CERTIFICATE OF OCCUPANCY
THIS CERTIFIES that the building SOLAR PANEL
Location of Property: 350 Paddock Way, Mattituck
Date: 6/2/2015
SCTM #: 473889 Sec/Block/Lot: 107.4-2.12
Subdivision: Filed Map No. Lot No.
conforms substantially to the Application for Building Permit heretofore filed in this office dated
4/28/2014 pursuant to which Building Permit No. 38868 dated 5/8/2014
was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for
which this certificate is issued is:
I_XKN1XY61"W96)3618121"uCelli _►MI10aJ_\M-W_101l"Wy_104inaalIftel_WATJIIry 1608]J-\�47_3al"My_Xy_\9aRla0ITGRI
The certificate is issued to Weissbach, Marc & Weissbach, Shari
of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL
ELECTRICAL CERTIFICATE NO.
PLUMBERS CERTIFICATION DATED
05-28-2015
_2 $,
Authorized Signature
X
Permit #: 38868
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN CLERK'S OFFICE
SOUTHOLD,NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permission is hereby granted to:
Weissbach, Marc & Weissbach, Shari
2909 Frankel Blvd
Merrick. NY 11566
Date: 5/8/2014
To: Ground mount solar panels and pergola with solar panels as applied for
At premises located at:
350 Paddock Way, Mattituck
SCTM # 473889
Sec/Block/Lot # 107.4-2.12
Pursuant to application dated 4/28/2014
To expire on 11/7/2015.
Fees:
and approved by the Building Inspector.
SOLAR PANELS $50.00
CO - ACCESSORY BUILDING $50.00
ELECTRIC $100.00
ACCESSORY $315.50
Total: $515.50
r,- ax-"
Building Inspector
Form No. 6
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN HALL
765-1802
APPLICATION FOR CERTIFICATE OF OCCUPANCY
This application must be filled in by typewriter or ink and submitted to the Building Department with the following:
A. For new building or new use:
1. Final survey of property with accurate location of all buildings, property lines, streets, and unusual natural or
topographic features.
2. Final Approval from Health Dept. of water supply and sewerage -disposal (S-9 form).
3. Approval of electrical installation from Board of Fire Underwriters.
4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1% lead.
5. Commercial building, industrial building, multiple residences and similar buildings and installations, a certificate
of Code Compliance from architect or engineer responsible for the building.
6. Submit Planning Board Approval of completed site plan requirements.
B. For existing buildings (prior to April 9, 1957) non -conforming uses, or buildings and "pre-existing" land uses:
1. Accurate survey of property showing all property lines, streets, building and unusual natural or topographic
features.
2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is
denied, the Building Inspector shall state the reasons therefor in writing to the applicant.
C. Fees
1. Certificate of Occupancy - New dwelling $50.00, Additions to dwelling $50.00, Alterations to dwelling $50.00,
Swimming pool $50.00, Accessory building $50.00, Additions to accessory building $50.00, Businesses $50.00.
2. Certificate of Occupancy on Pre-existing Building - $100.00
3. Copy of Certificate of Occupancy - $.25
4. Updated Certificate of Occupancy - $50.00
5. Temporary Certificate of Occupancy - Residential $15.00, Commercial $15.00
Date.
New Construction: _)5&
Old or Pre-existing Building: (check one) f
Location of Property: J & a o� W j !C%
House No. } Street Hamlet
Owner or Owners of Property:
l%l� bl S �)b6 01
Suffolk County Tax Map No 1000, Section ) 01 Block Lot -
Subdivision Filed Map. Lot:
Permit No. �.� �S Date of Permit. Applicant:
Health Dept. Approval: Underwriters Approval:
Planning Board Approval:
Request for: Temporary Certificate Final Certificate: (check one)
Fee Submitted: $
Applicant Signature
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, NY 11971-0959
11,14""
'of soyo1
of � �tw
�4UNTI,�
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
Telephone (631) 765-1802
Fax(631)765-9502
roger. riche rt(cD-town.southold.ny.us
CERTIFICATE OF ELECTRICIAL COMPLIANCE
SITE LOCATION
Issued To: Weissbach
Address: 350 Paddock Way City: Mattituck St: New York Zip: 11952
Building Permit #: 38868 Section: 107 Block: 4 Lot: 2.12
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: DBA: RJ CoraZini Electric License No: 33419 -ME
SITE DETAILS
Office Use Only
Residential X Indoor Basement Service Only
Commerical Outdoor X 1st Floor Pool
New Renovation 2nd Floor Hot Tub
Addition Survey Attic Garage
INVENTORY
Service 1 ph Heat Duplec Recpt Ceiling Fixtures HID Fixtures
Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors
Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors
Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps ,
Transformer Appliances Dryer Recpt Emergency FixturesTime Clocks
Disconnect Switches El Twist Lock Exit Fixtures H I TVSS
Other Equipment: 19.180 Watt Photovoltaic System To Include, 6- Lumos LXS 250 and
68- Hundi S260 Panels with Micro Inverters, Combiner Boxes and A/C Disconnects.
Notes:
Inspector Signature: Date: May 28, 2015
Electrical 81 Compliance Form.xls
OF SOUryolo
C 6 � • �o
courm,�c�
OF SOUTHOLD BUILDING DEPT.
TOWN
765-1802
INSPECTION
[ ] FOUNDATION IST [ ] ROUGH PLUMBING
[ ] FOUNDATION 2ND [ ] INSULATION
[ ]
FRAMING/ STRAPPING [ ] FINAL-
[ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] CAULKING.
REMARKS:
_ DATE � �� INSPECTOR
Marc Weissbach, RA
2909 Frankel Boulevard
Merrick, NY 11566
June 1, 2015
RE: Project Signoff for New Ground Mount and Trellis Solar Photovoltaic Arrays at 350 Paddock Way,
Mattituck, NY
Michael J. Verity, Chief Building Inspector
Town of Southold
Building Department
Town Hall Annex Building
P.O. Box 1179
Southold, NY 11971
Dear Building Inspector:
Ell _;
!I
JUN - 2 2015 I J,
bi_DG. DEPT
Or SOU N00
1, Marc Weissbach, as the Registered Architect and Design Professional of Record for the New Ground
Mount and Trellis Solar Photovoltaic Arrays, Permit #38868 at 350 Paddock Way, Map of District 1000,
Section 107, Block 4, Lot 2.12, Mattituck, NY certify that: the ground -mount solar photovoltaic array was
installed in general accordance with the permitted plans and with Schlettei's installation specifications,
and the trellis solar photovoltaic array was installed in general accordance with the permitted plans and
with Lumos Solar's installation specifications.
The ground mount racking system was designed by Schletter, the racking manufacturer, to meet local
code requirements. The trellis mount racking system was custom-designed, to meet local code
requirements. I made visits and reviewed photographic documentation of the array installations during
I
New York State Architect License #025297
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN HALL
SOUTHOLD, NY 11971
TEL: (631) 765-1802
FAX: (631) 765-9502
SoutholdTown.NorthFork.net
Examined , 20
Approved , 20L�(
Disapproved a/c
PERMITi7•6♦
BUILDING PERMIT APPLICATION CHECKLIST
e� _X 2q,5
Building Inspector
C' E nn]
Do you have or need the following, before applying?
Board of Health
4 sets of Building Plans
Planning Board approval
Survey
Check
Septic Form
N.Y.S.D.E.C.
