Loading...
HomeMy WebLinkAbout01/29/200302.04/2003 TUE 14:40 FAX TOWN OF SOUTlf OLD LANDFILL CLOSURE' Attendees: Name J. Bunchuck T. Maher R. Terry T. Nowell MINUTES OF JANUARY 29, 2003 PROGRESS M14 ETING Affiliation Town of Sourhold Dvirka and Bartilucci Consulting Engineers Terry Contracting & Materials, Inc. Terry Contracting & Materials, Inc. 1. s ammerlts on Minutes of Previous "January 17,2003) Meeting Bob Ten -y stated that he had no comments on the January 17, 2003, Progress Meeting minutes. 2. Ltatus of Installation of Replacement Water SuuL1y W1ell The Town needs to review specifications and contract likely will be signed this week - i. Status of Construction on 17 -acre Parcel No work performed since the last Progress Meeting due to cold weather. Screening recommenced today. 4. Status of Completion acid Testing of Gas Monitoring Wells and Completion of Groundwater Monitoring Wells Gas monitoring wells have not been tested since the last Progress Meetings but are p1muied to be tested this week. Bob Terry stated that all wells are complete, except for concrete pads, and will confirm with Tim Trowell today. 0 1314110130301 1 Z004/007 02/04/2003 TUE 14:41 FAX 5. Status of New Access Road to Cox Lane The Town still is waiting to hear from SCDHS regarding soil chemical results. Tim nanchuck stated that Corraxini has requested privacy slats along his property. 6. Costs for Additional Surveys Still waiting for these costs. Bob Terry stated that he will provide the costs to Tom Maher this week. Bob estimated the additional costs to be approximately $70,000, although some of the cost may be related to the 17 -acre parcel 7. Protection of Erosion Control Blanket Bob Terry stated that all of the erosion control blanket has been covered properly and would inspect and confirm today with Tim Howell. 8. Replacement of Concrete Blocks A1on , Road to 17 -Acre Parcel Bob Terry stated that no blocks have been placed/manufactmed since the last Progress Meeting due to the cold weather. 9. Easement Termination No change since the last meeting. 10. Retaining Wall/Easement Along McBride Property/Relocation of Road McBride has not gotten back to the Town regarding acceptance of a permanent easement. D&B, as the Town's preference, is pursuing relocation of the roadway along the McBride property. 0 1314/r0130301 2 2 005/ 007 02!04,'2003 TUE 14:41 FAX 11. Grading. of Transition Area D&B will perform survey work this week to determine areas along the eastern boundary that cannot be graded to a inilihnuln of 21,1 slope to the preconstruction elevations at the property line. 12. Split Rail Fence Proposal The Town will contract separately to construct this fence. 13. Removal of Fluster Material The Town has not notified Fluger; but Aill do so before temporary road along east side of landfill is removed. 14. Completion of All Remaining Work Tom Maher went over the list of remaining work to date and there were no changes since the last Progress Meeting, 13. Schedule of Work for Next Two Weeks Boli Terry stated that only screening sand on the 17 -acre parcel will take place during the next two weeks. 16. Power Requirements The Town still needs to provide this to Bob Terry. C 13141TO130301 3 a008f007 02/04/2003 TUE 14:41 FAX 17. Manufacture of Compost Am Bunchuck said that he expects to have approximately 13,000 cy of compost= including material currently in the Borrow Pit, in six weeks (--- March 15), 18. Construction of Swing Gates Jim Bunchuck stated his preference for placement of three swing gates at the landfill. Bob Terry stated that he will provide Jim with a cost proposal for the swing gates. Only one of the two contract gates will be installed. e istarrGI30301 4 Z007/007