Loading...
HomeMy WebLinkAbout600 Southern Blvd Permit No. TOWN OF SOUTHOLD ,¢o�suFFo�k�o HIGHWAY DEPARTMENT Peconic Lane Peconic,New York 11958 c • �"'t (631)765-3140 APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit pursuant to Chapter 237 of the Code of the Town of Southold, Suffolk County,New York,and other applicable laws,ordinances or regulations for each individual contiguous excavation project herein described. The applicant agrees to comply with all applicable laws, ordinances,codes and regulations,the attached"General Conditions of Permit"and"Special Conditions",if any and to permit authorized inspectors to make necessary inspections of the job site. Print or Type 1. Co, Name of Applicant Phone Number Address of Applicant 2. �I f 1 Ibrl l r -�/ -� �0 C /big (�,�42ma& /\S4 f 1725 Name of Contractor Phone Number Address of Contractor CM-bcf: Leu�,v -�a 6kj &3() Z Iq-q/(5-Z 3. Name of Property Owner Requesting Service(if applicable) Address of�Owner g ,9 r 4.. �� l?P.0 r .�?�'V�L� Q�l' ho ox (o C) -`_ktt/�w li Ely ,�a /a,/a7 Work Description and Location(Street Number,Hamlet,Cross Street) r�f (a) Is construction located within 75 feet of tidal wetlands? *Yes No { Cedar wat - IS yo r *If yes,other Town permits may be required. NOTE: All information requested by this Signature of Applicant Application/Permit Form is _ �� z©�� Required for a complete application! Date 5. (a) Attached plot plan to reasonably and adequately describe the proposed work. Provide accurate schematic site plan showing the location of all proposed excavations and relationship to adjoining premises,public streets or areas,and give a detailed description of all site and pavement restoration work. (b) Attach all other necessary permits and licenses for this project. (c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk. 6. Tax Map No.: District 1000 , Section Block , Lot _ 7. Starting Date: g(la[Jl!(0 Completion Date; 4611 8. Work Schedule: Phase Coi>>letion Date Excavation Work Schedule Facility Installation q 7X 716 Must be provided Backfill&Completion for consideration as a Pavement Replacement Complete Application. 9. Under which authority is application being made: See Town Code Chapter 237(E)-Provide Resolution by,or authority from,the Utility being modified. 10. Estimated Cost of Proposed Work: $_ / 11. Remarks:/ k ' �VVI'U— L(f I✓le_ i�S 6e4' 1'Y1 51,7 G19d �V Anv-V- Cv 00 PkK f?pk I� aioS5 5fi'-e�4• /5' t;i �l-liSSS Z�I cshG�e� l�a��y D-39 1 of 3 12. Insurance Coverage:(Attach Copy) (a) Insurance Company: (b) Policy#: (c)State whether policy of certification on file with the Highway Department: (d)Coverage required extended to the Town: Any Loss including Bodily injury,property or commercial injury caused by or attributable to the work performed: $1,000,000 per Occurrence and$2,000,000 general aggregate. 13. Security: (a)Surety Bond or Certified Check, provided in the total Amount of$ (b)Maintenance Bond provided: 2 years or 3 years. 14. Fees for Applications and permits: Basic Application Fee for Each Project Location - $150.00 A Project Location would include each Bell Hole and/or every road opening or excavation within any 50'Radius whether or not they may be inter-connected by open trench or directional boring. The total number of Project Locations shall be subject to the approval of the Highway Superintendent. Al. /Service Connections excavations @$20.00 $ 20 No. A2. /Additional Excavations same service @$10.00 $ No. B. Excavations 18"in depth or less 0-100 L.F.=$10.00;Additional L.F.@$0.10 $ C. Excavations 18"in depth to 5' in depth 0-100 L.F.=$30.00;Additional _ L.F.@$0.30 $ D. Excavations 5' in depth and over 0-100 L.F.=$50.00;Additional L.F.@$0.50 $ E. Utility Repair Excavations @$10.00 $ No. Repairs same service @$5.00 $ Additional TOTAL$ ` Do F. Notice to public utilities proof must be provided and Shall be attached to this application prior to issuance of permit. Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation permit to: accordance with this application and subject to the"General Conditions"and"Special Conditions"of permit(if y attached reto. SUPERINTEN W S TOWN OF S L W RK Date Received by the Town Clerk Date Date Permit Issued bAuo Permit No. NOTE: Permit expires one(1)year from date of issuance. No work to start without 24 hour notice to Superintendent of Highways. Permit must be available at all times for inspection,on site,during construction, D-39 2 of 3 Copy Distribution: Permit# Highway Department Engineer(with page 3) Applicant Town Clerk(Original) INSPECTOR'S RECORDS Inspection Date Findings(use code) Applicant Notified 1 St 2nd 3rd 4th (To