Trustees
Flood Permit/
Storm -Water Assessment Form
Contact: H
Mail to: PQAWV-4 NWD
Phone:
APR 2 g 2014 ICATION FOR BUILDING PERMIT
Date a�-(•� , 2014
BLDG. DEPT. INSTRUCTIONS
TOWN OF SOUTHOLD
a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4
sets of plans, accurate plot plan to scale. Fee according to schedule.
b. Plot plan showing location of lot and of buildings on premises,. relationship to adjoining premises or public streets or
areas, and waterways.
c. The work covered by this application may not be commenced before issuance of Building Permit.
d. Upon approval of this application, the Building Inspector will issue a Building Permit to the applicant. Such a permit
shall be kept on the premises available for inspection throughout the work.
e. No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector
issues a Certificate of Occupancy.
f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of
issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the
property have been enacted in the interim, the Building Inspector may authorize, in writing, the extension of the permit for an
addition six months. Thereafter, a new permit shall be required.
APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the
Building Zone Ordinance of the Town of Southold, Suffolk County, New York, and other applicable Laws, Ordinances or
Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The
applicant agrees to comply with all applicable laws, ordinances, building code, housing code, and regulations, and to admit
authorized inspectors on premises and in building for necessary inspections.
U " U6PANCC.'Y
NIAWFUL
J r J tiY (1, 9 4 Atl 't A
(Signature of applicant or name, if a corporation)
(Mailing address of applicant)
State whether applicant is owner, lessee, agent, architect, engineer, gqA "r&, & Bri an, plumber or builder
30
Name of owner of premises " >1 9 C
(As on the '
PM FOR THE
If applicant is a corporation, signature of duly authorized office1r,LLOV.1I;1JG INSPECTIO dS:
1. FOUNDATION - 1 bAj0 RcOUiRED
(Name and title of corporate officer) FOR POURED CONCRETE
ELECTMAL, 2. ROUGH - FRAMING, PLUMBING,
STRAPPING, ELECTRICAL & CAULKING
Builders License No. INSULATION
Plumbers License No. 4. FINAL - CONSTRUCTION & ELECTRICAL
Electricians License No. MUST BE COMPLETE FOR C.O.
Other Trade's License No. ALL CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF THE CODES OF NEW
1. Location of land on which proposed work will be done: YORK STATE. NOT RESPONSIBLE FOR
_ _ DESIGN(SaR��lVSTF.dIG'�v.F�s�rc
House Number � Street
County Tax Map No. 1000 Section
Subdivision k OOH Ok- Qc�
1 RETAINI' ORM WATER RUNOFF
PURIANT TOjrCHAPTER 2362 2
d� Block:., SOF,_ .=,7(lUll"rClf1�. Lot �
?fJl aifi.,tlti),J tif<"
.
2. State existing use and occupancy of
a. Existing use and occupancy`
3.
L'1
5
b. Intended use and occupancy
use and occupancy of proposed construction:
Nature of work (check which applicable): New Building Addition Alteration
Repair Removal Demolition Other Work �—
�`C) u �o _-V (Description)
Estimated Cost i 'D C) Fee s-�-v,S � k s� -�- k6Gj -; C, I- 51 S , S o)
(To be paid on filing this application)
If dwelling, number of dwelling units
If garage, number of cars
Number of dwelling units on each floor
6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. _
" -
7. Dimensions of existing structures, if any: Front _ Rear Depth 1 _.
Height Number of Stories
Dimensions of same structure with alterations or additions: Front Rear
Depth Height Number of Stories"
8. Dimensions 4f entir new ctn trsruuc on: Front �v _ Rear
Height f ®- �`i ��'�, °u�c�. mber of Stories 0 ��
Depth L 'IS `
9. Size of lot: Front Rear Depth C `�
10. Date of Purchase --A>4 L5 7.nLOName of Former Owner �_bd
11. Zone or use district in which premises are situated
12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO X
13. Will lot be re -graded? YES NO X Will excess fill be removed from premises? YES NO
14. Names of Owner of premises :2 l- U-XalS -Address t I lcM- III kkS% Phone No. 7102-1Q3
Name of Architect Address Phone No
Name of Contractor Address Phone No.
15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO
* IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY BE REQUIRED.
b. Is this property within 300 feet of a tidal wetland? * YES_ NO K30t,.s
* IF YES, D.E.C. PERMITS MAY BE REQUIRED. e>vi ppm
16. Provide survey, to scale, with accurate foundation plan and distances to property lines. J�,T,
17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey.
18. Are there any covenants and restrictions with respect to this property? * YES NO
* IF YES, PROVIDE A COPY.
STATE OF NEW YORK)
SS:
COUNTY OF �p,�yC )
I'?- C-, " being duly sworn, deposes and says that (s)he is the applicant
(Name of individual signing contract) above named,
(S)He is the
(Contractor, Agent, Corporate Officer, etc.)
of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;
that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be
performed in the manner set forth in the application filed therewith.
Sworn to before me this
day of , I_...,M..,., '20-
A 20— _
PuIVWry Public State 'Of • NelwYOrk I Signature of Applicant
Qualified in Bronx County
My Commission Expires 12/10! 1G
Registration No 01JA6273399
ado
Scott A. Russell
SUPERVIS®R C
SOUTHOLD TOWN HALL - P. O. Box 1179 16
Telephone #: (631) - 765 -1560 41-
MICHAEL.COLLINS@TOWN.SOUTHOLD.NY.US
James A. Richter, R.A.
Michael M. Collins, P.E.
53095 Main Road - SOUTHOLD, NEW YORK 11971
Fax #: (631) - 765 - 9015
JAMIE.RICHTERQTOWN.SOUTHOLD.NY.US
Office of the Engineer
Town of Southold
STORMWATER MANAGEMENT CONTROL PLAN REVIEW COVER SHEET
( TO BE COMPLETED BY THE APPLICANT)
PLEASE NOTE: All Contact & Project Information Requested by this FORM is Nessary for a Complete Application.
APPLICANT: (Property Owner, Design Professional, Agent, Contractor, Other)
NAME: M -NRS—
ADDRESS:
`kms
Telephone Numbenc\o L(ikA�6 _?10Z_12>
PROPERTY OWNER: (If Different from Applicant)
NAME: W�
ADDRESS:
Telephone Number: r::A (_Q (a;1 12 -
Completed Applications can be picked tip at the Engineering Department after being notified by the Department, or;
it can be Mailed to the Applicant with the submission of a Self Addressed 8.5' x I I" Envelope & Appropriate Postagei
DATE: Property Address / Location of Construction Work:
rSU D C*, W A
SCTM#: 1000- q UZ-
District Section Block Lot
Reauired Documents for Stormwater Review:
Copy of Complete Building Permit Application.
Stormwater Management Control Plan. (2 Sets)
Note: SMCP's are required whenever Grading or Excavations exceed 5,000 S.F, when New Impervious Surfaces are
created, and/or when existing Roof Systems, Driveways, Patios or other Impervious Surfaces are Re -Surfaced.
De Minimis Projects will NOT be Subject to the Submission of a SMCP During the Stormwater Review!
Note: These Projects would be Limited to Interior Renovations, Replacement of exterior Doors & Windows, Deck Construction
with Loose Fit Decking, Installation and/or Modification of Mechanical Systems or other similar Work.
A Complete Description of the Scope of Work Proposed under the Building Permit Application.
A rmmnlatarl Stnrmwater Review Checklist_ If No or NA are Indicated. Justification is Required.
_._ ..
FOR E G DEPARTMENT USE ONLY
s I�
Reviewed By: Date:
App oved:
111 MMM���111 �
F]Ad nal Information Required:
I
APPRoo eo C&' Q- GRcxaNQ Nou,ti l e o FWacynn s E, Sym
Town Hall Annex
54375 Main Road
P.O. Box 1179
Southold, NK 11971-0959
Telephone (631) 765-11802
roger.rlc�lertAO 1.867605t95615.tlny.us
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
APPLICATION FOR ELECTRICAL INSPECTION
REQUESTED BY: Date:
Company Name:
No..
No..
