HomeMy WebLinkAbout1000-115.-11-12 d
Town of Southold
A
LWRP CONSISTENCY ASSESSMENT FORM PR 09 2015
Southold Town
A. INSTRUCTIONS Planning Board
1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for
proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This
assessment is intended to supplement other information used by a Town of Southold agency in
making a determination of consistency. *Except minor exempt actions including Building Permits
and other ministerial permits not located within the Coastal Erosion Hazard Area.
2. Before answering the questions in Section C, the preparer of this form should review the exempt
minor action list, policies and explanations of each policy contained in the Town of Southold Local
Waterfront Revitalization Program. A proposed action will be evaluated. as to its significant
beneficial and adverse effects upon the coastal area(which includes all of Southold Town
3. If any question in Section C on this form is answered "yes" or "no", then the proposed action will
affect the achievement of the LWRP policy standards and conditions contained in the consistency
review law. Thus, each answer must be explained in detail, listing both supporting and non-
supporting facts. If an action cannot be certified as consistent with the LWRP policy standards and
conditions, it shall not be undertaken.
A copy of the LWRP is available in the following places: online at the Town of Southold 's
website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all
local libraries and the Town Clerk's office.
B. DESCRIPTION OF SITE AND PROPOSED ACTION /I
SCTM#
PROJECT NAME ,<<.�� 2�`Y,�1'Dl�����,e/�1/T�O,,e.Q1"S1J/LT
R4;T Plmlw& riUrV'-',G
The Application has been submitted to (check appropriate response):
w
Town Board ❑ Planning Board❑ Building Dept. ❑ Board of Trustees
1. Category of Town of Southold agency action(check appropriate response):
(a) Action undertaken directly by Town agency(e.g. capital
construction, planning activity, agency regulation, land transaction) ❑
(b) Financial assistance (e.g. grant, loan, subsidy)
(c) Permit, approval, license, certification:
Nature and extent of action: 'DE�OU 710AI CK EAzr,T l/,dam,�X ',�C/�/py J�,�30�?�Ty D/-' f
_ 'eDr%V AM0 Ca26r. ca f> evcj'A- I. >> p v
00/,P/.moi D10Y w�G1-. ,P���„ " P��II/TFO,�'Ar,B011, r 94 f"T 1,4145416
114�1G J"414 Re 1111 & C(/ v1l 0�y4xylAl& AV/14y.-
#AIPAW. /6�," GaNDev,41p/� elf" ;OC/./p U"Zwp
Location of action: ZZbS LUMON p INjr ,2P
Site acreage: 9, 424
Present land use: 7 J 5N,7 ZAL
Present zoning classification: g/T],t�
2. If an application for the proposed action has been filed with the Town of Southold agency, the following
information shall be provided:
(a) Name of applicant: 4c- 'VZ�V_ AN/2 ID-4"-.4
(b) Mailing address: 127CO 4 LIp77W
�i,�lrnrU�r f. y `Z 9�'z
(c) Telephone number: Area Code ( ) 9/ 7
(d) Application number, if any:
Will the action be directly undertaken,require funding, or approval by a state or federal agency?
Yes ❑ No' If yes, which state or federal agency?
C. Evaluate the project to the following policies by analyzing how the project will further support or
not support the policies. Provide all proposed Best Management Practices that will further each policy.
Incomplete answers will require that the form be returned for completion.
DEVELOPED COAST POLICY
Policy 1. Foster a pattern of development in the Town of Southold that enhances community character,
preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and
minimizes adverse effects of development. See LWRP Section III—Policies; Page 2 for evaluation
criteria.
