HomeMy WebLinkAbout01/2002MEMORANDUM TO: James Bunchuck FROM: Thomas Mah .! DATE: January 11, 2002 SUBJECT: Sand from 17 -Acre Parcel Attached is a summary of use of material from the 17 -acre parcel. As discussed, after use of sand from the 17 -acre parcel, approximately 40,000 cy of the remaining 80,000 cy of stockpiled sand in the Borrow Pit will be required to complete the landfill cap. TFM/tam Attachment 1314/TFM02LTR. do c-06 (RO 1) SUMMARY OF USE OF 17 -ACRE MATERIAL As of January 2002 H2M estimate of sand and stone on 17 -acre parcel 160,000 cy Material initially screened at $2.50/cy based on volume of screened sand (20,000 sand, 2,500 gravel and 2,500 stone - cost 25,000* = 20,000 x $2.50 = $50,000 - sand used for gas venting layer (GVL) (17,000 cy) on western portion of landfill and Town Highway Department (3,000 cy) i.s:),Uuu Contour grading material and 6" final subbase used to date on western portion of landfill 30,000 105,000 Contour grading material and 6" final subbase to complete western portion of landfill 3,000 102,000 GVL to complete western portion of landfill (8,000 cy*) 10,000 92,000 Barrier protection layer (BPL) for western portion of landfill (28,000 cy*) 35,000 Needed from Borrow Pit stockpiled material to complete cap 40,000 *Screened sand 0 1314/1'0109205 (R05 ) D /,UUU Waste Excavation Area #1 backfill 2,000 55,000 Waste Excavation Area 92 backfill 3,000 52,000 Waste Excavation Area #3 backfill 2,000 50,000 Waste Excavation Area #4 backfill 500 49,000 Contour grading material and 6" final subbase on eastern portion of landfill 17,000 32,000 Backfill Recharge Basin #4 12,000 Remaining unscreened material 20,000 = Remaining screened sand 16,000 GVL for eastern portion of the landfill (28,000 cy) (28,000) 12,000 BPL for eastern portion of the landfill (28,000 cy) (28,000) Needed from Borrow Pit stockpiled material to complete cap 40,000 *Screened sand 0 1314/1'0109205 (R05 ) `-r Dvirka d! and 0 Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-3649890 ■ 718-460-3634 ■ Fax: 5.16-364-9045 e-mail: db-eng@worldnet.att.net Prineipala January 25, 2002 Nicholas J. Bartilucci, P.E. President Henry J. Chlupsa, P.E. Ese hw Vice President Thomas F. Maher, P.E. Vice President Anthony J. Cava, P.E. Anthony Robert T. Burns, P.E. Vice President Regional Solid and Hazardous Materials Engineer Richard M. Walka Vice President New York State Department of Steven A. Fangma"", P. E. Vice President Environmental Conservation - Region 1 SUNY - Building 40 Senior Aaaodatea Stony Brook, NY 11790-2356 Anthony 0. Conetta, P.E. Dennis F. Koehler, P.E. Re: Southold Landfill Closure Joseph H. Marturano Kenneth J. Pritchard, P.E. D&B 1314 Theodore S. Pytlar, Jr. Brian M. Veith, P.E. Dear Mr. Cava: Aaaoalatea As a follow-up to my letter of October 15, 2001, which provided a conceptual Garrett M. Byrnes, P.E. plan for a new drainage system along the eastern boundary of the landfill, Rudolph F. Cannavale enclosed are design drawings for review and approval. Joseph A. Fiorafiso, P.E. David S. Glass, P.E. The main change from the conceptual plan is that drainage pipe will no longer run Gould, Gerald CPG WilD. n, P.E. through waste to discharge to Recharge Basin #3, but will be outside the limits of liamMichael Neuberger, P.E. waste' Richard P. Russell, P.E. Charles J. Wachsmuth, P.E. We are in the process of preparing the details for the catch basins, manholes and Kenneth P. Wenz, Jr., CPG head wall, and redesign of Recharge Basin #3 to accommodate additional flow. These drawings will be provided to you when they are complete. The catch basins will be waterproofed since they are over (Catch Basin #1) and adjacent to (Catch Basin #2) waste. Since we would like to install this drainage system as soon as possible, we would appreciate your comments/approval by mid-February. A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. r. Dvirka and Bartilucci CONSULTING ENGINEERS Anthony J. Cava, P.E. Page Two Regional Solid and Hazardous Materials Engineer New York State Department of Environmental Conservation January 25, 2002 If you have any questions or require additional information, please do not hesitate to call me at (516) 364-9890. Very truly yours, Thomas F. Maher Vice President TFM/tam Enclosures cc: Robert Phaneuf, NYSDEC Igor Sikiric, NYSDEC James Bunchuck, Town of Southold Chris Morris, D&B Peter Sutherland, TEC 0131VITNI02MR.doc-28 i r- .�l C 50 40 30 20 10 I DATUM ELEV 0.00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 DRAINAGE PROFILES HW1 TO CB2 SCALES: HORIZ: 1 "=40' VERT: 1"=4' 8+00 9+00 10+00 11+00 12+00 50 �o 30 6 20 5 10 40 DATUM ELEV 30.00 0+00 L=30' S=1.00% DIA. CHDPE DRAINAGE PROFILES C61 TO MI -15 SCALES: HORIZ: 1"=40' VERT: 1"=4' PROJECT NO. DRAWING NO. N0. DATE REVISION INT. TOWN OF SOUTHOLD UNAUTHORIZED ALTERATION OR ADDITION TO THIS DOCUMENT IS A VIOLATION OF SUFFOLK COUNTY, NEW YORK 1314 a SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW. SOUTHOLD LANDFILL CLOSURE DATE: DRAINAGE PROFILES DECEMBER 2001 PROJECT ENGINEER: DRAWN BY: T.F.M. J.E.Z. DVIRKA AND eARTiLUCCi GENERAL CONSTRUCTION SCALE: L z DESIGNED BY: CHECKED BY: CONSULTING ENGINEERS AS NOTED E.P. E.P. A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. V) V3 0 C�n Ld 00 6 �O �N 04 O M Lrj 00tn O0 OQ� Lr) OOrM MO� C4C)n .0� JcpF- } 04 AZO CC) rr�cZ0 +C6ZO 0) +ozo (—f)O�Z OM Zp -N 04 NWZ �q— .- "'— .