Loading...
HomeMy WebLinkAbout38868-ZNo: 37586 Town of Southold 6/2/2015 P.O. Box 1179 53095 Main Rd Southold, New York 11971 CERTIFICATE OF OCCUPANCY THIS CERTIFIES that the building SOLAR PANEL Location of Property: 350 Paddock Way, Mattituck Date: 6/2/2015 SCTM #: 473889 Sec/Block/Lot: 107.4-2.12 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 4/28/2014 pursuant to which Building Permit No. 38868 dated 5/8/2014 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: I_XKN1XY61"W96)3618121"uCelli _►MI10aJ_\M-W_101l"Wy_104inaalIftel_WATJIIry 1608]J-\�47_3al"My_Xy_\9aRla0ITGRI The certificate is issued to Weissbach, Marc & Weissbach, Shari of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. PLUMBERS CERTIFICATION DATED 05-28-2015 _2 $, Authorized Signature X Permit #: 38868 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN CLERK'S OFFICE SOUTHOLD,NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permission is hereby granted to: Weissbach, Marc & Weissbach, Shari 2909 Frankel Blvd Merrick. NY 11566 Date: 5/8/2014 To: Ground mount solar panels and pergola with solar panels as applied for At premises located at: 350 Paddock Way, Mattituck SCTM # 473889 Sec/Block/Lot # 107.4-2.12 Pursuant to application dated 4/28/2014 To expire on 11/7/2015. Fees: and approved by the Building Inspector. SOLAR PANELS $50.00 CO - ACCESSORY BUILDING $50.00 ELECTRIC $100.00 ACCESSORY $315.50 Total: $515.50 r,- ax-" Building Inspector Form No. 6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: 1. Final survey of property with accurate location of all buildings, property lines, streets, and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage -disposal (S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1% lead. 5. Commercial building, industrial building, multiple residences and similar buildings and installations, a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings (prior to April 9, 1957) non -conforming uses, or buildings and "pre-existing" land uses: 1. Accurate survey of property showing all property lines, streets, building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied, the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy - New dwelling $50.00, Additions to dwelling $50.00, Alterations to dwelling $50.00, Swimming pool $50.00, Accessory building $50.00, Additions to accessory building $50.00, Businesses $50.00. 2. Certificate of Occupancy on Pre-existing Building - $100.00 3. Copy of Certificate of Occupancy - $.25 4. Updated Certificate of Occupancy - $50.00 5. Temporary Certificate of Occupancy - Residential $15.00, Commercial $15.00 Date. New Construction: _)5& Old or Pre-existing Building: (check one) f Location of Property: J & a o� W j !C% House No. } Street Hamlet Owner or Owners of Property: l%l� bl S �)b6 01 Suffolk County Tax Map No 1000, Section ) 01 Block Lot - Subdivision Filed Map. Lot: Permit No. �.� �S Date of Permit. Applicant: Health Dept. Approval: Underwriters Approval: Planning Board Approval: Request for: Temporary Certificate Final Certificate: (check one) Fee Submitted: $ Applicant Signature Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, NY 11971-0959 11,14"" 'of soyo1 of � �tw �4UNTI,� BUILDING DEPARTMENT TOWN OF SOUTHOLD Telephone (631) 765-1802 Fax(631)765-9502 roger. riche rt(cD-town.southold.ny.us CERTIFICATE OF ELECTRICIAL COMPLIANCE SITE LOCATION Issued To: Weissbach Address: 350 Paddock Way City: Mattituck St: New York Zip: 11952 Building Permit #: 38868 Section: 107 Block: 4 Lot: 2.12 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: DBA: RJ CoraZini Electric License No: 33419 -ME SITE DETAILS Office Use Only Residential X Indoor Basement Service Only Commerical Outdoor X 1st Floor Pool New Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures HID Fixtures Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps , Transformer Appliances Dryer Recpt Emergency FixturesTime Clocks Disconnect Switches El Twist Lock Exit Fixtures H I TVSS Other Equipment: 19.180 Watt Photovoltaic System To Include, 6- Lumos LXS 250 and 68- Hundi S260 Panels with Micro Inverters, Combiner Boxes and A/C Disconnects. Notes: Inspector Signature: Date: May 28, 2015 Electrical 81 Compliance Form.xls OF SOUryolo C 6 � • �o courm,�c� OF SOUTHOLD BUILDING DEPT. TOWN 765-1802 INSPECTION [ ] FOUNDATION IST [ ] ROUGH PLUMBING [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING/ STRAPPING [ ] FINAL- [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] CAULKING. REMARKS: _ DATE � �� INSPECTOR Marc Weissbach, RA 2909 Frankel Boulevard Merrick, NY 11566 June 1, 2015 RE: Project Signoff for New Ground Mount and Trellis Solar Photovoltaic Arrays at 350 Paddock Way, Mattituck, NY Michael J. Verity, Chief Building Inspector Town of Southold Building Department Town Hall Annex Building P.O. Box 1179 Southold, NY 11971 Dear Building Inspector: Ell _; !I JUN - 2 2015 I J, bi_DG. DEPT Or SOU N00 1, Marc Weissbach, as the Registered Architect and Design Professional of Record for the New Ground Mount and Trellis Solar Photovoltaic Arrays, Permit #38868 at 350 Paddock Way, Map of District 1000, Section 107, Block 