TOWN OF SOUTROLD LANDFILL CLOSURE
3UNUTES OF SEPTEMBER 27, 2002
PROGRESS MEETING
Affiliation
Town of Southold
Dvirka and Bartilucci Consulting Engineers
Dvirka and Bartilucci Consulting Engineers
Terry Contracting & Materials, Inc.
Terry Contracting & Materials, Inc.
1. Minutes of Previous Se tember 19 2002` 1Vleetin s
No comments by anyone.
2. Status of Submittals
D&B owes a response to Terry on their landscaping proposal. Bob Terry will make a
submittal on using either Curlex I or II for erosion control on the east half of the landfill, together
with credits to the Town for use of the substitution. Toni Matter said he is inclined to go with
Curlex 11 at the moment.
3. Status of Sated Screening. Topsoil Manufacture and Testin
Bob Terry said they will resume screening sand on the 17 -acre parcel shortly for use as
BPL on the landfill. Torn Maher said he will put together a change order which will reflect a
charge to the landfill project of $113,150 for screening 31,000 cy of sand at a unit price of
$3.65/cy. Torn asked Bob to submit a proposal for providing approximately 10,000 cy of off-site
topsoil necessary to complete the cap. Tom said the 17,000 cy of material from the Navy .job at
Calverton had one sample show an organic content of about 5.5 percent, but that all of the
0 1314/T0R7201(RO1)
1
10;01/2002 TUE 10:54 FAX
Z 004/008
chemical analyses must be received before a decision can be made on its possible usa on the
Iandfill project. Tom said lie will be looking at the Calverton material this Monday and has been
in contact with NYSDEC regarding its use.
4. Status of Soil Test Results and ]Resolution of Three Crag Vent La er Samples
Jim Mulligan said that Lori Bart of Tectonic had called to say that there is no need to
collect three more gas vent layer samples. Tint Howell said that because he had taken all of his
GVL and BPL samples based on truck count and the specifications require the samples to be
collected based on "in-place" volume, they are shy about 18 samples each on both the GVL and
BPL. Tom .Maher asked Jim Mulligan to discuss this with Tectonic, but is not overly concerned
given the total number of samples collected thus far and that the material is from the same source
processed in the carne manner and is fairly uniform.
5. Status of Installation of Replacement of Water $0ly Well
Jim Bunchuck said he talked to Doug Picka of NYSDEC who indicated that the permit
application he now has probably would be approved although this will be in a few weeks. Jim is
not aware whether the Fire Department has gone out to bid to secure a contractor to do the job.
6. Daily Schedule of Wort: for Next_ Week
Tim Howell distributed next week's work schedule. Tom Maher reviewed the schedule
a.nd discussed the entire construction schedule with Bob and Tim. The liner will be installed
from September 30 to October 18; BPL will be applied from October 7 to October 21; topsoil
will be applied from October 14 to October 28. Since Jim Mulligan's last day on the site will be
Octobor 11, 2002, Tom said that he and Frank DeVita probably will cover the construction
oversight. Discussion then took place regarding what oonstitutes "Substantial Completion of
Work." Bob Terry said that the construction of Recharge Basin No. 3 may be delayed after
November 1, 2002, (the date for Substantial Completion of Work) because the Town's wood
chips are in the way. Tom asked Jim Bunchuck to have either the Town or Bob Terry inove the
0 1314[027-201 (ROI) 2
10/01/2002 TUE 10:55 FAX
X1005/008
wood chits to remove the obstacle. Since the gas and water monitoring wells still have to be
installed, Torn suggested to Bob to line up Casola Well Drillers as soon as possible.
7. Status of Construction on 17 -Acre Parcel
Bob Terry said they were working today on expanding the RCA pad further south on the
17-acr(.- parcel. Tim Bunchuck ordered Bob Terry to stop work after the close of work today
since he wants to review the costs incurred to date and compare that to his balance in the budget.