Yes ❑ No � Not Applicable
?yam L3ddlri F/-) c!>/LL A.VV,�C N0 11VA1C1- 0,V Ca 4V,, l'l..q
��/ C'/lJL 1'F
�S' ,e� F � c►T�'c�J l �i��oM.�,VI
Attach additional sheets if necessary
Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See
LWRP Section III—Policies Pages 3 through 6 for evaluation criteria
❑ Yes ❑ No X Not Applicable
Attach additional sheets if necessary
Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See
LWRP Section III—Policies Pages 6 through 7 for evaluation criteria
❑ Yes ❑ No 6Z Not Applicable
U,OZZ 6v/u 4AV-�F t-1v7r.1--- a�2 ilio 111�'A4C - oti V=.21 14-
aUi�pY
Attach additional sheets if necessary
NATURAL COAST POLICIES
Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP
Section III—Policies Pages 8 through 16 for evaluation criteria
Yes ❑ No ❑ Not Applicable
L 60-`AIG A Z44 ZZIS . f
Attach additional sheets if necessary
Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III
—Policies Pages 16 through 21 for evaluation criteria
❑ Yes ❑ No V�l Not Applicable
Attach additional sheets if necessary
Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including
Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III—Policies; Pages 22
through 32 for evaluation criteria.
❑ ❑
Yes No Not Applicable
Attach additional sheets if necessary
Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies
Pages 32 through 34 for evaluation criteria.
❑ Yes [:] No Z Not Applicable
q/Q
Attach additional sheets if necessary
Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous
substances and wastes. See LWRP Section III—Policies; Pages 34 through 38 for evaluation criteria.
❑ Yes ❑ No ® Not Applicable
PUBLIC COAST POLICIES
Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public
resources of the.Town of Southold. See LWRP Section III—Policies; Pages 38 through 46 for evaluation
criteria.
❑ YeJZ No❑ Not Applicable
/I A140 Bog
Zze-
Attach additional sheets if necessary
WORKING COAST POLICIES
Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in
suitable locations. See LWRP Section III Policies; Pages 47 through 56 for evaluation criteria.
❑ Yes ❑ No V\,I Not Applicable
I
Attach additional sheets if necessary
i
Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic
Estuary and Town waters. See LWRP Section III—Policies; Pages 57 through 62 for evaluation criteria.
❑ Yes ❑ No;MJ- Not Applicable
i
Attach additional sheets if necessary
Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III — Policies; Pages
62 through 65 for evaluation criteria.
❑ Yes ❑ No® Not Applicable
I
i
Attach additional sheets if necessary
I
Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP
Section III—Policies; Pages 65 through 68 for evaluation criteria.
❑ Yes ❑ No 0 Not Applicable
PREPARED BY_ V,4,& A AIM/, /lG TITLE A&6- DATE 7 26
Y.
I-J
• �,� � � is �, ;���., __ "
••
MIN
Is-
'� •• -` .` tom,s' � j'N' ;� _
t� � 1
At
61
x3 + y
:iL 4
'Y`. 1P � � .. i��.'y, is• .. �a W 4�
��� ' �a .�,Y Ja, ��•. � mar►
i A.r :ns Q
cy-
� K
1
"� 1
« err �` • �' .. �' =
At v
tA
Sir
�t ' 'y. � i •a.� _ a o ;' � -rte
Is ASP
v ,
�' � '}` -_wr l.Y �" \: ,•� yA�" teals � �:�t.•.� E
10
Ar
A lot
y
t
17 r
. d
9
�1
e
(7)Flaherty
Taken Feb.14,2015
Looking NE
y
Aj
Vd
f�
_. - (8)Flaherty
Taken Feb.14,2015
I nnkina NW
d ' -
Ix
•we:
`y -.
41L
a r
1 !.
f I
y
►►
4 Y •�.�p-
a
•� i
fes. �. Y I�' F LTi��~ �Y• � �
' �� � � r� l •mak r` v' -+.s' �r
f
9,� � ww _l •
i<�. 7■■ 111{6■/ � � I ..
r.
s
N SURVEY OF PROPERTY
A T MA TTITUCK
TOWN OF SO UTHOLD
_-__SU.FFOLK _C_OUNTY, N. Y.