JOBSITE INFORMATION: (*Indicates required information)
*Name:
*Address:
*Cross Street:
*Phone No.:
Permit No.:
Tax -Map District:
Jill 11
ww 621,
1000 Section:
*BRIEF DESCRIPTION OF WORK (Please Print Clearly)
Block:
Lot: 2- ,
(Please Circle All That Apply)
*Is job ready for inspection: YES/ NO Rough In Final
To -you need a Temp Certificate: YES / O
Temp Information (If. needed)
*Service Size: 1 Phase 3Phase 100
150 200 300 350 400 Other
*New Service: Re -connect Underground Number of Meters Change of Service Overhead /
Additional information: PAYMENT DUE WITH APPLICATION
60 "O O
82=Request for Inspection Form
3 2-�F�
GROUND MOUNT SOLARPHOTOVOLTAIC
DISCLAIMER: ARC R' -
ALL C0115TRUCTION 5HALL MEET THE Q, QO wfi/
CODE REQUIREMENT5 OF NEW YORK �Q'
STATE. ._ }A '
of
f
S
SYSTEM & TRELLIS
MATTITUCK, NY
March 26, 2014
REVISION:
MAP OF DISTRICT 1000; SECTION 107; BLOCK 4; LOT 2.12
PV -1 00: PLOT PLAN
PV -101 PV ELECTRICAL SITE PLAN
PV -102 FULL ELECTRICAL SITE PLAN
PV 200-OPT1 : UNIRAC ARRAY PLAN AND SECTION
PV 200-OPT2 : SCHLETTER ARRAY PLAN AND SECTION
PV -300 : FIELD ARRAY ONE -LINE DIAGRAM
PV301: TRELLIS ARRAY ONE -LINE DIAGRAM
A-100: GROUND PLAN AT TRELLIS
A-101 :EXISTING AND PROPOSED SITE PLAN AT TRELLIS
A-102: TRELLIS STRUCTURAL PLAN
A-103: TRELLIS ELECTRICAL PLAN
A-200: TRELLIS NORTH ELEVATION
A-201: TRELLIS WEST ELEVATION
A-300: TRELLIS SECTIONS
A300: TRELLIS DETAILS
APPENDDCA: FLOOD MAP
APPENDIX B: SITE SURVEY
SOUTHOLD APPLICATION DRAWINGS 103.26.2014
LIPA APPLICATION DRAWINGS 112.12.2013
PROJECT: SHEET:
WEISSBACH'RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM COVER
350 PADDOCK WAY, MATTITUCK NY
M. VAISH
DATE: 03.26.2014
SCALE: AS NOTED
LANDWARD Lil AIT OF TIDAL
WETLANDS AS FLAC GED BY SEA
LEVEL COON UNE 15,2002
LANDW RD LIMIT OF
TIDALETLANDS AS
INDICA ED ON FILED
MAP
LEGEND
CENIC AND NATURAL
PROJECT:
FLOOD LIGHT, SURFACE
DISCLAIMER:
MOUNTED
WATERPROOF
GROUND -FAULT CIRCUIT
WP
INTERRUPTER OUTLET
GFCI
DRIVEWAY
/ PROPOSED DIRECT BURIAL
CABLE, 400A SERVICE
LOCATION OPTION #1 -
NEW DIGITAL NET
METER
DATA TAKEN FROM YOUNG AND YOUNG SURVEY -
09/28/10. SC TAX MAP No# 1000 -107 - 04 2.12 ZONE AC.
WOLF PIT POND ESTATES 8963, FILED 6.21.90 REFER TO
FLOOD INSURANCE RATE MAP 36103CO14M 9.25.2009
CENIC AND NATURAL
PROJECT:
SHEET:
DISCLAIMER:
VEGETATION RETENTI
BUFFER
ALL CON5TRUCTION SHALL MEET THE
Q,G
XISTING FENCE
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
%FU
COD Of NEW YORK
31 -5"
8.6 kW
SCHANZ PROPERTY
PV -101
EREQUIREMENT5
,I,IP OUND MOUNT
TRUST
5
GFO` PHOTOVOLTAIC
350 PADDOCK WAY, MATTITUCK NY
ARRAY EXPANSION
P OSED 13.26 kW
5
ROUND MOUNT
PHOTOVOLTAIC
SHEETTITLE:
BY: M.VAISH
ARRAY
1
PROPOSED AC PV DIRECT
CHECKED BY:
1
BURIAL CABLES 28 - O"
03.26.2014
DATE: 03.26.2014
--/
PV ELECTRICAL SITE PLAN
:EXISTING
IFENCE
"
LIPA APPLICATION DRAWINGS
12.12.2013
SCALE: AS NOTED
I
PROPOSED 400A PANEL
\\
.PROPOSED DIRECT BURIAL CABLE,
LOCATION OPTION #2 -
110A SERVICE
NEW DIGITAL NET
\
EXISTING
METER 6'.. ";?:i:•.
\\
O
A8'ANA"
EXISTING METER TO \\
BE REMOVED
\\
1
I
WETLANDS AND NATURAL
FXIS /7NG:HOLI
100
II
RETENTION BUFFER
NEW TRELLIS
PROPOSED 2.34 kW TRE
MOUNT PHOTOVOLTAIC
:EXISTING GARAGE;;:, I
ARRAY
I
6Z-10" J
"19-
19-FIRM
FIRMZONE, BOUNDARY LINE
EXISTING
_
SCALED FROM THE FLOOD
FENCE
INSURANCE RATE MAP
FUTURE DC PV DI ECT BURIAL - -
PROPOSED 110A PANEL
36103CO143 G - MAY 41 1998.
\ ^ ZONE AE [EL = 111.
v \
CABLES
PROPOSED 2.5 kW PV
INVERTER
DRIVEWAY
/ PROPOSED DIRECT BURIAL
CABLE, 400A SERVICE
LOCATION OPTION #1 -
NEW DIGITAL NET
METER
DATA TAKEN FROM YOUNG AND YOUNG SURVEY -
09/28/10. SC TAX MAP No# 1000 -107 - 04 2.12 ZONE AC.
WOLF PIT POND ESTATES 8963, FILED 6.21.90 REFER TO
FLOOD INSURANCE RATE MAP 36103CO14M 9.25.2009
REVISION:
PROJECT:
SHEET:
DISCLAIMER:
E /`SSB �!'
ALL CON5TRUCTION SHALL MEET THE
Q,G
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
COD Of NEW YORK
4 9y
PV -101
EREQUIREMENT5
350 PADDOCK WAY, MATTITUCK NY
SHEETTITLE:
BY: M.VAISH
N
CHECKED BY:
1
SOUTHOLD APPLICATION DRAWINGS
03.26.2014
DATE: 03.26.2014
PV ELECTRICAL SITE PLAN
0
LIPA APPLICATION DRAWINGS
12.12.2013
SCALE: AS NOTED
ti
UNIRAC TOPMOUNT END CLAMP 11-1
13'-72'
LG 260SlC-A3 MODULE
UNIRAC SOLARMOUNT HD RAIL
UNIRAC ALUMINUM CAP
ARCHI R�'
G %\N%\NE ISSB ���
Q O
g 92 C0�
z
2�g,*,
�F N v
REVISION:
PROJECT:
\NEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
9 -14'
UNIRAC TOPMOUNT
2" DIA. SCH. 40 GALVANIZED STEEL
SHEET TITLE:
ARRAY PLAN AND SECTION - UNIRAC
MID CLAMP
PIPE, PER UNIRAC ENGINEER SPEC
CHECKED BY:
1
SOUTHOLD APPLICATION DRAWINGS
03.26.2014
DATE: 03.26.2014
0
UNIRAC TOPMOUNT
12.12.2013
SCALE: AS NOTED
END CLAMP
UNIRAC ALUMINUM SLIDER
3 ,
CONCRETE FOOTING
36" DIAMETER, 46" DEEP
�k
X11,{ �ti (5j
€.I^^
Ift t`� I1; a ili t=
t_.r. EI 11-4 .i; - t=I t--}!
