Loading...
HomeMy WebLinkAboutMaiden StPermit No. I O r q File No. W If TOWN OF SOUTHOLD HIGHWAY DEPARTMENT Peconic Lane P.econic, New York 11958 (631) 765-3140 APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR W.O.T101731438 APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Permit pursuant to Chapter 83 of the Code of the Town of Southold, Suffolk County, New York, and other applicable laws, ordinances or regulations for the excavation herein described. The applicant agrees to comply with all applicable laws, ordinances, codes and regulations, and to permit authorized inspectors to make necessary inspections of the job site. Print or Type 1) KEYSPAN GAS EAST CORPORATION d/b/a NATIONAL GRID — GAS CONSTR. DEPT. —175 E. OLD COUNTRY RD. — HICKSVILLE, NY 11801 Name of Applicant Address 2) Maiden St. Mattituck Premises Address 3) 4) Open a- 4'x4' bellhole on the W/s of the road, N/o County Road 48, to replace a leaking gas main. 5) 6) 7) tidal wetlands? *Yes No _X *If yes, other Town permits may be required. Builder's License No. N/A Plumber's License No. N/A Electrician's License No. N/A Other Trade's License No. N/A Signature of Applicant Date; 06/08/15 5) a) Attach plot plan showing location of proposed excavation and relationship to adjoining premises or public streets or areas, and giving a detailed description of layout of excavation. b) Attach all other necessary permits and licenses for this project. c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk. 6) Tax Map: Section 7) Starting Date: 8) Work Schedule: Block Completion Date: Lot Phase Completion Date Excavation......................................................................... Facility Installation............................................................... Backfill& Compaction......................................................... PavementReplacement......................................................... 9) Under which authority is the application made: 10) Estimated Cost of Proposed Work: 11) Remarks: 12) Insurance Coverage (Attach Copy) a) Insurance Company: b) Policy # c) State whether policy of certification on file with the Highway Department: d) Coverage required extended to the Town: Bodily injury and property damage: $300,000/$500,000 Bodily Injury, and $50,000 property damage. 13) Securi : a) Surety Bond of $ b) Maintenance Bonded provided: or Certified Check provided in the total amount 2 years or 3 years 14) Fees for applications and permits: Basic Application Fee Al. _1 /Service Connections excavations @ $20.00 = A2. /Additional Excavations same service @ $10.00 = No. B. Excavations 18" in depth or less: 0-100 I.f. = $10.00 - l.f.@$0.10= Additional C. Excavations 18" in depth to 5' in depth: 0-1001.f. = Additional If. @.30= D. Excavations 5' in depth and over: 0-100 l.f. = $50.00 l.f. @ $0.50 = $ Additional E. Utility Repair Excavations @ $10.00 = $ No. Repairs same service @ $5.00 = $ Additional $150.00 $20.00 F. Notice to public utilities proof must be provided and attached to this application prior to issuance of permit. TOTAL COST = $170.00 Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Exca ation Permit to: KEYSPAN ENERGY DELIVERY in accordance with this application. YS TOWN r ' Vincent M. Orlando J �O r Received by the Town Clerk,Date % [Q / / Date Lo L-11 Permit Issued (o J Permit No. Note: Permit expires one (1) year from Date of Issuance. No work to start without 48 hour notice to the Superintendent of Highways. Permit must be available for inspection. D-39 Copy Distribution: Page 2 of 3 Highway Department Inspector Applicant Town Clerk INSPECTOR'S RECORD IA 2nd 3rd 4 t Inspection Date Findings (use code) Applicant Notified (To Permit Clerk) REMARKS CODE IB — Improper barricades IL — Improper lights ST — Sunken trench or excavation UTM — Unable to measure (due to backfilling) BUC — Building under Construction WIP — Work in Progress DB — Improper backfill (too high) (not sufficient) HFS — Inspector holding for final settlement of excavation RFR — Ready to Repair D-39 Page 3 of 3 05/06/2015 03:12 (UTC/GMT) National Grid page 2 FC -6111.4 1\1kriMAL 6POD REQUEST FOR STREET OPENING PERMIT NASSAU SUFFOLK STATE Cl COUNTY D COUNTY X Soo- l ol-D PERMIT MIS JOB ` DATE LOCATION 1-o ve /- Ave k V REASONFOR �C--PI C Z-J-.Ar?411/1 W.O./PA FOREMAN DATE OF NO. OPENING REQUESTED BY j , ,� ?4 EK DEPARTMENT GAS CONSTR. MAINT. & SERVICES DIVISION IChs-rrs*.