Permit Clerk) REMARKS CODE IB Improper Barricades IL Improper Lights ST Sunken Trench or Excavation UTM Unable to Measure(due to backfilling) BUC Building Under Construction WIP Work In Progress DB Improper Backfill(too high,not sufficient) HFS Inspector Holding for Final Settlement of Excavation RFR Ready for Repair D-39 3 of 3 i o GENERAL CONDITIONS OF PERMIT APPLICATION/PERMIT FOR I4IGHWAY EXCAVATION AND REPAIR, 1. Permittee's Contractors to Complytiyith,Permit Requirements: The Permittee is responsible for informing'its-independent contractors,employees, agents and'assigns of their responsibility to,comply with this permit, including all,special/site specific and general conditions imposed by the Highway Superintendent while acting as the permittee's agentVith respect to the permitted activities,and such persons=shall:be required to comply with all permit requirements. 2. No Rikht to Teesnass or Interfere with Private PropertyRiahts: This permit does not convey to the per any,right to trespass upon the lands of adjacent property owners in order to perform the permitted work nor does it authorize the impairment of any rights,title,or interest in real or personal property held or vested in a person not a party to the permit. 3. Protection of the niahway and I+uture Ilii!liivay'Maintenance: If future operations or,highway maintenance projects by the Town of Southold require an alteration in,the;position of the utility,structure or work herein authorized,or if, in the opinion of the Highway Superintendent the work performed under this permit shall cause unreasonable obstruction to required highway,maintenance or endanger the health, safety and/or welfare of vehicular or pedestrian traffic,this permit shall be revoked and the utility, structure,fill,excavation,or other modification of the highway hereby be shall not be completed. Additionally,the permit may be revoked if the Highway Superintendent finds that the issuance of the permit was illegal or unauthorized or that the applicant failed to comply with any of the terms and conditions of the permit or Chapter 237 of the Town Code. 4. ,Revocation of the Permit,by the Highway Simeriritendent: If the Highway Superintendent deems it necessary to revoke this permit and the project hereby authorized has not been completed,the applicant shall,-without expense to the Town and to such extent and in such time and manner as the Superintendent may require,remove all or any portion of the uncompleted utility,structure or fill and restore the site to its former condition. 5. Notice of Commencement: At least 24 hours prior to commencement of the project,the permittee and/or contractor shall notify the Town,Highway Department in writing that they are fully aware of and understand all terms and project conditions of this permit.' Upon'completion of the work;the contractor shall provide photographs of the completed work to the Town Highway Department and request a Final inspection. 6. Storake of Equipment&Materials: The storage of construction equipment and/or materials shall be confined within the project work area and/or adjacent areas where permission/legal access has been obtained in a manner that does not interfere with normal highway traffic. 7, Utility Mark-Outs: The Applicant/Contractor shall be responsible for verification of all existing utility mark-outs and shall take all precautions to protect same. Damage to existing utilities shall be the responsibility of the contractor and shall be repaired at the contractor's expense. 8. Road Closures: All scheduled road closures must first receive written permission from the Southold Town Board prior to closing a road. Temporary lane closures may be permitted with the approval of the Highway Superintendent. This item will included but not be limited to the installation of appropriate signage and flag men to stop and start traffic to allow for single lane traffic. Road Closures due to unforeseen emergencies require immediate notification of the Highway Department and shall be limited to immediate and/or expedited restoration of the Work Zone, 9. No Construction-Debris in Road Shoulder Area: All Construction Debris shall be removed from the job site on a daily basis. All stockpiled soil as well as all other project materials that will be staged within the Right-of Way must be delineated with reflective signage or other means to meetthe minimum requirements of the NYS DOT Construction Standards. GENERAL CONDITIONS OF PERMIT APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR (Continued) 10. IirstaI4 Maintain Erosion--Controls:,Required Erosion Control Measures(i.e.,silt fencing) is to be.placed on the downslope edge of any disturbed area. This sediment barrier is to be put in place before any disturbance of•the ground occurs and is to be maintained in good functional condition until thick vegetative cover is established. I I—Clean-Fill Only:-All project back-fill shall consist of clean sand,gravel or soil(NOT asphalt,slag,flyash, broken''concrete or'demolition debris). All unsuitable.soils excavated at the site(i.e. Clay,'Bog,etc.) are to be removed from the site and not used to backfill any excavation within a Town Highway. 