Loading...
HomeMy WebLinkAboutTR-1913ALL MOORINGS AND '~'AKES MUST DISPLAY VISIBLE M~oRING NUMBERS ALL DOCKS AND BULKHEADS MUST DISPLAY VISIBLE PERMIT NUMBERS Board Of $Outhold Town Trustees sOUTHOLD, NEW YORK Mooring ~ N/A ISSUED TO T,eonard Beckenstein ................................................ Pursuanf fo fha provisions o{ Chaplet 615 of fha Laws of fke Sfafe o{ New York, 1893; and Chapfer 404 of fha Laws o{ fha 5fare o{ New York 1952; and fha Soufhold Town Ordinance eh- rifled "REGULATING AND THE PLACING OF OBSTRUCTIONS IN AND ON TOWN WATERS AND PUBLIC LANDS and fha., REMOVAL OF SAND, GRAVEL OR OTHER MATERIALS FROM LANDS UNDER TOWN WATERS;" and in accordance wlfk fke Resoluflon of The Board adopfed afa meeflng held on .N....o..¥.........l.~..,.. of ~.a.t..t..it.2.c.,~ .......................................................... N. Y. and subiec+ fo fhe Terms and CondiHons I~s~ed on fhe reverse side hereof, of Soufhold Town Trustees aufhorizes and permifs fhe following: Application approved to constr'uct a 4' x 40' fixed elevated, catwalk, 4' x 1.6' ramp; and. (2) 6' x 20' floats in "L" shape, in Mattituck Creek, Mattituck all in accordance wi+h fhe de~ailed speclficafions as presenfed in fhe originating application .... ..-.- IN WITNESS WHEREOF, The said Board of Trus('ees kere- . by causes i+s Corporafe Seal +o be fhese presen+s be subscribed by a .maiorify of as of INSTRUCTIONS: TOWN OF SOUTHOLD SHORT ENVIRONMENTAL ASSESSMENT FORM --ga) in order to answer the questions in this short EAF it is assumed that the preparer wili use currently available £nFormation concerning the project and the likely impacts of the action. [t is not expected that addit£onai studies, research or other investigations w£1! be undertaken. (b) If any question has been answered Yes the project, may be s~gnificant and a completed Environmental Assessment Form is necessary. (c,) [£ all questions have been answered No it is ~ikely that this project is not significant. (dj Ehvironmental Assessment ~. ~i~t project ~esu~t in a large physica! change to the p~oject site or physically alter more than l0 acres of land9 Yes >~No 2. Will there be a majo~ change to any unique or ' unusual land form found on the site? .......... Yes No 3. ~il! pro ect alter or have a large effect on ~-- existing body of water9 Yes No 4. Wiii project have a potentially la~ge impact . ~ on groundwotYr quality? ....................... Yes No 5. Wilt p~ojec-t significantly effect"droinoge .... flow on adjacent sites? - Yes No 6. Will pro ect affect any threatened or - endangered plant or anima~ species? ........... Yes 7. Will project result in o major adverse effec~ -- on air quality? Yes 8. ~'/ill pro3ect have o major effect on visual - character of the community or scenic views or vistas known to be important to the community? Yes ?. Will project adversely impact any site or structure of historic, prehistoric or paleontological importance or any site designated os o cr£ticol environmental oreo by o local agency? ..- · ''. .......... .... '-'~.;'-.'-;",o.~. Yes 10. Will project have a major effect on existing -' o= future ~ecreational opportunities~.......... Yes 11. ~ill project result in major t~affic problems ' or cause a major effect to existing transportation systems? ....................... Yes 12o ~fill project regularly cause objectionable odors, noise, glare, vibration, or electrical disturbance as a result of the project's operation~ 13. Will project have any impact on public health" or.safety? .................................... Yes 14. ~lill project affect the existing community by" directly causing a growth in permanent population of more than, 5 percent over a one year period or have a major negative effect on th~ character of the community or neighborhood? .................... ~ ............ Yes 15. ls there public controversy concerning the project?...~. ....................... Yes REpREsENTING - ATE, AuEust ,,1 No No No No No No No Leonard Beckenstein 15 Farm Road St, James, New York 11780 June 29 1984 To whom it may concern: I authorize Enconsultants Inc. to act as my agent in order to acquire permits to place floating docks in Mattituck creek in front of my two pieces of property. Said properties are located on the map entitled "Map of Jackson"s Landing at Mattituck "and are properties #3 and #8 on said map~ Properties are in Mattiiuck, Su££olk County, New York. /'f~ V-T/Toe/< II 0 ~oo_+'T'o Wi'i,',, R O,. 3o ~o _ J .