1 MAR 16 2015
1000-115-11-12
- - ,S'CALK 1'=30'
JANUARY 6, 2015
JANUARY 21, 2015 (PROP. ADD1710N)
ROAD
POIN
OPTON
P '00.00
/,Nx'19'45 O I WATER
r o METER 4.9
1��
1+ l- *N ) ' Z
1�01218.07 POLE , GAIL \
/ POLE �
STf
/ 1
O 4.6> ///
/� wP
a G ,a o
►�
ST(,
NO PAthD FR• H�. 9 Dw
N
� 1
FLOOD ZONE X ,�
FLOOD zoW►n+E •. -��Z
FIAOD 7ONE,,, g,1f �p� �•v1
RAIN RUNOFF CONTAINMENT: a+'E w►�`
PROP. ADDITION: 298 Sq. Ft.
298 x 0.17 x 1 = 50.7 Cu.Ft. S76�0�13 C1'
Provide 1 DWs. 8'0x 2' Deep O�E
Connected by Gutters & Leaders H
DEEP
w0-0-DOC`
AREA s 21,522 90. FT. ° n` -r�
GAY` 1 '•"r j ^�
TO TIE LINE
ELEVA 77ONS & CONTOURS ARE REFERENCED TO NGVD.
-- ---- ----- ----- � :: a
xSi-•
_ _.F_L000_ZONES_F_R_OM FIRM-36103C0482H-9125109
�=• �•--.�� ��
■ = MONUMENT ` 4 '
_ .YS. L/C. N0. 49618
AN ALTERA71ON OR ADDrnON TO THIS SURVEY IS A V10LA77ON YORS, P.C.
OF SEC7701V 7209OF THE'NEW YORK STATE EDUCAT1oW LAW. (631) 765-5020 FAX (631) 765-1797
EXCEPT AS PER SEC'RON 7209-SUBDIVISION 2. ALL COMMA77ONS P.O. BOX 909
HEREON ARE VALID FOR THIS MAP AND COPIES MEREOF ONLY IF
-SAID-MAP OR_COPIES_BEAR_THE IMPRESSED SEAL OF THE SURVEYOR 1230 TRAVELER STREET -148
WOSE 9MA7URE APPEARS HEREON - - - - - - ----SOUTHOLD,-N-Y.--11971----1`t- 4�
i
I
SURVEY OF PROPERTY
N AT MATTITUCK
_ <' 7 `4u <` t TOWN OF SOUTHOLD
.� r r
SUFFOLK COUNTY, N. Y,
i 1.
L' r;?/6) iZ0i5 I J
1000-115-11-12
SCALE: 1'=30'
Scuth�rd T,-,vm JANUARY 6, 2015
JANUARY 21, 2015 (PROP. ADDITION)
i
i
i
i
D
ROA ,
POINT° °•
L
PTpN
x . ,14
WATER Nf
1y J r METER 4.9
\\ / O N•M�ES 18.3, `j
v•07 UTILITY \
O
121 POLE O
�
�ry
t ST(. ,' N 5'� 'e
GAX
� 1
O 4.6 _
O 16s
25.3• 70
O n
y // �• \g6 %,,;�, 15.2 �°
16J P�It,�o +. Z SHSE 11 9e
fK 3 DW 04
�° 28.5' �7.•� �l ��Ey1s• �
7D SV.
'6- ���, �� �',Z� � �� i imp WAu•
01.
LA 1
J
I J 1
FLOOD ZONE X
� 1 i
1ti' J i
sem£ i.w -- �,, ---
J
FLOOO Z0W u% /
FLOOD ZONE
01% (AE
Nbc
RAIN RUNOFF CONTAINMENT: 0•1'E
X65°, K
PROP. ADDITION: 298 Sq. Ft. 6.5dAyvl R (!E♦'
298 x 0.17 x 1 50.7 Cu.Ft. S7 C1"y
Provide 1 DWs. 8'Ox 2' Deep OLE
Connected by Gutters & Leaders x
DEEP
$1000 DOCK
S NEW
AREA a 21,522 SO. FT. co 41o
FME �0Rx
��
TO TIE LINE
ELEVATIONS & CONTOURS ARE REFERENCED TO NGVD.
