HomeMy WebLinkAboutPre Submission Materials MAILING ADDRESS: PLANNING BOARD MEMBERS fP SOF S , `� P.O. Box 1179 Southold, NY 11971 DONALD J.WILCENSKIy Chair OFFICE LOCATION: Town Hall Annex WILLIAM J.CREMERS PIERCE RAFFERTY ' 54375 State Route 25 JAMES H.RICH III 1 (cor. Main Rd. &Youngs Ave.) MARTIN H.SIDOR COU w� Southold, NY Telephone: 631 765-1938 www.southoldtow-xmy.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD August 26, 2015 Denise J. Vista, Esq. Amato Law Group, PLLC 666 old Country Road, Suite 901 Garden City, NY 11530 Re: Proposed Verizon Wireless Co-location at East Marion Fire District Located at 9245 NYS Route 25, East Marion, NY 11939 SCTM#1000-31-3-11.31 Zoning District: HB & R-40 Dear Ms. Vista: The Planning Department is in receipt of an application to co-locate on an existing wireless facility and related equipment at the existing site referenced above. Pursuant to §280-74A(d) of the Town Code, the Planning Board will hire a Technical Consultant to aid in the review of the application and hereby requires the submission of $4,000.00 into an escrow account with the Town Comptroller's Office to cover the cost of the Technical Consultant's review. Please remit a check in the amount of$4,000.00 payable to the Town of Southold. Any unused portion of the Technical Consultant's Fee will be returned to you. Our consultant is Cityscape Consultants, Inc. They may contact you directly regarding this application. If you have any questions regarding this application or its process, please do not hesitate to call this office. Thank you in advance for your prompt payment. Very truly yours, Brian A. Cummings Planner Zmz=s Consultants, Inc. 7050 West Palmetto Park Road#15-652 Boca Raton,Florida 33433 Tel:877.438-2851 Fax:877.220-4593 LETTER OF AGREEMENT Sb�. p(a I�A��M� .� August 25, 2015 ° Heather Lanza, AICP,Planning Director , Town of Southold Plaiirme g Board 53095 Route 25 Southold,NY 11971 Southold,New York 11971 Re: Agreement between Town of Southold,New York(Town) and CityScape Consultants, Inc. (Consultant), dated March 5,2013 (Agreement) Dear Ms. Lanza, CityScape agrees to provide a review and analysis for a wireless application submitted by Verizon Wireless to collocate on an existing wireless facility located "for proposed new tower construction located at 9245 Main Road,East Marion, SCTM#1000-31-3-11.31 (Application). Review services for the Application will be performed at an agreed upon rate of four thousand dollars($4,000). There will be no additional costs or fees associated with the review of this Application and/or follow-up letters relating to this Application. Consultant will provide the services as outlined in Exhibit A, Scope of Services, of the Agreement referenced above. Sincerely, Kay Miles MAILING ADDRESS: PLANNING BOARD MEMBERS f � .. P.O. Box 1179 DONALD J.WILCENSKISouthold, NY 11971 Chair OFFICE LOCATION: WILLIAM J.CREMERS Town Hall Annex PIERCE RAFFERTY 54375 State Route 25 JAMES H.RICH III (cor. Main Rd. &Youngs Ave.) MARTIN H.SIDOR ` �� ). Southold, NY Telephone: 631 765-1938 www.southoldtownny-gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD August 13, 2015 Mr. Richard L. Edwards d/b/a CityScape Consultants, Inc. 7050 Palmetto Park Road Boca Raton, FL 33433 Re: Verizon Wireless at East Marion Fire District Located at 9245 Main Road, East Marion, NY 11939 SCTM#1000-31-3-11.31 Dear Mr. Edwards: The Planning Department is in receipt of an amended Site Plan Application for Verizon Wireless to co-locate on the existing wireless facility referenced above. Pursuant to §280- 74(A)(4) of the Southold Town Code, the Planning Department is seeking your assistance in reviewing and evaluating the application, including the construction and modification of the site, once permitted, and any site inspections. Please provide an estimate for the cost of your consulting services to determine whether the application meets the General Requirements in the Southold Town Code for maximum permissible exposure. Should the Planning Board approve your estimate, a purchase order will be provided authorizing this application's review to begin. Please, do not start any review until you are authorized to do so in writing. If you have any question or comments, please contact me. Best regards, Brian Cummings Planner .� 2' TOWN OF SOUTHOLD "" FORM NO. 3 Ott U 0 3 2 0�',i NOTICE OF DISAPPROVALL�: cit-45Gtiri T6 W1 9llara*u Board _.. ..m-...._, �ry DATE: August 3, 2015 TO: Amato Law Group (Verizon Wireless) 666 Old Country Road Suite 901 Garden City, NY 11530 Please take notice that your application dated July 13, 2015 For permit for construction of a new public utility wireless facility w/generator at Location of property: 9245 Main Road, East Marion, NY County Tax Map No. 1000 - Section 31 Block 3 Lot 11.031 Is returned herewith and disapproved on the following grounds: arc, c �� tt use_c r tlr::-1 r cl ill the 1,111 oil is ;), t)lrlted ��rz�;cstipr�rt to.r,.`ili Plan_rev_iew_by )p i�lrrr ����r m� ,.� .. .. ALr Wi ize l Sig, l" o r c CC: file, planning Note to Applicant: Any change or deviation to the above referenced application, may require further review by the Southold Town Building Department. TOWN OF SOUTHOLD BUILDh-q0' PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health .. SOUTHOLD,NY 11971 4 sets of Building Plans _.. TFL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 suryey South olo ortor . et PERMIT NO. Check Septic Form.... N.Y.S.D.E.C. Trustees C.O.Application Flood Permit Examined 20 Single&Separate Storm-Water Assessment Form Contact: Denise J. Vista, Esq. Amato Law Group, PLLC Approved 20 Mail to: 666 Old Country Road, Suite 901 Disapproved arc den Ci , NY 31530 Phone..... !L5161 aa7-F363 .. Expiration ,20 Building Ins ector _.. PPLi `AiION FOR BUILDING PERMIT JUL 13 2M Date July 9 .. 2015 �- - ---� INSTRUCTIONS a. This ap�tp c-a-"-Mii-*S I'be-co lrleltly--fi .d in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or areas,and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws, Ordinances or Regulations,for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances,building code,housing code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. NewYork Lim' d f artnersbip d/b/a Verizon Wireless N John Want Cd ofapplic Title: i®r corporation) rn quipffien c/o 666 Old Country Road, Suite 901 Garden Ci ..11 mm3® .... (Mailing address of applicant) State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder Aplicant is Lessee of property Name of owner of premises East Marion Fire District ... ... _ ...... ..., ... (As on the tax roll or latest deed) If applicant is a corporation, signature of duly authorized officer (Name and title of corporate officer) - Builders License No Plumbers License No _. Electricians License No. � Other Trade's License No. 1. Location of land on which proposed work will be done: East o 9245.,,._.... ad, w....... ........_. ... .-..�. ..........__ ___....._ -w..........,, .__... House Number Street Hamlet County Tax Map No. 1000 Section 31 lock. 3 11.031 Subdivision w Filed Map N —Lot 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy jKg_pMartWut and ublic nt�lity wireless commmization. facility b. Intended use and occupancy Same, and new public utility eless commmication 3. Nature of work(check which applicable):New Building Addition Alteration Repair Removal Demolition Other Work diesel star (Description) 4. Estimated Cost ,000.00 Fee (To be paid on filing this application) 5 dg number of dwel If number of ling units —Number of dwelling units on each floor If garage, 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. Mmucipal/Publi utility wireless communization facilit; 7. Dimensions of existing structures, if any: Front Rear Depth Height, Number of Stories Dimensions of same structure with alterations or additions: Front Rear Depth Height Number of Stories Length Width i Depth 8. Dimensions ions of�entire new cons construction: � enerator i t compound 9. Size of lot: Front Rear Depth 3.0583 acres 10. Date of Purchase NIA Name of Former Owner Applicant 3s lessee of Property 11. Zone or use district in which premises are situated EUmilett Business and R-40 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO x 13. Will lot be re-graded? YES NO x Will excess fill be removed from premises?YES NO x East Marion 14.Naj=s of Owner of premises Fire District Address 245 Road Phone No. Name of Architect William F. colli Address lO-:t Tec nolo nr. Plione No 631 68mgk5o Name of Contractor Comcell construction c Address 1373 Lincoln Avenue Phone No. (631) 654-59]5 Holbrook 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO x * IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C.PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO x * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale,with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey„ 18. Are there any covenants and restrictions with respect to this property? * YES X NO * IF YES, PROVIDE A COPY. STATE OF NEW YORK) SS: COUNTY OF Nassm un-tehnif of New York SKSA Limited Partnership John Wal d/b/a VerlEon wireless being duly sworn,deposes and says that 40he is the applicant (Name of individual signing contract)above named, ($)He is the seniori r- nt of the lessee of the pr q (Contractor,Agent,Corporate Officer,etc.) and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief;and that the work will be performed in the manner set forth in the application filed therewith. Sworn to before me tbi ly of -Q, '2 New Yor f ed Partnership d/b/a Verizon Wireless or HOWra i ERNANDEZ Sicnature of Applicant ROTARY E RLiC.STATE of NEW Y v"' Walde ' Registration No.fit HE6322291 Title: Senior Rngineer-Equipment Qualified in Su, k meant Commission Exphs March R A UTORIZATIONAND CONSENT WHEREAS, New York SMSA Limited Partnership d/b/a Verizon Wireless ("Verizon Wireless"), having a principal place of business located at c/o Amato Law Group, PLLC, 666 Old Country Road, Suite 901, Garden City, New York 11530, desires to install and operate the proposed public utility wireless communication facility (the "Communication Facility") on certain real property located at 9245 Main Road, East Marion, in the Town of Southold, County of Suffolk, State of New York, and known as and designated as District 1000, Section 31, Block 3, Lot 11.031 (the "Property"), owned by the East Marion Fire District(the "Owner"), and WHEREAS, Verizon Wireless, in order to install and operate the proposed Communication Facility, must submit to the Town of Southold (the "Town") certain zoning applications and/or building permit applications. WHEREAS, the Owner agrees and consents to Verizon Wireless' submission of all necessary zoning and/or building permit applications to the Town, as well as any other application required by any federal, state or local entity with jurisdiction thereof, such that the required approvals for the proposed installation and operation of the proposed Communication Facility are necessary. NOW, THEREFORE, the Owner hereby authorizes, consents and agrees to have Verizon Wireless act as its agent, as follows: I. The Owner hereby consents to the filing of all necessary applications by Verizon Wireless with the Town, and any other necessary federal, state or local agency, with respect to the installation and operation of the proposed Communication Facility on the Property. 