Loading...
HomeMy WebLinkAboutOff-Site Improvement Plan P:\29305.00 Heritage Cutchogue\cad\Id\Planset\29305.00_OFF SITE.dwg O V .Q s pa 3 Engineering, Surveying & k Landscape Architecture, PC 100 Motor Parkway I Suite 135 F ,{ F Hauppauge, NY 11788 631.787.3400 } I t I 3 t ; i f w < i F { i t } I t I i N38' 04' 40"W __,.... __..._......._. . 5.0 ,273 .68 a, i (0 o N I U, 0 O D +j v I� O rT1 N N ^1 I'- Lo O j � N FLUSH CONCRETE S39' 39' 10"W / 8 SIDEWALK I U NEW CONCRETE SIDEWALK; 4.56 I (SEE NOTE 3) PROPOSED ADA RAMP APPROXIMATE EDGE OF .� ' L= 38.63 PAVEMENT TYPE D-D (TYP) S38' 05" 40"W I R= 23.91 PROPOSED ADA RAMP TYPE B-D RAMP (TYP) W I 5.0 1 \ I PROPOSED R1-1(TYP) PROPOSED 3 FT. GRASS STRIP S52' 55' 20"W ' PROPOSED STOP BAR (TYP) 671.42 55.03 9°3910 E - -- - _ — _ - - — S37'04 40"E 95.00' , I — — — „ _... _._ _ . _ ._.__ 358.97 — w � R35' —— — 'IN S 00 ___. N 640.91 N38'32"40""E SAWCUT 2 FT 0 EXISTING PAVEMENT R10' FOR CURB INSTALLATION (TYP.) APPROXIMATE CENTERLINE () PROPOSED CROSSWALK (TYP) OF GRIFFING STREET !� v, MEET EXISTING PAVEMENT PROPOSED ADA RAMP WITH NEW CURB TYPE B-D RAMP (TYP) fI o 0 PROPOSED R1-1(TYP) Sign Summary 3 M.U.T.C.D. Specification O Number Width height Desc. 24.1' 75' BUILDING SETBACKR1-1 15U 30 R1-8 (�') _...ti_._.._.._.__,_... ..._ p° D o } General Notes �n £ 1. CONTRACTOR REQUIRED TO PULL ALL NECESSARY PERMITS FOR OFF SITE WORK > i- tN WITH TOWN. The Heritage at �; I -' -- - - 2. THE RIGHT-OF-WAY LINES WERE BASED ON A SURVEY BY PECONIC SURVEYORS, 400.00' P.C. ON JULY 1, 1997, WHICH SHOWS A TAKING BY THE TOWN OF SOUTHOLD PER C u tc h og u e LIBER 6395 PAGE 110. 1 3. THE LIMITS OF OFFSITE PAVEMENT SHOWN WERE APPROXIMATED BY AERIAL CutchO ue, New York PHOTOGRAPHY. CONTRACTOR TO VERIFY EDGE OF PAVEMENT IN FIELD PRIOR TO g CONSTRUCTION. Town of Southold 0 4. THE PROPOSED SIDEWALK FROM WITHIN THE DEVELOPMENT OUT TO AND ALONG GRIFFING STREET WILL BE PROVIDED B'Y THE DEVELOPER, EXCEPT FOR THE STRETCH No. Revision Date Appvd. Q OF SIDEWALK BETWEEN THE POST OFFICE AND SCHOOLHOUSE ROAD, WHICH IS EXPECTED TO BE CONSTRUCTED BY THE OWNER OF THE BAXTER SUBDIVISION. THE HERITAGE AT CUTCHOGUE, HOWEVER, WILL BUILD THE THIS STRETCH OF SIDEWALK, IF IT HAS NOT BEEN BUILT AT THE T1MAE THE HERITAGE IS READY TO BEGIN PHASE I 4 OF ITS PROPOSED DEVELOPMENT. 4 SCDHS SUB./TOWN FINDING STATEMENT 10/7/16 AVL 1 5. OFFSITE WORK TO INCLUDE COORDINATION WITH THE SUFFOLK COUNTY WATER 3 REVISED PHASING PLAN 8/19/16 AVL AUTHORITY TO EXPAND THE WATER MAIN ALONG SCHOOL HOUSE LANE TO THE N I 2 FEIS SUBMISSION 5/20/16 AVL SUBJECT PROPERTY. 0 6. CONTRACTOR REQUIRED TO PROVIDE TRAFFIC CONTROL PLAN PRIOR TO START OF 1 DEIS REVISIONS(SMP NOTES) 10/21/15 AVL CONSTRUCTION FOR APPROVAL BY THE ENGINEER. PLAN SHALL INCLUDE CLOSURE Designed by Checked by 0 f SIGNAGE, BARRICADES, AND ANY OTHER PERTINENT INFORMATION. Issued for Date 0 July 10, 2015 1 0 Not Approved for Construction 6 , H N O 0 I• t O Q J CQ t D -- �— �— Drawing Number Ln N �� � '�r 0 U 0 OCT 19 2016 '2i LM900 Q) Souihold Town Planning Board U x 4 Sheet of 40 0 40 80 c:. ` 16 22 w� L SCALE IN FEET Project Number U) 29305.00