FLOOD ZONES FROM FIRM J6103CO482H 9/25/09 v_
■ = MONUMENT .Y.S. LIC. NO. 49618
ANY ALTERATION OR ADDITION TO THIS SURVEY IS A VIOLATION ON/ MORS, P.C.
OF SECTION 72090E THE NEW YORK STATE EDUCATION LAW. (631) 765-5020 FAX (631) 765-1797
EXCEPT AS PER SECTION 7209-SUBDIVISION 2. ALL CERTIFlCATIONS P.O. BOX 909
HEREON ARE VAUD FOR THIS MAP AND COPIES THEREOF ONLY IF 1230 TRAVELER STREET
SAID MAP OR COPIES BEAR THE IMPRESSED SEAL OF THE SURVEYOR SOU MOLD, N.Y. 11971 14-148
WHOSE SIGNATURE APPEARS HEREON.
REVISIONS:
I IF
En z
FFI
Q
-oo t I 1 -
I � �
PROPOSED SOUTH ELEVATION
A
SCALE: 1./4" = 1' a
a� H
I
I o
N 1r
x
�3
U �
❑ ❑ ❑ ® EEEIin
I
F:
MAR '16 2015
EXISTING SOUTH ELEVATION
SCALE: 1/4" = 1'
i
DRAWN:MH/MS
SCALE: 1J4"-1'-W
JOE 8:
Jammy 14,1015
SHEET NUMBER:
SHALL N FY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS,THE SPECIFICATIONS,AND THE FIELD CONDITIONS,AND SHALL REQUEST CLARIFICATION BEFORE COMMENCING WORK. CONTRACTOR SHALL VERIFY ALL GENERAL CONTRACTOR TO COORDINATE MEETING WITH OWNERS FOR APPROVAL OF ALL GENERAL CONTRACTOR SMALL E RESPONSIBLE FOR ALL BUILDING DEPARTMENT INSPECTIONS
A-1
PAINTER TO PRIME AND PAINT ALL DOOR EDGES TO MAINTAIN CONTRACTOR OTI
MANUFACTURER'S WARRANTY AND SHALL BE INSPECTED TO VERIFY ALL WORK. DIMENSIONS AND CONDITIONS AT JOB SITE.INCLUDING BUILDING AND SITE CLEARANCES FOR DELIVERY OF EQUIPMENT AND MATERIALS,AND REMEDY ALL DISCREPANCIES WITH ARCHITECT PRIOR TO THE COMMENCEMENT OR CONTINUATION OF WORK. ROUGH ELECTRIC,PLUMBING.AND HVAC P0.10R TO INSULATING AND SHEETROCKING AND SHALL SECURE THE C d O O0.TO RECEIVING FINAL PAYMENT FRpM OWNERS.
NOT F011 C.ONSTI3.IX710N BID SET
i
REVISIONS:
i
z
L ® ® A
W �
Ind
-� -
�1LL - o W
0-0
ji
_
co
TTT lill
--1 J ,
- _ -_ - Q
- - PROPOSED WEST ELEVATION o P4
SCALE: 1/4" = 1'
o�
cq a
PLO
0
ci a
El
v53
U6
aD
EXISTING WEST ELEVATION
SCALE: 1/4" = 1'
DRAWN:
SCALE:
JOB 8:
Jin 14,2015
SHEET NUMBER:
A-2
PAINTER TO PRIME AND PAINT ALL DOOR EDGES TO MAINTAIN CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS,THE SPECIFICATIONS,AND THE FIELD CONDITIONS,AND SHALL REQUEST CLARIFICATION BEFORE COMMENCING WORK. CONTRACTOR SHALL VERIFY ALL GENERAL CONTRACTOR TO COORDINATE MEETING WITH OWNERS FOR APPROVAL OF ALL GENERAL CONTRACTOR SHA BE RESPONSIBLE FOR ALL BUILDING DEPARTMENT INSPECTIONS
MANUFACTURER'S WARRANTY AND SHALL BE INSPECTED TO VERIFY ALL WORK DIMENSIONS AND CONDITIONS AT JOB SITE,INCLUDING BUILDING AND SITE CLEARANCES FOR DELIVERY OF EQUIPMENT AND MATERIALS,AND REMEDY ALL DISCREPANCIES WITH ARCHITECT PRIOR TO THE COMMENCEMENT OR CONTINUATION OF WORK. ROUGH ELECTRIC,PLUMBING,AND HVAC PRIOR TO INSULATING AND SHEETROCKING AND SHALL SECURE THE C of 0 PRIOR TO RECEIVING FINAL PAYMENT FROM CHIMERS.