2. Verizon Wireless shall have the authority to act as the limited Agent for the Owner, thereby permitting Verizon Wireless to execute and complete any necessary documents on behalf of said Owner as may be required in order to obtain the necessary approvals and permits to install and operate the proposed Communication Facility. 3, This Authorization shall be limited solely for the purpose of permitting Verizon Wireless to obtain the necessary approvals and permits to install and operate the proposed Communication Facility, and for no other purpose. 4. This Authorization shall terminate, and be of no further force and effect, only after Verizon Wireless receives the necessary Town, federal, state and/or local approvals and permits required to install and operate the proposed Communication Facility. EAST MARION FIRE DISTRICT By. . � Name: J 1Y " Title: do W eh 5 e1 Sworn to before me this the cay of ' Ol5 i N �Puels JOSEPH CHEREPovoui Notaryul)'lic,StsrO f e "or . No.4 a l ouc t Tbrmapires stember 30,, e IT FOR INTERNAL USE UI LY SITE PLAN USE TERMN Tt0 �� C [1]", �1 11��� i 3 (1 , w. inwai deter6inafiion u . Date dent: �� �.._ --J l Date: Project Name. ,. Project Address I •�1 Zoning District: . -- 1 Suffolk County Tax Map No.:1000-a L Requestx l�catio�i and 0 ...� � t�.�ng docume��tation a� o Note: ISP cl° it Aip supl" COPY ��� t ..gid P �o� � lei I��� suk�rnitted.) propos„ Initial Determination as to whether use is perrnitted:,_ 1. 0 Initial rind w �Dete.rmination as to whether site plan is���,�� ... ,. .� - n� ector �... Sigw U11dir , Planning Department (P.D.) Referral:---. ..�.. pa D I I S te of Comment- P.D. omm ent: p,.p. Date Received:= 3 -- Comments: , � W ULw „ . Signature viewer ture of Planning Dept. Staff Re g . Final Determination Decision: _..� _... - ci.,,nhirP of Riii0ina In�nPctnr TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health-- SOUTHOLD,NY 11971 4 sets of Building Plans,,,,,__, TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 Survey__ SoutholdTown.NorthFork.net PERMIT NO. Check--,,,,,,, Septic Form__, N.Y.S.D.E.C, Trustees C.O.Application Flood Permit ­­— Examined---­ 20­ Single&Separate— Storm-Water Assessment Form Contact: Denise J. Vista, Esq. Asato Law Group, PLLC Approved­­-­................. 20Mail to: 666 Old" '� y Road, Suite 91 Disapproved a/c Garden Clitm, MY M30 Phone:--jufi1-22zfi3fi3-­— Expiration 20 Building Inspector APPLICATION FOR BUILDING PERMIT Date July 9 ­­­­, 2015 INSTRUCTIONS a.This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale.Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application,the Building Inspector will issue a Building Peitto the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f.Every building peitshall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the peitfor an addition six months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws, Ordinances or Regulations,for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances,building code, housing code,and regulations,and to admit authorized inspectors on premises and in building for necessary inspections. Nkmw York Lim: artnership d/b/a Verizon Wireles (Si nature of applicant or name,if a corporation) igi kll..i 3obb k1lden Title: Senior Engineer-Equipa c/o 666 Old Country Road, Suite 901 Garden Ci NY M30 (Mailing address of applicant) State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder Lessee of 1propejty Name of owner of premises East Marion Fire District . ........ (As on the tax roll or latest deed) If applicant is a corporation, signature of duly authorized officer (Name and title of corporate officer) Subdivision Filed ML, 40...- — —Lot 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy b. Intended use and occupancy_ same and vow Public Ut*A;kdKq3Less communipAkipp L-WoRr'Itar 3. Nature of work(check which applicable):New Building Addition w _Alteration Repair Demolition 6ther Work --AAt 4. Estimated Cost oo Fee (Description) (To be paid on filing this application) 5. If dwelling, number of dwelling units_—,,.,. ...._Number of dwelling units on each floor.­­­...... If garage, number of cars 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. wireless taminnicatiAm faclu 7. Dimensions of existing structures, if any: FrontRear—,­­­­., Height--Number of Sto—ries-- Dimensions of same structure with alterations oradditions: Front Rear Depth_ Height Numbe—ro'f—Stor-ie—s---­— (e cons oLength th .qui cc 8. Dimensions of entire new nsruTc­di)6n*:franL VidDepth Height, 91± fir . V3LthXn_TWJpment caqwuDd 9. Size of lot: Front Rear Depth 3.0583 acres 10. Date of Purchase N/A -Name of Former Owner . ftlic is lessee of pETT" 11.Zone or use district in which premises are situated- BmIett Bminess and A-40 12. Does proposed construction violate any zoning law, ordinance or regulation? YES—NO x 13. Will lot be re-graded? YES_NO X Will excess fill be removed from premises?YES NO x East Hu-ion. 14.Names of Owner of premises—Fire District Address--22&Ljqgn mom Phone No. Name of Architect wijLiLian F. Collins —Address io-JL TechnGIRKLpr. Phone No-ifi3il-Aa9:Name of Contractor-ceme-e-iii. consquet 2n cox54p Address 1373 Lincoln Aveme Phone No. 16330 6 -59 101sio—ok 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO X IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. ITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES—NO x IF YES, D.E.C. ITS MAY BE REQUIRED. 16. Provide survey, to scale,with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES X NO— * IF YES, PROVIDE A COPY, STATE OF NEW YORK) SS: COUNTY OF imssan. I au-behalf of am York SuSA JohnLimited Partuership --AjWa�Verizan wireless being duly swom,deposes and says that f4he is the applicant (Name of individual signing contract)above named, He is the—serdor ee the lessee of jye��ty, (Contractor,Agent,Corporate Officer,etc.) w TOWN OF SOUTHOLD Ir FORM NO. 3 NOTICE OF DISAPPROVAL fly"rVlr�rw gIhaid DATE: August 3, 2015 TO: Amato Law Group (Verizon Wireless) 666 Old Country Road Suite 901 Garden City, NY 11530 Please take notice that your application dated July 13, 2015 For permit for construction of a new public utility wireless facility at Location of property: 9245 Main Road, East Marion, NY County Tax Map No. 1000 - Section 31 Block 3 Lot 11.031 Is returned herewith and disapproved on the following grounds: � _ jsed use on Sit ,par ;.�l in the HB Zone is� ttej ittm��� ed ptj��,�K����t�� fat St��..N�1�tit �����w 1�� 1�1��- The sd_ ........................... r titltot ize(I Signature CC: file, planning Note to Applicant: Any change or deviation to the above referenced application, may require further review by the Southold Town Building Department. TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING ENT Do you have or need the following,before applying? TOWN HALL Board of Health_T SOUTHOLD,NY 11971 4 sets of Building Plans TEL: (631)765-1802 Planning Board approval FAX: (631) 765-9502 Survey.............. .... _.._.m_.... out of To . ort or .net PERMIT NO. Check-— Septic Form ..... .... _ . N.Y.S.D.E.C._ mIT.. Trustees C.O.Application Flood Permit Examined----....-.,20 Single&Separate__,,._,.,,_ Storm-Water Assessment Form Contact: Denise J. Vista, Esq. PUL " .......... to LW W t�Grou_p_, Approved- pp PPed Mail to: �6 Oldfinn �R,a4a�d0� wite 901 Disapproved a1 Ph ne: (516) 227-6363 Expiration 1 :.. r 20. In nspector ACATION FOR BUILDING PERMIT JUL 13 N Date,...... July 9,_._.�......_, 201-5 INSTRUCTIONS This application MUST be compl tely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plat plro-to°tel according to schedule. b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or areas,and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months.Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York,and other applicable Laws, Ordinances or Regulations,for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances,building code,housing code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. yo d a tnerstaip d/b/a Verizon Vxrele, ley: _ iSienature of applicant or name,if a corporation) r Jotxxn 9 dlden Title. S "or ineer-Equipment c/o 666 Old Cotmtry Road, Suite 901 Garden City, MY M30 (Mailing address of applicant) State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder Applicant is Lessee-of..McTerty Name of owner of premises..... East Marion Fire District (As on the tax roll or latest deed) If applicant is a corporation, signature of duly authorized officer (Name and title of corporate officer) Builders License No. Plumbers License No. Electricians License No. Other Trade's License No. 1. Location of land on which proposed work will be done: 9245 Main Road, East Marion House Number Street Hamlet County Tax Map No. 1000 Section 3iL Block 3 Lot n.031 Subdivision Filed Map 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: g occupancy _ _- � e apd public,utility fireless en ation facile a. Existing use and occu anc ire artm�ent , b. Intended use and occupancy sae and new public utility wireless commamication facility 3. Nature of work(check which applicable):New Building Addition Alteration Repair_ _ Removal—_IT___ Demolition Other Workyub is utility wireless coaimicatia (Description) Facility 4. Estimated Cost anxgam 6 125.000.00 Fee ... (To be paid on filing this application) 5. If dwelling, number of dwelling units Number of dwelling units on each floor., If garage, number of cars 6. 1f business, commercial or mixed occupancy, specify nature and extent of each type of use. symigivallftblic urility tower wireless communication facilit 7. Dimensions of existing , if any: Front Height no,* agl Number of Stories N/A Dimensions of same structure with alterations or additions: Front _ N/A Rear N/A Depth--___gL& Height�c Number of Stories x,A_ (equipment co,po,M4) Length Width 8. Dimensions of entire new construction: Depth Height 91t Number of Stories N/A 9. Size of lot: Front Rear Depth 3.0583 acres 10. Date of Purchase N/A Name of Former Owner Applicant is lessee of property 11. Zone or use district in which premises are situated Hamlett Business and R-40 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO a 13. Will lot be re-graded? YES NO x Will excess fill be removed from premises?YES NO x East Marion 14.Names of Owner of premises Fire District Address 9245 Main Road Phone No.Afin4jz= u Name of Architect William F. collies Address 10-1 Tecbnolo" Dr. _Phone No (631) 689-845o Name of Contractor Cowell construction corp. Address 7373 Lincoln Avenue .Phone No. (631) 654-5915 Ho rook 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO a * IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C.PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO x * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale,with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below,must provide topographical data on survey. 