4, Lot 2.12, Mattituck, NY certify that: the ground -mount solar photovoltaic array was installed in general accordance with the permitted plans and with Schlettei's installation specifications, and the trellis solar photovoltaic array was installed in general accordance with the permitted plans and with Lumos Solar's installation specifications. The ground mount racking system was designed by Schletter, the racking manufacturer, to meet local code requirements. The trellis mount racking system was custom-designed, to meet local code requirements. I made visits and reviewed photographic documentation of the array installations during I New York State Architect License #025297 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL SOUTHOLD, NY 11971 TEL: (631) 765-1802 FAX: (631) 765-9502 SoutholdTown.NorthFork.net Examined , 20 Approved , 20L�( Disapproved a/c PERMITi7•6♦ BUILDING PERMIT APPLICATION CHECKLIST e� _X 2q,5 Building Inspector C' E nn] Do you have or need the following, before applying? Board of Health 4 sets of Building Plans Planning Board approval Survey Check Septic Form N.Y.S.D.E.C. Trustees Flood Permit/ Storm -Water Assessment Form Contact: H Mail to: PQAWV-4 NWD Phone: APR 2 g 2014 ICATION FOR BUILDING PERMIT Date a�-(•� , 2014 BLDG. DEPT. INSTRUCTIONS TOWN OF SOUTHOLD a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises,. relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application, the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e. No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim, the Building Inspector may authorize, in writing, the extension of the permit for an addition six months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County, New York, and other applicable Laws, Ordinances or Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances, building code, housing code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. U " U6PANCC.'Y NIAWFUL J r J tiY (1, 9 4 Atl 't A (Signature of applicant or name, if a corporation) (Mailing address of applicant) State whether applicant is owner, lessee, agent, architect, engineer, gqA "r&, & Bri an, plumber or builder 30 Name of owner of premises " >1 9 C (As on the ' PM FOR THE If applicant is a corporation, signature of duly authorized office1r,LLOV.1I;1JG INSPECTIO dS: 1. FOUNDATION - 1 bAj0 RcOUiRED (Name and title of corporate officer) FOR POURED CONCRETE ELECTMAL, 2. ROUGH - FRAMING, PLUMBING, STRAPPING, ELECTRICAL & CAULKING Builders License No. INSULATION Plumbers License No. 4. FINAL - CONSTRUCTION & ELECTRICAL Electricians License No. MUST BE COMPLETE FOR C.O. Other Trade's License No. ALL CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE CODES OF NEW 1. Location of land on which proposed work will be done: YORK STATE. NOT RESPONSIBLE FOR _ _ DESIGN(SaR��lVSTF.dIG'�v.F�s�rc House Number � Street County Tax Map No. 1000 Section Subdivision k OOH Ok- Qc� 1 RETAINI' ORM WATER RUNOFF PURIANT TOjrCHAPTER 2362 2 d� Block:., SOF,_ .=,7(lUll"rClf1�. Lot � ?fJl aifi.,tlti),J tif<" . 2. State existing use and occupancy of a. Existing use and occupancy` 3. L'1 5 b. Intended use and occupancy use and occupancy of proposed construction: Nature of work (check which applicable): New Building Addition Alteration Repair Removal Demolition Other Work �— �`C) u �o _-V (Description) Estimated Cost i 'D C) Fee s-�-v,S � k s� -�- k6Gj -; C, I- 51 S , S o) (To be paid on filing this application) If dwelling, number of dwelling units If garage, number of cars Number of dwelling units on each floor 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. _ " - 7. Dimensions of existing structures, if any: Front _ Rear Depth 1 _. Height Number of Stories Dimensions of same structure with alterations or additions: Front Rear Depth Height Number of Stories" 8. Dimensions 4f entir new ctn trsruuc on: Front �v _ Rear Height f ®- �`i ��'�, °u�c�. mber of Stories 0 �� Depth L 'IS ` 9. Size of lot: Front Rear Depth C `� 10. Date of Purchase --A>4 L5 7.nLOName of Former Owner �_bd 11. Zone or use district in which premises are situated 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO X 13. Will lot be re -graded? YES NO X Will excess fill be removed from premises? YES NO 14. Names of Owner of premises :2 l- U-XalS -Address t I lcM- III kkS% Phone No. 7102-1Q3 Name of Architect Address Phone No Name of Contractor Address Phone No. 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO * IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES_ NO K30t,.s * IF YES, D.E.C. PERMITS MAY BE REQUIRED. e>vi ppm 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. J�,T, 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES NO * IF YES, PROVIDE A COPY. STATE OF NEW YORK) SS: COUNTY OF �p,�yC ) I'?- C-, " being duly sworn, deposes and says that (s)he is the applicant (Name of individual signing contract) above named, (S)He is the (Contractor, Agent, Corporate Officer, etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be performed in the manner set forth in the application filed therewith. Sworn to before me this day of , I_...,M..,., '20- A 20— _ PuIVWry Public State 'Of • NelwYOrk I Signature of Applicant Qualified in Bronx County My Commission Expires 12/10! 