NOT FOR ("ONS'1TRUCTION BID STT
REVISIONS:
i
J
L _ Q
PC=t��
W
00
a>
Old
z
a
H
0-4
_ AQ
14
d
PROPOSED NORTH ELEVATION
SCALE: 1/4" = 11 a
0
Fes,
0
2
:iT
LEI [I
rV�
LL=j Lw- 1"]
V �
EXISTING NORTH ELEVATION
SCALE: 1/4" = V DRAWN:MJIJMS
SCALE: 1/4'-1'-0'
JOB S:
Jammy 14,2015
SHEET NUMBER:
PAINTER TO PRIME AND PAINT ALL DOOR EDGES TO MAINTAIN CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS,THE SPECIFICATIONS.AND THE FIELD CONDITIONS,AND SHALL REQUEST CLARIFICATION BEFORE COMMENCING WORK. CONTRACTOR SHALL VERIFY ALL GENERAL CONTRACTOR TO COORDINATE MEETING WITH OWNERS FOR APPROVAL OF ALL GENERAL CONTRACTOR SHA U.BE RESPONSIBLE FOR ALL BUILDING DEPARTMENT INSPECTIONS A-3
`+ !
MANUFACTURER'S WARRANTY AND SHALL BE INSPECTED TO VERIFY ALL WORK DIMENSIONS AND CONDITIONS AT JOB SITE.INCLUDING BUILDING AND SITE CLEARANCES FOR DELIVERY OF EQUIPMENT AND MATERIALS,AND REMEDY ALL DISCREPANCIES WITH ARCHITECT PRIOR TO THE COMMENCEMENT OR CONTINUATION OF WORK ROUGH ELECTRIC,PLUMBING.AND HVAC PRIOR TO INSULATING AND SHEETROCKING AND SHALL SECURE THE C d 0 PRIOR TO RECEIVING FINAL PAYMENT FROM OWNERS.
NOT FOR (".ONSTRIA"MON
1111) ,SET
REVISIONS:
'I
------------------------------------ ----------------------------------------------------
i
'
i
i � !
1
1 I
t
r
r � i
1
z
0
H
EXISTING PATIO
' y
w a
O
O
0
' G-UL2X3.RS FJI Q-QC A
• /EX 2XR Rt F1 a n7 O[-� N i ry F%.3%A RS Fl f�20'OC/
EX.4X6 GIRDER
3'-6" 1'-4"
--8x16 VENT ICA
Ind
=I 0sAND TFFTO
G. EXISTING SUNROOM
SLAB
Pu
..
