HomeMy WebLinkAboutElizabeth Field - Lighting, Visual Aids, Electrical BldgU.S. Department of Transportation Federai Aviation Administration OCT rv{ &. V" 181 S. YwA&v Awaa, OBS,.. 305 Mr. Scott L. Harris Supervisor, Town of Southold Town Hall OCT 1 4 W 53095 Main Road Southold, New York 12953 SodiAT4 Dear Mr. Harris: Elizabeth Field Airport, Fishers Island Lighting & Rehabilitation For Runways 7-25 & 12-30 VASI & REILS on R/W's 7, 25, 12 & 30 and Electrical Vault Installation - Proposed Change Order #1 AIP Project No. 3-36-0029-05-92 Reference is made to your consultant, Calocerinos & Spina, letter dated September 22, 1992 requesting our review on a proposal to install four (4) additional runways intersection signs, via a change order, for the subject project. We have reviewed the drawings submitted and have no objection. Please prepare Change Order #1 and submit it to us for our review and approval. The federal share for the amount to be approved is subject to the maximum obligation of the United States payable under the Grant Agreement. If you have any questions, please call at 516-295-9343. Sincerely, s - Dan Vornea Airport Engineer a 11 DEPARTMENT OF TRANSPORTATION vac ENDM FEDERAL AVIATION ADMINISTRATION October 2, 1992 CONSTRUCTION PROGRESS AND INSPECTION REPORT FAAP/ADAP FAAP/ADAP PRDUECT NUMBER 3-36-0029-05-92 AIRPORT NAIAE ELIZABETH FIELD AIRPORT -FISHERS ISLAND TYPE of O0NmAm - AIRFIELD LIGHTING, VISUAL OONTRACTORS NAME AIDS & ELECTRICAL BUILDING FALVEY CONSTRUCTION CORPORATION _... 1. ROUGH ESTIMATE OF PERCENT COMPLETION TO DATE OF CON87RU0T10N PHASES P , SEE ATTACHED n 2 BRIEF OUTUNE OF WORK COMPLETED OR IN PROGRESS THIS WEEK - Runway painting was completed. - Segmented circle was completed. - Work on the electrical building equipment was continued. - Trench restoration was continued. 3. BRIEF WEATHER SUMMITRY THIS WEEK MIOLUDMLG APPROXUATE RNWALL a PERIODS OF BELOW FFA M ZNG TEMPERATURE 09/28/92 - high - 67- - low - 52- - precip. - 0.0' 09/29/92 - high - 64' - low - 56' - precip. - 0.0' 09/30/92 - high - 55' - low - 41, - precip. - 0.0' 10/01 /92 - high - 53, - low - 34' - precip. - 0.0' 10/02/92 - high - 61- - low - 36• - precip. - 0.0' 4. OONTRACf TIME (60 Days) & BRI F SUMMARY LABORATORY AND FIELD TESTN13 THIS WEEK None RG DAYS CHARGED/ LAST WORMW DAY REMAW Mil DAY CHARGED 57/3 10/02/92 e. WORK BY CONTRACTOR ANTIMATED FOR NEXT WEEK - Complete the electrical building roof. - wmpiete the restoration of ail trenches and staging area. - Complete the installation of electrical equipment in the electrical building. 7. PROBLEM AREAS OR OTHER COMMENTS - 95% of contract time has elapsed; approximately 90% of the work Is completed. - 9/28/92 was not charged due to wet conditions. SPONSOR'S INSPECTOR OR REPRESENTATIVE TYPED OR PRINTED NAME AND TTTLE SIGNATURE DATE Scott Shova, Resident Inspector / 10/05/92 I'AA I-UHM WfU-1 • DATE OF -•- 92 `,ROJECT: Eltzabeth Field Almon - Fishers IlMnd - AlrfWd Lighting, Visual Aids & Elec. BUg-- 1. Rough Estimate of Percent Completlon to Date of Construction Phases: P-152 (1) 0% P-152 (2) 85% P-612 (3) 95% P-620 (4) 100% L-102 (5) 90% L-106 (6) 95% L-107 (7) 95% L-108 (8) 90% L-108 (9) 100% L-108 (10) 100% L-108 (11) 100% L-109 (12) 60% L-110 (13) 100% L-110 (14) 100% L-110 (15) 90% L-110 (16) 90% L-110 (17) 100% L-112 (18) 80% L-115 (19) 100% L-115 (20) 100% L-125 (21) 70% L-125 (22) 100% L-125 (23) 95% L-125 (24) 95% L-125 (25) 95% L-125 (26) 95% L-125 (27) 90% L-125 (28) 90% L-125 (29) 90% L-125 (30) 90% L-125 (31) 90% L-125 (32) 90% L-125 (33) 90% L-125 (34) 90% L-125 (35) 0% M-100 (36) 90% M-200 (37) 100% FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 October 05, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: ri (Zaaylv TEL 203/663-1695 FAX 203/663-2719 OCT, 13 1992 `�M r.,,.., r ,,4 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated October 1, 1992 regarding the deletion of Item No. 1 "Common Excavation, Area No. 1" from this contract. Please be advised that Falvey Construction Corporation has performed work under this item during the first week on site. Further, Falvey Construction Corporation is entitled to receive payment for job overhead as well as home office overhead and costs for the extensive amount of time invested in creating the proposal for the possible, but now deleted change order. With the above noted, Falvey Construction Corporation hereby grants the Town of Southold a credit in the amount of $2,281.80 as stated in this firm's proposal dated August 20, 1992 for the relocation of the beach sand. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja Enclosures cc: Larry Cerretani - C&S Phil Knauff - F.I. Ferry Dist. VScott Harris - Town of Southold Scott Shova - C&S File: 'FIAIR/FCC/CT-0/GC:1 VW3/Airport/delete.#1 • FALVEY CONSTRUCTI®N CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 October- 6, 19922 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York: 13088 Attention: Larry Cerretani' Inspection Supervisor Fie: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: LF U TEL 203/663-1695 FAX 203/663-2719 amm OCT, 13 VW SO*0" T..... rU4 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's memorandum dated September- 25, 1992 regarding weekly prog- ress meeting #11. Please be advised this firm takes exception to the statements made regarding the amount of contract days charged as well as the percentage of work completed. Falvey Construction Corporation stated at the aforementioned weekly project meeting that our firm believes Calocerinos & Spina's calculations of contract clays charged and percentage of work: complete are incorrect. Please refer to Falvey C*-onstrucLion Corporation's correspon- dence dated August 26, Sept. 3, Sept. 4, Sept. 9, Sept. 18, and Sept. 21, 1992. As of Sep- tember 16, 1992, this firm believes there to be 46 contract days charged with 19 remaining. Falvey Construction Corporation's calculations indicate 70% contract time has elapsed with 78% of the work completed. If you have any questions and/or comments, please contact the writer at 203-663-1695. Very truly yours, j Mathew D. Falvey Manager MDF/nja cc: Charles McDermott - C&S Phil Knauff - F.I. Ferry District Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/meeting.#11 6 I " Calocerinos & Spina Engineers, P.C. MEMO TO: Files 9 FROM: Scott Shova Resident Inspector RE: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 Attendees: Falvey Construction Corporation Weekly Progress Meeting No. 13 PURITIC, October 6, 1992 r} /� Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina - Falvey Construction Fisher Island Ferry District Weekly Progress Meeting No. 13, for the above -referenced project, was held Wednesday, September 30, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. Through October 2, 1992, 57 days have been charged to the Contract, with 3 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending October 2. 1992: 1. Segmented Circle was completed. 2. Runway Painting was completed. 1020 Seventh �drth StreeteLiiverrp9 T#13089'S (31571 1 CONTRACTOR: SUBJ: FILE: DATE: Attendees: Falvey Construction Corporation Weekly Progress Meeting No. 13 PURITIC, October 6, 1992 r} /� Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina - Falvey Construction Fisher Island Ferry District Weekly Progress Meeting No. 13, for the above -referenced project, was held Wednesday, September 30, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. Through October 2, 1992, 57 days have been charged to the Contract, with 3 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending October 2. 1992: 1. Segmented Circle was completed. 2. Runway Painting was completed. 1020 Seventh �drth StreeteLiiverrp9 T#13089'S (31571 1 MEMO TO: Files, 211.004 Page 2 October 6, 1992 4. Work in Electrical Building continued. 5. Cable for the Electrical Building's electric service was pulled to the meter from the pole mounted transformer. 95 % of Contract Time has elapsed with approximately 90 % of the work completed. 1. Install Electrical Building roof. 2. Complete installation of electrical equipment. 3. Complete all trench restoration. 4. Energize new Runway lights and visual aids. 5. Remove existing edge lights. Calocerinos & Spina requested a cost breakdown for the additional guidance signs. 2. Calocerinos & Spina requested approved Shop Drawings and Certifications on the Runway paint, prior to payment for this item. 3. Calocerinos & Spina requested a shop drawing be submitted for the non corrosive locks for the exterior enclosures. 4. Calocerinos & Spina stated that they take exception to Falvey Construction's letter dated September 18, 1992, regarding the time extension for the Runway intersection work. C&S had objections to the extension. Phil Knauff stated that he did not specify that time will be granted, but said an extension of time may be considered. 5. Calocerinos & Spina stated that prior to the Airport's new Runway lighting system being energized that a NOTAM should be issued stating the new Runway widths and that the Runway Lighting will be operated by pilot control. 6. Falvey Construction questions Estimate No. 2 and it's location. Scott Shova commented that he would look into it and confirm it's location. Phil Knauff stated that he should have it by 10/6/92 for this pay period. MEMO TO: Files, 211.004 Page 3 October 6, 1992 The meeting was adjourned and meeting No. 14 was scheduled for Wednesday, October 7, 1992, at 2:00 p.m. SS/kw cc: Those in Attendance Those not in Attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. D. O'Rourke Mr. D. Vornea 9 October 7, 1992 Falvey Construction Corporation 12 Fire Tower Road Post Office Box 699 Killingworth, CT 06419 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-04-91 File: 211.004 Gentlemen: We are in receipt of your September 30, 1992 correspondence in which you are requesting an on-site inspection, for the above -referenced project. We assume you are requesting that a final inspection be conducted October 8, 1992. Be advised, we shall schedule the final inspection when the Resident Inspector has verified that all work items are complete. If you have any questions, do not hesitate to contact us. LJC/kw cc: Mr. P. Knauff Mr. S. Harris Mr. C. McDermott Mr. S. Shova Very truly yours, CALOCERINOS &c SPINA ENGWEERS, P.C. La rence J. Cerretani Inspection Supervisor Airport Division 1v 4�7-6J 109 October 2, 1992 Mr. M. Falvey Falvey Construction Corporation 12 Fire Tower Road Post Office Box 699 Killingworth, CT 06419 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-04-91 N.Y.S.D.O.T. No. 0913.04 File: 211.004 Dear Mr. Falvey: We are in receipt of your September 21, 1992 correspondence in which you request we reconsider our position regarding the charging of August 18 and 19, 1992 as work days, on the above -referenced project. On behalf of the Owner, please be advised our position has not changed. We strongly suggest you work as expeditiously as possible to facilitate completion of the project within the specified Contract Time. If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/kw cc: Mr. S. Harris Mr. D. O'Rourke Mr. P. Knauff Mr. S. Shova Mr. D. Vornea Mr. A. D'Eredita 1020 5even:h IFALVIEY CONSTRUCTION CORP. J- 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 October 02, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Scott Shoves Field Inspector Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 Sadhow Trwm rl A In reference to the above -captioned project, the following is a breakdown of our payment requisition #3 for the lump sum items. L-106 Segmented Circle Item #6 Machine $ 1,040.00 Material $ 1,022.00 Labor $ 1,080.00 Total $ 3,142.00 L-109 Installation of Airport Electrical Building Equipment Item #12 Material $13,238.00 Labor $ 9,240.00 Total $22,478.00 L-112 Electrical Building Item #18 Material $10,152.00 Labor $ 6,480.00 Machine $ 4,800.00 Subcontractor $13,200.00 Total $34,632.00 L-125 Installation of Airport Lighting & Navigational Systems Item #27 Material $ 4,295.00 Machine $ 2,178.00 Labor $ 1,320.00 Total $ 7,793.00 9 Calocerinos & Spina, P.C. October 2, 1992 Page 2 L-125 Installation of Airport Lighting & Navigational Systems Item #28 Material $ 4,295.00 Machine $ 2,178.00 Labor $ 1,320.00 Total $ 7,793.00 L-125 Installation of Airport Lighting & Navigational Systems Item #29 Material $ 4,385.00 Machine $ 1,080.00 Labor $ 1,440.00 Total $ 6,905.00 L-125 Installation of Airport Lighting & Navigational Systems Item #30 Material $ 4,385.00 Machine $ 1,080.00 Labor $ 1,440.00 Total $ 6,905.00 L-125 Installation of Airport Lighting & Navigational Systems Item #31 Material $ 3,983.00 Machine $ 1,324.00 Labor $ 2,265.00 Total $ 7,572.00 L-125 Installation of Airport Lighting & Navigational Systems Item #32 Material $ 3,983.00 Machine $ 1,324.00 Labor $ 2,265.00 Total $ 7,572.00 L-125 Installation of Airport Lighting & Navigational Systems Item #33 Material $ 4,233.00 Machine $ 1,324.00 Labor $ 2,265.00 Total $ 7,822.00 L-125 Installation of Airport Lighting & Navigational Systems Item #34 Material $ 3,983.00 Machine $ 1,324.00 Labor $ 2,265.00 Total $ 7,572.00 Calocerinos & Spina, P.C. October 2, 1992 Page 3 If you have any questions and/or comments, please contact the writer at 203-663-1695. Very truly yours, MDF/nja cc: Charles McDermott - C&S ,hil Knauff - F.I. Ferry District *'Scott Harris - Town of Southold Larry Cerretani - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/breakdwn.cst Mathew D. Falvey Manager MDF/nja cc: Charles McDermott - C&S ,hil Knauff - F.I. Ferry District *'Scott Harris - Town of Southold Larry Cerretani - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/breakdwn.cst JUDITH T. TERRY TOWN CLERK REGISTRAR OF VITAL STATISTICS MARRIAGE OFFICER OFFICE OF THE TOWN CLERK TOWN OF SOUTHOLD October 71 1992 Town Fall, 53095 Main Road P.O. Box 1179 Southold, New York 11971 Fax (516) 765-1823 Telephone (516) 765-1801 Lawrence J. Cerretani, P.E. Inspection Supervisor Airport Division Calocerinos S Spina Engineers, P.C. 1020 Seventh North Street Liverpool, New York 13088-6199 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids and Electrical Building Dear Mr. Cerretani : Your letter of October 1, 1992 transmitting Falvey Construction Corporation's correspondence regarding the potential delay claim for the change in the Runway 30 REIL location, was discussed by the Southold Town Board at their October 6, 1992 work session. It was the opinion of the entirety of the Board that your position outlined in that letter is correct and that you should be guided accordingly. Very truly yours, Judith T. Terry Southold Town Clerk r 1 • Mr. Scott Harris Supervisor, Town of Southold Town Hall 53095 Main Road Post Office Box 1179 Southold, New York 11971 Dear Mr. Harris: 9 October 1, 1992 s Re: Elizabeth Field Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-04-91 N.Y.S.D.0.T. No. 0913.04 File: 211.004 Please find enclosed Falvey Construction Corporation's September 18, 1992 correspondence regarding the potential delay claim for the change in the Runway 30 REIL location, on the above -referenced project. In accordance with Section 50-16 Claim and Disputes, of the Contract Documents, we are foma ding Falvey Cr-!ist--jetion Corpnr?tilor_'s potential claim and our recommendations to you, for your consideration. It is our opinion that Falvey's potential claim is not warranted, as the contractor was able to continue with work on the project for eight hours on the days in question. Specifically, duct banks crossing Runway 12-30 were backfilled, roof planks at the electrical building were grouted and the defective 600 volt cable for the Runway 7 REILS was replaced. This was conveyed to the contractor in our September 9, 1992 correspondence. Please advise us of your decision with regard to this matter, so that we may inform the Contractor. Mr. Scott Harris Page 2 October 1, 1992 If you have any questions, or require additional information, do not hesitate to contact US. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/kw Enclosure cc: Mr. P. Knauff (w/enc.) Mr. C. McDermott (w/enc.) Mr. H. Wagner (w/enc.) Mr. A. D'Eredita (w/enc.) Mr. S. Shova (w/enc.) ]FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 18, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Inspection Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated September 9, 1992 regarding the REIL unit locations on Runway 30. Please be advised of the following: A. Falvey Construction Corporation bid this project with the understanding that the plans and specifications were accurate and required no changes. B. Falvey Construction Corporation's schedule date for installation of REIL bases on Runway 30 was actually August 31, 1992 but without major disruption rescheduled the installation date to September 1, 1992. The intent was to allow Calocerinos & Spina more time to provide this firm with direction. As noted above, Falvey Construction Corporation had notified Calocerinos & Spina verbally in the field on August 26, 1992 and again in this firm's correspondence dated August 28, 1992 via fax and postal service that Falvey Construction Corporation scheduled the installation of the REIL units on September 1, 1992. Falvey Construction Corporation did not receive verbal direction until the afternoon of September 2, 1992 and written direction until Sep- tember 11, 1992. With the above noted, it is apparent that a disruption in the sequence and scheduling occurred, i.e. delay. There is a cost associated with any delay that occurs. This firm does not know the full impact of this particular delay at this time. Falvey Construction Corporation reserves its rights to charge the Town of Southold for any and all costs associated with the above noted change and delay. Once accurately accessed and calculated, Falvey Construction Corporation may or may not deem it necessary to pursue the costs incurred to this firm. cont. Calocerinos & Spina, P.C. September 18, 1992 Page 2 If you have any questions and/or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry District Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/reil.loc FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699 FAX 203/663-2719 KILLINGWORTH, CT 06419 September 30, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Inspection Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, please be advised that Falvey Construction Corporation is requesting that an on-site inspection be performed on October 8, 1992. Please contact this office so a specific time can be arranged. If you have any questions and/or comments, please contact the writer at 203-663-1695. Very truly yours, r) Mathew D. Falvey Manager MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry District Cott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-O/GC:l VW3/Airport/inspection DEPARTMENT OF TRANSPORTATION we �aNO FEDERAL AVIATION ADMINISTRATION September 25, 1992 CONSTRUCTION PROGRESS AND INSPECTION REPORT OCT FLAP/ADAPPRDIECT NUMBER 3-36-0029-05-92 AIRPORT NAME ELIZABETH FIELD AIRPORT-FISHERS ISLAND Tyn OF Ow" AST - AIRFIELD LIGHTING, VISUAL CONTRACTORS NAME AIDS & ELECTRICAL BUILDING FALVEY CONSTRUCTION CORPORATION 1. ROUGH ESTIMATE OF PERCENT COMPLETION TO DATE OF CONSTRUCTION PHASES SEE ATTACHED 2 BRIEF OUTLINE OF WORIC COMPLETED OR IN PROGRESS THIS WEEK - Runway edge lines to chevron were being painted on Runway's 7-15 and 12-30. - Installation of electrical building equipment was continued. - Pavement was removed by the apron area and topsoil was placed. - Work on the segmented circle was continued. 3. BRIEF WEATHER SUMMARY THIS WEEK INCLUDING APPROXIMATE RAINFALL & PERIODS OF BELOW FREEZING TEMPERATURE 09/21/92 - high - 71' - low - 55' - precip. - 0.0" 09/22/92 - high - 75' - low - 64' - precip. - 0.08" rain 09/23/92 - high - 70" - low - 51- - precip. - 0.0" 09/24/92 - high - 65' - low - 41 ' - precip. - 0.0" 09/25/92 - high - 64' - low - 43' - precip. - 0.0" 4. CONTRACT TIME (60 Days) S. BRIEF SUMMARY LABORATORY AND FIELD TESTING THIS WEEK None DAYS QED/ LAST WORWNG DAY REMAINING DAY CHARGED 53/7 9/25/92 8 WORK BY CONTRACTOR ANTICIPATED FOR NEXT WEEK - Continue work on the segmented circle. - Install the electrical building roof. - Continue trench restoration. - Continue the installation of the REIL and PAPI systems. 7. PROBLEM AREAS OR OTHER COMMENTS - 88% of contract time has elapsed; approximately 82% of the work is completed. - Contractor is disputing 4 charged days and has informed the Engineer of potential delay claims for relocating Runway 30 REILs, runway/runway intersection work, and increased costs due to updated wage rates. The Engineer does not agree with the Contractor's claims and is responding accordingly. SPONSOR'S INSPECTOR OR REPRESENTATIVE TYPED OR PRINTED NAME AND TITLE SIGNATURE DATE Scott Shova, Resident Inspector 09/30/92 FAA I UHM 537o-1 DATE OF REPORT: 9/25/92 PROJECT: Elizabeth Field Airport - Fishers Island - Airfield Lighting Visual Aids & Elec. Bldg. 1. Rough Estimate of Percent Completion to Date of Construction Phases: P-152 (1) 0% L-115 (20) 100% P-152 (2) 75% L-125 (21) 60% P-612 (3) 88% L-125 (22) 70% P-620 (4) 70% L-125 (23) 50% L-102 (5) 85% L-125 (24) 50% L-106 (6) 80% L-125 (25) 50% L-107 (7) 80% L-125 (26) 50% L-108 (8) 85% L-125 (27) 75% L-108 (9) 85% L-125 (28) 75% L-108 (10) 94% L-125 (29) 75% L-108 (11) 98% L-125 (30) 75% L-109 (12) 40% L-125 (31) 75% L-110 (13) 100% L-125 (32) 75% L-110 (14) 100% L-125 (33) 75% L-110 (15) 90% L-125 (34) 75% L-110 (16) 90% L-125 (35) 0% L-110 (17) 100% M-100 (36) 82% L-112 (18) 80% M-200 (37) 100% L-115 (19) 80% 0��Sl Calocerinos & Spina Engineers, P.C. October 1, 1992 0 Mr. Mathew Falvey Falvey Construction Corporation 12 Fire Tower Road..` Killingworth, Connecticut 06419 Re: Elizabeth Field - Fishers Island Airport Airfield Lighting, Visual Aids, and Electrical Building FAA AIP No. 3-36-0029-05-92 NYSDOT No. 0913.05 File: 211.004 Dear Mr. Falvey: On behalf of the Owner, please be advised that the work associated with Item No. 1 Common Excavation Area No. 1 shall be deleted from your contract. Deletion of Item No. 1 will also eliminate the requirement to paint chevron markings beyond the Runway 7 threshold as detailed on Sheet 7 of the contract drawings. In addition, your cost proposal for removal of sand materials and planting beach grass beyond the Runway 7 threshold is considered unreasonable, and as a result, will not be ordered under your contract. It is our intent to formally amend the contract to reflect these changes in the final change order. If you have any questions regarding these modifications, please call our office. Very truly yours, Oharles OCEFcDermott A E INEER C. R Engineer CRM:kal cc: Mr. Philip Knauff Mr. Scott Harris Mr. Scott Shova Mr. Larry Cerretani Mr. Philip Brito Mr. Robert Michaud Mr. John Taylor 1020 Seventh North Street, Liverpool, NY 13088 6199 (3151 =x57.8711 F� !31 r) 45 October 1, 1992 Mr. M. Falvey Falvey Construction Corporation 12 Fire Tower Road Post Office Box 699 Killingworth, CT 06419 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-04-91 N.Y.S.D.O.T. No. 0913.04 File: 211.004 Dear Mr. Falvey: On behalf of the Owner, please be advised your request for additional monies, due to the updated wage rate schedule for the above -referenced project, is denied for the following reasons: 1. Section 220 of the Labor Law requires the successful bidder to pay the prevailing wage rate and any updates at the time the work is being performed. 2. All bidders were notified at the time of advertisement that the wage rates are subject to change and that they will be notified of the changes. 3. In view of the above noted, it is apparent that the bid was made in the expectation of these increased costs and the increased costs were incorporated into the total contract price for the work to be performed. Please forward all corrected payrolls to the site inspector, Mr. Shova, for review. 1020 Seventh North Street, _�, erpooi, NY' 1 c� _ :' S (' 5j 457-671' FAX (315) 457-9803 .r 1 0 Mr. M. Falvey Page 2 October 1, 1992 x If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani . Inspection Supervisor Airport Division LJC/kw cc: Mr. S. Harris Mr. D. O'Rourke Mr. D. Vornea Mr. P. Knauff Mr. H. Wagner Mr. A. D'Eredita Mr. S. Shova Mr. C. McDermott C, qR a - � 0 Calocerinos & Spina Engineers, P.C. 0 OCT 2 rn'? MEMO TO: Files FROM: Scott Shova Resident Inspector RE: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 CONTRACTOR: Falvey Construction Corporation SUBJ: Weekly Progress Meeting No. 12 FILE: 211.004 I DATE: September 29, 1992 rr -------------------------------------------- -------------------------------------------- Attendees: Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina Falvey Construction Fisher Island Ferry District Weekly Progress Meeting No. 12, for the above -referenced project, was held Friday, ;,September 25, 1992, at 10:00 a.m.-, in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. Through September 25, 1992, 53 days have been charged to the Contract, with 7 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending September 25. 1992: 1. Runway striping was started on Runways 7-25 and 12-30. 2. Pavement excavation by the Apron area was removed and area topsoiled. 3. Continued work in the electrical building on the electrical equipment. MEMO TO: Files, 211.004 Page 2 September 29, 1992 4. Restoration of cable trenches continued. 5. Continued work on the Wind Cone to the segmented circle. 88% of Contract Time has elapsed with approximately 83% of the work completed. Work anticipated for week of September 28. 1992 through October 2. 1992: 1. Complete Runway painting. 2. Complete painting of the segmented circle. 3. Continue work on the electrical building equipment. 4. Continue the restoration of the cable trench. 1. Calocerinos & Spina requested a cost breakdown for the additional guidance signs. 2. Calocerinos & Spina asked Phil Knauff if the existing Runway Edge Lights and Wind Sock assembly were to be stored or discarded. Phil stated that the Edge Lights were to be disposed of and the Wind Sock will be turned over to the Airport. 3. Calocerinos & Spina requested a NOTAM be issued indicating the new Runway widths for both Runways. 4. Calocerinos & Spina requested all outstanding payrolls and utilization reports be submitted. The meeting was adjourned and meeting No. 13 was scheduled for Wednesday, September 30, 1992, at 2:00 p.m. SS/kw cc: Those in Attendance Those not in Attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea CciCcennos & Spina !(i=er-. p -C.. • RECEIVED OCT( 2 W Southold Town ( l t, 7RANS,v111T-:- L Mr. Phil Knauff Re: Fisher's Island Ferry District Commissioner Airfield Lighting, Visual Aids Fisher's Island Ferry District and Electrical Building Foot of State Street New London, CT 06320 ;7.ie: 211.004 Ott- n ion: Dare: September 28, 1992 .'.'e are sending you XX nerewith under secarate cover _, is Original Second Estimate and Claim Voucher, for the above -referenced project. -r•G aocve are for information XX app'o,;a revs = ccnstruction XXcther Payment �2rnarks. If you have any questions, please feel free to contact us. enc' --)sec are not as notes, piease nc ir,, us at �Drce. 6�__S wrence J. Cerretani Inspection Supervisor Airport Division LJC/kw - Enclosures cc: Ms. Judith Terry (w/enc.) 1020 Seventh North Street, Live poo±. N f • • i Account Number ............. Invoice #............. Date ................ C2L0CERi!NGS.9 SPI"IA TOWN OF SOUTHOLD, COUNTY OF SUFFOLK, N.Y., Dr. PAY TO: Payee Identification SEP ZS 8 47 AN Payee Name: or Social Security Number: ..... Fa 1 yey .Construction .Corporation Payee Reference: Address: .................................... PO ..........Box 699 ..................... Phone No. (....)....................... ...... Ki]lingworth,.Cona.06419........ Vendor Contact Cash Discount ..................% .........Days.................................... Item No. Description of Material/Service Quantity Unit Price Amount 523-12 Airport nvoice , 9/14/92 211.004 Pursuant to the terms of the Contract, dated May 1, 199Z, by and between the lown-of-56—uthold Estimate attached hereto... AMOUNT DUE CONTRACTOR, SECOND ESTIMATE ------------------ 7 ---- ------- 62,952.75 Total 162,952.75 Discount Net The undersigned (Claimant) (Acting on behalf of above named claimant) does herebycertify t t the foregoing claim is true and correct and that no part thereof has been paid, except as therein s ed, and that thebala ce t rein statec,i� actually due and owing. Dated. 119 . .. .......... Signat re PROJECT: ELIZABETH FIELD AIRPORT -FISHERS ISLAND File No, 211.:=4 AIRFIELD LIGHTING, VISUAL AIDS & ELECTRICAL BUILDING FAA-AIP NO. 3-36-0029-05-92, N.Y.S.D.O.T. NO. 0913.05 Date: 9/14/;-? Estimate No: Two TO THE TOWN OF SOUTHOLD: Pursuant to the terms of the Contract, dated May 1, 1992, by and between the Town of Southold and Falvey Construction Corporation, contractor for the construction of the Elizabeth Field Airport -Fishers Island, Airfield Lighting, Visual Aids & Electrical Building (FAA-AIP No. 3-36-0029-05-92, H.Y.S.D.O.T. No. 0913.05), we hereby submit the Second Estimate, for work completed through August 31, 1992: :--------------------------------------------------------------------------------------------------------------------------------------- ORIGINAL QUANTITY Item CONTRACT UNIT TO UNIT 7^ AL S Number :------------- DESCRIPTION I------------------------------------------ QUANTITY DATE PRICE TJ DATE P-152 1. t---------------- Common Excavation, Area No. 1 t-------- 100.00% I---------------- L.S. I------------------ 0.00% : 1----------------: 810,000,00 $0.00 P-152 2. Pavement Excavation(Bituminous Concrete) : 900.00 S.Y. 0.00 3.00 0.00 : P-612 3. Field Office 100.00% L.S. 62.00% : 18,200.00 11,284.00 P-620 4. Runway Painting 23,000.00 s.f. 0.00 0.50 0.00 L-102 5. Electrical Building Electrical Service 100.00% L.S. 75.00% : 9,000.00 5,750.00 L-106 6. Segmented Circle 100.00% : L.S. 0.00% : 15,300.00 : 0.00 L-107 7. Lighted Wind Cone 100.00% : L.S. 0.00% : 16,700.00 0.00 : L-108 8. Cable Trenching for the Installation of Underground Cable 8,600.00 l.f. 6,784.00 2.25 15,26.1.00 . L-108 9. No. 8 AWG 600V Type C Single Conductor Underground Cable instld in Trench/Duct 28,300.00 l.f. 23,130.50 0.38 3,789.59 L-108 10. No. 8 AWG 5KV Type C Single Conductor , Underground Cable instld in Trench/Duct 12,900.00 l.f. 11,029.30 : 0.38 4,:91.13 L-108 11. No. 8 AWG Bare Copper Counterposie Wire installed in Trench including Grounding Rods and Exothermic Connections 9,500.00 l.f. 9,330.00 0.28 2,612.40 L-109 12. Installation of Airport Electrical Building Equipment, in Place 100.00% : L.S. 0.00% : 30,000.00 0.00 L-110 13. 4 -way Electrical Duct Bank Type I 700.00 l.f. 697.00 55.00 ?d,335.00 L-110 14. 8 -way Electrical Duct Bank Type I 200.00 l.f. 195.00 70.00 12,550.00 L-110 15. 2 -in Dia RSC installed in Pavement 3,000.00 l.f. 2,004.40 4.00 : 8,017.60 L-110 16. 2 -in Dia RSC installed in Turf 270.00 l.f. 185.00 2.00 373.00 L-110 17. 2 -in Dia RSC reinstalled in Turf 190.00 l.f. 0.00 2.00 0.00 L-112 18. Electrical Building 100.00% L.S. : 42.00% : 40,000.00 15,800.00 L-115 19. Electrical Manhole No. 1 1.00 each 49.00% : 12,250.00 6,002.50 L-115 20. Pull Box Reinstallation 1.00 each 0.00 500.00 0.00 L-125 21. Medium Intensity R/W Edge Lights, Base Mounted, in Pavement 57.00 each 0.00 315.00 0.00 . L-125 22. Runway 25 Threshold Lights 100.00% L.S. 40.00% 3,800.00 1,520.00 L-125 23. Airport Guidance Sign No. R-2-5, Base Mounted, in Pavement 100.00% : L.S. 0.00% : 2,655.00 0.00 L-125 24. Airport Guidance Sign No. R-2-19, Base Mounted, in Pavement 100.00% L.S. 0.00% : 2,655.00 0.00 L-125 25. Airport Guidance Sign No. R-1-3, Base Mounted, in Turf 100.00% L.S. 0.00% : 2,400.00 0.00 L-125 26. Airport Guidance Sign No. R-1-19, Base Mounted, in Turf 100.00% : L.S. 0.00% 2,400.00 0.00 L-125 27. : R/W End Identification Light (REIL) System, Runway 7 End 100.00% : L.S. 40.00% : 8,250.00 3,300.00 L-125 28. R/W End Identification Light (REIL) System, Runway 25 End 100.00% L.S. 40.00% : 8,250.00 33,300.00 L-125 29. R/W End Identification Light (REIL) , Y System, Runway 12 End 100.00% : L.S. . 0.00% : 8,250.00 0.00 L=125 30. R/W End Identification Light (REIL) , System, Runway 30 End 100.00% : L.S. 0.00% : 8,250.00 0.00 L-125 31. Generic Visual Approach Descent Indicator System, Runway 7 End 100.00% L.S. 46.00% 9,580.00 4,406.80 L-125 32. Generic Visual Approach Descent , Indicator System, Runway 25 End 100.00% : L.S. 46.00% : 91580.00 4,406.80 L-125 33. Generic Visual Approach Descent Indicator System, Runway 12 End 100.00% : L.S. 0.00% : 9,580.00 0.00 L-125 34. Generic Visual Approach Descent Indicator System, Runway 30 End 100.00% : L.S. 0.00% : 9,580.00 0.00 L-125 35. Removal of Existing Runway Edge Lights 100.00% L.S. 0.00% : 7,500.00 0.00 M-100 36. M & P of Traffic 100.00% : L.S. 57.00% : 23,500.00 13,395.00 M-200 37. Mobilization 100.00% L.S. 100.00% 16,000.00 16,000.00 ---------------------------------------------------------------------------------------------------------------------------------------- Total Amount of Work Done to Date ---------------------------- $178,394.82 STATEMENT OF DAYS CHARGED Less 5% Retained --------------------------------------------- 8,919.74 TOTAL CONTRACT DAYS 60 $169,475.08 LESS DAYS CHARGED 37 .... Amount Recommended for Payment, Previous Estimates ----------- 106,522.33 ..,..,.,.,.««...,,. DAYS REMAINING 23 AMOUNT DUE CONTRACTOR, SECOND ESTIMATE ---------- $62,952.75 FA V�Y C,.11. "sCCTION CORPORATION CALOCERINOS & SPINA Engineers, P.C. BY: TITLE: Gas/gyp% DATE: Harold W. Wagner, Division Manager IFALVJC' Y CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 Mr. Vincent Ernandez Branch Manager Suffolk County New York Board of Fire Underwriters 85 John Street New York City, New York 10038 TEL 203/663-1695 FAX 203/663-2719 9-25-92 RECEIVED Re: Elizabeth Field Airport SEP ' 199? Town of Southhold Fishers Island, NY."''�'` r{ FAA AIP PROJECT NO. 3-36-0029-04-91 NYSDOT PROJECT NO. 0913.04 Per our phone conservation of 9-25-92 with regards to field inspections related to this project we offer the following: * Proper permits for the work were taken out. * All work is in conformance to the contract documents. * The contract documents explicitly state that the authorized inspector assigned to make all necessary inspections and/or testing of work performed or of material furnished is the firm of Calocerinos & Spina Engineers, PC. They are also the resident engineer directly incharge of all work. C & S authority (as directed by contract documents) is to review, monitor, and inspect the quality and acceptability of material furnished, work performed and make interpretations as required. Such duties extend to all work and to the preparation, fabrication, manufacture and installation employed by the contractor. The firm of C & S is required to inspect, witness, and approve all materials and details of each part of the work. The firm of C & S is represented daily, has done inspections at the site, and has continuous access to all parts of the work. * It is our understanding that the firm of C & S is acting as a 3rd party inspector serving thV Town of jS thold. �erald J. Cotter Project Estimator Falvey Construction Corp. cc:Larry Cerretani - C&S Phil Knauff - F.I. Ferry District ,,'Scott Harris - Town of Southhold Scott Shova - C&S FALVEY CONSTRUCTION CORP, 12FIRE TOWER ROAD PD.BOX 699 K|LL|NGVV0RTH.CTO6u18 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Inspection Supervisor September '24, 1992 Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RFCFIVFD '-��' 1992 In reference to the above -captioned project, please be advised Falvey Construction Corpora- tion acknowledges receipt of Calocerinos & Spina's memorandum regarding weekly progress meeting #10. Please be advised of the following. Falvey Construction Corporation takes exception to Calocerinos & Spina's statement that as of September 11, 1992, 43 contract days have been charged with 17 days remain- ing'Addressing the contract days, this firm believes there to be 41 work days charged with 24 remaining. Please refer to Falvey Construction Corporation correspondence dated August 26, and September 18, 1992' Further, Falvey Construction Corporation has requested an extension of time as a result of owner caused delays regarding simultaneous runway closures. Refer to this firm's correspondence dated September 3, 1992. With the above noted, it is apparent Calocerinos & Spina's calculations of remaining contract time is incorrect. Addressing the percentage of contract time elapsed, Falvey Construction Corporation believes that 75% of the work is completed as of September 11, 1992 with approximately 63% of con- tract time elapsed. Addressing item #1 under the open discussion section, please be advised Falvey Construction Corporation provided an updated schedule to Calocerinos & Spina, i.e. Scott Shova on Septem- ber 10, 1992 following the weekly meeting. painting, etc. No objection was noted. If You have any questions and/or comments, please contact the writer at 203-663-1695. Very truly s, ; Y�c4~7����� �~` "', Mathew D. Falvey ,~T Manager MDF/nja cc: Charles McDermott - C&S Phil Knauff - F.I. Ferry District Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-O/GC:1 VW3/Airport/meeting.#10 0 i IFALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 24, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated September 10, 1992. This firm did have a telephone conversation with Charles McDermott regarding the beach sand removal and cable re -installation at runway end 7. Falvey Construction Corporation is currently preparing the necessary paperwork. Please be advised this firm can not act upon a telephone conversation. We are requesting a formal directive. Thank you for your cooperation. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja cc: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/beach.snd IW4. "o Calocerinos & Spina Engineers, P.C. MEMO TO: Files FROM: Scott Shova Resident Engineer RE: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA AIP No. 3-36-0029-05-92 NYSDOT No. 0913.05 V, Falvey Construction Corporation Weekly Progress Meeting No. 11 211.004 September 25, 1992 Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina Falvey Construction Fisher Island Ferry District RKIHVED . Weekly Progress Meeting No. 11, for the above referenced project, was held on Wednesday, September 16, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not • accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. Through September 18, 1992, 48 days have been charged to the Contract, with 12 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending 9/18/92: 1. Four-way ducts and edge light trenches on Runway 12-30 were repaved. 2. Work on Electrical Building equipment was continued. 3. Work on the wind cone segmented circle was continued. 4. Pull box and conduit for the obstruction light on Runway End 7 was reinstalled. 5. Work on the PAPI System was continued. CONTRACTOR: SUBJ: FILE: DATE: Attendees: V, Falvey Construction Corporation Weekly Progress Meeting No. 11 211.004 September 25, 1992 Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina Falvey Construction Fisher Island Ferry District RKIHVED . Weekly Progress Meeting No. 11, for the above referenced project, was held on Wednesday, September 16, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not • accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. Through September 18, 1992, 48 days have been charged to the Contract, with 12 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending 9/18/92: 1. Four-way ducts and edge light trenches on Runway 12-30 were repaved. 2. Work on Electrical Building equipment was continued. 3. Work on the wind cone segmented circle was continued. 4. Pull box and conduit for the obstruction light on Runway End 7 was reinstalled. 5. Work on the PAPI System was continued. v Memo To: Files September 25, 1992 Page 2 80% of Contract Time has elapsed with approximately 76% of the work completed. 1. Start painting edge lines on the runways. 2. Continue work in the Electrical Building on the installation of electrical equipment. 3. Continue work on the segmented circle. 4. Remove asphalt adjacent to the ramp and reseed and mulch. 1. C&S asked Phil Knauff if downspouts were desired on the Electrical Building, and if so, a Change Order would be required. Mr. Knauff stated that he did not think they were necessary. 2. Falvey Construction stated that they would need the airport closed on approximately September 23 and 24, 1992; a confirmed date will be given on September 21, 1992 when the NOTAM will be issued. This closure will allow for the runway painting. 3. Falvey Construction requested information on the taxi hold line and additional signs. C&S stated that written directives will be sent to their firm when the additional work has been finalized with the FAA. The meeting was adjourned and Meeting No. 12 was scheduled for Wednesday, September 23, 1992. SS/cb cc: Those in attendance Those not in attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea DEPAR11NEW OF TRANSPORTATION WEEK ENDING FEDERAL AVIATION ADMINISTRATION September 18, 1992 CONSTRUCTION PROGRESS AND INSPECTION REPORT FAAP/ADAP FAAPIADAP PPAIECT NUMBER 3-36-0029-05-92 AIRPORT NAME ELIZABETH FIELD AIRPORT -FISHERS ISLAND TYPE DF cDNTRAcr _AIRFIELD LIGHTING, VISUAL CORSNAME AIDS & ELECTRICAL BUILDING FALVEY CONSTRUCTION CORPORATION 1. ROUGH ESTIMATE OF PERCENT OOMPLFTION TO DATE OF OONSTRUMION PHASES RECEIVED 017P SEE ATTACHED 2 BRIEF OUTLINE OF WORK COMPLETED OR IN PROGRESS THIS WEEK 4 -way duct banks and edge light tranches were repoured c;. Rums -ay 12-30. PAPI units were being installed on Runway 12-30. Work on the segmented circle was continued. The installation of electrical equipment in the Electric Building continued. 