MINUTES OF APRIL 16, 2003
PROGRESS MEETING
NO
Affiliation
Town of Southold
Dvirka and Bartilucci Consulting Engineers
Terry Contracting & Materials, Inc.
Comments on Minutes of Previous (April 11, 2003) Meeting
No comments on the April 11, 2003, Progress Meeting minutes.
Status of Installation of Replacement Water Supply Well
Jim Bunchuck stated that the water supply well is scheduled to be installed in late
Status of Construction on 17 -acre Parcel
Bob Terry stated that the pad will be completed on April 17 and the plantings will
begin on April 22.
C65
4. Status of Completion and Testing of Gas Monitoring Wells / ce
and Completion of Groundwater Monitoring._ Wells
Tom Maher stated that the gas monitoring wells and groundwater monitoring wells
still have not been completed. Bob Terry stated that he will meet with Casola on April 18
to discuss completion of the wells. Tom reported that the gas wells were monitored on
April 14 and all wells were non detect except for well #6 which was 37% LEL.
01314/r0429301(R01)
1
5. Status of New Access Road to Cox Lane
41
Jim Bunchuck stated that the property transfer has not been completed.
6. Costs for Additional Surveys
Tom Maher and Bob Terry agreed that the cost of the additional surveys will be
$58,943.90. Tom and Bob also agreed to final payment for the geomembrane in the
amount of $888,841.16 (171,901 sy).
7. Protection of Erosion Control Blanket
Bob Terry stated that the erosion control blanket was being installed where new
topsoil was being placed.
8. Replacement of Concrete Blocks Along Road to 17 -Acre Parcel
Bob Terry stated that the concrete blocks will begin to be delivered on April 17.
Tom Maher stated that the damaged blocks that have been installed along the road to the
Compost Facility will need to be replaced, to which Bob Terry agreed.
9. Easement Termination`'4'c
Jim Bunchuck stated that the easements will be terminated at the end of April.
10. Retaining Wall/Easement Along McBride Property/Relocation of Road
Bob Terry stated that the road will be relocated in early to mid May.
01314/ O429301(ROl)
0)
Ifl
11. Grading of Transition Areas
Bob Terry stated that all transition grading was essentially complete and final
grading will be performed when the topsoil is placed in the transition areas.
12. Proposal for Swing Gates
Bob Terry stated that he provided the proposal for the swing gates to Jim Bunchuck.
13. Removal of Fluller Material
Jim Bunchuck stated that he will notify Fluger to remove his material, if required.
14. Town Power Requirements
Bob Terry stated that the proposal from Ocean Electric to provide additional power
to the Compost Facility is in the process of being prepared.
15. Alternate Headwall for Recharge Basin No. 3.
Bob Terry stated that the headwall for Recharge Basin No. 3 has been constructed
as designed by D&B. Tom Maher stated that the wall was not constructed entirely as
designed regarding installation of rebar, which may affect payment if the wall cracks. Bob
also stated that Recharge Basin No. 3 will be completed in late May and that Recharge
Basins No. 1 and 2 will be completed in the third week in May.
16. Manufacture of Topsoil
Bob Terry stated that the manufacture of the topsoil is continuing and he hopes that
it will be completed by April 18.
0 1314/r0429301(RO1) 3
in
17. Completion of Submittals
Tom Maher stated that all submittals and revised submittals have not been
completed, which Bob Terry acknowledged. Tom stated that the incomplete submittals
will delay review and approval of the next payment application.
18. Completion of Remaining Work
Bob Terry stated that for the remainder of this week and next week, only topsoil
will be manufactured and placed, together with seeding and installation of the erosion
control blanket. Tom Maher stated that a large area has greater than 6 inches of topsoil and
that the thickness will need to be adjusted to achieve the contract requirement of 6 inches.
Tom also stated that a portion of the seeding on the top of the middle hill and middle swale
on the east side of the landfill was broadcast mechanically, which is not in accordance with
the contract documents and that it will need to be reseeded using the hydroseeding method.
Bob stated that he will not reseed these areas, to which Tom stated that payment will not be
made for seeding in an inappropriate and unapproved manner. Tom also stated that the
hydroseeding was being performed without the use of mulch to which Bob stated that -he
received prior approval to ' eliminate the mulch. Tom stated that he does not recall
receiving a request from Bob to eliminate mulch. Bob stated that he will check his records.
19. Fencing
Bob Terry stated that fencing for the landfill will be completed by the end of May,
and that he presently is installing fencing at the Compost Facility.
0 1314/T0429301(RO1) 4
SOUTHOLD LANDFILL CLOSURE
AGENDA ITEMS FOR
MAY 2, 2003, PROGRESS MEETING
1. Comments on Minutes of Previous (April 16, 2003) Meeting
2. Status of Installation of Replacement Water Supply Well
3. Status of Construction on 17 -acre Parcel
4. Status of Completion and Testing of Gas Monitoring Wells and Completion of
Groundwater Monitoring Wells
5. Status of New Access Road to Cox Lane
6. Replacement of Concrete Blocks Along Road to 17 -Acre Parcel
7. Easement Termination
8. Relocation of Road Along McBride Property
9. Grading of Transition Areas
10. Removal of Fluger Material
11. Cost Proposal from Ocean Electric for Additional Power for Compost Facility
12. Manufacture and Placement of Topsoil
13. Installation of Fencing
14. Completion of Submittals
15. Schedule of Work
01314lr0501303