HomeMy WebLinkAbout07/19/200207/24/2002 WED 09.40 FAX R003/007
Attendees:
Name
J. B unchuck
T. Maher
J. Mulligan
R. Terry
T. Howell
TO
M OF SOUTHOLD LID LANIDFILL CLOSURE
ME9UTES OF JULY 19, 2002
PROGRESS MEETING
Affiliation
Town of Southold
Dvirka and Bartilucci Consulting Engineers
Dvirka and Bartilucci Consulting Engineers
Terry Contracting & Materials, Inc
Terry Contracting & Materials, Inc.
1. Minutes of Previous�ily 12.2021 MeeYan
Bob Terry said he had not read the minutes, but there were no comments by anyone else.
2. Status of skibmittals
Tim Dowell indicated that he resubmitted the laboratory test procedure and results for the
RCA to be used for the permanent road subbase to D&B. Tom Maher asked Jim Mulligan if this
information was satisfactory and Jim said it was. Tom then gave verbal approval for use of the
RCA.
3. Status of Construction of 17 -Acre Parcel
Not discussed.
4. Status of Sand Screening and Testing
Tim Howell explained that further sand screening on the center 1% acre area of the 17 -
acre parcel would take place some time next week. The power screener still is being used to
screen the vegetative cover mix in the Borrow Pit area and Terry would like to screen as much of
0 1314M723201 (R01)
1
''
07/24/2002 WEU 09:01 FAX
0004/007
this as possible before moving the screener to the 17 -acre parcel. There is no stockpile of
screened sand currently available to finish covering the geocomposite and liner with BPL on the
east half of the landfill. BFI. must be plat over the geocomposite presently not covered by
Tuesday, July 30, 2002. Therefore, Terry .must have screened sand available and placed by this
date.
5. Status_of Soil Test Results
Tim Howell indicated that Tectonic had made him aur of three soil test results on GVL
samples whom the laboratory results appear to be duplicated. Tian is working on reconciling this
with their laboratory, Universal, but said if it cannot be reconciled he will take an additional
three samples for CTVT. analyses.
6. Status of Grading in Area of Shroder Pro e
Jim Mulligan explained that Shroder had removed some of the sand stockpiled on the 40 -
foot easement and, therefore, complicates the amount of sand that Torry will have to refill in that
area. Jim Bunchuck has agreed to wait until Terry is finished working in this area before
meeting with Shroder and discussing the final grading.
7. Schedule to Manufacture Topsoil
Tim Howell said they are manufacturing (screening) about 3,000 ey of topsoil (vegetative
cover mix) per day. Tire agreed with Jim Mulligan that about half of the unseteened topsoil has
been screened to date.
S. Daily Schedule of Work for Next 2. Weeks.
Terry did not have a writtcn schedule at the meeting.
0 1314frO723201(ROl) 2
07/29/2002 WED 09:02 FAX
9. Schedule for Construction of Permanent Road
R005/007
The geotextile and most of the RCA has been placed. A 20 -ton vibratory compactor was
on-site and rolling the RCA, Compaction testing by 'tectonic on the RCA will be perfonned on
Tuesday, July 23, 2002. Corazini will begin paving oil Thursday, July 25, and finish the weep
after with the mal two layers. Because of the temporary potential instability of the subgrade on
the north side of the permanent road, it was decided that the paving would be about 24 feet wide
(from the southern edge of diL- road) with the remaining paving to be performed after the
norther!' side subgrade is stabilized with BPL and stone. Also, Bob Terry suggested putting
down a temporary paved access path from the scale area to the permanent road at an estimated
cost of $1,000 which would later be removed when the permanent road and main access road
areas are completely paved. Tom Maher agreed with this suggestion.
10. Status of Completion of Gas Monitoring Wells Along Southwestern Bourrdary
Jim Mulligan pointed out that the sampling talcs still must be installed on the four wells,
but that he and Tim Howell will continue to sarnple for gas by opening the caps on a weekly
basis. Tlxa sampling performed this week indicated no significant level of gas in the four
monitoring wells, but that high gas levels were detected in one of the gas vents near the southern
boundary indicating that the gas is not migrating off-site in this area.
11. Review of Submittals for Compliance with the
Contract Documents Prior to Submittal to D&B
Tom Maher explained that incomplete and incorrect submittals have been a problem on
many occasions and most recently has occurred on the submittal of the RCA for use on the
permanent road. Bob Terry agreed that this causes a delay in tine and should not happen.
12. Response Due on Revised Chenango Cost Backtui
for Phased Liner Installation on West Side
Tom Maher has spoken to a Chenango representative and Chenango will be submitting
this breakdown in the neer fixture.
c i 3la/ro7MOI (R01) 3
.�1
07/24/2002 WED 09:04 FAX
2000/007
m Tom Maher said that NYSDEC has inquired if an additional 2,000 cy of contaminated
soil froth Moores Pond (Greenport) can be accepted for placement under the cap, and
the question arises as to whether the Town is willing and able to receive this soil in
the landfill. Tom suggested that all of the waste under the temporary road first be
removed and placed in the southern portion of the east half of the landfill and then
determine whethor there isspace still available for this cont=inated soil. Jim
Bunchuek will determine if the Town is willing to tsake the soil. Tom also said chat
should the soil be put in the landfill, which would take a week or so, Tenry should be
given a like amount of time for extension on substantial completion of the landfill
work.
Jim Bunchuck said that Ken Sluder of NYS Environmental Facilities Corporation has
been in contact with him regarding the status of meeting the Ml EAVI3E goals of the
project. it was agreed that Terre would include a Utilization Report with his next
application for payment, that D&B would review same, and that the Town would then
file and/or forward the Utilization Report for K. Spider's review.
® Tom Maher reminded Bob Terry to submit a plantings proposal with costs. Bob
Terry said he will prepare the proposal.
0 ]3]4/f0723201(ROl) 4
07/16/2002 TITE 13:36 FAX
'4
SOUTHOLD LANDFILL CLOSURE
AGENDA ITKMS FOR
JULY 121 2A02., PROGRESS MEETINC.
1. Minutes, of Previous (July 12,2002)Mcefing
2. Status of Submittals
3. Status of Construction on 17-acrc Parcel
4. Status of Sand Screening and Testing
5. Status of Soil Test Results
6. Status of Grading in Area of Shroder Property
7. Schedule to Manufacture. Topsoil
8. Daily Schedule of Work for Next 2 Weeks
9. Schedule for Construction of Permanent Road
10. Status of Completion of Gas Monitoring Wells along Southwestern Boundary
11. Review of Submittals for Compliance with the Contract Documcnts Prior to Submittal to
D&B
12. Response due;
- Revised Chenango Cost Backup for Phascd Liner Instal lafion on West Side
ROOO/006