Jim said he is preparing several options for the Town Supervisor, Josh Horton, on the costs to
complete work on the compost facility. The Town Board will he considering whether an
additional bond authorization is to be made in order to provide funding for the remaining work
on the 17 -acre parcel.
8. Replacement of Sand Along the McBride Property
Bob `ferry said nothing has been done on this and estimates one-half to one day will be,
required to perform the work within the next three weeks.
9. Status of Completion and Testing of Gas
Monitoring Wells Alone Southwestern Boundary
Jim Mulligan said the wells had not been tested this week, but that last week's testing
showed no gas in the wells.
10. Proposal for P)antings_Along uS' outhercl Boundary
Tom Mahcr said he would like to resolve this marter by next week's meeting.
11. Abandonment of Existing Landfill Well
.Bob Terry said this will be done by the end of next week since the liner is to be installed
in that area shortly.
01314/ M -i201( O1) 3
10!01'2002 TUE 10:55 FAX
12. Status of Revised Construction Schedule
See Item No. 6.
13. Status ofInstatlation of Vinyl Coated pence Along Bounds of Residential Area
2006/008
This work should be completed by early next week and is now about two-thirds
coanpl(le.
14. Price for Construction of Asphalt Curb Along Permanent Road
Terry Contracting has submitted this cost and Change Order No. 12 has been ,prepared
and accepted by Bob Teny. This item can be deleted.
15. Status of Establishn)ent of a Work Area Along Southeast Boundary of Landfill
The Town ]w Provided the necessary area in which Terry can work and, therefore, this
item can be deleted.
16. Metes and Bounds for New Access Road
The Town has provided T'e-ry the metes and bounds. The survey, however, is on hold
since there are issues regarding an onvironmental site assessment of the parcel by Nelson and
Dope performed for the Town.
17. Maintenance of the Borrow Pit Perimeter Road and Grading of the Cut Areas
Nothing done on this item.
C. 131.4(rO927201(RO1) 4
10/01/2002 TUE 10;55 FAX
18, Privacy Slats Mone New Access Road to Coag Lane
No decision on this. Sec; Item No. 16.
19. Other
Z007/008
- Tom Mahe), asked Jim Bunchuck to talk to Corazini about moving the concrete
crusher which is blocking, access for. Terry to work this weekend or it may delay
completing installation of the liner on the east side of the landfill.
- Bob Terry submitted a draft proposal in a letter dated September 27, 2002, to Tom
Maher in which he outlines the costs to construct Recharge Basin No. 3. Bob will
resubmit the proposal after completing the cost proposal breaking the costs down
further.
0 1314/rO927201(ROl) 5
09i23i2002 MON 14:08 FAX
SOUTHOLD LANDFILL CLOSURE
AGENDA ITEMS FOR
S.10TEMBER 27 2002 PROGRESS MEETING
1. Minutes of Previous (September 19, 2002) M"lings
2. Status of Submittals
3. Status of Sand Screening, Topsoil Manufacture and Testing
4, Status of Soil Test Results and Resolution of 3 Gas Vent Layer Samples
5. Status of Installation of Replacement Water Supply Well
6. Daily Schedule of Work for Next Week
7. Status of Construction on 17 -acre Parcel
S. Replacement of Sand Along the McBride Property
9. Status of Completion and Testing of Gas Monitoring Wells along Southwestern
Boundary
10. Proposal for Plantings Along Southern Boundary
11. Abandonment of Existing Landfill Well
12. Status of Revised Constriction Schedule
13. Status of Installation of Vinyl Coated Fence Along Boundary of Residential Area,
14. Price for Construction of Asphalt Curb Along Permanent Road
15. Status of Establishment of a Work Area Along Southeast Boundary of Landfill
16. ]Metes and Bounds for New Access Road
[a 008/008
17. Maintenance of the Borrow Pit Perimeter Road and Grading of the Cut. Areas
IS. Privacy S tats Along New Access Road to Cox Lane
Cit
%\ %Sr' o . `, - SC