Loading...
HomeMy WebLinkAboutFuel Dispensing Facility ProjectWFt RESOLUTION 2015-525 ADOPTED DOC ID: 10905 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2015-525 WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON JUNE 2, 2015: RESOLVED that the Town Board of the Town of Southold hereby approves Change Order 41 to the Town of Southold Highway Yard Fuel Dispensing Facility Project Contract with Aventura Construction Corp. in the net amount of $6,052.50, pursuant to their Change Order Form dated May 13, 2015, subject to the approval of the Town Engineer and Town Attorney. Elizabeth A. Neville Southold Town Clerk RESULT: ADOPTED [UNANIMOUS] MOVER: Louisa P. Evans, Justice SECONDER: Robert Ghosio, Councilman AYES: Ghosio, Dinizio Jr, Ruland, Doherty, Evans, Russell TOWN OF SOUTHOLD PROCUREMENT POLICY PUBLIC CONTRACT CHANGE ORDER APPROVAL FORM This form must be completed when a Public Contract Change Order increase is: a) $1,000 or more b) It is a minimum of 10% over the original contract award FAX FORM TO TOWN ATTORNEY'S OFFICE * 631/765-6639 DEPARTMENT: % C' r n DATE: slo? 6/15 TOWN BOARD RESOL. #/DATE:a0)y-11311• -14 VENDOR NAME: AVe✓l4yeq l 0✓I3 1✓Jt4:o-7 (DV j. P ORIGINAL CONTRACT AMOUNT:li �ys iS-10 INCREASE AMOUNT. /. o �a so I REASON FOR INCREASE: r64e4T11 '-Ak9V CD7711A1*,-1 W Sd;l ClCOV-14e-ed,,$ja,t ro-74411CCd{4 DEPARTMENT HEAD SIGNATURE: Notes: N' Approved ❑ Denied Reason for Denial Town Attorney Authorization Date Date Rebid: ❑ Yes ❑ No Town Attorney Autl iza 'o Signature Rec'd by Comptroller Comptroller Approval Sent to.Town Attorney Rec'd Back From TA 5/19/15 1-2--7 &1 Date Date dvootufd CONSTRUCTION CORP. TO Town Of Southold 53095 Main Rd Southold NY 11971 CHANGE ORDER Aventura Construction Corporation (NY) 1101 Waverly Avenue ORDER 1 Holtsville NY 11742 ORDER DATE 05/13/2015 Phone: 631-654-0660 ORDERED BY 382 Donald Fastuca Fax: 631-654-0990 CUSTOMER ORDER PROJECT 1160 The contractor agrees to perform and the owner agrees to pay for the following changes to this contract. Description of Work spare 4 inch conduit Town of Southold -Fuel Dispensi 275 Peconic Lane Peconic NY 11958 PLANS ATTACHED SPECIFICATIONS ATTACHED Install a spare 4" conduit just outside our new curb as per attached marked -up drawing Trench and remove soil Install new 4 inch conduit Backfill and trench with removed soil TOTAL $2,450. fixed costs for contaminated soil Dispose of approximately 25 tons of contaminated soil Stockpile soil on poly Sample and analyze stockpiled soil Load contaminated soil (if necessary) Negative changes will lower the overall contract price requiring no additional payment by owner. Requested Amount Of Change Theoriginal Contract Sum was..................................................................................................................................................................................... Net change by previous Change Orders .................................................... The Contract Sum prior to this Change Order ..........................:..... The Contract Sum will be changed by this Change Order The new Contract Sum including this Change Order will The Contract Time will be changed by ......................................................... Approved Date Contractor Owner Date Amount 2,450.00 1,340.00 6,052.50 948,850.00 0.00 948,850.00 6,052.50 954,902.50 0 Days Change Order Order: i Continued... Page: 2 of 2 Description of Work Amount TOTAL $1,340.00 variable costs for contaminated soil 2,262.50 Dispose of approximately 25 tons of contaminated soil Truck and dispose of contaminated soil (if necessary) -- $90.50 / ton TOTAL $2,262.50 Notes