. • z
"'� I EX.FOUNDATION xy EXISTING BASEMENT � ! O
♦ •---"'-��of- TO REMAIN u\i, BLOCK FOUNDATION ( '
I--4 o
tri�X l0 U �
___ __ _ POST
_______
EX.06 GIRDER
' _----_--_-� - ---- _���-
EX LOCUST ---- -- '
I ,
1
8-X16-CONC.PIER m '
W/24'X32'X12' I i FX.2XA Fl reib"OC
- CONC.FTG.(TYP.) u V tO
• m
i num�
num '
i owu O �
uix m N
'lux x r
1EXISTING PATIO °�
Vm
(�,�j(8 Df�FLjJ{;j,aAM (��FM�uSH JW.N , (UNDER WALL ABOVE) r (UNDER WALL ABOVE)EWCRAWLSPACEE
N
ADDITION: ;;O I
1 ♦ REMOVE EXISTING X
' � • AREA:332.0 SQ.FT. nnu m iD
i0 nnm N FOUNDATION(VIF)
e 4
----wr7.,-------------
----------
i i p ; CeQ1
i
1
jI EXISTING CRAWL SPACE 3
i'] s_. DIRT FLOOR �
r
ce
j €> s
®I�6'�
C4 .#5 REBAR 912.00 i
- -. ,:'.' ANon7Fra EXISTING PORCH O
'4 1
M
------------L ______-
8x16 VENT 8x16 VENT 1 ,
8'-10° —0" 8'-61fi" --- ---- - ----- -
19'-41/2"
WALL LEGEND 1).8-THICK POURED CONCRETE FOUNDATION,3000 psi.MATCH EXISTING 4).PROVIDE 2.2X6 ACC)SILL PLATES OTHERWISE NOTED.ADJUST AS REQUIRED TA
FOUNDATION WALL HEIGHT ABOVE GRADE.EXTERIOR OF FOUNDATION FOR FINISHED FLOOR HEIGHT TO MATCH EXISTING.SILL PLATES TO BE COI I I�I D A TT O I�I n
WALL TO BE REMOVED TO BE DAMPPROOFED PER N.Y.S.RESIDENTIAL CODE WITH A BITUMINOUS INSTALLED OVER COP-R-TEX TERMITE SHIELD AND FOAM SILL GASKET.
FOUNDATION„ 1 1 'y r 'y
COATING. i
5).PROVIDE 5/8'DIA.ANCHOR BOLTS AT 6'-0'O.C.AND WA V-17 OF CORNERS. Sl��//��.#'1LE. 1/411 = 11
O EXISTING WALL 2).NEW FOUNDATION TO HAVE 16-X8-CONCRETE(2X4)KEYWAY FOOTING. INTERSECTIONS AND SPLICED JOINTS.ANCHOR BOLTS TO HAVE A
FOOTINGS TO HAVE 2-#5 CONTINUOUS RE-BAR.ALL FOOTINGS TO REST MINIMUM 7'IMB EDMENT INTO THE CONCRETE.EACH ANCHOR BOLT TO
NEW WALL ON UNDISTURBED SOIL(MINIMUM 3000#CAPACITY).CONTRACTOR TO BE ATTACHED TO SILL PLATES WITH 3X3 SQUARE WASHER AND NUT. N 4
VERIFY SOIL CONDITIONS FOR BEARING CAPACITY PRIOR TO CONSTRUCTION. /11
6).DOUBLE UP FLOOR JOISTS UNDER PARALLEL WALLS ABOVE.PROVIDE E 1 1\OJ ECT NORTH
NOTE: 3).CRAWL SPACE SLAB TO BE 2-THICK CONCRETE.POUR SLAB OVER EXISTING BLOCKING AT 8'•0'O.C.AND MIDSPAN,
DIMENSIONS OF EXISTING WALLS ARE FROM FINISHED WALL CRAWLSPACES WITH EXPOSED DIRT.INSTALL 1/2'EXPANSION JOINT MATERIAL
[INT.:2X4-4-1/2',2X6-6.1/2',EXT.:2X4•4',2X6-6'1 WHERE SLAB MEETS ADJOINING WALLS.
