Loading...
HomeMy WebLinkAboutOaklawn Ave (3) Permit No. �`I TOWN OF,SOUTHOLD ��suFFOtkco HIGHWAY DEPARTMENT Peconic Lane 94 Peconic,New York 11958 c (631)765-3140 APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit pursuant to Chapter 237 of the Code of the Town of Southold,Suffolk County,New York,atid'other applicable laws,ordinances or 'regulations for each.individual contiguous excavation project herein'describe'd. The applicant agrees to comply with all applicable laws, ordinances,codes and regulations,the attached"General Conditions of Permit"and"Special Conditions", if any and to permit authorized inspectors to make necessary inspections of the job site. PrintorT,lc Keyspan Gas East Corp D/B/A National Grid Gas Permits Dept, Bldg: 3 FI: 1 l 175 E. Old Country Rd Hicksville, NY 11801 Name of Applicant Phone Number Address of Applicant- 2. Name of Contractor Phone Number Address of Contractor 3. lel 8I Name of Property Owner Requesting Service(if applicable) Address of Owner 4. AvA iqwp ME-- 2�� d AA 6/,9 low J& PP4 5,9 1/Tff Work'Descriptionand Location(Street Number,Hamlet,Cross Street) (a) Is construction located within 75 feet of tidal wetlands? *Yes No *If yes,other Town permits may be required. Lw—ltp� 61 NOTE: All information requested by this S nature of Appli nt Application/Permit Form is (0z �,/Required for a complete application! _I Date 5. (a) Attached plot plan to reasonably and adequately describe the proposed work. Provide accurate schematic site plan showing the location of all proposed excavations and relationship to adjoining premises,public streets or areas,and give a detailed description of all site and pavement restoration work. (b) Attach all other necessary permits and licenses for this project. (c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk. 6. Tax Map No.: District 1000 , Section Block Lot 7. Starting Date: Completion Date: 8. Work Schedule: Phase Completion Datc Excavation Work Schedule Facility Installation Must be provided Backfill'&Completion for consideration as a Pavement Replacement Complete Application. 9. Under which authority is application being made: See Town Code Chapter 237(E)-Provide Resolution by,or authority from,the Utility being modified. 10. Estimated Cost of Proposed Work: $ 11. Remarks:®�GIV `sC���l ' MW e-&T-1®Ay A7—J (S)S 3�{M V sS A)P ✓Lr ATg D-39 1 of 3 12. Insurance Coverage:(Attach Copy) (a) Insurance Company:;' . (b) Policy# (c)State whether policy of certification on file with the Highway Department: (d)Coverage required extended to the.Town: -Any Loss including Bodily injury,property or commercial injury caused by or attributable to the work performed: $1,000,000 per Occurrence and$2,000,000 general aggregate. 13. Security: (a)Surety Bond or Certified Check provided in the total Amount of$ (b)Maintenance Bond provided: 2 years or 3 years. 14. Fees for Applications and permits: Basic Application Fee for Each Project Location - $150.00 A'Project Location would include each;Bell Hole and/or every road opening orexcavation within any 50'Radius whether or not they may be inter-connected by open trench or directional boring. The total number of Project Locations shall be subject to the approval of the Highway Superintendent. Al. la /Service Connections excaations $20 00 '$ D, o. �E�L HoL�S u��rn! d J�ADl�g A2. / 0 B. Excavations 18"in depth or less 0-100 L.F.=$10.00;Additional L.F. @$0.10 $ C. Excavations 18"in depth to 5' in depth 0-100 L.F.=$30.00;Additional L.F.@$0.30 $ D. Excavations 5' in depth and over 0-100 L.F._$50.00;Additional L.F.@$0.50 $ - E. Utility Repair Excavations @$10.00 $ No. Repairs same service @$5.00 $ Additional — p,• � -oZ els ' TOTAL$ F. Notice to public utilities proof must be provided and Shall be attached to this application prior to issuance of permit. Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation permit to: accordance with this application and subject to the"General Conditions"and"Special Conditions"of permit(if y)attached here SUPERINTEND T W YS TOWN OF SOU 1- RK Vi cent .Orl Date Date Received by the TownJerk lJ Date Permit Issued 613 ( PermitNo. l l I V NOTE: Permit expires one(1)year from date of issuance. No work to start without 24 hour notice to Superintendent of Highways. Permit must be available at all times for inspection,on site,during construction. D-39 2 of 3 Copy,Distribution: Permit# Highway Department Engineer'(with'page 3) Applicant Town Clerk(Original) INSPECTOR'S RECONS Inspection Date Findings (use code) Applicant-Notified 1St 2nd 3rd 4th (To Permit Clerk) REMARKS CODE IB Improper Barricades ,IL Improper Lights ST Sunken Trench or Excavation UTM Unable to Measure(due Io backfilling) BUC Building Under Construction WIP Work'In Progress , DB Improper Backfill(too high,not sufficient) HFS Inspector Holding for Final Settlement of Excavation RFR Ready for Repair D-39 3 of 3 GENERAL CONWTIONS OF"-PERNIIT; APPLICATION/PERMIT FORHIGHWAY EXCAVATION AND_REPAIR. , 1. Permittae's Contractars'io Conitily�with-PermitReguiremenis: The Permittee is°responsible for informing its independent contractors,°employees;agents•and assigns of their responsibility to comply with,, mit -this`per , including'all special/site .specific and general;;conditions imposed by the:Hi'ghway Superiniendent'while acting as the,permittee'.s:age-nt with respect to the'-permitted•activities;-and such persons'shall,be,required to comply with all permit requirements.' 