RACKING SPECIFICATIONS; I
FOUNDATION TYPE: SYSTEM TO BE EMBEDDED IN CONCRETE FOUNDATIONS. I
MATERIAL: ALUMINUM, POST CONSISTING OF GALVANIZED STEEL, HARDWARE IS STAINLESS STEEL (METRIC)
REINFORCED CONCRETE FOUNDATIONS: 3'-0" DIAMETER X T-10" DEEP /�
NUMBER OF POSTS PER RACK: 30 ARRAY SECTION
GROUND CLEARANCE MODULES: 2'-0" � I
1/4" = 1'-0" I
1
s
gg� �
,,CIA
X
DISCLAIMER: _
ALL THE
CODE NSTP MIEONT5 ANEW MEET
ORK C-
STATE.
ARCHI R�'
G %\N%\NE ISSB ���
Q O
g 92 C0�
z
2�g,*,
�F N v
REVISION:
PROJECT:
\NEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
SHEET:
PV-200-OPT1
350 PADDOCK WAY, MATTITUCK NY
SHEET TITLE:
ARRAY PLAN AND SECTION - UNIRAC
BY: M.VAISH
CHECKED BY:
1
SOUTHOLD APPLICATION DRAWINGS
03.26.2014
DATE: 03.26.2014
0
LIPA APPLICATION DRAWINGS
12.12.2013
SCALE: AS NOTED
SCHLETTER ALUMINUM
LG 260S1C-A:
SCHLETTER ALUMI
SCHLETTER GALVANIZ
CONCRETE
24" DIAMETER,
RACKING SPECIFICATIONS;
FOUNDATION TYPE: SYSTEM TO BE EMBEDDED IN CONCRETE FOUNDATIONS.
MATERIAL: ALUMINUM, POST CONSISTING OF GALVANIZED STEEL, HARDWARE IS STAINLESS STEEL (METRIC)
REINFORCED CONCRETE FOUNDATIONS: 2'-0" DIAMETER X T -T' DEEP
NUMBER OF POSTS PER RACK: 11
GROUND CLEARANCE MODULES: 2'-0" ARRAY SECTION
2 1/4„ = 11-01,
�A�
NORTH ARRAY PLAN
® 1/8"=V-0"
DISCLAIMER:
ARCHITECT:REVISION:
PROJECT:
SHEET:
ALL CONSTRUCTION SHALL MEET THE
CODE REOUIREMENT5 OF NEW YORK
��g�EREp
�� �yG wzlo' "—
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
PV-200-OPT2
350 PADDOCK WAY, MATTITUCK NY
STATE.
�Q Sm
9
n
SHEET TITLE:
BY: M. VAISH
CHECKED BY:
� O
1
SOUTHOLD APPLICATION DRAWINGS
03.26.2014
DATE: 03.26.2014
se 97
ARRAY PLAN AND SECTION - SCHLETTER
OA.
AS NOTED
APPA -4 ISCALE:
0
LIPA APPLICATION DRAWINGS
12.12.2013
EXTERIOR I INTERIOR
AT HOUSE
400A
SERVICE PANEL
W/ 100A PV
CIRCUIT BREAKER
e
UTILITY M
SERVICE
I �
EXTERIOR (EXTERIOR
FROM ARRAY AT ARRAY
TO HOUSE
IAC PV SUBPANEL
240V, 100A W/ 3
20A BREAKERS
PV ARRAY INFORMATION:
RATED POWER (DC): 13.26 kW
RATED POWER (AC): 11.545 kW
NUMBER OF MODULES, TOTAL: 51
NUMBER OF MODULES IN SERIES: 1
NUMBER OF PARALLEL CIRCUITS: 51 IN 3 SETS OF 17 EACH
LOWEST EXPECTED AMBIENT TEMPERATURE: -22" C
HIGHEST CONTINUOUS AMBIENT TEMPERATURE: 29'C
PV MODULE
MODULE MANUFACTURER:
MODULE MODEL#:
RATINGS AT STC
MAX POWER POINT CURRENT (Imp):
MAX POWER -POINT VOLTAGE (Vmp):
OPEN CIRCUIT VOLTAGE (Voc):
SHORT-CIRCUIT CURRENT (Isc):
MAX SERIES FUSE (OCPD):
MAX POWER (Pmax):
MAX SYSTEM VOLTAGE:
Voc TEMP COEFF:
INVERTER
INVERTER MAKE:
INVERTER MODEL #:
MAX DC VOLT RATING:
MAX DC SHORT CIRCUIT CURRENT:
MAX POWER @ 40" C:
NOMINAL AC VOLTAGE:
MAX AC CURRENT:
MAX UNITS PER 20A BRANCH CIRCUIT:
DISCLAIMER:
ALL CONSTRUCTION SHALL MEET THE
CODE REQUIREMENTS OF NEW YORK
STATE.
LG
LG260SlC-A3
8.38 A
31.1 V
38.1 V
9.05 A
15A
260 W
1000 V
-0.31 %/"C
ENPHASE M215
M215-60-2LL-S22 @ 240 VAC
45 V
15A
215 W
240 V
0.9 A
17
NEC 2008 LABELING REQUIREMENTS:
UTILITY INTERACTIVE INVERTER (690.5) -
WARNING: ELECTRIC SHOCK HAZARD IF A GROUND FAULT IS
INDICATED.
NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND
ENERGIZED.