-�-- _< �(n�-- _��>> ZZ �(nQ'-- MQ ZZ 21— �Np_ZZ �Q�>> SF-- �V) Lr)Q SF-- �0EK J» tOQmi> =F-- KZ �cr)E NQJ> mF- Z (-) 1+00 2+00 3+00 4+00 5+00 6+00 7+00 DRAINAGE PROFILES HW1 TO CB2 SCALES: HORIZ: 1 "=40' VERT: 1"=4' 8+00 9+00 10+00 11+00 12+00 50 �o 30 6 20 5 10 40 DATUM ELEV 30.00 0+00 L=30' S=1.00% DIA. CHDPE DRAINAGE PROFILES C61 TO MI -15 SCALES: HORIZ: 1"=40' VERT: 1"=4' PROJECT NO. DRAWING NO. N0. DATE REVISION INT. TOWN OF SOUTHOLD UNAUTHORIZED ALTERATION OR ADDITION TO THIS DOCUMENT IS A VIOLATION OF SUFFOLK COUNTY, NEW YORK 1314 a SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW. SOUTHOLD LANDFILL CLOSURE DATE: DRAINAGE PROFILES DECEMBER 2001 PROJECT ENGINEER: DRAWN BY: T.F.M. J.E.Z. DVIRKA AND eARTiLUCCi GENERAL CONSTRUCTION SCALE: L z DESIGNED BY: CHECKED BY: CONSULTING ENGINEERS AS NOTED E.P. E.P. A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. I I I 36" DIA. CHD E L-162' S=1.00 "CHDPE L-158' S=1 00 • L=g '7::r �736" L=27' DIA. CH PE 5=1.0 % 24" DIA. S=1.00% CHDPE 36" DIA. CH PE 5=1.00 L=400' 36 DIA. CHDPE 36" DIA. CHDPE L= 215' 5=1.00 O O CV 00 G,ZO +_ 0 0 N Z 0, 5� , I I 1+00 2+00 3+00 4+00 5+00 6+00 7+00 DRAINAGE PROFILES HW1 TO CB2 SCALES: HORIZ: 1 "=40' VERT: 1"=4' 8+00 9+00 10+00 11+00 12+00 50 �o 30 6 20 5 10 40 DATUM ELEV 30.00 0+00 L=30' S=1.00% DIA. CHDPE DRAINAGE PROFILES C61 TO MI -15 SCALES: HORIZ: 1"=40' VERT: 1"=4' PROJECT NO. DRAWING NO. N0. DATE REVISION INT. TOWN OF SOUTHOLD UNAUTHORIZED ALTERATION OR ADDITION TO THIS DOCUMENT IS A VIOLATION OF SUFFOLK COUNTY, NEW YORK 1314 a SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW. SOUTHOLD LANDFILL CLOSURE DATE: DRAINAGE PROFILES DECEMBER 2001 PROJECT ENGINEER: DRAWN BY: T.F.M. J.E.Z. DVIRKA AND eARTiLUCCi GENERAL CONSTRUCTION SCALE: L z DESIGNED BY: CHECKED BY: CONSULTING ENGINEERS AS NOTED E.P. E.P. A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. Dvi rka and 0 Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 - 718-460-3634 • Fax: 516-364-9045 e-mail db-eng@worldnet.att.net Principals Nicholas J. Bartilucci, P E President Henry J. Chlupsa. P.E. Executive Vice President Thomas F Maher. P.E. Vice President Rbben T. Burns, P.E. Vice President Richard M. Walka Vice President Steven A. Fangmann, P. E. Vice President Senior Associates Anthony 0. Conetta. P.E. Dennis F. Koehler. P.E. Joseph H. Marturano Kenneth J. Pritchard, P.E. Theodore S. Pytlar, Jr. Brian M. Veith, P.E. Associates Garrett M. Byrnes, P.E. Rudolph F. Cannavale Joseph A. Fioraliso, P.E. David S. Glass, P.E. Gerald Gould, CPG William D. Merklin, P.E. Michael Neuberger, P.E. Richard P. Russell, P.E. Charles J. wachsmuth, P.E. Kenneth P. Wenz, Jr., CPG January 25, 2002 Mr. Robert G. Terry Terry Contracting & Materials, Inc. 840 West Main Street Riverhead, NY 11901 Re: Southold Landfill Closure D&B No. 1314 Dear Mr. Terry: We have reviewed your letter dated January 24, 2002, requesting that the geocomposite maximum exposure period be extended from the contract required period of 14 days to 30 days based on the recommendation of the manufacturer (Engineered Synthetic Products, Inc.). Although the' manufacturer's letter refers to no "noticeable" degradation, to confirm: this -=we need to review the manufacturer's data on degradation of properties with time. Also, as discussed, if we find the extension of time acceptable, we will require a statement from both the manufacturer and Terry Contracting & Materials, that the increased' exposure period will not affect the warrantee of the material or the overall closure project. If you have any questions, please do not hesitate to call me. - TFM/tam cc: J.. Bunchuck" I.-Sikiric C. Morris . P. Sutherland '01314lrFM02LTR.doc-27 - V 1y yo , Thomas F. Maher, P.E. Vice President A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. PDD 00 02 12.15 PROM. ID.:10004007n PAGO 2"T DV i rka and 0 Bartilucci cnrv.wr-u..TlrJo rtuTvir-r nn 330 Crossways Park Drive, Woodbury, New York,. 11797-2015 516-364-9890 - 718.460-3634 - Fax; 516-364-9045 e-mail: db eng@worldnet.alt.net Ffln"jo-Als NrchoWs J. Gon;luccl, P E ' Hatay J. Chl*!:4 P E. Thomas F. Mahw. P F ROW T oome, PF Richard M 1M *4 816va(,A Fangmann, RE James Bunchuck niwAaµQcialu Solid Waste Coordinator Anrhony o. Comm). P E Town Southold Nrois F Koohlor, PE of JOsoo H (Aun rano Town Hatl Kennoth J Pnrchnrd, P.E. lheoloroS Pyllar Jr. P.O. Box 1 179 53095 Main Road RudolpnF. Cann)valo Southold, NY 11971 JosaphA. Floralizo PC oawrl s Gia:.;; P E. WdLam 0 MoMlin, PE Re: Southold Landfill M cnael Nooboraor, P E Mori M Vedh, a E D&B No. 1314 (67) Charles J. Nbchsmulh F E Dear Mr, Bunchuck: January 24, 2002 Please find enclosed an invoice in the amount of $88,838.84 for our services for the period commencing December 1, 2001 through December 28, 2001. This invoice includes the following: Task h3 - Construction Observation 1. Provide full-time construction inspection services. 2 Coordinate, attend and record weekly progress meetings. 3. Review and comment on contractor's submittals. 4. Review contractor's progress and schedules. 5, Review application for payment. 6. Review and evaluate contractor's proposal for changes to design, 7, Obtain NYSDEC approval for design changes. 