3. BRIEF WEATHER SUMMARY THIS WEEK P40LUDING APPROXIMATE RAINFALL & PERIODS OF BELOW FREEZWGG TEMPERATURE 09/14/92 - high - 72' - low - 48' - precip. - 0.0" 09/15/92 - high - 78' - low - 52• - precip. - 0.0' 09/16/92 - high - 81 * - low - 62' - precip. - 0.0' 09/17/92 - high - 83' - low - 64' - precip. - 0.0' 09/18/92 - high - 81 ' - low - 64' - precip. - 0.0- 4. CONTRACT TIME a BRIEF SUMMARY LABORATORY AND FIELD TESTMIG THIS WEEK None CHARGED LAST WORKING TO DATE DAY CHARGED 48/12 9/18/92 a WORK BY OONTRACTOR AMKWATED FOR NEXT WEEIC Start painting the edge lines on the runways. Continue work on the Electrical Building electrical equipment. Remove asphalt adjacent to the apron and topsoll, seed and mulch that area. 7. PROBLEM AREAS OR OTHER COMMENTS 80% of contract time has elapsed; approximately 76% of the work is completed. SPONSOR'S INSPECTOR OR REPRESENTATIVE TYPED OR PRINTED NAME AND TIRE SIGNATURE DATE Scott Shova, Resident Inspector 09/21/92 FAA FORM 5370-1 D' E OF -•- •t PROJECT:Elizabeth b=1t1 =,! Alrwrt Fishers Island - Airfield Lighting. Visual •Elec.• • 1. Rough Estimate of Percent Completion to Date of Construction Phases: P-152 (1) 0% L-115 (20) 100% P-152 (2) 0% L-125 (21) 50% P-612 (3) 80% L-125 (22) 60% P-620 (4) 0% L-125 (23) 50% L-102 (5) 80% L-125 (24) 50% L-106 (6). 70% L-125 (25) 50% L-107 (7) 65% L-125 (26) 50% L-108 (8) 85% L-125 (27) 65% L-108 (9) 85% L-125 (28) 65% L-108 (10) 94% L-125 (29) 65% L-108 (11) 98% L-125 (30) 65% L-109 (12) 20% L-125 (31) 75% L-110 (13) 100% L-125 (32) 75% L-110 (14) 100% L-125 (33) 75% L-110 (15) 80% L-125 (34) 75% L-110 (16) 80% L-125 (35) 0% L-110 (17) 70% M-100 (36) 76% L-112 (18) 77% M-200 (37) 100% L-115 (19) 80% CJS 0 Calocerinos & Spina Engineers, P.C. Ms. Karen A. Munze Sr. Environmental Analyst New York State Department of Environmental Conservation Building 40 - SUNY Stony Brook, New York 11790-2356 Dear Ms. Munze: C` September 23, 1992 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids and Electrical Building FAA AIP No. 3-36-0029-05-92 NYSDOT No. 0913.05 NYSDEC Permit Application No. File: 211.004 1-4738-00506/00001-0 Pursuant to our phone conversation on September 2, 1992, it is our understanding that all work associated with the removal of sand on Runway 7 as described in the above -referenced DEC permit, is not required to be performed under the current Airfield Lighting, Visual Aids and Electrical Building construction project. It is our intent to include all work associated with the removal of sand from Runway 7 in a future design project. We are currently in the design phase for the bituminous overlay of Runway 7-25 and anticipate receiving bids this winter and begin construction early next Spring. It is also our understanding that the above -referenced DEC permit must remain in effect for completing the sand removal and for 5 years after the planting of beach grass. An extension of the current permit will be requested if necessary. A future permit will be applied for by C&S for all work associated with the Runway 7-25 overlay project. If this is not your understanding of our phone conversation, please contact me so we can resolve any misunderstanding. My sincere thanks for all of your assistance with this project. Very truly yours, SPIN RS, P.C. (Charles R. McDermott Engineer CRM:jmc cc: Mr. Philip Knauff Mr. Scott Harris Mr. Scott Shova Mr. Larry Cerretani 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-980? HARVEY A. ARNOFF Town Attorney MATTHEW G. KIERNAN Assistant Town Attorney 0 OFFICE OF THE TOWN ATTORNEY TOWN OF SOUTHOLD September 24, 1992 Calocerinos & Spina 1020 SEventh North Street Liverpool, NY 13088-6199 SCOTT L. HARRIS Supervisor Town Hall, 53095 Main Road P.O. Box 1179 Southold, New York 11971 Fax (516) 765-1823 Telephone (516) 765-1800 Attention: Lawrence Cerretani, Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York Dear Mr. Cerretani: I have been requested on behalf of the Town Board to respond to your letter of September 9, 1992 directed to Supervisor Harris. Based upon a discussion at a work session of the Town Board, it was the opinion of the entirety of the Board that your position outlined in that letter is correct and that you should be guided accordingly. Should other additional information be needed, please feel free to contact me. Very tryl yours, Har. ey �Arnof Town A HAA:mis cc: Judith T. Terry, Town Clerk Scott L. Harris, Supervisor Galocennos &Spina Engineers. P.C. Mr. Scott Harris Supervisor, Town of Southold Town Hallo P.O. Box 1179 Southold, New York 11971 Dear Mr. Harris: September 9, 1992 �o Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA AIP # 3-36-0029-04-91 NYSDOT # 0913.04 File: 211.004 Please find enclosed Falvey Construction Corporation's August 28, 1992 correspondence regarding reques-rTar additional monies to cover the increase in labor costs due to the updated prevailing wage rate schedule for the above referenced project. In accordance with 50-16 Claims and Disputes, we are forwarding Falvey Construction Corporation's claim and our recommendations for your consideration. It is our opinion that Falvey's request is not warranted for the following reasons: 1. Section 220 of the Labor Law, which is a part of this Contract, requires the successful bidder to pay the prevailing wage rate and any updates at the time the work is being performed. 2. All bidders were notified at the time of advertisement that the wage rages are subject to change and that they will be notified of the changes. 3. In summary, the bid was made in the expectation that the Contractor has incorporated these increased costs in arriving at the total Contract price for which the Contractor shall perform the work. 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 cls Mr. Scott Hams September 9, 1992 Page 2 Please advise us of your decision with regard to this matter so that we may inform the Contractor. If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. La rence J. Cerretani V Inspection Supervisor Airport Division I.JC/cb Enclosure cc: With Enclosures Mr. P. Knauff Mr. C. McDermott Mr. H. Wagner Mr. A. D'Eredita Mr. S. Shova FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 August 28, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attn: Larry Cerretani Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 TEL 203/663-1695 FAX 203/663-2719 In reference to the above captioned project, Falvey Construction Corporation acknowledges receipt of the letter from Calocerinos & Spina, dated July 21, 1992, which enclosed the New York State wage rate schedule, revision date July, 14, 1992. Falvey Construction Corporation noted that there is a difference in wage rates for the classification of workers involved in this project as outlined below: Base Rate Increase Classification Per Hour Fringe Benefit Increase Per Hour Equipment Operator $1.10 $1.52 Class 2 Backhoe Equipment Operator $1.10 $1.52 Class 2 Front End Loader Equipment Operator $1.10 $1.52 Class 2 Teamster -Group 1 $3.70 $1.58 Mason -Cement $1.97 $1.89 Due to this increase from the original estimated labor costs as outlined in the Contract Documents, Falvey Construction Corporation is requesting that Calocerinos & Spina prepare and forward a fully executed change order to this contract . At this time, all costs are not known. This firm reserves the right to tabulate these costs as they became known and forward them to Calocerinos & Spina. Also, please be advised that Falvey Construction Corporation has paid the above - 1 stated wage increases to its employees as indicated in payrolls #1-5. This was done in a good faith effort, and as directed by Calocerinos & Spina, ie. Scott Shova. Payrolls #6 on will indicate the original wage rates because it is this firm's belief that these original wage rates remain in effect until such time that Calocerinos & Spina issues a fully executed change order to the Contract to cover the wage and fringe benefit increases as well as this firm's overhead and profit costs. If you have any questions and/or comments please contact the writer at 663-1695. MDF/tsc cc: Phil Knauff Scott Harris Scott Shova Charlie McDermott File: FIRAIR/FCC/SUBM/GC:1 WPWIN\fi_c&s4.wp2 6 Very truly yours, AAJ��Z—. Mathew D. Falvey Manager I ,An Int,.,. r SFP 2 4 ►� Calocerincs & Spina Engineers, P.C. September 22, 1992 ` Mr. Dan Vornea Federal Aviation Administration New York Airports District Office 181 South Franklin Avenue Valley Stream, New York 11581 Re: Elizabeth Field Airport Fishers Island Airport Airfield Lighting, Visual Aids and Electrical Building FAA AIP No. 3-36-0029-05-92 NYSDOT No. 0913.05 File: 211.004 Dear Mr. Vornea: Pursuant to our phone conversation on September 16, 1992, and on behalf of the Town of Southold, we are proposing to include the installation of four additional runway/runway intersection signs and pavement markings to comply with the updated FAA AC 150/5340-18C, Change 1, entitled "Standards for Airport Sign Systems" under the above -referenced project. Attached is our opinion of construction costs based on estimate quantities for the additional work. Also enclosed is a plan showing the proposed location of the additional signs and pavement markings required to comply with the revised AC. We have requested the Contractor to submit a complete breakdown of costs associated with the additional work that is not already included in the contract. Please review the enclosed construction costs and plans. If accpetable, we will begin to process Change Order No. 1. If you have any questions or need.' additional information, do not hesitate to call our office. Very truly yours, RCRI O PI ENGINEERS, P.C. . McDermott Engineer CRM: kal Attachment cc: Mr. Scott Harris Mr. Phil Knauff Mr. Larry Cerretani Mr. Scott Shova Mr. Robert Michaud Mr. James Kuzloski 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457 6711 FAX (315) 457-9803 r- IS CC-11oCeI' nos & Spi ite September 21, 1992 Falvey Construction Corporation 12 Fire Tower Road Post Office Box 699 Killingworth, CT 06419 Re: Elizabeth Field Airport Airport Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-04-91 N.Y.S.D.O.T. No. 0913.04 File: 211.004 Gentlemen: Please be advised the Owner takes no exception to the use of Fresh Start Construction Co., Inc. as a subcontractor, on the above -referenced project, for construction of the electrical building roof, subject to compliance with all aspects of the Contract Documents. If you have any questions, do not hesitate to contact us. LJC/kw cc: Mr. P. Knauff Mr. S. Harris Mr. C. McDermott Mr. S. Shova Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. 0(1`1V1 4Z?/i Lawrence J. Cerretani Inspection Supervisor Airport Division 1020 Seventh North L�� .r �_. Y '., 1_,3 '�' ';.7-4 ; 1 t F`X +" - 45- y FALVEY CONS 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Inspection Supervisor CTION CORP. TEL 203/663-1695 :i� 203/663-2719 #I T S 'P 2 4 1992n supavisciE s cj-+ecrw i September 21, 1992 Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated September 11, 1992 regarding Calocerinos & Spina's charging Falvey Construction Corporation contract days for August 18 and August 19, 1992. Please be advised of the following. Falvey Construction Corporation concurs with Calocerinos & Spina that work progressed for 6 hours on August 18, 1992 and 8 hours on August 19, 1992. It must be noted that said work was performed out of sequence due to adverse weather conditions. The efficiency of this firm's schedule was greatly affected. A delay was inflicted upon this firm by circumstances beyond our control. The essence of the work and primary objective, i.e. princiipal item for the week was to pave runway 25 as indicated in Falvey Construction Corporation's correspon- dence dated August 26, 1992. Section 80-07, Item #1 states "No time shall be charged for days on which the contractor is unable to proceed with the principal item of work under construction at the time for at least six (6) hours with the normal work force employed on such principal item." As stated above, Falvey Construction Corporation could not proceed with the principal item of work. This firm is requesting Calocerinos & Spina to reconsider their position. cont. 'va Calocerinos & Spina, P.C. September 21, 1992 Page 2 i If you have any questions and/or comments, please contact the writer at 203-663-1695. Verytrulyyours, Mathew D. Falvey V Manager MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry District Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/chrge.day 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 ]FALV]EY CONSTRUCTION CORP. September 21, 1.992 Calocerinos & 1020 7th North Liverpool, New Spina, P.C. Street York: 131088 Attention: Larry Cerretani Inspection Supervisor Re: Airfield Lighting, Visual Aids & Electrical Buildinq Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-W29-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED SEP 2 r 1992 otj$014 T-,,,- ("Irl In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated September- 11, 19';2 regarding wort; within the runway intersection (work: area "C"). Please be advised Falvey Construction Corporation disagrees with Calocerinos & Spina's statement that our firm's request for an extension of time is not warranted. The contract documents, Section 80-11, clearly states that because of arriva..ls and departures of air- craft, the owner makes no representations as to the periods of time when conditions at the runways will permit the work: to be performed without interruption or as to when any work: can be performed and complete. The contract documents are r-eferrinq to miscellaneous interrup- tions during any given work: day. They do not account for a delay of approximately two weeks. Falvey Construction Corporation could not have possibly forseen this delay at the time of bidding. This firm will not accept liability for act=. out of our control. This delay is viewed by Falvey Construction Corporation as an owner- generated request. Such an act serves as a major disruption to Falvey Construction Corporation's progress schedule. If Calocerinos & Spina or the owner intended not to allow the runway to be closed during the first and second week: in September, then it should have been included in the contract docu- merits. Section 80-11 also states the use of runways and taxiways by aircraft, adjacent to areas where the contractor- is working, will be so scheduled a=_. to reduce disturbance to the con- tractor's operations. The contract documents, Section 80-()7, item #1 states "No time will be charged for days on which the contractor is unable to proceed with the principal item of work: under construction at the time for at least six (6) hour S. with the normal work: force employed on such principal item." The principal item scheduled work was to install the conduit, cable, etc. at the intersection of the two runways. cant. ,+ Calocerinos &< Spina, F.C. September 21, 1992 Page 2 Falvey Construction Corporation's schedule in fact would have allowed the intersection work: to be performed on September 'rd, 4th and 8th, 1992, but the owner requested the airport remain open during both sides of the Labor Day weekend. Falvey Construction Corporation revised our schedule to allow work: to be performed on September 3rd, 9th and 10th, 1992. Falvey Construction Corporation was requested/required by the owner to revise our schedule again. This firm informed the owner and Calocerinos & :spina that a time extension would be required along with associated costs. On September 14, 19922 Falvey Construction Corporation received Calocerinos & Spina's correspondence stating our request for a time extension is denied. Falvey Construction Corporation believes Calocerinos & Spina's actions are inconsistent with the contract documents. This firm is requesting that Calocerinos & Spina kindly recon- sider its position in order to mitigate further costs addressing this matter. If you have any questions and/or comments, please contact the writer at 203-663-1695. Vrery [trruly yours, Mathew D. Falvey Manager MDF/n is cc: Charles McDermott - C&S Phil Knauff - F.I. Ferry District Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-0/6C:1 Vii.'/Airport/workarea.c FALV]EY CONSTRUCTION CORP, 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 21, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED SEP 2 1992 SOUI'W'4 T- (•!„rk In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's request for proposal regarding the proposed shield for REIL unit on runway 30. Please be advised Falvey Construction Corporation is currently preparing a proposal and will forward it as soon as possible. If you have any questions and/or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja CC: Larry Cerretani - C&S Phil Knauff - F.I. Ferry District Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/shield.rei FALVEY CONSTRUC'➢'IM CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 21, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Inspection Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED P 2 , (3r' A t�th,1,4 T,..... In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated September 11, 1992 regarding the updated wage rates. Falvey Construction Corporation appreciates Calocerinos & Spina's attention in addressing this matter. It must be noted this firm will not be responsible for any delays in the resolution of this matter. Falvey Construction Corporation thanks you for your cooperation. If you have any questions and/or comments, please contact the writer at 203-663-1695. Very truly yours, r 1 V \ C,�.4_f u, D . - kl_ Mathew D. Falvey Manager MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry District Scott Harris - Town of Southold Scott Shova - US File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/rates.wag 0 0 FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699 FAX 203/663-2719 KILLINGWORTH, CT 06419 September 18, 1992 Calocerinos Plna, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Inspection Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated September 8, 1992 regarding cost breakdowns for lump Bum payments. Please be advised of the following: Addressing paragraph #1, Falvey Construction Corporation acknowledges Calocerinos & Spina's receipt of this firm's letter. Addressing paragraph #2, Calocerinos & Spina's interpretation of Falvey Construction Corpo- ration's letter dated August 14, 1992 is blatantly incorrect. If your firm would re -read said letter, it should be clear that Falvey Construction Corporation does not interpret the contract documents in such a manner. On the contrary, the contract documents indicate that substantiations of cost are required for certain types of payment. Further,.it is common practice within the industry to make such a request. As stated in Falvey Construction Corporation's aforementioned letter, this firm forwarded a cost breakdown to Calocerinos & Spina, i.e. Scott Shova on August 7, 1992 per Calocerinos & Spina's request. On August 12, 1992 Falvey Construction Corporation received Calocerinos & Spina's letter of August 10, 1992 requesting further cost breakdown which Falvey Construction Corporation found to be unjustified as indicated in this firm's letter dated August 14, 1992. Addressing paragraph #3, Falvey Construction Corporation concurs with Calocerinos & Spina's outline of Section 90-06. This firm interprets Section 90-06, once thoroughly read, to allow the contractor partial payments for work performed and materials installed complete, in place and in accordance with the contract documents. Therefore the contractor is allowed to bill for phases of lump sum items complete and in place. Calocerinos & Spina apparently interprets this section to mean that the contractor is not allowed to bill for work per - cont. Calocerinos & Spina, P.C. September 18, 1992 Page 2 formed in accordance with the contract documents until this unit is 100% complete. Not only is the interpretation unfair, but it is contrary to industry standard and contract documents Any time work is performed in accordance with the contract documents, the contractor is entitled to be reimbursed for said work. Addressing paragraph #4, as indicated in Calocerinos & Spina's letter and herein above, Section 90-06 allows partial payments for the value of the work performed and materials complete, in place and in accordance with the contract documents. No where in the contract documents does it state the unit must be in working order and 100% complete. The contract document clearly states the contractor is allowed partial payments for work performed. Addressing paragraph #5, this firm did not arbitrarily request partial payment. The con- tract documents allow this firm partial payments for lump sum items. If Calocerinos & Spina requests a cost breakdown for work complete and in place, Falvey Construction Corporation will gladly forward such information in accordance with the contract documents. The Schedule of Value was agreed upon at the start of this project. Re-evaluating this schedule at this time provides undo hardships and presents an avenue of delays in obtaining payment due. Falvey Construction Corporation will gladly cooperate with Calocerinos & Spina in any way possible, but will take an entitlement granted by the agreed upon contract documents. If you have any questions and/or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry District Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/091892.c&s FALVEY CONSTRUCTI®N CORP. (,�)"�_� 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699 FAX 203/663-2719 KILLINGWORTH, CT 06419 September 18, 1992 Calocerinos & Spina, P.C. RECENED 1020 7th North Street �rA Liverpool, New York 13088 Attention: Larry Cerretani ,t Inspection Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated September 9, 1992 regarding the REIL unit locations on Runway 30. Please be advised of the following: A. Falvey Construction Corporation bid this project with the understanding that the plans and specifications were accurate and required no changes. B. Falvey Construction Corporation's schedule date for installation of REIL bases on Runway 30 was actually August 31, 1992 but without major disruption rescheduled the installation date to September 1, 1992. The intent was to allow Calocerinos & Spina more time to provide this firm with direction. As noted above, Falvey Construction Corporation had notified Calocerinos & Spina verbally in the field on August 26, 1992 and again in this firm's correspondence dated August 28, 1992 via fax and postal service that Falvey Construction Corporation scheduled the installation of the REIL units on September 1, 1992. Falvey Construction Corporation did not receive verbal direction until the afternoon of September 2, 1992 and written direction until Sep- tember 11, 1992. With the above noted, it is apparent that a disruption in the sequence and scheduling occurred, i.e. delay. There is a cost associated with any delay that occurs. This firm does not know the full impact of this particular delay at this time. Falvey Construction Corporation reserves its rights to charge the Town of Southold for any and all costs associated with the above noted change and delay. Once accurately accessed and calculated, Falvey Construction Corporation may or may not deem it necessary to pursue the costs incurred to this firm. cont. 9 0 Calocerinos & Spina, P.C. September 18, 1992 Page 2 If you have any questions and/or comments, please contact the writer at 203-663-1695. Very (truly yours, Mathew D. Falvey Manager MDF/nia CC: Charles McDermott — C&S Phil Knauff — F.I. Ferry District Scott Harris — Town of Southold Scott Shova — C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/reil.loc PALLET CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 18, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Inspection Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, Falvey Construction Corporation takes exception to Calocerinos & Spina's memorandum dated September 9, 1992 regarding weekly progress meet- ing #9. A. Falvey Construction Corporation takes exception to Calocerinos & Spina's statement that there have been 40 days charged to this contract with 20 working days remaining, when in fact, there should be 38 contract days charged with 22 working days remaining as of Septem- ber 9, 1992. Please refer to Falvey Construction Corporation's correspondence dated August 26, 1992. B. Calocerinos & Spina stated they believe the elapsed contract time is 67% with approxi- mately 61% of the work complete. A review of Falvey Construction Corporation's schedule clearly shows approximately 63% of contract time has elapsed with approximately 65% of work completed. C. Falvey Construction Corporation, i.e. Mathew Falvey stated that an extension of time as well as associated costs will be required by this firm as a result of the owners delay to Falvey Construction Corporation's schedule. No objection was noted by Calocerinos & Spina or the Town of Southold. Mr. Knauff indicated a time extension will be granted. D. Falvey Construction Corporation stated that simultaneous closure of the runway will be required in addition to September 15, 1992 throught September 17, 1992 to allow runway painting, etc. No objection was noted. cont. Calocerinos & Spina, P.C. September 18, 1992 Page 2 If you have any questions and/or comments, please contact the writer at 203-663-1695. Very truly yours, %% k 4 Mathew D. Falvey Manager MDF/nja CC: Charles McDermott — C&S Phil Knauff — F.I. Ferry District Scott Harris — Town of Southold Scott Shova — C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/meeting.#9 Calocerinos & Spina Engineers, P.C. MEMO TO: Files FROM: UM CONTRACTOR: fV41 SiTBJ: FILE: DATE: CAttendees: Scott Shova Resident Engineer Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA AIP No. 3-36-0029-05-92 NYSDOT No. 0913.05 Falvey Construction Corporation Weekly Progress Meeting No. 10 211.004 September 17, 1992 Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina Falvey Construction - Fisher Island Ferry District Weekly Progress Meeting No. 10, for the above referenced project, was held on Thursday, September 10, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. -- The following is a summary of items discussed. In the event the following does not } accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. Through September 11, 1992, 43 days have been charged to the Contract, with 17 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending 9/11/92: 1. Work on the lighted wind cone was continued. 2. Work on electrical building was continued. 3. Cable installation for Runway 12-30 was completed, except for the intersection. 11 Memo To: Files September 17, 1992 Page 2 4. Duct bank for the electrical building's electrical service was formed and the conduit was installed. 72% of Contract Time has elapsed with approximately 68% of the work completed. Work anticipated for week of September 14 1992 - September 18 1992: 1. Repave the 4 -way duct banks and edge light trenches on Runway 12-30. 2. Continue work on the electrical building roof. 3. Work on the runway edge lights located near the runway's intersections. 4. Continue work on the wind cone segmented circle. I - • 1. C&S requested an updated schedule from the Contractor. 2. Falvey Construction stated that he will be doing work in the runway's intersections on September 15, 16 and 17, 1992. On these dates the airport will be closed from 8:00 a.m. to 4:00 p.m. A NOTAM was issued stating these conditions. Also, Falvey Construction stated that there might be two days of the week of September 21 - 25 on which he may need the airport closed for painting in the intersection. Phil Knauff commented that it was no problem, but would like to no the exact dates by the next weekly Progress Meeting on September 16, 1992. 3. Falvey Construction's questions on the response of the previous problem on the wage rates. Scott Shova of C&S stated that he would have to contact his office and give Falvey Construction a response at a later date. 1 0 Memo To: Files September 17, 1992 Page 3 The meeting was adjourned and Meeting No. 11 was scheduled for Wednesday, September 16, 1992. SS/cb cc: Those in attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea r1 DEPARTMENT OF TRANSPORTATION vac ENDING FEDERAL AVIATION ADMINISTRATION September 11, 1992 CONSTRUCTION PROGRESS AND INSPECTION REPORT FAAP/ADAP F AAPJAOAP PROJECT NLIMBER 3-36-0029-05-92 AIRPORT NAME ELIZABETH FIELD AIRPORT -FISHERS ISLAND TYPE of CONTRACT - AIRFIELD LIGHTING, VISUAL CONTRACTOR8 NAME AIDS & ELECTRICAL BUILDING FALVEY CONSTRUCTION CORPORATION t. ROUGH ESTIMATE OF PERCENT OOMPLETION TO DATE OF CONSTRUCTION PHA8E8 SEE ATTACHED 1 2. BRIEF OUTLINE OF WORK COMPLETED OR IN PROGRESS THIS WEEK Work on the segmented circle for the wind cone was started. Work on the electrical building was continued. Block sealer and the first coat of epoxy paint was installed in the electrical building. The installation of No. 8 Aug. 5 kw cable was completed on Runway End 30. 3. BRIEF WEATHER SUMMARY THIS WEEK INCLUDING APPROXIMATE RAINFALL i PERIODS OF BELOW FREEZING TEMPERATURE 09/07/92 - Holiday 09/08/92 - high - 78- - low - 66, - precip. - 0.19" rain 09/09/92 - high - 78' - low - 69' - precip. - 0.0" 09/10/92 - high - 80- - low - 71, - precip. - 0.0" 09/11/92 - high - 76, - low - 64' - precip. - 0.11" rain 4. CONTRACT TIME 1L BRIEF SUMMARY LABORATORY AND FIELD TESTING THIS WEEK None CHARGED LAST WORION(i TO DATE DAY CHARGED 43/17 9/10/92 B WORK BY CONTRACTOR ANTICIPATED FOR NEXT WEEK Continue work on the electrical building's roof. Complete the painting of the electrical's interior. Continue work on the segmented circle. 7. PROBLEM AREAS OR OTHER COMMENTS 72% of contract time has elapsed; approximately 68% of the work is completed. 9/7/92 was not charged due to a legal holiday. SPONSOR'S INSPECTOR OR REPRESENTATIVE TYPED OR PRINTED NAME AND TITLE SIGNATURE DATE Scott Shova, Resident Inspector 09/14/92 FAA rUHM 5370-1 DATE OF -•- •t PROJECT:•eti • Airport - Fishersd • • •- Visual Aids & Elec, BWZ 1. Rough Estimate of Percent Completion to Date of Construction Phases: P-152 (1) 0% L-115 (20) 0% P-152 (2) 0% L-125 (21) 45% P-612 (3) 72% L-125 (22) 60% P-620 (4) 0% L-125 (23) 50% L-102 (5) 77% L-125 (24) 50% L-106 (6) 0% L-125 (25) 50% L-107 (7) 65% L-125 (26) 50% L-108 (8) 85% L-125 (27) 65% L-108 (9) 83% L-125 (28) 65% L-108 (10) 94% L-125 (29) 65% L-108 (11) 98% L-125 (30) 65% L-109 (12) 0% L-125 (31) 65% L-110 (13) 90% L-125 (32) 65% L-110 (14) 100% L-125 (33) 65% L-110 (15) 67% L-125 (34) 65% L-110 (16) 69% L-125 (35) 0% L-110 (17) 0% M-100 (36) 68% L-112 (18) 75% M-200 (37) 100% L-115 (19) 80% 0 ]FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 16, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED 8E 2 4 1992 In reference to the above -captioned project, Falvey Construction Corporation is submitting the names and addresses of the subcontractors that will be working for this firm. Subcontractors Name & Address Job Performed Fresh Start Construction Co., Inc. electrical bldg. roof 34 Beatrice Street Westerly, RI 02891 If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja cc: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. ;/Scott Harris - Town of Southold File: FIAIR/FCC/CT-O/GC:I VW3/Airport/subcontr.2 Z� Cs_�bcerinos & SO�u DC Mr. Mathew Falvey Falvey Construction Corp. 12 Fire Tower Road P.O. Box 699 Killingworth, CT 06419 Dear Mr. Falvey: September 11, 1992 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA AIP # 3-36-002944-91 NYSDOT # 0913.04 File: 211.004 We are in receipt of your September 3, 1922 correspondence regarding the scheduling of the runway/runway intersection work (Work Area "C"), on the above referenced project, and have the following comments on behalf of the Owner. We do not agree that your firm is due additional compensation because of the Owner allowing work to be conducted on September 15, 16, and 17, 1992 instead of September 3, 9 and 10, 1992 due to arrivals and departures at the airport. Section 80-11 of the Contract Documents clearly states that because of arrivals and departures of aircraft, the Owner makes no representations as to the periods of time when conditions at the runways will permit the work to be performed without interruption or as to when any work can be performed and completed. In view of the above noted, it is our position that Falvey Construction's claim is not warranted. In addition, your request for a time extension is denied as work could have and did progress in other work areas. v _ Jt 1 # FAX 'J1 � 4ti ��n 0,Pventh North 3r �_ �.�ti.i a _ , ,-C � _9 ;. ti Mr. Mathew Falvey September 11, 1992 Page 2 If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. / dtlt�- Lawrence J. Cerretanni Inspection Supervisor Airport Division IJC/cb cc: Mr. S. Harris Mr. P. Knauff Mr. S. Shova Mr. A. D'Eredita (w/encl) =- _.0ce "InaS & S, Mr. Mathew Falvey Falvey Construction Corp. 12 Fire Tower Road P.O. Box 699 Killingworth, CT 06419 Dear Mr. Falvey: • SSP 1 5 , September 11, 1992 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA AIP # 3-36-0029-04-91 NYSDOT # 0913.04 File: 211.004 We are in receipt of your August 28, 1922 and September 4, 1992 correspondence regarding your request for a Change Order for the increased labor costs due.to the updated wage rate schedule on the above referenced project. Please be advised we have forwarded your request and our recommendation to the Owner. When we receive the Owner's response, we will advise you accordingly. If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division UC/cb cc: Mr. S. Harris Mr. P. Knauff Mr. S. Shova Mr. A. D'Eredita (w/encl) ^^ ` --,Gnth I ' , „ ; -�% '? FAX ;315j 45 <-9W3 iocerinos & Spi} Mr. Mathew Falvey Falvey Construction Corp. 12 Fire Tower Road P.O. Box 699 Killingworth, CT 06419 Dear Mr. Falvey: September 11, 1992 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA AIP # 3-36-0029-04-91 NYSDOT # 0913.04 File: 211.004 We are in receipt of your August 26, 1922 correspondence in which you dispute the charging of August 18 and 19, 1992 as work days, on the above referenced project, and have the following comments on behalf of the Owner. A review of the project records and discussions with the Resident Inspector reveals that weather was not a factor that prevented work from progressing on August 18 and 19, 1992. Work in fact progressed on the project as cable trenching, cable and conduit was installed. Work proceeded for six hours on August 18, 1992 and for eight hours on August 19, 1992 which required the presence of the Resident Inspector. In view of the above noted, your request is denied. If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. �CLaJencaeJ. Cerretani Inspection Supervisor Airport Division LJC/cb cc: Mr. S. Harris Mr. P. Knauff Mr. S. Shova Mr. A. D'Eredita (w/encl) 102 Seventh North :x t. ._ ;r��.:'. "�; . ,q � �7 %�i 1 1 FAX (3 i 5) 457-9%� DEPARTMENT OF TRANSPORTATION Wal` ENDING FEDERAL AVIATION ADMINISTRATION r r ! ,, f Sept. 4, 1992 CONSTRUCTION PROGRESS AND INSPECTION REPORT FAAP/ADAP M FAIADAP PROJECT NUMBER 3-36-0029-05-92 AMORT NAME ELIZABETH FIELD AIRPORT -FISHERS ISLAND TYPE OF CONTRACT - AIRFIELD LIGHTING, VISUAL CONTRACTOR'S NAME AIDS & ELECTRICAL BUILDING FALVEY CONSTRUCTION CORPORATION 1. ROUGH ESTIMATE OF PERCENT COMPLETION TO DATE OF CONSTRUCTION PHASES SEE ATTACHED 2. BRIEF OUTLINE Or WORK COMPLETE) OR INPROWIESS TMS WEEK Duct banks on R/W 12-30 were backfilled. Work on the inst. of RFIL and PAP1 systems, on R/W 12-30 was continued. The inst. of R/W edge light cables was continued. Wind cone foundation was inst. 3. OR WEATHER SUMMARY THIS WEEK INCLUDING APPROXIMATE RAINFALL • PERIODS OF BELOW FREEZING TEMI"ATURE 08/31/92 - high - 780 - low - 64° 09/01/92 - high - 750 - low - 570 09/02/92 - high - 761 - low - 541 09/03/92 - high - 711 - low - 580 precip. 71" rain 09/04/92 - high - 780 - low - 581 6. CONTRACT TIME 5. BRIEF SUMMARY LABORATORY AND FIELD TESTING THIS WEEK None CHARGED LAST WORKING TO DATE DAY CHARGED 40/20 9/04/92 S. WORK BY CONTRACTOR ANTICPATED FOR NEM WEEK Repave duct bank and edge light cuts on R/W 12-30. Paint the inside of the Elect Building. Inst. Reil system R/W 12-30. Complete the inst. of cable for R/W 12-30. 7. PROBLEM AREAS OR OTHER COMMENTS 67% of contract time has elapsed. Approximately 61 % of the work is completed. 9/3/92 was not charged due to rain. SPONSOR'S INSPECTOR OR REPRESENTATIVE TYPED OR PRINTED NAME AND TIRE SIGNATURE DATE Scott Shova, Resident Inspector / 09/10/92 A FORM 3 -1 w 0 a DATE OF REPORT: 9/04/92 PROJECT: Elizabeth Field Airoort - Fishers Island - Airfield Liahtina. Visual Aids & Elec. Blda. 1. Rough Estimate of Percent Completion to Date of Construction Phases: P-152 (1) % L-115 (20) % P-152 (2) % L-125 (21) 45% P-612 (3) 67% L-125 (22) 60% P-620 (4) % L-125 (23) 30% L-102 (5) 75% L-125 (24) 30% L-106 (6) % L-125 (25) 30% L-107 (7) 30% L-125 (26) 30% L-108 (8) 79% L-125 (27) 60% L-108 (9) 82% L-125 (28) 60% L-108 (10) 85% L-125 (29) 50% L-108 (11) 98% L-125 (30) 10% L-109 (12) % L-125 (31) 60% L-110 (13) 90% L-125 (32) 60% L-110 (14) 98% L-125 (33) 50% L-110 (15) 67% L-125 (34) 50% L-110 (16) 69% L-125 (35) % L-110 (17) % M-100 (36) 61% L-112 (18) 62% M-200 (37) 100% L-115 (19) 80% FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 04, 1992 Calocei inos & Spina, P.1'... 1020 7th North Street. Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York A1P Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED SEP 16 1992 3rAwb r, C44 In refer-ence to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's memorandum dated August 31, 1992 regarding the weekly meet- ing No. 8. This firm takes except -i. -in to Calocerinos & Spina's statement under the open discussion sec- tion, ?tem 4. Falve��('>nstruction Corporation did not state that the wage rates in the con- tract !.)cuments are not for the correct dates. This firm stated that we are requesting a change order for the w1!_fe rate increase effective July 1. 1992, which is not listed in the contra(t documents date) and sign by this firm on May 1, 1992. Falvey Construction Corpo- ration will not be resr-Drisible for changes or alterations to the contract documents without a full; authorized and fully executed change order. Falvey Construction Corr -oration is here again requesting a change order for the wage rate increa:!e. Falvey Construction Corporation reserves the right to charge the Town of Southold for an, and all costs a3sociated with the delay in addressing the issue. Please contact this office as soon as Possible in order to mitigate damages. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, �1:_.).v rl 'e —(-2"ve Mathew D. Falvey 1 ey Manager MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/weekly.#8 ocenn0S&Sp, Mr. Mathew Falvey Falvey Construction Corp. 12 Fire Tower Road P.O. Box 699 Killingworth, CT 06419 Dear Mr. Falvey: September 10, 1992 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA AIP # 3-36-0029-04-91 NYSDOT # 0913.04 File: 211.004 We are in receipt of your September 1, 1992 correspondence regarding your request for direction with the beach sand removal and cable re -installation at the Runway 7 end on the above referenced project. It is my understanding Charles McDermott of our office clarified any questions you may have had with regard to the above noted in his September 3, 1992 telephone conversation with you. If you have any questions or require further clarification, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. /1 /,\ _ - (�dCU/L'�A� Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/cb cc: Mr. S. Harris Mr. P. Knauff Mr. S. Shova Mr. C. McDermott Mr. D. Vornea (w/encl) Mr. S. Honor (w/encl) 1 C20 Sevenih North SkrF .. - 671 1 FAX (315j 457-9W33 0 C cerinos&Spit September 10, 1992 Mr. Mathew Falvey Falvey Construction Corp. 12 Fire Tower Road P.O. Box 699 Killingworth, CT 06419 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA AIP # 3-36-0029-04-91 NYSDOT # 0913.04 File: 211.004 Dear Mr. Falvey: Attached is the Notice of Determination Poster for the above referenced project. The determination is for a maximum of 10 hours per day 5 days per week for the period from September 2, 1992 to September 30, 1992. In addition, the poster is required to be installed on your bulletin board at the project site. If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. 0/4 - Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/cb cc: Mr. S. Harris Mr. P. Knauff Mr. S. Shova (w/encl) `f . , a ti15; 157-67' 1 F-kX 3' � 4 1020 'Sevenm North . tr. -' ._ _ -1 57-9803 C- - -S Calocerinos & Spina Engineers. P.C. Mr. Mathew Falvey Falvey Construction Corp. 12 Fire Tower Road P.O. Box 699 Killingworth, CT 06419 Dear Mr. Falvey: 0 September 9, 1992 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA AIP # 3-36-0029-04-91 NYSDOT # 0913.04 File: 211.004 We are in receipt of your September 1, 1992 correspondence regarding the location of the proposed Runway 30 REEL units, on the above referenced project, and have the following commends on behalf of the Owner. You were notified on September 2, 1992 we received approval from the FAA to reposition the Runway 30 REIL units to 35 feet right and left of the Runway 30 edge line instead of the 40 feet as shown on the plans. We do not consider this a delay which has caused any additional costs or warrants a time extension as work continued on the project. Specifically, duct banks crossing Runway 12-30 were backfilled, the roof planks at the electrical vault building were grouted and the defective 600 -volt cable for the Runway 7 REIL units was replaced. If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. f t Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/cb cc: Mr. S. Harris Mr. P. Knauff Mr. S. Shova Mr. C. McDermott 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 IFS Calocerinos & Spina Engineers, P.C. MEMO TO: Files FROM: Scott Shova Resident Engineer RE: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA AIP No. 3-36-0029-05-92 NYSDOT No. 0913.05 Attendees: Falvey Construction Corporation Weekly Progress Meeting No. 9 211.004 September 9, 1992 Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina Falvey Construction - Fisher Island Ferry District 4i Weekly Progress Meeting No. 9, for the above referenced project, was held on Wednesday, September 2, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not accurately reflect the sura and substance of what iranspired at this meeting, please provide an addendum or corrections immediately. Through September 4, 40 days have been charged to the Contract, with 20 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending9/4/92: 1. Duct banks on Runway 12-30 were backfilled. 