HomeMy WebLinkAbout08/30/200209/ 05/2002 THAT 07:37 FAX 2004/047
Attendees:
Name
TOWN OF SOUTIIOLD LANDFILL CLOSURE
N UNUTES OF .AUGUST 30, 2002
PROGRESS MEETING
Affiliation
T. Maher Dvirka and Bartilucci Consulting Engineers
J. Mulligan Dvirka and Bartiiucci Consulting Engineers
R. Terry Terry Contractiag & Materials, Inc.
1. Minutes of Previous (August 22 2002 Meeting
Bob Terry- said Ile had not read the minutes as yet.
2. Status of Submittals
Bob Terry indicated that everything was up to date and D&B did not owe comments on
any submittals.
3. Status of Sand Screening and Testine
Sand screening continues on the 17 -acre parcel. Torn Maher said that Jim Bunchuck
expTessed concern that Terry does not screen any more sand than is necessary for the landfill
project. Bob Terry agreed that this would be the case. Torn Maher stated that Terry would not
be paid to screen, more sand than necessary.
4., Status of Soil Test Fesults and Resolution of Three Gas Vent Layer Sam les
Tim Mulligan said he will call Peter Sutherland (Tectonic Engineering) to make: sure that
evcgthing is satisfactory.
0 014Ir0903201(R01) 1
00/45/2002 THIT 07:37 FAX 005/007
�. Discussion with Ed Wankel Regarding Seed Mixture,
Includine Wildflower Mix Along Southern. Area of Landfill
Tom Maher distributed a copy of Ed Wankel's August 26, 2002, letter to Tom in which
Wankel confirms the grass mix recommended on the landfill in light of the potential golf facility.
Tom asked Jinn Mulligan to check with Jim Bunchuck on where he would Iike the wildflower
seed to be applied.
6. Daily Schedule of Work for Next 2 Weeks
Although no written work schedule was submitted, Bob Terry described the work to be
done next week, including: adding CGM to east half of landfill; completing gas migration trench
on westerly property line of landfill; installating fencing on southern end of site by 17 -acres and
residents; and seeding on west half of landfill.
7. Status of Construction on 17 -Acre parcel
Terry is excavating and screening sand south of the eydsting 1 -acre RCA pad and has
been waiting for plans from I-LNI showing drainage and road details. During the meeting, the
plans from H2M arrived and were reviewed. Several questions arose regarding the drainage
details and retaining wall near the road. Jim Mulligan met with Jamie Richter atter the meeting
and resolved the issues. Terry can therefore move forward with the rernaluing work on the site
and will submit a plan to complete the project.
8. Schedule for Completion of the Permanent Road
and R moval of the Temporary Road to 17 Acres,
This item is completed and can be removed from the next meeting agenda.
9. Design of Primary Road on to 17 -Acre Parcel
and Status of Construction of Secondary Road
See item No. 7 above.
013 ivro9)O.i2o1(Rol) 2
09/05/2002 THU 07:37 FAX X006/007
10. Status of Completion and Tcsting of Gas
Monitorina Wells Along Southwestern Bound
'Testing thus far has shown no gas to be present in the lour gas monitoring wells. Bob
Terry said he will contact Cassola Well Drilling to complete installation of the sampling ports on
each of these wells.
11. Proposal for Plantings AIM Southern Boundary
,rom Maher suggested that we meet again with Jim Bunchuck on the details of what
plantings Jim prefers and where they are to be located. This will be discussed at the next progress
meeting.
12. Abandonment of Existing Landfill Well
Terry still needs to cut about 3 feet off of the 10 -inch steel casing and cap with cement.
13. Revised Construction Schedule
The revised schedule was submitted at the August 22, 2002, progress meeting. The
schedule will be reviewed at each progress meeting.
14. Vinyl Coated Fence Along Boundary of Residential Area
Tim Howell's letter of August 28, 2002, contained a cost proposal to install black vinyl
fence along the southern property line near the residential area. Jim Bunchuck verbally
responded shortly thereafter by giving approval to install the 9 -gauge fencing at an extra cost of
53,995.
0 1314/T0903201(ROI) 3
09/05/2002 THU 07:38 FAX
15 . Other
IM007/007
- knob Terry is to get the cost for installing the asphalt curb along the permanent road to
the compost facility.
- Bob Terry will meet with Jim Bunchuck to establish the contract limit along the area
south of the east half of the landfill in order to have working room for his equipment
to operate and access the 17 -acre parcel from the east.
- Bob Terry restated that he needs Town resolution on the issue of nietes acid bounds of
the new access road Corazini is to give the Town (in exchange for the current Cox
Lane access road). Also, Corazini must move a stockpile of ;gravel in this area.
01314lr090320I(ROI) 4
48i.;f2402 TUB 08:56 FAX
SOUTHOLD LAsNDFILL CLOSURE
AGENDA ITEMS FOR
AUGUST 30, 2002, PROGRESS MEETING
1. Minutes of Previous (August 15 and August 22, 2002) Meeting
2. Status of Submittals
3. Status of Sand Screening and Testing
4_ Status of Soil Test Results and Resolution of 3 Gas Vent Layer Samples
5, Discussion with Ed Wankel Regarding Seed Mixture, including Wildflower Min Along
Southern Arca of Landfil l
6. Daily Scbedule of Work for _Next 2 Weeks
7. Status of Construction on 17 -acre Parcel
S. Schedule for Completion of the Permanent Road and Removal of the Temporary Road to
17 -acres
9. Design of Primary Road on to 17 -Acre Parcel and Status of Construction of Secondary
Road
10. Status of Completion and Testing of Gas Monitoring Wells along Southwestern
Boundary,
11, Proposal for Plantings Along Southern Boundary
12, Albardonment of Existing Landfill Wall
13. Revised Construction Schedule
14. Vinyl Coated Fence Along Boundary of Residential Area
0 t 314/P0R20202(R0'")