8, Prepare change orders. A DIVISION OF WILLIAM F COSLIUCH ASSOCIATES. P.C. ®vi rka and Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 • 718-460-3634 ■ Fax: 516-364-9045 e-mail: db-eng@worldnet.att.net Principals Nicholas J. Bartilucca, P.E. President Henry J. Chlupsa, P.E. Executive Vice President Thomas F. Maher. P.E. January 23, 2002 Vice President Robert T. Burns. P.E. Y'e President Mr. Robert O. Terry. Richard M. Walka Vice President Terry Contracting & Materials, Inc. Steven Fangmann, P.E. Yx:e Resident i 840 West Main Street Riverhead, NY 11901 Senior Associates Anthony O. Conaria, P.E. Re: Southold Landfill Closure Dennis F. Koehler. P.E. D&B No. 1314 Joseph H. Marturano Kenneth J. Pritchard, P.E. Dear Mr. Terry: Theodore S. Pytlar, Jr. Brian M. Veith, P.E. This is in response to your letter dated January 21, 2002, requesting a time Associates extension for work performed in Waste Excavation Areas 2 and 3. Please be Garrett M. Byrnes, P.E. aware that this time extension previously was provided to you as part of Change Rudolph F. Cannavale Order No. 4, which was fully executed on November 8, 2001. Joseph A. Fioraliso, P.E. David S. Glass, P.E. Ve/ry^d truly yours, Gerald Gould, CPG G William D. Merklin, P.E. Michael Neuberger, P.E. Richard P. Russell, P.E. Charles J. Wachsmuth, P.E. Thomas F. Maher, P.E. Kenneth P. Wenz, Jr., CPG Vice President TFM/tam cc: J. Bunchuck I. Sikiric C. Morris 01314/rFM02LTR.doc-24 A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. Dvi rka and O Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 - 718-460-3634 ■ Fax: 516-364-9045 e-mail: db-eng@worldnet.att.net Principals Nicholas J. Bartilucci, P.E. Resident Henry J. Chlupsa, P.E. Executive Vice President Thomas F. Maher, P.E. January 23, 2002 Vwe Resident Robert T. Bums, P.E. Vice Resident Rwalks• Robert G. Terry Richard M. Vw President Terry Contracting & Materials; Inc. Steven A. Fangmann, P. E. Ywe President 840 West Main Street Riverhead, NY 11901 Senior Associates Anthony O. Conetta, P.E. Re: Southold Landfill Closure Dennis F. Koehler, P.E. Joseph H. Marturano D&B No. 1314 Kenneth J. Pritchard, P. E. Theodore S. Pytlar, Jr. Dear Mr. Terry: Brian M. Veith, P.E. As discussed, please provide a cost estimate for testing of the 17 -acre material for Associates use on the landfill. This cost estimate should provide the type of test, unit price, Garrett M. Byrnes, P.E. estimated quantity and total costs. As also discussed, please provide this cost Rudolph F. Cannavale estimate to me at the January 24, 2002, Progress Meeting. Joseph A. Fioraliso, P.E. David S. Glass, P.E. GVery truly yours, Gerald Gould, CPG William D. Merklin, RE. Michael Neuberger, P.E. Richard P. Russell, P.E. Charles J. Mchsmuth, P.E. Thomas F. Maher, P.E. Kenneth P. wenz, Jr., CPG Vice President TFM/tam cc: J. Bunchuck I. Sikiric C. Morris 01314/PFM02LTR.doc-21 A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. Dvi rka and 0 Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 ■ 718-460-3634 - Fax: 516-364-9045 e-mail: db-eng@worldnet.att.net Principals Nicholas J. Bartilucci, P E President Henry J. Chlupsa. P.E. Execuh� Vice President Thomas F. Maher. P.E. Vice Resident RobertT Burns, P. E. Vice Resident Richard M. M-lka Vice President Steven A. Fangmann, P. E. bice Resident Senior Associates Anthony 0. Conetta, P.E. Dennis F. Koehler. P.E. Joseph H. Marturano Kenneth J. Pritchard, P.E. Theodore S. Pytlar, Jr. Brian M. Veith, P.E. Associates Garrett M. Byrnes, P.E. Rudolph F. Cannavale Joseph A. Fioraliso, P.E. David S. Glass, P.E. Gerald Gould, CPG William D. Merklin, P.E. Michael Neuberger, P.E. Richard P. Russell, P.E. Charles J. Wachsmuth, P.E. Kenneth P. Wenz, Jr., CPG January 22, 2002 Mr. Robert G. Terry Terry Contracting & Materials, Inc. 840 West Main Street Riverhead, NY. 11901 Re: Southold Landfill Closure D&B No. 1314 Dear Mr. Terry: At the January 17, 2002, meeting, in reviewing costs for compost facility construction, you indicated that approximately 110,000 cy of sand is to be screened at $3.65/cy. As stated 'iri �rry letter to you dated December 31, 2001, unscreened sand shall be used as final 6 -inch subgrade layer on the eastern portion of the landfill. You are responsible for ensuring that 20,000 cubic yards of unscreened sand remains from development of the 17 -acre parcel unless directed otherwise by the Town. There shall be no payment for screening of sand which results in less than 20,000 cubic yards of unscreened sand remaining on the 17 -acre parcel. If you have any questions, please call me. Very truly yours, J Thomas F. Maher, P.E. Vice President TFM/tam ; Cc: J. Bunchuck:. C. Morris 01314/TFM02LTR.doc-16(R01) A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. 3 Dvirka and Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 ■ 718-460-3634 - Fax: 516-364-9045 e-mail: db-eng@worldnet.att.net January 22, 2002 Principals Nicholas J. Bartilucci, RE President Henry J. Chlupsa, P.E. Executive Vice President Thomas F. Maher, P.E. Vice President Robert T. Burns, P. E. Vice President Richard M. Walka Vice President James Bunchuck Solid Waste Coordinator Town of Southold 53095 Main Road Southold, NY 11971 Steven A. Fangmann, P. E. Vice President Re: Southold Landfill Closure and Senior Associates Compost Facility Construction Anthony o. Conetta, P.E. D&B No. 1314 Dennis F. Koehler, P.E. Joseph H. Marturano Kenneth J. Pritchard, P.E. Dear Mr. Bunchuck: Theodore §. Pytlar, Jr. Brian M. veith, P.E. Based on comments received at the January 17, 2002, Progress Meeting on my analysis of landfill closure savings and additional costs, and compost facility Associates construction costs, I have revised the cost analysis, which is enclosed with this Garrett M. Byrnes, P.E. letter. Please review the enclosure and provide me with any additional comments Rudolph F Cannavale at the January 24 Progress Meeting, in particular as it relates to allocation of costs Joseph A. Fioraliso, P.E. to either the closure or compost facility project. David S. Glass, P.E. Gerald Gould, CPG , William D. Gould, C n, P, E. These are a few items on which I need clarification: Michael Neuberger, P.E. 1 Richard P. Russell, P.E. 1. Should removal/hauling of unscreened sand from the 17 -acre parcel Charles J. Wachsmuth, P.E. and placement at the landfill as contour grading/subbase material Kenneth P. Wenz, Jr., CPG ($3/cy) be charged to the closure or compost project? 