18.Are there any covenants and restrictions with respect to this property? * YES a NO * IF YES, PROVIDE A COPY. STATE OF NEW YORK) SS: COUNTY OF Nas f of New York SMSA Limited Partnership John Walden, d/b/a Verizon Wireless _ being duly sworn,deposes and says that f0he is the applicant (Name of individual signing contract)above named, (S)He is the Senior EpgjueerjT t of the lessee of the propert�r (Contractor,Agent, Corporate Officer,etc.) mxmmmma and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be performed in the manner set forth in the application filed therewith. Sw m to before me this day of 1 .20/5 NewY ted Partnership d/b/a Verizon Wireless Si ature of Applicant John Walder Title: Senior Engineer-Nquipment A UTHORIZATIONAND CONSENT WHEREAS, New York SMSA Limited Partnership d/b/a Verizon Wireless ("Verizon Wireless"), having a principal place of business located at c/o Amato Law Group, PLLC, 666 Old Country Road, Suite 901, Garden City, New York 11530, desires to install and operate the proposed public utility wireless communication facility (the "Communication Facility") on certain real property located at 9245 Main Road, East Marion, in the Town of Southold, County of Suffolk, State of New York, and known as and designated as District 1000, Section 31, Block 3, Lot 11.031 (the "Property"), owned by the East Marion Fire District (the "Owner"), and WHEREAS, Verizon Wireless, in order to install and operate the proposed Communication Facility, must submit to the Town of Southold (the "Town") certain zoning applications andJor building permit applications. WHEREAS, the Owner agrees and consents to Verizon Wireless' submission of all necessary zoning and/or building permit applications to the Town, as well as any other application required by any federal, state or local entity with jurisdiction thereof, such that the required approvals for the proposed installation and operation of the proposed Communication Facility are necessary. NOW, THEREFORE, the Owner hereby authorizes, consents and agrees to have Verizon Wireless act as its agent, as follows: 1. The Owner hereby consents to the filing of all necessary applications by Verizon Wireless with the Town, and any other necessary federal, state or local agency, with respect to the installation and operation of the proposed Communication Facility on the Property. 2. Verizon Wireless shall have the authority to act as the limited Agent for the Owner, thereby permitting Verizon Wireless to execute and complete any necessary documents on behalf of said Owner as may be required in order to obtain the necessary approvals and permits to install and operate the proposed Communication Facility. 3 This Authorization shall be limited solely for the purpose of permitting Verizon Wireless to obtain the necessary approvals and permits to install and operate the proposed Communication Facility, and for no other purpose. 4. This Authorization shall terminate, and be of no further force and effect, only after Verizon Wireless receives the necessary Town, federal, state and/or local approvals and permits required to install and operate the proposed Communication Facility. EAST MARION FIRE DISTRICT By: Name:/,3 'y V".)6X-_We-rf4_ Title: w en e 5s Sworn to before me this the ,Z&ay of 015 N Pu I is JOSEPH CHEREPOWICH NOtarY PublicState of New yore 48:0461 No. � N1 ,Suffolk Con u 1 ty ,arm EV,"as SaPtember 30,,?-vi 2r 5O VDJ 'p,o) A Mz 0� UI��Y . FOR INTERNAL... USE SITE PLAN USE ETERMINAI"LO �iUmRlown pl,,11p r Board Initial De 1p n tiol Date Sent:�f_ f-� a Date: _ 3 Project-Narne: N��, r d �Yk Project Address: �_ . I1 � t"ict: y _ .:1000-� � — • Zoning DiOt Suffolk Count Tax Map No Ilcatio -_. . I and � Ipportir�d dotlentaticr a� o tote Col)Y-01 f l ui4 s (s 4µ ermit , -sub proposed rise or uses �>l�ould La�� ���It:�niitted,) -Ini$ial Determination as to whether use is pei milted: 4 - itial Determination to whether site plan is r ' m zujuu I n .. tot . .� Sign Planning Departr-ne nt tMl",4 ,) l e Leri I. pate of Comment:�_� P..D. Date R( ceived:-- Coininents: � _. Signature of Pi ailing Dept. Staff Reviewer Final petermination Date: �= Decision: – � e:,i„afiirpmof Rnildino Insnpctnr '� TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD, NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Board approval_,,_ FAX: (631) 765-9502 Survey_ SoutholdTown.NorthFork.net PERMIT NO. Check Septic Form N.Y.S.D.E.C.... ...... Trustees C.O.Application Flood Permit Examined -,20 Single& Separate Storm-Water Assessment Form—,. Contact: Denise J. Vista, Esq. Approved 120 Mail to: Amato Law Group, PUZ ---6fi6-­Old-Gountry-Road,-suite gol Disapproved a/c_ W.4111CP Phone: (516) 227-6363 Expiraflo�i —.20---- Building Inspector APPLICATION FOR BUILDING PERMIT Date JUIV 9 92015 INSTRUCTIONS a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d.Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an addition six months.Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws, Ordinances or Regulations,for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances,building code,housing code, and regulations,and to admit authorized inspectors on premises and in building for necessary inspections. i Y:t7l aptnership d/b/a Verizon Wireless re of applicant or= —oration) me;i Nauw/- Joli� Wald n Title: 11Engineer-Equipment c/o 666 Old Country Road, Suite 901 Garden Ci 2 NY U530 (Mailing address of applicant) State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder ......­ .pp icant is Lessee of plo er-ty Name of owner of premises East Marion Fire District (As on the tax roll or Latest deed) If applicant is a corporation, signature of duly authorized officer (Name and title of corporate officer) Builders License o. Plumbers License No. ... ... Electricians License NO. Other Trade's License No. 1. Location of land on which proposed work will be done: 9245Main Road, East Marion House Number Street Hamlet County Tax Map No. 1000 ,–,Block—.3 -Lot 11.031 Subdivision--—---,­ Filed Map Nc ___,_,—Lot... , 2. ot-,2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy Fire pgpgrbment and b. Intended use and Occupancy Same and new public utility wireless coommmicat::Lon fAgilit 3. Nature of work(check which applicable):New Building Addition, Alteration Repair_ Demolition—,w Other Work-Public utility wireless communication (Description) Facility 4. Estimated Cost., jjgGdWkM g 125.000.00 Fee (To be paid on filing this application) 5. If dwelling, number of dwelling units –Number of dwelling units on each floor Ifgarage, number of cars 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. tower wireless comminicat:ion facint� 7. Dimensions of existingAPIWMEM, if any: Front .....NLA Rear Depth11 Height no't agl Number of Stories N Dimensions of same structure with alterations or additions: Front MIA —Rear—N/A Depth N/A Height_,. N,_, Number of Stories NIA (equipment coco' Length Width 8, Dimensions of entire new nsYru'c"tqi)6n: Depth Height 9® Number of Stories N/A 9. Size of lot: Front Rear Depth 3.0583 acres 10. Date of Purchase MIA Name of Former Owner Applicant is lessee of 11. Zone or use district in which premises are situated— EIamilett Business and R-40 12. Does proposed construction violate any zoning law, ordinance or regulation? YES—NO x 13. Will lot be re-graded? YES-NO x Will excess fill be removed from premises?YES—NO x r&ast marion 14.Names of Owner of premises. Fire District Address 9245 main Rom Phone No. Name of Architect William F. Collins Address to-l. Technol2sm Dr. Phone No-jkm2-,§ 9- �. Name of Contractor Concell ti Address 3373 Lincoln Aveone Phone No. (631) 654-5915 Holibrook 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO x IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C.PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO—x IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey,to scale,with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES X NO— * IF YES, PROVIDE A COPY. STATE OF NEW YORK) SS: COUNTY OF Xassmmn ) off-Indiallf of New York SIMM United Partnership John Walden,_ d/b/a VeriBless being duly sworn,deposes and says that he is the applicant (Name of individual signing contract)above named, ($)He is the senior gngineer:���t� of the lessee of the proper,�X, (Contractor,Agent,Corporate Officer,etc.) KhMMXfflmccummmxwW and is duly authorized to perforin or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief;and that the work will be performed in the manner set forth in the application filed therewith. Sworn to before rne this, day o,f 20 new Yqk *Fited Partnership d/b/a Verizon Wireless b" Name,.- John WaIdSpature of Applicant PT R Title: Senior Engineer-Xquipwmt rnPAUL J. FORD AND COMPANY S T R U C T U R A L E N G I N E E R S 250 East Broad Street • Suite 600 • Columbus, Ohio 43215-3708 Date: October 23, 2014 Mitzi Parker Paul J. Ford and Company Crown Castle 250 East Broad St., Suite 600 3530 Toringdon Way, Suite 300 Columbus, OH 43215 Charlotte, NC 28277 (614) 221-6679 Subject: Structural Analysis Report Carrier Designation: Verizon Wireless Co-Locate Carrier Site Number: N/A Carrier Site Name: East Marion Crown Castle Designation: Crown Castle BU Number: 857111 Crown Castle Site Name: EAST MARION Crown Castle JDE Job Number: 296560 Crown Castle Work Order Number: 947131 Crown Castle Application Number: 247537 Rev. 5 Engineering Firm Designation: Paul J. Ford and Company Project Number: 37514-2382.001.7805 Site Data: 9245 MAIN ROAD, EAST MARION, Suffolk County, NY Latitude 41° 7'41.71", Longitude-720 20'28.71 109 Foot-Monopole Tower Dear Mitzi Parker, Paul J. Ford and Company is pleased to submit this "Structural Analysis Report" to determine the structural integrity of the above mentionedtower. This analysis has been performed in accordance wit°h the Crown Castle Structural 'Statement of Work' and the terms of Crown Castle Purchase Order Number 719109, in accordance with application 247537, revision 5. The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have determined the tower stress level for the structure and foundation, under the following load case, to be: LC5: Existing + Proposed Equipment Sufficient Capacity Note:See Table I and Table II for the proposed and existing/reserved loading,respectively. The analysis has been performed in accordance with the TIA/EIA-222-F standard and 2010 New York Building Code a wind speed of 85 mph fastest mile. We at Paul J. Ford and Company appreciate the opportunity of providing our continuing professional services to you and Crown Castle. If you have any questions or need further assistance on this or any other projects please give us a call. Respectfully submitted by: Maria C. Lopez, P.E. Project Manager tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 2 TABLE OF CONTENTS 1) INTRODUCTION 2) ANALYSIS CRITERIA Table 1 - Proposed Antenna and Cable Information Table 2 -Existing and Reserved Antenna and Cable Information Table 3 - Design Antenna and Cable Information 3) ANALYSIS PROCEDURE Table 4 - Documents Provided 3.1)Analysis Method 3.2)Assumptions 4) ANALYSIS RESULTS Table 5-Section Capacity(Summary) Table 6—Tower Components vs. Capacity 4.1) Recommendations 5) APPENDIX A tnxTower Output 6)APPENDIX B Base Level Drawing 7) APPENDIX C Additional Calculations tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 3 1) INTRODUCTION This tower is a 109 ft Monopole tower designed by PENNSUMMIT TUBULAR, LLC in November of 2007. The tower was originally designed for a wind speed of 90 mph per TIA-222-G. 2) ANALYSIS CRITERIA The structural analysis was performed for this tower in accordance with the requirements of TIA/EIA-222-F Structural Standards for Steel Antenna Towers and Antenna Supporting Structures using a fastest mile wind speed of 85 mph with no ice, 37.6 mph with 0.75 inch ice thickness and 50 mph under service loads. Table 1 - Proposed Antenna and Cable Information Center Number Number Feed Mounting Line of Antenna Antenna Model of Feed Line INote Level (ft) Elevation Antennas Manufacturer Lines Size (in) (ft) m.. .. 