INVERTER (690.54)
WARNING: ELECTRIC SHOCK HAZARD
DO NOT TOUCH TERMINALS
TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED
IN OPEN POSITION
WARNING: DISCONNECT IS ENERGIZED FROM TWO SOURCES --
SOLAR SYSTEM AND UTILITY GRID
AC OPERATING VOLTAGE: 240 V
MAXIMUM AC CURRENT PER MODULE: 1.04 A
AC PV SUBPANEL (690.54)
WARNING: DISCONNECT IS ENERGIZED FROM TWO SOURCES --
SOLAR SYSTEM AND UTILITY GRID
AC OPERATING VOLTAGE: 240 V
MAXIMUM AC CURRENT PER STRING: 15.3 A
AC CIRCUIT BREAKER (690.64)
WARNING: CIRCUIT BREAKER IS ENERGIZED FROM TWO SOURCES --
SOLAR SYSTEM AND UTILITY GRID
AC OPERATING VOLTAGE: 240 V
MAXIMUM AC CURRENT: 45.9 A
(E)
EQUIPMENT SCHEDULE:
- - - - -
- - - - -
- - -
- -
ii
(1)
(1) JL
-I
(5) AC PV SUBPANEL:
240V 100A NEMA 3-R W/ THREE (3) 2 -POLE 20A BREAKERS
-
MIDNIGHT SOLAR MNSPD-300 SURGE PROTECTION DEVICE
(7) SERVICE PANEL:
(1) PV MODULE:
LG 260W
(2) MICRO INVERTER:
ii
(1)
(1) JL
-I
(5) AC PV SUBPANEL:
240V 100A NEMA 3-R W/ THREE (3) 2 -POLE 20A BREAKERS
-
(1) PV MODULE:
LG 260W
(2) MICRO INVERTER:
ENPHASE M215
(3) AC JUNCTION BOX
(4) MULTI -CIRCUIT AC JUNCTION BOX
(5) AC PV SUBPANEL:
240V 100A NEMA 3-R W/ THREE (3) 2 -POLE 20A BREAKERS
(6) SURGE PROTECTOR:
MIDNIGHT SOLAR MNSPD-300 SURGE PROTECTION DEVICE
(7) SERVICE PANEL:
400A SERVICE, W/ ONE (1)100A PV CIRCUIT BREAKER
WIRE SCHEDULE:
(A) INVERTER OUTPUT CIRCUIT:
(B) INVERTER OUTPUT CIRCUIT:
(C) INVERTER OUTPUT CIRCUIT:
(D) INVERTER OUTPUT CIRCUIT:
(E) NEW DC GEC:
REVISION:
J
12/3 (ENPHASE ENGAGE CABLE)
#10 AWG THWN-2 COPPER, #6 BARE COPPER GROUND, IN %" EMT
3x#2 AWG THWN-2 COPPER, #6 BARE COPPER GROUND, IN 2 Y2" PVC BURIED 18" BELOW GRADE (OR EQUIVALENT CODE -COMPLIANT DIRECT -BURIAL WIRE)
3x#2AWG THWN-2 COPPER, #6 BARE COPPER GROUND, IN 2 Y" PVC
1x#6 BARE COPPER GROUND
1 I SOUTHOLD APPLICATION DRAWINGS 1 03.26.2014 1
LIPA APPLICATION DRAWINGS
12.12.2013
PROJECT:
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
350 PADDOCK WAY, MATTITUCK NY
FIELD ARRAY ONE -LINE DIAGRAM
SHEET:
PV -300
BY: M. VAISH
CHECKED BY:
DATE: 03.26.2014
SCALE: AS NOTED
PV ARRAY INFORMATION:
RATED POWER (DC): 2.34 kW
RATED POWER (AC): 2.01 kW
NUMBER OF MODULES, TOTAL: 9
NUMBER OF MODULES IN SERIES: 9
NUMBER OF PARALLEL CIRCUITS: 1
LOWEST EXPECTED AMBIENT TEMPERATURE: -22° C
HIGHEST CONTINUOUS AMBIENT TEMPERATURE: 29° C
PV MODULE
MODULE MANUFACTURER:
MODULE MODEL #:
RATINGS AT STC
MAX POWER POINT CURRENT (Imp):
MAX POWER -POINT VOLTAGE (Vmp):
OPEN CIRCUIT VOLTAGE (Voc):
SHORT-CIRCUIT CURRENT (Isc):
MAX SERIES FUSE (OCPD):
MAX POWER (Pmax):
MAX SYSTEM VOLTAGE:
Voc TEMP COEFF:
INVERTER
INVERTER MAKE:
INVERTER MODEL #:
MAX DC VOLT RATING:.
MAX DC SHORT CIRCUIT CURRENT:
MAX POWER @ 40° C:
NOMINAL AC VOLTAGE:
MAX AC CURRENT:
DISCLAIMER:
ALL CON5TRUCTION SHALL MEET THE
CODE REGUIREMENT5 OF NEW YORK
STATE.
LUMOS SOLAR
LSX260-60M-C
8.57 A
30.3 V
37.6 V
8.94 A
15A
260 W
1000V
-0.35 %/°C
SMA AMERICA
SB 2500HFUS-30 - 240VAC
600 V
15A
2750 W
208 V
12.0 A
,1�, =D
SSB��
O
g� l o�. 9=
AAXRIORTHOUSEI INTERIOR I FREXTERIOR
GARAGE IAATGGARIOR
RAGE
400A TO HOUSE I
SERVICE PANEL GARAGE I SUBPANEL
(8) I I 240V, 100A W/ 1
20A PV BREAKER
UTILITY M
SERVICE
(7P y y
(C) I (C) I (B)
I
DC DISCONNECT (D)
1 STRING OF 9 X 260W INTEGRAL WITH
MODULES IN SERIES INVERTER 2.5 kW INVERTER AC DISCONNECT
(1) n (2) (3) 1 F (4)
NEC 2008 LABELING REQUIREMENTS:
DC DISCONNECT
DC OPERATING CURRENT: 8.94A
DC OPERATING VOLTAGE: 40.89V
MAXIMUM SYSTEM VOLTAGEA49.79V
SHORT CIRCUIT CURRENT:13.97A
UTILITY INTERACTIVE INVERTER (690.5)
WARNING: ELECTRIC SHOCK HAZARD IF A GROUND FAULT IS,
INDICATED.
NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND
ENERGIZED.
INVERTER (690.54)
WARNING: ELECTRIC SHOCK HAZARD
DO NOT TOUCH TERMINALS
TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED
IN OPEN POSITION
WARNING: DISCONNECT IS ENERGIZED FROM TWO SOURCES --
SOLAR SYSTEM AND UTILITY GRID
AC OPERATING VOLTAGE: 240 V
MAXIMUM AC CURRENT: 10.4 A
AC CIRCUIT BREAKER (690.64)
WARNING: CIRCUIT BREAKER IS ENERGIZED FROM TWO SOURCES —
SOLAR SYSTEM AND UTILITY GRID
AC OPERATING VOLTAGE: 240 V
MAXIMUM AC CURRENT: 10.4 A
EQUIPMENT SCHEDULE:
(OV MODULE:
LUMOS SOLAR LSX260-60,-C 260W, 9 IN SERIES
(2) DC DISCONNECT:
INTEGRAL WITH INVERTER
(3) INVERTER:
SMA AMERICA SB2500HFUS-30-240VAC
(4) AC DISCONNECT:
30A AC DISCONNECT
(5) GARAGE SUBPANEL:
240V 100A NEMA 3-R W/ ONE (1) 2 -POLE 20A BREAKER FOR PV
(6) SURGE PROTECTOR:
MIDNIGHT SOLAR MNSPD-300 SURGE PROTECTION DEVICE
(7) SERVICE PANEL:
400A SERVICE
WIRE SCHEDULE:
(A) INVERTER OUTPUT CIRCUIT:
(B) INVERTER OUTPUT CIRCUIT:
(C) INVERTER OUTPUT CIRCUIT:
(D) NEW DC GEC:
REVISION:
#10 AWG THWN-2 COPPER, #6 BARE COPPER GROUND, IN 3/y" EMT
#10 AWG THWN-2 COPPER, #6 BARE COPPER GROUND, IN 3/a" EMT
DIRECT BURIAL CABLE BY OTHERS
1x#6 BARE COPPER GROUND
SOUTHOLD APPLICATION DRAWINGS
LIPA APPLICATION DRAWINGS
PROJECT:
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
350 PADDOCK WAY, MATTITUCK NY
SHEET TITLE:
03.26.2014 1 TRELLIS ARRAY ONE -LINE DIAGRAM
12.12.2013
SHEET:
PV -301
BY: M. VAISH
CHECKED BY:
DATE: 03.26.2014
SCALE: AS NOTED
B -
A201
A -
1 2
A200 '
I _I .....
I I —�
... ...
••..•.•.•.•.•.'.•.•
• ......
,. ... .
N
�
p
� 2
..••...• z
F-
D
:: ••• .. w
r--,
_I _CL ---
I I
:...........:... .
................ .
I
I
_ I
n F1 n n n n n n n n n n n n n n n n n n n ItI n
I I 1,1 I I I I 11 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 I I I
I LI I II I II II II II II II II II II II II II II II II II II
I II II 11 11 II II 11 I
r 1 r ---i -- r --j r- I_ r
LJ L_J L--FL--J L_J L_J L -J L_ Ll
I I I I I I I I S I I I I I I i t S I I III I I III III I I I I I I I I I I I I I
I I IIII I I I I I I I I S I I I I I I I I S I I III I I III III I I I I I I I I I I I I I II 11 I I
I I I I I I I I _I I I I I I I I I I _I I I I I I __I I__11Irr I III I I I I I I I I I I I I I I II11 I I•.