2. Wind cone foundation was installed. 3. REIL System foundations runway end 30 was installed. CONTRACTOR: PVJ SUBJ: FILE: DATE: Attendees: Falvey Construction Corporation Weekly Progress Meeting No. 9 211.004 September 9, 1992 Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina Falvey Construction - Fisher Island Ferry District 4i Weekly Progress Meeting No. 9, for the above referenced project, was held on Wednesday, September 2, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not accurately reflect the sura and substance of what iranspired at this meeting, please provide an addendum or corrections immediately. Through September 4, 40 days have been charged to the Contract, with 20 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending9/4/92: 1. Duct banks on Runway 12-30 were backfilled. 2. Wind cone foundation was installed. 3. REIL System foundations runway end 30 was installed. • ,ft. Memo To: Files September 9, 1992 Page 2 4. Work on the Runway 12-30 edge light bases was continued. 67% of Contract Time has elapsed with approximately 61 % of the work completed. 1. Repave the 4 -way duct banks and edge light trenches on Runway 12-30. 2. Complete the installation of runway lighting cables on Runway 12-30. 3. Paint the inside of the electric building. 4. Begin work on the wind cone segmented circle. 5. Install the REIL System on Runway 12-30. Open Discussion 1. C&S stated that the REIL System on Runway End 30 will be moved into 35' off the runway edge line. This is to prevent disturbing the stone break water. 2. C&S requested from the Contractor a corrected set of Shop Drawings on the Electrical Building Equipment. 3. Phil Knauff stated that the runway intersection work can be done on September 15, 16 and 17. On these dates the airport will be closed between the hours of 8:00 a.m. and 4:00 p.m. The meeting was adjourned and Meeting No. 10 was scheduled for Wednesday, September 9, 1992. SS/cb cc: Those in attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea RECEIVES • _ _ QQ TRANSMITTAL t✓a!n .erin'e5 & S ina D-" ^ p tr P 1 s 2992 cnc:n? s P.C. SOUTh011r4 T,.,,,n r7lpr4 Mr. Phil Knauff pe- Fisher's Island Ferry District Commissioner Airfield Lighting, Visual Aids Fisher's Island Ferry District and Electrical Building Foot of State Street New London, CT 06320 Fife: 211.004 At'ertion: Date: September 10, 1992 We are sending you XX herewith under separate cover via Original First Estimate and Claim Voucher, for the above referenced project. The above are for information XX approval revision construction XX other Payment r=ye-rarks. If you have any questions, please feel free to contact us. If erc;osed are not as noted, please notify us at once. C ';LCC=—'L'& SPINA Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/cb Enclosure cc: Ms. Judith Terry (w/encl) 1020 Seventh North Street, Liverpool, NY (315) 457-6711 FAX (315) 457-9803 Account Number ............. Invoice *............. Date ................ 19........... TOWN OF SOUTHOLD, COUNTY OF SUFFOLK, N.Y., Dr. PAY TO: Payee Identification Payee Name: or Social Security Number: .................................... .... Fa)yey. Construction. Corporation... Payee Reference: Address: .................................... P:9:.4X.699....................... Phone No.(....)....................... ... Killingworth,,Conn.06419........... Vendor Contact Cash Discount ..................% .........Days.................................... Item No. Description of Material/Service Quantity Unit Price Amount 523-12 Airport Invoice #1, 8/10/92 211.004 Pursuant to the terms of the Contract, dated May 1, 1992 by and between the Town of Southold and a vey Construction Lorporation and Engineer's AMOUNT DUE CONTRACTOR, FIRST ESTIMATE ----------------------------------- )106,0522. Total `1.106,522.31. Discount Net The undersigned (Claimant) (Acting on behalf of above named claimant) does hereby certify that the foregoing claim is true and correct and that no part thereof has been paid, except as therein stated, and that the balance therein stated is actually due and owing. Fal vey Constructi on Corporation Dated ...... ..............19�Z . by; ... Signature z .......... ,.............................•..........................................0.......................................... PROJECT: , ELIZABETH FIELD AIRPORT -FISHERS ISLAND File No. 211.004 ' AIRFIELD LIGHTING, VISUAL AIDS & ELECTRICAL BUILDING FAA-AIP NO. 3-36-0029-05-92, N.Y.S.D.O.T. NO. 0913.05 Date: 8/10/92 Estimate No: ONE TO THE TOWN OF SOUTHOLD: Pursuant to the terms of the Contract, dated May 1, 1992, by and between the Town of Southold and Falvey Construction Corporation, contractor for the construction of the Elizabeth Field Airport -Fishers Island, Airfield Lighting, Visual Aids & Electrical Building (FAA-AIP No. 3-36-0029-05-92, N.Y.S.D.O.T. No. 0913.05), we hereby submit the First Estimate, for work completed through July 30, 1992: ---------------------------------------------------------------------------------------------------------------------------------------• ORIGINAL QUANTITY Item CONTRACT UNIT : TO UNIT TOTAL $ Number ------------ DESCRIPTION I------------------------------------------ i----------------- QUANTITY DATE PRICE TO DATE P-152 1. Common Excavation, Area No. 1 i-------- 100.00% : I---------------- L.S. i ------------------ 0.00% : 1----------------: $10,000.00 $0.00 P-152 2. Pavement Excavation(Bituminous Concrete) : 900.00 S.Y. 0.00 3.00 0.00 P-612 3. Field Office 100.00% : L.S. 32.00% : 18,200.00 5,824.00 P-620 4. Runway Painting 23,000.00 s.f. 0.00 0.50 0.00 L-102 5. Electrical Building Electrical Service 100.00% : L.S. 75.00% : 9,000.00 6,750.00 L-106 6. Segmented Circle 100.00% : L.S. 0.00% : 15,300.00 0.00 11-107 7. Lighted Wind Cone 100.00% : L.S. 0.00% : 16,700.00 0.00 L-108 8. Cable Trenching for the Installation of Underground Cable 8,600.00 l.f. 2,716.00 2.25 6,111.00 L-108 9. No. 8 AWG 600V Type C Single Conductor , Underground Cable instld in Trench/Duct 28,300.00 1.f. 10,956.50 0.38 4,163.47 L-108 10. No. 8 AWG 5KV Type C Single Conductor , Underground Cable instld in Trench/Duct 12,900.00 l.f. 0.00 0.38 0.00 L-108 11. No. 8 AWG Bare Copper Counterposie Wire installed in Trench including Grounding Rods and Exothermic Connections 9,500.00 l.f. 0.00 0.28 0.00 L-109 12. : Installation of Airport Electrical : Building Equipment, in Place 100.00% : L.S. 0.00% : 30,000.00 : 0.00 L-110 13. : 4 -way Electrical Duct Bank Type I 700.00 l.f. 258.00 : 55.00 : 14,190.00 L-110 14. : 8 -way Electrical Duct Bank Type I 200.00 : l.f. 195.00 : 70.00 : 13,650,00 L-110 15. : 2 -in Dia RSC installed in Pavement 3,000.00 l.f. 590.70 : 4.00 : 2,362.80 L-110 16. : 2 -in Dia RSC installed in Turf 270.00 l.f. 13.00 : 2.00 : 26.00 L-110 17. : 2 -in Dia RSC reinstalled in Turf 190.00 l.f. 0.00 : 2.00 : 0.00 L-112 18. : Electrical Building 100.00% : L.S. 42.001 : 40,000.00 : 16,800.00 L-115 19. : Electrical Manhole No. 1 1.00 : each 49.00% : 12,250.00 : 6,002.50 L-115 20. : Pull Box Reinstallation 1.00 : each : 0.00 : 500.00 : 0.00 L-125 21. : Medium Intensity R/V Edge Lights, : Use Mounted, in Pavement 57.00 each 0.00 315.00 0.00 L-125 22. : Runway 25 Threshold Lights 100.00% : L.S. 40.00% : 3,800.00 1,520.00 L-125 23. , Airport Guidance Sign No. R-2-5, : Base Mounted, in Pavement 100.00% : L.S. 0.00% : 2,655.00 0.00 L-125 24. : Airport Guidance Sign No. 8-2-19, : Base Mounted, in Pavement 100.00% L.S. 0.00% : 2,655.00 0.00 ..-125 25. , Airport Guidance Sign No. R-1-3, : Base Mounted, in Turf 100.00% : L.S. 0.00% : 2,400.00 0.00 L-125 26. : Airport Guidance Sign No. R-1-19, : Base Mounted, in Turf 100.00% L.S. 0.00% : 2,400.00 0.00 L-125 27. : R/W End Identification Light (REIL) : System, Runway 7 End 100.00% : L.S. 40.00% : 8,250.00 3,300.00 L-125 28. : R/W End Identification Light (REIL) : System, Runway 25 End 100.00% : L.S. 40.00% : 8,250.00 3,300.00 L-125 29. R/W End Identification Light EIL) � �.00X System, Runway 12 End 100.00% , L.S. 8,250.00 0.00 , L-125 30. R/W End Identification Light (REIL) , System, Runway 30 End 100.00% : L.S. 0.00% : 8,250.00 : 0.00 L-125 31. Generic Visual Approach Descent Indicator System, Runway 7 End 100.00% : L.S. 40.00% : 9,580.00 3,832.00 L-125 32. Generic Visual Approach Descent Indicator System, Runway 25 End 100.00% : L.S. 40.00% : 9,580.00 3,832.00 L-125 33. Generic Visual Approach Descent Indicator System, Runway 12 End 100.00% : L.S. 0.00% : 9,580.00 0.00 L-125 34. Generic Visual Approach Descent Indicator System, Runway 30 End 100.00% : L.S. 0.00% 9,580.00 0.00 L-125 35. Removal of Existing Runway Edge Lights 100.00% : L.S. 0.00% : 7,500.00 : C.00 M-100 36, M & P of Traffic 100.00% : L.S. : 19.00% : 23,500.00 4,465.00 M-200 37. Mobilization 100.00% : L.S. 100.00% : 16,000.00 16,000.00 ---------------------------------------------------------------------------------------------------------------------------------------- Total Amount of Work Done to Date ---------------------------- $112,128,77 STATEMENT OF DAYS CHARGED Less 5% Retained --------------------------------------------- 5,606.44 TOTAL CONTRACT DAYS 60 $106,522.33 LESS DAYS CHARGED 19 .... Amount Recommended for Payment, Previous Estimates ----------- 0.00 ............. DAYS REMAINING 41 AMOUNT DUE CONTRACTOR, FIRST ESTIMATE ---------- $106,522.33 FALVEY CONSTRUCTION CORPORATION 8Y: TITLE:f�Q/_)IUQYI�. DATE: Av% ;xa. igq-.2, CALOCERINOS 6 SPINA Engineers, P.C. kL - Harold V. Wagner, Jr 1 Division Manager 0 FALVIEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 8, 1992 Calocerinos & Spina. F.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cer-retani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth, Field, Fishers Island, New York AIF Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: L 00� u TEL 203/663-1695 FAX 203/663-2719 RECEIVED SEP 1 , z- 1992 C'wJfht%W T--..- /1_4 In reference t,) the ab, -,we -captioned project, Falvey Construction Corporation is in receipt of Calc­.:erinus & Spina's letter dated August 10, 1992 regarding this firm's construction schedule. Please be advised that Falvey Construction Corporation disagrees with the calcu- lations indicated in Calocerinos & Spina's said letter. Be further advised that Falvey Con- struction Corporation submitted our updated progress schedule on August 6, 1992, one day prior- to Calocerinos & Spina's review of the project records. This firm believes that this project, will be completed on schedule. Falvey Construction Corporation will forward an updated schedule in the week of September 7, 1992. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, IV Mathew D. Falvey Manager MDF/n is Enclosures CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/schedule FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 1, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED SEP 0 1992 1qAIItknIA I—— #-I_L In reference to the above -captioned project, please be advised as of this date, Falvey Con- struction Corporation has not received direction regarding the relocation of the REIL units at Runway End 30. Please refer to Falvey Construction Corporation's correspondence dated August 28, 1992. This firm hereby reserves the right to charge the Town of Southold for any and all costs associated with the above -noted delay and will require an extension of time. All costs will not be known until near the end of this project. Once tabulated, they will be forwarded to Calocerinos & Spina and the Town of Southold. Falvey Construction Corporation is requesting direction be forwarded as soon as possible in order to mitigate damages and delays so that this project may be brought to a timely and favorable close. If you have any questions or continents, please contact the writer at 203-663-1695. Very truly yours, ^M� U. �;avl ,jm- Mathew D. Falvey Manager MDF/nja Enclosures CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-O/GC:1 VW3/Airport/rei1.30 FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 3, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED In reference to the above -captioned project, please be advised on September 1, 1992 at approximately 8:00 AM, Falvey Construction Corporation, i.e. Mathew Falvey met with the Fishers Island Ferry District, i.e. Phil Knauff and informed hire of this firm's schedule for simultaneous closure of the runways. Mr. Falvey explained that Falvey Construction Corpora- tion's schedule will require the runways to be closed on September 3, September 9, and Sep- tember 10, 1992 between 8:00 AM and 4:00 PM. Mr. Knauff replied by stating the runways can be closed from September 15, 1992 through September 17, 1992 only. Mr. Falvey indicated that this would delay Falvey Construction Corporation's progress in the project and would result in additional costs. Mr. Knauff said lie would consult with other people to see if they would allow Falvey Construction Corporation to close the runways on the sc_.hed+tled dates. Mr. Falvey contacted Mr. Knauff later in the day and queried Mr. Knauff regarding the above -noted. Mr. Knauff stated after consultation with his people, the only time they will allow the simultaneous closure of the runways is September 15, 1992 tbrou,,:lr September 17, 1992. Guth fire al;, -,v- r,ted, it is apparent to Falvey Construction Corporation that the owner is causln- delay i_-, the proal els of this project. In accar(lar,ce with the contract documents, section ilk' -07. Falvey Con, --!f "' l.c�rp��iation is hei-el_)y re<jUesting an ^nslon of tiliie as nec((s,sary t,o coir,pC,n ate f,_ -)Y any delays of simultaneous ri]nactys closures ".urther, Falvey C;ollm.rui1ion corpor•ition reserveS the 1-iglit- to charge the T,Dwn of Southold for any and all cc:>ts as.>o(_iated with said delays. Once the costs are accurately accessed and tal_l.dated, the -,y will be forward -d to Calc,cerinc,s & ;spina and tl.e Town of Southold. cent. Calocerinos & Spina, P.C. September 3, 1992 Page 2 If yoti have any questlr,n ol- cf-irfliients, Blease contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja Enclosures CC: Charles McDermottsy C&S Phil Knauff — F.I. Ferry Dist. 'Phil Harris — Town of Southold Scott Shova — C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/runway.clo ]FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 September 1, 1992 TEL 203/663-1695 FAX 203/663-2719 Calocerinos & Spina, P.C. RECEIVED 1020 7th North Street Liverpool, New York 13088 P _92 Attention: Larry Cerretani Cnuthnlri Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, please be advised the work at the end of Runway End 7, i.e. beach sand removal and cable re -installation is scheduled to commence on Tues- day. September 8, 1992. Falvey Construction Corporation is inquiring as to whether a Change Order will be issued or is the work to be performed under the original contract documents. This firm is requesting a response and direction prior to this scheduled start date. If direction is not provided as requested, Falvey Construction Corporation will reserve its right to charge for any and all delays, disruptions and associated costs. Thank you for your cooperation. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, 7"" -D, Mathew D. Falvey Manager MDF/n ja Enclosures cc: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold Scott Shova - C&S File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/RWEnd.7 -S Calocerinos & Spina E-,cineers, P.C. Falvey Construction Corporation 12 Fire Tower Road Post Office Boz 699 Killingworth, CT 06419 Gentlemen: • September 1, 1992 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-04-91 N.Y.S.D.O.T. No. 0913.04 File: 211.004 We have contacted the FAA regarding the conflict with the existing rock retaining wall and the proposed location of the REIL units for Runway 30, on the above -referenced project. Specifically, we have requested approval to reposition the REEL units for Runway 30 to 35 feet right and left of Runway centerline instead of the 40 feet, as shown on the plans. We shall notify you of the FAA's decision, when received. If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/kw cc: Mr. P. Knauff Mr. S. Harris Mr. S. Shova Mr. C. McDermott 1020 Seventh North Street, Liverpool, NY 13088-8199 (315 ) 457-6711 FAX (315) 457-9803 Calocerinos & Spina Engineers, P.C. MEMO TO: Files FROM: Scott Shova Resident Inspector RE: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 Attendees: Falvey Construction Corporation Weekly Progress Meeting No. 8 211.004 August 31, 1992 Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina - Falvey Construction Fisher Island Ferry District Weekly Progress Meeting No. 8, for the above -referenced project, was held Wednesday, O August 26, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. Through August 28, 1992, 36 days have been charged to the Contract, with 24 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending August 28, 1992: 1. 4 -way Duct Bank on Runway 12-30 poured with Concrete. 2. PAPI and REIL foundations were installed on Runway end 12. Worrk on R�ii OIA 3Q3�&R� P and Threshold was continued. 1020 Seventh Orth Street, Liverp6b , CONTRACTOR: SUBJ: FILE: DATE: Attendees: Falvey Construction Corporation Weekly Progress Meeting No. 8 211.004 August 31, 1992 Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina - Falvey Construction Fisher Island Ferry District Weekly Progress Meeting No. 8, for the above -referenced project, was held Wednesday, O August 26, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. Through August 28, 1992, 36 days have been charged to the Contract, with 24 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending August 28, 1992: 1. 4 -way Duct Bank on Runway 12-30 poured with Concrete. 2. PAPI and REIL foundations were installed on Runway end 12. Worrk on R�ii OIA 3Q3�&R� P and Threshold was continued. 1020 Seventh Orth Street, Liverp6b , M • MEMO TO: Files, 211.004 Page 2 August 31, 1992 4. The installation of Runway lighting cables was continued for Runway 12-30. 60% of Contract Time has elapsed with approximately 57% of the work completed. Work anticipated for week of August 31. 1992 through September 4. 1992: 1. Start paving for the 4 -way Duct Bank crossings on Runway 12-30. 2. Continue the installation of Runway light cables and the light transformer. 3. Continue work on PAPI and REIL System Runway 12-30. Open Discussion: 1. A list of updated required submittals was given to the contractor. 2. Calocerinos & Spina requested the corrected payrolls and monthly utilization reports from the contractor and all subs. 3. Phil Knauff stated that the work in the Runway intersections be done after September 8, 1992. 4. Contractor stated that the wage rates in the Contract Documents are not for the correct dates. Calocerinos & Spina stated that it is the contractor's responsibility to pay the correct rate for the time period when the work is performed. The meeting was adjourned and meeting No. 9 was scheduled for Wednesday, September 29 1992, at 2:00 p.m. SS/kw cc: Those in Attendance Those not in Attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea r DEPARTMENT OF TRANSPORTATION WEEK ENDING FEDERAL AVIATION ADMINISTRATION August 21, 1992 CONSTRUCTION PROGRESS AND INSPECTION REPORT FAAP/ADAP FAAP/ADAP PROJECr NUMBER 11 3-36-0029-05-92 AIRPORT NAME ELIZABETH FIELD AIRPORT -FISHERS ISLAND '''PE OF °ONi"'4"T -AIRFIELD LIGHTING, VISUAL CONTRAOTMS NAME I ` AIDS & ELECTRICAL BUILDING FALVEY CONSTRUCTION CORPORATION t. ROUGH ESTIMATE OF PERCENT COMPLETION TO DATE OF CONSTRUCTION PHASESgutl SEE ATTACHED 2. BRIEF OUTLINE OF WORK COMPLETED OR IN PROGRESS THIS WEEK 4 -way duct bank Sta. 11 +30 on Runway 7-25 was paved. Work on Runway 7-25 edge lights was continued. Cable installation for Runway 7-25 was continued. Work on the REIL System on Runway 7-25 was continued. 3. BRIEF WEATHER SUMMARY THIS WEEK INCLUDING APPROXIMATE RAINFALL & PERIODS OF BELOW FREEZING TEMPERATURE 08/17/92 - high - 73' - low - 61' - precip. - 0.3r rain 08/18/92 - high - 77' - low - 62' - precip. - 0.1r rain 08/19/92 - high - 80' - low - 65' - precip. - OA' 08/20/92 - high - 83' - low - 62' - precip. - 0.0' 08/21/92 - high - 80 - low - 54' - precip. - 0.0' (Weekly precipitation .54' rain.) 4. CONTRACT TIME 5. BRIEF SUMMARY LABORATORY AND FIELD TESTING THIS WEEK None. CHARGED LAST WOR KM TO DATE DAY CHARGED 31/29 8/21/92 & WORK BY CONTRACTOR ANTICIPATED FOR NEXT WEEK CamplAtp Work on Rlurm-4 7-25 and rco er:. Close Runway 12-30 and begin excavating for cable trenches and duct banks. Continue work on the electrical building. 7. PROBLEM AREAS OR OTHER COMMENTS 8/17/92 not charged due to rain. 52% of Contract time elapsed; approximately 40% of the work is complete. SPONSOR'S INSPECTOR OR REPRESENTATIVE TYPED OR PRINTED NAME AND TITLE SIGNATURE DATE Scott Shova, Resident Inspector - 08/26/92 rrw rvnm asiu j 0 • DATE OF REPORT: 8/21/92 PROJECT: Elizabeth Field Airport - Fishers Island - Airfield Lighting, Visual Aids & Elec. Bldg. 1. Rough Estimate of Percent Completion to Date of Construction Phases: P-152 (1) % L-115 (20) % P-152 (2) % L-125 (21) 15% P-612 (3) 52% L-125 (22) 40% P-620 (4) % L-125 (23) 30% L-102 (5) 75% L-125 (24) 30% L-106 (6) % L-125 (25) % L-107 (7) 10% L-125 (26) % L-108 (8) 40% L-125 (27) 40% L-108 (9) 49% L-125 (28) 40% L-108 (10) 44% L-125 (29) % L-108 (11) 55% L-125 (30) % L-109 (12) % L-125 (31) 46% L-110 (13) 51% L-125 (32) 46% L-110 (14) 98% L-125 (33) % L-110 (15) 43% L-125 (34) % L-110 (16) 31% L-125 (35) % L-110 (17) % M-100 r3E► 40% L-112 (18) 62% M-200 (37) 100% L-115 (19) 80% Calocerinos & Spina Engineers, P.C. AUG 3 1 199? MEMO TO: Files FROM: Scott Shova - Resident Engineer RE: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA AIP No. 3-36-0029-05-92 NYSDOT No. 0913.05 CONTRACTOR: 1k] S[;BJ: FILE: DATE: Attendees: Falvey Construction Corporation Weekly Progress Meeting No. 7 211.004 August 24, 1992 Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina - Falvey Construction Fisher Island Ferry District Weekly Progress Meeting No. 7 for the above referenced project was held on Thursday, August 20, 1992 in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. Through August 21, 1992, 31 days have been charged to the Contract, with 29 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending 8/21/92 1. 4 -way duct bank Runway 7-25 Sta. 11 +30 was paved. 2. No. 8 Awg. 5KV and 600V cables were continued to be installed for Runway 7- 25. 3. Work on the runway edge lights was continued. 52% of Contract time has elapsed with approximately 40% of the work complete. Memo To: Files August, 24, 1992 Page 2 Work anticivated for week of August 24. 1992 - AuLyust 28. 1992 1. Complete work on Runway 7-25. 2. Close Runway 12-30 and start excavating for the duct banks. 3. Continue work on the electrical building. 4. Continue the installation of runway lighting cables for Runway 12-30. Qpen Discussion 1. C&S requested that the corrected payrolls go to the Field Inspector. 2. C&S commented that all trenches must be backfilled and all obstruction be cleaned up before Runway 7-25 is reopened. 3. C&S stated that once Runway 7-25 is reopened there is to be no work performed within the safety area of this runway. 4. C&S stated that all existing lights on Runway 7-25 are to be operational prior to the runway opening. The meeting was adjourned and meeting No. 8 was scheduled for Wednesday, August 26, 1992, at 2:00 p.m. SS/cb cc: Those in attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea i a :. . STATE OF NEW YORK ` =t DEPARTMENT OF LABOR BUREAU OF PUBLIC WORK FALVEY CONSTRUCTION CORP P 0 BOX 699 KILLINGWORTH CT 06419 • Date 08/10/1992 ';� sof;... Control No. 1440111714. _ P.R.C. No. 9102912 We received your Application sur Dispensation for Hous. Upon review, your application has been denied for the following reason(s): El Incomplete Application Complete all items marked in red and resubmit. �- Department of Jurisdiction did not complete bottom section .2]' Other: Please note that in order for me to recommend to the Commissioner of Labor that your dispensation be granted you must demonstrate that the life and limb of the general public is endangered. PRC JOB DESCRIPTION: ELIZABETH FIELD AIRPORT AIRFIELD LIGHTING AIP NO.3-36-0029-04-91 FISHER'S ISLAND,NY You may direct your response to: Department of Labor, Bureau of Public Work.. Governor W.A. Harriman State Office Building Campus, Albany, N.Y. 12240. / � A Senior Pub "c Work Wage Investigator PW -30.1 J. is 'i EFT. OF LASH x u. At b 0 A.1992 STATE OF NEW YORK • DEPARTMENT OF LABOR BUREAU OF PUBLIC WORK THE GOV. W. AVERELL HARRIMAN Control No. STATE OFFICE BUILDING CAMPUS ALBANY, N.Y. 12240 6U�WJ QF pueLlC WPA' :. APPLICATION FOR DISPENSATION FOR HOURS W YORK Applica t�complete both ides and have a representative of the Department of Jurisdiction (contracting agency) complete certification at bottom; return to the address shown above. APPLICANT: (Firm name, office address and phone number of applicant contractor) NAME AND ADDRESS _(_ FEDERAL EMPLOYER IDENTIFICATION NUMBER -cL1VQ� �.UY�`.� C I tC)v1 t%L� ��C C cti�l Grp D V 1 y� C) 9 TELEPHONE NO. KA 1 ��c Wer C1 1 CG3-&(D2) PROJECT UDEINTIFICATIOiN: Al- —(?t Z ` A Li(_t4-1(ao(4r�l T-) 4'n DESCRIPTION OF LOCATION: (City, town, intersection, street or route, etc.) - \'` — �tV17�� �1 '��\ ` _ `�' A A- � r vcr NATURE OF PROJECT: (Check one) ❑ 1 NEW BUILDING ❑ 2 ADDITION TO EXISTING STRUCTURE ❑ 4 NEW SEWER OR WATERLINE ❑ 6 OTHER RECONSTRUCTION, MAINTENAN( REPAIR OR ALTERATION 3 HEAVY AND HIGHWAY CONSTRUCTION (NEW AND REPAIR) ❑ 5 OTHER NEW CONSTRUCTION ❑ 7 DEMOLITION REASON FOR REQUESTING DISPENSATION 1 11 C7 v x� r (nom, w LL L �h c— S QC J. U ( e CL I Y Ocx+ op-,,ct (, s -c, DISPENSATION REQUIRED: (Complete statement below); Application is made for a period beginning Ii and ending 3 _1L permit (DAT) (DATE) operations 1 D h per day, 5 daysiD week. 011 (Date) (Signature C ntractor o0 th 6rized Representative) (Title) This Section to be Certified by an Officer icer of the Department of Jurisdiction (complete all copies) IT IS HEREBY CERTIFIED THAT THE ABOVE DESCRIBED PUBLIC WORK PROJECT IS OF AN IMPORTANT NATURE AND THAT A DELAY IN CARRYING IT TO COMPLETION WOULD RESULT IN SERIOUS DISADVANTAGE TO THE PUBLIC. 1 Town of Southold r (DEPARTMENT OF JURISDICTION) AUTHORIZED SIGNATURE 53095 Main Road (STREET ADDRESS) ,. Southold, New York 11971 Scott Louis Harris, Supervisor 8/28/92 (TOWN, CITY, STATE) (ZIP CODE) PLEASE PRINT NAME, AND TITLE DATE TELEPHONE NO.: ( 516 ) 765-1801 ' PW -30 (6-91) COMPLETE AND RETURN LIST THE JOB CLASSIFICATIONS FOR WHICH THIS DISPENSATION IS REQUESTED AND THE NUMBER OF EMPLOYEES IN EACH CLASSIFICATION. JOB.CLASSIFICATION (occupations) Number to be Employed Ll C_ 7- v lcwl?(—UVJCLA4 Cit,, L yin, a l When this application is complete, have an officer of the department of jurisdiction complete the certification section and return.itto this office. No worker, laborer, or mechanic maybe employed in excess of 8 hours in anyone day nor 5 days in anyone calendar week until you receive a notice of determination. FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 August 20, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 ` AUG 2 5 1992 In reference to the above -captioned project, please be advised Falvey Construction Corpora- tion herein has enclosed our proposal for relocating beach sand on Runway End 7. Our price further includes planting of approximately 20,500 culms of American Beach Grass performed by Grove Gardens Landscaping, Inc. Falvey Construction Corporation will provide staking of this area as well as watering of the proposed beach grass. Grove Gardens Landscaping Inc. has consulted with their supplier regarding the maintenance of the grass. It is recommended the American Beach Grass be watered during the initial planting and then a minimum of once a week for a period of four weeks. Falvey Construction Corporation's proposal is based on the revised drawing from Calocerinos & Spina dated May 20, 1992, Page #3 and a review of the field conditions. This firm's interpretation of said drawings and information provided by our subcontractor, Grove Gardens Landscaping, Inc. would mean that an extension of time of approximately 28 working days will be required under thiss proposal. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja Enclosures CC: Larry Cerretani - C&S P,Xil Knauff - F.I. Ferry Dist. cott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 lF ALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699 FAX 203/663-2719 KILLINGWORTH, CT 06419 August 18, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attn: Larry Cerretani Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 In reference to the above captioned project, Falvey Construction Corporation acknowledges receipt of the transmittal letter from Calocerinos & Spina dated August 13, 1992 regarding Payment Requisition number one and Claim Voucher. Please be advised that this firm received payment number one from the town of Southold on August 13, 1992 in the amount of $106,522.33. Enclosed please find the above mentioned documents signed by Falvey Construction Corporation as requested in the letter from Calocerinos & Spina. If you have any questions and/or comments please contact the writer at 663-1695. Very truly yours, Mathew D. Falvey Manager MDF/tsc cc: P. Knauff, Fishers Island Ferry District w"'S'cott Harris, Town of Southold File: FIRAIR/FCC/SUBM/GC:l WPWIN\ f i_c&sl.wp2 6 r FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 August 14, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attn: Larry Cerretani Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 ccOO pv TEL 203/663-1695 FAX 203/663-2719 In reference to the above captioned project, Falvey Construction Corporation acknowledges receipt of the letter from Calocerinos & Spina dated August 10, 1992 regarding Falvey Construction Corporation payment requisition number one. Please be advised of the following: 1) Addressing Paragraph number one, Falvey Construction Corporation is in the process of double checking our records and reviewing the Contract Documents. If any outstanding items are to be found, this firm will forward them as soon as possible. 2) Falvey Construction Corporation is unaware of receiving any list of outstanding items at the weekly project meeting on July 30, 1992. 3) Prior to submitting requisition number one, Falvey Construction Corporation, ie. Matt Falvey, and Calocerinos & Spina, ie. Scott Shova, reviewed, discussed and negotiated extensively all items which were requested for payment. Mr. Shova had requested a breakdown of lump sum items, which was provided by Falvey Construction Corporation and agreed upon by both parties. All items included under this requisition are believed to be fair and/or under -billed. Upon receipt of the above referenced letter from Calocerinos & Spina, Falvey Construction Corporation has reviewed the Contract Documents, and to the best of this firm's knowledge, has provided more than satisfactory information in accordance with the Contract Documents and industry standards. 1 J The last parag. of Item 90-06 Partial Payments contains one statement that was noted by this firm upon reviewing. "No partial payment shall bind the Owner to the acceptance of any materials or work in place as to quality or quantity. All partial payments are subject to correction at the time of final payment as provided in the subsection titled Acceptance and Final Payment of this section." Again, Falvey Construction Corporation believes that its request for partial payment of lump sum items is very fair and requested in accordance- with industry standards. This firm finds the requirements of further documentation for Calocerinos & Spina to be unjustified. Falvey Construction Corporation requests that Calocerinos kindly delete this requirement as a prerequisite for payment, or provide this firm with supporting evidence as outlined in the Contract Documents. MDF/tsc File: FIRAIR/FCC/CF-O:GC-1 WPWIN\fi_laryl.wp2 2 Very truly yours, -m a"i o Mathew D. Falvey Manager • r' a Calocerinos & Spina Engineers, P.C. MEMO TO: Files FROM: Scott Shova Resident Inspector RE: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 ,M CONTRACTOR: SUBJ: FILE: DATE: Attendees: Falvey Construction Corporation Weekly Progress Meeting No. 6 August 17, 1992 �Im Scott Shova Mathew Falvey Phil Knauff �gS r s AUG Calocerinos & Spina - Falvey Construction Fisher Island Ferry District Weekly Progress Meeting No. 6, for the above -referenced project, was held Thursday, August 13, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. Through August 14, 1992, 27 days have been charged to the Contract, with 33 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending August 14, 1992: 1. Runway 25 Threshold was paved. 2. Sign bases R-2-5 and R-2-19 were installed. 1020 Seventh orth Str et; La� DouC�t k Ata (bit) y 7-25 completed. MEMO TO: Files, 211.004 Page 2 August 17, 1992 4. 4 -Way Duct Bank, Sta 3+75, Runway 7-25 paved. 45% of Contract Time has elapsed with approximately 30% of the work completed. Work anticipated for week of August 17, 1992 through August 21. 1992: 1. Backfill and pave 4 -Way Duct Bank, Runway 7-25 (Sta. 11 +30). 2. Continue the installation of 5kv and 600v Cable for the Runway 7-25 Edge Lights and REAS. 3. Continue work on the Electrical Building. Open Discussion: 1. Calocerinos & Spina requested an updated schedule with a percentage of work completed compared to time remaining. 2. Calocerinos & Spina requested the Contractor complete the job information board. 3. Calocerinos & Spina requested corrected certified payrolls from the Contractor. 4. Phil Knauff requested 1 to 2 weeks notice prior to the closure of the airport for work in the Intersection of the Runways. 5. Calocerinos & Spina requested a cost comparison from the Contractor for installing beach grass or stone at Runway End 7. The meeting was adjourned and meeting No. 7 was scheduled for Wednesday, August 19, 1992, at 2:00 p.m. SS/kw cc: Those in Attendance Those not in Attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea • Calocerinos & Spina tnaineers, P.C. Augu:.t 10, 1992 Falvey Construction Corporation 12 Fir-- Tower Road Post Office Box 699 Killingworth, CT 06419 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 File: 211.004 Gentlemen: t:E Please be advised, we cannot process Estimate No. 1, for the above -referenced project, as we are lacking shop drawing submittals, manufacturer's certifications, sub -contractor payrolls, and copies of monthly utilization reports. A list of the outstanding items was provided to you at the July 30, 1992 weekly project meeting. Your request for partial payments on Lump Suai Items shall reqpire a cost breakdown and supporting documentation of costs incurred to facilitate verification of the percent complete of the items in questions. If you have any questions, do not hesitate to contact us. Very truly yours, 1 C:ALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJCIkw cc: Mr. P. Knauff Mr. D. Vornea Mr. S. Harris Mr. S. Honor Mr. C. McDermott Mr. S. Shova 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457$711 FAX (315) 457-9803 • Calocerinos &Spina Engineers. P.C. Falvey Construction Corporation 12 Fire Tower Road Post Office Box 699 Killingworth, CT 06419 Gentlemen: 0 t AUG 1 7 August 10, 199.12 , ,ice . <:'OLD Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 File: 211.004 On behalf of the Owner, please be advised, the weekly certified payrolls submitted for Falvey Construction Corporation and sub -contractor Nelson & Hough, on the above -referenced project, are incorrect. The deductions for individuals working in different classifications are not shown separately for each classification the employee is working. Please make the necessary corrections and resubmit to this office for review. If you have any questions, do not hesitate to contact us. 't Very truly yours, n �tfl CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/kw cc: Mr. P. Knauff Mr. D. Vornea Mr. S. Harris Mr. S. Honor Mr. C. McDermott Mr. S. Shova 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 • �C �!ocennos & Spinca August 10, 1992 Falvey Construction Corporat ' 12 Fire Tower Road Post Office Box 699 Killingworth, CT 06419 AUG 1 3 10-90 it3 T A, N' p die: th Field Airport � Airfield Lighting, Visual Aids, and Electrical Building FAA-AIP No. 3-36-0029-04-91 N.Y.S.D.O.T. No. 0913.04 File: 211.004 Gentlemen: On behalf of the Owner, a review of the above -referenced project's records has indicated a total of 38% of Contract Time has elapsed, with approximately 20% of the work completed, through August 7, 1992. In view of the above noted, it does not appear that the project will be completed within the specified contract time. Accordingly, we are again requesting that you submit a revised, written, construction schedule showing how you intend to complete the project, within the specified contract time. The construction schedule shall be submitted in bar chart form, showing percent of work completed versus weekly time increment to facilitate a progress curve. Your immediate attention to this matter is essential, to avoid assessment of liquidated damages in the amount of $900.00 for each work day the project remains incomplete, per Section 80-08 of the Contract Documents. If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/kw cc: Mr. P. Knauff Mr. S. Harris Mr. D. Vornea Mr. S. Honor Mr. C. McDermott Mr. S. Shova 1030 Seventh North Street, Liverpool, NY 1 3088-61 99 (315) 457-6711 FAX (315) 457-9803 Calocerinos & Spina Engineers, P.C. MEMO TO: Files AUG 13 FROM: Scott Shova Resident Inspector RE: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 ��� ��� CONTRACTOR: Falvey Construction Corporation SUBJ: Weekly Progress Meeting No. 5 FILE: 211.004 DATE: August 10, 1992 Attendees: Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina Falvey Construction - Fisher Island Ferry District Weekly Progress Meeting No. 5, for the above -referenced project, was held Thursday, August 6, 1992, at 1:00 p.m., in the Airport Manager's Conference Room_ Through August 7, 1992, 23 days have been charged to the Contract, with 37 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending August 7. 1992: 1. Work was continued on the 4 -way Duct Banks on Runway 7-25. 2. Continued cable installation for Runway Lights on Runway 7-25. 3. Paving was started on all open trenches on Runway 7-25. 1020 Seventh North Street, Liverpool, NY 13088 (315) 457-6711 MEMO TO: Files, 211.004 Page 2 August 10, 1992 • Work anticipated for week of August 10. 1992 through August 14. 1992: 1. Continue the 4 -way Duct Bank at Sta. 11 +30 on Runway 7-25. 2. Continue paving the Threshold to 4 -Way Duct on Runway End. 3. Continue the installation of Runway Light Cables for Runway 7-25. Open Discussion: 1. Contractor submitted an updated Construction Schedule. 2. Calocerinos & Spina requested a price breakdown on all Lump Sum Items that were requested for Estimate No. 1. 3. Calocerinos & Spina requested certifications for all items contractor has requested payment for. 4. Calocerinos & Spina requested a cost breakdown for the installation of the beach grass on Runway End 7. The meeting was adjourned and meeting No. 6 was scheduled for Wednesday, August 12, 1992, at 2:00 p.m. SS/kw cc: Those in Attendance Those not in Attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea w . • Calocerinos & Spina Engineers, P.C. MEMO TO: Files FROM: UN fACONTRACTOR: SUBJ: FILE: DATE: Attendees: Scott Shova Resident Inspector Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 Falvey Construction Corporation Weekly Progress Meeting No. 4 211.004 August 5, 1992 Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina Falvey Construction - Fisher Island Ferry District Weekly Progress Meeting.No. 4, for the above -referenced project, was held Thursday, • July 30, 1992, at 10:00 a.m., in the Airport Manager's Conference Room. Through July 31, 1992, 19 days have been charged to the Contract, with 41 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending July 31, 1992: 1. 8 -way Duct Bank was completed. 2. Continued work on the 4 -way Duct Banks on R/W 7-25. 3. Work was continued on Threshold Lights on R/W 7-25. 4. Cable installation for R/W lights on R/W 7-25 continued. �5. Instillation , an� >1 I �tPgations continued. 1020 Seventh orth Street, lati ool, 1 0 8 l3 • MEMO TO: Files, 211.004 Page 2 August 5, 1992 Work anticipated for week of August 3. 1992 through August 7. 1992: 1. Set roof planks on Electrical Building. 2. Continue work on the 4 -way Duct Bank, Sta 11 +30 Runway 7-25. 3. Continue the installation of cable for Runway 7-25. 4. Continue installation of edge light bases on Runway 7-25. 5. Begin paving open trench on Runway 7-25. Open Discussion: 1. Calocerinos & Spina requested an updated construction schedule. 2. Contractor asked Phil Knauff about a location for spoils. Phil designated a temporary location for use, until the spoils can be removed off site. 3. Contractor to request permission, in writing, to use high early concrete on duct bank, to facilitate backfilling duct banks 3 days after concrete placement. 4. Phil Knauff stated that pay application should be to him by August 5, 1992, for the Contractor's first estimate. 5. Calocerinos & Spina requested payrolls from the Contractor's sub -contractors. The meeting was adjourned and meeting No. 5 was scheduled for Wednesday, August 5, 1992, at 2:00 p.m. SS/kw cc: Those in Attendance Those not in Attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 FALVEY CONSTRUCTION CORP. August 3. 1992 �Fr_ _,"V o TEL 203/663-1695 FAX 203/663-2719 Calocerinos & Spina, P.C. 1020 7th North Street RKE1VM Liverpool, New York 13088 Attention: Larry Cerretani AUG 1992 Construction Supervisor SoUtbold Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, enclosed please find the originals of Falvey Construction Corporation's certified payrolls #2 and #3, along with certified payrolls #1, 2, and 3 from Nelson & Hough Construction. Copies of these payrolls have been forwarded to Scott Shova, Field Inspector, at the project site. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja Enclosures CC: Charles McDermott - C&S Phjl Knauff - F.I. Ferry Dist. L,ec-ott Harris - Town of Southold File: FLAIR/FCC/CT-0/GC:1 VW3/Airport/payrollcrt C-:��_`-_s 0 Calocerinos & Spina E,igineers. P.C. Falvey Construction Corp. 12 Fire Tower Road P.O. Box 699 Killingworth, CT 06419 Gentlemen: August 4, 1992 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA AIP # 3-36-0029-04-91 NYSDOT # 0913.04 File: 211.004 Please be advised the Owner takes no exception to the use of the following subcontractor on the above referenced project subject to compliance with all aspects of the Contract Documents: Metcalf Paving & Landscaping Paving 13 Marjorie Street Stonington, CT 06378 If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. X (2t'ltz� Lawrence 1. Cerretani Inspection Supervisor Airport Division LJC/cb- cc: Mr. P. Knauff Mr. S. Harris Mr. S. Honor Mr. C. McDermott Field Inspector 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 July 30, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED AUG a 1992 -%wthoW T.,, rye,+ In reference to the above -captioned project. Falvey Construction Corporation is submitting the names and addresses of additional subcontractors that will be working for this firm. Subcontractors Name & Address Job Performed Metcalf Paving & Landscaping asphalt paving 13 Marjorie Street Stonington, CT 06378 If you have any questions or comments, please contact.tlie writer at 203-663-1695. Very truly yours, --i-_> - pm_�ZY14_ Mathew D. Falvey Manager MDF/nja cc: Larry Cerretani - C&S Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/metcalf.usn w t I� Calocerinos & Spina Engineers, P.C. MEMO TO: FROM: Files Scott Shova Resident Inspector • V [[[ 4 .ICF` ,Lc RE: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 CONTRACTOR: SUBJ: FILE: DATE: Attendees: Falvey Construction Corporation Weekly Progress Meeting No. 3 049 July 27, 1992 Scott Shova Mathew Falvey Calocerinos & Spina Falvey Construction Weekly Progress Meeting No. 3, for the above -referenced project, was held Thursday, • July 23, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. Through July 24, 1992, 14 days have been charged to the Contract, with 46 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending July 24, 1992: 1. Blocks for the Electric Building were installed. 2. Trenching for Runway Lights on Runway 7-25 Continued. 3. 170 1. f. of 8 -way Duct Bank installed. 4. 100 U. of 4 -way Duct Bank installed. 5. Work on Runway 25 end Threshold Lights started. 1020 Seventh North Street, Liverpool, NY 13088 (315) 457-6711 w 0 � MEMO TO: Files, 211.004 Page 2 July 27, 1992 Work anticipated for week of July 27 1992 through July 31, 1992• 1. Continue work on the 4 -way Duct Banks in Runway 7-25. 2. Continue installation of the Threshold Light Runway End 25. 3. Continue installation of cable for Runway 7-25. 4. Set roof planks for the Electrical Building. 5. Install REILS and PAPIS foundations Runway End 25. Qpen Discussion: 1. Calocerinos & Spina requested an updated construction schedule. 2. Calocerinos & Spina requested all required submittals and payrolls from the sub- contractors. 3. Calocerinos & Spina advised the Contractor that a submittal from a Connecticut supplier should have a copy of the Connecticut specification for that item. 4. Calocerinos & Spina reminded the Contractor that no open trenches may be in the Runway Safety areas. 5. The contractor commented on the asphalt temperature for the Runway cuts. Calocerinos & Spina stated that the temperature range is 250-325 degrees F. The meeting was adjourned and meeting No. 4 was scheduled for Wednesday, July 29, 1992, at 2:00 p.m. SS/kw cc: Those in Attendance Those not in Attendance Mr. P. Knauff Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea • Calocerinos & Spina Engineers, P.C. 100 i MEMO TO: Files FROM: no MCONTRACTOR: FILE: - DATE: Scott Shova Resident Inspector Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 Falvey Construction Corporation Weekly Progress Meeting No. 2 211.004 July 22, 1992 Attendees: Scott Shova Mathew Falvey Phil Knauff Calocerinos & Spina Falvey Construction - Fisher Island Ferry District --------------------------------------------- --------------------------------------------- OWeekly Progress Meeting No. 2, for the above -referenced project, was held Wednesday, July 15, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. Through July 17, 1992, 10 days have been charged to the Contract, with 50 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending July 17. 1992: 1. Electrical Manhole installed. 2. Trenching for Runway Lights on Runway 7-25 started. 3. Electrical Building floor poured. 1020 Seventh North Street, Liverpool, NY 13088 (315) 457-6711 w If MEMO TO: Files, 211.004 Page 2 July 22, 1992 4. 201. f. of 8 -way Duct Bank installed. 5. 4 -way Duct Bank on R/W 7-25 at Sta. 11+30 started. Work anticipated for week of July 20, 1992 through July 24. 1992: 1. Begin installation of Block for Electrical Building. 2. Continue work on Cable Trenching. 3. Continue installation of light cables for Runway 7-25. 4. Continue work on Duct Banks. Open Discussion: 1. Calocerinos & Spina reviewed the contractor's outstanding submittals. 2. Phil Knauff stated that there was no answer, to date, from the DEC on the planting of grass on the end of Runway 7-25. 3. Contractor stated that he would have 75' of Runway 7-25 open for planes to taxi on. 4. Contractor stated that he was not going to use high early concrete on the duct bank, and would wait the 7 days for curing time. The meeting was adjourned and meeting No. 3 was scheduled for Wednesday, July 22, 1992, at 2:00 p.m. SS/kw cc: Those in Attendance Those not in Attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea 0 -1 calocerinos & Spina E­aineers. P.C. Falvey Construction Corporation 12 Fire Tower Road Post Office Box 699 Killingworth, CT 06419 Gentlemen: Re: Elizabeth Field Airport Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-04-91 N.Y.S.D.O.T. No. 0913.04 File: 211.004 Please be advised, the Owner takes no exception to the use of the following subcontractors, on the above -referenced project. Nelson & Hough Construction - Duct Banks & Electrical Vault P.O. Box 930 Wilton, Maine 04294 Richard Grebe - Trenching P.O. Box 576 Fishers Island, New York 06390 If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/kw cc: Mr. P. Knauff Mr. C. McDermott Mr. S. Harris Mr. S. Shova 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9303 Calocerinos & Spina Engineers, P.C. MEMO TO: Files FROM: Scott Shova Resident Inspector RE: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-05-92 N.Y.S.D.O.T. No. 0913.05 CONTRACTOR: Falvey Construction Corporation SUBJ: Weekly Progress Meeting No. 1 FILE: 211.004 DATE: July 14, 1992 Attendees: IMScott Shova Mathew Falvey Donald Falvey Phil Knauff - Calocerinos & Spina - Falvey Construction - Falvey Construction - Fisher Island Ferry District Weekly Progress Meeting No. 1, for the above -referenced project, was held Wednesday, July 8, 1992, at 2:00 p.m., in the Airport Manager's Conference Room. Through July 10, 1992, 5 days have been charged to the Contract, with 55 working days remaining. A weekly statement of the days charged was issued to the Contractor. Work completed week ending July 10, 1992: 1. Concrete footing poured for the electrical building. 2. Sawcutting for the installation of Runway Lights and Duct Banks. 1020 Seventh North Street, Liverpool, NY 13088 (315) 457-6711 I s MEMO TO: Files, 211.004 Page 2 July 14, 1992 Work anticipated for week of July 13, 1992 through July 17. 1992: 1. Install Electrical Manhole. 2. Install 2001. f. of 8 -way Duct Bank. 3. Start trenching for Runway Lights on Runway 7-25. Open Discussion: 1. Letter of required submittals still outstanding was given to the Contractor. 2. Billing dates were discussed and Phil Knauff stated that a pay request should be submitted 8 days in advance, for review by the Town Board. Also, Phil stated that once Calocerinos & Spina approved the quantities, we could send it to the Town of Southold, for their approval. 3. Contractor asked Phil Knauff if the Owner wants the grass (included in Change Order No. 1) planted on the end of Runway 7-25. Phil stated that he would contact Charlie Hamilton, from D.E.C. , for an answer, and would let Charlie McDermott of Calocerinos & Spina know. The meeting was adjourned and meeting No. 2 was scheduled for Wednesday, July 15, 1992, at 2:00 p.m. SS/kw cc: Those in Attendance Those not in Attendance Mr. L. Cerretani Mr. C. McDermott Mr. S. Harris Mr. S. Honor Mr. D. Vornea o��SpFF01,�cOG SCOTT L. HARRIS SUPERVISOR y Ze 11 1-17 FAX (516) 765 - 1823 O • TELEPHONE (516) 765 - 1800 AIj01 OFFICE OF THE SUPERVISOR TOWN OF SOUTHOLD July 2, 1992 Mr. Matthew Falvey Falvey Construction Corp. 12 Fire Tower Road P.O. Box 699 Killingworth, Connecticut 06419 Town Hall, 53095 Main Road P.O. Box 1179 Southold, New York 11971 Re: Elizabeth Field - Fishers Island Airport Airfield Lighting, Visual Aids and Electrical Building FAA AIP Project No. NYSDOT Project No. Dear Mr. Falvey: 3-36-0029-05-92 0913.05 The Contract Documents pertaining to construction of the Airfield Lighting, Visual Aids & Electrical Building Contract have been submitted to and subsequently reviewed and approved by the Town of Southold and the Federal Aviation Administration. You are hereby authorized to proceed with construction in conformance with the Plans and Specifications. This authorization is issued subject to State final approval and with the understanding that you will provide any additional information and/or documents required to support the Contract Documents, if called for during the review process. As referenced in Section 80-02 "Notice To Proceed" and Section 80-07 "Determination and Extension of Contract Time" of the Contract Documents, work shall begin and Contract Time shall be charged beginning on July 6, 1992. Please acknowledge receipt of this Notice to Proceed by signing in the space provided below and return the original and all copies except one. Thank you. Sincerely, Scott Louis Harris, Supervisor Town of Southold RECEIVED This will acknowledge receipt of the Notice /to Proceed. JUL v 1992 Contractor: r/e Z �,1/ G lJi� Signature and Title of Signing Officer sc'�,Vcc=i/ Date: 7' �� �� SCOTT L. HARRIS SUPERVISOR FAX (516) 765 - 1823 TELEPHONE (516) 765 - 1800 f Falk 2�► cm 10 t b lam,{ d OFFICE OF THE SUPERVISOR TOWN OF SOUTHOLD July 2, 1992 Mr. Matthew Falvey Falvey Construction Corp. 12 Fire Tower Road P.O. Box 699 Killingworth, Connecticut 06419 Town Hall, 53095 Main Road P.O. Box 1179 Southold, New York 11971 Re: Elizabeth Field - Fishers Island Airport Airfield Lighting, Visual Aids and Electrical Building FAA AIP Project No. 3-36-0029-05-92 NYSDOT Project No. 0913.05 Dear Mr. Falvey: The Contract Documents pertaining to construction of the Airfield Lighting, Visual Aids 6 Electrical Building Contract have been submitted to and subsequently reviewed and approved by the Town of Southold and the Federal Aviation Administration. You are hereby authorized to proceed with construction in conformance with the Plans and Specifications. This authorization is issued subject to State final approval and with the understanding that you will provide any additional information and/or documents required to support the Contract Documents, if called for during the review process. As referenced in Section 80-02 "Notice To Proceed" and Section 80-07 "Determination and Extension of Contract Time" of the Contract Documents, work shall begin and Contract Time shall be charged beginning on July 6, 1992. Please acknowledge receipt of this Notice to Proceed by signing in the space provided below and return the original and all copies except one. Thank you. Sincerely, Scott Louis Harris, Supervisor Town of Southold RECEIVED This will acknowledge receipt of the Notice to Proceed. JUL 1992 Contractor: Srn ithnl,•i Signature and Title of Signing Officer iii✓ y' .fCc`i7,c Date:—�� 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 FALVEY CONSTRUCTION CORP. July 08, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 TEL 203/663-1695 FAX 203/663-2719 RECEIVED JUL 131992 Gentlemen: In reference to the above -captioned project, please be advised of the following telephone numbers: Calocerinos & Spina Engineer's office trailer 516-788-5531 C&S and Falvey Const. Corp. fax machine 516-788-5532 Falvey Construction Corporation's office trailer 516-788-5530 If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja cc: Larry Cerretani - C&S /Phill Knauff - F.I. Ferry District / Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 Ref: VW3/Airport/telephones 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 ]FALVEY CONSTRUCTION CORP. July 8, 1992 TEL 203/663-1695 FAX 203/663-2719 Calocerinos & Spina, P.C. RECEIVED 1020 7th North Street Liverpool, New York 13088 J U L 13 1992 Attention: Charles McDermott Engineer Scn,thol,4 T-••._ �,,,,� Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, Falvey Construction Corporation is submitting the names and addresses of additional subcontractors that will be working for this firm. Subcontractors Name & Address Nelson & Hough Const. P. 0. Box 930 Wilton, ME 04294 Richard Grebe Box 576 Fishers Island, NY 06390 Job Performed construction of duct bank construction of electrical building trenching If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, -p- rvQ:�a Mathew D. Falvey Manager MDF/nja cc: Larry Cerretani - C&S Shil Knauff - F.I. Ferry Dist. cott Harris - Town of Southold File: FIAIR/FCC/CT-O/GC:1 VW3/Airport/addition.sub Cl a U.S. Department of Transportation Federal Aviation Administration Mr. Scott L. Harris Supervisor, Town of Town Hall 53095 Main Road Southold, New York Dear Mr. Harris: 0 V" A. 181 ,b. 9V« , r2. 305 vy N,., ny 11581 Southold RECEIVED JuL 9 1992 12953 Elizabeth Field Airport, Fishers Island AIP Project No. 3-36-0029-05-92 Notice to Proceed We have received the contract specifications, the payment and performance bonds and the insurance certificates submitted by your consultant C&S for this subject project and find them in order. It is our understanding that the contractor did not meet the DBE goal but their good faith effort has been reviewed and found valid by the FAA Civil Rights Office. Therefore, you have our approval to issue a Notice to Proceed to Falvey Construction Company of Killingworth, Connecticut as of June 29, 1992. A copy of this letter is being sent to the New York State Department of Transportation and to your consultant. Sincerely, Dan Vornea Airport Engineer 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 r i FA LVEY CONSTRUCTION CORP. July 01, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED JUL c 1992 In reference to the above -captioned project, please be notified that Falvey Construction Corporation will begin construction on Monday, July 6, 1992 at approximately 11:00 AM. As per a conversation of today between Falvey Construction Corporation, i.e. Nancy Aiello and Calocerinos & Spina, i.e. Scott Sheva, the FAA has indicated that the Notice to Proceed is being forwarded to this firm via United States Postal Service. As of this date, the Notice to Proceed has not been received. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja cc: Larry Cerretani - C&S Phill Knauff - F.I. Ferry District Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 Ref: VW3/Airport/start.dat � sFALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 July 01, 1992 Calocerinos 84 Spina, P.C. 1020 7th North Street Liverpool, New York: 130188 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED JJL 6' 1992 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated June 25, 1992 responding to this firm's ques- tions at the pre -construction meeting on June 10, 1992. Also be advised that this firm has reviewed the responses and has no concerns at this time. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, (} 1'�7 Mathew D. Falvey Manager MDF/nja cc: Larry Cerretani - C&S hill Knauff - F.I. Ferry District Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 Ref: VW3/Airport/precon.que 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 ]FALVIEY CONSTRUCTION CORP. July 01, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED JUL 61992 .,*,,1,4 T,....., f1004 In reference to the above -captioned project, enclosed please find the original and two copies of the revised cost breakdown for Change Order #1. Also enclosed for your reference is a copy of the approved temporary service permit issued to Walsh Contracting, Ltd. If you have any questions or comments, please contact the writer at 203-663-1695. Very �truly yours, Mathew D. Falvey �J Manager MDF/nja cc: Larry Cerretani - C&S W 11 Knauff - F.I. Ferry District V13cott Harris - Town of Southold File: FIAIR/FCC/CO#1 Ref: FIARI/FCC/CT-0/GC:1 Ref: VW3/Airport/traffic.rte SCOTT L. HARRIS SUPERVISOR FAX (516) 765 - 1823 TELEPHONE (516) 765 - 1800 40 r0(,�c� � 1 A OFFICE OF THE SUPERVISOR TOWN OF SOUTHOLD Mr. Matthew Falvey Falvey Construction Corp. 12 Fire Tower Road P.O. Box 699 Killingworth, Connecticut 06419 Dear Mr. Falvey: July 2, 1992 Town Hall, 53095 Main Road P.O. Box 1179 Southold, New York 11971 Re: Elizabeth Field - Fishers Island Airport Airfield Lighting, Visual Aids and Electrical Building FAA AIP Project No. 3-36-0029-05-92 NYSDOT Project No. 0913.05 The Contract Documents pertaining to construction of the Airfield Lighting, Visual Aids 6 Electrical Building Contract have been submitted to and subsequently reviewed and approved by the Town of Southold and the Federal Aviation Administration. You are hereby authorized to proceed with construction in conformance with the Plans and Specifications. This authorization is issued subject to State final approval and with the understanding that you will provide any additional information and/or documents required to support the Contract Documents, if called for during the review process. As referenced in Section 80-02 "Notice To Proceed" and Section 80-07 "Determination and Extension of Contract Time" of the Contract Documents, work shall begin and Contract Time shall be charged beginning on July 6, 1992. Please acknowledge receipt of this Notice to Proceed by signing in the space provided below and return the original and all copies except one. Thank you. Sincerely, ' Scott Louis Harris, Supervisor Town of Southold This will acknowledge receipt of the Notice to Proceed. Contractor: Signature and Title of Signing Officer Date: L QCI iS � Eng+nejw C V FAx TRANsmiTTALr DATE.- Tum. z !�' # OF PA GES.- 92 - (Add Cover St feet) TO FllUf.- A77ENTION: Mi. -41 o a t - L, -- SVRr�+ C�+y.*g . ; = j — j ,�.�i6rd, 1��'>�r � �.5 ia.-�'1,d�i;��s���4" ;�1v+�'1�.1'l i-f���'!+^�� !�lok ~Co ..0 ���•o Cei• ci b AR k'., 4 �� L at ,c Kko�-ic�e To . i ,L c-ee,el ca r, �.�.�-{ty uri140—Vd :e�.G9-d �yc7' Vic. GCS=a{aL iticS Itkw's- n �„cHa�ct�/,.._r �. C -C, r�uv o��ice ,- T1,QK� O U o �} b V V + 4 a,r, c e- �`'� a V AIRPORT DlMON 1010 SRV'RR7I NORM STREET �-ELRP17ONH. (315) 453-7981 LrVTRRP 1,, NEW YORK IJOU FAX: (-115) 434-8313 TR PHOiN . (315) 457-6711 M. (31S) 457.9803 77 BROADW4Y BUFFALO, NEW YORK 14303 TSLEPHONZ;. (716) 3471630 FAX: (716) &17-1484 ;0qq i W Mr. Matthew Fal $ 12 Fire Tower Rom P.O. Box 699 Killingworth, CT 06419 Gentlemen: SAMPLE NOTICE TO PROCEM duty � AUN=, 1992 Re: Elizabeth Field - Fisher's Island Airport Airfield Lighting, Visual Aida & Electrical Building FAA AIP Project No. 3-36-0029-05-92 N'YSDOT Project No. 0913.05 The Contract Documents permining to construction of the Airfield Lighting, Visual Aids & Electrical Building Contract have been submitted to and subsequently reviewed and approved by the Town of Southold and `ie Federal Aviation Administration. You are hereby authorized to proceed with construction in coafor aAce with the Plans and Specifications. This authorization iii issued subject to State final approval and with the understanding that you will provide any additional information and/or documents requi ed to support the Contract Documents, if called for ,during the review process. As referenced in Senior: 904'3-2 "Notice To Proceed" and Section 80-07 "Data s�:ination and Extension of Contract Time" of the Contract Documents, work shall begun and Contract Time shall be charged beginning on July 6, 1992. Please acknowledge receipt of this Notice to Proceed by signing in the space provided below and return the original and all copies except one. Sincerely, TOWN OF SOUTHOLD Scott Harm Town Supervisor SH:CRM:kal This will acknowlodge receipt of the''.:tice to Proceed. Contractor: Signature and Title of Signing Officer: Data: �(j' J Y �alcc,:erinas & Spina Engineers, P.C. June 25, 1992 a Pn ':1 n 7 9 .. Mr. Matt Falvey Falvey Construction Corporation 12 Fire Tower Road P.O. Box 699 Killingworth, Connecticut" 06419 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids and Electrical Building FAA AIP No. 3-36-0029-05-92 NYSDOT No. 0913.05 File: 211.004 Dear Mr. Falvey: In response to your questions at the pre -construction meeting on June 10, 1992 and subsequent phone conversations for the above -referenced project, we offer the following: 1. We have reviewed locating the proposed utility pole no. 5, 15 -feet south of the designed location as shown on Sheet No. 10 of the Contract Drawings. It is our understanding that a concrete bunker is located beneath the surface at the designed location for pole no. 5. C&S concurs with your recommendation to locate pole no. 5, 15 -feet south of the designed location. 2. We have reviewed changing the proposed service entrance connection to an existing utility pole along the airport access road as shown on Sheet No. 10 of the Contract Drawings, to an adjacent existing utility pole located approximately 70 -feet south, which has a pole mounted transformer. C&S recommends the service entrance connection be made as shown on the Contract Drawings, although, connection to the existing utility pole to the south with the pole mounted transformer is acceptable, contingent upon no additional costs to the contract. 3. The prefabricated metal pullbox shall be mounted to the electrical building wall using unistruts of sufficient strength. This is only one method that can be used, if you have a particular method you would like us to review, please forward. 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 Mr. Matt Falvey June 25, 1992 Page 2 4. Your request to allow aircraft to taxi across the grass while constructing the proposed 4 -way duct bank at Station 11+30 on Runway 7-25 to reach the existing apron and terminal area is denied. At no time shall your operations require any aircraft to taxi on the grass to reach any portion of the airport during the work in this contract. While working on the proposed 4 -way duct bank at Station 11 +30 on Runway 7-25, you are directed to leave 60 -feet minimum of asphalt transversely across the runway to allow aircraft to taxi to the apron while Runway 7-25 is closed. Also, Type H barricades shall be placed 8 -feet on center along the edge of work area until completion and the Resident Engineer directs you to remove them. If you have any questions or additional information is needed, please do not hesitate to contact me at (315) 455-7981. Very truly yours, C RINO NA EN INFERS, P.C. Charles R. McDermott Engineer CRM:jmc cc: Mr. Larry Cerretani Mr. R. Philip Knauff Mr. Stan Honor Mr. Philip Brito Mr. Scott Harris FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 June 25, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Gentlemen: TEL 203/663-1695 FAX 203/663-2719 JUN s In reference to the above -captioned project, this letter confirms the telephone conversation on June 25, 1992 between Calocerinos & Spina, i.e. Charles McDermott and Falvey Construction Corporation, i.e. Mathew D. Falvey. Charles McDermott stated to Falvey Construction Corporation that two options were available for re-routing traffic on Runway 25 while the proposed duct bank is under construction. The options are as follows: Option #1: Construction can be done in two phases, allowing traffic to use a portion of the runway for taxiing purposes. Option #2: Install temporary road plates for taxiing purposes. Mathew Falvey indicated that the use of a grass route along side of runway 25 would be the safest way to provide temporary access. This firm will most likely provide access through Option #1 as specified by Calocerinos & Spina. If any changes are made, Falvey Construction Corporation will notify Calocerinos & Spina. If you have any questions or comments, please contact the writer at 203-663-1695. Verytrulyyours, Mathew D. Falvey Manager MDF/nja cc: Larry Cerretani - C&S hill Knauff - F.I. Ferry District Scott Harris - Town of Southold File: FIAIR/FCC/SUBM/GC:1 Ref: VW3/Airport/traffic.rte Q Calocerinos & Spina Engineers, P.C. MEMO TO: FROM: • Files L. J. Cerretani -, RE: Elizabeth Field Airport Airfield, Lighting, Visual Aids & Electrical Building FAA AIP NO. 3-36-0029-04-91 NYSDOT NO. 0913.04 WfUBJECT: FILE: DATE: R4 MM'_�"I_ Preconstruction Meeting 211.004 June 15, 1992 Charlie McDermott Scott Shova Don Falvey Chad Falvey Nancy Aiello Matthew Falvey Phil Knauff Lawrence Cerretani - Calocerinos & Spina - Calocerinos & Spina - Falvey Construction - Falvey Construction - Falvey Construction - Falvey Construction - Fisher Island Ferry District - Calocerinos & Spina • A preconstruction meeting for the above referenced project was held at 8:00 am, Wednesday, June 10, 1992, in the Airport Manager's Conference Room. The following is a summary of items discussed. In the event the following does not accurately reflect the sum and substance of what transpired at this meeting, please provide an addendum or corrections immediately. PROJECT DESCRIPTION Title: Elizabeth Field Airport Airfield, Lighting, Visual Aids & Electrical Building FAA AIP NO. 3-36-0029-04-91 NYSDOT NO. 0913.04 1020 Seventh North Street, Liverpool, NY 13088 (315) 457-6711 The project generally includes the installation of an electrical building, airfield lighting, NAVAD systems including runway edge light, glide slope indicators, runway end identification lights, lighted windcone, segmented circle, and the installation of all related electrical control and distribution equipment. STATUS OF CONTRACT 1. The contract has been awarded to Falvey Construction Corporation of P.O. Box 699 Killingworth, Connecticut 0641, in the amount of $419,421.00. 2. The contract has been executed by the Contractor and Owner. 3. Bonds and insurance has been issued by the Contractor and is under review by the Owner. The insurance is incorrect and is being returned to the Contractor for correction. Bid bond (Sec 20-09) Performance bond (Sec 30-05) Payment bond (Sec 30-05) Insurance (Sec 20-16 / Sec 70-21) 4. Notice to proceed will be issued by the Owner, Town of Southold, N.Y. to facilitate a July 6, 1992 start date, providing bonds, insurances, DEC permits and the DBE plan are acceptable. 5. The Contractor submitted his proposed subcontractors and suppliers to be used on the project and the Engineer has approved them on behalf of the Owner. The Contract Documents requires that all Subcontractors and Suppliers be approved prior to being utilized on the project and prior to the start of work. COMMENCEMENT AND COMPLETION (Sec 30-09) 1. The Contractor is reminded that the time of completion is of the essence. Work shall commence within ten days following issuance of the Notice to Proceed. Total contract time for the project is 60 work days. 2. In the event the Contractor exceeds the contract time as specified, including all extensions and adjustments as provided by Sec 80-07, the contract allows for the assessment of liquidated damages in the amount of $900 per work day. (Sec 80-08) PROJECT MANAGEMENT 1. RELATIONSHIPS a. FAA & Owner have a Grant Agreement b. Owner & Engineer have Design & Inspection Agreements c. Owner & Contractor have a Construction Contract d. The Owner is the Town of Southold, New York. e. The FAA & NYSDOT are not parties to this contract; but they retain the right to inspect progress at any time. 2 9 0 2. ENGINEER & HIS AUTHORITY - The Engineer for this project is Calocerinos & Spina Engineers, P.C. The Resident Inspector will be Scott Shova, who will be the Owner's representative on the project site and through whom all project business is to be conducted. The home office for Calocerinos & Spina is located at 1020 Seventh North Street, Liverpool, New York, 13088, and the telephone number is 315-457-6711 - extension 251 for the Construction Division. The on site field office telephone number will be published to attendees of the meeting at a later date. 3. CONTRACTOR'S REPRESENTATIVE - The Contractor's Project Manager and Project Superintendent is Mat Falvey, and who will supervise the construction and shall be authorized to receive and fulfill instructions from the Engineer. The Contractor's home office is located in Killingworth, Connecticut, telephone number (203) 663-1695. His project site telephone number will be published to attendees of the meeting at a later date. 4. SUBCONTRACTORS AND THEIR RELATIONSHIP - The Owner and the Engineer will not deal directly with subcontractors. All business shall be conducted through the Prime Contractor who shall also be represented on the project site whenever any subcontractor is performing work. EQUAL EMPLOYMENT OPPORTUNITY 1. The Minority and Female Participation goals for this contract are 5.8 % and 6.9 % respectively. The same goals apply to all Subcontractors. 2. The DBE Participation goal for this contract is 11.0%, and shall be met unless otherwise approved by the Owner. The same goal applies to all Subcontractors and shall be included in their contracts by the Prime. The Contractor has forwarded his report to Calocerinos & Spina's home office, for review and a recommendation to the Owner. (Sec 70-22-I-2) 3. The Contractor is reminded that the above noted DBE submittal must be received by Charles Mc Dermott and approved by the Owner prior to the start of construction. 4. Monthly FEDERAL utilization reports (Form SF 257) are to be submitted directly, by the Contractor, to the U.S. Department of Labor, Office of Federal Compliance, Room 202, 825 East Gate Blvd., Garden City, New York 11530 (telephone number 516-227-3104), by the 5th of the month. A copy of each report must also be provided the Resident Inspector, the C&S home office (Attn: L. Cerretani, Construction Division). LABOR REQUIREMENTS AC 150/5100-6C was issued to the Contractor. 3 2. The Contractor shall post required State and Federal Labor Department posters/notices in a conspicuous place at the job site (e.g. Workman's Compensation, permission to work overtime, permission to pay by check, Company Equal Employment Opportunity Policy, State and Federal Wage Rates, etc.). 3. The Contractor shall pay the minimum wage in accordance with the appropriate State or Federal wage rate, which ever is higher. 4. Copies of Certified Weekly payrolls shall be submitted to the Resident Inspector, and the C&S home office (Attn: L. Cerretani, Construction Division), by the Contractor. Each payroll must provide each persons name, social security number, address, classification, rate of pay, hours worked, and deductions made. 5. All the Contractor's subcontractors are under the same obligations as the prime contractor. 6. Form 7460-1 is being reviewed by the FAA. C&S shall check on the status and advise. UTILITIES 1. All known utilities have been shown on the plans however, it is the Contractor's responsibility to verify the presence and location of all utilities prior to the performance of work. If the Contractor damages any utilities as a result of his construction operations, he must notify the Resident Inspector and Airport Management immediately, as well as begin immediate repair of the damage at no cost to the owner. SAFETY DURING CONSTRUCTION 1. The Contractor and all his personnel and subcontractors must be conscience of safety and that it is of utmost importance on an airfield during construction activities. 2. AC 150/5370-2C and Eastern Region Order 5210.1C was issued to the Contractor. The Contractor shall comply with all safety requirements outlined in these directives and in the contract documents. 3. Further safety requirements may be found in sections 80-11 through 80-15 of the contract documents, and the Contractor is advised to review the material in these sections as it will be strictly adhered to. An extracted copy of section 80-11 through 80-15 was issued to the Contractor. 4. All equipment, open excavations, and construction areas shall be lit and/or marked as specified in Sec 70-08 of the contract and the AC. Acceptable marking of equipment shall be flags (3' by 3' international orange and white checkered) during the day and rotating amber beacon at night. In 5. Appropriate NOTAM'S will be issued by the Owner's representative, Mr. Phil Knauff, prior to and during construction as necessary. A minimum of 24 hrs notice is required. CONSTRUCTION CONTROL 1. The Contractor is required to submit a written Construction Schedule for approval within ten days of Notice To Proceed. (Sec 80-03). No work may commence in any area prior to approval of the work schedule by the Engineer. (Sec 80-12-C-5) 2. Manufacturer's certifications and test results shall be the basis for acceptance for materials along with daily field measurements. (Sec 60). The Contractor was issued the format for manufacturer's certifications. 3. Shop drawing procedures are outlined in Sec 50-17, 50-18, and 50-19. The Contractor was issued a sample format for shop drawing submittals. 4. Shop drawings and manufacturer's certifications shall be submitted for all materials incorporated in the project. The Contractor is to identify all submittals by bid item and FAA spec numbers. Approval must be obtained from the Engineer prior to the start of any work item. No estimates shall be prepared for payment of work done on items lacking such approvals, and submittials. (Sec 60) 5. Shop drawings are to be mailed with a transmittal letter to Calocerinos & Spina's home office, Attn: Charles Mc Dermott. The Contractor shall submit a minimum of four (4) copies. - one for the Resident Inspector - one for the C&S Construction file - one for the C&S Design file - one for return to the Contractor 6. Manufacturer's certifications are to be given to the Resident Inspector in the field. 7. Testing of materials is the responsibility of the Engineer. (Sec 60) 8. Testing of electrical circuits is the responsibility of the Contractor and specific details are provided in Sec L-108. Testing must be accomplished prior to the start of construction, to establish a system base line datum for acceptance of work after construction. The Contractor is notified that he is required to utilize a 500 volt, 0 to 199.9 megohm, digital electric circuit tester in addition the tests prior to construction shall be witnessed by the Resident Inspector and the Owners electrician . (L-108-4.10) 9. Weekly FAA Progress Reports will be submitted by the Engineer. 10. The NYSDOT MURK system shall be used to monitor and record progress of the contract. 5 • C 11. Weekly project meetings are required and shall be coordinated by the Resident Inspector. CONTRACTOR PAYMENT 1. Work completed shall be measured in place on a daily basis and payment estimates prepared monthly by the Engineer. 2. Any change orders that may be required shall be prepared by the Engineer and must be approved by the Owner, the FAA, and the State prior to the performance of work. See Sec 40-04 for further details. The Contractor was issued the form for agreed price submittials. CONSTRUCTION WORK AREAS/ SPECIFIC AIRPORT OPERATING PROCEDURES 1. The Contractor was advised to review in detail sections 80-11 through 80-15 of the Contract Documents as they will be strictly adhered to. The following key points of these sections were reviewed in detail at the preconstruction meeting. A copy of section 80-11 through 80-15 are attached. Specific Airport Operating Requirements - Work areas - Construction and operating requirements - Temporary R/W closures - Barricade placement - Maintenance of existing airport lighting systems - NAVADS - Spoil and disposal areas - Contractor's staging area and field office - Storage and movement of equipment - Contractors haul routes - Access to the airport - No open excavations - Accidents - Coastal shoals, bars and mudflats - Contractor's communication system - Inpavement edge light and guidance sign systems - R/W & T/W safety areas - FOD 1.1 OPEN DISCUSSION 1. The DEC permit is anticipated to be approved June 22, 1992 and the requirements to facilitate survey and stakeout were reviewed as follows, per the DEC. - Vehicles shall stay on established access roads. All clearing to facilitate survey lines shall be done by hand. - Clearing width shall be two feet maximum. - No equipment is allowed. No excavation is allowed. 2. The Town is on a two week pay cycle. The next date the Town issues payment is on July 8, 1992. Progress payments are required to be in to Phil Knauff on the Wednesday, prior to the end of the pay cycles. 3. The Contractor's normal work hours are 7:30 am to 4:00 pm. The Contractor requested to work 7:00 am to 6:00 pm on an intermittent basis. C&S stated the Contractor is required to apply for and obtain approval from the Dept. of Labor prior to working any overtime hours. 4. The existing concrete bunker conflicts with the proposed electrical pole number 5. C&S will review and advise of the solution to the conflict. In addition an agreed price for the demolition and removal of spoil of the bunker shall be submitted as an option. 5. The additional plans and specifications the Contractor requested have been mailed to the Contractor. 6. A three day cure of the concrete duct banks will be required prior to backfill subject to the use of high early concrete. 7. All duct banks are to be located per plan, no deviations will be allowed unless approved by the Engineer. 8. The proposed duct bank located at station 11 +30, R/W 7-25 shall be placed in two separate pours to facilitate aircraft access to the active R/W. 9. R/W's to be closed for duct bank installations as directed by the Engineer. 7 10. The electrical duct bank and manhole detail is required to be constructed per the detail on sheet 11 of the plans. Concrete is required for entire length of the duct bank from the inside face of the manhole to the bottom of the floor slab in the vault. 11. The Contractor will be using two way radios to communicate with his employees. No exception taken subject to monitoring the airport unicom with air transceivers to avoid an incident with an aircraft. 12. The Contractor asked if a water source was available. C&S and the Owner stated that the Contractor is required to obtain permission from the water authority prior to using any hydrant, and if required by the water authority install a meter to determine the amount used. 13. The Contractor requested permission to share the Resident Inspector's FAX line. C&S took no exception to the request. 14. The connections into the existing pull boxes shall be as follows: Stub out of pull box with the two inch conduit, two feet. Conduit to have bell ends flush with the inside face of the pull box and grouted in place. 15. C&S to check on type of mounting device for prefabricated pull box to vault wall. 16. The Contractor requested to apply the sealer to the blocks prior to the sixty day cure period. C&S shall check with their architectural department and advise of their decision. cc: Those in Attendance Those not in Attendance Mr. D. Vornea Mr. S. Honor Mr. S. Harris E CERTIFICATE OF INSURANCE: __. _ ___ __� __ __-� CSR BS 06/11 9.2 6D tk t ; i TC+4T"t iii SiJESA A r�TTERt; ; YY �Att;�O "� EVANS SHORES & LEONARD M f CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE I C H A L EVANS DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE 111 ROBERTS STREET POLICIES BELOW. EASTHARTFORD, CT j--------------------------------------------------------------------------- 06108 ( COMPANIES AFFORDING COVERAGE PHOriE 203-289-6816 ----------------------------------------------------- SuREJ i ---------------------------------------------------------------------------, COMPANY LETTER A CNA INSURANCE COMPANY FALVEY CONSTRUCTION ---------------------------------------------------------------------------, COMPANY LETTER B CORPORATIONi--------------------------------------------------------------------------- BOX 699, 12 FIRE TOWER ROAD COMPANY LETTER C KI L L I N G W O R T H C T--------------------------------------------------------------------------- 06417 1 COMPANY LETTER D - - --------------------- --------------------------------------------- COMPANY LETTER E COVERAGES <____________________________________________________________________________________________________________________ imIS IS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REOUIREME`;T, TERM OR CONDIT ON OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTiFICATE MAY BE ISSUED OR MAY PERTAIN, IH INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL TERAS, EXCLUSIONS, AND COND:TIO;6 OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLADS. ---- ---------------- -------------------------------------------------------------------------------------------------------------.. L"U TY?E OFNSORA'CE POLICY NU!