DIMENSIONS OF NEW WALLS ARE FROM STUDS
[EXT./INT.:2X4><3-1/2',2X6-5-1/2']
DRAWN:MH/MS
SCALE: 114'-1'-W
JOB III:
1
IEM 14,1115
ER:
PAINTER TO PRIME AND PAINT ALL DOOR EDGES TO MAINTAINCONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS,THE SPECIFICATIONS,AND THE FIELD CONDITIONS,AND SHALL REQUEST CLARIFICATION BEFORE COMMENCING WORK. CONTRACTOR SHALL VERIFY ALL GENERAL CONTRACTOR TO COORDINATE MEETING WITH OWNERS FOR APPROVAL OF ALL GENERAL CONTRACTORS BE RESPONSIBLE FOR ALL BUILDING DEPARTMENT INSPECTIONS
MANUFACTURER'S WARRANTY AND SHALL BE INSPECTED TO VERIFY ALL WORK DIMENSIONS AND CONDITIONS AT JOB SITE,INCLUDING BUILDING AND SITE CLEARANCES FOR DELIVERY OF EQUIPMENT AND MATERIALS.AND REMEDY ALL DISCREPANCIES WITH ARCHITECT PRIOR TO THE COMMENCEMENT OR CONTINUATION OF WORK ROUGH ELECTRIC,PLUMBING.AND HVAC PRIOR TO INSULATING AND SHEETROCKING AND SHALL SECURE THE C of D PRIOR TO RECEIVING FINAL PAYMENT FROM OWNERS. L 1II-
i'
I�
REVISIONS:
i
z
0
H ,
►¢ g
� H
0
I-
0-4H
•un I
Rx I
j
------------------------------
.2'-0-
--------------------- i;
\
.\\\
\
7'-6-
0-f-4'- S-6" f-4'.' \�\
CX145
R g c 1r M46.FP Q) A
FLM HEARTH rA a
EX.LIVING/DINING ROOM EX.SUN ROOM
SfOM UNDER � '
\\\ O
• ,m SLOPED
CEILING
r — *- - �•
I ukksw• 1 16'-9" G1v Gv �
•I K iFRFSH AIR•IE P
Nr wrtH ®0 / -j
O
■�„ II AHD•LINOS II - - - i
I / N 'L J' 100
O -r-(2) Ftl DrN2�LL
0 �x Ix EX.DEDR
I
\ r+7 In O CEILING HEIGHT '
1
____________ � (ALTERED)
I I WAINSCOTTING
N
2.4' 24• ' M I � I I N
• [ 2)IXB HDR • E 2X8 HDR. I I
i 1 i 04
Eo 1 w EX.KITCHEN
5'-11" 6'-8vz" rJ z w
PROVMX DRAIN P l J' EX.ENTRY
i R WALK-IN i i • • 'W/Di .r
BATHROOM
o r- CLOSET 5'-11" 5'-64 a 6' 8'h" -6" 4'-10
• I BATHROOM O O
AL O O ' 3 in
i�l ; 7'-5" oVz" ALK
CLOSET
1 $
OQ
r u I 2 CEI],ING CEILING '
Co
L
tV TEMPERED O •CUT BACK PORCH AS 1 '1
I I ' #�
' CX245 TW2432 i I I REQ.FOR ADDITION
N (2)2XB HDR. 2)2X8 HDR � ( 2X8 HDR i")
TEcxsisED TEMXffe ED TW2432
• tn
------------------------------------------------------------------- B'4S6'i PI TE HEIGHT
ALTERNATIVE BATH LAYOUT 4'-2" 5-,0,�" 5'-6'/'" 3'-93/a"
a
19'-4th" F
WALL LEGEND i).REMOVE EXISTING WALLS,CEILING AND ROOF As INDICATED ON B).INSUUTE nLL�EYV EXTERK)R WALLS.2X6 WALLS AT R19
PLAN. ANO 2X1 W AT R13. CCCVVV,,,JJJJJJ
WALL TO BE REMOVED 2).PLATE HEIGHT AT 8'4 VY+/-:ADJUST FOR MATCHING PORCH 9).INSULATE CEILINGS WITH R30 INSULATION.ALL CATHEDRAL 1ST, FLOOR LAN .