97.0 97 3r am phenol... CWWX06 3Pipe w/ 12 7/8 Moue I . 4 m._ ._ . _ .,.._.,.. - ...._. �.� ..�.m . Notes. 1) Proposed Equipment Table 2 -Existing and Reserved Antenna and Cable Information Center eNumber. - Ante. ...mw_ Antenna Mo _... g Number Number er Feed Mounting of Antenna del of Feed Line Note Level (ft) Elevation Antennas Manufacturer Lines Size(in) (ft) � ry mmmm mm,m� 109.0 112.0 1 kmw HB-X-AW-19-65-OOT 1 7/8 1 communications 3 kathrein 800 10121 w/Mount Pipe 107.0 107.0 �. .m ...... .... . 12 11/4 1 6 andrew ETM19_OG-12UB ted, _3.. w ....rfs/cellwave . ATMAA1412D-._.m __.... 1A20 90.0 93.0 ....... 3-- V and „ ,..,m TMBXX1651/6-R2M w/- 12 7/8 1 3 andrew Mount Pipe �. .. , . __. HBX-6516DS-VTM w/ 11 77.0 77.0 3 andrew 15/8 1 Mount Pipe6.. . ., �,, ,,.,... ... .. .....__... ._ 35.0 30.0 2 towerandrew mounts Side Arm MouOntt[SO 306-1 30.0 !.. ,26.0 1.LL sinclair SD312-HF2P4SNM 4 1/2 1 1 24 0 1 andrew PG7N0E-0090-313 �..._.... ..,�,...�.: .e ..., .....__... ,.__.... totes:; 1) Existing Equipment tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 4 Table 3 - Design Antenna and Cable Information Center .._Nurr r�ber ber mmm- T ryNumber Feed d of Mounting Line Antenna Antenna Model of Level (ft) Elevation Manufacturer d Line (ft) Antennas Lines Size (in) m., 3) ANALYSIS PROCEDURE Table 4- Documents Provided Document Remarks Reference Source 4-GEOTECHNICAL REPORTS Thomas D. Reilly, 12/06/2007 4567820 CCISITES 4-TOWER FOUNDATION PJF, 29207-0158, 01/03/2008 4567810 CCISITES DRAWINGS/DESIGN/SPECS 4-TOWEDRAW NGS TURER ennSummit, 29537, 11/20/2007 5172082 E CCISITES 3.1) Analysis Method tnxTower(version 6.1.4.1), a commercially available analysis software package, was used to create a three-dimensional model of the tower and calculate member stresses for various loading cases. Selected output from the analysis is included in Appendix A. 3.2) Assumptions 1) Tower and structures were built in accordance with the manufacturer's specifications. 2) The tower and structures have been maintained in accordance with the manufacturer's specification. 3) The configuration of antennas, transmission cables, mounts and other appurtenances are as specified in Tables 1 and 2 and the referenced drawings. 4) When applicable, transmission cables are considered as structural components for calculating wind loads as allowed by TIA/EIA-222-F. 5) At the time of analysis CCI Sites had documentation on (2) different types of foundations, a spread footing and a caisson. Both foundations were analyzed with the worst case scenario reported in Table 6 of this report This analysis may be affected if any assumptions are not valid or have been made in error. Paul J. Ford and Company should be notified to determine the effect on the structural integrity of the tower. tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382 001 7805, Application 247537, Revision 5 Page 5 4) ANALYSIS RESULTS Table 5 -Section Capacity (Summary) Section Elevation(ft) Component Size Critical P tKl SF'P allow % Pass/Fail No Type Element (K) Capacity -��, L1 [ 109 89 Pole TP4.5x4.5x0.5 1 -2.24 351.77 83.4 Pass L2 89-69 % Pole TP8x8x1 2 -5-,7,,3 738,72 68.3 Pass L3 69-18 Pole TP37.14300.2188 3 -11.14 1249.81 30.6 Pass L4 1-8-0 Pole TP39.22x36.0375x0.25 ( 4 �� -14.38 1580 78 35.5- Pass } g �Summary� Pole(1-1) 834 Pass P.., .Rating= ),,,,,,83.4 . Pass Table 6 -Tower Component Stresses vs. Capacity Notes ComponentJElevation (ft) % Capacity Pass! Fail 1 Anchor Rods 0 53.2 Pass 1Base Plate 0 70.7 Pass 1,3 Base Foundation 0 18.5 Pass Steel Sse o I Interaction fn.. . ®..e.. a�....... _._.. _. 1,2 3 . . � 0 � 35 8 �. � Pass.,. 72.4 Ra ....Flange Connection ..... ..... 69., 66.5....... .. ..m Pass.� g �.,. ,,.. _ ......._ Structure Rating (max from all components)= 83.4% Notes: 1) See additional documentation in"Appendix C—Additional Calculations"for calculations supporting the%capacity consumed. 2) According to the procedures prescribed and agreed to by the Crown Castle Engineering Foundation Committee,held in January 2010,the existing caisson foundation was analyzed using the methodology in the software'PLS-Caisson' (Version 8.10,or newer, by Power Line Systems,Inc.). Per the methods in PLS-Caisson,the soil reactions of cohesive soils are calculated using 8CD independent of the depth of the soil layer. The depth of soil to be ignored at the top of the caisson is the greater of the geotechnical report's recommendation,the frost depth of the site or half of the caisson diameter. 3) See assumption#5. 4.1) Recommendations The tower and its foundation have sufficient capacity to carry the existing and proposed loads. No modifications are required at this time. tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 6 APPENDIX A TNXTOWER OUTPUT tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 7 �_ .... � ..� .. Tower Input Data There is a pole section. This tower is designed using the TIA/EIA-222-F standard. The following design criteria apply: 1) Tower is located in Suffolk County, New York. 2) Basic wind speed of 85.00 mph. 3) Nominal ice thickness of 0.7500 in. 4) Ice density of 56.00 pcf. 5) A wind speed of 37.62 mph is used in combination with ice. 6) Temperature drop of 50.00 °F. 7) Deflections calculated using a wind speed of 50.00 mph. 8) A non-linear(P-delta) analysis was used. 9) Pressures are calculated at each section. 10) Stress ratio used in pole design is 1.333. 11) Local bending stresses due to climbing loads, feed line supports, and appurtenance mounts are not considered. Q tions ...... .� .,,,,, Consider Moments-Legs Distribute Leg Loads As Uniform Treat Feedline Bundles As Cylinder Consider Moments-Horizontals Assume Legs Pinned Use ASCE 10 X-Brace Ly Rules Consider Moments-Diagonals q Assume Rigid Index Plate Calculate Redundant Bracing Forces Use Moment Magnification 4 Use Clear Spans For Wind Area Ignore Redundant Members in FEA q Use Code Stress Ratios Use Clear Spans For KUr SR Leg Bolts Resist Compression q Use Code Safety Factors-Guys Retension Guys To Initial Tension All Leg Panels Have Same Allowable Escalate Ice 4 Bypass Mast Stability Checks Offset Girt At Foundation Always Use Max Kz 4 Use Azimuth Dish Coefficients 4 Consider Feedline Torque Use Special Wind Profile 4 Project Wind Area of Appurt. Include Angle Block Shear Check Include Bolts In Member Capacity Autocalc Torque Arm Areas Poles Leg Bolts Are At Top Of Section SR Members Have Cut Ends q Include Shear-Torsion Interaction Secondary Horizontal Braces Leg Sort Capacity Reports By Component Always Use Sub-Critical Flow Use Diamond Inner Bracing(4 Sided) Triangulate Diamond Inner Bracing Use Top Mounted Sockets Add IBC.6D+W Combination Use TIA-222-G Tension Splice Capacity Exemption Ta ered Pole Section Geometry Section . mm. ,.�_-`§ec„; ,l �.m ---W�.,,,,, Bend ole Grade rae Elevation Section Splice Number Top Bottom Wall Bend Pole Grade Length Length of Diameter Diameter Thickness Radius ftft R Sides in _ in in i n 0.00 Round 4.5000 .... 4.5000 _0 5000 A ... _.........._. . 5 _ _-----� .mm.._ �.... _... 582-70 89.0000 (70 ksi) L2 89.0000- 20.0000 0.00 Round 8.0000 8.0000 1.0000 A572-42 69.0000 (42 ksi) L3 69.0000- 51.0000 4.75 18 30.0000 37.1400 0.2188 0.8750 A572-65 18.0000 (65 ksi) L4 18.0000- 22.7500 18 36.0375 39.2200 0.2500 1.0000 A572-65 0.0000 (65 ksi .m._. _-- ... ...... Tapered Pole Properties Section Ti p Dia. Area t r C I/C J INQ w wR in inz inn in in in3 Wint in L1 4.5000 6 28'3'1 12,7627 1.4252 2.2500 3.6723 25 52154 3.1397 0.0000 0 4.5000 6.2832 12.7627 1.4252 2.2500 5.6723 25.5254 3.1397 0.0000 0 tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CC/BU No 857111 Project Number 37514-2382.001 7805, Application 247537, Revision 5 Page 8 Dia. Area P r C I/C J It/Q w w� in in in in in in' in int in 12 8.0000 21.9911 137.4447 2.5000 4.0000 34.3612 274.8894 10.9890 0.0000 0 8.0000 21.9911 137.4447 2.5000 4.0000 34.3612 274.8894 10.9890 0.0000 0 L3 30.4628 20.6775 2316,9742 10.5723 15.2400 152.0324 4636.9972 10.3407 4.8950 22.377 37.7129 25.6349 4414.9076 13.1070 18.8671 234.0001 8835.6245 12.8199 6.1516 28.122 L4 37.2682 28.3974 4594.9254 12.7046 18.3071 250.9921 9195.8969 14.2014 5.9026 23.61 39.8250 30.9227 5933.0171 13.8343 19.9238 297.7860 11873.841 15.4643 6.4627 25.851 0 Tower Gusset Gusset Gusset-Grade -- .- "c,t"- .-. e-We -��� �--o�W'b,l. ng-1, .D.-o e n-g-1,'.w Adjust.Factor Adjust. Weight Mult. Double Angle Double Angle Elevation Area Thickness Ai Factor Stitch Bolt Stitch Bolt (per face) Ar Spacing Spacing Diagonals Horizontals ftffz i n m m L1109.0000- A 0 1 89.0000 L2 89.0000- 1 0 1 69.0000 L3 69.0000- 1 I 18.0000 L4 18.0000- 1 1 1 0.0000 Feed Line/Linear A urtenan -mm�ired AsmmmmmITIT� ""._w.. . Area Description Face Allow Component Placement Total CAAA Weight or Shield Type Number .... __ _ ..e �I_iC FS OJ1(f18") C No Inside Pole 109.0000_0....0000 1 No Ice 0,0000 0.33 1/2"Ice 0.0000 0.33 1"Ice 0.0000 0.33 LDF6-50A(1-1/4") C No Inside Pole 107.0000-0.0000 12 No Ice 0.0000 0.66 1/2"Ice 0.0000 0.66 1"Ice 0.0000 0.66 AVA5-50(7/8") C No Inside Pole 97.0000-0.0000 12 No Ice 0.0000 0.30 1/2"Ice 0.0000 0.30 1"Ice 0.0000 0.30 LDF5-50A(7/8") C No Inside Pole 90.0000-0.0000 12 No Ice 0.0000 0.33 1/2"Ice 0.0000 0.33 1"Ice 0.0000 0.33 LDF7-50A(1-5/8") C No Inside Pole 77.0000-0.0000 6 No Ice 0.0000 0.82 1/2"Ice 0.0000 0.82 1"Ice 0.0000 0.82 LDF4-50A(1/2") C No Inside Pole 30.0000-0.0000 4 No Ice 0.0000 0.15 1/2"Ice 0.0000 0.15 1"Ice 0.0000 0.15 Feed Line/Linear Appurtenances Section ...... Areas Tower Tower Face AR AF CAAA CAAA Weight Sectio Elevation In Face Out Face !! _._._ ft-.... .. .. ....... .... ..... .f$ _ ... -0...... _ ..