2. Should removal/hauling of screened sand from the 17 -acre parcel and placement at the landfill as gas venting and barrier protection material ($3/cy) be charged to the closure or compost project? 3. Should the screening of sand from the 17 -acre parcel ($2.50/cy and $3.65 cy) be charged to the closure or compost project? A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. Dvirka and Bartilucci CONSULTING ENGINEERS James Bunchuck Page Two Solid Waste Coordinator Town of Southold January 22, 2002 4. Should the testing of the screened and unscreened sand from the 17 -acre parcel be charged to the closure or compost project? By copy of this letter, I am requesting that John Romanelli and Bob Terry also review and provide comments on this letter and the enclosures, including review of the quantities by Bob Terry. Ve ruly your -sem Thomas F. Maher Vice President TFM/tam Enclosure cc/encl: John Romanelli Bob Terry 0 13141FFM02LTR.doc-18 SOUTHOLD LANDFILL CLOSURE SAVINGS/ADDITIONAL COST ANALYSIS AS OF JANUARY 15, 2002 SAVINGS Item No. Description Unit Price Estimated Actual Savings 3 Reduction in clearing and $1,200/acre 50 acres 12 acres $45,600 grubbing. 7 Elimination of Geotextile $2/sy 166,000 sy 0 $332,000 Type I between final 6" subgrade and gas venting layer 30 Elimination of sand pit $3/cy 73,000 cy 0 $219,000 regrading 21 Elimination of southwest $8.75/sy 1,030 sy $9,000 maintenance road 13B Elimination of contingency $13.80/cy 18,000 cy 0 $248,400 off-site topsoil 13A Manufacture of additional on- $7/cy 18,000 cy 0 (126,000) site vegetative growth medium 0 $122,400 22 Elimination of asphalt for a $42.50/sy 3,400 sy 0 $144,500 portion of Main Access Road 1,020 ft. x 30 ft. = 30,600 sf 9 21 Replacement with 12" $8.75/sy 3,400 sy 0 29,750) recycled concrete aggregate 0 $114,800 Elimination of waterproofing manholes along southwestern drainage system $1,700 26 Reduction of depth of southwestern drainage system 19A Elimination of fencing along $18.75 If 1,2601f $23,600 western boundary 0 1314/T0115202(ROS) SOUTHOLD LANDFILL CLOSURE SAVINGS/ADDITIONAL COST ANALYSIS AS OF JANUARY 15, 2002 ADDITIONAL COSTS Item No. Description Unit Price Estimated Actual Cost 32 Test pit excavation to $1,200/day 0 9 days $10,800 determine limits of waste 33 Placement of waste after $25/ton 0 2,575 tons $64,375 baseline topographic survey (10,000 cy) 5D Excavation of waste from $6.78/cy* 0 7,138 cy* $48,396 Area 2 5E Excavation of waste from $6.78/cy* 0 6,911 cy* $46,857 Area 3 10 Additional gas vents due to $1,184/vent 39 vents 51 vents $14,200 placement of loam on west side and test vents on east side (Charge Spreading of Greenport $21,000 LS 8,400 cy $21,000 to DOT?) Pond material 5A Additional excavation of $6.78/cy* 2,000 cy 2,010 cy* $68 waste from area 1 5C Pull back and backfilling of $3/cy 0 3,000 cy $9,000 waste in Waste Excavation Area 2 Excavation of waste from $6.78/cy* 493 cy $3,313 Area 4 (Charge to Compost Facility?) Testing of 17 -acre soil 3 Pull back and relandfilling of $5/cy 0 395 cy $1,975 waste in Waste Excavation Area 3 0 1314/T0115202(R05) A ADDITIONAL COSTS (continued) Item No. Description Unit Price Estimated Actual Cost 6 Additional contour grading $3/cy 36,000 cy —80,000 cy $132,000 material 11 Additional geocomposite $4.20/cy 39,000 sy 59,000 sy $84,000 28 Modified water supply well New drainage system on east side, including enlarged Recharge Basin 3 6 Backfilling of Recharge $3/cy 0 12,300 cy $36,900 Basin 4 *In-place 01314/T0115202(R05) COMPOST FACILITY CONSTRUCTION Description Clearing and grubbing Windrowing of topsoil and loam Removal and stockpiling of topsoil in borrow pit Removal and placement of topsoil on landfill Removal and placement of loam on landfill Removal and placement of loam in borrow pit Excavation and screening of initial 25,000 cy of sand Excavation and screening of remaining sand ? Removal and placement of unscreened sand on landfill as contour grading material and 6" subbase on west side ? Removal and placement of screened sand on landfill as gas venting layer and barrier protection layer Temporary access road to 17 -acre parcel Relocate temporary access road Permanent access road to 17 -acre parcel Widening of the northwest road from 17 -acre parcel to the borrow pit Modification to southwest drainage system* Additional guide rail* 01314/f0115202(R05) Unit Price Ouanti Cost $1,200/acre 17 acres $20,400 $2/cy 32,565 cy $65,130 $5/cy 12,877 cy $64,385 $3/cy 4,321 cy $12,963 $3/cy 42,833 cy $128,499 $3/cy 50,523 cy $151,569 $2.50/cy 20,000 cy $50,000 $3.65 60,000 cy $219,000 $3/cy —53,000 cy —$159,000 $3/cy —60,000 —$180,000 $36,250 LS 1 $36,250 $42.50/sy 2,270 sy $96,500 $8.75/sy 680 sy $5,950 Description Relocation of brush* Temporary 1 -acre pad* Sound barrier and vegetation along permanent access road* *To be determined 0 13141 0115202(805) Unit Price Quantily Cost Dvi rka d! and 0 Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 ■ 718-460-3634 ■ Fax: 516-364-9045 e-mail: db-eng@worldnet.att.net January 22, 2002 Principals Nicholas J. Bartilucci, RE President Henry J. Chlupsa, P.E. James Bunchuck Executive Vice President Garrett M. Byrnes, P.E. Thomas F. Maher, P.E. �+ !