SOFFIT(VIF)•ADJUST EX.WALLS AS REQUIRED(TYP.) SECTIONS TO BE PROVIDED WITH A i•AIR SPACE BETWEEN ROOF
EXISTING WALL SHEATHING AND INSULATION.ALSO PROVIDE 1.1/2'THICK FOAM
3).CEILING HEIGHT AT 10'-01. INSULATION 1'-0'FROM EXTERIOR WALL PLATE INTO HOUSE ON 1 SCALE:
1 C i/�EE _ i E
CATHEDRAL ROOF PARTS. '
NEW WALL 4). EXTERIOR WALLS TO BE FRAMED WITH 2X6 DF12 STUDS AT 16'O.C.. SCALL 1
Schluter -KERDI-SHOWERNORTH WALL TO BE 2X4 TO MATCH EXISTING. 10).ALL WALLS AND CEILINGS TO BE PROVIDED WITH 5/87 SHEET ROCY-
NOTE: BATHROOM TO HAVE MOISTURE-RESISTANT SHEET ROCK.
DIMENSIONS OF EXISTING WALLS ARE FROM FINISHED WALL 5).EXTERIOR SHEATHING TO BE 5/8'THICK FIR CDX PLYWOOD. N
! [INT.:2X4-4.1/2',2X6-6-M',EXT.;2X4-4',2X6-6'] 11).INSTALL SMOKE AND CO DEFECTORS PER CODE.
6).PROVIDE 2.2X8 DFN2 HEADERS OVER ALL OPENINGS UNLESS E PROJECT NORTH
0
Rn' {
DIMENSIONS OF NEW WALLS ARE FROM STUDS OTHERWISE NOTED.ALL OPENINGS OVER 3 FT.TO HAVE 2 JACK 12).INTERIOR DOORS AND TRIM TO MATCH EXISTING.
[EXT./INT.:2X4-3-1/2',2X6-5.1/2') STUDS ON EACH SIDE OF OPENING.PROVIDE 3 JACK STUDS ON
EACH SIDE FOR MICROLAM HEADERS. 13).PATCH.REPAIR AND REFINISH EXISTING FLOORING AS REQUIRED. DRAWN:MH/MS
NEW FLOORING TO MATCH EXISTING IN BEDROOM.TILE BATH.
7).ALL NEW EXTERIOR OPENINGS TO HAVE DESIGN-PRESSURE SCALE: 114-1'-0'
UPGRADES WHERE APPLICABLE.PROVIDE DEBRI-PROTECTION 14).PATCH,REPAIR AND PAINT(TO MATCH EXISTING)INTERIOR WALLS JOB N:
PANELS WITH FASTENING HARDWARE UNLESS OPENINGS HAVE AND CEILING RELATED TO WORK ON ADDITION. ] 14,lA1S
IMPACT GU21N6.
SHE -M I3R:
PAINTER TO PRIME AND PAINT ALL DOOR EDGES TO MAINTAIN CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS,THE SPECIFICATIONS,AND THE FIELD CONDITIONS.AND SHALL REQUEST CLARIFICATION BEFORE COMMENCING WORK CONTRACTOR SHALL VERIFY ALLGENERAL CONTRACTOR TO COORDINATE MEETING WITH OWNERS FOR APPROVAL OF ALL GENERAL CONTRACTOR SHALI BE RESPONSIBLE FOR ALL BUILDING DEPARTMENT INSPECTIONS A-5
5
MANUFACTURERY WARRANTY AND SHALL BE INSPECTED TO VERIFY ALL WORK. DIMENSIONS AND CONDITIONS AT JOB S .INCLUDING BUILDING AND SITE CLEARANCES FOR DELIVERY OF EQUIPMENT AND MATERIALS,AND REMEDY ALL DISCREPANCIES WITH ARCHITECT PRIOR TO THE COMMENCEMENT OR CONTINUATION OF WORK ROUGH ELECTRIC,PLUMBING,AND HVAC PRIOR TO INSULATING AND SHEETROCKING AND SHALL SECURE THE C of 0 PRIOR TO RECEIVING FINAL PAYMENT FROM OWNERS.
NOT FOR CONSTRIA3TIONBII) SFNr