЊЌΉЋЉЊЍЌΉЋЊΉЊЏ Waiting for requested SUBDIVISIONSKETCH items to be APPROVAL submitted. SUBDIV {ƚǒƷŷƚƌķ STANDARD R-40 CONDITIONAL ЊΉЊБΉЋЉЊЋЊЉΉЌΉЊЏ Stanton, Phil & Jennifer64.-1-29 Waiting on applicant SUBDIVISIONFINAL to fulfill conditions. APPROVAL SUBDIV Monday, January 30, 2017Page 2 of 3 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦĻ œƚƓĻ{ƷğƷǒƭ SubmittedRecent Activity/ƚƒƒĻƓƷƭ Sutton, Alexander & Tracy78.-9-54 STANDARD CONDITIONAL ЎΉЋЉΉЋЉЉБЍΉЍΉЊЏ Waiting for applic to SUBDIVISIONPRELIMINARY submit Final Plat APPROVAL Applic SUBDIV Monday, January 30, 2017Page 3 of 3 Planning Board Monthly Report - Site Plans IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦϜƚƓĻ{ƷğƷǒƭ{ǒĬƒźƷƷĻķbĻǣƷ {ƷĻƦƭͲ /ƚƒƒĻƓƷƭ /ǒƷĭŷƚŭǒĻ Ackermann Agricultural Barn 102.-4-6.1 SITE PLAN AC PENDING 8/29/2016Public hearing 10/3/16 held AGRICULTURAL open to 11/7/16 and extended for written comment to 11/21/16 then closed. PB sent ZBA a request to interpret the proposed use of the barn 12/2/16 E. Lopez Nursery97.-3-3.1 SITE PLAN LB PENDING 6/23/2016Referral review conducted 10/24/16; NYSDOT permit needs to be obtained; PB required revisions to site plan not received as of 12/15/16 East End Tick & Mosquito 97.-3-2 SITE PLAN LB PENDING 3/30/2015Revised plans reviewed by PB Pest Control12/19/16; revisions required SITE PLAN HD PENDING Heritage at Cutchogue 2015102.-1-33.31/2/2015Approved with 43 conditions RESIDENTIAL 11/7/16; Conditions must be met before the Chairman can endorse the site plan Monday, January 30, 2017Page 1 of 4 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦϜƚƓĻ{ƷğƷǒƭ{ǒĬƒźƷƷĻķbĻǣƷ {ƷĻƦƭͲ /ƚƒƒĻƓƷƭ Sannino Winery & Tasting 101.-1-14.4 SITE PLAN AC PENDING 8/25/2015Two primary concerns about Roompotential impacts regarding proposed building/parking location and traffic safety. While the parking and building location issue was resolved at PBs 1/23/17 work session, traffic safety remains a concern and the discussion will continue at the Planning Board's next available work session. Terp Retail102.-5-4 SITE PLAN HB PENDING 5/23/2016public hearing held and closed 8/8/16; visual impact analysis required by PB following hearing and not submitted as of 1/27/17 Threes Brewing East83.-3-4.9 SITE PLAN LI PENDING 7/29/2016SCDHS approval outstanding and applicant needs to provide proof of filing C&R's as of 1/27/17 CźƭŷĻƩƭ LƭƌğƓķ Fox Lane Residences12.-1-1.2 SITE PLAN AHD PENDING 2/1/2016SCDHS approval outstanding as of 1/27/17 DƩĻĻƓƦƚƩƷ Matchbook Distillery48.-2-44.3 SITE PLAN LI PENDING 9/23/2016Public hearing closed 1/9/17; referral review conducted 1/23/17 with revisions to site plan and photometric plan required \[ğǒƩĻƌ Monday, January 30, 2017Page 2 of 4 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦϜƚƓĻ{ƷğƷǒƭ{ǒĬƒźƷƷĻķbĻǣƷ {ƷĻƦƭͲ /ƚƒƒĻƓƷƭ Country Car Wash Additions125.-1-19.5 SITE PLAN B PENDING 6/17/2016Amended site plan application requires special exception and an area variances as per the revised notice of disapproval issued 11/16/16; ağƷƷźƷǒĭƉ 13400 Main Road Corp.114.-11-9.6 SITE PLAN HB PENDING 11/10/2015Public hearing closed 1/9/17, PB conducted referral review 1/23/17 and required revisions to the site plan; hƩźĻƓƷ Verizon Wireless at MGH 15.-9-8.1 SITE PLAN MII PENDING 6/2/2016Public hearing held and WIRELESS Enterprisesclosed 9/12/16; referral review forthcoming; ZBA area variance required and Special Exception by PB for a co-location extension of 20'; tĻĭƚƓźĭ SITE PLAN B PENDING Berry & Berry, LLC75.-5-1312/2/2014Public hearing held and closed 6/1/15; referral review conducted 7/6/15; SCDHS approval outstanding as of 1/27/17 {ƚǒƷŷƚƌķ Filipkowski Air, Inc.59.-10-5 SITE PLAN LB PENDING 4/15/2014Incomplete application. Special exception and multiple large area variances required. PB has required smaller bldg than proposed. Monday, January 30, 2017Page 3 of 4 IğƒƌĻƷtƩƚƆĻĭƷ bğƒĻğǣ ağƦ ϔǤƦϜƚƓĻ{ƷğƷǒƭ{ǒĬƒźƷƷĻķbĻǣƷ {ƷĻƦƭͲ /ƚƒƒĻƓƷƭ Lucas Ford59.-3-32.1 AMENDED SITE B PENDING 12/10/2014Applicant working on new PLAN design with Ford Company after preliminary (positive) review with ARC North Fork United Methodist 63.-1-15 SITE PLAN LB PENDING 2/10/2016Application found Churchincomplete for review 3/21/16 and 12/5/16; application materials and photometric plan required SITE PLAN HB PENDING North Fork Woodworks61.-1-15.33/9/2016Application found incomplete at PB's 3/21/16 work session; revisions and additional information required and not submitted as of 1/27/17 Purita Winery51.-3-5 SITE PLAN AC PENDING 8/2/2016Referral review conducted 1/9/17 with revisions to site plan required along with approval from SCDHS; Southold Gas Station & 55.-5-2.2 SITE PLAN B PENDING 3/31/2015DEIS found inadequate for Convenience Storepublic review on 10/24/16 and for a second time on 1/23/17, missing required information Surrey Lane Vineyard69.-5-18.1 SITE PLAN AC PENDING 8/29/2016Public hearing adjourned 12/5/16 and request sent by PB to ZBA for code interpretation on winery & tasting room Monday, January 30, 2017Page 4 of 4