� Solid Waste Coordinator Vice President Town of Southold Robert Burns, P.E. David S. Glass, P.E. Vice President 53095 Main Road Richard M. Wake Vice President Southold, NY 11971 Steven A. Fangmann, P.E. William D. Merklin, P.E. Vice President Vice President Michael Neuberger, P.E. Re: Southold Landfill Closure Senior Associates D&B No. 1314. Anthony O. Conetta, P.E. Dennis F. Koehler, P.E. Dear Mr. Bunchuck: Joseph H. Marturano Kenneth J. Pritchard, P.E. Theodore S. Pytlar, Jr. Enclosed please find a copy of the letter to Terry Contracting & Materials Brian M. Veith, P.E. regarding a request for a credit for sewing rather than heat seaming the geotextile end of the geocomposite, which I inadvertently neglected to copy you. Associates Garrett M. Byrnes, P.E. Very truly yours, Rudolph F. Cannavale Joseph A. Fioraliso, P.E. David S. Glass, P.E. Gerald Gould, CPG Thomas F. Maher, P.E. William D. Merklin, P.E. Vice President Michael Neuberger, P.E. T / TFM tam Richard P. Russell, P.E. Enclosure Charles J. Wachsmuth, P.E. Kenneth P. Wenz, Jr., CPG cc: I. S1k1nc R. Terry T. Howell P. Sutherland C. Morris 01314lrFM02LTRAoc-20 A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. Dvirka d! and 0 Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 ■ 718-460-3634 ■ Fax: 516-364-9045 e-mail: db-eng@woddnet.att.net January 18, 2002 Principals Mr. Robert G. Terry Nicholas J. Bartilucci, P.E. .President Terry Contracting & Materials, Inc. Henry J. Chlupsa, RE. 840 West Main Street Executive Vice President Thomas F Maher, P.E. Riverhead, NY 11901 vice President Robert T. Bums, P.E. Vice Presaent Re: Southold Landfill Closure Richard M. walks Vxe President D&B No. 1314 Steven A. Fangmann, P.E. vw President Dear Mr. Terry: Senior Associates Anthony O. Conetta, P.E. We have reviewed Chenango Contracting, Inc., s request, dated January 17, 2002, Dennis F. Koehler, P.E. Joseph H. Marturano to stitch the loose edge of the geotextile around the exposed edge of the Kenneth J. Pritchard, P.E. geocomposite as it terminates outside the storm water channels, and approve this Theodore S. Pytlar, Jr. method provided the stitch is a double thread lock stitch, Type 401, with a flat or Brian M. Veith, P.E. prayer seam. Associates Since the stitching method is faster than the heat seam geotextile wrap as Garrett M. Byrnes, P.E. specified in the Contract Documents, the Town of Southold expects a credit based Rudolph F. Cannavale on this change. Please provide me with the amount of the credit. Joseph A. Fioraliso, P.E. David S. Glass, P.E. - If you have any questions, please call me. Gerald Gadd, CPG William D. Merklin, RE. Very truly yours, Michael Neuberger, P.E. Richard P. Russell, P.E. Charles J. Wachsmuth, P.E. Kenneth P. Wenz, Jr., CPG Thomas F. Maher, P.E. Vice President TFM/tam 01314/PFM02LTR.doc-15 A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. 01/22/2002 TUE 16:36 FAX 002/OO�J a_ Ovirka and Bartiiucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 51&364-9894 • 718.460-3634 . Fax: 518.364-9045 e-mail. db-enq@worldnet.attnet January 22, 2002 PrInCIPRIB Nicholas J. Dadgueei, P E emmw HQM J. Chlu4ps r, P.E. James Bunchuck D,eaci,e u+w -+wJ,ier Thomas F. MOW, P.E. Solid Waste Coordinator wa {1YvAo Town of Southold kamen� ns, P.E. wo 53095 Main Road gieherd M. YUhlke V" preAmnr Southold, NY 11971 Slievenk Fanpmem, P.E. *V %vsM-* Re: Southold Landfill Closure and Senior A**otlstes Compost Facility Construction ArO=y O. Caropa, RE D&B No. 1314 Dems F. Koehler, P.C. Jo seph K MvAur= n 7' Dear MT, Bunchuck: Kemain J. Pmenara, PE. Themore 6. PpWr, Jr Wan NL Mwlh, re, Based on comments received at the January 17, 2002, Progress Meeting on my analysis of landfill closure savings, and additional costs, and compost facility Aeaedl.kts construction costs,- 1 have revised the cost analysis, which is enclosed with this Nrrattk 9ymos, RE letter. Please review the enclosure and provide me with any additional comments `umw F• cmnaveie at the January 24 Progress Meeting, in particular as it relates to allocation of costs Joseph Fmraiiso, P.E... to either the closure or compost facility project. David $. Glass, P.E. Gerald OOWtl, CFO These are a few items on which I need clarification: welled U. Meech, P.E Michael NeuEugee,, P.E. Richard P Paseo. PE. 1. Should removal/trauling of unscreened sand from the 17 -acre parcel Cherlae J. Vachamurh. PE and placement at the landfill as contour grading/subbase inaterial ldnnSM P. wean, A. cPa ($31cy) be charged to the closure or compost project? 2. Should removaUhauling of screened sand from the 17 -acre parcel and placement at the landfill as gas venting and barrier protection material ($3/cy) be charged to the closure or compost project? 3. Should the screening of sand from the 17 -acre parcel ($2.50/cy and $3.65 cy) be charged to the closure or compost project? A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, PC, - 01/22/2002'TUE 16:37 FAX y ®virka and Bartilucci CONSULTING ENGINEERS Z 003/008. James Bunchuck Page Two Solid Waste Coordinator Town of Southold January 22, 2002 4. Should the testing of the screened and unscreened sand from the 17 -acre parcel be charged to the closure or compost project? By copy of this letter, I am requesting that John Romanelli and Bob Terry also review and provide comments on this letter and the enclosures, including review of the quantities by Bob Terry. . Vemlruly ypyxs� Thomas F. Maher Vice President TFM/tam Enclosure cc/encI: John Romanelli Bob Terry 01314MM0MTA.doo-18 13 01/22/2002 TUE 18:38 FAX SOUTHOLD LANDFILL CLOSURE SAVINGWADDITIONAL COST ANAL Y•SB AS OF JANUARY 15, 2002 SAVINGS' Item No. " Description Unit Price Estimated - Actual 3 Reduction in clearing and - $1,200/acre 50 aeres 12 acres 4004/008 Savings $45,600 