1G Registration No 01JA6273399 ado Scott A. Russell SUPERVIS®R C SOUTHOLD TOWN HALL - P. O. Box 1179 16 Telephone #: (631) - 765 -1560 41- MICHAEL.COLLINS@TOWN.SOUTHOLD.NY.US James A. Richter, R.A. Michael M. Collins, P.E. 53095 Main Road - SOUTHOLD, NEW YORK 11971 Fax #: (631) - 765 - 9015 JAMIE.RICHTERQTOWN.SOUTHOLD.NY.US Office of the Engineer Town of Southold STORMWATER MANAGEMENT CONTROL PLAN REVIEW COVER SHEET ( TO BE COMPLETED BY THE APPLICANT) PLEASE NOTE: All Contact & Project Information Requested by this FORM is Nessary for a Complete Application. APPLICANT: (Property Owner, Design Professional, Agent, Contractor, Other) NAME: M -NRS— ADDRESS: `kms Telephone Numbenc\o L(ikA�6 _?10Z_12> PROPERTY OWNER: (If Different from Applicant) NAME: W� ADDRESS: Telephone Number: r::A (_Q (a;1 12 - Completed Applications can be picked tip at the Engineering Department after being notified by the Department, or; it can be Mailed to the Applicant with the submission of a Self Addressed 8.5' x I I" Envelope & Appropriate Postagei DATE: Property Address / Location of Construction Work: rSU D C*, W A SCTM#: 1000- q UZ- District Section Block Lot Reauired Documents for Stormwater Review: Copy of Complete Building Permit Application. Stormwater Management Control Plan. (2 Sets) Note: SMCP's are required whenever Grading or Excavations exceed 5,000 S.F, when New Impervious Surfaces are created, and/or when existing Roof Systems, Driveways, Patios or other Impervious Surfaces are Re -Surfaced. De Minimis Projects will NOT be Subject to the Submission of a SMCP During the Stormwater Review! Note: These Projects would be Limited to Interior Renovations, Replacement of exterior Doors & Windows, Deck Construction with Loose Fit Decking, Installation and/or Modification of Mechanical Systems or other similar Work. A Complete Description of the Scope of Work Proposed under the Building Permit Application. A rmmnlatarl Stnrmwater Review Checklist_ If No or NA are Indicated. Justification is Required. _._ .. FOR E G DEPARTMENT USE ONLY s I� Reviewed By: Date: App oved: 111 MMM���111 � F]Ad nal Information Required: I APPRoo eo C&' Q- GRcxaNQ Nou,ti l e o FWacynn s E, Sym Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, NK 11971-0959 Telephone (631) 765-11802 roger.rlc�lertAO 1.867605t95615.tlny.us BUILDING DEPARTMENT TOWN OF SOUTHOLD APPLICATION FOR ELECTRICAL INSPECTION REQUESTED BY: Date: Company Name: No.. No.. JOBSITE INFORMATION: (*Indicates required information) *Name: *Address: *Cross Street: *Phone No.: Permit No.: Tax -Map District: Jill 11 ww 621, 1000 Section: *BRIEF DESCRIPTION OF WORK (Please Print Clearly) Block: Lot: 2- , (Please Circle All That Apply) *Is job ready for inspection: YES/ NO Rough In Final To -you need a Temp Certificate: YES / O Temp Information (If. needed) *Service Size: 1 Phase 3Phase 100 150 200 300 350 400 Other *New Service: Re -connect Underground Number of Meters Change of Service Overhead / Additional information: PAYMENT DUE WITH APPLICATION 60 "O O 82=Request for Inspection Form 3 2-�F� GROUND MOUNT SOLARPHOTOVOLTAIC DISCLAIMER: ARC R' - ALL C0115TRUCTION 5HALL MEET THE Q, QO wfi/ CODE REQUIREMENT5 OF NEW YORK �Q' STATE. ._ }A ' of f S SYSTEM & TRELLIS MATTITUCK, NY March 26, 2014 REVISION: MAP OF DISTRICT 1000; SECTION 107; BLOCK 4; LOT 2.12 PV -1 00: PLOT PLAN PV -101 PV ELECTRICAL SITE PLAN PV -102 FULL ELECTRICAL SITE PLAN PV 200-OPT1 : UNIRAC ARRAY PLAN AND SECTION PV 200-OPT2 : SCHLETTER ARRAY PLAN AND SECTION PV -300 : FIELD ARRAY ONE -LINE DIAGRAM PV301: TRELLIS ARRAY ONE -LINE DIAGRAM A-100: GROUND PLAN AT TRELLIS A-101 :EXISTING AND PROPOSED SITE PLAN AT TRELLIS A-102: TRELLIS STRUCTURAL PLAN A-103: TRELLIS ELECTRICAL PLAN A-200: TRELLIS NORTH ELEVATION A-201: TRELLIS WEST ELEVATION A-300: TRELLIS SECTIONS A300: TRELLIS DETAILS APPENDDCA: FLOOD MAP APPENDIX B: SITE SURVEY SOUTHOLD APPLICATION DRAWINGS 103.26.2014 LIPA APPLICATION DRAWINGS 112.12.2013 PROJECT: SHEET: WEISSBACH'RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM COVER 350 PADDOCK WAY, MATTITUCK NY M. VAISH DATE: 03.26.2014 SCALE: AS NOTED LANDWARD Lil AIT OF TIDAL WETLANDS AS FLAC GED BY SEA LEVEL COON UNE 15,2002 LANDW RD LIMIT OF TIDALETLANDS AS INDICA ED ON FILED MAP LEGEND CENIC AND NATURAL PROJECT: FLOOD LIGHT, SURFACE DISCLAIMER: MOUNTED WATERPROOF GROUND -FAULT CIRCUIT WP INTERRUPTER OUTLET GFCI DRIVEWAY / PROPOSED DIRECT BURIAL CABLE, 400A SERVICE LOCATION OPTION #1 - NEW DIGITAL NET METER DATA TAKEN FROM YOUNG AND YOUNG SURVEY - 09/28/10. SC TAX MAP No# 1000 -107 - 04 2.12 ZONE AC. WOLF PIT POND ESTATES 8963, FILED 6.21.90 REFER TO FLOOD INSURANCE RATE MAP 36103CO14M 9.25.2009 CENIC AND NATURAL PROJECT: SHEET: DISCLAIMER: VEGETATION RETENTI BUFFER ALL CON5TRUCTION SHALL MEET THE Q,G XISTING FENCE WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM %FU COD Of NEW YORK 31 -5" 8.6 kW SCHANZ PROPERTY PV -101 EREQUIREMENT5 ,I,IP OUND MOUNT TRUST 5 GFO` PHOTOVOLTAIC 350 PADDOCK WAY, MATTITUCK NY ARRAY EXPANSION P OSED 13.26 kW 5 ROUND MOUNT