12. All Areas of Soil Disturbance: All areas of soil disturbance resulting from the approved project shall be stabilized to tlie•satisfaciion of the Highway Superintendent immediately following project completion. If the project site remains inactive for more than 48 hours•or planting is impractical due to the,'season;then the area shall be-stabilized with straw,hay mulch and/or jute matting until weather conditions favor germination. 13. Backfill-&Cork0action of all Excavations:_ Back Fill shall consist of clean fill or soils which exhibit a well-defined moisture'density relationship as determined to be in accordance with ASTMD 698. Fill shall be placed in'maximum lifts of twelve(12")inches thick and shall be meclianically.compacted to a Ninety- five(95%)percent maximum dry density. Suitable hydraulic compaction by water jetting at three-foot intervals will also be,permitted subject to a project specific approval by the Highway Superintendent. 14. Restoration of.the.'Road Shoirlder Area: All man-made improvements located within existing road shoulder areas must be protected to the greatest extent practical. Items would include but not be limited to driveway'&private road aprons,mail boxes,sprinkler systems,trees and ornamental plantings. Excavations'through driveways and private road 'pavements must be'.reconstructed to meet all requirements of Southold Town Highway Specifications. All pre-existing road shoulder improvements that have been disturbed during construction must be replaced or repaired by the contractor to the satisfaction of the Highway Superintendent. 15. Schematic Pians with all Technical information and Scone of Work: To reasonably and adequately describe the proposed work;accurate schematic site plans'must be provided to'show or indicate all proposed con'struotion activity required under this permit. All Pavement surfaces'scheduled for excavation must be saw cut to the full depth of asphalt and/or concrete pavements. Accurate size of bell holes or width of trenching must be indicated by dimension or labeling. This schematic site plan must provide details on all restoration required to meet the requirements of these General Conditions and requirements found in the Southold Town Highway Specifications. 16. Pavement Reconstruction: All Pavement sections must be reconstructed in the following manner; (Note:When Concretd Pavements are Present,Please review Restoration requirements with the Highway Superintendent) a) Complete all back-fill&soil compaction work as needed to provide a suitable sub-base; b) Over-cut existing asphalt bell hole or trench by twelve(12")inches on all sides; c) Install a compacted lift of 4"thick Stone Blend base(RCA Blend must meet NYS DOT Specification); d)• Install a two and one half(2.5") inch compacted lift of Asphalt Base Course; e) Install a one and one half(1.5")inch of Asphalt(Type 6)Wearing Course. (Provide AC at all joints) All work listed herein must meet the minimum requirements of the Southold Town Highway Specifications. 17. Trenching of-Pavement Surfaces Exceeding One'Hundred (100')Teet in Length: All trenching of pavement,surfaces exceeding 100' in length must first be reconstructed to meet the requirements'of Item # 16 as noted above. Once all pavement reconstruction is completed to the satisfaction of the Highway Superintendent,the entire road section and/or width of road over the entire length of trench shall be repaved with a two(2") inch lift of Asphalt(Type 6)Wearing Course(Typical,shoulder to shoulder). s)ly a o� cy�l E/s�o �en 3fvd- �— U��T CABLEV I51Ckv c(o COL U'�It,mES ?a. �jc logg ��UIN �jozAt�� fa31- Zlq-a(�Z hoc Y f- �� (7e vm l`f3 C�L—Ufi f flies can, * * * RECEIPT * * * Date: 08/31/16 Receipt#: 212912 Quantity Transactions Reference Subtotal 1 Excavation Permits 1149 $170.00 Total Paid: $17000 Notes: Payment Type Amount Paid By CK#9166 $170.00 C, D L Underground Specialists Southold Town Clerk's Office 53095 Main Road, PO Box 1179 Southold, NY 11971 Name: C, D L Underground Specialists Po Box 1098 Commack, NY 11725 Clerk ID: BONNIED Internal ID, 1149