7 Elimination of Gcotextile $21st' 166,000 sy 0 $332,000 Type, I between final 6" subgrade and gas venting layer 30 Elimination of sand pit $3/cy 73,000 cy 0 $219;000. regrading 21 Elimination of southwest $8.75/sy 1,030 sy $9,000 maintenance road 13E Elimination of contingency $13.80/cy 18,000 cy 0 $248,400 off-site topsoil 13A Manufacture of additional on- $7/cy 18,000 cy 0 (126,U00) site vegetative growth medium A $122,400 22 Elimination of asphalt for a $42.50/sy 3,400 sy 0 $144,500 portion of Main Access Road 1,020 ft, x 30 ft. m 9 21 Replacement with 12" 58.75/sy 3,400 sy 0 29,7 0 recycled concrete aggregate A $114,802 Elimination of waterproofing manholes along southwestern drainage system $1,700 26 Reduction of depth of southwestern drainage system 19A Elimination of fencing along $18.?51f 1,260 If $23,600 western boundary 01314(r0x15=(R05) / 01/22/2002 TUE 18:38 FAX 0005/008 . SOMHOLD 1LANDFML CLOSURE - SAVINOS/ADDITIONAL COST ANALYSIS - AS OF JANUARY 15, 2002 ADDITIONAL COSTS item No. Description 32 Test pit excavation to detcrmine limits of waste Unit Price Estimated Actual Cost $1,200/day 0 9 days $10,800 33 Placement of waste after $25/ton 0 2,575 tons $64,375 baseline topographic survey (-10,000 cy) 5D Excavation of waste from $6.78/cy* 0 7,138 cy* $48,396 Area 2 5E Excavation of waste from $5.78/cy* 0, 6,911 cy* $46,857 Area 3 10 Additional gas vents due to $1,184/vent 39 vents 51 vents $14,200 placement of loam on west side and test vents on cast side (Charge Spreading of Greenport $21,000 LS 8,400 cy $21,000 to DOT?) Pond material 5A Additional excavation of $6.78/4* 2,000 cy 2,010 cy* $68 waste from area 1 5C Pull back and backfilling of $3/cy 0 3,000 cy S9,000 waste in Waste Excavation Area 2 Excavation of waste from $6.78/cy* 493 cy $3,313 .Area 4 (Charge to Compost Facility?) Testing of 17 -acre soil 3 Pull back and relandflling of $5/cy 0 395 cy $1,975 waste in Waste Excavation Area 3 013141TO115202(R45) 01/22/2002 TUE 16:39 FAX R006/008 ADDITIONAL COSTS (continued) Item No. Description . - Unit Price Estimated - Actual - -C4,st 6 Additional contour grading $3/cy 36,000 cy —80,000 cy $132,000 material I l Additional geocornposite $4.20/cy 39,000 sy 59,000 sy$84,000 28 ---Modified water supply wellNew drainage system on east side, including enlarged Recharge Basin 3 6 Backfilling of Recharge $3/cy 0 ---12,300 cy $36,900 Basin 4 *In-place 01314rr0115202(ROS) #q�a��s� sa 1,1' w s �gl g vo- co, 01/22/2002 TUE 16:39 FAX Y COMPOST FACILITY CONSTRUCTION ` Description Clearing and grubbing Windrowing of topsoil and loarn Removal and stockpiling of topsoil in borrow - pit Removal and placement of topsoil on landfill Removal and placement of loam on landfill Removal and placement of loam in borrow pit Excavation and screening of initial 25,000 cy of sand Excavation and screening of remaining sand ? Removal and placement of unscreened sand on landfill as contour grading material and 6" subbase on west side ? Removal and placement of screened sand on landfill as gas venting layer and barrier protection layer Temporary access mad to 17 -acre parcel Relocate temporary access road Permanent access road to 17 -acre parcel ' Widening of the northwest road from 17 -acre parcel to the borrow pit Modification to southwest drainage system* Additional guide rail* 0 13141TOI15202(R05) Z007/006 Un nt ri a Quantity os -- S1,200/acre 17 acres $20,400 $2/cy 32,565 cy $65,134 $5/0y 12,877 cy $64,385 $31cy 4,321 cy $12,963 $3/cy 42,833 cy $128,49.9 $3icy 50,523 ey $151,569 $2.50/cy 20.000 cy $50,000 $3.65 60,000 cy $219,000 $3/cy —53,000 ey —$159,000 $31cy —60,000 -✓$1.80,000 $36,2.50 ]J$ 1 $36,250 .$42.50/sy 2,270 sy $96,500 $8.75/sy 680 sy $5,950 01/22/2002 TUB 16:40 FAX Desedption Relocation of brush* Temporary 1 nacre pad* Sound barrier and vegetation along permanent access road* *To be determined 0 1314/C0115202(R05) Unit Price Ouantity - Cost X1008/006 DVIRKA AND BARTILUCCI CONSULTING ENGINEERS 330 CROSSWAYS PARK DRIVE WOODBURY NY 11797-2015 PHONE: (516)364-9890 FAX: (516) 364 - 9045 TO: Terry Contracting & Materials, Inc. 840 West Main Street Riverhead, NY 11901 WE ARE SENDING YOU: Shop Drawings Copy of Letter LETTER OF TRANSMITTAL Date: 17 -Jan -02 JJob No. 1314-F3 Attention: Robert Terry Re: General Construction Contract No. 2000 Southold Landfill Closure 0 Attached F -I Under Separate Cover Via. the following items: For your use Prints ❑ Plans ❑ Samples ❑ Specifications Q Change Order ❑ TRANSMITTAL COPIES No. Received Returned DESCRIPTION 1 30b 01/17/2002 01/17/2002 Geocomposite Roll Certifications - Resubmit 2 For your use Return corrected prints As requested E-1 Other For review and comment THESE ARE TRANSMITTED as checked below ❑ For approval F—] Submit copies for distribution For your use Return corrected prints As requested E-1 Other For review and comment I Iff . .