I I II --CC_IZ+ -- --O-•1-LC �=--D--1`� III I I I I I I I I I I
I I IIII_-1 I I I I I I� I I I I I I I I I I I I I I II 11 I I
I I III n --1-I -TT--I-1 r -1Z --I- -Tr n- rr-77--In- I I I I I I I I I I I I I I I I I I I I I
1111117--I I I I 4I -- I I I I I I I I I I I I II I
I I I
I I VIII a2_J� .CC_11.t J__LC_11 _LJ_t1L �11__D--1J7 III I I I I I I I I I I I I I VIII I I
II IIII II II II IIS II II II II SII III II III III II II II II II II I II 11 II
I I IIII I I I I I I I I I I I I I I I I I S I I I I I I I I III I I I I I I I I I I I I I II 11 I I
II ii11 ii ii II 1I ii ii ii II 11 Iii ii lii 11 II ii ii ii II II i ii ii ii
-n-err �rrt==n-= r� III I I I I 11 I I I I I I I IIII I I
I I I'I a_ IT 'T-7-774 I I I I -nl-+r � � -r I i I III I I I I I I I I I I I I 11 11
uLE I I I L-h--rrr-i4--Irr 1 I 1 1 11 1 1 I I 11 1 1 1 11 1 I
I I I I U --L _1 J_L_JJ --U- I I I I I I I I I I I I I I I 1111 I I
I I 111r -I I I I I I I 1 1 I I �� I I I
1,III a2_�Z -C= DC==LC= 2..D-ZC=C===D_= D III I I I I I I I I 11 I I V I I I 11
I I IIII 1 1 1 1 1 1 11 1 X 1 1 1 1 I I 1 1 X 1 1 1 1 I I 1 1 i 1 1 I I 1 1 I I I I I I 1 1 I 11 1, 1 1
I I 11 II III � 11 11 11 11 X11 11 11 p1 III II 11 II II II II IIII I
I I 11 11 11 11 II II II X11 11 11 11 11 II II 11 11 11 II I
rtr-1-r--rr- t --h- rr--r--rl-- 1
n �_--rr- r�-r+rr-� I I I r-� r-� r- I r-� r-� r-�I r-� r r
L � =J-C=� _ �_ - —J -C -fit �t-�-!__ - J L_J L_J L_J L_J L_J L J L_J L
I I� ..
.
I�LIL,.i._.I .. .I L...I L...I I...I I ..I 1...I I...I
..... .U.'.`.'. ....U.'. .U.'.'.'.U.'.' '.U'..' .'.'.'U ".'.'U.' '.' LJ.'.' .U.'...U.'.'..0 ..'. U' '..'U .'.'.'U'.'.'.'U.'.'. LJ..'.'.U.'.`.'.U.'.'.".U.'..'. ..: .
.......
''''.:.........:....:.....:..:.:...:..........:...:..:.:....:........' '
'.'..........................:.................................................... . �'.....
.... . .... ... ... .
_ _
- -
_
PV MO
2
A3
_
0
- -
-
......................:..............I
..."..'...'.'-'.'.........
. ....._ .....
.... :.:..
..... . .......
.,.... ..
..........:
..... ......
..... ......
.
. ... ..
I I
EKED AAC
DISCLAIMER:
ALL CON5TKUCTION 5HALL MEET THE
CODE REQUIREMENTS OF NEW YORK
STATE.
AR S
�' G 69� (�
5
D 1 O�
2529 .� P
N
P
J 111
s EL WOOD STONE CONCRETE
VENEER
II�TIL-I �
IIIIIIIllJJI
gm S
EARTH GRAVEL GRASS PAVING
REVISION:
PROJECT:
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
SHEET:
A100
350 PADDOCK WAY, MATTITUCK NY
SHEET TITLE:
GROUND PLAN
BY: M. VAISH, A. KURCHENKO
_
CHECKED BY:
1
SOUTHOLD APPLICATION DRAWINGS
03.01.2014
DATE: 03.27.2014
0
LIPA APPLICATION DRAWINGS
12.12.2013
SCALE 1:50
DISCLAIMER:
ALL CONSTRUCTION ShALL MEET THE
CODE REQUIREMENTS OF NEW YORK
STATE.
IIT �XAED
�5 NI E 18,9 ��`
C, e9 ��
I
'%%%
EXISTING STRUCTURE
REVISION:
I
PROJECT:
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
350 PADDOCK WAY, MATTITUCK NY
SHEET:
A101
`d
SHEET TITLE:
BY: M. VAISH, A. KURCHENKO
����� oe25 29'�
PROPOSED DESIGN
1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014
SITE PLAN
EXISTING STRUCTURE VS. PROPOSED DESIGN
CHECKED BY:
DATE: 03.27.2014
SCALE 1:50
�OQ�
O N
r 0 LIPA APPLICATION DRAWINGS 12.12.2013
DISCLAIMER:
ALL CON5TRUCTION 5HALL MEET THE
CODE REQUIREMENT5 OF NEW YORK
5TATE.
I
F-1 n n n n n n n n n n n n n n n n
II II II I II II II II I II II II II I II II II II I II II II II II
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
fro"
�I,
II II I II II II II I II II II Ifi II II II II II I II II 11
_ _ _ _ I �' - - - �_�-� _ - - �✓_�_ _ - _ 1 r- l r- - - 1 ( I -
LJ L �L- LL_1L JELL- 1-J L �1�J!!!!L�•'1�1� IJ L_J L L_J L J ILS J LJ
I - -- - - -- - -- -t ®_t•'"Lt'�' III I I I I I I I I I 1 3 1 1
I V f! I! I I I I I I I I I I I I I I-
I I I I III I I I I I I I I I I I I I I l 1 I I III I I I I I I I I 9F1 I I I, I I
I I I QFGI I I I I I I I
I I I I I I I I I I I I I 1 III
I I 7'T---7-77-77- 7T-17---1--7T--Ll
--TT n
TI a
I I I I III
OIL—21r- 1 I- I I ! -I I _- I I - I --I I-+ I `Islr�
U_ ®i-9 LI. III I I I I I I I I 11111 I
7 I I I I I I I I I I I I I I I I`NI I
1 1 11,111 I I I I I � I I I I I � I I 1 1 I I I I I I I I I I I I I I I I I I 11,11 I I
I I II 111 I I I I I � I I I I I � i I f .III I I I I I I I I I I I I I 11�1� I I
I I 11 I I I I I I I I I I I I t l 1 I I I I I I I I I I I 11sll i
Lr r_
I I I I1L I I7-11 I I I I 1 1
I
F
-- r-rtr--I� tr--1'Y--
PV MODULE kBOVE I 11111 J1L_1 �11_--i1 -- I I I I I I I I I I I I 11111 I I
11 ,,;. I1 m�t1 ! 1 ri til E I I __:C I l i I I I I I I I I I I I II iii
PV STR NGING I I j I I jl QL_ �_-_ Z"° f�__=� OO-E"-�°j+ '-�°1Z-- --=°D jII I 11 I{ir( 1" PVC CO DUIT
I l j I I I I I I I II I I 1 1 111 I I I 1 I III I I I I I I I I I 11 I #,1 1
I I 1
I 3/4" PVC CONDUIT
I I I I I I ��,
1 I I II 11 II II 11 II i1 II II II II II I
I I l I ( I, ,jll1 :'
�r>.�.rr >w re r.�''1. "`qI� 'I'asw $ 1. ``• "``aN "�I. .`''i3 r 1 — em 1- — — —
"1'f—'T T
a_ �f F -I tet" �t tai t ILEI J L J L J J
1 __�� -u_� - _- -
.,;Jim
lJ P -I• + h - I-1- -� F- ti - I+ - + i- -H -
FFTO
I i --F -� f-- -I-I - i- +. -i-1- ,-+ -
GRASS.
PAVING
.. . ." , .. .1 I .I'
:.; .I .. i ; I �., •
u....u..
:I I I
I I f 1 I 1.1 .: 1 I .�
u u LJ >� . �.