2. No=Riuht'fo-Trespass�oe Infcrfere ivith Privsite Property'R ahfs:,This permit does;not,convey to the permitted:anyrigh`t io trespass upon.the lands of.adjacent property ovvners in ordertoperform the.pe`rcr►itted. work nor'does it authorize the'impairinerit of any'rights,title;•or,interest'in real or,personal property,held,or vested-in-mperson not a party:to-the permit. 3-. Pr•oteciion of lh`, 11 nyay And Future-l'Tii!liwayt'MaintenAnce:,,If-future operations or highway maintenance-piojects`.by,the Town°of Southold'"require an alteration•-in the•position of the utility;atructure ,or work'herain authorized,°or,if,'in the opinion of the Highway Superintendent the work performe'd,under this permit shall cause•unreasonable obstruction to required,highway',maintenance,or endange'r,=the health, safeN;and/or welfare of;vehicular or pedestriari,tr`affic,this permit shall be revoked and the utility, structure,f ll,;excavation;'or other modification,of the-highway hereby,abthorii6d shall not be completed. Additionally;the permit may be reyoked.if ihe,Highway Superintendent finds tha the issuance of,tlie permit wa's`illegal or.unauthorized or thafthe applicant failed to complywitli any.of the terms and conditions of the,perniitor Chapter 237 of the Townl-Code. 4. ,Revocation of tiiePemiit liy,thc'TIiahFyay Suneiintenilent: If the Highway Superintendent deems Lit necei"iy,to revoke•this permit and the project-hereby awho- ized:has,not been completed,the;applicant shall';without expense to the-Town andto such extent'and in such time and manner as the Superintendent may-require;remove all or'any'portion of the-uncompleted utility;structure or fill and restorethe site to its former,condition. 5. -Notice of•Commencement:;At-least hours.prior to commencement of the project,the permittee and/or contractor shall'notify;the,Town Highway Departmenfin,wiitirig that they are fully aware,of and understand 611 terms and'project conditions of this permit. Upon completion;of the'work;the contractor shall provide ph&ographs'of the completed work�to the Town Highway Department and request'a Final inspection. 6: Stoih a o'f Equipment&'Materials: The storage of construction equ;ipmentand/or mAteriI I shall be confined within the-project work area and/or'adjacent areas where permission/legal access has,been obtained in-a manner thatd' not°interfere with normal,highway traffic. 7. 'UtiliiyaMarli-Outs:-The Applicant/-Contractor shall,be responsible for`verification,of all existing utility mark=outsrand shall take all precautions to.protect"`same, .Damage to existing utilities shall'be the, . responsibility'of the•contractoi and shall be repaired;at,the contractor's expense. 8. Road.Closures: All scheduled road closures must first receive written permission from the SoutholdTown Board•prior.to`closing a road. Temporary lane closures maybe permitted with the approval of the Highway Superintendent., This item will included but not`be-limitW'to the installation-of Appropriate signage and flag mento" ' andstarttraffic,to•allow for single lane traffic.:Road Closures'due•to unforeseen emergencies-require'imme.diate.notif cation ofthe Highway Department-and shall be limited to'immediate and/or expedited restoration the Work.Zone, 9. No Construction.Debris in Road Shoulder•A:rea:.All Construction Debris shall be removed from the job site on a`daily,basis,.-All stock'pil_ed-soil.as well as.a11`other°project materials that•wiil be staged within the, 'Right-of Way must.be delineated with reflective signage or other means•to-meet the minimum requirements of the NYS DOT'Constriuction Standards. �',.GENERAL.CONDITIONS-OF PERMIT;,' APPLICATION/PERIVIITY 'EXCAVATION AND REPAIR• (Coritiiiued) ; I a._'jnstxll;Mairitain.Erosion.Controls:,,Requiied Erosion Control Measures(i:e.silffencing) is to be placed on"the downslope'edge of ariy,disturbed area. 'This,sediment'barrier'is to be put,in place;before any disturbance of the ground occurs and is to be maintained in go od.functional,condition until thick vegetative cover is established:, l l.;.CleRn.Fill-Only:.Allproject'back-fill shall consistof'clean sand,,gravel orsoil(NOT'asphalt,slag,flyash,' ''broken',concrete or'demolition'debris).''All unsuitable soils,ekcavated'at thel'site(i.e.