PHOTOVOLTAIC SHEETTITLE: BY: M.VAISH ARRAY 1 PROPOSED AC PV DIRECT CHECKED BY: 1 BURIAL CABLES 28 - O" 03.26.2014 DATE: 03.26.2014 --/ PV ELECTRICAL SITE PLAN :EXISTING IFENCE " LIPA APPLICATION DRAWINGS 12.12.2013 SCALE: AS NOTED I PROPOSED 400A PANEL \\ .PROPOSED DIRECT BURIAL CABLE, LOCATION OPTION #2 - 110A SERVICE NEW DIGITAL NET \ EXISTING METER 6'.. ";?:i:•. \\ O A8'ANA" EXISTING METER TO \\ BE REMOVED \\ 1 I WETLANDS AND NATURAL FXIS /7NG:HOLI 100 II RETENTION BUFFER NEW TRELLIS PROPOSED 2.34 kW TRE MOUNT PHOTOVOLTAIC :EXISTING GARAGE;;:, I ARRAY I 6Z-10" J "19- 19-FIRM FIRMZONE, BOUNDARY LINE EXISTING _ SCALED FROM THE FLOOD FENCE INSURANCE RATE MAP FUTURE DC PV DI ECT BURIAL - - PROPOSED 110A PANEL 36103CO143 G - MAY 41 1998. \ ^ ZONE AE [EL = 111. v \ CABLES PROPOSED 2.5 kW PV INVERTER DRIVEWAY / PROPOSED DIRECT BURIAL CABLE, 400A SERVICE LOCATION OPTION #1 - NEW DIGITAL NET METER DATA TAKEN FROM YOUNG AND YOUNG SURVEY - 09/28/10. SC TAX MAP No# 1000 -107 - 04 2.12 ZONE AC. WOLF PIT POND ESTATES 8963, FILED 6.21.90 REFER TO FLOOD INSURANCE RATE MAP 36103CO14M 9.25.2009 REVISION: PROJECT: SHEET: DISCLAIMER: E /`SSB �!' ALL CON5TRUCTION SHALL MEET THE Q,G WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM COD Of NEW YORK 4 9y PV -101 EREQUIREMENT5 350 PADDOCK WAY, MATTITUCK NY SHEETTITLE: BY: M.VAISH N CHECKED BY: 1 SOUTHOLD APPLICATION DRAWINGS 03.26.2014 DATE: 03.26.2014 PV ELECTRICAL SITE PLAN 0 LIPA APPLICATION DRAWINGS 12.12.2013 SCALE: AS NOTED ti UNIRAC TOPMOUNT END CLAMP 11-1 13'-72' LG 260SlC-A3 MODULE UNIRAC SOLARMOUNT HD RAIL UNIRAC ALUMINUM CAP ARCHI R�' G %\N%\NE ISSB ��� Q O g 92 C0� z 2�g,*, �F N v REVISION: PROJECT: \NEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 9 -14' UNIRAC TOPMOUNT 2" DIA. SCH. 40 GALVANIZED STEEL SHEET TITLE: ARRAY PLAN AND SECTION - UNIRAC MID CLAMP PIPE, PER UNIRAC ENGINEER SPEC CHECKED BY: 1 SOUTHOLD APPLICATION DRAWINGS 03.26.2014 DATE: 03.26.2014 0 UNIRAC TOPMOUNT 12.12.2013 SCALE: AS NOTED END CLAMP UNIRAC ALUMINUM SLIDER 3 , CONCRETE FOOTING 36" DIAMETER, 46" DEEP �k X11,{ �ti (5j €.I^^ Ift t`� I1; a ili t= t_.r. EI 11-4 .i; - t=I t--}! RACKING SPECIFICATIONS; I FOUNDATION TYPE: SYSTEM TO BE EMBEDDED IN CONCRETE FOUNDATIONS. I MATERIAL: ALUMINUM, POST CONSISTING OF GALVANIZED STEEL, HARDWARE IS STAINLESS STEEL (METRIC) REINFORCED CONCRETE FOUNDATIONS: 3'-0" DIAMETER X T-10" DEEP /� NUMBER OF POSTS PER RACK: 30 ARRAY SECTION GROUND CLEARANCE MODULES: 2'-0" � I 1/4" = 1'-0" I 1 s gg� � ,,CIA X DISCLAIMER: _ ALL THE CODE NSTP MIEONT5 ANEW MEET ORK C- STATE. ARCHI R�' G %\N%\NE ISSB ��� Q O g 92 C0� z 2�g,*, �F N v REVISION: PROJECT: \NEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM SHEET: PV-200-OPT1 350 PADDOCK WAY, MATTITUCK NY SHEET TITLE: ARRAY PLAN AND SECTION - UNIRAC BY: M.VAISH CHECKED BY: 1 SOUTHOLD APPLICATION DRAWINGS 03.26.2014 DATE: 03.26.2014 0 LIPA APPLICATION DRAWINGS 12.12.2013 SCALE: AS NOTED SCHLETTER ALUMINUM LG 260S1C-A: SCHLETTER ALUMI SCHLETTER GALVANIZ CONCRETE 24" DIAMETER, RACKING SPECIFICATIONS; FOUNDATION TYPE: SYSTEM TO BE EMBEDDED IN CONCRETE FOUNDATIONS. MATERIAL: ALUMINUM, POST CONSISTING OF GALVANIZED STEEL, HARDWARE IS STAINLESS STEEL (METRIC) REINFORCED CONCRETE FOUNDATIONS: 2'-0" DIAMETER X T -T' DEEP NUMBER OF POSTS PER RACK: 11 GROUND CLEARANCE MODULES: 2'-0" ARRAY SECTION 2 1/4„ = 11-01, �A� NORTH ARRAY PLAN ® 1/8"=V-0" DISCLAIMER: ARCHITECT:REVISION: PROJECT: SHEET: ALL CONSTRUCTION SHALL MEET THE CODE REOUIREMENT5 OF NEW YORK ��g�EREp �� �yG wzlo' "— WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM PV-200-OPT2 350 PADDOCK WAY, MATTITUCK NY STATE. �Q Sm 9 n SHEET TITLE: BY: M. VAISH CHECKED BY: � O 1 SOUTHOLD APPLICATION DRAWINGS 03.26.2014 DATE: 03.26.2014 se 97 ARRAY PLAN AND SECTION - SCHLETTER OA. AS NOTED APPA -4 ISCALE: 0 LIPA APPLICATION DRAWINGS 12.12.2013 EXTERIOR I INTERIOR AT HOUSE 400A SERVICE PANEL W/ 100A PV CIRCUIT BREAKER e UTILITY M SERVICE I � EXTERIOR (EXTERIOR FROM ARRAY AT ARRAY TO HOUSE IAC PV SUBPANEL 240V, 100A W/ 3 20A BREAKERS PV ARRAY INFORMATION: RATED POWER (DC): 13.26 kW RATED POWER (AC): 11.545 kW NUMBER OF MODULES, TOTAL: 51 NUMBER OF MODULES IN SERIES: 1 NUMBER OF PARALLEL CIRCUITS: 51 IN 3 SETS OF 17 EACH LOWEST EXPECTED AMBIENT TEMPERATURE: -22" C HIGHEST CONTINUOUS AMBIENT TEMPERATURE: 29'C PV MODULE MODULE MANUFACTURER: MODULE MODEL#: RATINGS AT STC MAX POWER POINT CURRENT (Imp): MAX POWER -POINT VOLTAGE (Vmp): OPEN CIRCUIT VOLTAGE (Voc): SHORT-CIRCUIT CURRENT (Isc): MAX SERIES FUSE (OCPD): MAX POWER (Pmax): MAX SYSTEM VOLTAGE: Voc TEMP COEFF: INVERTER INVERTER MAKE: INVERTER MODEL #: MAX DC VOLT RATING: MAX DC SHORT CIRCUIT CURRENT: MAX POWER @ 40" C: NOMINAL AC VOLTAGE: MAX AC CURRENT: MAX UNITS PER 20A BRANCH CIRCUIT: DISCLAIMER: ALL CONSTRUCTION SHALL MEET THE CODE REQUIREMENTS OF NEW YORK STATE. LG LG260SlC-A3 8.38 A 31.1 V 38.1 V 9.05 A 15A 260 W 1000 V -0.31 %/"C ENPHASE M215 M215-60-2LL-S22 @ 240 VAC 45 V 15A 215 W 240 V 0.9 A 17 NEC 2008 LABELING REQUIREMENTS: UTILITY INTERACTIVE INVERTER (690.5) - WARNING: ELECTRIC SHOCK HAZARD IF A GROUND FAULT IS INDICATED. NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. INVERTER (690.54) WARNING: ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN OPEN POSITION WARNING: DISCONNECT IS ENERGIZED FROM TWO SOURCES -- SOLAR SYSTEM AND UTILITY GRID AC OPERATING VOLTAGE: 240 V MAXIMUM AC CURRENT PER MODULE: 1.04 A AC PV SUBPANEL (690.54) WARNING: DISCONNECT IS ENERGIZED FROM TWO SOURCES -- SOLAR SYSTEM AND UTILITY GRID AC OPERATING VOLTAGE: 240 V MAXIMUM AC CURRENT PER STRING: 15.3 A AC CIRCUIT BREAKER (690.64) WARNING: CIRCUIT BREAKER IS ENERGIZED FROM TWO SOURCES -- SOLAR SYSTEM AND UTILITY GRID AC OPERATING VOLTAGE: 240 V MAXIMUM AC CURRENT: 45.9 A (E) EQUIPMENT SCHEDULE: - - - - - - - - - - - - - - - ii (1) (1) JL -I (5) AC PV SUBPANEL: 240V 100A NEMA 3-R W/ THREE (3) 2 -POLE 20A BREAKERS - MIDNIGHT SOLAR MNSPD-300 SURGE PROTECTION DEVICE (7) SERVICE PANEL: (1) PV MODULE: LG 260W (2) MICRO INVERTER: ii (1) (1) JL -I (5) AC PV SUBPANEL: 240V 100A NEMA 3-R W/ THREE (3) 2 -POLE 20A BREAKERS - (1) PV MODULE: LG 260W (2) MICRO INVERTER: ENPHASE M215 (3) AC JUNCTION BOX (4) MULTI -CIRCUIT AC JUNCTION BOX (5) AC PV SUBPANEL: 240V 100A NEMA 3-R W/ THREE (3) 2 -POLE 20A BREAKERS (6) SURGE PROTECTOR: MIDNIGHT SOLAR MNSPD-300 SURGE PROTECTION DEVICE (7) SERVICE PANEL: 400A SERVICE, W/ ONE (1)100A PV CIRCUIT BREAKER WIRE SCHEDULE: (A) INVERTER OUTPUT CIRCUIT: (B) INVERTER OUTPUT CIRCUIT: (C) INVERTER OUTPUT CIRCUIT: (D) INVERTER OUTPUT CIRCUIT: (E) NEW DC GEC: REVISION: J 12/3 (ENPHASE ENGAGE CABLE) #10 AWG THWN-2 COPPER, #6 BARE COPPER GROUND, IN %" EMT 3x#2 AWG THWN-2 COPPER, #6 BARE COPPER GROUND, IN 2 Y2" PVC BURIED 18" BELOW GRADE (OR EQUIVALENT CODE -COMPLIANT DIRECT -BURIAL WIRE) 3x#2AWG THWN-2 COPPER, #6 BARE COPPER GROUND, IN 2 Y" PVC 1x#6 BARE COPPER GROUND 1 I SOUTHOLD APPLICATION DRAWINGS 1 03.26.2014 1 LIPA APPLICATION DRAWINGS 12.12.2013 PROJECT: WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 350 PADDOCK WAY, MATTITUCK NY FIELD ARRAY ONE -LINE DIAGRAM SHEET: PV -300 BY: M. VAISH CHECKED BY: DATE: 03.26.2014 SCALE: AS NOTED PV ARRAY INFORMATION: RATED POWER (DC): 2.34 kW RATED POWER (AC): 2.01 kW NUMBER OF MODULES, TOTAL: 9 NUMBER OF MODULES IN SERIES: 9 NUMBER OF PARALLEL CIRCUITS: 1 LOWEST EXPECTED AMBIENT TEMPERATURE: -22° C HIGHEST CONTINUOUS AMBIENT TEMPERATURE: 29° C PV MODULE MODULE MANUFACTURER: MODULE MODEL #: RATINGS AT STC MAX POWER POINT CURRENT (Imp): MAX POWER -POINT VOLTAGE (Vmp): OPEN CIRCUIT VOLTAGE (Voc): SHORT-CIRCUIT CURRENT (Isc): MAX SERIES FUSE (OCPD): MAX POWER (Pmax): MAX SYSTEM VOLTAGE: Voc TEMP COEFF: INVERTER INVERTER MAKE: INVERTER MODEL #: MAX DC VOLT RATING:. MAX DC SHORT CIRCUIT CURRENT: MAX POWER @ 40° C: NOMINAL AC VOLTAGE: MAX AC CURRENT: DISCLAIMER: ALL CON5TRUCTION SHALL MEET THE CODE REGUIREMENT5 OF NEW YORK STATE. LUMOS SOLAR LSX260-60M-C 8.57 A 30.3 V 37.6 V 8.94 A 15A 260 W 1000V -0.35 %/°C SMA AMERICA SB 2500HFUS-30 - 240VAC 600 V 15A 2750 W 208 V 12.0 A ,1�, =D SSB�� O g� l o�. 9= AAXRIORTHOUSEI INTERIOR I FREXTERIOR GARAGE IAATGGARIOR RAGE 400A TO HOUSE I SERVICE PANEL GARAGE I SUBPANEL (8) I I 240V, 100A W/ 1 20A PV BREAKER UTILITY M SERVICE (7P y y (C) I (C) I (B) I DC DISCONNECT (D) 1 STRING OF 9 X 260W INTEGRAL WITH MODULES IN SERIES INVERTER 2.5 kW INVERTER AC DISCONNECT (1) n (2) (3) 1 F (4) NEC 2008 LABELING REQUIREMENTS: DC DISCONNECT DC OPERATING CURRENT: 8.94A DC OPERATING VOLTAGE: 40.89V MAXIMUM SYSTEM VOLTAGEA49.79V SHORT CIRCUIT CURRENT:13.97A UTILITY INTERACTIVE INVERTER (690.5) WARNING: ELECTRIC SHOCK HAZARD IF A GROUND FAULT IS, INDICATED. NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. INVERTER (690.54) WARNING: ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN OPEN POSITION WARNING: DISCONNECT IS ENERGIZED FROM TWO SOURCES -- SOLAR SYSTEM AND UTILITY GRID AC OPERATING VOLTAGE: 240 V MAXIMUM AC CURRENT: 10.4 A AC CIRCUIT BREAKER (690.64) WARNING: CIRCUIT BREAKER IS ENERGIZED FROM TWO SOURCES — SOLAR SYSTEM AND UTILITY GRID AC OPERATING VOLTAGE: 240 V MAXIMUM AC CURRENT: 10.4 A EQUIPMENT SCHEDULE: (OV MODULE: LUMOS SOLAR LSX260-60,-C 260W, 9 IN SERIES (2) DC DISCONNECT: INTEGRAL WITH INVERTER (3) INVERTER: SMA AMERICA SB2500HFUS-30-240VAC (4) AC DISCONNECT: 30A AC DISCONNECT (5) GARAGE SUBPANEL: 240V 100A NEMA 3-R W/ ONE (1) 2 -POLE 20A BREAKER FOR PV (6) SURGE PROTECTOR: MIDNIGHT SOLAR MNSPD-300 SURGE PROTECTION DEVICE (7) SERVICE PANEL: 400A SERVICE WIRE SCHEDULE: (A) INVERTER OUTPUT CIRCUIT: (B) INVERTER OUTPUT CIRCUIT: (C) INVERTER OUTPUT CIRCUIT: (D) NEW DC GEC: REVISION: #10 AWG THWN-2 COPPER, #6 BARE COPPER GROUND, IN 3/y" EMT #10 AWG THWN-2 COPPER, #6 BARE COPPER GROUND, IN 3/a" EMT DIRECT BURIAL CABLE BY OTHERS 1x#6 BARE COPPER GROUND SOUTHOLD APPLICATION DRAWINGS LIPA APPLICATION DRAWINGS PROJECT: WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 350 PADDOCK WAY, MATTITUCK NY SHEET TITLE: 03.26.2014 1 TRELLIS ARRAY ONE -LINE DIAGRAM 12.12.2013 SHEET: PV -301 BY: M. VAISH CHECKED BY: DATE: 03.26.2014 SCALE: AS NOTED B - A201 A - 1 2 A200 ' I _I ..... I I —� ... ... ••..•.•.•.•.•.'.•.• • ...... ,. ... . N � p � 2 ..••...• z F- D :: ••• .. w r--, _I _CL --- I I :...........:... . ................ . I I _ I n F1 n n n n n n n n n n n n n n n n n n n ItI n I I 1,1 I I I I 11 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 I I I I LI I II I II II II II II II II II II II II II II II II II II I II II 11 11 II II 11 I r 1 r ---i -- r --j r- I_ r LJ L_J L--FL--J L_J L_J L -J L_ Ll I I I I I I I I S I I I I I I i t S I I III I I III III I I I I I I I I I I I I I I I IIII I I I I I I I I S I I I I I I I I S I I III I I III III I I I I I I I I I I I I I II 11 I I I I I I I I I I _I I I I I I I I I I _I I I I I I __I I__11Irr I III I I I I I I I I I I I I I I II11 I I•. I I II --CC_IZ+ -- --O-•1-LC �=--D--1`� III I I I I I I I I I I I I IIII_-1 I I I I I I� I I I I I I I I I I I I I I II 11 I I I I III n --1-I -TT--I-1 r -1Z --I- -Tr n- rr-77--In- I I I I I I I I I I I I I I I I I I I I I 1111117--I I I I 4I -- I I I I I I I I I I I I II I I I I I I VIII a2_J� .CC_11.t J__LC_11 _LJ_t1L �11__D--1J7 III I I I I I I I I I I I I I VIII I I II IIII II II II IIS II II II II SII III II III III II II II II II II I II 11 II I I IIII I I I I I I I I I I I I I I I I I S I I I I I I I I III I I I I I I I I I I I I I II 11 I I II ii11 ii ii II 1I ii ii ii II 11 Iii ii lii 11 II ii ii ii II II i ii ii ii -n-err �rrt==n-= r� III I I I I 11 I I I I I I I IIII I I I I I'I a_ IT 'T-7-774 I I I I -nl-+r � � -r I i I III I I I I I I I I I I I I 11 11 uLE I I I L-h--rrr-i4--Irr 1 I 1 1 11 1 1 I I 11 1 1 1 11 1 I I I I I U --L _1 J_L_JJ --U- I I I I I I I I I I I I I I I 1111 I I I I 111r -I I I I I I I 1 1 I I �� I I I 1,III a2_�Z -C= DC==LC= 2..D-ZC=C===D_= D III I I I I I I I I 11 I I V I I I 11 I I IIII 1 1 1 1 1 1 11 1 X 1 1 1 1 I I 1 1 X 1 1 1 1 I I 1 1 i 1 1 I I 1 1 I I I I I I 1 1 I 11 1, 1 1 I I 11 II III � 11 11 11 11 X11 11 11 p1 III II 11 II II II II IIII I I I 11 11 11 11 II II II X11 11 11 11 11 II II 11 11 11 II I rtr-1-r--rr- t --h- rr--r--rl-- 1 n �_--rr- r�-r+rr-� I I I r-� r-� r- I r-� r-� r-�I r-� r r L � =J-C=� _ �_ - —J -C -fit �t-�-!__ - J L_J L_J L_J L_J L_J L J L_J L I I� .. . I�LIL,.i._.I .. .I L...I L...I I...I I ..I 1...I I...I ..... .U.'.`.'. ....U.'. .U.'.'.'.U.'.' '.U'..' .'.'.'U ".'.'U.' '.' LJ.'.' .U.'...U.'.'..0 ..'. U' '..'U .'.'.'U'.'.'.'U.'.'. LJ..'.'.U.'.`.'.U.'.'.".U.'..'. ..: . ....... ''''.:.........:....:.....:..:.:...:..........:...:..:.:....:........' ' '.'..........................:.................................................... . �'..... .... . .... ... ... . _ _ - - _ PV MO 2 A3 _ 0 - - - ......................:..............I ..."..'...'.'-'.'......... . ....._ ..... .... :.:.. ..... . ....... .,.... .. ..........: ..... ...... ..... ...... . . ... .. I I EKED AAC DISCLAIMER: ALL CON5TKUCTION 5HALL MEET THE CODE REQUIREMENTS OF NEW YORK STATE. AR S �' G 69� (� 5 D 1 O� 2529 .� P N P J 111 s EL WOOD STONE CONCRETE VENEER II�TIL-I � IIIIIIIllJJI gm S EARTH GRAVEL GRASS PAVING REVISION: PROJECT: WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM SHEET: A100 350 PADDOCK WAY, MATTITUCK NY SHEET TITLE: GROUND PLAN BY: M. VAISH, A. KURCHENKO _ CHECKED BY: 1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014 DATE: 03.27.2014 0 LIPA APPLICATION DRAWINGS 12.12.2013 SCALE 1:50 DISCLAIMER: ALL CONSTRUCTION ShALL MEET THE CODE REQUIREMENTS OF NEW YORK STATE. IIT �XAED �5 NI E 18,9 ��` C, e9 �� I '%%% EXISTING STRUCTURE REVISION: I PROJECT: WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 350 PADDOCK WAY, MATTITUCK NY SHEET: A101 `d SHEET TITLE: BY: M. VAISH, A. KURCHENKO ����� oe25 29'� PROPOSED DESIGN 1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014 SITE PLAN EXISTING STRUCTURE VS. PROPOSED DESIGN CHECKED BY: DATE: 03.27.2014 SCALE 1:50 �OQ� O N r 0 LIPA APPLICATION DRAWINGS 12.12.2013 DISCLAIMER: ALL CON5TRUCTION 5HALL MEET THE CODE REQUIREMENT5 OF NEW YORK 5TATE. I F-1 n n n n n n n n n n n n n n n n II II II I II II II II I II II II II I II II II II I II II II II II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I fro" �I, II II I II II II II I II II II Ifi II II II II II I II II 11 _ _ _ _ I �' - - - �_�-� _ - - �✓_�_ _ - _ 1 r- l r- - - 1 ( I - LJ L �L- LL_1L JELL- 1-J L �1�J!!!!L�•'1�1� IJ L_J L L_J L J ILS J LJ I - -- - - -- - -- -t ®_t•'"Lt'�' III I I I I I I I I I 1 3 1 1 I V f! I! I I I I I I I I I I I I I I- I I I I III I I I I I I I I I I I I I I l 1 I I III I I I I I I I I 9F1 I I I, I I I I I QFGI I I I I I I I I I I I I I I I I I I I I 1 III I I 7'T---7-77-77- 7T-17---1--7T--Ll --TT n TI a I I I I III OIL—2­1r- 1 I- I I ! -I I _- I I - I --I I-+ I `Islr� U_ ®i-9 LI. III I I I I I I I I 11111 I 7 I I I I I I I I I I I I I I I I`NI I 1 1 11,111 I I I I I � I I I I I � I I 1 1 I I I I I I I I I I I I I I I I I I 11,11 I I I I II 111 I I I I I � I I I I I � i I f .III I I I I I I I I I I I I I 11�1� I I I I 11 I I I I I I I I I I I I t l 1 I I I I I I I I I I I 11sll i Lr r_ I I I I1L I I7-11 I I I I 1 1 I F -- r-rtr--I� tr--1'Y-- PV MODULE kBOVE I 11111 J1L_1 �11_--i1 -- I I I I I I I I I I I I 11111 I I 11 ,,;. I1 m�t1 ! 