�,BER ,POLICY EFF ; POLICY EXP LI�fiTS _TR, i- i DATE GATE -- ----------------------------- --------------------------- GENERAL LIABILITY ------- ------------- �� ---------------------------------- ;GENERAL AGGREGATE X2,000,000 i------------------- A4. ;IX COMMERCIAL GEN LIABILITY 5-04667745 --------------, 04/01/92 i 04/01/931PROD-COMP/OP AGG, ;1,000,000 i CLAicS MADE X _ OCC. ------------------+-------------- ?ERS. & ADV. INJURY 1, 000, 00Q iXJ uWP;ERS'S & CONIRP,CTGR'S j-------------------------------- EACH OCCURRENCE 11000,000 PROTECTIVEL i -------------------i--------------; -IRE DAMAGE i 0NY ONE FIRE) 150 , 000 i------------------ --------------, [ I MED. EXPENSE (ANY ONE PERSON) i5, 000 - --------------------------------- ---------------------------------------------------------------------------- AUTOMOBILE LIAB ------------ ;COMB. SINGLE LIMIT A, 000,000 jj A, A ANY AUTO 3-04667746 r ------------------- ;-------- --- - i 04/01/92 i 04/01/931BODILY INJURY .i ALL OWNED AUTOS i(PER PERSON) j i 7 SCHEDULED AUTOS ! i-------------------,------------ 17f1 HIRED AUTOS i i3DDi�-Y INJURY X NON-Gwr+ED AUTOS (PER ACCIDENT) Ii: i GARAGE LIABILITY i------------- -i-- --------- - I ;PROPERTY DAMAGE ------------------ - -- - -- LIABILITY -------- ---------------i -------------- ------------------- , - OCCURRENCE -1,000,000 AS A UMBRELLA R 1-04667747 04/01/92 --- ------ OOd i OTHER THAI; UMBRELLA FORK I (AGGREGATE 11, 000, --------------; -------------------- i ;STATUTORY LIMITS; A WORKERS' COMP WC -004667748 i 04/01/92 04/01/93;EACH ACCIDENT 100,000 AND DISEASE-POL. LIMIT 1500,000 EMPLOYERS' LIABi�DISEASE-EACH EMP. !100,000 --------------- ------------ ----------------------- -------------------------------------------------------------- OTHER --------------------------------------------------------------------------------------------------------------------------------- DESCRI�TiGN OF uPERATIONS/LGCATiO'rSIV`tHICLES/SPECIAL ITE}S JUN j 6im THE TOWN OF SOUTHOLD IS NAMED AS ADDITIONAL INSURED. Towft*swomm ? L-R--a=:LATE HOLDER CANCELLATION <- = SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX- = PIRATION DATE THEREOF, THE ISSUING COMPANY ;,ILL ENDEAVOR TO MAIC 10 DAYS WRITTEN NOT=CE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT = FAILURE TO MAIL SUCH NOTICE SHALL .MPOSE NO OBL GAT'ON OR LIA511-iTY 01 - TOWN TOWN O F S O U T H O L D = AR KIND UPON THE COMPAr�Y, IT S AGENTS OR REPRES�NTATI VES. 53095 MAIN ROAD =--------------------------------------------------------- ----------------- SO11UTHOLD NY = AUTHORIZED REPRESENTATIVE ACbRD 2AS (1/90)_. MICHAEL W. _EVANS_T�ld/ a FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699"'" -� �'► "' �� AX 203/663-2719 KILLINGWORTH, CT 06419 June'' 22,` 1992 AIRFIELD LIGHTING, VISUAL AIDS AND-`EtECTRIM WILDING Elizabeth Field Airport Fishers Island, New York PRE -CONSTRUCTION MEETING MINUTES June 10, 1992 In Adttendance: Charles McDermott - Calocerinos & Spina Larry Cerretani - Calocerinos & Spina Scott Shova - Calocerinos & Spina Phill Knauff - F. I. Ferry District James Hancock - F. I. Electric Co. Donald J. Falvey - Falvey Const. Corp. Mathew D. Falvey - Falvey Const. Corp. Nancy J. Aiello - Falvey Const. Corp. Chad Fouke - Falvey Const. Corp. The meeting began at 8:15 A.M. with the above -listed people in attendance. The following items were discussed: Status of Contract - Contract awarded to Falvey Construction Corporation - contract signed on May 1, 1992 - the FAA granted has been executed and released. Falvey Construction Corporation's bonds and insurance will be forwarded to the owner and the FAA for their approval. The Notice to Proceed can not be issued until the DEC Wetlands Permit has been approved. Calocerinos & Spina anticipates that they will receive an answer from the DEC on this permit in approximately two weeks. The worst case scenario would probably be July 6, 1992. The DEC will allow Falvey Construction Corporation to perform work under the conditions that all machines, trucks and equipment stay on the established roads, general clearing be done by hand and no digging. This pertains to any work performed in the area below the elevation of 10 feet. Survey work on Saturday, June 13, 1992 on hold until bonds and insurance is approved. Cal- ocerinos & Spina will express mail them in an effort to expedite matters and will notify Falvey Construction Corporation prior to Saturday. Falvey Construction Corporation's list of subcontractors and suppliers has been approved. All other subcontractors must be approved prior to utilizing them. Page 1 PRECONSTRUCTION MEETING MINUTES - Page 2 There will be 60 working days on this project. If an inspector is required for work per- formed on Saturday or Sunday, Falvey Construction Corporation will be charged. If the con- tract time is exceeded, the liquidated damages for inspector services provided by Caloceri- nos & Spina will be $900.00 per day. Phil Knauff of the Ferry District indicated that they would allow an additional two to three days to the contract if necessary due to the congestion on the ferry around the Labor Day weekend. The completion date of this Project will be rrarl;r!ated on the start eat -3 There was discussion as to the owner of the project being the Town of Southold. The FAA and the State of New York DOT are not a party to the contract. Calocerinos & Spina's full time inspector on the project will be Scott Shova. Falvey Con- struction Corporation's full time superintendent and project manager will be Mathew Falvey. Calocerinos & Spina will request from the DEC an exception to the above-mentioned restric- tions in order to install the utility poles. Calocerinos & Spina requires 24 hour emergency telephone numbers of three individuals from Falvey Construction Corporation. The owner (Town of Southold) or Calocerinos & Spina will not deal with any subcontractors of Falvey Construction Corporation. Falvey Construction Corporation must have a superintendent on site full time. Equal Employment Opportunity goals for minority and female are 5.8 and 6.9%. Falvey Con- struction Corporation's DBE plan has been reviewed and approved by Calocerinos & Spina. It is Calocerinos & Spina's opinion that although the 11% requirement was not met, Falvey Construction Corporation made a good faith effort to reach that goal. The DBE plan was forwarded to the Town of Southold for their approval. Federal Standard Form 257 to be submitted directly to Scott Shova of Calocerinos & Spina with a courtesy copy to Larry Cerretani. Calocerinos & Spina issued Falvey Construction Corporation an FAA Advisory Circulars on Labor Requirements. State and Federal Labor Department posters must be displayed at the jol site along with the EEO policy and the State and Federal Wage Rates. Scott Shova will receive the originals of the certified payrolls from Falvey Construction Corporation and all subcontractors. A courtesy copy will be forwarded to Larry Cerretani. It is the responsibility of the general contractor to have the underground utilities locate(. prior to any construction. Notify Scott Shova or Phil Knauff of any damages that may occur during construction. Calocerinos & Spina issued another FAA Advisory Circular on Safety Requirements on Airports During Construction. Other safety requirements from the contract were discussed, i.e. the use of checkered flags, closing the operations on a nightly basis and the use of rotating amber beacons during night constructions, if any. a 9 0 PRECONSTRUCTION MEETING MINUTES- Page 3 NOTAMS - Falvey Construction Corporation to give Helen (Fishers Island Airport) 24 hours notice. Calocerinos & Spina will review Falvey Construction Corporation's construction schedule. Larry Cerretani indicated that he would like the schedule to indicate the percentage of completion. Falvey Construction Corporation will revise our schedule accordingly. Calocerinos & Spina discussed the .req!iirpments or; manufactin.ares Corti-`icc:tes and test results. Larry Cerretani gave Falvey Construction Corporation a format to use. This will be required for all materials incorporated into the project. No payment will be made on items without certificates. Manufacturer's certificates are to be given to Scott Shova. The shop drawings were also discussed. If Falvey Construction Corporation requires addi- tional copies to be returned, then additional copies must be submitted. Testing is the responsibility of Calocerinos & Spina. Testing of the proposed electrical system is Falvey Construction Corporation's responsibility. Runway lights must remain working during non -contract hours. There was discussion about the problems with keeping the lights working. Due to the dilapidated conditions of the runway lights and unique circuit set up, it was agreed by all parties that any problems could be worked out by working closely with Fishers Island Ferry District and the airport. Calocerinos & Spina will prepare an FAA progress report. A weekly construction meeting will be required between the engineers, contractor and owner. An agreeable time and day will be established once the project begins. The payment schedule was discussed. Falvey Construction Corporation can receive payment every 30 days. The owner pays on a bi-weekly schedule. Calocerinos & Spina will prepare the bill and forward to the owner after meeting with Falvey Construction Corporation to determine t1hp paymn i payment. Fa, .Y Consc ucti;r� ;:,rpora lore Will i inform, Calocerinos & Spina if partial payments will be required on lump sum items. Larry Cerretani stated Falvey Con- struction Corporation may be paid partial payments for lump sum items provided a schedule be submitted. Drawings were handed out in order to review how the project is divided into four work area. Those areas were discussed in detail. Specifications regarding working in area "A" - con- tractor can work in two or more areas as long as one runway remains open. Larry Cerretani stated the contract documents are contradictory, therefore at least one runway must remain open during all non -contract work hours. Calocerinos & Spina will ask the DEC to grant permission to Falvey Construction Corporation to perform work in the building area. The spoil and disposal area shown on the plan must be seeded and mulched upon completion of the project. The contractor's staging area is as shown on the plan. Calocerinos & Spina's office trailer is to be fully operational prior to the start of the project. RECONSTRUCTION MEETING MINUTES - Page 4 The safety area of the runway and threshold area was discussed. Two radio transceivers are required on this project, to be turned over to the owner upon completion. All parties discussed the installation of the power poles and lines. Jim Hancock of the Fishers Island Electric Company brought up a problem with the layout of the pole line. Calocerinos & Spina will review the plans and notify Fishers Island Electric Co. and Falvey Con3tiuctlori Corpoiatiin of '.S?eir 'Fal%".J l.ons','-_"' ,.'tlo^ Corporation offered to give a quote on removing the concrete pad in order to accommodate the pole line. Additional plans and contract books are in the mail to Falvey Construction Corporation. Concrete - three days of curing required before backfilling. The time span requirements in the contract for painting is flexible. Calocerinos & Spina agreed that the individual ducts could be done in two or more pours, i.e. cold joints are acceptable but should be kept to a minimum. The time span for the application of sealer on the electrical building was questioned by Falvey Construction Corporation. Calocerinos & Spina will check with their engineering department. Falvey Construction Corporation asked Calocerinos & Spina for clarification on how the pre- fabricated metal pullbox was to be fastened to the concrete wall. Calocerinos & Spina will check and notify Falvey Construction Corporation. Falvey Construction Corporation asked if the 8 way duct under the building has to be encase, in concrete. Calocerinos & Spina stated that they wanted it encased in concrete. Falvey :,QnELruction Corpo atior, an ed if one un com rind several two-way radios could be utilized in lieu of two unicoms and if Fishers island Ferry District wanted to retain them. Phil Knauff of the Fishers Island Ferry District said he felt the ferry district had no rea need for them and Calocerinos & Spina stated one unicorn would be acceptable. Falvey Construction Corporation requested access to the nearest water main. Phil Knauff of the Ferry District suggested that Mike Conroy or Bob Wall be contacted at 516-788-7422. Falvey Construction Corporation asked if Calocerinos & Spina would object to sharing a fax machine. Calocerinos & Spina conceded. Falvey Construction Corporation asked for clarification of installation of the sleeve in the pull box on runway end 25. Calocerinos & Spina suggested the use of a 2" bell with a watertight termination. Calocerinos & Spina requested that the construction schedule show the percentage of comple- tion on a weekly basis. PRECONSTRUCTION MEETING MINUTES - Page 5 There was discussion on the work hours. The normal work hours will be from 7:30 AM to 4:00 P.M. Falvey Construction Corporation will be required to notify the engineers of any anticipated overtime. Due to the fact that it may be on a short notice basis, Calocerinos & Spina will fill in the required paperwork indicating two hours overtime per day on a "as required" basis. Respectfully submitted, ti Nancy JAiello Office Manager The above stated items are the writer's interpretation of the items discussed at the pre - construction meeting. Should any parties disagree, please notify Falvey Construction Cor- poration in writing within 5 days from the date of this letter. cc: Phil Knauff - F.I. Ferry District Scott'Harris - Town of Southold Jim Hancock - F. I. Electric Co. Cs� JUP ! Calocerinos & Spina Engineers, P.C. June 18, 1992 Mr. Philip Brito, Manager Federal Aviation Administration New York Airports District Office 181 South Franklin Avenue Room 305 Valley Stream, New York 11581 JUN 22 S92 Tarn C" SkOWd Re: Elizabeth Field Airport Air -field Lighting, Visual Aids, and Electrical Building AIP Project No. 3-36-0029-05-92 NYSDOT Project No. 0913.05 File: 211.004 Dear Mr. Brito: We are enclosing the following information for your review and approval: • One copy of the Executed Contract. • One copy of the Contractor's Performance Bond. • One copy of the Contractor's Labor and Material Payment Bond. • One copy of the Contractor's Certificates of Insurance. Also enclosed is documentation regarding Falvey Construction Corporation's DBE participation for the above project. Falvey Construction Corporation will not meet their DBE goal of I I % for this project. If the above meets with your approval, please authorize the Town of Southold to issue a Notice To Proceed to Falvey Construction Corporation for a tentative construction start date of June 29, 1992. If you have any questions or require additional information, please do not hesitate to contact our office. Very truly yours, ERIN S NGC. ChI Charles R. McDermott Engineer CRM Jmc Enclosures cc: Mr. Scott L. Harris Mr. Philip Knauff (w/encl) 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX 1315) 457-9803 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 FALVEY CONSTRUCTI®N CORP. June 17, 1992 TEL 203/663-1695 FAX 203/663-2719 Itarm Calocerinos & Spina, P.C. JUN 1020 7th North Street 2 IM Liverpool, New York 13088 Town elm* Attention: Charles McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, enclosed please find this firm's revised con- struction schedule and Percent Completion Schedule. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, _Awap�;;�4_ Mathew D. Falvey Manager MDF/nja cc: Larry Cerretani - C&S Phil Knauff - F.I. Ferry Dist. y/Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/sched.& FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 June 16, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles R.'McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Gentlemen: TEL 203/663-1695 FAX 203/663-2719 JUN 2 2 1992 town Chic Sou"Wd In reference to the above -captioned project, listed below are the 24 hour emergency tele- phone numbers for four representatives of this firm. Name of Representative Title Donald J. Falvey President Mathew D. Falvey Manager Nancy J. Aiello Office Manager Chad Fouke Foreman Telephone Number 203-663-1695 203-663-3495 CT Residence 516-788- FI Residence 516-788- FI Office Trailer 203-663-1803 203-663-3127 As soon as a telephone number is established at the rental residence of Mathew D. Falvey on Fishers Island, this firm will notify Calocerinos & Spina of that number. Respectfully submitted, Mathew D. Falve7 Manager MDF/nja cc: Mr. Scott L. Harris Mr. R. Philip Knauff /Mrs. Judith Terry File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/Emerg.tel FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699 FAX 203/663-2719 KILLINGWORTH, CT 06419 June 16, 1992 Calocerinos & Spina, P.C. 1020 7th North Street JUN 2 2 Liverpool, New York 13088 Tamen Cha SM*Add Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, enclosed please find three copies of this firm's revised Certificates of Insurance. If you have any questions or comments, please contact the writer at 203-663-1695. Very ��truly ((ru l y yours, N\OJ Mathew D. Falvey Manager MDF/nja cc: Lawrence Cerretani - C&S Phil Knauff - F.I. Ferry Dist. t,., -Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW:3/A i rport./cert.. i ns FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 June 8, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York ' 13088 Attention: Lawrence Cerretani Inspection Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: LJ TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated June 3, 1992 via fax. Please be a advised of the following. Addressing paragraph #2, Section 80-04 of the contract documents states that the contractor shall notify the engineer 48 hours prior to commencing work within airport operations area. Falvey Construction Corporation notified Calocerinos & Spina on May 13, 1992 of proposed survey and stakeout work on May 16, 1992. Seventy-two hours of notice was provided. had Calocerinos & Spina responded within that time, the incident would have most definitely been avoided. Addressing paragraph #3; Falvey Construction Corporation concurs and apologizes for not forwarding the bond and insurance prior to the requested date for project stake out and survey. The reason this firm did not forward these documents is due to the fact that Cal- ocerinos & Spina notified this firm that the FAA had not forwarded the necessary paperwork to the Town of Southold, thereby delaying the commencement of this contract. Falvey Con- struction Corporation was not provided with any information to indicate when this contract would commence and did not want to incur costs, i.e. bond premiums, until a commencement time was established. Addressing paragraph #4, Falvey Construction Corporation concurs and has forwarded the bonds and insurance. This firm has re -submitted a request for stake out and survey and will pro- vide a construction schedule as indicated. Addressing paragraph #5, as noted above, this firm, stated the reasons for not forwarding the bonds and insurance based on communications with Calocerinos & Spina. cont. Calocerinos & Spina, P.C. Page 2 June 8, 1992 Falvey Construction Corporation is well aware of who we are contracted with and did not attempt to question the FAA's actions as Calocerinos & Spina has indicated in their June 3, 1992 letter. Calocerinos & Spina's insinuation of such is without merit. Section 70-05 of the contract documents state " No requirement of the Program, the rules and regulations implementing the Program, or this Contract shall be construed as making the Federal Govern- ment a party to the Contract nor will any such requirement interfere, in any way, with the rights of either party to the Contract." Falvey Construction Corporation has not and will not attempt to question or challenge the FAA's actions. Due to the fact that the pre -construction meeting scheduled in April was cancelled and a date was not provided to re -schedule, it was very apparent to Falvey Construction Corporation that this project was delayed. Therefore, we attempted to avoid incurring costs as a result. We apologize for any misunderstandings caused by Falvey Construction Corpora- tion and we look forward to this matter being put to rest and continuing an enjoyable work- ing relationship. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, /:�� Mathew D. Falve Manager MDF/nja CC: Charles McDermott - C&S Yhii Knauff - F.I. Ferry District ✓ Scott Harris - Town of Southold' File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/FAA FALVIEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13086 Attention: Charles McDermott Engineer k- g JUN 1 21992 June 8, 1992 Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's memo dated June 3, 1992 and will be attending the pre - construction meeting as requested. Falvey Construction Corporation will present our con- struction schedule for discussion. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja CC: Larry Cerretani - C&S Ptdl Knauff - F.I. Ferry Dist. cott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:I VW3/Airport/precon.ack ]FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 June 8, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York - 13088 Attention: Charles McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated June 4, 1992. Please be advised that this firm will install the split face block as noted. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja CC: Larry Cerretani - C&S Peril Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/block.app • C ___-B Calocerinos & Spina E,,a veers. P C. Mr. Mathew D. Falvey Falvey Construction Corporation 12 Fire Tower Road Post Office Box 699 Killingworth, CT 06419 Dear Mr. Falvey: 0 June 9, 1992 JUN ! 11992 Town dark &W"0eld Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA-AIP No. 3-36-0029-04-91 N.Y.S.D.O.T. No. 0913.04 File: 211.004 We are in receipt of the certificates of insurance and applications for electrical permits submitted by your firm June 5, 1992, for the above -referenced project. We shall forward the certificates of insurance to the Owner and FAA for approval. You are to submit the application for the electrical permits to the appropriate agency. Please forward copies of the approved permits, upon approval, for our records. If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/kw cc: Mr. P. Knauff Mr. S. his Mr. C. McDermott Field Inspector 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 • mu - Calocerinos & Spina E.igineers. P C Mr. Mathew D. Falvey Falvey Construction Corporation 12 Fire Tower Road Post Office Box 699 Killingworth, CT 06419 0 June 9, 1992 ,.Io f 5 y Y Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA-AIP No. 3-36-0029-04-91 N.Y.S.D.O.T. No. 0913.04 File: 211.004 Dear Mr. Falvey: Please be advised, the Owner takes no exception to the use of the attached sub- contractors, on the above -referenced project. If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/kw enclosure cc: Mr. P. Knauff (w/enc.) Mr. S. Harris (w/pnc. ) Mr. C. McDermott (w/enc.) Field Inspector (w/enc.) 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 t Y. ]FALVEY CONSTRUCTI®N CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 June 4, 1992 TEL 203/663-1695 FAX 203/663-2719 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, Falvey Construction Corporation is submitting the names and addresses of the subcontractors that will be working for this firm. Subcontractors Name & Address Commercial Sealcoating 7 Peach Orchard Hill P. 0. Box 407 Plainville, CT 06062 Brian Spiker Masonry 299 Stetson Rd. Brooklyn, CT Pawcatuck Roofing Co., Inc. Pond Side Pawcatuck, CT Walsh Contracting, Ltd. Montauk Avenue Fishers Island, NY 06390 cont. Job Performed painting, sawcutting, joint sealing block building electrical bldg. roof (bituminous) electrical 11 Y Calocerinos & Spina, P.C. Page 2 June 4, 1992 At this time, Falvey Construction Corporation is still negotiating with two paving contrac- tors. As soon as a final decision is made, this firm will notify Calocerinos & Spina. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey v Manager MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/subcontractors FALVEY CONSTRUCTI®N CORP. 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699 FAX 203/663-2719 KILLINGWORTH, CT 06419 June 8, 1992 Calocerinos & Spina, P.C. 1020 7th North Street JUN I 1 Im Liverpool, New York 13088 Town C" eW Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated May 26, 1992. Enclosed please find this firm's proposal, prepared in accordance to Section 40-02 and 90-05 of the contract docu- ments, for extra work to be performed under Change Order #1. Summary of Scope of Proposed Work Sand over runway will be pushed and bucketed into the specified area with care. Sand will be finish graded to match existing contours. Stake out of the area will be performed as shown on revised drawing dated May 20, 1992. Placement of beach grass will be done at 12 inches on center as specified on the same drawing. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja cc: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold File: FIAIR/FCC/CT-O/GC:1 VW3/Airport/changeor.1 FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 June 8, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool_, New York 13088 Attention: Larry Cerretani Construction Supervisor RICEM JUN i 1 199? Re: Airfield Lighting, Visual Aids & Electrical Building S�Iwld Elizabeth Field, Fishers Island, New York low C" AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, enclosed please find the following documents: Certificate of Good Standing (3 copies) (proof of name change) Construction Schedule (3 copies) Change Order #1 (3 copies) If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. /Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/sched.fi 0 Calocerinos & Spina Engineers, P.C. P] RKNM JUN 81992 ten Cie& smwtam MEMO TO: Mr. R. Philip Knauff - Fishers Island Ferry District Mr. Scott L. Harris - Town of Southold Mrs. Judith Terry - Town of Southold Mr. Philip Brito - FAA NYADO Mr. Robert Michaud - NYSDOT Region 1 - Albany Mr. Stan Honor - NYSDOT Region 10 Mr. Mathew Falvey - Falvey Construction Corp. Mr. Harold Wagner, P.E. - Calocerinos & Spina Construction Division Manager FROM: Charles R. McDermott Engineer RE: Preconstruction Conference for the Construction of the Airfield Lighting, Visual Aids and Electrical Building Contract at Elizabeth Field. DATE: June 3, 1992 FILE: 211.004 A preconstruction meeting for the above -referenced project will be held on June 10, 1992 at 8:00 a.m. at the Fishers Island Ferry District Office, Fishers Island, New York. All interested parties in your organization are invited to attend. THE CONTRACTOR IS REQUESTED TO PRESENT HIS CONSTRUCTION SCHEDULE AT THE MEIrTT NG FOR DISCUSSION. CRM: jmc 1020 Seventh North Street, Liverpool, NY 13088 (315) 457-6711 Ah � - -- -- S - Calocerinos &Spina =--ineers. P C_ June 3, 1992 Mr. Mathew D. Falvey Falvey Construction Col 12 Fire Tower Road P.O. Box 699 Killingworth, CT 06419 Re: " ` th Field Airport Airfield Lighting, Visual Aids, and Electrical Building FAA AIP # 3-36-0029-04-91 NYSDOT # 0913.04 File: 211.004 Dear Mr. Falvey: We are in receipt of your May 20, 1992 response to our May 18, 1992 correspondence regarding the start of survey work on the above referenced project and have the following comments on behalf of the Owner. Your May 13, 1992 correspondence stated survey work was to be preformed May 16, and 23, 1992. The undersigned did not receive your fax of May 13, 1992 until May 18, 1992, two days after you stated survey work was to begin. We do not consider this adequate notice to coordinate this work with the Owner. In addition, this situation is viewed as a potential safety hazard as survey personnel would be within an active runway safety area, and to our knowledge NOTAMS were not issued, which is in direct non-compliance with the Contract Documents. It appears from your correspondence, it is your perception that survey and stakeout work can proceed immediately following the award of tic Contract without approved bonds and insurance. Your perception is incorrect, in that the Contract Documents require that the successful bidder submit the appropriate bonds and insurance within fifteen calendar days of receipt of notice of award. Per our previous telephone conversation and correspondence, please be advised authorization to conduct survey work is denied until the required bonds and insurance are approved. In addition, we shall require your schedule for this work to facilitate coordination with the Owner and issuance of NOTAMS. The schedule shall state the start and end dates, daily start and end work hours, and the areas of work per given workday. 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 Mr. Mathew D. Falvey June 3, 1992 Page 2 C"� =�`--S- Your statement that the bonds and insurance have not been forwarded simply because of the delay by the FAA is irrelevant as your Contract is with the Town of Southold and not with the FAA. It is our understanding that you elected not to submit bonds and insurance until the Grant Agreement was executed. In view of this, we feel that the FAA has not caused any delays and has acted in a responsive manner. We hope this clarifies any misunderstandings regarding the start of work on this project. If you have any questions do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/cb cc: Mr. P. Knauff Mr. S. Harris Mr. D. Vornea Mr. S. Honor Mr. M. Pertanchuk Mr. H. Wagner Field Inspector iY Mr. Mathew D. Falvey June 3, 1992 Page 2 C"� =�`--S- Your statement that the bonds and insurance have not been forwarded simply because of the delay by the FAA is irrelevant as your Contract is with the Town of Southold and not with the FAA. It is our understanding that you elected not to submit bonds and insurance until the Grant Agreement was executed. In view of this, we feel that the FAA has not caused any delays and has acted in a responsive manner. We hope this clarifies any misunderstandings regarding the start of work on this project. If you have any questions do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. Lawrence J. Cerretani Inspection Supervisor Airport Division LJC/cb cc: Mr. P. Knauff Mr. S. Harris Mr. D. Vornea Mr. S. Honor Mr. M. Pertanchuk Mr. H. Wagner Field Inspector FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699 FAX 203/663-2719 KILLINGWORTH, CT 06419 June 5, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 g 1�2 Attention: Larry Cerretani JUN Construction Supervisor Town Ch* Sewfiew Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, enclosed please find the following documents: Certificate of Insurance (3 copies) Electrical Permits (3 copies) If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja CC: Charles McDermott - C&S Pbil Knauff - F.I. Ferry Dist. v,Scott Harris - Town of Southold File: FIAIR/FCC/CT-O/GC:I VW3/Airport/permits.ins • LVEY CONSTRUCTIOPI CORP. �Ou 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699 FAX 203/663-2719 KILLINGWORTH, CT 06419 June 4, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor JUN 8 1992 Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York Town C" sw*jwd AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, enclosed please find the following documents: Performance Bonds (3 copies) Payment Bonds (3 copies) Insurance Policies & letter (3 copies) from insurance agent Subcontractor List (3 copies) If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. Cott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/misc.doc FALVEY CONSTRUCTION CORP, 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 June 4, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 JUN 8 i Tom as* S- on"M In reference to the above -captioned project, Falvey Construction Corporation is submitting the names and addresses of the subcontractors that will be working for this firm. Subcontractors Name & Address Commercial Sealcoating 7 Peach Orchard Hill P. 0. Box 407 Plainville, CT 06062 Brian Spiker Masonry 299 Stetson Rd. Brooklyn, CT Pawcatuck Roofing Co., Inc. Pond Side Pawcatuck, CT Walsh Contracting, Ltd. Montauk Avenue Fishers Island, NY 06390 cont. Job Performed painting, sawcutting, joint sealing block building electrical bldg. roof (bituminous) electrical Calocerinos & Spina, P.C. Page 2 June 4, 1992 At this time, Falvey Construction Corporation is still negotiating with two paving contrac- tors. As soon as a final decision is made, this firm will notify Calocerinos & Spina. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nJa CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. 4.--S`cott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/subcontractors lFALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 June 3, 1992 Calocerinos & Spina, F.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 JUN g OW TWA* CIM* In reference to the above -captioned project, Falvey Construction Corporation hereby notifies the Town of Southold and Calocerinos & Spina that project survey and stakeout work will be resuming on June 13, 1992. If this date is not acceptable or you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. /Scott Harris - Town of Southold File: FIAIR/FCC/CT-O/GC:1 VW3/Airport/survey.2nd !► i ]FALVLY CONSTRUCTI®N CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KI LLI NGWORTH, CT 06419 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles McDermott Engineer TEL 203/663-1695 FAX 203/663-2719 June 1, 199., ANN 4 f/1111) 13 lot .. f- tit7r. ft Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 In reference to the above -captioned project, please provide Falvey Construction Corporation with an additional 6 sets of the contract drawings and specifications. If available, one set of the contract drawings in the reduced size would be appreciated. If you have any questions or comments, please contact the writer at 203-663-1695. MDF/nja cc: Mr. Larry Cerretani - C&S Mr. Phil Knauff - F.I. Ferry District Mr. Scott Harris - Town of Southold File: FIAIR/FCC/CT-O/GC:1 VW3/Airport/books.add Very truly yours, Mathew D. Falvey Manager AN EQUAL OPPORTUNITY EMPLOYER • • . • IFALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 June 1, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, Section 70-02 of the contract states "The con- tractor shall be responsible for posting the permits and shall comply with all requirements of the permits". Falvey Construction Corporation is requesting that Calocerinos & Spina forward the New York State Department of Environmental Protection Tidal Wetland permit and Fresh Water Wetlands permit so they can be posted as required. If you have any questions or comments, please contact the writer at 203-663-1695 MDF/nja CC: Mr. Larry Cerretani - C&S Mr. Phil Knauff - F.I. Ferry District Mr. Scott Harris - Town of Southold File: FIAIR/FCC/CT-O/GC:1 VW3/Airport/permits.pst Very truly yours, Mathew D. Falvey Manager AN EQUAL OPPORTUNITY EMPLOYER • • 0 • FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 June 1, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Inspection Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated June 1, 1992. Please be advised that Falvey Construction Corporation will forward the bonds and insurance immediately. This firm will resubmit our request for a future date for the survey and stakeout work. If you have any questions or comments, please contact the writer at 203-663-1695 MDF/nja cc: Mr. Charles McDermott - C&S Mr. Phil Knauff - F.I. Ferry District Mr. Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/bonds.ins Very truly yours, Mathew D. Falvey Manager AN EQUAL OPPORTUNITY EMPLOYER • • 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 0 • ]FALVEY CONSTRUCTION CORP. May 29, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 JUN 31992 tlrMCb* * In reference to the above -captioned project and the DBE goals in accordance with Section 70-22, Item I "Disadvantaged Business Enterprise Requirements", Falvey Construction Corpora- tion is submitting the attached information to substantiate the fact that this firm has made a good faith effort to meet the contract requirements. Please make note of the number of call that we made with no response from the DBE firm. We find this to be very frustrating. The contractors that did respond were considerable higher as indicated on the attached information. If you have any questions or need any further information, please do not hesitate to contact the writer. Very truly yours, Mathew D. Falvey Manager MDF/nia Enclosures cc: Charles McDermott - C&S hil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold File: FIAIRP/FCC/CT-0/GC:1 VW3/contacts.DBE Faxed this date, mailed U.S. PostalA§eE69ALtb0POA ft ITY EMPLOYER 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 FALVEY CONSTRUCTION CORP. Minority and Woman Contractors Le end: NEMN: New England Minority News BB: The Blue Book DBE: Disabled Business Enterprise MBE: Minority Business Enterprise WBE: Woman Business Enterprise Date of this printing: May 29, 1992 TEL 203/663-1695 FAX 203/663-2719 Name Mason Contractors: Julius Gonsalves & Son (MBE) RFD #1 Stonington Rd. Norwich, CT (203) 887-5962 B. Rodriguez Mason Contractor (MBE) 23 Spruce St. Norwich, CT (203) 887-4974 Mike Gomez Masonry (MBE) 41 Tilley St. New London, CT (203) 443-0925 Paving Contractors: Lee Mac Paving (MBE) 17 Fitch Ave. Groton, CT (203) 445-6570 J Mitchell Paving & Sealing Company (WBE) 552 Buff Cap. Rd. Tolland, CT (203) 875-1066 B.T. Sessa Company (WBE) 3 Sessa Lane Niantic, CT (203) 739-2413 • • Source Comments NEMN NEMN NEMN NEMN called on 4-24-92A 9:14am left a message to call us back regarding F.I. project called on 4-24-92@ 9:10am they returned call @ 9:30 called on 4-24-92. left a message to call back. F.C.0 sent spec. package 4-25-92. called on 4-24-92@ 11:40am. F.C.C. sent spec. package 4-25-92 BB called 4-24-92. F.C.C. sent spec. package 4-25-92and gladly answered subsequent questions. M. F. attended on-site meeting w/ J. M. 5- 23-92 and went over job in great detail. BB called and arranged for meeting on 5-28-92. 2 • Response did not return call returned call on 4-24-92@ 9:30am. said they were not interested Mike Gomez called back 4- 24-92 and said he was interested. no response since spec. package sent. Lee Mac said he was interested. no response since spec. package sent. J. Mitchell said she was very interested. J.M. contacted F.C.C. several times w/ questions. J.M. requested on-site meeting. J.M. said she would definitely get back to us[F.C.C.]. no response to date since that time. F.C.C. awaiting quote Roofing Contractors: New London NEMN Roofing Company, Inc. (MBE) P.O. Box 496 New London, CT (203) 442-6637 SR Roofing (MBE) NEMN 22 Morgan Court Groton, CT (203) 445 -1106 Foundry Companies: Fort Path Casting NEMN Company (DBE) 108 Fort Path Rd. Madison, Ct (203) 245-9872 Painting, Sealing, & Sawcutting Contractors: Brown's Striping BB Company (WBE) 70 N. Plains Industrial Hwy Wallingford, CT (203) 284-1997 called on 4-24-92@ one # has been changed to a 11:35am. non -published number called on 4-24-92@ phone # not in service 11:40am. called on 4-24-92@ 1:34pm. phone # not in service called on 4-24-92. sent out sent quote which F.C.C. spec. package on same day. received 4-30-92 prices from received quote are considerably higher than others received by F.C.C. 3 The following quotes were received from two subcontractors for painting, sawcutting, and joint sealing work. Brown's Striping Co. 605 N. Cherry St. Ext. Wallingford, CT 06492 WBE Commercial Sealcoating, Inc. P.O. Box 407 Plainville, CT 06062 non - DBE Painting $9,200 $8,200 Sawcutting $7,053 $1,747 Joint Sealing $6,000 $2,400 4 FALVIEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 May 29, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 r .17 . JUN 3 IM left CM* 3r,r160d1 In reference to the above -captioned project, enclosed please find a physical sample of the split face block Falvey Construction Corporation proposes to use for the electrical building as specified in the contract drawings, page 9 and Item L-112 Electrical Building, 112-2.6, Paragraph I. If you have any questions or comments, please do not hesitate to contact the writer. MDF/nja Enclosures CC: Charles McDermott - C&S /Phil Knauff - F.I. Ferry Dist. t/ Scott Harris - Town of Southold File: FIAIRP/FCC/CT-0/GC:1 VW3/sample.blk Very truly yours, ,44Lw-D Mathew D. Falvey t� 1 Manager AN EQUAL OPPORTUNITY EMPLOYER FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 May 27, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 MAY 2 g I! TWM iii& Ssw6y In reference to the above -captioned project and the DBE goals in accordance with Section 70-22, Item I "Disadvantaged Business Enterprise Requirements", please be advised of the following. Falvey Construction Corporation has made every effort to utilize the required eleven per cent of DBEs, but has been unsuccessful. We used the New England Minority News and The Blue Book dated 1992 as sources to locate DBEs. The majority of the firms that we contacted were not interested in participating in the project or did not respond after receiving the bid package. The few that did respond had considerably higher prices. The geographic location of Fishers Island and the State of New York makes it nearly impos- sible to receive competitive prices from contractors on Long Island. This is due -to the fact that Fishers Island is only accessible from New London, Connecticut. Therefore, most of the businesses contacted are in central and eastern Connecticut. The following DBEs will be utilized. Doors & Hardware, Inc. P. 0. Box 792 Old Saybrook, CT 06475-0792 Selecto-Flash Safety Inc. P. 0. Box 543 East Hanover, NJ 07936 doors, frames & hardware $2,075.00 barricades $2,580.00 AN EQUAL OPPtORTUNITY EMPLOYER Calocerinos & Spina Page 2 May 27, 1992 At this time, we have been long awaiting quotes from two paving firms that are DBEs. The estimated amount of paving is approximately $15,000.00. Falvey Construction Corporation will inform Calocerinos & Spina as soon as a final decision is made. If you have any questions or comments, please contact the writer at 203-663-1695. Very ttr�uly' yours, Mathew D. Falvey Manager' MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/goals.dbe Faxed this date Mailed via US Postal Service this date FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 May 26, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 k MAY 2 81992 4 GA=F In reference to the above -captioned project, Falvey Construction Corporation hereby notifies the Town of Southold and Calocerinos & Spina that project survey and stakeout work will be resuming on June 6, 1992. If this date is not acceptable or you have any questions or comments, please contact the writer at 203-663-1695. MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/survey.2nd. Very truly yours, Mathew D. Falvey Manager AN EQUAL OPPORTUNITY EMPLOYER C','aiocerinos & Spina Z�r^,sneers, P Crn [73 [� I; May 18, 1992 Mr. Mathew D. Falvey Falvey Construction Corporation 12 Fire Tower Road Post Office Box 699 Killingworth, CT 06419 Re: Elizabeth Field Airport -Fishers Island Airfield Lighting, Visual Aids and Electrical Building FAA-AIP No. 3-36-0029-04-91 N.Y.S.D.O.T. No. 0913.04 File: 211.004 Dear Mr. Falvey: We are in receipt of your May 13, 1992 correspondence regarding notification that you will perform survey work, on the above -referenced project, May 13 and 23, 1992 and have the following -comments, on behalf of the ^mer- __ - -- __-- -- Section 80-12 of the Contract Documents requires that you give adequate notice to the Engineer and obtain approval, prior to starting work on the project, to facilitate coordination with the Owner. It is evident that you failed to do so, as we received notification May 18, 1992, three days after you started survey work. Your actions are in direct non-compliance with the Contract Documents, as well as a potential safety hazard and not _eptable. Authorization to perform survey work, on the above -referenced project, is denied at this time, as the Notice to Proceed has not been issued, the required bonds and insurance have not been submitted and approved, and your construction schedule has not been submitted for approval. 