- Clay,B'og;`eta.)are to be removed from,the,site'and,not used to;backfill any excavation within a.Town Highway. 12. `All Areas of Soil Disturbance: -All areas of soil'disturbance resulting from the approved project'shall.be stabilized1dihe satisfaction of the Highway.Superintendenf imtnediately'following projertcompletion. If the.projdct siie'r6ma'ins'itiactive'for more than'4064s-or7plantinIg is'imp ractical due to.the'season,,then the area_hall be stabilized with straw,hay,mulch and/or jute-matting until weatherconditions favor germination. ` 13.'I3nckfill''&Corapaetion bf h1l Excaivations:. Back Fill sliall consist of clean fill-or soils which exhibit a well'-'defined moisture density'relationship as-determined tube in`accordance with=ASTMD 698. Fill shall be..'placed in.maximum,lifts of twelve(12")inches,thick and shall-be'm'eclianicahy compacted to a:Nin@ty- five`(95%)per`centmaximum dry density. :Suitable'hydraulic,coiiipaction:by water jetting at three-foot intervals wilt also betpermitted subject to a project specif d,a,pprova]'by,,the Highway Superintendent. e 14.•Restbrafiofi, � .theRoad",Slioalder'Arcat:,All man=inade.improvements located within existing road, shoulder areas x`nust,be protected to the greatest extent,practical.-Items would include but:not be limited.to driveway&private'road aprons,mail boxes,'spririkier systems,trees and ornamental plantings:; Ekcavations`through driveways and privato road pavements must,be reconstructed to,meet all requirements of Southold Town'-Hig11 h'way Specifications; All pre=existing'road shoulder,improvem'ents that have'been di'sturbed.during construction must be replaced or repaired by the contractor,to the`sati faction of the Highwayrsuperintendent. •j 5. rvith>all Teclinicsihinformation'ti[nd Scone o`f Worli' To•reasonably and adequately ;. describe the proposed work,accurate schetmtic site plans'must be provtded,to show,`or iridicate'all proposed`construction activity required under this permit.,'All Pavement surfaces;scheduled for excavation must be saw cutao the;full depth o£asphalt atid/or_concreie pavements.,Accurate size of bell holes or width of trenching must b'e,indicated'by dimension or;labeling. This schematic site "la must,provide details on all restoration required to'm' eet the requirements•ofthese General Conditions'arid requirerrients found in the Southold,Town,Highway-Specifications. 16. Pavement Reconstruction:`All Pavement sections must'be reconstructed in the following-mariner; (Note:,When'Concrete Pavements'are Present;Please review RestoritionsegWrements with the Highway Superintendent) a) Complete all back-fill,&soil compac'tion'work as,needed to provide a suitable sub-base; „ b) Over,'-cut existing asphalt bell hole,or trench by twelve'(12")inches on all sides; ' c) Install a compacied�lift uf•4"thick Stone Blend base(RCA Blend must;meet d)' InstalNYS DOT Specification); I a two and,one half(2.5')inch compacted lifttof Asphalt.Base'Course; e) Installa 6tid aitd'one half(1.5")inch of Asphalt(Type 6)Wearing Course: (Provide AC at all joints) All work listed1crein must meet the`minimuin"requirements of the Southold Town Highway Specif cations. 17. TreneliinlrofPavement Surfaces Exceeding 0ii6nunilrcd"(100'-1Teet--iiiLenatli:,All trenching of pavenierit'surfaces,exceeding 100' in',length must fh t.be reconstructed to meet,the requirements of Item # 16 as noted above. Once all'pavement reconstruction is completed to'the,satisfaction;of the Highway Siip'eriritendent,the entire road section arid%or width of road'over the entire length of trench'shall be repay' d v"ith'a'two(2"} inch lift of Asphalt(Type 6)Wearing Course(Typical,shoulder-to'shoulder). sj iy Oaklawn Ave (Main Road to Jernick Lane) natonalgrod Southold Road Opening Summary - T101876529 3x3 Bell Holes (7) = 63 Sq Ft 5x3 Send/Receive Pit (3)= 45 Sq Ft 5x8 Connection Pit (2)= 40 Sq Ft Total Square Footage= 148 Sq Ft ' Total Drill Linear Footage= 1350 Ln Ft Engineer: James Perry Contact: (347) 838-0354 CL 8x5 5x3 5x3 5x3 8x5 1320' Oaklawn Ave �iCT CL CL � C Key (All Typical,Not to Scale) ® Soil Excavation ® Roadway Asphalt Excavation ---- Horizontal Directional Drill Trench Line * * * RECEIPT * * * Date: 08/31/16 Receipt#: 212908 Quantity Transactions Reference Subtotal 1 Excavation Permits 1148 $990.00 Total Paid: $99000 Notes: Payment Type Amount Paid By CK#35716 35670 $990.00 National, Grid -Gas Permits. Dept Southold Town Clerk's Office 53095 Main Road, PO Box 1179 Southold, NY 11971 Name: National, Grid -Gas Permits. Dept 175 E Old Country Rd Bid 3 FI 1 Hicksville, NY 11801 Clerk ID: BONNIED Internal ID: 1148