� sv Fc0,,1-K APPROVED DATE SKETCH M f"!b L/I �7• ® q Xqi qf�' D &AW Y ' GENERkL CONDITIONS OF PER.tiiI"I' : ;APPLICATION/PERMIT FOR HIGHWAY EXCAVATION AND REPAIR I . Permittee's Contractors to Comply with Permit Requirements: "file Permittee is responsible fur informing its independent contractors, employees, agents and assigns of their responsibility to comply with this permit, including all special/site specific and general conditions imposed by the I lighway tiuperintendent while acting as the permittee's agent with respect to the permitted activitieS, imd �atch persons shall be required to.comply with all permit requirements. ', No Rip -ht to'Crespass or Interfere with Private Property Rip -lits: This permit does not convey to the permittee any right to trespass upon the lands of adjacent property owners in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit. 3. Protection of the Hip-hway and Future Hip-hway Maintenance: If future operations or highway maintenance projects by the Town of Southold require an alteration in the position of the utility, structure or work herein authorized, or if, in the opinion of the Highway Superintendent the work performed tinder this permit shall cause unreasonable obstruction to required highway maintenance or endanger the health, safety and/or welfare of vehicular or pedestrian traffic, this permit shall be revoked and the utility. structure, till, excavation, or other modification of the highway hereby authorized shall not be completed. ;Additionally, the permit may be revoked if the Highway Superintendent rinds that the issuance of the permit was illegal or unauthorized or that the applicant failed to comply with any of the terms and conditions of the permit or Chapter 237 of the `Gown Code. -l. Revocation of the Permit by the Hip-hway Superintendent: _ If the Highway Superintendent deems it necessary to revoke this permit and the project hereby authorized has not been completed, the applicant shall, without expense to the Town and to such extent and in such time and manner as the Superintendent may require, remove all or any portion of the uncompleted utility, structure or till and restore the ,ite to its former condition. Notice.of Commencement: /Nt least 24 hours prior to commencement of the project, the permittee and!or contractor shall notify the Town Highway Department in writing that they are fully aware of and Understand all terms and project conditions of this permit. Upon completion of the work, the contractor .hall provide photographs of the completed work to the 'rowvn Highway Department and request a final inspection. Storage of Eauinment & Materials: I'lhe storage of construction equipment and/or materials shall be confined within the project work area and/or adjacent areas where permission / legal access has been obtained in a manner that does not interfere with normal highway traffic. Utility dark -Outs: Ihe:Applic^nt / Contractor ,hall be re,ponsible to verification ul*all existing utility mark -outs and shall take all precautions to protect same. Damage to existing utilities shall be the responsibility of the contractor and shall be repaired at the contractor's expense. S. Road Closures: MI scheduled road closures must first receive written permission from the Southold Covvn Board prior to closing a road. Temporary lane closures may be permitted with the approval of the I lighw'ay Superintendent. This item will included but not be limited to the installation of appropriate signage and Ilag men to stop and start traffic to allow for single lane traffic. Road Closures due to unforeseen _mergencies require immediate notification of the Highway Department and shall be limited to immediate .utd/or expedited restoration of the Work 'Lone. 9. No Construction Debris in Road Shoulder Area: All Construction Debris shall be removed from the job site on a daily basis. All stockpiled soil as well as all other project materials that will be staved within the Right -of W'ay must be delineated with reflective signage or other means to meet the minimum requirements of file NYS DOT Construction Standards. ! S GENERAL CONDITIONS OF PERMIT