1 ri til E I I __:C I l i I I I I I I I I I I I II iii PV STR NGING I I j I I jl QL_ �_-_ Z"° f�__=� OO-E"-�°j+ '-�°1Z-- --=°D jII I 11 I{ir( 1" PVC CO DUIT I l j I I I I I I I II I I 1 1 111 I I I 1 I III I I I I I I I I I 11 I #,1 1 I I 1 I 3/4" PVC CONDUIT I I I I I I ��, 1 I I II 11 II II 11 II i1 II II II II II I I I l I ( I, ,jll1 :' �r>.�.rr >w re r.�''1. "`qI� 'I'asw $ 1. ``• "``aN "�I. .`''i3 r 1 — em 1- — — — "1'f—'T T a_ �f F -I tet" �t tai t ILEI J L J L J J 1 __�� -u_� - _- - .,;Jim lJ P -I• + h - I-1- -� F- ti - I+ - + i- -H - FFTO I i --F -� f-- -I-I - i- +. -i-1- ,-+ - GRASS. PAVING .. . ." , .. .1 I .I' :.; .I .. i ; I �., • u....u.. :I I I I I f 1 I 1.1 .: 1 I .� u u LJ >� . �. 1 u Wp 1" PVCCONDUIT : ::. ......... . L.. t :.:: :::: .. .. 3/4 PVC CONDUIT ::.::::::.:::::.:::::.:::::.::::::.:.::... ::: G C .' ::::::::..::':.:::::.: :''.'.'.'.'.'.'..'.'.'.'.......'I'.'I .. ..... . .. ..... ........................I. .......:....................:.:....;....'....'.'.'.'.. I .. ::::.:::::::::::...:::;.;::::::............:.::.:::.:::::..:: ...GFI.. . _. .. .......... ...... ... ....:::: .::.: ...::.::::: .... .............. ............... ... ......... :::' ' :::::::' '........ ...... . ...'.'....... LOCATION OF UNDERGROUND ... ..1::I ::..:::.. ..... . .....:.::..... .:::: '.::::.::... ............ . : ' CABL5/CONDUIT 1NTERFAC8. I: '. ............•. •.....................�...� �.�,:. .�.� ..,.:... .. ... . .. .... .... .. ... .. ... ...... ..... ..... ... ..... ....: ...... ...... ...:. .. .. ,. ..... .. . . ... -. .. - ...I. ... ............ .:.:'.'....'..'..::.............:':':.::'::........... . ,•.. , ...... ..... ..... ......... :'::::':::...:.::.:..................... • ... • , .. • _ .: FOR DETAIL.SEESITE PLAN).... ,...........,........,..,.` .......... ..... ..... .. .. .. ....... ..... ................: - ... ... .. ... ......... ... .., ... .. ':':...:.:.:':':'::I::I::':.:':':..::.'.'::::::::'::::::::::':':':::::.:':':::::::::.::: .............. I.I . ..I I.l .I .'.. .............. :::: ::.::::: ::::::::::: :::::: ... ... ... .... ... .., .. ...... ..... ... ..... ............... .I..:. ... ........., ........... .................. ... ...'. ...... ...... ..... .... ......:::............................ .............. �. _... .................. : .. ... ..... .. .... .. ..L.. .. . . . 7 E IS 5 REVISION: 1 I1 SOUTHOLD APPLICATION DRAWINGS 103.01.2014 I 0 1 LIPA APPLICATION DRAWINGS 12.12.2013 PROJECT: WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 350 PADDOCK WAY, MATTITUCK NY ELECTRICAL PLAN W 0 0 z W SHEET: Al 03 BY: M. VAISH, A. KURCHENKO CHECKED BY: DATE: 03.27.2014 SCALE 1:50 FFTO GRASS. PAVING ELECTRICAL OtFnHr f� REVISION: 1 I1 SOUTHOLD APPLICATION DRAWINGS 103.01.2014 I 0 1 LIPA APPLICATION DRAWINGS 12.12.2013 PROJECT: WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 350 PADDOCK WAY, MATTITUCK NY ELECTRICAL PLAN W 0 0 z W SHEET: Al 03 BY: M. VAISH, A. KURCHENKO CHECKED BY: DATE: 03.27.2014 SCALE 1:50 VENEER B[ UESTONE PAVING SAND 4' CONCRETE SLAB -1 16" D.C. TYP. I - r�— I — I — p off Structure I - m-, TT - - 10--0-'30 --Top .2f—c.­0!­urT!n--& 8'-2" OLAR PV MODULE V RAIL BOLTED TO RAFTER Top of BBQ Island 3--d- _[oEqf CoILLmn Pedestal 2'- 0" _lop of Be ch viiiiiiiiiiiiiiii1' —Ground Level x � W R A mg, Ww REVISION: 1 1 1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014 10 1 LIPAAPPLICATION DRAWINGS 12.12.2013 PROJECT: WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 350 PADDOCK WAY, MATTITUCK NY NORTH ELEVATION Foundation Wall -3' Footing 4-4" SHEET: A200 BY: M. VAISH, A. KURCHENKO CHECKED BY: DATE: 03.27.2014 SCALE 1:30 DISCLAIMER: ALL CONSTRUCTION SHALL mEffr THE CODE REQUIREMENT5 Of NEW YORK STATE. top 0,21529 FN REVISION: 1 1 1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014 10 1 LIPAAPPLICATION DRAWINGS 12.12.2013 PROJECT: WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 350 PADDOCK WAY, MATTITUCK NY NORTH ELEVATION Foundation Wall -3' Footing 4-4" SHEET: A200 BY: M. VAISH, A. KURCHENKO CHECKED BY: DATE: 03.27.2014 SCALE 1:30 N 4'�C ET S M iff Top of PV Top of Structure 101-0"--& Top pf_Column __& 8' -2 - Top of BBQ Island 3'-0" TopColumn Pedestal 2'- 0" 'JF Top of Bench V -111--s Top of Patio 01-6. Foundation Wall m-, -3- Footing -4- - 4" DISCLAIMER: ARCHITEC Amq REVISION: PROJECT: ALL CON5TPUCTION SHALL MEET THE CODE REQUIREMENTS Of NEW YORK 14F-I'ss El WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM — 350 PADDOCK WAY, MATTITUCK NY STATE. cp a y STEEL WOOD STONE CONCRETE VENEER I SHEET TITLE: III—ll— 0 29 H EARTH GRAVEL SAND GRASS WEST ELEVATION 1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014 (OF =Q7- ELECTRICAL OUTLET 0 LIPA APPLICATION DRAWINGS 12.12.2013 SHEET: A201 BY: M. VAISH, A. KURCHENKO CHECKED BY: DATE: 03.27.2014 SCALE 1:30 VENEER CONCRETE WALL AND F❑❑TING 1 c" of I ICCTfI AIC 2 ---- ----- — Top of Structure 10'-0" N �l l l _ To of Column 8' - 2" I I II 11 4"x8" RAFTER II II 3/8"-16 Thread, II II 10" LONG LAG BOLT II . II Ih II 2.5" SS BOLT II I 8"x16" GIRDER IF I II II 8"x8" BEAM II II II II STEEL BRACKET II It II II 1/2" SS BOLT II I II II STEEL LOLLY COLUMN lil II I II ❑UND FIBERGLASS II CAST COLUMN II II II II 3/4" PVC CONDUIT II II 1" PVC CONDUIT II II II II II II ISI II II II II II II II I.I II Top of