~,flP Q?) ~c/~C~ 1"~3oo0~ iT----- To: From: Re: Date: Don Dzenkowski, Bay Constable Ilene Pfifferling, Clerk Dock Inspection Sept. 11, 1986 Don, please make an inspection of the dock located on Jacksons Landing Mattituck. Copy of permits and specifications are attached. Please advise. Thank you. Ilene ALL DOCKS AND BULK- HEADS MUST DISPLAY .... VISIBLE PERMIT NUMBERS. ALL MOORINGS AND STAKES MUST DISPLAY VISIBLE MOORING NUMBERS. BOARD OF TOWN TRUSTEES TOWN. OF SOUTHOLD Main Road Southold, New York 11 97I Telephone (516-765771892) NOTICE OF ACTION - NOT A PERMI. T ~'~ J To. En-Consultants, Inc for Leonard Beckenstein 1. Your application, dated . . .8/.1.7. /. .8.4. ....................... has been reviewed by this Board, at a meeting of the Trustees held on .... .Ng".v.e..m~..e.r...2.6.,..1..9.8.4. ...... and resulting in the action, as indicated below: Application approved~ Application denied. ' ( .....) Application tabled. 2. Comments and remarks: '- Your application has been approved by resolution at the November 26, 1984 Trustee Meeting. The following fees are due and pay.able, before your permit will be issued. If your application is approved above, a Permit Fee is now due, and should be made payable to the order of the Board of Southold Town Trustees. This fee is computed below according to the Schedule of Rates. as set forth in the Instruction Sheet (Form i/1). This fee must be paid within 90 days or reapplication and additional fee will be necessary. if the Permit Fee is paid in person to the Clerk of the Board, the Permit will be obtainable at the same time. If the fee is paid by mail, the Permit will be mailed in reply. 4. 1. 4' x 40' catwalk 1. 4' x 16' ramp 2. 6' x 20' floats 2. spiles Computation of Permit Fee: @ .25 per sq. ft. = $40.00 @ .25 per sq. ft. = 16.00 @ .25 per sq. ft. = 60.00 @ $5.00 each 10.00 Total amount due $ 126.00 A $5.00 inspection fee is now due for the Wetland Permit also. $5.00 Total due. $131.00 Total Fee for. this application ............................. $....1.3.1.;0..0 ........ President. Board, of/.)S,~lthold Town Trustee Clerk, Board of S~6tffol~d Town Tru~/L/ees BOARD OF TOWN TRUSTEES Town O~ Southold Main Road .Southold, New York 11971 APPLICATION FOR FIXED and/or FLOATING DOCKS 2. Contractor's name and address: ....... .3..~..m..e..s...~.......R.a..m...b.~.....~..n..~.~.:...B..~..s..h.9.p..s....L..~..n..e.:....~.~R~ ....... l~e~...Yoxk.. J.~.9.6~ .... 3. Briefly explain the purpose of this application: ...gp..n..s..~..r..u..~.~...9..n..e....~.~...m..b..e..r....d.9..~..k....~..n....L.~~ ..... ....... 3.:. ...... h.°..'....e..$.x, f,.3.....5, fi nnfl...(g ...... ................................................................................................................... 4. After issuance of a Permit, I expect to: (mark by an X9 (a) Commence work -X_ AT ONCE ............ ; ASAP ............ ; UNKNOWN ............. (b) Complete work in ~ 1 DAY .... .X. ...... ; 1 MO ............. ; ] YR ............. ; FUTURE ............. 5. Secure the correct Area Map from the Secretary of this Board, ,and by using an X WITHIN A CIRCLE indicate as closely as possible the location: of this dock. On. the reverse side of this map, provide a SCALE DRAWING which will show Ordinary High Water Mark, the shape and size of the dock and any supplemental pilings which are needed to hold a floating dock or tie-up a boat..Give all dimensions necessary to determine the area of the dock surface which extends offshore from the O. H.. W. M. Will any portion of this construction extend offshore into Town Waters beyond an imaginary line or boundary formed by other similar structures along the areo's shoreline? YES or NO. If it does extend, beyond this so-called dock line indicate by how fa,r, approximately ........... ft. Provide the following documents: (a) A Licensed Engineer's 'Survey of the property involved. (b) A copy of t'he Contractor's Plans and Specifications. Will this construction require the Filling of any land offshore of the Ordinary High Water Mark or the Dredging of any material from Town La,rids under water? YES or NO. If it does, Form A/4 (Application for Dredging/Filling) must be completed and attached as port of this application. In requesting approval of this application, I submit that: the information presented herein is true and correct to the best of my knowledge and belief; I am the person accountable for the performance of the work in accordance with the plans and specifications attached; I have read or am familiar with the provisions of any Southold Town Ordinance pertinent to the work involved; and furl"her, I intend to adhere to and abide Permit, when and if issued to me. Ty the Terms and Conditions of the .Accepted by: Dated: August 8, 1984 / / ./ I/