1020 Seventh North Street, Liverpool. NY 130381' '315) 457-6711 FAX (315) 457-9803 Mr. Mathew D. Falvey Page 2 May 18, 1992 If you have any questions, do not hesitate to contact us. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. 1 4114� La nce J. Cerretani Inspection Supervisor Airport Division LJC/kw cc: Mr. P._ Knauff Mr. D. Vornea Mr. S. Honor --Mr—M. -Petranchuk Mr. H. Wagner Field Office file 1FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 May 12, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, please provide Falvey Construction Corporation with the radio frequency for the proposed L854 radio control units. ADB-Alanco is currently awaiting this information in order to begin manufacturing. If you have any questions or comments, please contact the writer at 203-663-1695. MDF/nja CC: Charles McDermott.- C&S Phil Knauff - F.I. Ferriqt File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/radio.frq Ref: FIAIR/FCC/SUB/VRM Very truly yours, Mathew D. Falvey Manager AN EQUAL OPPORTUNITY EMPLOYER FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 May 13, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, please be advised that representatives from this firm will be performing survey and stake -out of the proposed work as shown on the con- tract drawings on May 16, 1992 and again on May 23, 1992. If you have any questions or comments, please contact the writer at 203-663-1695. MDF/nja CC: Charles McDermott - C&S Phil Knauff - F.I. Ferr File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/survey.dat Very truly yours, Mathew D. Falvey O Manager AN EQUAL OPPORTUNITY EMPLOYER 11 M FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 April 30, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED MAY 14 1992 routF10IrI T-...., r1e4 Enclosed please find submittals for lights, guidance signs, wire, vault equipment, etc. As you know, some equipment takes up to 10 weeks to receive after the approval of submittals. This firm wishes to avoid any disruptions or delays to the project as a result of deliveries or any other reasons. Therefore, Falvey Construction Corporation is requesting a response to this particular package as soon as reasonably possible. This would allow the purchase order to proceed within the first week in May. Thank you for your understanding and cooperation. If you have any questions or comments, Please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey i� Manager MDF/nja CC: Mr. Scott L. Harris Mr. R. Philip Knauff ,/Mrs. Judith Terry File: FIAIR/FCC/9UBM/GC:1 VW3/Airport/coversh.sub AN EQUAL OPPORTUNITY EMPLOYER t ! rFALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699 FAX 203/663-2719 KILLINGWORTH, CT 06419 April 30, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 We believe the following items meet or exceed the applicable specifications contained in the contract documents for the above -referenced project: Item L-109 Electrical Building Equipment PERMATROL Photoelectric Control ADB-ALNACO, Inc. - L841 - Auxiliary Relay Cabinet ADB-ALNACO, Inc. - RL-854PR Radio Receiver ADB-ALNACO, Inc. - L-828 Constant Current Regulators 7.5KW MDF/nja cc: Mr. Scott L. Harris Mr. R. Philip Knauff e'Mrs. Judith Terry File: FIAIR/FCC/SUBM/GC:1 VW3/Airport/4submit.fi' Ref: FIAIR/FCC/CF-0/GC:1 Respectfully submitted, 5 ; �4 Mathew D. Falvey Manager AN EQUAL OPPORTUNITY EMPLOYER FALVEY CONSTRUCTI®N CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 April 30, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 TEL 203/663-1695 FAX 203/663-2719 We believe the following items meet or exceed the applicable specifications contained in the contract documents for the above -referenced project: Item L-108 Underground Cables ADB-ALNACO, Inc. - L824 -C #8 600V Cable ADB-ALNACO, Inc. - L824 -C #8 5KV Cable ADB-ALNACO, Inc. - #8 Stranded Bare Counterpoise Wire MDF/nja cc: Mr. Scott L. Harris Mr. R. Philip Knauff fMrs. Judith Terry File: FIAIR/FCC/SUBM/GC:1 VW3/Airport/3submit.fi Ref: FIAIR/FCC/CF-O/GC:1 Respectfully submitted, - � �; ?" <:: .2 X /,;! , Mathew D. Falvey Manager AN EQUAL OPPORTUNITY EMPLOYER FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 April 30, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 1088 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 BOO p�'I TEL 203/663-1695 FAX 203/663-2719 We believe the following items meet or exceed the applicable specifications contained in the contract documents for the above -referenced project: Item L-107 Airport Wind Cones ADB-ALNACO, Inca - L-807 - Style 1, Size 2 Wind Cone MDF/nja cc: Mr. Scott L. Harris R. Philip Knauff Mrs. Judith Terry File: FIAIR/FCC/SUBM/GC:1 VW3/Airport/2submit.fi. Ref: FIAIR/FCC/CF-0/GC:1 Respectfully submitted, Mathew D. Falvey Manager AN EQUAL OPPORTUNITY EMPLOYER FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 April 30, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 TEL 203/663-1695 FAX 203/663-2719 We believe the following items meet or exceed the applicable specifications contained in the contract documents for the above -referenced project: Item L-125 Airport Lighting & Navigational Systems ADB-ALNACO, Inc. - L-861 ADB-ALNACO, Inca - L -861-E Olson Industries - L-867 Olson Industries - L -867B ADB-ALNACO, Inc. - L-830-1 ADB-ALNACO, Inc. - L-823 ADB-ALNACO, Inc. - L-858 Elastimold/Amerace L-830-6 ADB-ALNACO, Inc. - L -849A ADB-ALNACO, Inc. - L-881 ADB-ALNACO, Inc.. - 62BO286 MDF/nja cc: Mr. Scott L. Harris Mr. R. Philip Knauff ✓Mrs. Judith Terry File: FIAIR/FCC/SUBM/GC:1 VW3/Airport/1submit.fi Ref: FIAIR/FCC/CF-0/GC:1 Incandescent Runway Light Threshold Lights Baseplate Light Base Isolation Transformers Cord Sets & Connector Kits Guidance Signs Series Isolating Transformers Runway End Identification rights PAPI-2 System with Aiming Device Kit 2" Frangible Coupling Respectfully submitted, Mathew D. Falvey Manager AN EQUAL OPPORTUNITY EMPLOYER FALVEY CONSTRUCTION CORP. �npy 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 May 1, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: James W. Leana Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RFCFIVFD 1,:Ay r' 1992 Southold r-,.,.., (7lork In reference to the above -captioned project, as of this date Falvey Construction Corpora- tion has not received a response to our letter dated April 7, 1992 requesting the required routing of all correspondence. Please forward this information as soon as possible. If you have any questions or comments, please contact the writer at 203-663-1695. MDF/nja CC: Mr. Scott L. Harris Mr. R. Philip Knauff Mrs. Judith Terry File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/routing.cor Very truly yours, '-i). fir• Mathew D. Falvey Manager AN EQUAL OPPORTUNITY EMPLOYER r 0 ]F'ALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 May 20, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 sAY2 61992 MAY SUPE:"i'w` .., OFFICE S'' LITH%D In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated May 18, 1992 via fax. Please be advised of the following: Addressing the first paragraph, Falvey Construction Corporation's letter dated May 13, 1992 regarding the project stake -out and survey did not state that survey work would be performed on May 13, 1992 as indicated. This firm's letter stated survey work would be performed on May 16, 1992. Therefore, Calocerinos & Spina's statement is incorrect. Addressing the second paragraph, Section 80-12 of the contract documents states the con- tractor shall give adequate notice to the resident engineer, so as to afford time to coor- dinate construction with the owner. If section 80-12 is thoroughly read, it should be apparent that this section is referring directly to construction procedures during actual construction of proposed contract work as outlined in work areas A, B, C, & D. The contract documents further state in Section 80-04, "when the work requires the contractor to conduct his/her operations within an air operations area of the airport, the work shall be coordi- nated with airport management (through the Engineer) at least forty-eight (48) hours prior to commencement of such work. This firm forwarded our letter dated May 13, 1992 to the attention of Larry Cerretani on May 13, 1992 via fax and sent the originals through the U. S. Postal Service. If Calocerinos & Spina did not receive a faxed copy and/or 72 hours of notification is not considered adequate by your firm, then please notify Falvey Construction Corporation so future correspondence can be corrected. Addressing the first statement of the third paragraph, stating that this firm's actions are in direct non-compliance with the contract documents is false. Falvey Construction Corpo- ration notified Calocerinos & Spina three days prior to commencing the project stake -out and survey. Again, if said fax was not received, please notify this firm. AN EQUAL OPPORTUNITY EMPLOYER Calocerinos & Spina, P.C. Page 2 May 20, 1992 Addressing the second statement of the third paragraph, Calocerinos & Spina stating this firm's actions created a potential safety hazard is unsubstantiated and without merit. Calocerinos & Spina did not have a representative on site to assess that a safety hazard was created. Further, Falvey Construction Corporation's safety record is impeccable and is highly emphasized with all of its employees. Safety is this firm's top priority and our performance should not be criticized unless a valid and substantiated case can be brought to our attention. Addressing the first statement of the fourth paragraph, Falvey Construction Corporation acknowledges Calocerinos & Spina's denial to perform the project stake -cut and survey and will resubmit. Addressing the remainder of the fourth paragraph, this paragraph appears to be irrelevant. This firm has been anxiously awaiting receipt of a Notice to Proceed. Costs are beginning to be incurred as a result of the delay. We hope that the Notice to Proceed will be forth- coming soon so that this project may commence. The contract documents specifically state in Item M-150 Project Survey & Stake -Out, Section 150-1.1 "The stakeout survey shall proceed immediately following the award of the Contract..". The contract clearly does not state that the project survey and stake -out should be performed only after the Notice to Proceed is issued. The bonds and insurance have not been forwarded simply because of the delay by the FAA. This issue was addressed with James Leana on April 7, 1992. Please refer to Falvey Con- struction Corporation's correspondence dated April 7, 1992. To avoid any further concerns, Falvey Construction Corporation will forward the insurance and bonds promptly. The contract documents further states in Section 80-03, Prosecution and Progress, states "Unless otherwise specified, the Contractor shall submit his/her progress schedule for the Engineer's approval within ten (10) days after the effective date of the Notice to Pro- ceed"." Therefore, once a Notice to Proceed is issued then this firm will submit a progress schedule. With the above noted, it would seem the fourth paragraph of Calocerinos & Spina's letter is irrevelant. This letter constitutes Falvey Construction Corporation's response and it should be evident that this firm's actions were in compliance with the contract documents contrary to Calocer- inos & Spina's letter dated May 18, 1992. Falvey Construction Corporation regrets that this incident happened. We sincerely wish to perform all work in accordance with the contract documents and in a first class and timely manner. This firm's main objective is to provide complete satisfaction to the Town of Sou- thold and Calocerinos & Spina so future working relationships can grow. This firm does not wish to dissatisfy the involved parties or create unnecessary situations or tensions that could otherwise be avoided. It should be noted in future situations if an allegation is made against Falvey Construction Corporation and it is validly substantiated, then we will concur. If this firm believes it has been wrongly accused, we will address any and all allegations accordingly. Falvey Construction Corporation regrets this incident occurred and we wish to avoid like situations in the future. Calocerinos & Spina, P.C. Page 3 May 20, 1992 Please contact the writer with any questions or comments. Verytr ly yours, Mathew D. Falvey e' Manager MDF/nia cc: Mr. Charles McDermott — C&S Mr. H. Wagner — C&S Mr. M. Petranchuk — C&S Phil Knauff — F.I. Ferry Dist. � Scott Harris — Town of Southold Mr. D. Vornea — FAA Mr. S. Honor — NYSDOT File: FIAIR/FCC/CT-0/GC:1 Ref: FIAIR/FCC/CF-0/GC:1 VW3/Airport/survey.rsp FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 May 19, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Larry Cerretani Construction Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: SUPE! TOW' I TEL 203/663-1695 FAX 203/663-2719 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated May 13, 1992 on May 18, 1992. Please be advised Falvey Construction Corporation will install the electrical manhole as specified in the contract documents and as per the direction of Calocerinos & Spina. If water is encountered during construction, this firm will provide adequate water control as outlined in the contract documents, Section 50-20, Removal of Water. If there is an influx of water in the manhole after the installation, and is not the result of defective workmanship, then Falvey Construction Corporation will not be responsible. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja CC: Charles McDermott - C&S ,,Phil Knauff - F.I. Ferry Dist. Scott Harris - Town of Southold File: FIAIR/FCC/CT-0%GC:1 Ref: FIAIR/FCC/CF-0/GC:1 VW3/Airport/altern.res AN EQUAL OPPORTUNITY EMPLOYER ]FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 April 13, 1992 Town of Southold 53095 Main Road P. 0. Box 1179 Southold, NY 11971 Attention: Scott L. Harris Supervisor Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentllemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED APR 1 1992 So444 r_..._ -1.4 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of the Town of Southold's letter of award dated April 8, 1992 on April 13, 1992. Please be advised Falvey Construction Corporation is very pleased to be awarded this con- tract and we are looking forward to working together again. This firm will forward all required documents as outlined in the contract. If you have any questions or comments, please contact the writer at 203-663-1695. x : yo Mathew D. FaIZ Manager MDF/nja cc: Mr. R. Philip Knauff File: FIAIR/FCC/CT-0/GC:1 Mr. James Leana VW3/Airport/award.tos ,,,Mrs. Judith Terry Ref: FIAIR/FCC/CF-0/GC:1 0 FALVEY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 April 13, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: Charles R. McDermott Engineer Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED APR 1 c 1992 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated April 8, 1992 along with the copy of the topo- graphic survey plan. This firm has reviewed the topographic survey drawn by Chandler, Palmer and King dated July 16, 1991," revision dated February 26, 1992, Sheet #1 of 3. Wetlands are noted approximately 300 feet north of runway end 12. This area should be well outside of any proposed work as shown on the contract drawings. If any other wetlands exists near the proposed work, please advise this firm prior to the commencement of work. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja cc: Mr. Scott L. Harris Mr, R. Philip Knauff Mrs. Judith Terry File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/survey.c&s Ref: FIAIR/FCC/CF-0/GC:1 JUDITH T. TERRY TOWN CLERK REGISTRAR OF VITAL STATISTICS MARRIAGE OFFICER To F rom M OFFICE OF THE TOWN CLERK TOWN OF SOUTHOLD Accounting & Finance Judith Terry, Town Clerk Bid Deposits April 10, 1992 Town Hall, 53095 Main Road P.O. Box 1179 Southold, New York 11971 Fax (516) 765-1823 Telephone (516) 765-1801 In accordance with the bid specifications, the following bidders on the Elizabeth Field, Fishers Island Airfield Lighting, Visual Aids & Electrical Building project have returned their plans, and are entitled to a $50.00 refund: Thank you. Power Line Constructors, Inc. P.O. Box 385 Clinton NY 13323 Fruean-Moulison Utilities Inc. P.O. Box 809 Georgetown MA 01833 Firebird Construction Corp. 329 Middle Country Road Smithtown NY 11787 J.P. Daly S Sons, Inc. 88A Brook Avenue Deer Park NY 11729 Carlin Contracting Co. Inc. P.O. Box 300 Waterford CT 06385 ]E ALV1EY CONSTRUCTION CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KILLINGWORTH, CT 06419 April 7, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: James W. Leana, Engineer Airport Division Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/.663-1695 FAX 203/663-2719 RECEIVED OR 1 1992 In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated April 2, 1992. Please be advised that Falvey Construction Corporation has not received a Notice of Award from the Town of Southold as of this date. This firm will forward all the items listed in the above -reference letter and will forward the documents as requested and outlined in the contract within 15 days upon receipt of the Notice of Award. Please note Mr. Mathew Falvey will be the Project Manager and all future correspondence should be addressed accordingly. Also, please notify this firm of the required routing of all correspondence regarding this project. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/bonds.c&s Ref: FIAIR/FCC/CF-0/GC:1 • E FALV1EY CONSTRUCTI®N CORP. 12 FIRE TOWER ROAD P.O. BOX 699 KI LLI NGWORTH, CT 06419 April 7, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: James W. Leana, Engineer Airport Division Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: TEL 203/663-1695 FAX 203/663-2719 RECEIVED APR 1( 1992 Cn��thnlrP In reference to the above -captioned project and the conversation between Nancy Aiello, Office Manager of this firm, and James Lean& of Calocerinos & Spina on April 7, 1992, the following items were discussed. 1) The pre -construction meeting is anticipated to be rescheduled in approximately one week. The previously scheduled meeting was cancelled due to the fact that the FAA had not forwarded the grant to the Town of Southold for processing. 2) A Notice of Proceed will not be issued until the FAA has reviewed this firm's insurance and bonding documents. This process takes approximately 5 days. 3) The Contractor's Proposed DBE Plan was discussed. Mr. Leana waived the 15 day clause that is stated on Page Bid -11 of the contract documents. 4) Mr. Charles McDermott will be reviewing this firm's submittals. There will be an inspector on the job site daily. Falvey Construction Corporation is very excited and anxious to proceed with this project and looks forward to working with your firm and all concerns on Fishers Island again. If you have any questions or concerns, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja cc: Mr. R. Philip Knauff File: FIAIR/FCC/CT-0/GC:1 Mr. Scott L. Harris VW3/Airport/review.let Mrs. Judith Terry Ref: FIAIR/FCC/CF-0/GC:1 U.S. Department of Transportation Federal Aviation Administration Mr. Scott L. Harris RECEIVED Town Supervisor Town Hall APR 1992 53095 Main Road P.O. BOX 1179 Cnn►hnLd T r`1 .� Southold, New York 11971 Dear Mr. Harris: Elizabeth Field Airport, Fishers Island, NY Lighting Rehabilitation to R/W's 7-25 & 12-30, VASI and Electrical Building AIP 3-36-0029-04-91 Please be advised that our office has reviewed the Bid tabulation or the subject project as submitted to us by your consultant, C&S, with their letter of March 24, 1992 and concur in the award of this contract to the low bidder, Falvey Construction Corporation, Killingworth, Connecticut in the amount of $419,421. This concurrence in the award is subject to compliance with all DBE requirements. Sincerely, - Dan Vornea Airport Engineer SCOTT L. HARRIS SUPERVISOR. FAX (516) 765 - 1823''' � TELEPHONE (516) 765 1800" 3 OFFICE OF THE SUPERVISOR TOWN OF SOUTHOLD April 8, 1992 Mr. Mathew Falvey Falvey Construction Corporation P.O. Box 699 Killingworth, Connecticut 06419 Town Hall, 53095 Main :. P.O. Box 1179 Southold, New York 11971 Re: Elizabeth Field - Fishers Island Airfield Lighting, Visual Aids, and Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Mr. Falvey: The bid which you submitted for the Airfield Lighting, Visual Aids, and Electrical Building Contract at Elizabeth Field Airport was the lowest responsible bid received meeting the requirements of the Contract Documents. In accordance with a Resolution passed by the Town of Southold, you are hereby awarded the Contract in the amount of $419,421.00, contingent upon Federal Aviation Administration and New York State Department of Transportation approval, including receipt and approval of your proposed DBE subcontract participation. Upon approval of your DBE participation plan, our consultant will forward the contracts for your signature. You will be required to submit contract bonds and insurance certificates when you return the signed contracts. Thank you for showing interest in our Airport Improvement Project. Very truly yours, TOWN OF SOUTHOLD Scott L. Harris, Supervisor Enclosure cc: Calocerinos & Spina Engineers, P.C. Mr. Philip Brito Mr. Robert Michaud Mr. James Kuzloski (w/encl) Mr. R. Philip Knauff (w/encl) JUDITH T. TERRY TOWN CLERK REGISTRAR OF VITAL STATISTICS MARRIAGE OFFICER 11 OFFICE OF THE TOWN CLERK TOWN OF SOUTHOLD Town Hall, 53095 Main Road P.O. Box 1179 Southold, New York 11971 Fax (516) 765-1823 Telephone (516) 765-1801 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION WAS ADOPTED BY THE SOUTHOLD TOWN BOARD AT A REGULAR MEETING HELD ON APRIL 7, 1992: RESOLVED that the Town Board of the Town of Southold hereby accepts the bid of Falvey Construction Corporation, Killingworth, Connecticut, in the amount of $419,421.00, the low bidder, for the Elizabeth Field, Fishers Island, Airfield Lighting, Visual Aids and Electrical Building project, all in accordance with the recommendation of Calocerinos S Spina, Engineers, P.C. , the Town's engineers for the project; and be it further RESOLVED that Supervisor Scott L. Harris be and he hereby is authorized and directed to execute the contract documents for the aforementioned project, as prepared by Calocerinos & Spina, Engineers, P.C. Judith T. Terry Southold Town Clerk April 8, 1992 To oj(-✓ k� Y THE JAS., ,S D. MOULISON COMPANIES, INC. 108 TENNEY STREET • P.O. BOX 809 GEORGETOWN, MA 01833 (508) 352-7084 • FAX (508) 352-6240 n -�cv- ` 04� '56. D o y 56 "e5 -if RECEIVED 7efi4`P-q 57'- APR 1992 $olAoldTr..e!n Mark 7`�G(J , � 0aS P, NF SEND WHITE COPY RETAIN YELLOW COPY Ci -s Calocerinos & Spina Engineers, P.C. R"WD APR 7 1992 April 2, 1992 Tawn Clerlt IB000ld Mr. Don Falvey Falvey Construction Corp. 12 Fire Tower Road Killingworth, CT 06417 Re: Elizabeth Field - Fishers Island Airfield Lighting, Visual Aids, and Electrical Building Dear Mr. Falvey: Enclosed are the original and seven conformed copies of the contract for the referenced project. Please have all contracts signed, notarized, and returned to my attention for further processing. In accordance with Sections 20-16 and 30-05 of the contract documents please submit the following: • Three copies of the Contractor's Performance Bond. • Three copies of the Contractor's Labor and Material Payment Bond. • The Original and two copies of the insurance policy. • Three copies of the Contractor's Certificates of Insurance. • One copy of the Contractor's proposed DBE Plan. Please note that the date of the Bonds must be the same as the date of this contract. If you have any questions, please do not hesitate to contact me. r Very truly yours, W. JWL:kal Enclosure cc: Mr. R. Philip Knauff Mrs. Judith Terry ENGINEERS, P.C. 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 Calocerinos & Spina Engineers, P.C. Im 1� U RECEIVED APR 1992 Southold T- r1.4 MEMO TO: Mr. R. Philip Knauff - Fishers Island Ferry District Mr. Scott L. Harrisyy - Town of Southold ki Mr. Philip Brito - FAA NYADO Mr. Robert Michaud - NYSDOT Region 1 - Albany Mr. Stan Honor - NYSDOT Region 10 Mr. Harold Wagner, P.E. - Calocerinos & Spina Construction Division Manager Mr. Mark Petranchuk - Calocerinos & Spina - Airport Division Managing Engineer Mr. Ronald Peckham, P.E. - Calocerinos & Spina - Airport Division Manager FROM: James W. Leana Project Engineer RE: Preconstruction Conference for the Construction of the Airfield Lighting, Visual Aids and Electrical Building Contract at Elizabeth Field. DATE: March 30, 1992 FILE: 211.004 A preconstruction meeting for the above -referenced project will be held on April 7, 1992 at 8:00 a.m. at the Fishers Island Ferry District Office, Fishers Island, New York. All interested parties in your organization are invited to attend. The Contractor is requested to present his construction schedule at the meeting for discussion. JWL:jmc 1020 Seventh North Street, Liverpool, NY 13088 (315) 457-6711 Calocennos & Spina Engineers, P.C. Mr. Scott L. Harris Town Supervisor Town of Southold Town Hall, 53095 Main Road P.O. Box 1179 Southold, New York 11971 March 24, 1992 RECEIVED PAR 3 G 11992 Southold T...� rlork Re: Elizabeth Field - Fishers Island Airfield Lighting, Visual Aids and Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 File: 211.004 Dear Mr. Harris: Seven bids for the above -referenced project were received on March 12, 1992 at 1:00 p.m. The bids were canvassed and the three lowest responsive bids are as follows: CONTRACTORS Falvey Construction Corporation Fruean Utilities, Inc. Dicin Electric Co., Inc. BID AMOUNTS $419,421.00 $563,511.00 The low bid submitted by Falvey Construction Corporation was reviewed and found to be in order. For a complete breakdown of the bid amounts and the remaining bids, please refer to the attached bid canvass sheet. The low bid submitted is within 10% of the Engineer's Opinion of Construction Cost for the project and is considered reasonable. The Federal Aviation Administration is expected to issue a grant to the Town of Southold for the project based upon the bid amount. 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 . . I'll 0 0 Mr. Scott L. Harris March 24, 1992 Page 2 Based upon our past experience working with Falvey Construction Corporation, we find them to have done sufficient work in this area to qualify them for the work of this Contract. We therefore recommend the award of the Contract, in the amount of $419,421.00, to Falvey Construction Corporation in accordance with the conditions of award stipulated in their bid and contingent upon the following: 1. Federal Aviation Administration concurrence 2. Receipt and Approval of the Required DBE Subcontract information Enclosed is a sample Notice of Award Letter which you may utilize to formally award the construction contract to Falvey Construction Corporation. If you have any questions or if additional information is required, please do not hesitate to contact our office. Very truly yours, CERINOS PINA ENGINEERS, P.C. W. ana JWL:jmc Enclosure cc: Mr. Philip Brito (w/encl) Mr. Robert Michaud (w/encl) Mr. James Kuzloski (w/encl) Mr. Philip Knauff (w/enol) Mr. Harold Wagner, Jr., P.E. (w/encl) L-1 SAMPLE NOTICE OF AWARD LETTER March 24, 1992 Mr. Donald Falvey Falvey Construction Corporation P.O. Box 699 Killingworth, Connecticut 06419 Re: Elizabeth Field - Fishers Island Airfield Lighting, Visual Aids, and Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Gentlemen: The bid which you submitted for the Airfield Lighting, Visual Aids, and Electrical Building Contract at the Elizabeth Field Airport was the lowest responsible bid received meeting the requirements of the Contract Documents. In accordance with a Resolution passed by the Town of Southold, you are hereby awarded the Contract in the amount of $419,421.00, contingent upon Federal Aviation Administration and New York State Department of Transportation approval, including receipt and approval of your proposed DBE subcontract participation. Upon approval of your DBE participation plan, our consultant will forward the contracts for your signature. You will be required to submit contract bonds and insurance certificates when you return the signed contracts. Thank you for showing interest in our Airport Improvement Project. Very truly yours, TOWN OF SOUTHOLD Scott L. Harris Town Supervisor SLH Jmc Enclosure cc: Calocerinos & Spina Engineers, P.C. Mr. Philip Brito Mr. Robert Michaud Mr. James Kuzloski (w/encl) ELIZABETH FIELD AIRPORT IENGINEERIS OPINION OF IFALVEY CONSTRUCTION CORP. IFRUEAN UTILITIES, INC. FISHERS ISLAND, NEW YORK lCONSTRUCTION COST IP.O. BOX 699 118 FRUEAN WAY AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICALOCERINOS $ SPINA IKILLINGWORTH, CONNECTICUT 0641IS. YARMOUTH, MASSACHUSETTS 0261 FAA-AIP NO. 3-36-0029-04-91 JENGINEERS, P.C. NYSDOT PROJECT NO. 0913.04 11020 SEVENTH NORTH STREET -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- LIVERPOOL, NEW YORK 13088 ITEM FAA I I I UNIT UNIT UNIT NO. SPEC NOI DESCRIPTION I QUANTITY UNITS I PRICE I TOTAL I PRICE I TOTAL I PRICE I TOTAL I xxzzxzxxzzzxxzezxxzzsszzxzazxazxxasa=xzxzsszxzzzzzzzzsxzszzzxxzzzxxzzzxzzxzzszxxzzzzxazzzxssaxsazszxzzzzzzzzzzzzzxzsaxzxxzazsmxmszaszazzxzzsszxzszxxxxxzaxaxxssasszxsazzxs 1821 L-125 IMEDIUM INTENSITY RUNWAY EDGE LIGHTS, BASE I I I I I I I I I MOUNTED, IN PAVEMENT I 57 EACH ( $600.00 I $34,200.00 I $315.00 I $17,955.00 I $565.00 I $32,205.00 I 22 L-125 IRUNWAY 25 THRESHOLD LIGHTS I 1 LS I $6,000.00 I $6,000.00 I $3,800.00 I $3,800.00 I $19,500.00 I $19,500.00 I 23 L-125 (AIRPORT GUIDANCE SIGN NO.R-2-5, BASE I I I I I I I MOUNTED, IN PAVEMENT I 1 LS I 53,000.00 I $3,000.00 I $2,655.00 ( $2,655.00 I $2,450.00 I $2,450.00 I 24 L-125 (AIRPORT GUIDANCE SIGN NO.R-2-19, BASE I I I I ( I I I I MOUNTED, IN PAVEMENT I 1 LS I $3,000.00 I $3,000.00 I $2,655.00 I $2,655.00 I $2,450.00 I $2,450.00 I 25 L-125 (AIRPORT GUIDANCE SIGN NO.R-1-3, BASE I I I I I I ( I I MOUNTED, IN TURF I 1 LS I 53,000.00 I 53,000.00 I 52,400.00 I $2,400.00 I $1,875.00 I $1,875.00 I 26 L-125 (AIRPORT GUIDANCE SIGN NO.R-1-19, BASE I I I I I I MOUNTED, IN TURF I 1 LS I 53,000.00 I $3,000.00 I $2,400.00 I $2,400.00 I $1,875.00 ( $1,875.00 27 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM,( . I RUNWAY 7 END I 1 LS I $6,000.00 ( $6,000.00 I $8,250.00 I $8,250.00 I $9,378.00 I $9,378.00 28 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM,) I I I I I RUNWAY 25 END I 1 LS I $6,000.00 I $6,000.00 I 58,250.00 I 58,250.00 I 59,378.00 I $9,378.00 29 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM,( I I RUNWAY 12 END I 1 LS I 56,000.00 I 56,000.00 I 58,250.00 I $8,250.00 I 59,378.00 I $9,378.00 0 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM,( I ( I I I I I RUNWAY 30 END I 1 LS I 56,000.00 ( 56,000.00 ( 58,250.00 I 58,250.00 I $9,378.00 I $9,378.00 31 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR I SYSTEM, RUNWAY 7 END I 1 LS I $9,000.00 I $9,000.00 I 59,580.00 I $9,580.00 I 512,850.00 I $12,850.00 32 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR I I I I I I I I SYSTEM, RUNWAY 25 END I 1 LS I 59,000.00 I $9,000.00 I $9,580.00 I $9,580.00 I $12,850.00 I $12,850.00 33 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR I I I I I I I I SYSTEM, RUNWAY 12 END I 1 LS I $9,000.00 I $9,000.00 I $9,580.00 I $9,580.00 I $12,850.00 I $12,850.00 34 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR I SYSTEM, RUNWAY 30 END I 1 LS I $9,000.00 I 59,000.00 I $9,580.00 I 59,580.00 I $12,850.00 I $12,850.00 35 L-125 IREMOVAL OF EXISTING RUNWAY EDGE LIGHTS I 1 LS I 52,000.00 I $2,000.00 I $7,500.00 ( $7,500.00 I 55,000.00 ( $5,000.00 36 M-100 IMAINTENANCE AND PROTECTION OF TRAFFIC I 1 LS I $3,000.00 ( 53,000.00 I $23,500.00 I $23,500.00 I $3,500.00 I 53,500.00 page 2 ELIZABETH FIELD AIRPORT JENGINEERIS OPINION OF IFALVEY CONSTRUCTION CORP. IFRUEAN UTILITIES, INC. FISHERS ISLAND, NEW YORK lCONSTRUCTION COST 1P.O. BOX 699 118 FRUEAN WAY AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICALOCERINOS & SPINA IKILLINGWORTH, CONNECTICUT 0641IS. YARMOUTH, MASSACHUSETTS 026 FAA-AIP NO. 3-36-0029-04-91 JENGINEERS, P.C. NYSDOT PROJECT NO. 0913.04 11020 SEVENTH NORTH STREET -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- LIVERPOOL, NEW YORK 13088 ITEM FAA I I I UNIT UNIT UNIT NO. SPEC NOI DESCRIPTION I QUANTITY UNITS PRICE TOTAL PRICE TOTAL PRICE TOTAL asxasaxaxxxssaa:x=axaaxxxxxxxaxxsaxxxxxxcsxxxsxss:zxsaaaasaasxaasaaxasxxxxaasaasassa:aa:aa:azaaxzasxssxssxaszaaxazza:saaxasa:sxaxaxaaaaaasa:a:axsxxxaaxzaasaaassaxxxszxaxs 37 M-200 IMOBILIZATION ---------------------------------------------- 1 LS $16,185.00 516,185.00 $16,000.00 $16,000.00 515,890.00 $15,890.00 ------------I TOTAL BID ------------------------------ --------------- $421,000.00 -------------- ----------------------------- ---------------� $419,421.00 $563,511.00 BID SECURITY ( 5% BID BOND 51 BID BOND �* DENOTES BIDDER'S ERROR, THE CORRECTED VALUE ---------------------------------------------------------------------------------- IS SHOWN. -------- ------------------------------------------------------------------------------ CALOCERINOS AND SPINA ENGINEERS, P.C. I CERTI THAT THIS A U RECT TABULATION OF BIDS RECEIVED MARCH 12, 1992. JOB NUMBER: 211.004.001 BID TABULATION SLGNED: — DATE: 16-Mar-92 0 page 3 ELIZABETH FIELD AIRPORT ENGINEER'S OPINION OF IFALVEY CONSTRUCTION CORP. IFRUEAN UTILITIES, INC. FISHERS ISLAND, NEW YORK lCONSTRUCTION COST IP.O. BOX 699 118 FRUEAN WAY AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICALOCERINOS & SPINA lKILLINGWORTH, CONNECTICUT 06411S. YARMOUTH, MASSACHUSETTS 026 FAA-AIP N0. 3-36-0029-04-91 JENGINEERS, P.C. NYSDOT PROJECT NO. 0913.04 11020 SEVENTH NORTH STREET -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- LIVERPOOL, NEW YORK 13088 ITEM FAA I I I UNIT UNIT UNIT NO. SPEC NOI DESCRIPTION QUANTITY UNITS PRICE TOTAL PRICE TOTAL PRICE TOTAL sxxsaxxxxsxxxxsxaxsxxxsx-____�__�_ _____________ ____ �___�________saxaxxsxsasx---a--_----xxxs-----xxx--_-----asssxs axs----x xxxxsxassxssssssxxxxssssxaaa 1 P-152 lCOMMON EXCAVATION, AREA NO.1 1 LS $2,000.00 $2,000.00 $10,000.00 $10,000.00 $2,500.00 ( $2,500.00 2 P-152 IPAVEMENT EXCAVATION (BITUMINOUS CONCRETE) 900 SY $10.00 $9,000.00 I $3.00 I $2,700.00 $5.95 $5,355.00 3 P-612 IFIELD OFFICE 1 LS $7,000.00 $7,000.00 $18,200.00 $18,200.00 $5,000.00 $5,000.00 4 P-620 IRUNWAY PAINTING 23,000 SF $0.50 $11,500.00 $0.50 $11,500.00 $0.73 $16,790.00 5 L-102 JELECTRICAL BUILDING ELECTRICAL SERVICE 1 LS $12,000.00 $12,000.00 59,000.00 $9,000.00 $15,375.00 $15,375.00 6 L-106 ISEGMENTED CIRCLE 1 LS $12,000.00 $12,000.00 515,300.00 $15,300.00 $10,450.00 $10,450.00 7 L-107 ILIGHTED WIND CONE 1 LS $6,000.00 $6,000.00 $16,700.00 $16,700.00 ( $8,495.00 $8,495.00 8 L-108 ICABLE TRENCHING FOR THE INSTALLATION OF UNDERGROUND CABLE 8,600 LF ( $4.00 $34,400.00 $2.25 $19,350.00 $4.35 537,410.00 9 L-108 IND. 8 AWG, 60OV, TYPE C SINGLE CONDUCTOR UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCT 28,300 LF 1 $0.60 1 $16,980.00 1 $0.38 $10,754.00 $0.65 $18,395.00 10 L-108 (N0. 