-... n . ...-. 0 __.._ K L1 109,fD000 A 0.000 0.000 0.000 0.000 0 00 89.0000 B 0.000 0.000 0.000 0.000 0.00 C 0.000 0.000 0.000 0.000 0.18 L2 89.0000-69.0000 A 0.000 0.000 0.000 0.000 0.00 B 0.000 0.000 0.000 0.000 0.00 C 0.000 0.000 0.000 0.000 0.36 L3 69.0000-18.0000 A 0.000 0.000 0.000 0.000 0.00 tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 9 Tower Tower Face ........ .cAAa, _...-CAAAA .......... W�,.ei ht g-h " Sectio Elevation In Face Out Face n It It, fe B 0.000 0.000 0.000 0.000 0.00 C 0.000 0.000 0.000 0.000 1.06 L4 18.0000-0.0000 A 0,000 0.000 0.000 0.000 0.00 B 0.000 0.000 0.000 0.000 0.00 C 0,000 0.000 0.000 0.000 0.38 Feed Line/Linear Appurtenances Section Areas - With Ice Tower���TowerFace Ice AA�.v.m�. CAAA C � R A A AA A Weight Sectio Elevation or Thickness In Face Out Face n It Leg in ft 2 ft2 ftz ft2 K L1 109.0000- A 0.750 0.000 0.000 0.000 0.000 0.00 89.0000 B 0.000 0.000 0.000 0.000 0.00 C 0.000 0.000 0.000 0.000 0.18 L2 89.0000-69.0000 A 0.750 0.000 0.000 0.000 0.000 0.00 B 0.000 0.000 0.000 0.000 0.00 C 0.000 0.000 0.000 0.000 0.36 L3 69.0000-18.0000 A 0.750 0.000 0.000 0.000 0.000 0.00 B 0.000 0.000 0.000 0.000 0.00 C 0.000 0.000 0.000 0.000 1.06 L4 18.0000-0.0000 A 0.750 0.000 0.000 0.000 0.000 0.00 B 0.000 0.000 0.000 0.000 0.00 C 0.000 0.000 0.000 0.000 0.38 Feed Line Center of Pressure Section Elevation CPX CPz CPX CPz Ice Ice ft in in in in L1 109.0000-89.0000 0.0000 0.0000 0.0000 0.0000 L2 89.0000-69.0000 0.0000 0.0000 0.0000 0.0000 L3 69.0000-18.0000 0.0000 0.0000 0.0000 0.0000 L4 18.0000-0.0000 0.0000 0.0000 0.0000 0.0000 _._......_�� ......._.......__._ .�...User Defined Load __._._.....�. __...__ s Description Elevation Offset Azimuth Weight Fx Fz Wind Force CAAc From Angle Centroid ._.Fiag. ....� 109,000- 0.0[.., 0.0000 N Ice e........ K.0.01 .. ,.K 0, 010 OM 0.16 3.6049 K 0.00 l 0.00 0,2073 Service 0.07 0.00 0..00 0.06 4.1557 Discrete Tower Loads Description- Face�� -Offset Offsets: Azimuth Placement CAAA CAAA Weight or Type Horz Adjustmen Front Side Leg Lateral t Vert It ft ft, ftz K ft ft tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 10 , o .. ..om Descri tion Face Offset Offsets: Azimuth Placement CAAA CAAA Weight or Type Horz Adjustmen Front Side Leg Lateral t Vert ft ft fe fe K ft ft UiPub,njn Rod 8 x'WV __ /8'° C From g ° Face 0.0000 41,04100 109 Ot&G10 Nrta Ice 0.5000 0.5000 0.011 0.00 1/2" 1.3135 1.3135 0.01 4.00 Ice 2.1437 2.1437 0.02 1"Ice HB-X-AW-19-65-OOT A From Leg 0.5000 0.0000 109.0000 No Ice 4.8167 4.8167 0.03 0.00 1/2" 5.2650 5.2650 0.06 3.00 Ice 5.7207 5.7207 0.10 1"Ice (2)ETM190G-12UB A From Leg 0.0000 0.0000 107.0000 No Ice 0.0000 0.0000 0.02 0.00 1/2" 0.0000 0.0000 0.02 0.00 Ice 0.0000 0.0000 0.03 1"Ice 800 10121 w/Mount Pipe A From Leg 0.0000 0.0000 107.0000 No Ice 0,0000 0.0000 0.07 0.00 1/2" 0.0000 0.0000 0.12 0.00 Ice 0.0000 0.0000 0.18 1"Ice (2)ETM190G-12UB B From Leg 0.0000 0.0000 107.0000 No Ice 0.0000 0.0000 0.02 0.00 1/2" 0.0000 0.0000 0.02 0.00 Ice 0.0000 0.0000 0.03 1"Ice 800 10121 w/Mount Pipe B From Leg 0.0000 0.0000 107.0000 No Ice 0.0000 0.0000 0.07 0.00 1/2" 0.0000 0.0000 0.12 0.00 Ice 0.0000 0.0000 0.18 1"Ice (2)ETM190G-12UB C From Leg 0.0000 0.0000 107.0000 No Ice 0.0000 0.0000 0.02 0.00 1/2" 0.0000 0.0000 0.02 0.00 Ice 0.0000 0.0000 0.03 1"Ice 800 10121 w/Mount Pipe C From Leg 0.0000 0.0000 107.0000 No Ice 0.0000 0.0000 0.07 0.00 1/2" 0.0000 0.0000 0.12 0.00 Ice 0.0000 0.0000 0.18 1"Ice CWWX063X25x00 w/ A From Leg 0.0000 0.0000 97.0000 No Ice 0.0000 0.0000 0.08 Mount Pipe 0.00 1/2" 0.0000 0.0000 0.17 0.00 Ice 0.0000 0.0000 0.27 1"Ice CWWX063X25x00 w/ B From Leg 0.0000 0.0000 97.0000 No Ice 0.0000 0.0000 0.08 Mount Pipe 0.00 1/2" 0.0000 0.0000 0.17 0.00 Ice 0.0000 0.0000 0.27 1"Ice CWWX063X25x00 w/ C From Leg 0.0000 0.0000 97.0000 No Ice 0.0000 0,0000 0.08 Mount Pipe 0.00 1/2" 0.0000 0,0000 0.17 0.00 Ice 0.0000 0,0000 0.27 1"Ice ETW190VS12UB A From Leg 0.0000 0.0000 90.0000 No Ice 0.0000 0.0000 0.01 0.00 1/2" 0.0000 0.0000 0.02 3.00 Ice 0.0000 00000 0.03 1"Ice TMBXX-6516-R2M w/ A From Leg 0.0000 0.0000 90.0000 No Ice 0.0000 0,0000 0.05 Mount Pipe 0.00 1/2" 0.0000 0.0000 0.10 3.00 Ice 0.0000 0.0000 0.16 1"Ice ATMAA1412D-lA20 A From Leg 0.0000 0.0000 90.0000 No Ice 0.0000 0.0000 0.01 0.00 1/2" 0.0000 0.0000 0.02 3.00 Ice 0.0000 0.0000 0.03 1"Ice ET V190VS12UB B From Leg 0.0000 0.0000 90.0000 No Ice 0.0000 0.0000 0.01 0.00 1/2" 0.0000 0.0000 0.02 tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 11 .. .....�. __ _ ..._ ,..�, m . .w Description Face Offset Offsets Azimuth Placement C1Aq 6 Weight or Type Horz Adjustmen Front Side Leg Lateral t Vert ft ft ftp ffz K ft ° ft 3.00 Ice 0.0000 0.0000 0.03 1"Ice TMBXX-6516-R2M w/ B From Leg 0.0000 0.0000 90.0000 No Ice 0.0000 0.0000 0.05 Mount Pipe 0.00 1/2" 0.0000 0.0000 0.10 3.00 Ice 0.0000 0.0000 0.16 1"Ice ATMAA1412D-1A20 B From Leg 0.0000 0.0000 90.0000 No Ice 0.0000 0.0000 0.01 0.00 1/2" 0.0000 0.0000 0.02 3.00 Ice 0.0000 0.0000 0.03 1"Ice ETW190VS12UB C From Leg 0.0000 0.0000 90.0000 No Ice 0.0000 0.0000 0.01 0.00 1/2" 0.0000 0.0000 0.02 3.00 Ice 0.0000 0.0000 0.03 1"Ice TMBXX-6516-R2M w/ C From Leg 0.0000 0.0000 90.0000 No Ice 0.0000 0.0000 0.05 Mount Pipe 0.00 1/2" 0.0000 0.0000 0.10 3.00 Ice 0.0000 0.0000 0.16 1"Ice ATMAA1412D-1A20 C From Leg 0.0000 0.0000 90.0000 No Ice 0.0000 0.0000 0.01 0.00 1/2" 0.0000 0.0000 0.02 3.00 Ice 0.0000 0.0000 0.03 1"Ice HBX-6516DS-VTM w/ A From Leg 0.0000 0.0000 77.0000 No Ice 0.0000 0.0000 0.03 Mount Pipe 0.00 1/2" 0.0000 0.0000 0.06 0.00 Ice 0.0000 0.0000 0.10 1"Ice HBX-6516DS-VTM w/ B From Leg 0.0000 0.0000 77.0000 No Ice 0.0000 0.0000 0.03 Mount Pipe 0.00 1/2" 0.0000 0.0000 0.06 0.00 Ice 0.0000 0.0000 0.10 1"Ice HBX-6516DS-VTM w/ C From Leg 0.0000 0.0000 77.0000 No Ice 0.0000 0.0000 0.03 Mount Pipe 0.00 1/2" 0.0000 0.0000 0.06 0.00 Ice 0.0000 0.0000 0.10 1"Ice PG7NOF-0090-313 A From Leg 3.0000 0.0000 30.0000 No Ice 5.7130 5.7130 0.00 0.00 1/2" 6.3208 6.3208 0.05 5.00 Ice 6.9378 6.9378 0.10 1"Ice PG7NOF-0090-313 C From Leg 3.0000 -60.0000 30.0000 No Ice 5.7130 5.7130 0.00 0.00 1/2" 6.3208 6.3208 0.05 5.00 Ice 6.9378 6.9378 0.10 1"Ice PG7NOF-0090-313 A From Leg 3.0000 0.0000 30.0000 No Ice 5.7130 5.7130 0.00 0.00 1/2" 6.3208 6.3208 0.05 -6.00 Ice 6.9378 6.9378 0.10 1"Ice SD312-HF2P4SNM C From Leg 3.0000 -60.0000 30.0000 No Ice 0.8800 0.8800 0.01 0.00 1/2" 1.6900 1.6900 0.01 -4.00 Ice 3.2400 3.2400 0.02 1"Ice Side Arm Mount[SO 306- A From Leg 0.0000 0.0000 30.0000 No Ice 0.9800 2.1800 0.04 11 0.00 1/2" 1.7000 3.8000 0.06 0.00 Ice 2.4200 5.4200 0.08 1"Ice Side Arm Mount[SO 306- C From Leg 0.0000 -60.0000 30.0000 No Ice 0.9800 2.1800 0,04 1] 0.00 1/2" 1.7000 3.8000 0.06 0.00 Ice 2.4200 5.4200 0.08 1"Ice Canister Loadl C None 0.0000 109.0000 No Ice 6.7297 6.7297 0.07 1/2" 6.9755 6.9755 0.16 tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 12 Description FaceOffset Offsets: Azimuth Placement .n CAAA CAAA�u. ..Weight MW or Type Horz Adjustmen Front Side Leg Lateral t Vert ft ft ft2 fe K ft It Ice 7.2214 7.2214 0.25 1"Ice Canister Load2 C None 0.0000 99.0000 No Ice 13.6745 13.6745 0.70 1/2" 14.1661 14.1661 0.87 Ice 14.6578 14.6578 1.05 1"Ice Canister Load3 C None 0.0000 89.0000 No Ice 14.1047 14.1047 0.74 1/2" 14.5964 14.5964 0.92 Ice 15.0880 15.0880 1.10 1"Ice Canister Load4 C None 0.0000 79.0000 No Ice 14.5349 14.5349 0.78 1/2" 15.0266 15.0266 0.96 Ice 15.5182 15.5182 1.15 1"Ice Canister Load5 C None 0.0000 69.0000 No Ice 7.3750 7.3750 0.74 1/2" 7.6208 7.6208 0.83 Ice 7.8667 7.8667 0.93 1"Ice Truck Ball C None 0.0000 109.7500 No Ice 1.4137 1,4137 0.05 1/2" 1.5752 1.5752 0.07 Ice 1.7453 1.7453 0.09 1"Ice Tower Pressures No Ice GH=1.690 Section z Kz T23,741 F AF AR A,ag Leg CAAA CAAA Elevation a % In Out c Face Face ft ft e ft fta ftz ff L1 109.0000- 99.0000 1.369 7.506"--K- 0,000 0,000 0.000 0.00 0.000 _ 0.000 89.0000 B 0.000 0.000 0.00 0.000 0.000 C 0.000 0000 0.00 0.000 0.000 L2 89.0000- 79.0000 1.283 A 0.000 0.000 0.000 0.00 0.000 0.000 69.0000 B 0.000 0000 0.00 0.000 0.000 C 0.000 0,000 0.00 0.000 0.000 L3 69.0000- 43.5581 1.083 . . A 0,000 142673 142,673 100.00 0.000 0.000 18.0000 3 B 0,000 142673 100.00 0.000 0.000 C 0,000 142.673 100.00 0.000 0.000 L418.0000- 8.9005 1 18.50 56.941 A 0,000 56.941 56.941 100.00 0.000 0.000 0.0000 B 0.000 56.941 100.00 0.0000.000 _J_2j 0.000 56.941 100.00 0.000 . 0.000 Tower Pressure - With Ice _. _. .._.... .. GH=1.690 Section z Kz qz tz AG F AF AR A,, Leg CAAA CAAA Elevation a % In Out c Face Face It ftsf in ft' e ff ftz fe ftz ftz Li'1 "109,0000~ 99,0000 1..369 4...90 _0.7500 '10.000 A.. ..... 0,000 0,0010 0.000 0.00 0.000 0.000 89.0000 B 0.000 0.000 0.00 0.000 0.000 C 0.00,01 0.0001 0.001 0.00,0 0000, tnxTower Report-version 6.1.4.1 October 23, 2DY4 109 Ft Monopole Tower Structural Analysis CC/BUNoQ57/1/ Project Number 37514'2302.00/.7805,Application 247537, Revision 5 Page 13 Elevation a % In Out Face Face L2 89.0000- 75-60-06' 1,283 4 65 07500 15833 A 0,000 0,000 0,000 0,00 0.000 0000 69.0000 B 0,000 0,000 &00 0.000 OMO C 0000 0000 0,00 0.000 0,000 L3 69.0000- 43,5581 1 083 3 90 0,7500 149 048 A 0,000 149,048 149-048 100,00 0.000 0,000 18.0 0 B 0,000 149048 100,00 0.000 0000 C 0000 149,048 10000 0.000 0000 L4 18.0000- 8,9005 1 162 07501 59,191 A 0,000 59191 59191 10000 0.000 0,000 0.0000 B 0000 59191 10000 0.000 0000 Tower Pressure - Service Gx= y.oyo Elevation a % In Out C Face Face Ll 109.0000- 99.0000 1.369 8.76 7.500 0 0.000 0.000 00 89.0000 B 0.000 0.000 0.00 0.000 0.000 C 0.000 0.000 0.00 0.000 0.000 L2 89.0000- 79.0000 1.283 8.21 13.333 A 0.000 0.000 0.000 0.00 0.000 0.000 69.0000 B 0.000 0.000 0.00 0.000 0.000 L3 69.0000- 43.5581 1.083 6.89 142.67 A 0.000 142.673 142.673 100.00 0.000 0.000 18.0000 3 B 0.000 142.673 100.00 0.000 0.000 C 0.0001 142.673 100.00 0.000 0.000 L4 18.0000- 8.9005 1 6 40 56 941 A 0.000 56.941 56.941 100.00 0.000 0.0001 0.0000 B 0.000 56.941 100.00 0.000 0.000 0000 56.941 100.00. 0.000 0.000 Load Combinations Description 3 Dead+Wind 30 deg-No Ice 4 Dead+Wind 60 deg-No Ice 5 Dead+Wind 90 deg-No Ice 6 Dead+Wind 120 deg-No Ice 7 Dead+Wind 150 deg-No Ice 8 Dead+Wind 180 deg-No Ice 9 Dead+Wind 210 deg-No Ice 10 Dead+Wind 240 deg-No Ice 11 Dead+Wind 270 deg-No Ice 12 Dead+Wind 300 deg-No Ice 13 Dead+Wind 330 deg-No Ice 1* oouu+|oo+romp 15 ooau+vwndoueg+|oe+Tomp 16 000u+vvnuuodoU+|oo+Tomp 17 000u+vvnoonuoo+|oe+Tomo 18 ooao+vmdnodog+|oe+Tomp 19 oeau+w|nd1oouoU+|oo+Tomp uo oovd+vv|no10000g+|no+Tomp 21 oouo+vvinu18Odn8+|uv+Temp ue oaaU+VNndo1Odeg+|ne+Tomp uo ovau+vwnuu*odog+|na+Tomp 24 oeuu+vvmna7odag+|oo+Tvmp ns ooao+wmdnoouvo+|oo+Temp zo oo°o+vv|n0000uog+|co+Temp tnxTowmrReport'version O.