APPLIC:iTIONTEWN11T FOR HIGHWAY EXCAVATION AND REPAIR � (Continued) IU. Install,Maintain Erosion Controls: Required Erosion Control Measures (i.c. ,silt fencing) is to be placed on the downslope edge of any disturbed area. This sediment barrier is to be put in place before ally disturbance urthe ground occurs and is to be maintained in ,good functional condition until thick vegetative Cover is established, I I. Clean Fill Only: All project back -till shall consist of clean sand, gravel or soil (NOT asphalt, slag, Hyash, broken concrete or demolition debris). All unsuitable soils excavated at the site (i.e. Clay, Bog. ctc.) are to be removed from the site and not used to backfill any excavation within a Town Highway, 13, Ml areas of Soil Disturbance : All areas of soil disturbance resulting from the approved project shall be Stabilized to the satisfaction of the Highway Superintendent immediately following project completion. If the project site remains inactive for more than 48 hours or planting is impractical due to the season, then the area shall be stabilized with straw, hay mulch and/or jute matting until weather conditions favor germination. 13. Backfill & Compaction of all Excavations: Back Fill shall consist of clean till or soils which exhibit a ~Yell -defined moisture density relationship as determined to be in accordance with AS'fMD 698. Fill shall be placed in maximum lifts of twelve (12") inches thick and shall be mechanically compacted to a Ninety- tive (95%) percent maximum dry density. Suitable hydraulic compaction by water jetting at three-foot intervals will also be permitted subject to a project specific approval by the Highway Superintendent. 14. Restoration of the Road Shoulder Area: All man-made improvements located within existing road ,shoulder areas must be protected to the greatest extent practical. Items would include but not be limited to driveway & private road aprons, mail boxes, sprinkler systems, trees and ornamental plantings. Excavations through driveways and private road pavements must be reconstructed to meet all requirements ot'Southold Town Highway Specifications. ,111 pre-existing road shoulder improvements that have been ,li.sturbed during construction must be replaced or repaired by the contractor to the satisfaction of the Ilighway Superintendent. 13, Schematic Plans with all Technical information and Scope of Work: fo reasonably and adequately describe the proposed work. accurate schematic site plans must be provided to show or indicate all proposed construction activity required under this permit. All Pavement surfaces scheduled for excavation must be saw cut to the full depth ofasphalt and/or concrete pavements. :Accurate size of bell holes or width oftrenching must be indicated by dimension or labeling. I'his schematic site plan must provide details un .ill restoration required to meet the requirements of these General Conditions and requirements found in the Southold town highway Specifications. 16. Pavement Reconstruction: All Pavement sections must be reconstructed in the following manner: ,Note: when Concnne Pavements Lire Present. Please rc%iew RCSIL)nWon requirements wth the I liuhway SupenntcnLICIM :u) Complete all back -till & soil compaction work as needed to provide a suitable sub -base: b) Over -cut existing asphalt bell hole or trench by twelve (12") inches on .ill sides: c) Install a compacted lift of 4" thick Stone Blend base (RCA Blend must meet NYS DOT Specification): J) Install a two and one half (2.5") inch compacted lift of Asphalt Base Course. e) Install a one and one half (1.5") inch of Asphalt (,fvpe 6) Wearing Course. t Provide :1C at all joints) All work listed herein must meet the minimum requirements of the Southold Town I lighway Specifications. 17. Trenching - of Pavement Surfaces Exceeding- One Hundred (1001) Feet in Lenuth• MI trenchine of pavement surfaces exceeding 100' in length must first be reconstructed to meet the requirements of Item 16 as noted above. Once all pavement reconstruction is completed to the satisfaction of the Highway �tiperintcndent, the entire road section told/or width of road over the entire len:th of trench shall be repaved with a mo (2'') inch lift of Asphalt (Type 6) Wearing Course ('fvpical, shoulder to shoulder).