� 0 Approved as submitted (A) = Resubmit copies for approval Approved as noted (AAN) F—] Submit copies for distribution aDisapproved (D) Return corrected prints Rejected (R) E-1 Other Copies to: J. Bunchuck T. Howell Signed: 'Nax�- T. Maher P. Sutherland rAaria Wright, P.E. 6 AI -Mau — I. Sikiric • MDIrnS If enclosures are not as noted, kindly notify us at once 30btransmit.x1s Dvirka anand o Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 - 718-460-3634 ■ Fax: 516-364-9045 e-mail: db-eng@worldnet.att.net Principals Nicholas J. Bartilucci, RE President Henry J. Chlupsa, P.E. Executive Vice President Thomas F Maher, R.E. Vice President Robert T. Burns, P.E. Vice President Richard M. Walka Vice President Steven A: Fangmann. P.E. Vwe President Senior Associates Anthony 0. Conetta, P.E. Dennis F. Koehler, P.E. Joseph H. Marturano Kenneth J. Pritchard, P.E. Theodore S. Pytlar, Jr. Brian M. Veith, P.E. Associates Garrett M. Byrnes, RE. Rudolph F. Cannavale Joseph A. Fioraliso, P.E. David S. Glass, P.E. Gerald Gould, CPG William D. Merklin, P.E. Michael Neuberger, P.E. Richard P. Russell, P.E. Charles J. Wachsmuth, P.E. Kenneth P. Wenz, Jr., CPG January 16, 2002 Mr. Robert G. Terry Terry Contracting & Materials, Inc. 840 West Main Street Riverhead, NX 11901 Re: Southold Landfill Closure Pre -Cast Concrete Waterproofing D&B No. 1314 Dear Mr. Terry: We are_ in receipt- of, your letter dated January 15, 2002, with regard to approval for elimination..of the waterproof coating for all precast manhole structures. As noted in y_.our.:letter, approval for elimination of the waterproofing is only provided for:.precast concrete structures located outside the limits of waste. The credit of $1,700 for elimination of the waterproofing on the manhole structures as part of the southwestern drainage system is acceptable. Please do not hesitate to contact me at (516) 364-9890 if you have any questions. Very truly yours, Thomas F. Maher, P.E. Vice President A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. Dvirka and 0 Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 ■ 718-460-3634 ■ Fax: 516-364-9045 e-mail: db-eng@worldnet.att.net January 16, 2002 Principals Mr. Robert G. Terry Nicholas J. Bartilucci, P.E. President Terry Contracting & Materials, Inc. Henry J. Chlupsa, P. E. p 840 West Main Street Executive Vice. President Thomas F. Maher, P.E. Riverhead, NY 11901 Vice President Robert T. Bums, P.E. trice President Re: Southold Landfill Closure Richard M. walks like Resident Submittal 27b Steven A. Fangmann, P.E. D&B No. 1314 Vice President Senior Associates . Dear Mr. Terry: Anthony O. Conetta, P.E. Dennis F. Koehler, P.E. Joseph H. Marturano As you are aware, we have reviewed Submittal 27b - Pre -Cast Concrete Kenneth J. Pritchard, P.E. 'Specifications - Manholes and Stilling Basin - Resubmit No. 2 received in our Theodore S. Pytlar, Jr. office on January 10, 2002, and submitted comments on the submittal on January Brian M. Veith, P.E. 14, 2002. In addition to the comments provided in our letter dated January 14, 2002, we also require the following: Associates Garrett M. Byrnes, P.E. 1. The Standard Manhole Drill Sheet for Manhole #3, must correspond with the Rudolph F. Cannavale Contract Drawings. Specifically, it appears as if the two 42 -inch holes in the Joseph A. Fioraliso, P.E. manhole are not orientated as required by the Contract Drawings. David S. Glass, P.E. Gerald Gould, CPG Please include a modified Standard Manhole Drill Sheet for Manhole #3 with William D. Merklin, PE. Mikael Neugerger, RE. your resubmittal that incorporates all comments provided to you previously on Richard R Russell, P.E. this submittal. Please do not hesitate to contact me at (516) 364-9890 if you have -Charles J. Wachsmuth, P.E. any questions. Kenneth P. Wenz, Jr., CPG Very truly yours Thomas F. Maher, P.E. Vice President TFM/MW(t)/tam cc: J. Bunchuck I. Sikiric T. Howell C. Morris 0 1314/rFM02LTR.doc-12 A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. L d1Dv i rka and 0 Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 • 718-460-3634 ■ Fax: 516-364-9045 e-mail: db-eng@worldnet.att.net Principals Nicholas J. Bartilucci, P.E. President January 15, 2001 ' Henry J. Chlupsa, P.E. Executive Vice President Thomas F. Maher, P.E. . Re: Southold Landfill Closure V"' President ,T_ M • Robert G. Terry Robert T. Bums, P.E. Vice President Terry Contracting & Materials, Inc. Richard M. Walka Vim President 840 West Main Street Vxe Prean; "9ma"", P.E. Riverhead, NY 11901 Brian M. Veith, P.E. We have reviewed your letter dated January 11, 2002, requesting additional Senior Associates . Re: Southold Landfill Closure Anthony O. Conetta, P.E. D&B No. 1314 Dennis F. Koehler, P.E. Joseph H. Marturano Dear Mr. Terry' Kenneth J. Pritchard, P.E. Theodore S. Pytlar, Jr. Brian M. Veith, P.E. We have reviewed your letter dated January 11, 2002, requesting additional payment associated with redesign of the drainage system along the southwestern Associates boundary of the landfill. Garrett M. Byrnes, P.E. Rudolph F. Cannavale Please be aware that while additional pipe and an additional manhole are required Joseph A. Fioraliso, P.E. as a result of the redesign, the depth of excavation and placement of the pipe is David S. Glass, P.E. substantially less (average of 6 feet over a distance of 320 feet) and depths of the Gerald Gould, CPG manholes are less (manhole #1 is 6 feet less and manhole #2 is 1.5 feet less) as William D. Merklin, RE. Mikael Neuberger P.E. compared to the original design. Please provide a credit (with computation) for Richard P. Russell, P.E. the reduction in the depth of the drainage system. Also, your price of $4,125 for Charles J. Wachsmuth, P.E. the additional manhole appears high, as compared to the costs provided to us for Kenneth P. Wenz, Jr, CPG construction of the new drainage system along the eastern boundary of the landfill which was $2,500 for a 15 -foot (average) manhole. Also based on your Schedule of Values, the average cost for an 18 -foot (average) 6 -foot diameter manhole is $3,400 while the requested increase in cost of $4,125 is for a 9 -foot, 4 -foot diameter manhole. Therefore, it appears that the cost for the additional manhole should not be greater than $2,000. A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. Dvirka and