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382 001.7805, Application 247537, Revision 5 Page 14 Comb....,.,,n.w...�..,.,...._.,._....�....-__..�m,_. _._- �a . ,o ,.e.�. ._,�.... � �.._...._..�.. .�.�..�.�.���,��..__w. _._.___..�.._......- Description No. 27 Dead+Wind 0 deg-Service 28 Dead+Wind 30 deg-Service 29 Dead+Wind 60 deg-Service 30 Dead+Wind 90 deg-Service 31 Dead+Wind 120 deg-Service 32 Dead+Wind 150 deg-Service 33 Dead+Wind 180 deg-Service 34 Dead+Wind 210 deg-Service 35 Dead+Wind 240 deg-Service 36 Dead+Wind 270 deg-Service 37 Dead+Wind 300 deg-Service 38 Dead+Wind 330 de9-Service Maximum Member Forces SectEn Cw.w , ConditionGov --Foceio levaoom onen ajor Axis Minor Axis n ft Type Load Moment Moment .__ _ _ .-..� _• K 'cria .... ��f�........ ,. 1 1 . . r Comb._ _.. __ 8w1 Pole Max Tension 21 0.00 -0,00 0.00 Max.Compression 14 -3.97 0.00 0.06 Max.Mx 11 -2.24 24.06 0.02 Max. My 2 -2.24 0.00 24.08 Max.Vy 11 -1.53 13.60 0.01 Max.Vx 2 -1.53 0.00 13.62 Max.Torque 11 -0.14 L2 89-69 Pole Max Tension 1 0.00 0.00 0.00 Max.Compression 14 -8.29 0.00 0.06 Max.Mx 11 -5.73 71.47 0.02 Max. My 2 -5.73 0.00 71.48 Max.Vy 11 -2.69 47.56 0.02 Max.Vx 2 -2.69 0.00 47.58 Max.Torque 5 0.14 L3 69-18 Pole Max Tension 1 0.00 0.00 0.00 Max.Compression 14 -15.57 0.43 0.57 Max. Mx 11 -11.14 277.17 0.04 Max.My 2 -11.14 0.10 276.56 Max.Vy 11 -6.41 277.17 0.04 Max.Vx 2 -6.34 0.10 276.56 Max.Torque 4 1.58 L4 18-0 Pole Max Tension 1 0.00 0.00 0.00 Max.Compression 14 -19.57 0.43 0.57 Max.Mx 11 -14.38 438.46 0.04 Max.My 2 -14.38 0.10 436.13 Max.Vy 11 -7.78 438.46 0.04 Max.Vx 2 -7.70 0.10 436.13 Max.Torque 4 1.58 Maximum Reactions Location Condition Gov. Vertical Horizontal,X Horizontal, Z Load K K K Comb. . --- -. 19_........._-�....., "� x.Vert 14 .57 0.00 0.00 Max.H. 11 14.38 7.78 0.00 Max.H. 2 14.38 0.00 7.70 Max.M. 2 436.13 0.00 7.70 Max.M. 5 438.25 -7.78 0.00 Max.Torsion 4 1.58 -6.73 3.85 Min,Vert 36 14.38 2.70 0.00 Min.H. 5 14.38 -7.78 0.00 Min.H. 8 14.38 0.00 -7.70 Min.Mx 8 -436.03 0.00 -7.70 Min.M. 11 -438.46 7.78 0.00 tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 15 Locafion� Condition Gov. ... Vertical Horizontal,X Horizontal, Z Load K K K Comb. Min.Torsion 10 1.58 6.73 -3.85 ..-mm........ Tower Mast Reaction Summar Load ��� � Shear Overturning Vertical Shearx Overturning Torque Combination Moment,M, Moment,M, K K K -'ft Dcd gniY-............... 14.38" - 0.00 4,7.00 .. 0 -0.05 010 0.00 Dead+Wind 0 deg-No lee 14.38 0.00 -7.70 -436.13 0.10 -0.85 Dead+Wind 30 deg-No lee 14.38 3.89 -6.67 -377.71 -219.08 -1.40 Dead+Wind 60 deg-No Ice 14.38 6.73 -3.85 -218.09 -379.53 -1.58 Dead+VVind 90 deg-No Ice 14.38 7.78 0.00 -0.04 -438.25 -1.34 Dead+Wind 120 deg-No Ice 14.38 6.73 3.85 218.00 -379.52 -0.73 Dead+Wind 150 deg-No Ice 14.38 3.89 6.67 377.61 -219.07 0.07 Dead+Wind 180 deg-No Ice 14.38 0.00 7.70 436.03 0.10 0.85 Dead+Wind 210 deg-No Ice 14.38 -3.89 6.67 377.61 219.28 1.40 Dead+VVind 240 deg-No Ice 14.38 -6.73 3.85 218.00 379.73 1.58 Dead+Wind 270 deg-No Ice 14.38 -7.78 0,00 -0.04 438.46 1.34 Dead+Wind 300 deg-No Ice 14.38 -6.73 -185 -218.09 379.73 0.73 Dead+Wind 330 deg-No Ice 14.38 -3.89 -667 -377.71 219.28 -0.07 Dead+Ice+Ternp 19.57 -0.00 -0,00 -0.57 0.43 0.00 Dead+Wind 0 19.57 0.00 -1,60 -90.88 0.44 -0.24 deg+lce+Temp Dead+Wind 30 19.57 0.81 -1.38 -78.78 -45.18 -0.35 deg+lce+Temp Dead+Wind 60 19.57 1.41 -0.80 -45.73 -78.58 -0.37 c1eg+Ice+Ternp Dead+Wind 90 19.57 1.63 -0.00 -0.59 -90.80 -0.29 deg+Ice+Ternp Dead+Wind 120 19.57 1.41 0.80 44.56 -78.58 -0.14 deg+lce+Temp Dead+Wind 150 19.57 0.81 1.38 77.61 -45.18 0.06 deg+lce+Temp Dead+Wind 180 19.57 -0.00 1.60 89.70 0.44 0.24 deg+lce+Temp Dead+Wind 210 19.57 -0.81 1.38 77.61 46.06 0.35 deg+Ice+Temp Dead+Wind 240 19.57 -1.41 0.80 44.56 79.46 0.37 deg+lce+Temp Dead+Wind 270 19.57 -1.63 -0.00 -0.59 91.68 0.29 deg+lce+Temp Dead+Wind 300 19.57 -1.41 -0.80 -45.73 79.46 0.14 deg+Ice+Ternp Dead+Wind 330 19.57 -0.81 -1.38 -78.78 46.06 -0.06 deg+lce+Temp Dead+Wind 0 deg-Service 14.38 0.00 -2.67 -151.96 0.10 -0.29 Dead+Wind 30 deg-Service 14.38 1,35 -2.31 -131.61 -76.25 -0.49 Dead+Wind 60 deg-Service 14.38 2.34 -1.34 -76.00 -132.14 -0.55 Dead+Wind 90 deg-Service 14.38 270 0.00 -0.05 -152.59 -0.46 Dead+Wind 120 deg- 14.38 234 1.34 75.91 -132.14 -0.25 Service Dead+Wind 150 deg- 14.38 1.35 2.31 131.51 -76.25 0.02 Service Dead+Wind 180 deg- 14.38 0.00 2.67 151.86 0.10 0.29 Service Dead+Wind 210 deg- 14.38 -1.35 2.31 131.51 76.45 0.49 Service Dead+Wind 240 deg- 14.38 -2.34 1.34 75.91 132.34 0.55 Service Dead+Wind 270 deg- 14.38 -2.70 0.00 -0.05 152.80 0.46 Service Dead+Wind 300 deg- 14.38 -2.34 -1.34 -76.00 132.34 0.25 Service Dead+Wind 330 deg- 14.38 -1.35 -2.31 -131.61 76.45 -0.02 Service ... .. tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 16 Solution Summary Sum of Applied Forces Sum of Reactions Load PX Py PZ PX Py PZ %Error Comb. K K K K K K -- 0.00 - - 14.38 --O AO........ ...�......0..0-0".......... ................ --,-0.00- ._.... ------.. .00 14.38 0.00 0.000% 2 0.00 -14.38 -7.70 0.00 14.38 7,70 0.000% 3 3.89 -14.38 -6.67 -3.89 14.38 6.67 0.000% 4 6.73 -14.38 -3.85 -6.73 14.38 3.85 0.000% 5 7.78 -14.38 0.00 -7.78 14.38 0.00 0.000% 6 6.73 -14.38 3.85 -6.73 14.38 -3.85 0.000% 7 3.89 -14.38 6.67 -3.89 14.38 -6.67 0.000% 8 0.00 -14.38 7.70 0.00 14.38 -7.70 0.000% 9 -3.89 -14.38 6.67 3.89 14.38 -6.67 0.000% 10 -6.73 -14.38 3.85 6.73 14.38 -3.85 0.000% 11 -7.78 -14.38 0.00 7.78 14.38 0.00 0.000% 12 -6.73 -14.38 -3.85 6.73 14.38 3.85 0.000% 13 -3.89 -14.38 -6.67 3.89 14.38 6.67 0.000% 14 0.00 -19.57 0.00 0.00 19.57 0.00 0.000% 15 0.00 -19.57 -1.60 0.00 19.57 1.60 0.000% 16 0.81 -19.57 -1.38 -0.81 19.57 1.38 0.000% 17 1.41 -19.57 -0.80 -1.41 19.57 0.80 0.000% 18 1.63 -19.57 0.00 -1.63 19.57 0.00 0.000% 19 1.41 -19.57 0.80 -1.41 19.57 -0.80 0.000% 20 0.81 -19.57 1.38 -0.81 19.57 -1.38 0.000% 21 0.00 -19.57 1.60 0.00 19.57 -1.60 0.000% 22 -0.81 -19.57 1.38 0.81 19.57 -1.38 0.000% 23 -1.41 -19.57 0.80 1.41 19.57 -0..80 0.000% 24 -1.63 -19.57 0.00 1.63 19.57 0.00 0.000% 25 -1.41 -19.57 -0.80 1.41 19.57 0.80 0.000% 26 -0.81 -19.57 -1.38 0.81 19.57 1.38 0.000% 27 0.00 -14.38 -2.67 0.00 14.38 2.67 0.000% 28 1.35 -14.38 -2.31 -1.35 14.38 2.31 0.000% 29 2.34 -14.38 -1.34 -2.34 14.38 1.34 0.000% 30 2.70 -14.38 0.00 -2.70 14.38 0.00 0.000% 31 2.34 -14.38 1.34 -2.34 14.38 -1.34 0.000% 32 1.35 -14.38 2.31 -1.35 14.38 -2.31 0.000% 33 0.00 -14.38 2.67 0.00 14.38 -2.67 0.000% 34 -1.35 -14.38 2.31 1.35 14.38 -2.31 0.000% 35 -2.34 -14.38 1.34 2.34 14.38 -1.34 0.000% 36 -2.70 -14.38 0.00 2.70 14.38 0.00 0.000% 37 -2.34 -14.38 -1.34 2.34 14.38 1.34 0.000% 38 -1.35 -14.38 -2.31 1.35 14.38 2.31 0.000% Non-Linear Convergence Results ,.. .-._.-.. , .. ,.� .. .. �Wi ..�...��, �� .� Load Converged? Number Displacement' - Force Combination of Cycles ToleranceTolerance ....---------- 1 Yes 4 0 00000001 0.00000001 2 Yes 5 0.00000001 0.00001476 3 Yes 5 0.00000001 0.00046599 4 Yes 5 0.00000001 0.00054728 5 Yes 5 0.00000001 0.00009771 6 Yes 5 0.00000001 0.00045190 7 Yes 5 0.00000001 0.00051794 8 Yes 5 0.00000001 0.00001474 9 Yes 5 0.00000001 0.00052301 10 Yes 5 0.00000001 0.00045038 11 Yes 5 0.00000001 0.00009772 12 Yes 5 0.00000001 0.00054423 13 Yes 5 0.00000001 0.00046952 14 Yes 4 0.00000001 0.00000001 15 Yes 5 0.00000001 0.00008009 16 Yes 5 0.00000001 0.00008873 tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 24 753 7, Revision 5 Page 17 17 Yes 5 0.00000001 0.00009253 18 Yes 5 0.00000001 0.00008140 19 Yes 5 0.00000001 0.00008719 20 Yes 5 0.00000001 0.00008877 21 Yes 4 0.00000001 0.00098954 22 Yes 5 0.00000001 0.00008928 23 Yes 5 0.00000001 0.00008744 24 Yes 5 0.00000001 0.00008159 25 Yes 5 0.00000001 0.00009245 26 Yes 5 0.00000001 0.00008891 27 Yes 4 0.00000001 0.00043418 28 Yes 4 0.00000001 0.00052393 29 Yes 4 0.00000001 0.00063557 30 Yes 4 0.00000001 0.00047547 31 Yes 4 0.00000001 0.00051316 32 Yes 4 0.00000001 0.00058565 33 Yes 4 0.00000001 0.00043078 34 Yes 4 0.00000001 0.00059365 35 Yes 4 0.00000001 0.00051318 36 Yes 4 0.00000001 0.00047570 37 Yes 4 0.00000001 0.00063052 _._ . .�. ,_ .....W.... .... 0.00000001MM�w Yes 4 , mm „W W 0.00052677 �..�.. __...___ __... Maximum Tower Deflectio ._.....__. . _ ......... . . ns - Service Wind Section Elevation Horz. Gov. Tilt Twist No, Deflection load ftin Comb. -...._. �.�------ -..-...-............109. 89m.................._........................15..347...,............................ .�. ..,,......._ - - _._.. _........._m..__...._0_ 2 2.7558 .0326 L2 89-69 6.107 36 1.0410 0.0039 L3 69-18 2.927 36 0.3633 0.0014 L4 22.75-0 0.368 36 0.1383 0.0008 Critical Deflections and Radius of Curvature - Service Wind Elevation A �.�.� .�. ppurtenanceGov. Deflection Tilt Twist Radius of Load Curvature ft _ _ Comb. in ft TruckBall � - --...____._27_..- ....��...... ..._u_.._ � ....m-.......... . ..._ ... ... _-..n 5.347 2.7558 0.0326 2134 109.0000 Lightning Rod 8'x 5/8" 27 15.347 2.7558 0.0326 2134 107.0000 (2)ETM190G-12UB 27 14.273 2.5601 0.0291 2134 99.0000 Canister Load2 37 10.162 1.8067 0.0157 1066 97.0000 CWWX063X25x00 w/Mount 37 9.225 1.6330 0.0128 888 Pipe 90.0000 ETW190VS12UB 36 6.430 1.1041 0.0047 586 89.0000 Canister Load3 36 6.107 1.0410 0.0039 580 79.0000 Canister Load4 36 3.935 0.5889 0.0007 1028 77.0000 HBX-6516DS-VTM w/Mount 36 3.675 0.5301 0.0007 1263 Pipe 69.0000 Canister Load5 36 2.927 0.3633 0.0014 6963 30.0000 PG7NOF-0090-313 36 0.601 0.1557 0.0012 8993 ..�.�mm.. Maximum Tower Deflections - Design Wind Section Elevation m Horz. yw Gov. Tiltp mmrvW Twist No Deflection Load ft in Comb. ....__-_- ..... .., w 4,a. ......,,. _ "-,-"-7.-7 ........ . ... L1 109-89 43.447 11 � ������� 7 7518 0.0931 L2 89-69 17.438 11 2.9583 0.0111 L3 69-18 8.381 11 1.0394 0.0039 tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 18 Sect•.. �.�„����,,� w„� .� ,...._. .�.a � �...�.,��..�,.„- .m .�...� .�,�y,,.. w --_ ..rom_- _.� „ro�.� ., ion Elevation Horz. Gov. Tilt Twist No. Deflection Load ft in Comb. L4... 2..,.., �. . ..... 2.75-0 1.055 11 03966 0.0023 Deflections of Curvature �� ��� Critical ns and R - - Desi in Wind Elevation A urtenance Load Deflection Tilt PP Twist Radiusoff Curvature 109.7500.. .....r.,.. Trtack Bdii9 Comb. in 7.7518 0.0931 ....r.__ �. . . ...._ - 78 109.0000 Lightning Rod 8'x 5/8" 11 43.447 7.7518 0.0931 778 107.0000 (2)ETM19OG-12UB 11 40.430 7.2054 0.0830 778 99.0000 Canister Load2 11 28.868 5.1009 0.0449 388 97.0000 CWWX063X25x00 w/Mount 11 26.230 4.6154 0.0365 323 Pipe 90.0000 ETW190VS12UB 11 18.350 3.1353 0.0134 212 89.0000 Canister Load3 11 17.438 2.9583 0.0111 209 79.0000 Canister Load4 11 11.275 1.6825 0.0020 367 77.0000 HBX-6516DS-VTM w/Mount 11 10.532 1.5154 0.0020 451 Pipe 69.0000 Canister Load5 11 8.381 1.0394 0.0039 2409 30.0000 PG7NOF-0090-313 11 1.719 0.4463 0.0034 3155 _.._.._...._ �... Com ression ............. -w�............