1
u
Wp
1" PVCCONDUIT : ::.
.........
.
L..
t
:.:: ::::
.. .. 3/4 PVC CONDUIT
::.::::::.:::::.:::::.:::::.::::::.:.::...
:::
G C .'
::::::::..::':.:::::.: :''.'.'.'.'.'.'..'.'.'.'.......'I'.'I
.. ..... .
.. .....
........................I.
.......:....................:.:....;....'....'.'.'.'..
I ..
::::.:::::::::::...:::;.;::::::............:.::.:::.:::::..::
...GFI..
.
_.
..
..........
......
... ....:::: .::.: ...::.:::::
.... ..............
...............
... .........
:::' ' :::::::' '........ ......
.
...'.'....... LOCATION OF UNDERGROUND ...
..1::I
::..:::.. ..... . .....:.::..... .:::: '.::::.::...
............ .
:
' CABL5/CONDUIT 1NTERFAC8.
I:
'.
............•. •.....................�...� �.�,:. .�.� ..,.:...
..
... . .. ....
.... .. ... .. ... ...... ..... .....
... ..... ....: ...... ...... ...:.
.. .. ,. ..... ..
. . ... -. .. - ...I.
... ............
.:.:'.'....'..'..::.............:':':.::'::...........
. ,•.. ,
......
.....
.....
.........
:'::::':::...:.::.:.....................
• ... • , .. • _ .: FOR DETAIL.SEESITE PLAN).... ,...........,........,..,.`
.......... ..... ..... .. .. ..
....... ..... ................: - ... ...
..
... .........
... .., ...
..
':':...:.:.:':':'::I::I::':.:':':..::.'.'::::::::'::::::::::':':':::::.:':':::::::::.:::
..............
I.I
.
..I
I.l
.I .'.. ..............
:::: ::.::::: ::::::::::: ::::::
... ... ... .... ...
.., .. ...... ..... ... ..... ...............
.I..:. ... ........., ........... ..................
... ...'. ...... ...... ..... ....
......:::............................ ..............
�. _... ..................
:
.. ...
.....
.. ....
.. ..L.. ..
. .
.
7
E IS
5
REVISION:
1 I1 SOUTHOLD APPLICATION DRAWINGS 103.01.2014
I 0 1 LIPA APPLICATION DRAWINGS 12.12.2013
PROJECT:
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
350 PADDOCK WAY, MATTITUCK NY
ELECTRICAL PLAN
W
0
0
z
W
SHEET:
Al 03
BY: M. VAISH, A. KURCHENKO
CHECKED BY:
DATE: 03.27.2014
SCALE 1:50
FFTO
GRASS.
PAVING
ELECTRICAL OtFnHr
f�
REVISION:
1 I1 SOUTHOLD APPLICATION DRAWINGS 103.01.2014
I 0 1 LIPA APPLICATION DRAWINGS 12.12.2013
PROJECT:
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
350 PADDOCK WAY, MATTITUCK NY
ELECTRICAL PLAN
W
0
0
z
W
SHEET:
Al 03
BY: M. VAISH, A. KURCHENKO
CHECKED BY:
DATE: 03.27.2014
SCALE 1:50
VENEER
B[ UESTONE PAVING
SAND
4' CONCRETE SLAB
-1
16" D.C. TYP.
I
- r�— I — I — p off Structure
I - m-,
TT - - 10--0-'30
--Top .2f—c.0!urT!n--&
8'-2"
OLAR PV MODULE
V RAIL BOLTED
TO RAFTER
Top of BBQ Island
3--d-
_[oEqf CoILLmn Pedestal
2'- 0"
_lop of Be ch
viiiiiiiiiiiiiiii1'
—Ground Level x
� W R A mg,
Ww
REVISION:
1 1 1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014
10 1 LIPAAPPLICATION DRAWINGS 12.12.2013
PROJECT:
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
350 PADDOCK WAY, MATTITUCK NY
NORTH ELEVATION
Foundation Wall
-3'
Footing
4-4"
SHEET:
A200
BY: M. VAISH, A. KURCHENKO
CHECKED BY:
DATE: 03.27.2014
SCALE 1:30
DISCLAIMER:
ALL CONSTRUCTION SHALL mEffr THE
CODE REQUIREMENT5 Of NEW YORK
STATE.
top
0,21529
FN
REVISION:
1 1 1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014
10 1 LIPAAPPLICATION DRAWINGS 12.12.2013
PROJECT:
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
350 PADDOCK WAY, MATTITUCK NY
NORTH ELEVATION
Foundation Wall
-3'
Footing
4-4"
SHEET:
A200
BY: M. VAISH, A. KURCHENKO
CHECKED BY:
DATE: 03.27.2014
SCALE 1:30
N
4'�C ET S
M
iff
Top of PV
Top of Structure
101-0"--&
Top pf_Column
__&
8' -2 -
Top of BBQ Island
3'-0"
TopColumn Pedestal
2'- 0" 'JF
Top of Bench
V -111--s
Top of Patio
01-6.
Foundation Wall m-,
-3-
Footing
-4- - 4"
DISCLAIMER:
ARCHITEC Amq
REVISION:
PROJECT:
ALL CON5TPUCTION SHALL MEET THE
CODE REQUIREMENTS Of NEW YORK
14F-I'ss
El
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
—
350 PADDOCK WAY, MATTITUCK NY
STATE.
cp a y
STEEL WOOD STONE CONCRETE
VENEER
I
SHEET TITLE:
III—ll—
0 29
H
EARTH GRAVEL SAND GRASS
WEST ELEVATION
1
SOUTHOLD APPLICATION DRAWINGS
03.01.2014
(OF
=Q7- ELECTRICAL OUTLET
0
LIPA APPLICATION DRAWINGS
12.12.2013
SHEET:
A201
BY: M. VAISH, A. KURCHENKO
CHECKED BY:
DATE: 03.27.2014
SCALE 1:30
VENEER
CONCRETE
WALL AND F❑❑TING
1 c" of I ICCTfI AIC
2
---- ----- —
Top of Structure
10'-0"
N �l
l
l
_ To of Column
8' - 2"
I I
II 11 4"x8" RAFTER
II II 3/8"-16 Thread,
II II 10" LONG LAG BOLT
II . II
Ih II 2.5" SS BOLT
II I 8"x16" GIRDER
IF I
II II 8"x8" BEAM
II II
II II
STEEL BRACKET
II It
II II 1/2" SS BOLT
II I
II II STEEL LOLLY COLUMN
lil II
I II ❑UND FIBERGLASS
II CAST COLUMN
II II
II II 3/4" PVC CONDUIT
II II 1" PVC CONDUIT
II II
II II
II II
ISI II
II II
II II
II II
I.I II
Top of Column_ Pedestal
2'-0"
ALL CON5TPUCTION 5HALL MEET THE
CODE REQUIREIVIENT5Of •
IA�,�IAI
II • iii
I...I..I.
Top of Bench-&
1' - 1"
Top of Patio
01-0"
2
------------
Top of Structure
10'-0"
l
_ Top of Column
Le 4"x8" RAFTER
8' - 2..
