Loading...
HomeMy WebLinkAbout1145 Fanning Rd (2) * * * RECEIPT * * * Date: 09/15/16 Receipt#: 213330 Quantity Transactions Reference Subtotal 1 Excavation Permits 1155 $495.00 Total Paid: $495.00 Notes: Payment Type Amount Paid By CK#35824 $195.00 National, Grid -Gas Permits. Dept CK#35896 $300.00 National, Grid -Gas Permits Dept Southold Town Clerk's Office 53095 Main Road, PO Box 1179 Southold, NY 11971 Name: National, Grid -Gas Permits. Dept 175 E Old Country Rd Bld 3 FI 1 Hicksville, NY 11801 Clerk ID: LYNDAR Internal ID: 1155 RECEIVED Permit No. �. 5 LD TOWN OF SOUTHO HIGHWAY DEPARTMENT SEP 1 4 2086 104 � �Peeonie Lane Peconic,NewYork 11958 Southold Town C,er �T101880495 (631)765-3140 ? APPLICATION/PERRIIT FOR HIGIIWAY EXCAVATION AND REPAIR APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit pursuant to Chapter 237 of the Code of the Town of Southold,Suffolk County,New York,and other applicable laws,ordinances or regulations for each individual contiguous excavation project herein described. The applicant agrees to comply with all applicable law°, ordinances,codes and regulations,the attached"General Conditions of Permit"and"Special Conditions",if any and to permit authorized inspectors to make necessary inspections of the job site. Print orT a Keyspan Gas East Corp D/B/A National Grid Gas Permits Dept. Bldg: 3 FI: 1 l 516 545 4094 175 E. Old Country Rd Hicksville, NY 11801 Name of Applicant Phone Number Address of Applicant Name of Contractor Plione Number Address of Contractor 3. Name of Property Owner Requesting Service(if applicable) Address of Owner 4. 1145 FANNING RD-S/S, 250' W/O NEW SUFFOLK RD Work Description and Location(Street Number,Hamlet,Cross Street) (a) Is construction located within 75 feet of tidal wetlands? *Yes No *[f yes,other Town permits maybe required. Margaret Paglia NOTE: All information requested by this Signature of App scant Application/Permit Form Is Required for a complete application! 9/1/16 Date 5. (a) Attached plot plan to reasonably and adequately describe the proposed work. Provide accurate schematic site plan showing the location of all proposed excavations and relationship to adjoining premises,public streets or areas,and give a detailed description of all site and pavement restoration work. (b) Attach all other necessary permits and licenses for this project. (e) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the .own Clerk. 6. Tax Map No.: District-10-00 000 , Section�.��_. Block L� , Lot—IC2 a. __r._ 7. Starting Date: 9/30/16 Completion Date: 10/1/16250 8. Work Schedule: Phase Completion[late Excavation 1Vorlc Schedule Facility Installation Must be provided Backfill S Completion for consideration as a Pavement Replacement Complete Application. 9. Under which authority is application being made: Keyspan Gas East Corporation d/b/a National Grid See Town Code Chapter 237(E)-Provide Resolution by,or authority from,the Utility being modified. 10. Estimated Cost of Proposed Work: S- 11. _t1. Remarks: install new gas service D-39 1 of 3 � 4� 12. Insurance Coverage:(Attach Copy) (a) Insurance Company:, (b) Policy#: (c)State whether policy of certification on file with the Highway Department: (d)Coverage required extended to the Town: Any Loss including Bodily injury,property or commercial injury caused by or attributable to the work performed: $1,000,000 per Occurrence and S 2,000,000 general aggregate. 13. Security: (a)Surety Bond or Certified Check provided in the total Amount of$ (b)Maintenance Bond provided: 2 years or 3 years. 14. Fees for Applications and permits: Basic Application Fee for Each Project Location - $150.00 A Project Location would include each Bell Hole and/or every road opening or excavation within any 50'Radius whether or not they may be inter-connected by open trench or directional boring. The total number of Project Locations shall be subject to the approval of the Highway Superintendent. Al. /Service Connections excavations Q 520,00 S20.00 No. A2, /Additional Excavations some service Qa $10.00 S No. B. Excavations 18"in depth or less 0-100 L.F.=$10.00;Additional 250 L.F.Q$0.10 25.00 C. Excavations IS"in depth to 5' in depth 0-100 L.F.=$30,00;Additional L.F.Q$0.30 S D. Excavations 5'in depth and over 0-100 L.F._$50.00;Additional L.F.Q$0.50 $ E. Utility Repair Excavations(3a $10.00 S No, Repairs same service Q$5.00 $ Additional TOTAL$ 195.00 F. Notice to public utilities proof must be provided and Shall be attached to this application prior to issuance of permit. * s � a * w a rt ■ � ► .r a w Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation permit to: in cordance wi this application and subject to the"General Conditions"and"Special Conditions"of permit(if ny tached r SUPERINTEN T F G TOWN OF S N- R ncent 0 0 Date Date Received by the Town Clerk Date Permit Issued q —t 5- i(�Permit No. NOTE: Permit expires one(1)year from date of issuance. No work to start without 24 hour notice to