�. _..._.. ._...,.. --....._ Checks Pole De icin Data Section Elevation Size L L KI/r FB A Actual Allow. Ratio No. P Pa P ft ft ft ksi int K K P I-P4,5x4.5xO,5 2U000 O0000 0,0 42.000 6.2832 26189 L3-.._W 169-... ).. a TP37 14830x0 2188 51.0000 0.0000 O,O A'37.2046 25 191 -5.73 .3 ^mmmm554.18 0 002~µ L2 89-69(2) L4 18-0(4)) TP39.2206.03750.25 22.7500 0.0000 0.0 38.350 30.9227 -14.38 1185.88 0.012 ._..__. __................�. Pie..Bendin a Section Elevation Size Actual Actual Allow. Ratio Actual Actual Allow. Ratio No. K fnx FU fnx My fbr Fbr fbw ft kip-ft ksi ksin kip-ft ksi ksi Fb� 109-89(1)- .. --, 5TP4 5x4.5 x00,55 2.m. 2 m...... _ -. ... 0._....__ . 4,08 50.937 46.200 m1.103 0.00 0.000 46,2000 ... 0,01011 L2 89-69(2) TP8x8xl 71.48 24.964 27.720 0.901 0.00 0.000 27.720 0.000 L3 69-18(3) TP37.14x3OxO.2188 277.17 14.742 37.246 0.396 0,00 0.000 37.246 0.000 L4 18-0(4) TP39.22x36.03750.25 438.46 17.669 38.350 0.461 0.00 0.000 38.350 0.000 ............ ar Desi n Data Section Elevation Size � �� Actual Actual Allow Ratio Actua� � �.. ��� �� ,,. �I Actual Allow. Ratio No. V fv Fv fV T f f Fo fvf ft K ksi ksi FM kip-ft ksi ksi p '1,47 0.233 28.000 U17 0.00 0.000 28,000 0000 L2 89-69(2))..... PTP8x8x10 5-- 2.62 0.119 16.800 „0.014 0.00 0.000 16.800 w0.000 tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 19 Section Elevation Size � � �� � Actual Actual Allow. �Ratio �Actual Actual Allow. Ratio No. V f, Fv f� T fvr Fw ft ft K ksi ksi Fv kip-ft ksi ksi Fw - 18. 3)....... TP37.14x30x0.2188 - 6.4............0...... -- -_... 1 0.255 26.000 0.020 1.34 0.035 26.000 0.001 L4 18-0(4) TP39.22x36.03754.25 7.78 0.252 26.000 0.019 1.34 0.026 26.000 0.001 ..................__._.._. _._. ........ ...� .�.....�... ..........�. ole Interaction Design D.....�.�_ � ....�...... P Data Section � Elevation� ��Ratio � Ratio � Ratio�� Ratio Ratio� Comb. �� Allow. � �� Criteria�� No. P fk. ft, fV ft Stress Stress Ratio Rano �x..-._ ......_._ _._ 109-89(1') 01008 1.103 0000 0.017 0.000 1.111 1 333 H1-3+VT L2 89-69(2) 0.010 0.901 0.000 0.014 0.000 0.911 1.333 H1-3+VT Y L3 69- 18(3) 0.012 0.396 0.000 0.020 0.001 0.J-4008 1.333 H1-3+VT Y L4 18-0(4) 0.012 0.461 0.000 0.019 0.001 0.473 1.333 H1 3+VT V Section Ca acit Table Section Elevation Component Size Critical P SF*P®„o„, % Pass No, yp Fall _ __....._ ..... _..... .., �.�---..e... - -- � --- _ �._.... Element K...� .........__K ..._.....apac..t.... ........_ .._.. L1 109-89 Pole TP4.5x4.5x0.5 1 2.24 351.77 83.4 Pass L2 89-69 Pole TP8x8xl 2 -5.73 738.72 68.3 Pass L3 69-18 Pole TP37.14x30x0.2188 3 -11.14 1249.81 30.6 Pass L4 18-0 Pole TP39.22x36.0375x0.25 4 -14.38 1580.78 35.5 Pass Summary Pole(1-1) 83.4 Pass RATING= 83.4 Pass tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CCI BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 20 APPENDIX B BASE LEVEL DRAWING tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CC/BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 21 (INS I FALI.f.D)ro 3o (4) 1/2 n LEVEL ( SrALLED)..TO I) 7/13' TO 101.) FT LEVEL. .................................................................... .. .... .. ... ..... ................. IN1 5/8 77 R LFVEL 2) T/e To 107 FT 11-VU 1INSTALED) 12) 7f8" rO 90 FT 00.L ......... ..... .......... .......................... 10 q/ I jn,u tnxTower Report-version 6.1.4.1 October 23, 2014 109 Ft Monopole Tower Structural Analysis CC/BU No 857111 Project Number 37514-2382.001.7805, Application 247537, Revision 5 Page 22 APPENDIX C ADDITIONAL CALCULATIONS tnxTower Report-version 6.1.4.1 DESIGNED APPURTENANCE LOADING TYPE ELEVATION TYPE ELEVATION _�- 109 0 ft Truck Ball 10975 TM BXX 6516 R2M w/Mount Pipe 90 p.pB X AW 1J 65 001 109 ..... AfMAA1412D 1A20 90 1 Canister Load 109 TMBXX-6516-R2M w/Mount Pipe 90 Lightning Rod 8'x 510" 909 ETW190VS12UB 99 Flag 109 ATMAA74920-1A20 90 � 800 10121 wt Mount Pipe ........... ,,.10 7 ETW190VS12LJB - 90 s (2}ETM 990G 1200 107 Canister Load3 89,,,,,,, eIPipe, ount )EMB 107 616DS VTMw/Mount Pipe 77 600 Ot21 w/Mount Pipu 107 INBX ( nnOG-12UB 7 6D5-VTM w/Mount Pipe Caste99Canister S69 _.. r CWWX063X25xOO wl Mount Pipe 97 Side Arm Mount ISO 306-1] ,. 30 r _ 89.0..Pt - ...._ ..... .... ,,, _ --. ,..._. . ..... ar ...... ...0_.. CWWX063X25x00 wt Mount Pipe 97 PG7NOF 0090-313 30 -� l < q� CWWX063X25xOO w/Mount Pipe 97 IPG7N0F0090-313 30 TMBXX-6516 R2M wl Mount Pipe 90 8D312!IF2P4SNM 30 AT..,. i MAA14120-1A1 90 Side Arm Mount[SO 3061i 130 ' jETW190VS72UB, ,,,,,, 90.... ... PG7NOF-0090-313.... 130 ... N Sr., MATERIAL STRENGTH w.......... NIASGRADE 42 ksi F 60 ksi Fu,.. GRADE Fy Fu y A502-76 70 ksi 90 ksi A572-65 65 ksl 60 ksi, 72-42 TOWER DESIGN NOTES ss o n 1, Tower is located in Suffolk County,New York. 2. Tower designed for a 85.00 mph basic wind in accordance with the TIA/EIA-222-F Standard. 3, Tower is also designed for a 37.62 mph basic wind with 0.75 in ice. 4. Deflections are based upon a 50.00 mph wind, 5. TOWER RATING:83,4% N n f II , ;I a I '9' � I 'i N Q C AXIAL 20 K SHEAR" �, MOMENT t I n 2K 92 kip-ft T ORQUE 0 kip-ft r 37.62 mph WIND-0.7500 in ICE S AXIAL < N o v o 14 K i s` SHEAR" MOMENT 8 K 438 kip ft 0,0 ft TORQUE 2 kip-ft REACTIONS-85.00 mph WIND sI ro �a a e - I N v P F Pq !® m C7 y N 09 f(qg prole ........ . J. Ford and Co an se5 Paul 7 250 East Broad St., Suite 600 r 1�`"'0'BU#8571111 PJF#375142382 001 Columbus, OH 43215 °liens Crown Castle Drawn Sy Nlana C tol7e2 Apra. Phone:(614)221-6679 Code: TIA/EIA 222-1` ogle 10/23114 Scale: NTS FAX:(614)448-4105 Path Uwg No F_ Square, Stiffened / Unstiffened Base Plate, Any Rod Material - Rev. F /G Assumptions: 1)Rod groups at corners. Total#rods divisible by 4. Maximum total#of rods=48(12 per Corner). 2)Rod Spacing=Straight Center-to-Center distance between any(2)adjacent rods(same corner) 3)Clear space between bottom of level'iri nut and to of concrete not r xr;eedinr i1j_* �Y:9 Diameter) Site Data Base Reactions BU#: 857111 TIA Revision: F Site Name: Unfactored Moment,M: 438 fl-kips A2 #: Unfactored Axial, P: 14 kips Anchor Rod Data Unfactored Shear, V: 6 ku ps Qty: 4 Diam: 2.25 in Anchor Rod Results Rod Material: A615-J TIA F-->Maximum Rod Tension 103.8 Kips Yield, Fy: 75 ksi Allowable Tension: 195.0 Kips Strength, Fu: 100 ksi Anchor Rod Stress Ratio: 53.2% Pass BoltCircle: 49 in Plate DataBase Plate Results Flexural Check PL Ref. Data W=Side: 44 1 in Base Plate Stress: 35.3 ksi Yield Line(in): Thick: m 2 in Allowable PL Bending Stress: 50.0 ksi 23.01 Grade: 50 ksi Base Plate Stress Ratio: 70.7% Pass Max PL Length. ClipDistance 4 in 23.01 N/A-Unstiffened StiffenerData (Geldnt�9 t�otl� roidrs Stiffener Results Configuration: Unstiffened, Horizontal Weld : N/A Weld Type: Vertical Weld: N/A Groove Depth: in"' Plate Flex+Shear,fb/Fb+(fv/Fv)^2: N/A Groove Angle: degrees Plate Tension+Shear,ft/Ft+(fv/Fv)^2: N/A Fillet H.Weld: <--Disregard Plate Comp. (AISC Bracket): N/A Fillet V. Weld: in Pole Results Width: in Pole Punching Shear Check N/A Height: in M- P , Thick: in Notch: iniK Ar h BAyE P P C f GObtt' ". Grade: Iksl My/4rriucicNo.ss �.... Weld str.: ksilyp tCARA'TION I Clear Space ���a�PP uaA In � 4,� , ,� �� �� between ,� ,� fs ���. Stiffeners at - .... B.C. w r.�p ����P• nr FIC. fatt 5IngLa "M 4, � � � FncUrazv' Case Y Pole Data wUk.... DAM D a Diam: M In M "Thick: in ,3pf ,�@dilss Caavr or Grade: ksi 0— P a-) #of Sides: '"'O"IF Round Stress Increase Factor ..ASD ASIF I 1.33 Note:for complete joint penetration groove welds the groove depth must be exactly 1/2 the stiffener thickness for calculation purposes CClplate 1.5-Square Base F-G 1.2, Effective March 19,2012 Analysis date: 10/23/2014 PAUL J. FORD AND COMPANY PJF Job#: 37514-2382 S T R U C T U R A L E N G I N E E R S Date: XX 250 East Broad Street • suite 600 • Columbus, Ohio 43215-3708 Engineer: XX Stiffened or Unstiffened, Stealth Flancie_Plate TIA Rev F Reactions Site Data Mu 71,48 ft-kips BU : 857111 Axial, Pu: 5.73 kips Site Name: Shear, Vu: 2,62 -kips App : Elevation: 69 feet Max Ratio: 105% Bolt Data Flange Bolt Results Qty.. ...6 Bolt Tension Capacity: 46.08 kips Diameter(in.): 1 Bolt Fu: 120 Bolt Tension: 25.42 kips Bolt Material: A325 Bolt Fy: 90 Bolt Stress Ratio: 55.2% Pass Circle in. : 22.5 Spoke Data Flange Plate Results Spoke Thick, t: 2 in Plate Bending Capacity:. 50.00 kip*in Spoke Width,w: 5 in Plate Bending: 32.63 kip*in Grade(Fy): 50 ksi Plate Bending Ratio: 65.3% Pass Stiffener Data Confl W�.p. g: 1 * Stiffener Results Weld Size: 0,25 in Stiffener Shear Capacity: 120.00 kips Width: 5.5 in Stiffener Shear: 53.61 kips Height: 9.75 in Stiffener Shear Ratio: 44.7% Pass Thick: 0.5 in Notch: 0.75 in Stiffener Tension/Compression Capacity: 93.54 kips Grade: 50 ksi Stiffener Tension/Compression: 30.10 kips :_ Weld str. 70 ksi Stiffener Tension/Compression Ratio: 32.2% Pass *0=none, 1 =1 por.spoke,2=2 per spoke Concealmllt ine Data Stiffener Weld Capacity: 4.95 kip/in .Diam: _ 8:.:w:. . _ in Stiffener Weld Tension: 3.29 kip/in Thick: 1 in Stiffener Weld Ratio: 66.5% Pass Grade: 42 ksi Fu 60 ksi Monopole Top Plate Iy9on2p2le Top Plate Data,** Monopole Plate Bending Capacity: 50.00 ksi Connected to: Monopole Monopole Plate Bending: 27.94 ksi Weld Type: Groove Monopole Plate Bending Ratio: 55.9% Pass Pole Diam: 30 in Pole Thick: 0.21875 in Monopole Plate Weld Capacity: 54.18 kips Spoke Thick,t: 2 in Monopole Plate Load: 26.37 kips Spoke Width,w: 5 in Monopole Plate Weld Ratio: 48.7% Pass Plate Fy: _ 50 ksi Assumes the weld is continuous around the ID of the monopole Weld Size: 0.25 in Weld Str:11 70 ksi Only for the flange connected directly to the monopole Stress Increase Factor ASIF:1 1.333333 Analysis Date: 10/23/2014 PAUL J. FORD AND COMPANY PJF Job#: XX S T R U C T U R A L E N G I N E E R S Date: XX 250 East Broad Street • Suite 600 • Columbus, Ohio 43215-3708 Engineer: XX Stiffened or Unstiffened, Stealth Flange Plate TIA Rev F Reactions Site Data Mu 24.08 ft-kips BU#: 857111 Axial, Pu: 2.24 kips Site Name: Shear, Vu: 1.47 kips App#: Elevation: 89 feet Max Ratio: 105% Bolt Data Flange Bolt Results mm Qty: 6 Bolt Tension Capacity: 25.92 kips Diameter(in.): 0.75 Bolt Fu: 120 Bolt Tension: 8.76 kips Bolt Material: A325 Bolt Fy: 90 Bolt Stress Ratio: 33.8% Pass Circle in. : 22 She Data Flange Plate Results Spoke Thick, t: 1.375 in Plate Bending Capacity: 50.00 kip*in Spoke Width, w: 4.5 in Plate Bending: 36.22 kip*in Grade F 50 ksi Plate Bending Ratio: 72.4% Pass Stiffener Data w Config: 1 Stiffener Results Weld Size: 0,25 in Stiffener Shear Capacity: 120.00 kips Width: 5,5 in Stiffener Shear: 32.11 kips Height: 9.75 in Stiffener Shear Ratio: 26.8% Pass Thick: 0.5 in Notch: 0.75 lin Stiffener Tension/Compression Capacity: 93.54 kips Grade: 50 ksi Stiffener Tension/Compression: 13.44 kips Weld str.: 70 ksi Stiffener Tension/Compression Ratio: 14.4% Pass "0=none, 1 =1 per spoke,2=2 per spoke Concealment Spine Data Stiffener Weld Capacity: 4.95 kip/in Dt��rr1: 4,5 in Stiffener Weld Tension: 1.69 kip/in Thick: 0,5 in Stiffener Weld Ratio: 34.2% Pass Grade: 70 ksi Fu 90 ksi i i Stress Increase Factor AS I F: 1.333333 Analysis Date: 10/23/2014 PALJL J. FC)RE) ANL-) CX')MPAP,0' Job Number: 37514-2382 Page: 1 r R U Y U R A L E N G o N L L R S Site Number: 857111 Byt MCI MSite Name: Site Name Date; 10/23/2014 ..........