Column_ Pedestal 2'-0" ALL CON5TPUCTION 5HALL MEET THE CODE REQUIREIVIENT5Of • IA�,�IAI II • iii I...I..I. Top of Bench-& 1' - 1" Top of Patio 01-0" 2 ------------ Top of Structure 10'-0" l _ Top of Column Le 4"x8" RAFTER 8' - 2.. I I II PI 3/8"-16 Thread, 10" LONG LAG BOLT Ij II 8°x16" GIRDER II II 8"x8" BEAM I I 01 II II STEEL BRACKET II II II II 1/2" SS BOLT II li I� • II STEEL LOLLY COLUMN II II Ij II ❑UND FIBERGLASS CAST COLUMN II lil 1" PVC CONDUIT II II II II 3/4" PVC CONDUIT II II II II LfBLUESTONE ° BLUESTONE II lil II IIOUNTAIN LEDGE STONE ENEER II II II II❑NCRETE II 14ALL AND F❑❑TING II II PAVING AND " CONCRETE SLAB I II I Top of Column Pedestal 2'-0" 2 SECTION AT COLUMN Scale 1:20 REVISION: PROJECT: ISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 350 PADDOCK WAY, MATTITUCKNY Top of Beneh� Ground Level 0'-0" SHEET: A300 SHEET TITLE: BY: M. VAISH, A. KURCHENKO CHECKED BY: 1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014 SECTIONS DATE: 03.27.2014 0 LIPA APPLICATION DRAWINGS 12.12.2013 SCALE: AS NOTED I1 I L_ T a �• I '' 1 1 1 p •. a• ; " a f N 1 `1 � - " j�SECTIJON AT COLUMN 20 ALL CON5TPUCTION 5HALL MEET THE CODE REQUIREIVIENT5Of • IA�,�IAI II • iii I...I..I. Top of Bench-& 1' - 1" Top of Patio 01-0" 2 ------------ Top of Structure 10'-0" l _ Top of Column Le 4"x8" RAFTER 8' - 2.. I I II PI 3/8"-16 Thread, 10" LONG LAG BOLT Ij II 8°x16" GIRDER II II 8"x8" BEAM I I 01 II II STEEL BRACKET II II II II 1/2" SS BOLT II li I� • II STEEL LOLLY COLUMN II II Ij II ❑UND FIBERGLASS CAST COLUMN II lil 1" PVC CONDUIT II II II II 3/4" PVC CONDUIT II II II II LfBLUESTONE ° BLUESTONE II lil II IIOUNTAIN LEDGE STONE ENEER II II II II❑NCRETE II 14ALL AND F❑❑TING II II PAVING AND " CONCRETE SLAB I II I Top of Column Pedestal 2'-0" 2 SECTION AT COLUMN Scale 1:20 REVISION: PROJECT: ISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 350 PADDOCK WAY, MATTITUCKNY Top of Beneh� Ground Level 0'-0" SHEET: A300 SHEET TITLE: BY: M. VAISH, A. KURCHENKO CHECKED BY: 1 SOUTHOLD APPLICATION DRAWINGS 03.01.2014 SECTIONS DATE: 03.27.2014 0 LIPA APPLICATION DRAWINGS 12.12.2013 SCALE: AS NOTED 3 SECTION PLAN DETAIL AT COLUMN Scale: 1"=l' -O" DISCLAIMER: ALL CON5TRUCTION 5HALL MEET THE CODE REQUIREMENT5 OF NEW YORK STATE. FRED n= JMN STONE j • �i ELECTRICAL OUTLET 2' E 44 5-1/2" Top of Structure 10'-0" 7 7-1/2" 3/8" -16 THREAD, 10" LONG LAG BOLT 4"x8" RAFTER 8„ 2.5" SS BOLT - Top of Column -50 I I: ill g 8'-2" I I 8"x16" GIRDER 8"x8" BEAM ROUND FIBERGLASS CAST COLUMN I I I I STEEL LOLLY COLUMN 2 SECTION DETAIL AT TOP OF STRUCTURE Scale: 1-1/2"=V-0" 2' 4" - _ _ _ Top of Structure 10'-0" 3-1/2" 4" 4"x8" RAFTER 3/8" -16 THREAD, 10" LONG LAG BOLT 2.5" SS BOLT 8"x8" BEAM STEEL BRACKET _ lop of Column III I I I I I I II rl I I I I I I ROUND FIBERGLASS CAST COLUMN I I I I STEEL LOLLY COLUMN I I I I SECTION DETAIL AT TOP OF STRUCTURE Scale: 1 -1/2"=l' -O" REVISION: PROJECT: WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM 350 PADDOCK WAY, MATTITUCK NY SOUTHOLD APPLICATION DRAWINGS 103.01.2014 LIPA APPLICATION DRAWINGS 12.12.2013 DETAILS SHEET: A500 BY: M. VAISH, A. KURCHENKO CHECKED BY: DATE: 03.27.2014 SCALE AS NOTED Q FEMA MAP - COUNTY 2 NTS NOTE: ZONE X DOES NOT CROSS INTO PROPERTY LINE LOCATIONS OF PROPOSED WORK WEISSBACH PROPERTY LINE 1 FEMA MAP - PROPERTY NTS DISCLAIMER: ARCHITEREVISION: �C'7 PROJECT: SHEET: ALL CON5TRUCTION 5tIALL MEET THE CODEREQUIREMENT5 OF NEW YORK �\ G W E 1,3 ij� Q� S WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM5TAT APPENDIX A 350 PADDOCK WAY, MATTITUCK NY SHEET TITLE: BY: M.VAISH h CHECKED BY: F ILI FLOOD MAP 1 SOUTHOLD APPLICATION DRAWINGS 03.26.2014 DATE: 03.26.2014 0 LIPA APPLICATION DRAWINGS 12.12.2013 SCALE: AS NOTED N Lot 8 j `\ 'wdr wt vcno £area: � LOt 9 s+smNrer O� `, M tlTEatia" E 'we.e vi1 Vora E•+ot.i id��StVS\ OF nit �'P..: c. X41` `•-` `�o °° i spa'' `•dh> 4 Lot t] ?w s Sy lil0 •? ca a vette to aom l= - its - -,- ' - ` P s.edwee _ s Att C ,r"~ y rwe wt nma fstv ,- t~ ? • � :i ' � ass G7 t j �� tw .�a;✓ ; 1 n t i RIGHT OF WAY "PADDOCK WAY.. yy t�iK s[•w +WEd✓� t\ / - t�`W ^� I � II�.000' f ♦ • t,j Lot 12 Lot 11 'rrar Rt Puna fateta A'. -- -- ARCHIT ED ARC%y EiSS fi `CO w� eq0 �� iJ y Young Young I .w ..«.,a,.. .. ew•.ns.c ..,. .drt raw ear-vt'-rsnJ SHEET: APPENDIX B K 350 PADDOCK WAY, MATTITUCK NY F' F�1 r jt K , } BY: M. VAISH NOTE k' - � r.t4 • 'f . ygxaac arnrwq'#we-lw uar 6i� ,rwe _ _ SORNEYOWS CERMCAi10N <.. • K N+I[!+' SQ4110 4ROw..we Qts M+l CoMa K ee.*Kf two aw,[K =11-7a. wr?n w µ 9JR\fr FOR LEONARD O'OONNORI LOT 13 '1Ku A -i P4:Mf} ES 1A'FES" t At Y.rt Gtuck. 'own 2f $Q,C'r01d Suffolk CO my, New '£Ott: FS Fi,1VA1�^SUFtvE'Y W Srd z�uttep— i wtBnrcrn `_ +nl +G mope "Y +w- n s'd0pmr DISCLAIMER: ALL CONSTRUCTION 5HALL MEET THE CODE REQUIREMENT5OfNEW YORK 5TATE. ARCHIT ED ARC%y EiSS fi `CO w� eq0 �� iJ y REVISION: PROJECT: WEISSBACH RESIDENCE; SOLAR PHOTOVOLTAIC SYSTEM SHEET: APPENDIX B 350 PADDOCK WAY, MATTITUCK NY F' SHEET TITLE: BY: M. VAISH 1 0252g� y� jQr SITE SURVEY CHECKED HECKED BY: 1 SOUTHOLD APPLICATION DRAWINGS 03.26.2014 DATE: 03.26.2014 F 0 LIPA APPLICATION DRAWINGS 12.12.2013 SCALE: AS NOTED