Superintendent of Highways. Permit must be available at all times for inspection,on site,during construction, D-39 2 of 3 Copy Distribution: Permit# Highway Department Engineer(with page 3) Applicant Town Clerk(Original) INSPECTOR'S RECORDS Inspection Date Findings(use code) Applicant Notified 1 st 2nd 3rd 4th (To Permit Clerk) RE1d1ARI�5 CODE I13 Improper Barricades IL improper Lights ST Sunken Trench or Excavation UTM Unable to Measure(due to backfilling) BUC Building Under Construction WIP Work In Progress DB Improper Backfill(too high,not sufficient) HFS Inspector Holding for Final Settlement of Excavation RFR Ready for Repair D-39 3 of 3 r GENERAL CONDITIONS OF PERMIT APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR 1. Perinittee's Contractors to Comply with Permit Re' uirements: The Permittee is responsible for informing its independent contractor's,employees,agents and assigns of their responsibility to comply with this permit, including all specie/site specific and general conditions imposed by the Highway Superintendent while acting as the permittee's agent with respect to the permitted activities,and such persons shall be required to comply with all permit requirements.-- 2, No Right to Trespass or Interfere with Private]'to er 'Ri lits: This permit does not convey to the permittee any right to trespass upon the lands of adjacent property owners in order to perform the permitted work nor does it authorize the impairment of any rights,title,or interest in real or personal property held or vested in a''person not a party to the permit. 3. Protection of the Ilighway and Future Ilighway Mnintenance: If future operations or highway maintenance projects by the Town of Southold require an alteration in the position of the utility,structure or work herein Authorized,orIif,in the opinion of the Highway Superintendent the work performed under this'permit shall'cause unreasonable obstruction to required highway maintenance or endanger the health, safety and/or welfare of vehicular or pedestrian traffic,this permit shall be,revoked and the utility, structure,fill,excavation,or other modification of the highway hereby authorized shall not be completed. Additionally,the permit may be revoked if the Highway Superintendent finds that the issuance of the permit was illegal or nnauthoriied or that the applicant failed to comply with any of the terms and conditions of the permit or Chapter 237 of the Town Code. 4. Revocation of the Permit by the Iliahwav Sunerintendcnt: If the Highway Superintendent deems it necessary to revoke this permit and the project hereby authorized has not been completed,the applicant shall,without expense to the Town and to such extent and in such time and manner as the Superintendent may-require,remove all or any portion of the,uncompleted utility,structure or fill and restore the site to its former condition. 5: Notice of Commencement: At least 24 hours prior to commencement of the project,the permittee and/or contractor,shall notify the Town Highway Department in writing that they are fully aware of and understand,all terms and project conditions of this permit. Upon completion of the work,the contractor shall provide photographs of the completed work to the Town Highway Department and request a Final inspection. 6. Storage of.I:ouinment&Mntel'ials: The storage of construction equipment and/or materials shall be confined within the project work area and/or adjacent areas Where permission/legal access has been obtained in a-manner that does not interfere with normal highway traffic. 7, Utility MnAc-Outs: -The Applicant/Contractor shall be responsible for verification of all existing utility mark-outs and shall take all precautions to protect same. Damage to existing utilities shall be the responsibility of the contractor and shall be repaired at the contractor's expense. 8. Road Closures: All scheduled road closures-must first receive written permission from the Southold Town Board prior to closing a road. Temporary lane closures may be permitted with the approval of the Highway Superintendent. This item will''Included but not be limited to the installation of appropriate signage and flag men'to stop and start traffic to allow for single lane traffic. Road Closures due to unforeseen emergencies require immediate notification of the Highway Department and shall be limited to immediate and/or expedited restoration of the Work Zone. 9. No Construction Debris in Road Shoulder Area: All Construction Debris shall be removed from the jab site on a daily basis. All stockpiled soil as well as all other project materials that will be staged within the Right-of Way must be delineated with reflective signage or other means to meet the minimum requirements of the NYS DOT Construction Standards. GENERAL CONDITIONS OF PERMIT APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR (Continued) 10. Install,Maintain Erosion_Cdnirols: Required Erosion Control Measures(i.e.silt fencing)is to be placed on the downslope edge of any disturbed area. This sediment barrier is to be put in place before any disturbance of the ground occurs and is to be maintained in good functional condition until thick vegetative cover is established. 