Bartilucci CONSULTING ENGINEERS Mr. Robert G. Terry Terry Contracting & Materials, Inc. January 15, 2002 Page Two Please revise your letter of January 11 based on the above comments. If you have any questions, please call me. Very truly yours, Thomas F. Maher, P.E. Vice President TFM/tam cc: J. Bunchuck I. Sikiric C. Morris M. Wright.. O 1314/rFM0MM.doc-10 Principals Nicholas J. Bartilucci, P.E. President Henry J. Chlupsa, P.E. Executive Vim President Thomas F. Maher, P.E. Vice President Robert T. Bums, P.E. ✓ice President Richard M. W'alka ✓Am President Steven A. Fangmann, P. E. Uwe President Senior Associates Anthony O. Conetta, P.E. Dennis F. Koehler, P.E. Joseph H. Marturano Kenneth J. Pritchard, P.E. Theodore S. Pytlar, Jr. Brian M. Veith, P.E. Associates Garrett M. Byrnes, P.E. Rudolph F. Cannavale Joseph A. Fioraliso, P. E. David S. Glass, P.E. Gerald Gould, CPG William D. Merklin, P.E. Michael Neuberger, P.E. Richard P. Russell, P.E. Charles J. wachsmuth, P.E. Kenneth P. wenz, Jr., CPG Dvirka and Bartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 ° 718-460-3634 ■ Fax: 516-364-9045 e-mail: db-eng@worldnet.att.net January 14, 2002 Mr. Robert G. Terry Terry Contracting & Materials, Inc. 840 West Main Street Riverhead, NY 11901 Re: Southold Landfill Closure Submittal 34 D&B No. 1314 Dear Mr. Terry: We have reviewed Submittal 34 - Corrugated High Density Polyethylene Drain Pipe Specifications received in our office on January 10, 2002. We have reviewed the submittal with respect to the requirements of the Specifications for the above -referenced project. Our comments are as follows: 1. The pipe shall bear the class of pipe and trademark of the manufacturer. The submittal has been stamped "approved as noted." Please do not hesitate to contact me at (516) 364-9890 if you have any questions. Very truly yours, Thomas F. Maher, P.E. Vice President TFM/MDWt/.cmc cc: J. Bunchuck I. Sikiric T. Howell C. Morris P. Sutherland M. Wright ♦ 1314\TFM02LTR-09.DOC A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. J Dvi rka and Dartilucci CONSULTING ENGINEERS 330 Crossways Park Drive, Woodbury, New York, 11797-2015 516-364-9890 ■ 718-460-3634 ■ Fax: 516-364-9045 e-mail: db-eng@worldnet.att.net Kenneth P. Wenz, Jr., CPG 1. The concrete mix design for the stilling basin must be provided. 2. The shop drawing for the stilling basin shall indicate that the precast concrete will meet the requirements of ASTM C478. 3. The contract drawings indicate the stilling basin base has.concrete fill. 4. Remove reference to 60 mil HDPE liner on stilling basin shop drawing and indicate stilling basin is to be installed in accordance with the contract drawings and specifications. A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. January 14, 2002 Principals Nicholas J. Bartilucci, P.E. President Henry J. Chlupsa, P.E. Executive Vice President Thomas F. Maher, P.E. Mr. Robert G. Terry We President Terry Contracting & Materials, Inc. RobertT Bums, P.E. Vice President 840 West Main Street Richard M. Walka Vice President Riverhead, NY 11901 Steven A. Fangmann, P.E. Yice President , Re: Southold Landfill Closure Senior Associates Submittal 27b Anthony O. Conetta, P.E. D&B No. 1314 Dennis F. Koehler, P.E. Joseph H. Marturano i_ Dear Mr. Terry: Kenneth J. Pritchard, P.E. Theodore S. Pytlar, Jr. Brian M. Veith, P.E. We have reviewed Submittal 27b - Pre -Cast Concrete Specifications - Manholes and Stilling Basin - Resubmit No. 2 received in our office on January 10, 2002. Associates We have reviewed the submittal with respect to the requirements of the Contract Garrett M. Byrnes, P.E. Specifications for the above -referenced project, and, there are a number of Rudolph F Cannavale omissions and inconsistencies between this Submittal and the Specifications. Joseph A. Fioraliso, P.E. Based on a telephone conversation with Mr. Timothy Howell of your office, we David S. Glass, P.E. understand that the head wall shop drawing will be submitted with the cast -in - Gerald Gould, CPG Gould,C submittals and the cast iron covers also will be a separate submittal. William D. n, RE.place Michael Neuberger, P.E. Based on this review, we have the following comments: Richard R Russell, P.E. Charles J. Wachsmuth, P. E. Kenneth P. Wenz, Jr., CPG 1. The concrete mix design for the stilling basin must be provided. 2. The shop drawing for the stilling basin shall indicate that the precast concrete will meet the requirements of ASTM C478. 3. The contract drawings indicate the stilling basin base has.concrete fill. 4. Remove reference to 60 mil HDPE liner on stilling basin shop drawing and indicate stilling basin is to be installed in accordance with the contract drawings and specifications. A DIVISION OF WILLIAM F. COSULICH ASSOCIATES, P.C. Dvirka and Bartilucci CONSULTING ENGINEERS Mr. Robert G. Terry Page Two Terry Contracting & Materials, Inc January 14, 2002 In addition, it is our understanding that you are considering requesting approval for excluding the use of Kop-Coat Bitumastic waterproofing on the precast structures. Please provide a formal request with regard to this issue and modify the submittal accordingly. Please note that the Kop- Coat Bitumastic waterproofing will be required on any precast structure to be placed within the limits of waste. The submittal has been stamped "revise and resubmit". Please do not hesitate to contact me at (516) 364-9890 if you have any questions. Ve. truly yours,, Thomas F. Maher, P.E. Vice President TFM/MDW/jmy,tam cc: J. Bunchuck I. Sikiric T. Howell C. Morris P. Sutherland M. Wright ♦ 1314frFM02LTR-07.doc(ROI)