Attendees:
Nance
T. Maher
J. Mulligan
R_ Terry
TOWN OF SO1<T7I HOLD
LANDFILL C;L()SURE
MINUTES OF MAY 9, 2002
PROGRESS MEETING
Affiliation
lvirka and Bartilucci Consulting Engineers
Dvirk-a and Bartilucci Consulting Eagineers
Terry Contracting & Materials
1. Minutes of Pxevious Qdgy 3.2002 Meeting
Bob Terry has not yet reviewed minutes of the three preV110Uq meetings. He
reserved the right to comment in waiting.
2. Status of Surveying of Eastern Portion of Landfill by McLean
McLean (surveyor for Terry) recently finished the topographic; surveying for the
north half or so of the eastern portion of the landfill. Bob hopes to have this survey to
D&B by tomorrow so that with D&B's approval he can then move forward with adding
the final subgrade and gas venting layer to this area.
3. Status of Fire Department Plan, to Install the 14Tongotable SunOly Well
Jim Bunchuck is looking into this and will get the cost from the Fire Depaxbrnent.
4. Status of Submittals
Bob Terry said Tim Howell informed him that they are up to date with all
submittals.
a 1314a6509201(R01) 1
x]00.3/007
05/14/2002 TUE 08:09 FAX
5. Additional Testing of Vegetative Cover Mix by theTow, and Terry
The three satuples agreed to be taken at the May 3, 2002, Progress Meeting will
be collected either today or tomorrow by J. Bunchuck, R. Terry and J. Mulligan.
6. Status of Completion of Permanent Pad for 17 -acre Parcel
Shn Bunchuck will have Town personnel (starting this weekend) remove leaves
and wood chips along the western boundary so that Terry can excavate and lay filter
fabric and RCA in this area. The Town will then move brush frog the northern 3 -acre
area onto the area prepared with RCA to the south so that Terry can access this 3 -acre
area for sand. This is critical since the sand will be needed for covering the eastern
portion of the landfill.
7. Status of Sand 5creoing and Testing
Bob Terry said no screening is taking place at the present time,
S. Status of Soil Test Results
Not discussed.
9. PLar► and Schedule for Lowering Manhole #3 along Southwest Drainage_System
Bob Terry said work started. today. Bob agreed that rebar would be added when
recemcnting the sidewall and bottom of the manhole and epoxy would be applied to seal
the bottom where it meets the side wall as best possible.
10. Plan for Furthcr R.c¢rading Area by Shroder �y
Bob Terry said this will be addressed after the eastern drainage system is firdshed-
in this area_
013141ra509201(x01) 2
Z 004/007
05/14/2002 TUE 08:09 FAX
11. Schedule to Manufacture Topsoil
See item No. 5. No firm schedule until retesting is performe-d.
12. Daily Schedule of Work for Next 2 Weeks
Bob Terrywill complete today and forward to D&B.
13. - latus of Request for Time Extension
Tom Maher contacted John Romanelli to determine if the Town Board has taken
action on this. Tom said that the Town would need a cost update for both construction
and engineering, before making a. decision.
14. Plan/Proposal for Placement of Subgrade and Gas Venting
Layer on East Side of. Landfill and to Ca . mete West Side
Bob Terry handed out a letter dated May 9, 2002, addressed to Toni Maher
wherein he outlined a proposal to deal with the subgrade and gas venting layer on the east
side of the landfill. Tom and Bob discussed this for quite some time. Tom is willing to
ask the Town for approval to use approximately 20;000 cy of "screened" sand located in
the southwest corner of the borrow pit, as well as considering paying Terry for screening
additional sand from the 17 -acre parcel. Tom said he will review Terry's proposal to pay
additional money for transporting sand from the 17 -acre parcel to the east half of the.
landfill. Tom feels that Terry saved money on the west side of the landfill in using sand
from the 17 -acre parcel, Torn asked Bob to give him backup information on the $1.85
per cubic yard cost for transporting the sand as contained in his May 9, 2002, proposal.
OI3I41TO5092OI(RO1) 3
IRI 005/007
05/14/2002 TUE 08:10 FAX
15. Status of_April 12, 2002, Project Schedule as of May g. 2002'
Bob Terry said he is one week behind on the eastern drainage system. (Note:
Bob Terry agreed to have McLean survey/as-built the manhole and pipe inverts on the
system ,before backfilling). Bob also said he will personally contact Cassola Well
Drilling today to arrange for the abandonment and installation of gas and water
monitoring wells since Tim Howell has not been successful to date in getting Cassola on-
site. Tom Maher suggested that only in the southwest area should new gas monitoring
wells be installed, since they and the new groundwater monitoring wells might be
damaged if installed elsewhere at this time. Tom said he wants this work done by next
week prior to placement of the .liner south of the permanent road. Bob agreed.
16. � Responses
- Stil&g Basin Shop .Drawing Information - Bob Terry said he will send
information to Tom Maher on this item,
- Cost Proposal for Placement of 18" Subgrade/CVL -See Item #14.
Chenango Cost Badup for Phased T finer Installation of West Side -Bob
Terry said he will send a later to Tom next week with this information.
01314rro5MO1(x01) - 4