Loading...
HomeMy WebLinkAbout05/2015 Department of Public Works Monthly Report Date: May 2015 Town Hall - Worked in conjunction with Kolb on A/C repair Police Dept - Finished cement pad(s) on new storage building, prepared pads, installed wire, worked with concrete and removed pads - Set barrier back into place - Framed out forms for west entry door on storage building - Filled perimeter curbs by storage building Parks/Beaches/Road Ends - Repaired swings at Tasker Park playground, delivered a load of sand to cover concrete base of playground equipment - Removed exposed irrigation line near sidewalk and capped line at Silversmiths - Repaired steps at Horton’s Lighthouse Beach - Repaired leak at Tasker Ladies Room - Reassembled bleachers at Corcoran Park - Removed graffiti from observation tower at Chapel Lane Preserve - Repaired broken stairs at 67 Steps beach & Rocky Point road end - Cut and removed downed trees at Soundview Dunes - Set poles at Pipes Cove Bridge - Finished installing stringers & girders, installed deck planks, and north side ramp at Pipes Cove bridge - Installed decking, cut away old rebar from old abutment and cleaned up area at Pipes Cove bridge HRC - Repaired copper pipe at HRC - Repaired sink leak - Resealed drain fittings on steam table - Installed awnings DSW - Replaced lightbulbs (with TimAbrams, bucket truck required) - Worked on lighting at the Recycle center INFO BOOTHS - Opened Greenport and Laurel Info booths for season - Replaced screen door at Laurel booth - Cleaned gutters at GPO booth - Replaced cracked flag holder at GPO booth ANIMAL SHELTER - Replaced water tank refill and “unloader” assembly - Repaired dryers Highway - Insulated and sheathed interior center wall of Carpenter Shop - Finished insulation and put plywood on ceiling in electrician’s shop Fishers Island - Replace bulbs and LEDs Mechanics - Summerize/winterize sander Installed multiple banners across roadways Town wide