8 AWG, 5KV, TYPE C SINGLE CONDUCTOR UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCT 12,900 LF 1 $0.70 $9,030.00 $0.38 $4,902.00 ( $0.65 I $8,385.00 11 L-108 IND. 8 AWG, BARE COPPER COUNTERPOISE WIRE INSTALLED IN TRENCH INCLUDING GROUNDING RODS AND EXOTHERMIC CONNECTIONS 9,500 LF $0.75 $7,125.00 $0.28 $2,660.00 $0.80 $7,600.00 12 L-109 1INSTALLATION OF AIRPORT ELECTRICAL BUILDING EQUIPMENT, IN PLACE 1 LS 1 $30,000.00 1 $30,000.00 1 $30,000.00 $30,000.00 $59,250.00 $59,250.00 13 L-110 14-WAY ELECTRICAL DUCT BANK, TYPE 1 700 LF 1 $50.00 ( $35,000.00 1 $55.00 1 $38,500.00 $82.50 $57,750.00 14 L-110 18-WAY ELECTRICAL DUCT BANK, TYPE I 200 LF 1 $65.00 1 $13,000.00 ( $70.00 $14,000.00 $115.00 $23,000.00 15 L-110 12-INCH DIAMETER RIGID STEEL CONDUIT INSTALLED IN PAVEMENT 1 3,000 LF 1 $14.00 $42,000.00 $4.00 $12,000.00 $12.75 $38,250.00 16 L-110 12-INCH DIAMETER RIGID STEEL CONDUIT INSTALLED IN TURF 1 270 LF 1 $12.00 $3,240.00 $2.00 $540.00 $7.75 $2,092.50 17 L-110 12-INCH DIAMETER RIGID STEEL CONDUIT REINSTALLED IN TURF 1 190 LF $6.00 $1,140.00 $2.00 $380.00 $7.85 51,491.50 18 L-112 (ELECTRICAL BUILDING 1 LS $30,000.00 $30,000.00 $40,000.00 $40,000.00 $63,780.00 $63,780.00 19 L-115 JELECTRICAL MANHOLE NO. 1 1 EACH $6,000.00 $6,000.00 $12,250.00 $12,250.00 $7,295.00 $7,295.00 20 L-115 IPULL BOX REINSTALLATION 1 EACH $200.00 $200.00 $500.00 $500.00 $1,190.00 $1,190.00 page 1 ELIZABETH FIELD AIRPORT ICARLIN CONTRACTING CO., INC. IDICIN ELECTRIC CO., INC. IJ.P. DALY & SONS, INC. FISHERS ISLAND, NEW YORK 1454 BOSTON POST ROAD 1156 CROSS ROAD INA BROOK AVENUE AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING IP.O. BOX 300 IWATERFORD, CONNECTICUT 06385 IDEER PARK, NEW YORK 11729 FAA-AIP NO. 3-36-0029-04-91 IWATERFORD, CONNECTICUT 06385 NYSDOT PROJECT NO. 0913.04 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I I UNIT ( UNIT UNIT NO. SPEC NOI DESCRIPTION I QUANTITY UNITS I PRICE I TOTAL I PRICE I TOTAL I PRICE I TOTAL I a-xxssxxsxsxsasxxaxaxsxxsxxxsxaxzaasxxxxxasxxxsxxxsxxxxzzxsassaasszxsxxxxaxxxxssaaxxaxxaszsazsszaxzaxxssszsxszxsxzxzzazaaaaasxxssxaxxxsxsxxzxaxxaasxxazxsaaazzaxxzxxxxzxax 1 P-152 (COMMON EXCAVATION, AREA NO.1 I 1 LS I $4,217.00 I $4,217.00 I $8,360.00 i $8,360.00 I $4,000.00 I $4,000.00 I 2 P-152 IPAVEMENT EXCAVATION (BITUMINOUS CONCRETE) I 900 SY I 535.00 I $31,500.00 ( $15.89 I $14,301.00 * $14.00 I $12,600.00 I 3 P-612 IFIELD OFFICE I 1 LS ( S3,650.00 I 53,650.00 I $7,000.00 ( $7,000.00 I $8,000.00 I $8,000.00 I 4 P-620 IRUNWAY PAINTING I 23,000 SF I 50.25 I 55,750.00 I $0.69 I $15,870.00 * $0.58 I $13,340.00 I 5 L-102 (ELECTRICAL BUILDING ELECTRICAL SERVICE I 1 LS I 533,000.00 I $33,000.00 I 56,520.00 I 56,520.00 I 518,100.00 I $18,100.00 I 6 L-106 ISEGMENTED CIRCLE i 1 LS I $15,296.00 I 515,296.00 I $17,297.50 I 517,297.50 I $11,700.00 I $11,700.00 I 7 L-107 ILIGHTED WIND CONE I 1 LS I $5,556.00 I $5,556.00 I 59,175.00 I 59,175.00 I 58,200.00 I 58,200.00 I 8 L-108 ICABLE TRENCHING FOR THE INSTALLATION OF I I I I I I I I I UNDERGROUND CABLE I 8,600 LF I 54.55 I 539,130.00 I $5.80 I 549,880.00 I $7.08 I $60,888.00 I 9 L-108 IND. 8 AWG, 60OV, TYPE C SINGLE CONDUCTOR I ( I I I I I I I UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCTI 28,300 LF I $0.51 I 514,433.00 I SO.67 I S18,961.00 I 50.82 I $23,206.00 I 10 L-108 IND. 8 AWG, 5KV, TYPE C SINGLE CONDUCTOR I I I I I I I I I UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCTI 12,900 LF I 50.68 I $8,772.00 I 50.74 I $9,546.00 I $0.95 I $12,255.00 11 L-108 IND. 8 AWG, BARE COPPER COUNTERPOISE WIRE I ( I I I I INSTALLED IN TRENCH INCLUDING GROUNDING RODS AND EXOTHERMIC CONNECTIONS I 9,500 LF I $0.66 I $6,270.00 I 50.68 ( $6,460.00 I $1.49 I $14,155.00 12 L-109 (INSTALLATION OF AIRPORT ELECTRICAL I I I I BUILDING EQUIPMENT, IN PLACE I 1 LS I 535,273.00 I $35,273.00 I $30,352.00 I $30,352.00 I $48,000.00 ( $48,000.00 13 L-110 I4 -WAY ELECTRICAL DUCT BANK, TYPE 1 I 700 LF I 572.00 I $50,400.00 I $96.00 I 567,200.00 I $88.00 I 561,600.00 14 L-110 I8 -WAY ELECTRICAL DUCT BANK, TYPE I I 200 LF I $66.00 I $13,200.00 I 5100.00 I $20,000.00 I $165.00 I 533,000.00 15 L-110 I2 -INCH DIAMETER RIGID STEEL CONDUIT INSTALLED I I I ( I I I I IN PAVEMENT I 3,000 LF I $28.00 I 584,000.00 I $20.68 I $62,040.00 I $20.50 I 561,500.00 16 L-110 I2 -INCH DIAMETER RIGID STEEL CONDUIT INSTALLED I I I I I I I I IN TURF I 270 LF I $17.00 I 54,590.00 I $13.00 I $3,510.00 I $14.50 I 53,915.00 17 L-110 12 -INCH DIAMETER RIGID STEEL CONDUIT REINSTALLEI I I I I I I I IN TURF I 190 LF I $17.00 I 53,230.00 I 513.00 I $2,470.00 I $14.20 I $2,698.00 18 L-112 (ELECTRICAL BUILDING I 1 LS I 545,000.00 I $45,000.00 I $40,000.00 I $40,000.00 I 533,800.00 I $33,800.00 19 L-115 (ELECTRICAL MANHOLE NO. 1 I 1 EACH I 53,566.00 I 53,566.00 I 58,000.00 I $8,000.00 I 58,600.00 I 58,600.00 20 L-115 IPULL BOX REINSTALLATION I 1 EACH I 51,841.00 I $1,841.00 I 5250.00 I 5250.00 I $600.00 I $600.00 page 4 ELIZABETH FIELD AIRPORT ICARLIN CONTRACTING CO., INC. IDICIN ELECTRIC CO., INC. 1J.P. DALY & SONS, INC. FISHERS ISLAND, NEW YORK 1454 BOSTON POST ROAD 1156 CROSS ROAD 188A BROOK AVENUE AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING 1P.O. BOX 300 IWATERFORD, CONNECTICUT 06385 IDEER PARK, NEW YORK 11729 FAA-AIP NO. 3-36-0029-04-91 IWATERFORD, CONNECTICUT 06385 NYSDOT PROJECT NO. 0913.04 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I I UNIT UNIT I UNIT NO. SPEC NOI DESCRIPTION QUANTITY UNITS PRICE TOTAL PRICE TOTAL PRICE TOTAL sxxaxaaxaxxsaxaaxaaxxsasaasaaaszxxaxaaxxaxassasxaaxx:sssxxxaxxaxssassaxa:zaza:zsaasasa:sszzzzesas:assxasasazs:a:xzszsssszasaz:sz:aaszzsszs::z:sass:ssz:zszs:asszzzsszsazsx 21 L-125 IMEDIUM INTENSITY RUNWAY EDGE LIGHTS, BASE MOUNTED, IN PAVEMENT 57 EACH $600.00 $34,200.00 $957.00 $54,549.00 $870.00 $49,590.00 22 L-125 1RUNWAY 25 THRESHOLD LIGHTS 1 LS $8,800.00 $8,800.00 $8,161.00 $8,161.00 $9,000.00 $9,000.00 23 L-125 JAIRPORT GUIDANCE SIGN NO.R-2-5, BASE MOUNTED, IN PAVEMENT 1 LS $2,500.00 $2,500.00 $4,160.00 ( $4,160.00 $2,700.00 $2,700.00 24 L-125 JAIRPORT GUIDANCE SIGN NO.R-2-19, BASE MOUNTED, IN PAVEMENT 1 LS $2,500.00 $2,500.00 $4,160.00 $4,160.00 $2,700.00 $2,700.00 25 L-125 JAIRPORT GUIDANCE SIGN NO.R-1-3, BASE MOUNTED, IN TURF 1 LS $2,500.00 $2,500.00 $4,160.00 $4,160.00 $2,700.00 $2,700.00 26 L-125 JAIRPORT GUIDANCE SIGN NO.R-1-19, BASE MOUNTED, IN TURF 1 LS $2,500.00 $2,500.00 $4,160.00 $4,160.00 $2,700.00 $2,700.00 27 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 7 END I 1 LS $4,500.00 $4,500.00 $12,030.00 $12,030.00 $8,800.00 $8,800.00 28 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 25 END I 1 LS $4,500.00 $4,500.00 $12,030.00 $12,030.00 58,800.00 $8,800.00 29 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 12 END 1 -1 LS $4,500.00 $4,500.00 $12,030.00 $12,030.00 $8,800.00 $8,800.00 1030 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM,I RUNWAY 30 END 1 LS $4,500.00 $4,500.00 $12,030.00 $12,030.00 $8,800.00 $8,800.00 31 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 7 END 1 LS $13,000.00 $13,000.00 $12,720.00 $12,720.00 $9,300.00 $9,300.00 32 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 25 END 1 LS $13,000.00 $13,000.00 $12,720.00 $12,720.00 $9,300.00 $9,300.00 33 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 12 END 1 LS $13,000.00 $13,000.00 $12,720.00 $12,720.00 $9,300.00 $9,300.00 34 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 30 END 1 LS 513,000.00 $13,000.00 $12,720.00 $12,720.00 59,300.00 $9,300.00 35 L-125 IREMOVAL OF EXISTING RUNWAY EDGE LIGHTS 1 LS $7,500.00 $7,500.00 $2,300.00 $2,300.00 $7,700.00 $7,700.00 36 M-100 IMAINTENANCE AND PROTECTION OF TRAFFIC 1 LS $31,000.00 $31,000.00 $18,025.00 $18,025.00 $4,100.00 $4,100.00 page 5 ELIZABETH FIELD AIRPORT ICARLIN CONTRACTING CO., INC. IDICIN ELECTRIC CO., INC. IJ.P. DALY $ SONS, INC. FISHERS ISLAND, NEW YORK 1454 BOSTON POST ROAD 1156 CROSS ROAD I88A BROOK AVENUE AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING IP.O. BOX 300 IWATERFORD, CONNECTICUT 06385 IDEER PARK, NEW YORK 11729 FAA-AIP NO. 3-36-0029-04-91 IWATERFORD, CONNECTICUT 06385 NYSDOT PROJECT NO. 0913.04 I I I ---------------------------------------------------------------------------------------------------------------------------•-------•-------------------------------------- ITEM FAA I I I UNIT UNIT UNIT NO. SPEC NOI DESCRIPTION I QUANTITY UNITS I PRICE I TOTAL I PRICE I TOTAL I PRICE I TOTAL I axaaxszxssxxsxxxazsxxxxsxxxxsaxaxszssxsxssxxssxsszsxaxaaxaxsazs-----xxxxxssxssxsxxsazasaaxsazzazsa---_-x----------z:ze:zaxaaazaxxsaasxxzsaxxxzxaaxxasxazzxszxaaaaxxaxxaaza 37 M-200 IMOBILIZATION I 1 LS I $28,826.00 I $28,826.00 ( $12,000.00 i $12,000.00 I $23,700.00 I $23,700.00 I --•---------I----------------------------------------------I----------------I--------------I---------------I--------------I---------------I--------------I---------------I ITOTAL 810 I I I $599,000.00 I I $607,867.50 * I $617,447.00 I I IBID SECURITY I I I I I I 5% BID BOND I I I I 5% BID BOND I i I I I 5% BID BOND I I I* DENOTES BIDDER'S ERROR, THE CORRECTED VALUE -------------------------------------------------------------------------------- I I i IS SHOWN. I I I I I I I I I I I I CALOCERINOS AND SPINA ENGINEERS, P.C. -------------------------•------------------------------------•---------•--------------- Y THAT THI IS A U I C ; RJOB ID CORRECT TABULATION OF BIDS RECEIVED MARCH 12, 1992. NUMBER: 211.004.001 BID TABULATION NED: �"- DATE: 16 -Mar -92 io page 6 ELIZABETH FIELD AIRPORT 1POWER LINE CONSTRUCTORS, INC. IFIREBIRD CONSTRUCTION CORP. FISHERS ISLAND, NEW YORK 124 ROBINSON ROAD, P.O. BOX 385329 MIDDLE COUNTRY ROAD AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICLINTON, NEW YORK 13323-0385 ISMITHTOWN, NY 11787 FAA-AIP NO. 3-36-0029-04-91 NYSDOT PROJECT NO. 0913.04 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I I UNIT UNIT UNIT NO. SPEC NOI DESCRIPTION QUANTITY UNITS PRICE TOTAL PRICE TOTAL PRICE TOTAL xxassaxasxxaxxxaxxxxasxxxaaxaxxsxx:xs:axxxxxaxxxaxxaxzxaxaxxzxaxasxsxssxzzzaxzasaaaasa:sassassaassazazxaassaassszzsz:zazzza:zzazsz:szsaszaxzaxazzaxssaaas:ssszsazssz:za:s: .1 P-152 lCOMMON EXCAVATION, AREA NO.1 1 LS $5,000.00 $5,000.00 $34,500.00 $34,500.00 2 P-152 (PAVEMENT EXCAVATION (BITUMINOUS CONCRETE) 900 SY $9.00 $8,100.00 $6.00 $5,400.00 3 P-612 IFIELD OFFICE ( 1 LS $4,000.00 $4,000.00 $5,000.00 $5,000.00 4 P-620 IRUNWAY PAINTING 23,000 SF $0.53 $12,190.00 $0.80 $18,400.00 5 L-102 JELECTRICAL BUILDING ELECTRICAL SERVICE 1 LS $14,000.00 $14,000.00 $10,200.00 $10,200.00 6 L-106 ISEGMENTED CIRCLE 1 LS $19,000.00 $19,000.00 $20,000.00 $20,000.00 7 L-107 ILIGHTED WIND CONE 1 LS $4,800.00 $4,800.00 $5,100.00 $5,100.00 8 L-108 ICABLE TRENCHING FOR THE INSTALLATION OF UNDERGROUND CABLE 8,600 LF $5.50 $47,300.00 $10.00 $86,000.00 9 L-108 IND. 8 AWG, 60OV, TYPE C SINGLE CONDUCTOR UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCT 28,300 LF 1 $0.70 1 $19,810.00 1 $1.10 1 $31,130.00 10 L-108 IND. 8 AWG, 5KV, TYPE C SINGLE CONDUCTOR UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCT 12,900 LF 1 $0.90 1 $11,610.00 1 $1.30 1 $16,770.00 11 L-108 IND. 8 AWG, BARE COPPER COUNTERPOISE WIRE INSTALLED IN TRENCH INCLUDING GROUNDING RODS AND EXOTHERMIC CONNECTIONS 9,500 LF $0.60 $5,700.00 $1.50 $14,250.00 12 L-109 1INSTALLATION OF AIRPORT ELECTRICAL BUILDING EQUIPMENT, IN PLACE 1 LS $41,500.00 $41,500.00 523,500.00 $23,500.00 13 L-110 14-WAY ELECTRICAL DUCT BANK, TYPE 1 700 LF $109.00 $76,300.00 $100.00 $70,000.00 14 L-110 18-WAY ELECTRICAL DUCT BANK, TYPE I 200 LF $106.00 $21,200.00 $110.00 $22,000.00 15 L-110 12-INCH DIAMETER RIGID STEEL CONDUIT INSTALLED IN PAVEMENT 1 3,000 LF 1 $30.00 1 $90,000.00 1 $30.00 1 $90,000.00 16 L-110 12-INCH DIAMETER RIGID STEEL CONDUIT INSTALLED IN TURF 1 270 LF 1 $10.00 52,700.00 $32.00 $8,640.00 17 L-110 12-INCH DIAMETER RIGID STEEL CONDUIT REINSTALLED IN TURF 1 190 LF 1 $9.00 $1,710.00 $18.00 $3,420.00 18 L-112 JELECTRICAL BUILDING 1 1 LS 1 $60,000.00 1 $60,000.00 1 $50,000.00 $50,000.00 19 L-115 JELECTRICAL MANHOLE NO. 1 1 EACH $7,200.00 $7,200.00 $4,500.00 54,500.00 20 L-115 IPULL BOX REINSTALLATION 1 EACH $900.00 $900.00 ( 5800.00 $800.00 page 7 ELIZABETH FIELD AIRPORT POWER LINE CONSTRUCTORS, INC. IFIREBIRD CONSTRUCTION CORP. FISHERS ISLAND, NEW YORK 124 ROBINSON ROAD, P.O. BOX 385329 MIDDLE COUNTRY ROAD AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICLINTON, NEW YORK 13323-0385 ISMITHTOWN, NY 11787 FAA-AIP NO. 3-36-0029-04-91 NYSDOT PROJECT NO. 0913.04 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I I UNIT UNIT UNIT NO. SPEC NOI DESCRIPTION QUANTITY UNITS PRICE TOTAL PRICE TOTAL PRICE TOTAL xxxxsxaaxxxxxxxxasxaxxxxxxxxxxxaxxxxxsxsxxxxsxxxxxsxxsxxsxxxxaaxxsxxxxxxxasxsx:xssaax:sxaxaxxasxxaxxxxxxaxxxxxxxxxsxaxxxsxxxxxxaxxxxxxxaaxxxaxxxaxxxxxxxxaxxxxxsxxxxxxxxxx 21 L-125 IMEDIUM INTENSITY RUNWAY EDGE LIGHTS, BASE MOUNTED, IN PAVEMENT 57 EACH $900.00 551,300.00 $565.00 $32,205.00 22 L-125 1RUNWAY 25 THRESHOLD LIGHTS 1 LS $15,000.00 $15,000.00 $15,000.00 515,000.00 23 L-125 JAIRPORT GUIDANCE SIGN NO.R-2-5, BASE MOUNTED, IN PAVEMENT 1 LS 52,600.00 $2,600.00 54,800.00 54,800.00 24 L-125 JAIRPORT GUIDANCE SIGN NO.R-2-19, BASE MOUNTED, IN PAVEMENT 1 LS 52,600.00 $2,600.00 54,800.00 $4,800.00 25 L-125 JAIRPORT GUIDANCE SIGN NO.R-1-3, BASE MOUNTED, IN TURF 1 LS $2,300.00 52,300.00 $4,800.00 54,800.00 26 L-125 JAIRPORT GUIDANCE SIGN NO.R-1-19, BASE MOUNTED, IN TURF 1 LS 52,300.00 $2,300.00 54,800.00 $4,800.00 27 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 7 END 1 1 LS $12,000.00 !12,000.00 $7,500.00 57,500.00 28 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 25 END 1 1 LS 512,000.00 512,000.00 57,500.00 $7,500.00 29 L-125 1RUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 12 END 1 1 LS 512,000.00 512,000.00 $7,500.00 $7,500.00 30 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 30 END 1 LS 1 $14,000.00 $14,000.00 $7,500.00 57,500.00 31 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 7 END 1 LS 512,500.00 $12,500.00 $10,000.00 510,000.00 32 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 25 END 1 LS $12,500.00 512,500.00 $10,000.00 $10,000.00 33 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 12 END 1 LS 512,500.00 $12,500.00 510,000.00 $10,000.00 34 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 30 END 1 LS $12,500.00 $12,500.00 510,000.00 510,000.00 35 L-125 IREMOVAL OF EXISTING RUNWAY EDGE LIGHTS 1 LS $1,500.00 $1,500.00 $2,000.00 52,000.00 36 M-100 IMAINTENANCE AND PROTECTION OF TRAFFIC 1 LS 56,500.00 $6,500.00 $15,000.00 $15,000.00 page 8 ELIZABETH FIELD AIRPORT POWER LINE CONSTRUCTORS, INC. IFIREBIRD CONSTRUCTION CORP. FISHERS ISLAND, NEW YORK 124 ROBINSON ROAD, P.O. BOX 385329 MIDDLE COUNTRY ROAD AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICLINTON, NEW YORK 13323-0385 ISMITHTOWN, NY 11787 FAA-AIP NO. 3-36-0029-04-91 NYSDOT PROJECT NO. 0913.04 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I I UNIT UNIT UNIT NO. SPEC NOI DESCRIPTION I QUANTITY UNITS PRICE TOTAL PRICE TOTAL PRICE TOTAL ssxxsaaxsaxzszxssxzaazaazszxszsxssxzszxaaxaazaazzaxzszxzxxsxazxzxszsxzsxasazxszzxxassasss::aaaxzzxssxzsxxszxaaxxsaxzzsaaz:zssa:xxxaaas:zazzszsxsaazazaa:sazsazzzzzassza:za -0 37 M-200 MOBILIZATION ----� 1 LS $25,000.00 ( $25,000.00 $26,000.00 526,000.00 ----------------------------------------------------- ----------------------------------------------------------- --------------- -----------------------------� NOTAL BID $662,120.00 $699,015.00 BID SECURITY 5% BID BOND 5% BID BOND �* DENOTES BIDDER'S ERROR, THE CORRECTED VALUE IS SHOWN. -------------------------------------------------------------------------------N"_ ------------------------------------------------------------------------------ CALOCERINOS AND SPINA ENGINEERS, P.C. 1 THIS IS TRU ND`C�ORRECT TABULATION OF BIDS RECEIVED MARCH 12, 1992. JOB NUMBER: 211.004.001 BID TABULATION SI -'�— DATE: 16-Mar-92 0 page 9 0 Cq--s Calocerinos & Spina Engineers, P.C. March 24, 1992 Mr. Philip Brito, Manager Federal Aviation Administration New York Airports District Office 181 South Franklin Avenue, Room 305 Valley Stream, New York 11581 Re: Elizabeth Field - Fishers Island Airfield Lighting, Visual Aids, and Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 File: 211.004 Dear Mr. Brito: Seven bids for this project were received on March 12, 1992 at 1:00 p.m. and the lowest responsible bidder is Falvey Construction Corporation. Their bid has been reviewed and found to be in order. As stated in our letter to the Town of Southold, we have recommended award of the Contract for the Base Bid in the amount of $419,421.00 to Falvey Construction Corporation in accordance with the award procedures outlined in their bid. We request your concurrence with this recommendation. We are enclosing the following: 1. One (1) copy of the Certified Bid Tabulation. 2. One (1) set of the As -Advertised Plans and Specifications. 3. One (1) copy of the Certificate of Publication. If you have any questions, or if additional information is required, please do not hesitate to contact us. JWLJmc Enclosures cc: Mr. Robert Michaud Mr. James Kuzloski Mr. Scott L. Harris Mr. Philip Knauff Very trulv yours, & NA ENGINEERS, P.C. 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-8711 FAX (315) 457-9303 f--_ _VR,� MAR 3 019co March 24, 1992 To Mr. Scott L. Harris Town Supervisor Town of Southold Town Hall, 53095 Main Road P.O. Box 1179 Southold, New York 11971 Re: Elizabeth Field - Fishers Island Airfield Lighting, Visual Aids and Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 File: 211.004 Dear Mr. Harris: Seven bids for the above -referenced project were received on March 12, 1992 at 1:00 p.m. The bids were canvassed and the three lowest responsive bids are as follows: CONTRACTORS Falvey Construction Corporation Fruean Utilities, Inc. Dicin Electric Co., Inc. BID AMOUNTS $419,421.00 $563,511.00 ' • • 111 11 The low bid submitted by Falvey Construction Corporation was reviewed and found to be in order. For a complete breakdown of the bid amounts and the remaining bids, please refer to the attached bid canvass sheet. The low bid submitted is within 10% of the Engineer's Opinion of Construction Cost for the project and is considered reasonable. The Federal Aviation Administration is expected to issue a grant to the Town of Southold for the project based upon the bid amount. f ! 0 Mr. Scott L. Harris March 24, 1992 Page 2 Based upon our past experience working with Falvey Construction Corporation, we find them to have done sufficient work in this area to qualify them for the work of this Contract. We therefore recommend the award of the Contract, in the amount of $419,421.00, to Falvey Construction Corporation in accordance with the conditions of award stipulated in their bid and contingent upon the following: Federal Aviation Administration concurrence 2. Receipt and Approval of the Required DBE Subcontract information Enclosed is a sample Notice of Award Letter which you may utilize to formally award the construction contract to Falvey Construction Corporation. If you have any questions or if additional information is required, please do not hesitate to contact our office. JWL:jmc Enclosure cc: Mr. Mr. Mr. Mr. Mrs Mr. Philip Brito (w/encl) Robert Michaud (w/enol) James Kuzloski (w/encl) Philip Knauff (w/encl) Judith T. Terry (w/enol) Harold Wagner, Jr., P.E. (w/encl) Very truly yours, 1ALOCERINOS & SPINA ENGINEERS, P.C. J es . Leana Enger • SAMPLE NOTICE OF AWARD LETTER March 24, 1992 Mr. Donald Falvey Falvey Construction Corporation P.O. Box 699 Killingworth, Connecticut 06419 0 Re: Elizabeth Field - Fishers Island Airfield Lighting, Visual Aids, and Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Gentlemen: The bid which you submitted for the Airfield Lighting, Visual Aids, and Electrical Building Contract at the Elizabeth Field Airport was the lowest responsible bid received meeting the requirements of the Contract Documents. In accordance with a Resolution passed by the Town of Southold, you are hereby awarded the Contract in the amount of $419,421.00, contingent upon Federal Aviation Administration and New York State Department of Transportation approval, including receipt and approval of your proposed DBE subcontract participation. Upon approval of your DBE participation plan, our consultant will forward the contracts for your signature. You will be required to submit contract bonds and insurance certificates when you return the signed contracts. Thank you for showing interest in our Airport Improvement Project. Very truly yours, TOWN OF SOUTHOLD Scott L. Harris Town Supervisor SLH Jmc Enclosure cc: Calocerinos & Spina Engineers, P.C. Mr. Philip Brito Mr. Robert Michaud Mr. James Kuzloski (w/encl) r ELIZABETH FIELD AIRPORT IENGINEERIS OPINION OF IFALVEY CONSTRUCTION CORP. IFRUEAN UTILITIES, INC. I FISHERS ISLAND, NEW YORK lCONSTRUCTION COST IP.O. BOX 699 118 FRUEAN WAY I AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICALOCERINOS 8 SPINA IKILLINGWORTH, CONNECTICUT 0641IS. YARMOUTH, MASSACHUSETTS 0261 FAA-AIP NO. 3-36-0029-04-91 JENGINEERS, P.C. NYSDOT PROJECT NO. 0913.04 11020 SEVENTH NORTH STREET -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- LIVERPOOL, NEW YORK 13088 ITEM FAA I I i UNIT I UNIT UNIT NO. SPEC NOI DESCRIPTION I QUANTITY UNITS I PRICE I TOTAL I PRICE I TOTAL I PRICE I TOTAL i a__________ x___________x_____-_ssasxxsaassssxsasssassssxsssasssa�sassxsaaassaasssaaxsxsaaxazssaaasaasxaazxasaaaz 1 P-152 (COMMON EXCAVATION, AREA N0.1 I 1 LS I $2,000.00 I $2,000.00 I $10,000.00 I $10,000.00 ( $2,500.00 I $2,500.00 I 2 P-152 IPAVEMENT EXCAVATION (BITUMINOUS CONCRETE) I 900 SY I $10.00 I $9,000.00 I $3.00 I $2,700.00 I $5.95 I $5,355.00 I 3 P-612 IFIELD OFFICE I 1 LS I $7,000.00 I $7,000.00 I $18,200.00 I $18,200.00 I $5,000.00 I $5,000.00 I 4 P-620 IRUNWAY PAINTING ( 23,000 SF ( $0.50 I $11,500.00 I $0.50 I $11,500.00 I $0.73 I $16,790.00 I 5 L-102 (ELECTRICAL BUILDING ELECTRICAL SERVICE I 1 LS I $12,000.00 I $12,000.00 I $9,000.00 I $9,000.00 I $15,375.00 I $15,375.00 6 L-106 ISEGMENTED CIRCLE I 1 LS I $12,000.00 I $12,000.00 I $15,300.00 ( $15,300.00 I $10,450.00 I $10,450.00 I 7 L-107 ILIGHTED WIND CONE I 1 LS I $6,000.00 I $6,000.00 I $16,700.00 I $16,700.00 I $8,495.00 I $8,495.00 I 8 L-108 ICABLE TRENCHING FOR THE INSTALLATION OF I I I I I I I I I UNDERGROUND CABLE I 8,600 LF I $4.00 I $34,400.00 I $2.25 ( $19,350.00 I $4.35 I $37,410.00 I 9 L-108 IND. 8 AWG, 6OOV, TYPE C SINGLE CONDUCTOR ( I ( I ( I I I I UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCTI 28,300 LF I $0.60 I $16,980.00 I $0.38 I $10,754.00 I $0.65 I $18,395.00 I 10 L-108 IND. 8 AWG, SKV, TYPE C SINGLE CONDUCTOR I I I I I I I I I UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCTI 12,900 LF I $0.70 I $9,030.00 ( $0.38 I $4,902.00 I $0.65 I $8,385.00 I 11 L-108 INO. 8 AWG, BARE COPPER COUNTERPOISE WIRE I I I I I I I I INSTALLED IN TRENCH INCLUDING GROUNDING RODS I ( I I I I AND EXOTHERMIC CONNECTIONS I 9,500 LF I $0.75 I $7,125.00 I $0.28 I $2,660.00 I $0.80 I $7,600.00 I 2 L-109 (INSTALLATION OF AIRPORT ELECTRICAL I I I I ( I I I BUILDING EQUIPMENT, IN PLACE I 1 LS I $30,000.00 ( $30,000.00 I $30,000.00 I $30,000.00 I $59,250.00 I $59,250.00 13 L-110 14 -WAY ELECTRICAL DUCT BANK, TYPE 1 I 700 LF I $50.00 I $35,000.00 I $55.00 I $38,500.00 I $82.50 I $57,750.00 14 L-110 I8 -WAY ELECTRICAL DUCT BANK, TYPE I I 200 LF I $65.00 I $13,000.00 I $70.00 I $14,000.00 I $115.00 I $23,000.00 15 L-110 I2 -INCH DIAMETER RIGID STEEL CONDUIT INSTALLED I I I I I I I I IN PAVEMENT I 3,000 LF I $14.00 I $42,000.00 I $4.00 I $12,000.00 I $12.75 I $38,250.00 16 L-110 I2 -INCH DIAMETER RIGID STEEL CONDUIT INSTALLED I I I I I I I I IN TURF I 270 LF I $12.00 I $3,240.00 I $2.00 I $540.00 I $7.75 I $2,092.50 17 L-110 I2 -INCH DIAMETER RIGID STEEL CONDUIT REINSTALLEI I I I ( I I I IN TURF I 190 LF I $6.00 I $1,140.00 I $2.00 I $380.00 I $7.85 I $1,491.50 18 L-112 (ELECTRICAL BUILDING I 1 LS I $30,000.00 I $30,000.00 I $40,000.00 1 $40,000.00 I $63,780.00 I $63,780.00 19 L-115 (ELECTRICAL MANHOLE NO. 1 I 1 EACH I $6,000.00 I $6,000.00 I $12,250.00 I $12,250.00 I $7,295.00 I $7,295.00 20 L-115 IPULL BOX REINSTALLATION I 1 EACH I $200.00 I $200.00 I $500.00 I $500.00 I $1,190.00 I $1,190.00 page 1 ELIZABETH FIELD AIRPORT ENGINEER'S OPINION OF IFALVEY CONSTRUCTION CORP. IFRUEAN UTILITIES, INC. FISHERS ISLAND, NEW YORK ICONSTRUCTION COST IP.O. BOX 699 118 FRUEAN WAY AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICALOCERINOS & SPINA IKILLINGWORTH, CONNECTICUT 0641 IS. YARMOUTH, MASSACHUSETTS 026 FAA-AIP NO. 3-36-0029-04-91 (ENGINEERS, P.C. NYSDOT PROJECT NO. 0913.04 11020 SEVENTH NORTH STREET -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- LIVERPOOL, NEW YORK 13088 ITEM FAA I I I UNIT UNIT I I UNIT NO. SPEC NOI DESCRIPTION QUANTITY UNITS PRICE ( TOTAL PRICE I TOTAL I PRICE ( TOTAL xsxxssszxxxxxsxsxxxsxxxxsxxsxzaxszxxxsxxxxzxxxsxxxsxca-xxaxzxsssxxsxzxaxszzxxxszxxxssszxazszsxsxaxaaxxzzxxxxxxxxxsxzxxxxszzxxxzxzssxxsxaxxxzxzasxxzzxzaaxazzaaxxxxzxxsx 21 L-125 IMEDIUM INTENSITY RUNWAY EDGE LIGHTS, BASE MOUNTED, IN PAVEMENT 57 EACH $600.00 !34,200.00 $315.00 $17,955.00 $565.00 $32,205.00 22 L-125 (RUNWAY 25 THRESHOLD LIGHTS 1 LS $6,000.00 $6,000.00 $3,800.00 $3,800.00 $19,500.00 $19,500.00 23 L-125 JAIRPORT GUIDANCE SIGN NO.R-2-5, BASE MOUNTED, IN PAVEMENT 1 LS $3,000.00 $3,000.00 $2,655.00 $2,655.00 $2,450.00 $2,450.00 24 L-125 JAIRPORT GUIDANCE SIGN NO.R-2-19, BASE MOUNTED, IN PAVEMENT 1 LS $3,000.00 $3,000.00 $2,655.00 $2,655.00 $2,450.00 $2,450.00 25 L-125 JAIRPORT GUIDANCE SIGN NO.R-1-3, BASE MOUNTED, IN TURF 1 LS $3,000.00 $3,000.00 $2,400.00 $2,400.00 $1,875.00 $1,875.00 26 L-125 JAIRPORT GUIDANCE SIGN NO.R-1-19, BASE MOUNTED, IN TURF 1 LS $3,000.00 $3,000.00 $2,400.00 $2,400.00 $1,875.00 $1,875.00 27 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, .I RUNWAY 7 END 1 1 LS $6,000.00 $6,000.00 $8,250.00 $8,250.00 $9,378.00 $9,378.00 28 L-125 (RUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 25 END 1 1 LS $6,000.00 $6,000.00 $8,250.00 $8,250.00 ( $9,378.00 ( $9,378.00 29 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM,) RUNWAY 12 END 1 1 LS $6,000.00 $6,000.00 $8,250.00 $8,250.00 $9,378.00 $9,378.00 30 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 30 END 1 LS $6,000.00 $6,000.00 $8,250.00 $8,250.00 $9,378.00 $9,378.00 31 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 7 END 1 LS $9,000.00 $9,000.00 $9,580.00 ( $9,580.00 ( $12,850.00 $12,850.00 32 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 25 END 1 LS $9,000.00 $9,000.00 $9,580.00 $9,580.00 $12,850.00 $12,850.00 33 L-125 (GENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 12 END 1 LS $9,000.00 $9,000.00 $9,580.00 $9,580.00 $12,850.00 $12,850.00 34 L-125 (GENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 30 END 1 LS $9,000.00 $9,000.00 $9,580.00 $9,580.00 $12,850.00 $12,850.00 35 L-125 REMOVAL OF EXISTING RUNWAY EDGE LIGHTS 1 LS $2,000.00 ( $2,000.00 $7,500.00 $7,500.00 $5,000.00 ( $5,000.00 36 M-100 IMAINTENANCE AND PROTECTION OF TRAFFIC 1 LS $3,000.00 $3,000.00 $23,500.00 $23,500.00 $3,500.00 $3,500.00 page 2 ELIZABETH FIELD AIRPORT ENGINEER'S OPINION OF IFALVEY CONSTRUCTION CORP. IFRUEAN UTILITIES, INC. FISHERS ISLAND, NEW YORK lCONSTRUCTION COST 1P.0. BOX 699 118 FRUEAN WAV AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICALOCERINOS & SPINA IKILLINGWORTH, CONNECTICUT 064115. YARMOUTH, MASSACHUSETTS 0261 FAA-AIP NO. 3-36-0029-04-91 IENGINEERS, P.C. I I I NYSDOT PROJECT NO. 0913.04 11020 SEVENTH NORTH STREET I I I -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ILIVERPOOL, NEW YORK 13088 I I I ITEM FAA I I I UNIT I ( UNIT I I UNIT I I NO. SPEC NOI DESCRIPTION 1 QUANTITY UNITS I PRICE I TOTAL I PRICE 1 TOTAL I PRICE I TOTAL I -xxxxxxxxxxxxxsxxxsxxxxxxxxxxxsxxxxxxxxzxxxxxzxxxxaxsassxzxxxxxxxxxxxxxxxasaaas:aassssaaaxassxxxsxxxxxxxxsxxxaz:zx:xxzxxxasxxxxxxxxssaaxaa:xaxxxxxxaasaazasaszaxxxxxzx 7 M-200 IMOBILIZATION i 1 LS I $16,185.00 I $16,185.00 I $16,000.00 I $16,000.00 I 515,890.00 I $15,890.00 I ------------ I---------------------------------------------- ITOTAL BID I---------------- I-------------- I--------------- I ( I 5421,000.00 I-------------- I--------------- I-------------- I I 5419,421.00 1 I--------------- I I $563,511.00 I I IBID SECURITY I I I I I I I I I I I 5% BID BOND ( I I I 5% BID BOND I I DENOTES BIDDER'S ERROR THE CORRECTED VALUE ------------------------------------------------------------------------------- I I I IS SHOWN. I I ..------------------------------------------------------------------------------------- I I I I I I I I I I CALOCERINOS AND SPINA ENGINEERS, P.C. JOB NUMBER: 211.004.001 BID TABULATION I CERTIMTHAT THIS ISS A S page 3 CT TABULATION OF BIDS RECEIVED MARCH 12, 1992. DATE: 16 -Mar -92 ELIZABETH FIELD AIRPORT ICARLIN CONTRACTING CO., INC. IDICIN ELECTRIC CO., INC. (J.P. DALY 8 SONS, INC. FISHERS ISLAND, NEW YORK 1454 BOSTON POST ROAD 1156 CROSS ROAD l88A BROOK AVENUE AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING 1P.O. BOX 300 IWATERFORD, CONNECTICUT 06385 IDEER PARK, NEW YORK 11729 FAA-AIP NO. 3-36-0029-04-91 IWATERFORD, CONNECTICUT 06385 NYSDOT PROJECT NO. 0913.04 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I I UNIT I I UNIT I I UNIT NO. SPEC NOI DESCRIPTION I QUANTITY UNITS I PRICE I TOTAL I PRICE I TOTAL I PRICE I TOTAL azcazz==az=z==zz=zz==z==z==zsaazsz=s==z==z===z===zzazzmzzzzzzxa=azz===az===za=z=zaaazaaxaxaaaaazzzaz======zxa=xzzazxaxaaazzaa=a==zzs=xz======a=zzzaaa=sazzxxazzzzma====s 1 P-152 (COMMON EXCAVATION, AREA N0.1 ( 1 LS $4,217.00 $4,217.00 58,360.00 $8,360.00 54,000.00 $4,000.00 2 P-152 IPAVEMENT EXCAVATION (BITUMINOUS CONCRETE) 900 SY $35.00 $31,500.00 $15.89 $14,301.00 * $14.00 $12,600.00 3 P-612 IFIELD OFFICE 1 LS $3,650.00 $3,650.00 $7,000.00 $7,000.00 $8,000.00 $8,000.00 4 P-620 IRUNWAY PAINTING 23,000 SF 50.25 $5,750.00 $0.69 $15,870.00 * $0.58 $13,340.00 5 L-102 JELECTRICAL BUILDING ELECTRICAL SERVICE 1 LS 533,000.00 $33,000.00 $6,520.00 $6,520.00 $18,100.00 $18,100.00 6 L-106 ISEGMENTED CIRCLE 1 LS $15,296.00 $15,296.00 $17,297.50 $17,297.50 $11,700.00 $11,700.00 7 L-107 ILIGHTED WIND CONE 1 LS $5,556.00 $5,556.00 $9,175.00 ( $9,175.00 $8,200.00 $8,200.00 8 L-108 ICABLE TRENCHING FOR THE INSTALLATION OF UNDERGROUND CABLE ( 8,600 LF $4.55 $39,130.00 $5.80 $49,880.00 $7.08 $60,888.00 9 L-108 IND. 8 AWG, 60OV, TYPE C SINGLE CONDUCTOR UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCT 28,300 LF ( $0.51 1 $14,433.00 1 $0.67 $18,961.00 $0.82 $23,206.00 10 L-108 IND. 8 AWG, 5KV, TYPE C SINGLE CONDUCTOR UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCT 12,900 LF 1 $0.68 1 $8,772.00 1 $0.74 $9,546.00 $0.95 $12,255.00 11 L-108 IND. 8 AWG, BARE COPPER COUNTERPOISE WIRE INSTALLED IN TRENCH INCLUDING GROUNDING RODS AND EXOTHERMIC CONNECTIONS 9,500 LF ( $0.66 $6,270.00 $0.68 $6,460.00 51.49 $14,155.00 12 L-109 1INSTALLATION OF AIRPORT ELECTRICAL BUILDING EQUIPMENT, IN PLACE 1 LS ( $35,273.00 $35,273.00 1 $30,352.00 $30,352.00 1 $48,000.00 $48,000.00 13 L-110 14-WAY ELECTRICAL DUCT BANK, TYPE I 700 LF $72.00 $50,400.00 1 $96.00 $67,200.00 1 $88.00 $61,600.00 14 L-110 18-WAY ELECTRICAL DUCT BANK, TYPE I 200 LF $66.00 $13,200.00 ( $100.00 $20,000.00 ( $165.00 $33,000.00 15 L-110 12-INCH DIAMETER RIGID STEEL CONDUIT INSTALLED IN PAVEMENT 1 3,000 LF $28.00 1 $84,000.00 $20.68 1 $62,040.00 $20.50 1 $61,500.00 16 L-110 12-INCH DIAMETER RIGID STEEL CONDUIT INSTALLED I I IN TURF 1 270 LF 1 $17.00 $4,590.00 $13.00 $3,510.00 $14.50 $3,915.00 17 L-110 12-INCH DIAMETER RIGID STEEL CONDUIT REINSTALLED IN TURF 1 190 LF $17.00 $3,230.00 $13.00 $2,470.00 $14.20 52,698.00 18 L-112 JELECTRICAL BUILDING 1 LS $45,000.00 $45,000.00 $40,000.00 $40,000.00 $33,800.00 $33,800.00 19 L-115 JELECTRICAL MANHOLE NO. 1 1 EACH $3,566.00 $3,566.00 $8,000.00 $8,000.00 $8,600.00 $8,600.00 20 L-115 IPULL BOX REINSTALLATION 1 EACH $1,841.00 $1,841.00 5250.00 $250.00 $600.00 5600.00 page 4 ELIZABETH FIELD AIRPORT ICARLIN CONTRACTING CO., INC. IDIC1N ELECTRIC CO., INC. ii.p. DALY & SONS, INC. FISHERS ISLAND, NEW YORK 1454 BOSTON POST ROAD 1156 CROSS ROAD 188A BROOK AVENUE AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING 1P.O. BOX 300 IWATERFORD, CONNECTICUT 06385 IDEER PARK, NEW YORK 11729 FAA-AIP NO. 3-36-0029-04-91 IWATERFORD, CONNECTICUT 06385 NYSDOT PROJECT NO. 0913.04 I I -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I ( UNIT I I UNIT I I UNIT NO. SPEC NOI DESCRIPTION QUANTITY UNITS PRICE I TOTAL I PRICE I TOTAL I PRICE I TOTAL -___�______�__aaazaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaeaaaaazaaazzazaszaaazazzaaaaazzaaaaaaaaaaaaaaaazzaaa0 a azzaaaaaaaazaaaaa_ as aaaaazaaaazaaaaazaaaaazzaaz 21 L-125 MEDIUM INTENSITY RUNWAY EDGE LIGHTS, BASE MOUNTED, IN PAVEMENT 57 EACH $600.00 ( $34,200.00 $957.00 $54,549.00 5870.00 $49,590.00 22 L-125 (RUNWAY 25 THRESHOLD LIGHTS 1 LS $8,800.00 58,800.00 $8,161.00 58,161.00 $9,000.00 $9,000.00 23 L-125 JAIRPORT GUIDANCE SIGN NO.R-2-5, BASE MOUNTED, IN PAVEMENT 1 LS 52,500.00 $2,500.00 $4,160.00 ( S4,160.00 $2,700.00 52,700.00 24 L-125 JAIRPORT GUIDANCE SIGN NO.R-2-19, BASE MOUNTED, IN PAVEMENT 1 LS 52,500.00 $2,500.00 $4,160.00 ( $4,160.00 52,700.00 52,700.00 25 L-125 JAIRPORT GUIDANCE SIGN NO.R-1-3, BASE MOUNTED, IN TURF 1 LS $2,500.00 $2,500.00 ( $4,160.00 $4,160.00 52,700.00 ( $2,700.00 26 L-125 JAIRPORT GUIDANCE SIGN NO.R-1-19, BASE MOUNTED, IN TURF 1 LS 52,500.00 $2,500.00 ( S4,160.00 ( $4,160.00 52,700.00 52,700.00 27 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 7 END 1 1 LS $4,500.00 $4,500.00 $12,030.00 $12,030.00 ( S8,800.00 58,800.00 28 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 25 END 1 1 LS $4,500.00 ( S4,500.00 512,030.00 512,030.00 $8,800.00 $8,800.00 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, �29 RUNWAY 12 END 1 -1 LS 54,500.00 54,500.00 $12,030.00 $12,030.00 $8,800.00 58,800.00 30 L-125 IRUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM, RUNWAY 30 END 1 LS $4,500.00 $4,500.00 $12,030.00 $12,030.00 $8,800.00 $8,800.00 31 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 7 END 1 LS $13,000.00 $13,000.00 $12,720.00 $12,720.00 $9,300.00 $9,300.00 32 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 25 END 1 LS $13,000.00 $13,000.00 ( S12,720.00 ( $12,720.00 59,300.00 $9,300.00 33 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 12 END 1 LS $13,000.00 $13,000.00 $12,720.00 $12,720.00 ( $9,300.00 $9,300.00 34 L-125 IGENERIC VISUAL APPROACH DESCENT INDICATOR SYSTEM, RUNWAY 30 END 1 LS $13,000.00 $13,000.00 $12,720.00 $12,720.00 $9,300.00 $9,300.00 35 L-125 IREMOVAL OF EXISTING RUNWAY EDGE LIGHTS 1 LS $7,500.00 $7,500.00 $2,300.00 $2,300.00 $7,700.00 $7,700.00 36 M-100 114AINTENANCE AND PROTECTION OF TRAFFIC 1 LS $31,000.00 ( $31,000.00 $18,025.00 $18,025.00 $4,100.00 $4,100.00 page 5 ELIZABETH FIELD AIRPORT ICARLIN CONTRACTING CO., INC. IDICIN ELECTRIC CO., INC. (J.P. DALY & SONS, INC. FISHERS ISLAND, NEW YORK 1454 BOSTON POST ROAD 1156 CROSS ROAD 188A BROOK AVENUE AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING 1P.O. BOX 300 (WATERFORD, CONNECTICUT 06385 IDEER PARK, NEW YORK 11729 FAA-AIP NO. 3-36-0029-04-91 IWATERFORD, CONNECTICUT 06385 NYSDOT PROJECT NO. 0913.04 I I I -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I I UNIT ( UNIT UNIT NO. SPEC NOI DESCRIPTION QUANTITY UNITS PRICE TOTAL PRICE TOTAL PRICE ( TOTAL a—sxasxasxsxsxxxxxxxxxssx� xxxsxxxxxxsssxxsxxxsx---xaxssxxxxxxxsxsxxxxxszxxxaxxxxsxaazsaassaszsaxsaaxxxsxxxxsssxxxsaazzsxzszxsaxxsaxaxsxxxxxssxxsxxxxzxxssxazaxzsxxsxxxxax . 37 M-200 IMOBILIZATION 1 LS ( $28,826.00 $28,826.00 $12,000.00 $12,000.00 $23,700.00 $23,700.00 ------------ I---------------------------------------------- TOTAL BID ---------------- -------------- --------------- $599,000.00 -------------- --------------- $607,867.50 -------------- --------------- * $617,447.00 BID SECURITY 5% BID BOND 5% BID BOND 5% 610 BOND �* DENOTES BIDDER'S ERROR, THE CORRECTED VALUE IS SHOWN. I I I -------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------- CALOCERINOS AND SPINA ENGINEERS, P.C. I CER Y THAT THi IS A i0 CORRECT TABULATION OF BIDS RECEIVED MARCH 12, 1992. JOB NUMBER: 211.004.001 BID TABULATION NED: — DATE: 16-Mar-92 0 page 6 ELIZABETH FIELD AIRPORT IPOWER LINE CONSTRUCTORS, INC. IFIREBIRD CONSTRUCTION CORP. FISHERS ISLAND, NEW YORK 124 ROBINSON ROAD, P.O. BOX 3851329 MIDDLE COUNTRY ROAD AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICLINTON, NEW YORK 13323-0385 ISMITHTOWN, NY 11787 FAA-AIP NO. 3-36-0029-04-91 NYSDOT PROJECT NO. 0913.04 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I I UNIT UNIT UNIT NO. SPEC NOI DESCRIPTION QUANTITY UNITS PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 P-152 ICOMMON EXCAVATION, AREA NO.1 1 LS ( $5,000.00 $5,000.00 $34,500.00 $34,500.00 2 P-152 IPAVEMENT EXCAVATION (BITUMINOUS CONCRETE) 900 SY $9.00 $8,100.00 $6.00 $5,400.00 3 P-612 IFIELD OFFICE 1 LS $4,000.00 $4,000.00 55,000.00 ( $5,000.00 4 P-620 IRUNWAY PAINTING 23,000 SF $0.53 512,190.00 $0.80 $18,400.00 5 L-102 JELECTRICAL BUILDING ELECTRICAL SERVICE 1 LS $14,000.00 $14,000.00 510,200.00 $10,200.00 6 L-106 ISEGMENTED CIRCLE 1 LS $19,000.00 $19,000.00 520,000.00 520,000.00 7 L-107 ILIGHTED WIND CONE 1 LS $4,800.00 $4,800.00 $5,100.00 $5,100.00 8 L-108 ICABLE TRENCHING FOR THE INSTALLATION OF I UNDERGROUND CABLE 8,600 LF 55.50 $47,300.00 $10.00 !86,000.00 9 L-108 IND. 8 AWG, 60OV, TYPE C SINGLE CONDUCTOR I UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCT 28,300 LF I $0.70 I $19,810.00 I $1.10 I $31,130.00 I 10 L-108 IND. 8 AWG, 5KV, TYPE C SINGLE CONDUCTOR I I I I I I I I UNDERGROUND CABLE INSTALLED IN TRENCH OR DUCTI 12,900 LF I $0.90 I $11,610.00 I $1.30 I $16,770.00 1 I 11 L-108 IND. 8 AWG, BARE COPPER COUNTERPOISE WIRE I I I I I I I I INSTALLED IN TRENCH INCLUDING GROUNDING RODS I I I ( I I AND EXOTHERMIC CONNECTIONS I 9,500 LF [ 50.60 I $5,700.00 [ $1.50 [ $14,250.00 12 L-109 (INSTALLATION OF AIRPORT ELECTRICAL I I I I I BUILDING EQUIPMENT, IN PLACE ( 1 LS I $41,500.00 I $41,500.00 I $23,500.00 I 523,500.00 I 13 L-110 I4-WAY ELECTRICAL DUCT BANK, TYPE I I 700 LF I $109.00 I $76,300.00 I $100.00 I $70,000.00 14 L-110 I8-WAY ELECTRICAL DUCT BANK, TYPE I i 200 LF I $106.00 I $21,200.00 I 5110.00 I $22,000.00 I I 15 L-110 12-INCH DIAMETER RIGID STEEL CONDUIT INSTALLED I I I I I I I I IN PAVEMENT I 3,000 LF I $30.00 I $90,000.00 I $30.00 1 590,000.00 I I 16 L-110 I2-,INCH DIAMETER RIGID STEEL CONDUIT INSTALLED I I I I I I IN TURF I 270 LF I $10.00 I $2,700.00 I 532.00 [ $8,640.00 I I 17 L-110 I2-INCH DIAMETER RIGID STEEL CONDUIT REINSTALLEI I I I I I I I IN TURF I 190 LF i $9.00 [ $1,710.00 I $18.00 I 53,420.00 I I 18 L-112 [ELECTRICAL BUILDING I 1 LS I $60,000.00 I 560,000.00 I $50,000.00 I 550,000.00 I I 19 L-115 [ELECTRICAL MANHOLE NO. 1 [ 1 EACH [ $7,200.00 I 57,200.00 i $4,500.00 I $4,500.00 [ I 20 L-115 IPULL BOX REINSTALLATION I 1 EACH I 5900.00 I 5900.00 [ $800.00 I 5800.00 I I page 7 ELIZABETH FIELD AIRPORT IPOWER LINE CONSTRUCTORS, INC. IFIREBIRD CONSTRUCTION CORP. FISHERS ISLAND, NEW YORK 124 ROBINSON ROAD, P.O. BOX 3851329 MIDDLE COUNTRY ROAD AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICLINTON, NEW YORK 13323-0385 ISMITHTOWN, NY 11787 FAA-AIP NO. 3-36-0029-04-91 NYSDOT PROJECT NO. 0913.04 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I I UNIT i I UNIT UNIT NO. SPEC NOI DESCRIPTION QUANTITY UNITS I PRICE I TOTAL PRICE TOTAL PRICE TOTAL �xxaxsxsxxxsxxsxxsxasxsssxssxssaxsxxxsxxsxxssssaxxsxxssxsaxssxssxassxxsxxasxazaxsaaazsaaxaaasazaassssxxxxaasxxsxaaazaxssaxaxxasxxxssaxssxxxaaaaxzaassxxsaaxazaasssaxssxxxs 21 L-125 (MEDIUM INTENSITY RUNWAY EDGE LIGHTS, BASE I I MOUNTED, IN PAVEMENT I 57 EACH I $900.00 i $51,300.00 I $565.00 I $32,205.00 I I I 22 L-125 (RUNWAY 25 THRESHOLD LIGHTS I 1 LS I $15,000.00 I $15,000.00 I $15,000.00 I $15,000.00 I I I 23 L-125 (AIRPORT GUIDANCE SIGN NO.R-2-5, BASE I I I I I I ( I I MOUNTED, IN PAVEMENT I 1 LS I $2,600.00 ( $2,600.00 I $4,800.00 I $4,800.00 I I I 24 L-125 (AIRPORT GUIDANCE SIGN NO.R-2-19, BASE I I I I I I I I I MOUNTED, IN PAVEMENT I 1 LS I $2,600.00 ( $2,600.00 I $4,800.00 I 54,800.00 I I I 25 L-125 (AIRPORT GUIDANCE SIGN NO.R-1-3, BASE I I I I I I I I I MOUNTED, IN TURF I 1 LS I $2,300.00 I $2,300.00 I $4,800.00 ( $4,800.00 I I I 26 L-125 (AIRPORT GUIDANCE SIGN NO.R-1-19, BASE I I I I I I I I I MOUNTED, IN TURF I 1 LS I $2,300.00 i $2,300.00 I $4,800.00 I $4,800.00 I I I 27 L-125 (RUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM,( I ( I ( I I I I RUNWAY 7 END I 1 LS I $12,000.00 I $12,000.00 I $7,500.00 i $7,500.00 I I I 28 L-125 (RUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM,( I I I I I I I I RUNWAY 25 END I 1 LS I $12,000.00 I $12,000.00 I $7,500.00 I $7,500.00 I I I 29 L-125 (RUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM,( I I I I I ( I I RUNWAY 12 END I 1 LS I $12,000.00 I $12,000.00 I $7,500.00 I $7,500.00 I I I 30 L-125 (RUNWAY END IDENTIFICATION LIGHT (REIL) SYSTEM,( I I I I I I I RUNWAY 30 END I 1 LS I $14,000.00 I $14,000.00 I $7,500.00 I $7,500.00 I I 31 L-125 (GENERIC VISUAL APPROACH DESCENT INDICATOR I I I I I I I I SYSTEM, RUNWAY 7 END I 1 LS I $12,500.00 I $12,500.00 I $10,000.00 I $10,000.00 I I 32 L-125 (GENERIC VISUAL APPROACH DESCENT INDICATOR I I I I I I I SYSTEM, RUNWAY 25 END I 1 LS ( $12,500.00 I $12,500.00 I $10,000.00 I $10,000.00 I I 33 L-125 (GENERIC VISUAL APPROACH DESCENT INDICATOR I I I I I ( I I SYSTEM, RUNWAY 12 END I 1 LS I $12,500.00 I $12,500.00 I $10,000.00 I $10,000.00 I I 34 L-125 (GENERIC VISUAL APPROACH DESCENT INDICATOR I I I I I I I I SYSTEM, RUNWAY 30 END I 1 LS I $12,500.00 I $12,500.00 I $10,000.00 ( $10,000.00 I I 35 L-125 (REMOVAL OF EXISTING RUNWAY EDGE LIGHTS I 1 LS I 51,500.00 I $1,500.00 I $2,000.00 I $2,000.00 I I 36 M-100 (MAINTENANCE AND PROTECTION OF TRAFFIC I 1 LS I $6,500.00 I $6,500.00 I $15,000.00 I $15,000.00 I I page 8 v ELIZABETH FIELD AIRPORT IPOWER LINE CONSTRUCTORS, INC. IFIREBIRD CONSTRUCTION CORP. FISHERS ISLAND, NEW YORK 124 ROBINSON ROAD, P.O. BOX 385329 MIDDLE COUNTRY ROAD AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING ICLINTON, NEW YORK 13323-0385 ISMITHTOWN, NY 11787 FAA-AIP NO. 3-36-0029-04-91 NYSDOT PROJECT NO. 0913.04 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ITEM FAA I I I UNIT UNIT UNIT NO. SPEC NOI DESCRIPTION I QUANTITY UNITS PRICE ( TOTAL PRICE TOTAL PRICE TOTAL xzxxsxxxzxxsxsxxzsxzxxxxxxxasxxsxzxasxzxx:ssaxxssssxzsaxszxasxxsxxxsxxszsaxxxs� xxzxasassszxasaasxxxxsxxasxxasxxsx:assseasxzzzaaxasxxasxazxszxasxazasasassxzaaxaxsaxxxxssx 37 M-200 (MOBILIZATION 1 LS $25,000.00 $25,000.00 526,000.00 $26,000.00 ------------ I -------------------------------------------------------------------------------------------------------------------------------------- --------------- TOTAL BID $662,120.00 $699,015.00 BID SECURITY I I 5% BID BOND 5% BID BOND �* DENOTES BIDDER'S ERROR, THE CORRECTED VALUE IS SHOWN. ------------------------------------------------------------------------------------------------------ ---- ------------------------------------------------------------- CALOCERINOS AND SPINA ENGINEERS, P.C. I CERTIFY T THIS IS TRU ND RECT TABULATION OF BIDS RECEIVED MARCH 12, 1992. JOB NUMBER: 211.004.001 BID TABULATION SI NED:_ DATE: 16 -Mar -92 page 9 C �(__J's 9 Calocerinos & Spina Engineers, P.C. March 24, 1992 Mr. Philip Brito, Manager Federal Aviation Administration New York Airports District Office 181 South Franklin Avenue, Room 305 Valley Stream, New York 11581 0 Re: Elizabeth Field - Fishers Island Airfield Lighting, Visual Aids, and Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 File: 211.004 Dear Mr. Brito: Seven bids for this project were received on March 12, 1992 at 1:00 p.m. and the lowest responsible bidder is Falvey Construction Corporation. Their bid has been reviewed and found to be in order. As stated in our letter to the Town of Southold, we have recommended award of the Contract for the Base Bid in the amount of $419,421.00 to Falvey Construction Corporation in accordance with the award procedures outlined in their bid. We request your concurrence with this recommendation. We are enclosing the following: 1. One (1) copy of the Certified Bid Tabulation. 2. One (1) set of the As -Advertised Plans and Specifications. 3. One (1) copy of the Certificate of Publication. If you have any questions, or if additional information is required, please do not hesitate to contact us. Very truly yours, CERINOS & SPI ENGINEERS, P.C. W. a JWL Jmc Enclosures cc: Mr. Robert Michaud Mr. James Kuzloski Mr. Philip Knauff Mrs. Judith T. Terry 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 FAdaYJjy,;, N§TWJCTI®N CORP. 12 FIRE TOWER ROAD TEL 203/663-1695 P.O. BOX 699 FAX 203/663-2719 KILLINGWORTH, CT 06419 March 23, 1992 Calocerinos & Spina, P.C. 1020 7th North Street Liverpool, New York 13088 Attention: James W. Leana, Engineer Airport Division Re: Airfield Lighting, Visual Aids & Electrical Building Elizabeth Field, Fishers Island, New York AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 Dear Gentlemen: In reference to the above -captioned project, Falvey Construction Corporation acknowledges receipt of Calocerinos & Spina's letter dated March 18, 1992 regarding our bid proposal and the large bid disparity. Please be advised that this firm has reviewed our bid proposal and contract specifications and understand the scope of the work. Therefore, this firm is returning one signed copy of the above -referenced letter acknowledging our satisfaction with the bid proposal. If you have any questions or comments, please contact the writer at 203-663-1695. Very truly yours, Mathew D. Falvey Manager MDF/nja Enclosure File: FIAIR/FCC/CT-0/GC:1 VW3/Airport/Leana.7% Ref: FIAIR/FCC/CF-0/GC:1 � w C S Calocorinos &Spina �1, PC FAL'v cY CONSTRUCTION CORP. March 18, 1992 Mr. Donald Falvey Falvey Construction Corporation 12 Fire Tower Road Killingworth, Connecticut 06419 Re: Elizabeth Field - Fishers Island Airfield Lighting Visual Aids and Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 File: 211.004 Dear Mr. Falvey: The bid you recently submitted to the Town of Southold for the above -referenced project is within 7% of Engineer's Opinion of Construction Cost, but was 34% below the next lowest bid. As a result of the large bid disparity, we are hereby requesting that you review your bid to ensure you are aware and understand the work required under this contract. Enclosed for your review and information is one copy of the Certified Bid Tabulation and one copy of the project Specifications. Following review of your bid and the enclosed Bid Tabulation, please acknowledge that you are satisfied with your bid by signing both copies of this letter in the space provided below and return one copy to our office. 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 Mr. Donald Falvey March 18, 1992 Page 2 D CONS-1TRUC : iON CORP. Cs If you have any questions or if additional information is required, please do not hesitate to contact our office. Very truly yours, CALOCERINOS James W: JWL:kal Enclosures ENGINEERS, P.C. This will acknowledge that I have reviewed and am aware of the work required under this Contract and that I am satisfied with my bid. FALVEY CONSTRUCTION CORPORATION By: Signature and"tide of Officer Date: To: Mrs. Judith T. Terry Southold Town Clerk Town Hall 53095 Main Road Southold, NY 11971 RECHV pED tliA Southold T rlo,-k Re: Elizabeth Field - Fishers Island Airfield Lighting, Visual Aids, And Electrical Building File: 211.004 Date: 21 -Mar -92 Enclosed please find the following: - The original bid packages for the referenced project. Remarks: If you have any questions or need additional information, please do not hesitate to contact us. Enclosures cc: CALOCERINOS & SPINA ENGINEERS, P.C. amen N Leana %aineer\ • Calocerinos & Spina Engineers, P.C. March 25, 1992 Mr. Edward Bennett Fruean Utilities, Inc. 18 Fruean Way S. Yarmouth, Massachusetts 02664 Re: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids & Electrical Building File: 211.004 Dear Mr. Bennett: On behalf of the Town of Southold, we thank you for submitting a bid for the above -referenced project. The bids have been tabulated and reviewed and it has been determined that you are not the low bidder on this project. Enclosed please find your original bid bond and one copy of the bid tabulation for this project. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. James W.ana Engineer JWL:jmc Enclosure 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 clol-�-s 0 Calocerinos & Spina Engineers, P.C. March 25, 1992 Mr. Brian J. Carey Carlin Contracting Co., Inc. 454 Boston Post Road P.O. Box 300 Waterford, Connecticut 06385 01 Re: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids & Electrical Building File: 211.004 Dear Mr. Carey: On behalf of the Town of Southold, we thank you for submitting a bid for the above -referenced project. The bids have been tabulated and reviewed and it has been determined that you are not the low bidder on this project. Enclosed please find your original bid bond and one copy of the bid tabulation for this project. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. J411 -- James W. Leana Engineer JWL Jmc Enclosure 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457--6711 FAX (315) 457-9803 �`�T's Calocerinos & Spina Engineers, P.C. March 25, 1992 Mr. Rudolph Chieka Dicin Electric Co., Inc. 156 Cross Road Waterford, Connecticut 06385 Re: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids & Electrical Building File: 211.004 Dear Mr. Chieka: On behalf of the Town of Southold, we thank you for submitting a bid for the above -referenced project. The bids have been tabulated and reviewed and it has been determined that you are not the low bidder on this project. Enclosed please find your original bid bond and one copy of the bid tabulation for this project. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. 0111� James W. Leana Engineer JWL:jmc Enclosure 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 9 �"Ts Calocerinos & Spina Engineers, P.C. March 25, 1992 Mr. Thomas Daly J.P. Daly & Sons, Inc. 88A Brook Avenue Deer Park, New York 11729 Re: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids & Electrical Building File: 211.004 Dear Mr. Daly: On behalf of the Town of Southold, we thank you for submitting a bid for the above -referenced project. The bids have been tabulated and reviewed and it has been determined that you are not the low bidder on this project. Enclosed please find your original bid bond and one copy of the bid tabulation for this project. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. James W. Leana Engineer JWL:jmc Enclosure 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 CC s Calocerinos & Spina Engineers, P.C. March 25, 1992 Mr. William Skolnik Firebird Construction Corp. 329 Middle Country Road Smithtown, New York 11787 Re: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids & Electrical Building File: 211.004 Dear Mr. Skolnik: On behalf of the Town of Southold, we thank you for submitting a bid for the above -referenced project. The bids have been tabulated and reviewed and it has been determined that you are not the low bidder on this project. Enclosed please find your original bid bond and one copy of the bid tabulation for this project. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. d*,� James W. Leana Engineer JWL:jmc Enclosure 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 C�is Calocerinos & Spina Engineers, P.C. March 25, 1992 Mr. David L. Critelli Power Line Constructors, Inc. 24 Robinson Road P.O. Box 385 Clinton, New York 13323-0385 Re: Elizabeth Field -Fishers Island Airfield Lighting, Visual Aids & Electrical Building File: 211.004 Dear Mr. Critelli: On behalf of the Town of Southold, we thank you for submitting a bid for the above -referenced project. The bids have been tabulated and reviewed and it has been determined that you are not the low bidder on this project. Enclosed please find your original bid bond and one copy of the bid tabulation for this project. Very truly yours, CALOCERINOS & SPINA ENGINEERS, P.C. /4_� James W. Leana Engineer JWL:jmc Enclosure 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 4 7 C S 0 Calocorinos & Spina f PC [J MARCH 12,1991 1:00 PM ELIZABETH FIELD AIRPORT AIRFIELD LIGHTING, VISUAL AIDS, ELECTRICAL BUILDING FAA AIP PROJECT: NO. 3-36-0029-04-91 BID SUMMARY NYSDOT PROJECT: NO. 0913.04 Bidsum Page 1 1020 Seventh North Street, Liverpool, NY 13038-6199 (315) 457-6711 FAX (315) 457-9803 03/11/92 CONTRACTOR BASE BID BID SECURITY 1. Carlin Contracting Co. Waterford, CT $599,000.00 Bid Bond 2. J.P. Daly & Sons, Inc. Deer Park, NY $617,447.00 Bid Bond 3. Dicon Electric Co., Inc. Waterford, CT $607,946.50 Bid Bond 4. Firebird Construction Corp. Smithtown NY $699,015.00 Bid Bond 5. Fruean Utilities, Inc. South Yarmouth MA $563,511.00 Bid Bond 6. Power Line Constructors, Inc. Clinton NY $662,120.00 Bid Bond 7. Falvey Construction Corp. Killingworth, CT $419,400.21 Bid Bond 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Bidsum Page 1 1020 Seventh North Street, Liverpool, NY 13038-6199 (315) 457-6711 FAX (315) 457-9803 03/11/92 c- S C_ aloCorinos &Spina PC MARCH 1211991 1:00 PM ELIZABETH FIELD AIRPORT AIRFIELD LIGHTING, VISUAL AIDS, ELECTRICAL BUILDING FAA AIP PROJECT: NYSDOT PROJECT: NO. 3-36-0029-04-91 BID SUMMARY NO. 0913.04 CONTRACTOR BASE BID BID SECURITY S X10 1. C�Q�•.. Cdr .t ��:.� Cb. S °�°t I CUD - 00 2. •Q. `J SKS. �.� ��� 4 . oo �.Z 80 3. Q ♦ U� �,\ec�. Cn, c. CA �0.5 4. CVA 5. V �� u�\ e S cJ �a3 SA. to 6 (n toZ- �Zb. old �� c'�t�•�� 7 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Bidsum Page 1 - 3/11/92 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-&71 ((31 5) 457-9803 II � $50.00 Bid Deposit (rc- idable to any bidder upon returning the drawings in good condition within 30 days of the bid date. Not refundable to non -bidders) BID - ELIZABETH FIELD AIRPORT, FISHERS ISLAND (Airfield Lighting, Visual Aids, Electrical Building) Mail Regular - $4.10 Express - $15.95 BID OPENING: 1:00 P.M., Thursday, March 12, 1992. C__ --s Calocerinos & Spina Engineers, P.0 ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK AIRFIELD LIGHTING, VISUAL AIDS, & BLDG. AIP PROJECT NO. 3-36-0029-04-91 PLANS AND SPECIFICATIONS TAKEN BY: i� BOOK NUMBER 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 02/13/92 NYSDOT PROJECT NO. 0913.04 PROSPECTIVE BIDDER ADDRESS TOWN HALL OWNER'S COPY 53095 MAIN ROAD TOWN OF SOUTHOLD SOUTHHOLD, NY 11971 ENGINEER'S COPY CALOCERINOS & SPINA ENGINEERS, P.C. Jim Moulison Fruean-Moulison Utilities (2/18) --9.r Falvey Construction Corp. (2/19 -FE) Power Line Constructors, Inc. (2/19 -FE) 4&�A� 9-Z-1 Fruean Utilities Inc. 2/ 1 Attn: Edward. (2/19 -FE) �/�/01f�- R.M.D. Construction Corp. Firebird Construction Corp. Michael Skolnik (2/24/92) VRM Company (2/24/92 - Reg. Mail) � J.P. Daly & Sops, Inc (2/24/92 -Reg. Mail) 1020 SEVENTH NORTH STREET LIVERPOOL, NEW YORK 13088 108 Tenney St. Georgetown, MA 01833 (508)352-7084 12 Fire Tower Road, P.O. Box 699 Killingworth, CT 06419 P.O. Box 385, 24 Robinson Road Clinton, NY 13323 18 Fruean Shay South Yarmouth, MA 02664 (408)398-6911 (408)775-5557 90-B Raynor Avenue Ronkonkoma, NY 11779 471-4444 329 Middle Country Rd. STIth1c r0, NY 11787 Cty. Rt 45 RD 2, Box 279 Central Square , NY 13036 88A Brook Ave. Deer Park, New York 11729 211.004 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK AIRFIELD LIGHTING, VISUAL AIDS, & BLDG. PAGE 2 PLANS AND SPECIFICATIONS TAKEN BY: BOOK NUMBER 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. PROSPECTIVE BIDDER --------------------- 2/26/92 LoDuca Associates, Inc. we 2/27/92 G. Penza & Sons, Inc. 2/27/92 G. Penza & Sons, Inc.IV4/- 3/3/92 South Fork Asphalt Corp. JWP Welsbach Electric Corp. 3/3/92 Exp.Mail �D ,�C R L I N M- a;x�0 INC 9� 3/3/92 Fed Ex ALLEN ELECTRIC SERVICE INC 3/3/92 Fed. Ex. 7�a'ES 02/13/92 %� ADDRESS ------------------------------ 1311 Lakeland Avenue Bohemia, N.Y. 11716 tele. no. 516 567-4401 457 Brook Avenue Deer Park, NY 11729 242-5115 457 Brook Avenue Deer Park, NY 11729 242-5115 P.O. Drawer 2028 East Hampton, NY 11935 324-1245 19-49 42nd Street Long Island City, NY 11105 718-274-4200 454 Boston Post Rd, P.O. Box 3001 Waterford CT 06385 203-443-8337 950-1 Old Medford Ave Medford, New York 11763 516-696-4424 211.004 ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK AIRFIELD LIGHTING, VISUAL AIDS, & BLDG. PAGE PLANS AND SPECIFICATIONS TAKEN BY: BOOK NUMBER 21. 22. 23. 24. 25. 26. 27. 28.- 29. 30. PROSPECTIVE BIDDER Bouton Services, Inc. 170 164— (Obtained from Phil Knauff) Dicon Electric Co. (Obtained from Phil Knauff) Dicon Electric Co. (Obtained from Phil Knauff) Walsh Serivice (Obtained from Phil Knauff) Z 8 S Contracting Inc. (Obtained from Phil Knauff) Enterprise Electric *ilk (Obtained from Phil Knauff) P 2 02/13/92 ADDRESS P.O. Box 506 Fishers Island NY 06390 516-788-7268 156 Crossroad Waterford CT 06385 203-442-0826 156 Crossroad Waterford CT 06385 203-442-0826 P.O. Box 476 Fishers Island NY 06390 516-788-7778 P.O. Box 202 Fishers Island NY 06390 516-788-7857 15 Hobron Street New London, CT 06320 211.004 ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK AIRFIELD LIGHTING, VISUAL AIDS, & BLDG. PAGE 2 PLANS AND SPECIFICATIONS TAKEN BY: BOOK NUMBER 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. PROSPECTIVE BIDDER 2/26/92 LoDuca Associates, Inc. ,� e we 2/27/92 G. Penza & Sons, Inc. ,,2�9� 2/27/92 G. Penza & Sons, Inc.-/MXBIec 3/3/92';.< South Fork Asphalt Corp. JWP Welsbach Electric Corp. 3/3/92 Exp.Mail `mood 0. INC 3/3/92 Fed Ex ALLEN ELECTRIC SERVICE INC 3/3/92 Fed. Ex. �< 02/13/92 ADDRESS 1311 Lakeland Avenue Bohemia, N.Y. 1 1716 tele. no. 516 567-4401 457 Brook Avenue Deer Park, NY 11729 242-5115 457 Brook Avenue Deer Park, NY 11729 242-5115 P.O. Drawer 2028 East Hampton, NY 11935 324-1245 19-49 42nd Street Long Island City, NY 11105 718-274-4200 454 Boston Post Rd, P.O. Box 300 Waterford CT 06385 203-443-8337 950-1 Old Medford Ave Medford, New York 11763 516-696-4424 211.004 ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK AIRFIELD LIGHTING, VISUAL AIDS, & BLDG. PAGE PLANS AND SPECIFICATIONS TAKEN BY: BOOK NUMBER 21. 22. 23. 24. 25. 26. 27. 28.- 29. 30. 2 02/13/92 PROSPECTIVE BIDDER ADDRESS Bouton Services, Inc. 17170 P.O. Box 506 Fishers Island NY 06390 (Obtained from Phil Knauff) 516-788-7268 Dicon Electric Co. 156 Crossroad (Obtained from Phil Knauff) Waterford CT 06385 203-442-0826 Dicon Electric Co. 156 Crossroad (Obtained from Phil Knauff) Waterford CT 06385 203-442-0826 Walsh Serivice `7�Lo P.O. Box 476 (Obtained from Phil Knauff) Fishers Island NY 06390 516-788-7778 Z & S Contracting Inc. P.O. Box 202 (Obtained from Phil Knauff) Fishers Island NY 06390 516-788-7857 Enterprise Electric YZo A3zk 15 Hobron Street (Obtained from Phil Knauff) New London, CT 06320 211.004 STYLE #09640 AMSTERDAM Printing and Litho Corp., AMSTERDAM, N. Y. ®1981 AP&LCorp. ate`. To: ,F POWER' 'E CONSTRUCTORS, INC. Town Clerk's Office 24 huanson Road, P.O. Box 385 53095 Main Road Clinton, N.Y. 13323-0385 Southold, NY 11971 Phone 315 - 853.6183 SUBJECT Elizabeth Field Airport, Fisher's Island DATE speedy reply D V Bid Date: March 12, 1992 03/16/92 message EmEsm— Gentlemen: We are returning herewith plans for the above -subject project. RECErm Kindly return our $50.00 deposit at your earliest convenience. MAR 1 g 1992 Thank you. Sow1ow Tow., a w -P SIGNE G� DATE OF REPLY REP TO avl L• Crit -611i, Vice President DLC:pas 22990 Enclosure MARCH 19, 1992 FOLD YOUR $50.00 DEPOSIT WILL BE REFUNDED ONCE WE AWARD THE BID. Thank you for your patience. Judith Terry Town Cler RECIPIENT • STYLE #09640 AMSTERDAM Printing and Litho Corp., AMSTERDAM, N. Y. ®1981 AP&LCorp. L qP A&�M I P.O. BOX 300, 454 BOSTON POST ROAD, WATERFORD, CT 06385 PHONE (203) 443-8337 TO Town of Southold 53095 Main Road Southold, NY 11971 WE ARE SENDING YOU Attached ❑ Hand Carried ❑ Under separate cover via ❑ Shop drawings Samples Plans ❑ Copy of letter Change order 1:1 Contract Li Purchase Order LETTE,OF TRANSMITTAL DATE 12 March 1992 JOB NO. ATTENTION Purchasing RE AIRFIELD LIGHTING - VISUAL AIDS - ELECTRICAL BUILDING ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK Drawings for above referenced project_ (specification book ___._._.___—__the following items: Prints I J Specifications COPIES DATE NO. DESCRiPTiON 1 set Drawings for above referenced project_ (specification book returned with bid proposal) t SoUthold T^, ­ THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted r, Resubmit copies for approval ❑ For your use ❑ Approved as noted L Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return _ corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE 19 _ ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS _ Please return our deposit in the amount of $ 50.00. Thank COPY TO CA"NNT BY aniel P. Carlin Vice President . !, R MA TOWN CLERK TOWN OF SOUTHOLD p ,C J V Suffolk County, New York Phone 516-765-1801 Southold, New York 11971 Date 19 .� RECEIVED OF (�2 L-cLC�Ir/� LL'. C'110� . _)III -C— Dollars $ For Judith T. Terry, Town Clerk Cash ❑ Check 21��6 c) —7 By �-- . !, R MA P.O. BOX 300, 454 BOSTON POST ROAD, WATERFORD, CT 06385 PHONE (203) 443-8337 TO Town of Southold 3095 11ain Road Southold, NY 11971 1-516-765-1801 WE ARE SENDING YOU X Attached ❑ Hand Carried ❑ Under separate cover via ❑ Shop drawings ❑ Copy of letter ❑ Contract ❑ Samples ❑ Plans ❑ Change order ❑ ❑ Purchase Order LETTER OF TRANSMITTAL FEDERAL EXPRESS oar March 1992 JOB NO. ATTENTION Judith Terry RE AIRFIELD LIGHTING - VISUAL AIDS - ELECTRICAL BUILDING ELIZABETH FIELD AIRPORT FISHERS ISLAND N Deposit check in the amount of $ 50.00 - refundable the following items: ❑ Prints ❑ Specifications COPIES DATE NO. DESCRIPTION 1 ea. 03/02/92 7048 Deposit check in the amount of $ 50.00 - refundable RECEIVED 992 boutho1d THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOANTO US REMARKS _ Please send us one (1) set plans and specs for the above referenced project. Our self-addressed Federal Express airbill is enclosed. Thank vou. COPY TO SIV BY `; NT�X'1110 Daniel P. Carlin Vice President ALLEN ELECTRIC SERVICE, INC. LICENSED ELECTRICAL CONTRACTOR 950-1 OLD MEDFORD AVENUE MEDFORD, NEW YORK 11763 (516) 696-4424 FAX (516) 696-4466 RECEIVED (E tqS 'c-- S E' Ur lq MAR 3 1992 I° 1�vc O -P 41 hfl r Vt S a: CL. 1d Cl e 61 d . a"- z I t z o - b ekh -r% e.1 d Q �� t? c�-, i`vs r -s ITS I(3r,.,>� As �5 c.us.sQ_j 12 ticl 1 S v (Ih(2ck. ra. c cc-'--- 1� Pi ti A s E- s.e n 0 -ve c�r-'C'qj i�S� y - CAI JWP Welsbach Electric Corp. March 2, 1992 Southhold Town Hall RECEIVED PO Box 1179 Southhold, NY 11971 MAR 31992 Attn: Judith Terry - Town Clerk Southold Town Clerk Re: Elizabeth Field Airport Fisher's Island Please find enclosed a check in the amount of $65.95 for the plans and specs for the Elizabeth Field Airport. We would appreciate if would send the plans and specs as soon as possible. The shipping charges are including in this amount. Thank you. Very truly yours, JWP WELSBACH ELECTRIC CORPORATION Thomas Hildebrandt Project Manager TH:cb JWP WELSBACH ELECTRIC CORPORATION 3/2/92 CHECK DATE CONTR( 3/2/92 Plans & specs. plus shipping Elizabeth Field Airport - Fisher's Island NUMBER CHECK 121687 DETACH HERE BEFORE DEPOSITING 19-49 42nd Street Long Island City, NY 11105 (718) 274-4200 FAX (718) 274-7427 $65.95 VRM co. RD. 2. BOX 279 CENTRA!. SQUARE, KY. 13038 315476-2477 O FAX - SAME 'LSF MESSAGE TO : 4J WOji f/O /r11/%% (ir ,*l DATE: 2 — 72 + — 7z ATTN: e &1,4�' PAGE: SUBJ : ...............................................................:............. .fid-- d ?4 - -2 44-77 V® FEB 24� Town Clerk OVJ= J.P. DALY & SONS, INC. 88A Brook Avenue DEER PARK, NEW YORK 11729 (516) 254-0436 FAX (516) 254-0664 SHEET NO. CALCULATED BY. CHECKED BY` CnAi G OF_ DATE DATE . ..... .. ITS ., "., ^.n. T. POWER LINE CONSTRUCTORS, INC. N2 2280 INVOICE DATE INVOICE NUMBER D E S C R I P T 10 N OUR REFERENCE NO. AMOUNT OF INVOICE DEDUCTIONS NET AMOUNT Plans & Specs for: Bid Date 05/12/92: , Visual Aids, Field $50.00 �9 Construction of Airfield Light" and Electrical Building at Elizalmth Airport, Fishers Island, NY Fed . Account No. 1131-490.1-3 REMITTANCE STATEMENT DETACH THIS STATEMENT BEFORE DEPOSITING CHECK CORPORATION KILLINGWORTH, CHECK NUMBER: 439 �ME-UK UH|�: V2/V4/`i:2 PAID TO: Southold Town Clerk FOR: bid specs - FI Airport AMOUNT: ********$50.00 ACCOUNT: AMOUNT: 6100-00 50.00 ~--~ LAww~�w°��= » � /y,49 18 FRUEAN WAY SO. YARMOUTH, MA 02664 RECEIVED FEB 18 1992 Tom CWk NOW TOWN CLERK'S OFFICE 53095 MAIN ROAD SOUTHOLD, NEW YORK GENTLEMEN: FRUEAN UTILITIES INC. Utility Contractors (508) 398-6911 - (508) 775-5557 FAX (508) 394.9620 FEBRUARY 13, 1992 PLEASE FORWARD TO THIS OFFICE TWO SETS OF PLANS AND SPECIFICATIONS FOR THE FOLLOWING PROJECT. AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING AT: ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK ENCLOSED IS OUR CHECK FOR $50.00. RESPECTFULLY, FRUEAN UTILITIES,INC. EDWARD M. BENNETT VICE PRESIDENT �c4 z�p. �1�. No. � �s3 - a s'�3s ,3 ,souton Services, Inc. Town's Clerk Office 53095 Main Road Southold, NY 11971 Dear Sir or Madam: RECEIVED FEB 11 1992 SOUrhold T.+,..., rj..k February 7, 1992 Enclosed please find a check in the amount of fifty dollars to be held as a deposit for contract documents for airfield lighting, visual aids, and electrical building at Elizabeth Field, Fishers Island, New York. Would you please forward bid documents to our office at your earliest convenience, Thank you. Siii,C rely, Paul L4BButler P.O. Box 506 Fishers Island, NY 06390 516/788-7268 TOWN CLERK TOWN OF SOUTHOLD Suffolk County, New York Phone 516-765-1801 Southold, New York 11971 _. RECEIVED OF _ 42657 Date w�==i=fiG • / 19 zq �� Judith T. Terry, Town Clerk Cash El Check L'J � 0,313- By , THE Jr "IS D. MORISON COMPANIES, INC. 108 TENNEY STREET - P.O. BOX 809 GEORGETOWN, MA 01833 (508) 352-7084 • FAX (508) 352-6240 V, FEB arc elv rf 3YJ A& SEND WHITE COPY RETAIN YELLOW COPY 22. 23.-- Dicon Electric Co., 156 Crossroad, Waterford, CT 06385 (Gada Contr, will send $100.00 check) 203 4442[°-0 24. Walsh Service, P.O. Box 476,.F.i.,N.Y. 788-777- 25. Z S S Contracting Inc., P.O. Box 202, F. I . , N.Y. 788-7857 2 sets left, if you hear of anyone in CT needing a set refer them to Phil. He said he has given out what he anticipated already to the major F.I. contractors. He is sending over 3 checks totalling $200.00 TOWN CLERK TOWN OF SOUTHOLD Suffolk County, New York Phone 516-765-1801 Southold, New York 11971 RECEIVED OF </ c For Cash ❑ Check 7?- S �-- Date " '? (" 42714 —19 qs-2— Dollars $ u� Judith T. Terry, Town Clerk By C- -c A .1 TOWN CLERK 42715 TOWN OF SOUTHOLD Suffolk County, New York Phone 516-765-1801 Southold, New York 11971 Date {' '1 19 't - RECEIVED OF lel For Cash ❑ Check p U & Dollars $ Judith T. Terry, Town Clerk By `� TOWN CLERK 42712 TOWN OF SOUTHOLD Suffolk County, New York Phone 516-765-1801 Southold, New York 11971 Date19 RECEIVED OF— C�`�L }cam �/ Cc lti c.-_- l For '21) Judith T. Terry, Town Clerk Cash ❑ Check a 3 �� By C'__ - S 0 Calocerinos & Spina Engineers. P.C. RECEIVED FEB 18 1992 To: Mrs. Judith T. Terry SoAold Town Clerk Town Hall 53095 Main Road Southold, New York 11971 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, And Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 File: 211.004 Date: 13 -Feb -92 Enclosed please find the following: - Contract Documents numbered 1, and 3 thru 20 for the above -referenced project. - Contract Document Sign -Out Sheet - Copies of the letters sent to Dodge Reports and AMAC. Remarks: Contract Document set No. 1 is provided for your records. If you have any questions or need additional information, please do not hesitate to contact us. Enclosures cc: CALOCERINOS & SPINA ENGINEERS, P.C. James Leana Engineer 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 �(_I_s 0 Calocerinos & Spina Engineers, P.C. To: Dodge Reports Re: Elizabeth Field Airport P.O. Box 607 Airfield Lighting, Visual Aids, East Syracuse, New York 13057 And Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 File: 211.004 Date: 13 -Feb -92 Enclosed please find the following: - One copy of the Contract Documents for the above -referenced project. Remarks: Please discard the Documents when no longer required. If you have any questions or need additional information, please do not hesitate to contact us. Enclosures + CALOCERINOS & SPINA ENGINEERS, P.C. fames N Leana Engineer 1020 Seventh North Street, Liverpool, IVY 13088-6199 (315) 457-6711 FAX (315) 457-9803 .6 "a Calocerinos & Spina Engineers, P.C. To: Ms. Clara Axam Chairperson Airport Minority Advisory Council (AMAC) P.O. Box 310866 Atlanta, Georgia 30331 Enclosed please find the following: 0 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids, And Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.04 File: 211.004 Date: 13 -Feb -92 - One copy of the legal advertisement for the above -referenced project. Remarks: If you have any questions or need additional information, please do not hesitate to contact us. CALOCERINOS & SPINA ENGINEERS, P.C. Enclosures James Leana n g i n e e'r\ 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 STATE OF NEW YORK) SS: COUNTY OF SUFFOLK) JUDITH T. TERRY, Town Clerk of the Town of Southold, New York, being duly sworn, says that on the 12th day of February , 1992 she affixed a notice of which the annexed printed notice is a true copy, in a proper and substantial manner, in a most public place in the Town of Southold, Suffolk County, New York, to wit: Town Clerk's Bulletin Board, Southold Town Hall, Main Road, Southold, New York 11971. Legal Notice, Notice to Bidders: Construction of Airfield Lighting, Visual Aids and Electrical Building at Elizabeth Field Airport, Fishers Island. Bid opening: 1:00 P.M., Thursday, March 12, 1992, Southold Town Clerk's Office. Judith T. Terry Southold Town Clerk Sworn to before me this 12th day of February , 1992• e_ *2 �'[ufugr,r -r N6tary Public LINDA J. COOPER Notary Public, State of Neje York No. 4822563, Suffolk Countyq Term Expires December 31,19_.x' LEGAL NOTICE NOTICE TO CONTRACTORS FOR THE CONSTRUCTION OF AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICIAL BUILDING AT THE ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK Sealed bids for the construc- tion of Airfield Lighting, Visual Aids and Electrical Bulding Contract will be received at the Southold Town Clerk's Office, Southold Town Hall, 53095 Main Road, Southold, New York, un- til 1:00 P.M., local time, Thurs- day, March 12, 1992, and there, at said office, at said time, publicly opened and read aloud. The project generally includes the installation of an electrical building and airfield lighting and navigational aid systems in- cluding runway edge lights, glide slope indicators, runway end identification lights, lighted windcone and segmented circle, and installation of all related electrical control and distribu- tion equipment. The Contract Documents, consisting of the Advertisement, General Provisions, Bid Agree- ment, Special Provisions and Contract Drawings, may be ob- tained only from the Southold Town Clerk's Office, 53095 Main Road, Southold, New York 11971 (516/765-1801) upon deposit of fifty dollars ($50.00) per set (check only). Any bidder, submitting a sealed bid, upon returning the drawings in good condition within thirty (30) days of the bid date will be refunded in the full amount of his deposit. Non -bidders will not be refunded their deposits. Parties failing to conform to the above conditions within the prescribed allotted time shall forfeit their deposits as heretofore set forth and shall have no recourse against the Town of Southold for refunds of the Plans and Specifications deposit. C:OUN'I'Y 01= SUFFOLK S'I'A'1'I: 01: NEW PORK SS: Patricia Wood,' being duly sworn, says that she is the Editor, of THE LONG ISLAND TRAVELER•WA'f aiMAN, a public newspaper printed at Southold, in Suffolk County; and that the notice of which the annexed is a printed copy, h.ls I)ccn hubIi5l1Cd in Said Long Island 'I'rnvcicr•Wnlchnlnn once each week for ....................f ...... weeks SIICCCSSIVCly, COMMC11Cing Oil the . . . . . . l y, day of... , . February , .19 9.2 z` Sworn to herore me Ibis . .. . . . . . . . . . . . . . . . , ... day of February... , 11 2... . . . . . . . . . . . . .ef•.. . Notary Public Copies of the above describ- ed Contract Documents may be examined at no expense at the Southold Town Clerk's Office, 53095 Main Road, Southold, New York, at the Office of Calocerinos & Spina Engineers, P.C., 1020 Seventh North Street, Liverpool, New Wk„.., (315/ 455-7981), and at the Fishers Island Ferry District Office on Fishers Island, New York (516/788-7463). Each bid must be accom- panied by a certified check or bid bond in the amount of five percent (5%) of the total max- imum bid price (combination of base bid or alternate bid plus add-on items) for the contract in the form and subject to the con- ditions provided in the Prepara- tion of Proposal. The right is reserved to waive any informality in the bid and to reject any and all bids. DATED: February 12, 1992 JUDITH T. TERRY SOUTHOLD TOWN CLERK 1X-2/20/92(2) BARBARA A. SCHNEIDER NOTARY PUBLIC, SI^te of New York No. 4BOGS46 Qualified in Suffolk Coynty Commission Expires 0/3i�j,2 (;U',,!N I Y U1- SL+F0LK S'I'A'1'1: or- New YORK SS: Patricia Wood,' being duly sworn, says that she is the Editor-, of THE LONG ISLAND TRAVELER•WATCHMAN, it public newspaper printed at Southold, in Suffolk County; and that the notice of which the annexed is a printed copy, h.rs been ,published in said Long Island 'I'ravcler•Watchnlan once each week for .......................... weeks 5uccessively, COn1111CnCilIg Ort the ........... .. . day of ... , February ....., '19 9.2 . tci heforc nlC this . .. . . . . . . . . . .. . . . . . . . . . day of February 1 2 Notary Public BARBARA A. SCHNEIDER NOTARY PUBLIC, St^te of New York No. 480G846 Qualilicd in Suffolk Coynty Commission Expires FP.311z LEGAL NOTICE NOTICE TO CONTRACTORS FOR THE CONSTRUCTION OF AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING A'1' THE ELIZABETH FIELD AIRPORT FISIIE'RS ISLAND, NEW YORK Scaled bids for the construc- tion of Airfield Lighting, Visual Aids and Electrical Building Contract will be re- ceived at the Southold Town Clerk's Office, Southold Town Hall, 53095 Main Road, Southold, New York, until 1:00 P.M., local time, Thursday, March 12, 1992, and there, at said office, at said time, publicly opened and read aloud. The project generally includes the installation of an electrical building and airfield lighting and navigational aid systems including runway edge lights, glide slope indicators, runway end identifica- tion lights, lighted windcone and segmented circle, and installation of all related electrical control and distribution equipment. The Contract Documents, con- sisting of the Advertisement, Gen- cral Provisions, Bid, Asrccmcnt, Special Provisions and Contract Drawings, may be obtained only from the Southold Town Clerk's Of- ficc, 53095 Main Road, Southold, New York 11971 (5161165-1801) upon deposit of fifty dollars ($50.00) per set (check only). Any bidder, submitting a scaled bid, upon returning the drawings in good condition within thirty (30) days of the bid date will be refunded the full amount of his deposit. Non - bidders will not be refunded their deposits. Parties failing to conform to the above conditions within the pre- scribed allotted time shall forfeit their deposits as heretofore set forth and shall have no recourse against the Town of Southold for refunds of the Plans and Specifica- tions deposit. Copies of the above described Contract Documents may be exam- ined at no expense at the Southold Town Clerk's Office, 53095 Main Road, Southold, New York, at the Office of Calocerinos & Spina Engineers, P.C., 1020 Seventh North Street, Liverpool, New York (315/455-7981), and at the Fishers Island Ferry District Office on Fish- ers Island, New York (516/788- 7463). Each bid must be accompanied by a certified check or bid bond in th0 amount of five percent (5%) of the total maximum bid price (combination of base bid or alter- nate bid plus add-on items) for the contract in the form and subject to the conditions provided in the Preparation of Proposal. The right is reserved to waive any informality in the bid and to re- ject any and all bids. DATED: February 12, 1992. JUDITI I T. TERRY SOUTI IOLD TOWN CLERK 7295-1TF20 STATE OF NEW YORK) ) SS: COUNTY OF SUFFOLK) 642,4 ccy-�,V_- i of Mattituck, in said County, being duly sworn, says that he/she Is Principal Clerk of THE SUFFOLK TIMES, a Weekly Newspaper, published at Mattituck, in the Town of Southold, County of Suffolk and State of New York, and that the Notice of which the annexed Is a printed copy, has been regularly published in said Newspaper once each week for �_ weeks successively, commencing on the .2G day of 19 q2— MELANIE 2MELANIE V. BROWN/ Nolary Ido, Slaia of Now Yofk No. 4909712 ou filed In Slliloik Col Commission Expires ®d.19,19,_ Principal Clerk Sworn to before me this C� b day of re G 19 Y LEGAL NOTICE NOTICE TO CONTRACTORS FOR THE CONSTRUCTION OF AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING AT THE ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK Sealed bids for the construction of Airfield Lighting, Visual Aids and Electrical Building Contract will be received at the Southold Town Clerk's Office, Southold Town Hall, 53095 Main Road, Southold, New York, until 1:00 P.M., local time, Thursday, March 12, 1992, and there, at said office, at said time, publicly opened and read aloud. The project generally includes the installation of an electrical building and airfield lighting and navigational aid systems including runway edge lights, glide slope indicators, runway end identification lights, lighted windcone and segmented circle, and installation of all related electrical control and distribution equipment. The Contract Documents, consisting of the Advertisement, General Provisions, Bid, Agreement, Special Provisions and Contract Drawings, may be obtained only from the Southold Town Clerk's Office, 53095 Main Road, Southold, New York 11971 (516/765-1801) upon deposit of fifty dollars ($50.00) per set (check only) . Any bidder, submitting a sealed bid, upon returning the drawings in good condition within thirty (30) days of the j bid date will be refunded the full amount of his deposit. Non -bidders will not be refunded their deposits. Parties failing to conform to the above conditions within the prescribed allotted time shall forfeit their deposits as heretofore set forth and shall have no recourse against the Town of Southold for refunds of the Plans and Specifications deposit. Copies of the above described Contract Documents may be examined at no expense at the Southold Town Clerk's Office, 53095 Main Road, Southold, New York, at the Office of Calocerinos S Spina Engineers, P.C., 1020 Seventh North Street, Liverpool, New York (315/455-7981), and at the Fishers Island Ferry District Office on Fishers Island, New York (516/788-7463). Each bid must be accompanied by a certified check or bid bond in the amount of five percent (50) of the total maximum bid price (combination i of base bid or alternate bid plus add-on items) for the contract in the form and subject to the conditions provided in the Preparation of Proposal. The right is reserved to waive any informality in the bid and to reject any and all bids. DATED: February 12, 1992. JUDITH T. TERRY SOUTHOLD TOWN CLERK i r Page 2 - Bid Notice - Elizabeth Field Airport PLEASE PUBLISH ON FEBRUARY 20, 1992, AND FORWARD ONE (1) AFFIDAVIT OF PUBLICATION TO JUDITH TERRY, TOWN CLERK, TOWN HALL, MAIN ROAD, SOUTHOLD, NEW YORK 11971. Copies to the following: The Traveler -Watchman The Suffolk Times Town Board Members Town Attorneys Calocerinos & Spina Engineers, P.C. R. Knauff, Fishers Island Ferry District Town Clerk's Bulletin Board LEGAL NOTICE NOTICE TO CONTRACTORS FOR THE CONSTRUCTION OF AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING AT THE ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK Sealed bids for the construction of Airfield Lighting, Visual Aids and Electrical Building Contract will be received at the Southold Town Clerk's Office, Southold Town Hall, 53095 Main Road, Southold, New York, until 1:00 P.M., local time, Thursday, March 12, 1992, and there, at said office, at said time, publicly opened and read -aloud. The project generally includes the installation of an electrical building and airfield lighting and navigational aid systems including runway edge lights, glide slope indicators, runway end identification lights, lighted windcone and segmented circle, and installation of all related electrical control and distribution equipment. The Contract Documents, consisting of the Advertisement, General Provisions, Bid, Agreement, Special Provisions and Contract Drawings, may be obtained only from the Southold Town Clerk's Office, 53095 Main Road, Southold, New York 11971 (516/765-1801) upon deposit of fifty dollars ($50.00) per set (check only) . Any bidder, submitting a sealed bid, upon returning the drawings in good condition within thirty (30) days of the bid date will be refunded the full amount of his deposit. Non -bidders will not be refunded their deposits. Parties failing to conform to the above conditions within the prescribed allotted time shall forfeit their deposits as heretofore set forth and shall have no recourse against the Town of Southold for refunds of the Plans and Specifications deposit. Copies of the above described Contract Documents may be examined at no expense at the Southold Town Clerk's Office, 53095 Main Road, Southold, New York, at the Office of Calocerinos E Spina Engineers, P.C. , 1020 Seventh North Street, Liverpool, New York (315/455-7981), and at the Fishers Island Ferry District Office on Fishers Island, New York (516/788-7463). Each bid must be accompanied by a certified check or bid bond in the amount of five percent (50) of the total maximum bid price (combination of base bid or alternate bid plus add-on items) for the contract in the form and .subject to the conditions provided in the Preparation of Proposal. The right is reserved to waive any informality in the bid and to reject any and all bids. DATED: February 12, 1992. JUDITH T. TERRY SOUTHOLD TOWN CLERK Page 2 - Bid Notice - Elizabeth Field Airport PLEASE PUBLISH ON FEBRUARY 20, 1992, AND FORWARD ONE (i, AFFIDAVIT OF PUBLICATION TO JUDITH TERRY, TOWN, CLERK, TOWN HALL, MAIN ROAD, SOUTHOLD, NEW YORK 11971. Copies to the following: The Traveler -Watchman The Suffolk Times Town Board Members Town Attorneys Calocerinos & Spina Engineers, P.C. R. Knauff, Fishers Island Ferry District Town Clerk's Bulletin Board r LEGAL NOTICE NOTICE TO CONTRACTORS FOR THE CONSTRUCTION OF AIRFIELD LIGHTING, VISUAL AIDS AND ELECTRICAL BUILDING AT THE ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK Sealed bids for the construction of Airfield Lighting, Visual Aids and Electrical Building Contract will be received at the Southold Town Clerk's Office, Southold Town Hall, 53095 Main Road, Southold, New York, until 1:00 P.M., local time, Thursday, March 12, 1992, and there, at said office, at said time, publicly opened and read aloud. The project generally includes the installation of an electrical building and airfield lighting and navigational aid systems including runway edge lights, glide slope indicators, runway end identification lights, lighted windcone and segmented circle, and installation of all _related electrical control and distribution equipment. The Contract Documents, consisting of the Advertisement, General Provisions, Bid, Agreement, Special Provisions and Contract Drawings, may be obtained only from the Southold Town Clerk's Office, 53095 Main Road, Southold, New York 11971 (516/765-1801) upon deposit of fifty dollars ($50.00) per set (check only) . Any bidder, submitting a sealed bid, upon returning the drawings in good condition within thirty (30) days of the bid date will be refunded the full amount of his deposit. Non -bidders will not be refunded their deposits. Parties failing to conform to the above conditions within the prescribed allotted time shall forfeit their deposits as heretofore set forth and shall have no recourse against the Town of Southold for refunds of the Plans and Specifications deposit. Copies of the above described Contract Documents may be examined at no expense at the Southold Town Clerk's Office, 53095 Main Road, Southold, New York, at the Office of Calocerinos & Spina Engineers, P.C., 1020 Seventh North Street, Liverpool, New York (315/455-7981), and at the Fishers Island Ferry District Office on Fishers Island, New York (516/788-7463). Each bid must be accompanied by a certified check or bid bond in the amount of five percent (50) of the total maximum bid price (combination of base bid or alternate bid plus add-on items) for the contract in the form and subject to the conditions provided in the Preparation of Proposal. The right is reserved to waive any informality in the bid and to reject any and all bids. DATED: February 12, 1992. JUDITH T. TERRY SOUTHOLD TOWN CLERK Page 2 - Bid Notice - Elizabeth Field Airport PLEASE PUBLISH ON FEBRUARY 20, 1992, AND FORWARD ONE (1) AFFIDAVIT OF PUBLICATION TO JUDITH TERRY, TOWN. CLERK, TOWN HALL, MAIN ROAD, SOUTHOLD, NEW YORK 11971. Copies to the following: The Traveler -Watchman The Suffolk Times Town Board Members Town Attorneys Calocerinos & Spina Engineers, P.C. R. Knauff, Fishers Island Ferry District Town Clerk's Bulletin Board • C S caiocerinos &Spina PC February 5, 1992 Mrs. Judith Terry Town of Southold Clerk Town Clerk's Office 53095 Main Road Southold, New York 11971 Re: Elizabeth Field Airport Airfield Lighting, Visual Aids and Electrical Building AIP Project No. 3-36-0029-04-91 NYSDOT Project No. 0913.14 File: 211.004 Dear Mrs. Terry: RECENM FEB 61992 S00614 Tn,*n. / iAA Enclosed for your review and approval is one copy of the following 100% complete documents for this project: 1. Contract Drawings 2. Contract Specifications 3. Engineers Design Report If the enclosed documents are acceptable, please make the necessary arrangements for advertisement and bid of the project. I have also enclosed the advertisement to be placed in the Town's designated newspaper. Please coordinate the advertisement and receipt of bid dates with us. If you have any questions or if additional information is required, please do not hesitate to contact our office. Very truly yours, James W Engineer JWL:jmc Enclosures NA ENGINEERS, P.C. 1020 Seventh North Street, Liverpool, NY 13088-6199 (315) 457-6711 FAX (315) 457-9803 ADVERTISEMENT NOTICE TO CONTRACTORS RECEIVED FOR THE CONSTRUCTION OF FEB 61992 AIRFIELD LIGHTING, VISUAL AIDS SOUthole4 T......, ri0.4 AND ELECTRICAL BUILDING AT THE ELIZABETH FIELD AIRPORT FISHERS ISLAND, NEW YORK Sealed bids for the construction of Airfield Lighting, Visual Aids and Electrical Building Contract will be received at Town Clerk's Office, 53095 Main Road, Southold, New York until ZZ p.m., local time, ZZ 1992, and there, at said office, at said time, publicly opened and read aloud. The project generally includes the installation of an electrical building and airfield lighting and navigational aid systems including runway edge lights, glide slope indicators, runway end identification lights, lighted windcone and segmented circle, and installation of all related electrical control and distribution equipment. The Contract Documents, consisting of the Advertisement, General Provisions, Bid, Agreement, Special Provisions and Contract Drawings, may be obtained only from the Town Clerk's Office, 53095 Main Road, Southold, New York (516/765-1801), upon deposit of fifty dollars ($50.00) per set (check only). Any bidder, submitting a sealed bid, upon returning the drawings in good condition within thirty (30) days of the bid date will be refunded the full amount of his deposit. Non -bidders will not be refunded their deposits. Parties failing to conform to the above conditions within the prescribed allotted time shall forfeit their deposits as heretofore set forth and shall have no recourse against the Town of Southold for refunds of the Plans and Specifications deposit. Copies of the above described Contract Documents may be examined at no expense at the Town Clerk's Office, 53095 Main Road, Southold New York, at the Office of Calocerinos & Spina Engineers, P.C., 1020 Seventh North Street, Liverpool, New York (315/455-7981), and at the Fishers Island Ferry District Office on Fishers Island (516/788-7463). Each bid must be accompanied by a certified check or bid bond, in the amount of five percent (5%) of the total maximum bid price (combination of base bid or alternate bid plus add-on items) for the contract in the form and subject to the conditions provided in the Preparation of Proposal. The right is reserved to waive any informalities in the bid and to reject any and all bids. TOWN OF SOUTHOLD END OF SECTION 11/91 ADV -1 �oc��EFOIK��Gy JUDITH T. TERRY L TOWN CLERK p rZ REGISTRAR OF VITAL STATISTICS MARRIAGE OFFICER OFFICE OF THE TOWN CLERK TOWN OF SOUTHOLD Town Hall, 53095 Main Road P.O. Box 1179 Southold, New York 11971 Fax (516) 765-1823 Telephone (516) 765-1801 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION WAS ADOPTED BY THE SOUTHOLD TOWN BOARD AT A REGULAR MEETING HELD ON FEBRUARY 4, 1992: RESOLVED that the Town Board of the Town of Southold hereby authorizes and directs the Town Clerk to advertise for bids for Elizabeth Field Airport Airfield Lighting, Visual Aids and Electrical Building, all in accordance with the plans and specifications as prepared by Calocerinos & Spina, P.C. the Town's consulting engineers. Judith T. Terry Southold Town Clerk February S, 1992