I I
II PI 3/8"-16 Thread, 10" LONG LAG BOLT
Ij II 8°x16" GIRDER
II II
8"x8" BEAM
I I 01
II II STEEL BRACKET
II II
II II 1/2" SS BOLT
II li
I� • II STEEL LOLLY COLUMN
II II
Ij II ❑UND FIBERGLASS CAST COLUMN
II lil 1" PVC CONDUIT
II II
II II 3/4" PVC CONDUIT
II II
II II LfBLUESTONE
° BLUESTONE
II lil
II IIOUNTAIN LEDGE STONE
ENEER
II II
II II❑NCRETE
II 14ALL AND F❑❑TING
II II PAVING
AND
" CONCRETE SLAB
I II
I Top of Column Pedestal
2'-0"
2 SECTION AT COLUMN
Scale 1:20
REVISION:
PROJECT:
ISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
350 PADDOCK WAY, MATTITUCKNY
Top of Beneh�
Ground Level
0'-0"
SHEET:
A300
SHEET TITLE: BY: M. VAISH, A. KURCHENKO
CHECKED BY:
1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014 SECTIONS DATE: 03.27.2014
0 LIPA APPLICATION DRAWINGS 12.12.2013 SCALE: AS NOTED
I1
I
L_ T
a �• I
''
1
1 1 p
•.
a•
; "
a f
N
1
`1
� -
"
j�SECTIJON AT COLUMN
20
ALL CON5TPUCTION 5HALL MEET THE
CODE REQUIREIVIENT5Of •
IA�,�IAI
II • iii
I...I..I.
Top of Bench-&
1' - 1"
Top of Patio
01-0"
2
------------
Top of Structure
10'-0"
l
_ Top of Column
Le 4"x8" RAFTER
8' - 2..
I I
II PI 3/8"-16 Thread, 10" LONG LAG BOLT
Ij II 8°x16" GIRDER
II II
8"x8" BEAM
I I 01
II II STEEL BRACKET
II II
II II 1/2" SS BOLT
II li
I� • II STEEL LOLLY COLUMN
II II
Ij II ❑UND FIBERGLASS CAST COLUMN
II lil 1" PVC CONDUIT
II II
II II 3/4" PVC CONDUIT
II II
II II LfBLUESTONE
° BLUESTONE
II lil
II IIOUNTAIN LEDGE STONE
ENEER
II II
II II❑NCRETE
II 14ALL AND F❑❑TING
II II PAVING
AND
" CONCRETE SLAB
I II
I Top of Column Pedestal
2'-0"
2 SECTION AT COLUMN
Scale 1:20
REVISION:
PROJECT:
ISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
350 PADDOCK WAY, MATTITUCKNY
Top of Beneh�
Ground Level
0'-0"
SHEET:
A300
SHEET TITLE: BY: M. VAISH, A. KURCHENKO
CHECKED BY:
1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014 SECTIONS DATE: 03.27.2014
0 LIPA APPLICATION DRAWINGS 12.12.2013 SCALE: AS NOTED
3 SECTION PLAN DETAIL AT COLUMN
Scale: 1"=l' -O"
DISCLAIMER:
ALL CON5TRUCTION 5HALL MEET THE
CODE REQUIREMENT5 OF NEW YORK
STATE.
FRED
n=
JMN
STONE
j
• �i
ELECTRICAL OUTLET
2'
E
44
5-1/2"
Top of Structure
10'-0"
7
7-1/2"
3/8" -16 THREAD, 10" LONG LAG BOLT
4"x8" RAFTER
8„ 2.5" SS BOLT
- Top of Column -50
I I: ill g
8'-2"
I I 8"x16" GIRDER
8"x8" BEAM
ROUND FIBERGLASS CAST COLUMN
I I I I STEEL LOLLY COLUMN
2 SECTION DETAIL AT TOP OF STRUCTURE
Scale: 1-1/2"=V-0"
2'
4" -
_ _ _ Top of Structure
10'-0"
3-1/2"
4"
4"x8" RAFTER
3/8" -16 THREAD, 10" LONG LAG BOLT
2.5" SS BOLT
8"x8" BEAM
STEEL BRACKET
_ lop of Column
III I I
I I I I
II rl
I I I I
I I ROUND FIBERGLASS CAST COLUMN
I I I I STEEL LOLLY COLUMN
I I I I
SECTION DETAIL AT TOP OF STRUCTURE
Scale: 1 -1/2"=l' -O"
REVISION: PROJECT:
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
350 PADDOCK WAY, MATTITUCK NY
SOUTHOLD APPLICATION DRAWINGS 103.01.2014
LIPA APPLICATION DRAWINGS 12.12.2013
DETAILS
SHEET:
A500
BY: M. VAISH, A. KURCHENKO
CHECKED BY:
DATE: 03.27.2014
SCALE AS NOTED
Q
FEMA MAP - COUNTY
2
NTS NOTE: ZONE X DOES NOT
CROSS INTO PROPERTY LINE
LOCATIONS OF PROPOSED
WORK
WEISSBACH PROPERTY LINE
1 FEMA MAP - PROPERTY
NTS
DISCLAIMER:
ARCHITEREVISION:
�C'7
PROJECT:
SHEET:
ALL CON5TRUCTION 5tIALL MEET THE
CODEREQUIREMENT5 OF NEW YORK
�\ G W E 1,3 ij�
Q�
S
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM5TAT
APPENDIX A
350 PADDOCK WAY, MATTITUCK NY
SHEET TITLE:
BY: M.VAISH
h
CHECKED BY:
F ILI
FLOOD MAP
1
SOUTHOLD APPLICATION DRAWINGS
03.26.2014
DATE: 03.26.2014
0
LIPA APPLICATION DRAWINGS
12.12.2013
SCALE: AS NOTED
N
Lot 8 j
`\ 'wdr wt vcno £area: �
LOt 9
s+smNrer
O� `, M tlTEatia" E 'we.e vi1 Vora E•+ot.i
id��StVS\
OF
nit
�'P..: c. X41` `•-` `�o °°
i spa'' `•dh> 4
Lot t]
?w
s
Sy
lil0 •?
ca a vette to aom l= - its - -,- ' - `
P s.edwee _
s Att C ,r"~ y rwe wt nma fstv ,-
t~ ? • � :i ' � ass
G7 t j �� tw .�a;✓ ;
1 n t i RIGHT OF WAY
"PADDOCK WAY..
yy t�iK s[•w +WEd✓� t\ / - t�`W ^� I � II�.000'
f ♦
• t,j Lot 12
Lot 11
'rrar Rt Puna fateta
A'.
-- --
ARCHIT ED ARC%y
EiSS fi
`CO w� eq0 ��
iJ y
Young Young
I
.w ..«.,a,.. .. ew•.ns.c ..,. .drt raw
ear-vt'-rsnJ
SHEET:
APPENDIX B
K
350 PADDOCK WAY, MATTITUCK NY
F'
F�1
r jt
K ,
}
BY: M. VAISH
NOTE
k' - � r.t4 • 'f
. ygxaac arnrwq'#we-lw
uar 6i� ,rwe _ _
SORNEYOWS CERMCAi10N <..
• K N+I[!+' SQ4110 4ROw..we Qts M+l
CoMa K
ee.*Kf two aw,[K =11-7a.
wr?n w µ
9JR\fr FOR
LEONARD O'OONNORI
LOT 13 '1Ku A -i P4:Mf} ES 1A'FES" t
At Y.rt Gtuck. 'own 2f $Q,C'r01d
Suffolk CO my, New '£Ott:
FS
Fi,1VA1�^SUFtvE'Y
W Srd
z�uttep— i
wtBnrcrn `_ +nl +G mope
"Y +w- n s'd0pmr
DISCLAIMER:
ALL CONSTRUCTION 5HALL MEET THE
CODE REQUIREMENT5OfNEW YORK
5TATE.
ARCHIT ED ARC%y
EiSS fi
`CO w� eq0 ��
iJ y
REVISION:
PROJECT:
WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM
SHEET:
APPENDIX B
350 PADDOCK WAY, MATTITUCK NY
F'
SHEET TITLE:
BY: M. VAISH
1
0252g� y�
jQr
SITE SURVEY
CHECKED HECKED BY:
1
SOUTHOLD APPLICATION DRAWINGS
03.26.2014
DATE: 03.26.2014
F
0
LIPA APPLICATION DRAWINGS
12.12.2013
SCALE: AS NOTED