11. Clean Fill Only: All project back-till shall consist of clean sand,gravel or soil(NOT asphalt,slag,flyash, broken concrete or'demolition debris). All unsuitable soils excavated at the site(i.e.Clay,Bog,etc.)are to be removed from the site and not used to backfill any excavation within a Town Highway. 12. All Areas of Soil Disturbance: .Ali areas of soil disturbance resulting from the approved project tion. be stabilized to the satisfaction of the Highway Superintendent immediately following project completion. If the project site remains inactive for-more than 48 hours or planting is impractical due to the season,then the area shall be stabilized with straw,hay mulch and/or jute matting until weather conditions favor germination. 13. Backfili&Cotri action of nil lrxcavations: Back Fill shall consist of clean fill or soils,which exhibit a wellAefned moisture density relationship as determined to be in accordance with ASTMD 698. Fill shall be placed in maximum lifts of twelve(12')inches thick and shall be mechanically compacted to a Ninety-, five(95%1 percent maximum dry density. Suitable hydraulic compaction by water jetting at three-foot intervals will also be permitted sabjectto a project speei&approval by the Highway Superintendent. 14. Restoration of the Road Shoulder Arein Ali man-made improvements located within existing road shoulder areas must be protected to the greatest extent practical. Items would'includc but not be limited to driveway&private road aprons,mail boxes,sprinkler systems,trees and ornamental'plantings. Excavations through driveways and private road pavements must be reconstructed to meet all requirements of Southold Town Highway Specifcntioris, All pre-existing road shoulder improvements that have been disturbed during construction must be replaced or repaired by the contractor to the satisfaction of the Highway Superintendent. 15. Schentntic Plans with all Technical information and Scope of Work: To reasonably and adequately describe the proposed work,accuiate's6hematic,the plans"must be provided to show or indicate all proposed construction activity required under this permit. All Pavement'surfitces scheduled for excavation must be saw cut to the full depth of asphalt andlor concrete pavements. Accurate size of bell holes or width of trenching must be indicated by dimension or labeling. This schematic site plan must provide details on all restoration required to tfieetthe requirements of these Genera!Conditions and requirements found in the Southold Town Highway Specifications. 16. Pavement Reconstruction: All Pavement sections must be reconstructed in the following manner, (Note:When Concrete Pavements are Present,Please review Restoration requirements with the Highway Superintendent) a) Complete all back-fill&soil compaction work as needed to provide a suitable sub-base; b) fiver-cut existing asphalt bell hole or trench by twelve(IT)inches on all sides; c) Install a compacted lift of 4"thick Stone Blend base(RCA Blend must meet NYS DOT Specification); d) Install a two and one half(2.5")inch compacted lift of Asphalt Base Course; c) Install a one and one half(1.5")inch of Asphalt(Type 6)Nearing Course. (Provide AC at all joints) All work listed herein must meet the minimum requirements of the Southold Town Highway Specifications. 17. Trenchina of Pavement Surfaces Exceeding One Hundred(1001)7eet in Lenetlt: All trenching of pavement"surfaces exceeding 100' in length must fast be reconstructed to meet the requirements of Item 0 16 as noted above. Once all pavement reconstruction is completed to the satisfaction of the Highway Superintendent,the entire road section and/or width of road over the entire length of trench shall be repaved with a two(2")inch lift of Asphalt(Type 6)Wearing Course(Typical,shoulder to shoulder). sl ly Road Opening Permit Request nationalgrid THE POWER OF ACTION Municipality:Town of Southold Work Order:T101880495 Location: 1145 Fanning Rd Grid: 101-45-6800 Town: New Suffolk Requested By: N Mattei Reason For Excavation: Install service line for customer at 1145 Fanning Rd Description:TOWN OF SOUTHOLD Tx 250'TRENCH ON S/S OF FANNING ROAD STARTING 250' W/0 NEW SUFFOLK RD HEADING EAST,X/S FRED ST,AND THREE 4' x 4' MAC BELL HOLES, ONE AT THE BEGINNING OF TRENCH ONE AT THE END AND ONE IN MIDDLE FOR SERVICE CONNECTION. = 3'X 250' MAC TRENCH N =4'X 4' MAC BELL HOLE S - w 114 rn 0 v Fanning Rd z co CURB LINE - 77 PROPERTY LINE a 250' Permit sketch may not include excavations required under 16 NYCRR Part 753 Revision: 0 Typical trench width is 12" wide,Typical bell hole excavation is 4'x 4'x 4' Date Submitted: Not To Scale Number Of Permits Requested: 1