-------- ...... DRILLED PIER SOIL AND STEEL ANALYSIS -TIA/EIA-222-F Unfactored Base Reactions from RISA StatetV FqcftLs „1-actors Factors Comp,tip Tension Tower Type onopole DP Moment,M ACI Code= OkCI 318-02 Shear,V= 8,0, kips Seismic Design Category L---.- Axial Load,P 14.0iaWjpp Reference Standard= 'r rIA/EIA-222-F Use 1 3 Load Factor? Yes OTM= 442.0§1111j=k-ft @ Ground Load Factor= 130 Drilled Pier Parameters Safeiyp Factor 4)Factor Diameter= 6 ft Soil Lateral Resistance Height Above Grade E==AO 5 fI Skin Friction= 2,0 185 .�5 Depth Below Grade fl End Bearing= 2.00 fc,= 3 ksi Concrete Wt.Resist Uplift EC= 0.003 in/in Load Combinations Checked per TIAIEIA-222-F Mat Ftdn.Cap Width 1 Ult.Skin Friction/2.00+Ult.End Bearing/2.00 Mat Ftdn.Cap Length= ft +Effective Soil Wt.-Buoyant Conc.Wt,tComp. Depth Below Grade it 2. Ult.Skin Friction/2.00+Buoyant Conc.Wt./1.25 a Uplift 3.Ult.Skin Frictiont1.50+Buoyant Conc.Wt./1.50 2 Uplift Steel ParametersSoil Parameters Number of Bars 6 Water Table Depth .00 t .......... Rebar Size Depth to Ignore Soil ..._mm....... Rebar Fy 60 lksp Depth to Full Cohesion .............. t Rebar MOE= 29000 ksp Full Cohesion Starts at? ,round Tie Size= #5 Above Full Cohesion Lateral Resistance=4(Cohesion)(Dia(H) Side Clear Cover to Ties= 4 In Below Full Cohesion Lateral Resistance=B(Cohesion)(Dia)(H) Direct t5tribed PotsShaft Pa rrietels Maximum Capacity Ratios Dia-5-Grade'=- In Maximum Soil Ratio Dia @ Depth Below Grade in Maximum Steel Ratio % Number of Sides Thickness= In Fy Backfill Condition Define Soil Layers Ncip Cohosimi U fairted Shear n�eyinoi ............................. ........ Friction ultimate Comp.Ult. Tension Ult. Thickness UnItWelght Cohesion Angle End Bearing Skin Friction Skin Friction Depth Layer ft f de rees psf It ---P-cf 2 100 Sand 2 28 100 30 Sand 8000 30 3 ........... 4 ......... ............. 5 ...............7 .................................. ........................ 8 ...d........ .............. 10 ........ .............. 12 ------------- Soil Results: Overtu in Depth to COR= 13 56 ft,from Grade Shear,V0 00 8.0 fps Bending Moment,M 86-4 !k-ft,from COR Resisting Shear,Va Resisting Moment,Ma ................ 1536.79 k4l,from COR MOMENT RATIO= 35.8% OK SHEAR RATIO= 35.8% OK Soil Results. U lift Soil l esults: Conlat'ession Compression,C 1400 Ips k� Uplift.T 119 kpp” Allowable Com Allowable Uplift Cap.,Ta L-- E,Ips p.Cap.,Ca- UPLIFT RATIO= 0.0% OK COMPRESSION RATIO= 16.5% OK Steel Results (A C1 318-02): Minimum Steel Area- [" jrlyl5 sq in Axial Load,P 3627 ips @ 4 75 it Below Grade Actual Steel Area EE-124 98 sq In Moment,M= 474.69 -ft @ 4 75 ft Below Grade Allowable Moment,Ma= 2572,5Z k-it Allowable Min Axial,Fla Where Ma 0 k-ft MOMENT RATIO 18.5% OK Allowable Max Axial,Pa 472 51 Where Ma-0 k-ft F� ]k V4 0 1.uecfie,V0 1 B-1.3 (c)CojprgIN200byPaQ.PI➢ For(.Oand Coffiparuy,a00nights irfferve.,d. Moment Capacity of Drilled Concrete Shaft (Caisson) for TIA Rev F or G Note: Shaft assumed to have ties, not spiral, transverse reinforcing Site Data Maximum Shaft Superimposed Forces BU#: 857111 TIA Revision: F Site Name: Site Name Max. Service Shaft M: 474.69 ft-kips(*Note) App#: Max. Service Shaft P: 36.27 kips Max Axial Force Type: Com . ( Ncrt MaxShaft Superimposed Moment does not necessarily Enter Load Factors Below: equal to the shaft top reaction moment For M (WL) <---- Enter Factor For P(DL) 1.3 <---- Enter Factor Load Factor Shaft Factored Loads 1.30 Mu: 617.097 ft-kips Pier Properties 1.30 Pu 47.151 1kips Concrete: Pier Diameter 4 6-,,0-1 ft Material Pro erties Concrete Area = 4071.5 int Concrete Comp. strength, fc= 3000 psi Reinforcement yield strength, Fy= 60 ksi Reinforcement: Reinforcing Modulus of Elasticity, E = 29000 ksi Reinforcement yield strain = 0.00207 Hzr Cover T eBar Size= 4.50 in Limiting compressive strain = 0.003 Vert. Cage Diameter= 5.11 ft ACII 318 Code Vert. Cage Diameter= 61.34 in Select Analysis ACI Code= 200'2 Vertical Bar Size=F Seismic (Properties Bar Diameter= 1.41 in Seismic Design Category= Bar Area = 1.56 int Seismic Risk= Hid h Number of Bars = = As Total= 24.96 int Solve <--Press Upon Completing All Input A s/Aconc, Rho: 0.0061 0.61% LRun ACI 10.5 , ACI 21.10.4, and IBC 1810. Results: Min As for Flexural, Tension Controlled, Shafts: Governing Orientation Case: 2 (3)"(Sgrt(fc)/Fy: 0.0027 { 200/Fy: 0.0033 r MuMu .R ' a i 1q' a t Case 1 Case 2 Dist. From Edge to Neutral Axis: 12.53 in Extreme Steel Strain, et: 0.0128 Minimum Rho Check: ct> 0.0050,Tension Controlled Actual Req'd Min. Rho: 0.33% Flexural Reduction Factor,cp: 0.900 Provided Rho: 0.61% JOK Ref. Shaft Max,Axial Capacities, d)Max(Pn or Tn): Max Pu = ((p=0.65) Pn. Output Note: Negative Pu=Tension Pn per ACI 318 (10-2) 6144.47 Ikips For Axial Compression, 9 Pn = Pu: 47.15 kips at Mu=((�=0.65)Mn= 3164.92 ft-kis Drilled Shaft Moment Capacity, (pMn: 3344.05 ft-kips Drilled Shaft Superimposed Mu: 617.10 ft-kips 90)Mn= 47.84 kips Max Tu,- =(0.9) Tri130.00 ft-kis (Mu/ wMn, Drilled Shaft Flexure CSR: 18.5°I at Mu Drilled-Shaft-Moment-Capacity, DSMC, Version 1.1 - Effective 04/01/2010 Analysis Date: 10/23/2014 PJF job no. 37514-2382 Project name 0 �m_mmmmmmmm —.... Page 1 —'"` Overturning Moment 438 ft-k = Foundation Loads: Comp Load=14 kips Pole weight or tower leg compression= 14 (kips) l''ler Projection=0.5 ft Horizontal load at top of pier= 8 (kips) Horizontal Load=8 k Overturning moment at top of pier= 438 (ftkips) r W Designc _�1�W 6 ft rounds ._ . __.. pier Safety factor against overturning= 1.5 aSoil=118.3 k (36)#8 vert �? Conc=116.3 k #5 ties Soil Properties: CO .a Water=0 k Soil density= 100 (pcf) @ 8 k L v a Allowable soil bearing= 4 (ksf) rymm �Wn o Depth to water table= 99 (ft) 3 (18)#8 ea way Top and Bottom Dimensions: . LL Pier shape(round or square) r ("R"or"S") Pier width= 6 (ft) N Pier height above grade= 0.5 (ft) depth to bottom of footing= 6 (ft) Footing thickness= 2 (ft) n Footing width= 18 (ft) Footing length= 18 (ft) Ecc=1.971 ft ._. 880 psf(net) Concrete: Concrete strength= 3 (Il 18 ft x 18 ft ?W48 aBWk Rebar strength= 60 (ksi) ultimate load factor= 1.3 Reinforcing Steel: Pad minimum cover over rebar= mm3 inches size of pad rebar= #8 bar Summary of anal sis results quantity of pad rebar= 18 (ea direction) Maximum Net Soil Bearing=0.88 ksf Ult Bending Shear Capacity=110 psi Allowable Net Soil Bearing=4 ksf Ult Bending Shear Stress=14 psi Reinforcing Steel: Soil Bearing Stress Ratio=0.22 Okay Bending Shear Stress Ratio=0.13 Okay Pier _ ®. size of vert rebar in pier- #8 bar Ftg Overturning Resistance=2237 ft-kips Pad Bending Moment Capacity=1198 ft-k vertical rebar quantity= 36 Overturning Moment=490 ft-kips Pad Bending Moment=193 ft-k size of pier ties= #5 bar Required Overturning Safety Factor=1.5 Bending Moment Stress Ratio=0.16 OK minimum cover over rebar= 3 inches Overturning Safety Factor=4.566 Ratio=0.33 Okay Total volume of concrete= 28.7 cu yd v3 3,Effective 2/10114 CCI Flagpole Tool AS LE Site Data BU#: 85711.1 Site Name: APP#. .�...� Code Code: TVA/EEA 222'.-F Ice Thickness: 01.1'5 in Windspeed(V): 85 mph Ice Wind Speed(V). mph Tower Information Total Tower Height: 108''ft Base Tower Height: 6§ ft Total Canister Length: 40 ft Number of Canister Assembly Sections: 4 Mating Mating Canister Canister Flange Flange Plate Canister Canister Section Number of Sides Plate Solidity Number Canister Section Ratio * Assembly Assembly Type: Plate Plate Weight Weight Length(ft): Diameter(In): Thickness Diameter (Kip): (Kip) «r. 7 143 �;. 0.55 0.551 0 / G// l iii///% ri i�r /li//�� i/i , 2 iF�i�i /��i, 2 ,.1,,. :. ��i/;,,, 1d)]$�,,,�i� ,� , „ ':;.,28,25 0.55 0.587 0.148 ai 7 i i 0, i 3 0 !�j„„' 25 %i i! Dtllld r ,or ” ,,.: . ' ' OJ 0.55 0.623 0.152 iio 4 „%' ' %!; 0! , ,., %- � /,;,;, i ,. .,! ., 8100 80;- 0.55 0.661 0.157 *Sections are nuunnhered from the top of the tower down **Mating Flange Plate Thickness at the bottorn of canister section Flag on Tower: ? e Flag Width: ” ft Flag Height: 8 ft Flag Elevation(z) Truck Ball on Tower:i Yes Diameter of Ball: I 18An Geometry:Base Tower +Spine 37514-2382.001.eri (last saved 10/23 8:05 am) op BottomWall Pole Height Above Section Lap Splice Diameter Diameter Thickness Bend Pole Base(ft) Length(ft) Length(ft) Number of Sides (in) (in) (in) Radius(in) Material Delete 109 i 20 0 0 4.5 4.5 0.5 n/a A582-70 [x] 89 20 0 0 8 8 1 n/a A572-42 [x] 69 51 4.75 18 30 37.14 0.21875 0.875 A572-65 [x] 75 0 18 36.0375 39. 22.75 22. 22 0.25 1 A572-65 [x] _o —� � Page 1 of 2 CCIFlagpole Tool v1,0 Apply CaAA at Weight Cap`A CaAA CaAA CaAA CaAA Weight No Discrete Loads: Elevation(z) 1/2"Ice No Ice(ftz) 1/2"Ice(ft) 1"Ice(ftz) 2"Ice(ft2) 4"Ice(ft') Ice(Kip) Truck Ball (ft) (Kip) 109.75 1.414 1.575 1.745 2.112 2.950 0.05 0.067 Discrete Loads:CFAF for Canister Assembly Canister Apply CFAF at CanisterAssembly Canister Loading Elevation(z) CFAF z CFAF z CrAF z CFAF z CFAF z Assembly Weight (ft) No Ice(ft ) 1/2"Ice(ft ) 1"Ice(ft ) 2"Ice(ft ) 4"Ice(ft ) Weight No 1/2"Ice Ice(Kip) Ki Canister Load 1 109 6.730 6.976 7.221 7.713 8.696 0.072 0.157 Canister Load 2 99 13.674 14.166 14.658 15.641 17.608 0.696 0.869 Canister Load 3 89 14.105 14.596 15.088 16.071 18.038 0.737 0.915 Canister Load 4 79 14.535 15.027 15.518 16.502 18.468 0.778 0.962 Canister Load 5 69 7.375 7.621 7.867 8.358 9.342 0.740 0.833 User Forces:Flag Force Calculation Per ANSI/NAAMM FP 1001-07 F Flag force should be included at the top of the flag WlndFORCF= 0.159 Kip attachment elevation.If the Weight= 0.073 Kip attachment of the flag to the WindFORce ice= 0.002 Kip halyard distributes forces Weight cF= 0.115 Kip equally to the pole,apply flag WFORre SERVICE WIND= 0.063 Kip forces accordingly in tnx file. Weight=1 0.073 Kip Deflection Check Required: "/ s ImroF't Cvedlert;) r_Best ts, 3%Spine Deflection Check Allowable(3%)Horizontal Spine Actual Sufficient/Insufficient Deflection(inches) Deflection 14.400 '11,2,4 20, Sufficient *"•Relative deflection under service IPM wind speed Page 2 of 2 CCIFlagpole Tool v1.0 Vol Pt VIA apt'A 1�s'? ~ SURVEY OF PROPERTY 07'.21,50AT EAST MARION TOWN OF SOUTHOLD SUFFOLK COUNTY, N.Y 1000-31-03-11.31 SCALE."P-30' AEARai GaAMR26 2010 " (PRCPOSEO MEMO PGS{EASE AWA) Olo +;. \ 00 tpi w� � r 04 r r r'n .Ad p2 µ$p yqC � y7Y Ap�h �l o,, m-MONUMENT S` / . �4C gpR4itly IWM AI FENW'6T'TF+'4YT A,rJLPrr1�'1 Pi)'lMxtS 4nWa'ue P'P6 A VJq,,MC9 W 618 ,v (631)765 aa?a)fi"AV(631)765-1........_-.__ WYW ASI VI I PAPN�"l C9'B@T7NGU°�TIti�Ir;MB V�1.C d'k"E'XP"dN"h'dPiwW3',' 797 ,IAID',Pd r%ddE+C0105i'&V!Pr1 tk-vF d r T Np S Plf* U dYM b"ib F P.0.BOC 909 AREA-3.0583 ACRES Arnroaa+cp n�xrs laly an,rKam teasf�.rr rra Sarre as fGfYA710NS REFERENCED TO N.A.VD. 'SH 4l1�Y79`E ytw N'NY.M'vE h�TK.WT'S p. iCsly, 1230 TRAVELER 02-251 4p_2 5 1 SO'JTNOLD, NK 11971 11971