Loading...
HomeMy WebLinkAbout39476-Z��Q��gUFFfld��� a Town of Southold P.O. Box 1179 53095 Main Rd Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 37527 Date: THIS CERTIFIES that the building SOLAR PANEL Location of Property: 2015 Gabriella Ct, Mattituck 4/23/2015 4/23/2015 SCTM #: 473889 See/Block/Lot: 108.4-7.53 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 12/29/2014 pursuant to which Building Permit No. 39476 dated J17/2015 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: roof mounted solar panels on an existing one family dwelling as applied for. The certificate is issued to DeMarco, Gerard & Theresa of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. PLUMBERS CERTIFICATION DATED 39476 3/31/2015 Authorized Signature SUFFotK TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN CLERK'S OFFICE W M! o • 4 SOUTHOLD NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit #: 39476 Date: 1/7/2015 Permission is hereby granted to: DeMarco, Gerard & DeMarco, Theresa 2015 Gabriella Ct Mattituck, NY 119 To: install a roof mounted electric solar panel system as applied for At premises located at: 2015 Gabriella Ct. Mattituck SCTM # 473889 Sec/Block/Lot # 108.-4-7.53 Pursuant to application dated 12/29/2014 and approved by the Building Inspector. To expire on Fees: 7/8/2016. SOLAR PANELS $50.00 ELECTRIC $100.00 CO - ALTERATION TO DWELLING $50.00 Total: $200.00 Building Inspector Form No. 6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: 1. Final survey of property with accurate location of all buildings, property lines, streets, and unusual natural or topographic features. 2. Final Approval from Health Dept. of water supply and sewerage -disposal (S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of I% lead. 5. Commercial building, industrial building, multiple residences and similar buildings and installations, a certificate of Code Compliance from architect or engineer responsible for the building. 6. Submit Planning Board Approval of completed site plan requirements. B. For existing buildings (prior to April 9, 1957) non -conforming uses, or buildings and "pre-existing" land uses: 1. Accurate survey of property showing all property lines, streets, building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied, the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy - New dwelling $50.00, Additions to dwelling $50.00, Alterations to dwelling $50.00, Swimming pool $50.00, Accessory building $50.00, Additions to accessory building $50.00, Businesses $50.00. 2. Certificate of Occupancy on Pre-existing Building - $100.00 3. Copy of Certificate of Occupancy - $.25 4. Updated Certificate of Occupancy - $50.00 5. Temporary Certificate of Occupancy - Residential $15.00, Commercial_ $15.00 Date. New Construction: l(JU( dad or Pre-existilk uilding:y (check one) PrtY Location of Property: � a �C House No.Street Hamlet Owner or Owners of Property:("Opqtvao Suffolk County Tax Map No 1000, Section \0% Block Lot (Jr Subdivision Filed Map. Lot: Permit No. Date of Permit. Applicant: Health Dept. Approval: Underwriters Approval: Planning Board Approval: Request for: Temporary Certificate Final Certificate: (check one) Fee Submitted: $ Applicant Signature Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, NY 11971-0959 BUILDING DEPARTMENT TOWN OF SOUTHOLD Telephone (631) 765-1802 Fax (631) 765-9502 roger. riche rt(a-)_town. so utho Id. ny. us CERTIFICATE OF ELECTRICIAL COMPLIANCE SITE LOCATION Issued To: Gerry De Marco Address: 2015 Gabriella Court City: Mattituck St: New York Zip: 11952 Building Permit #: 39476 Section: 108 Block: 4 Lot: 7.53 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: DBA: Eastern Energy Systems License No: 52689 -ME SITE DETAILS Office Use Only Residential X Indoor Basement Service Only Commerical Outdoor X 1st Floor Pool New Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures HID Fixtures Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps Transformer Appliances Dryer Recpt Emergency Fixtures Time Clocks Disconnect F1 Switches Twist Lock Exit Fixtures TVSS Other Equipment: 4.25 KW Roof Mounted Phovoltaic System to Include 17- HISM 250 Panels and 1- SMA SB 3800 TLVS Inverter, 1- A/C Disconnect. Notes: Inspector Signature: Date: March 31, 2015 Electrical 81 Compliance Form.xls April 10, 2015 Town of Southold Building Department 54375 Route 25 PO Box 1179 Southold, NY 11971 Subject: Solar Panels at Demarco Residence, 2015 Gabriella Court, Mattituck, NY To Whom It May Concern: I certify that the installation of the subject solar panels is in compliance with the current Building Code of New York State, the current Residential Code of New York State, the manufacturer's specifications, and all other relevant codes and standards. If you have any questions regarding this matter, please feel free to contact my office at 609-489-5511. Sincerely, I APR 2 2 2015 MPP Engineers, LLC 1 34 South Main Street, Suite D I Allentown, NJ 08501 609-489-5511 (Phone) I www.mppengineers.com 1 609-489-5916 (Fax) AP FIELD INSPEC7CX4N REQ'( FOUND,ATIOX (1ST) FOUNDATION (2ND) ROUGH FRANMr-?- & PLUMBING r INSULATION PEA N. Y. STATE ENERGY CODE FINAL �IM TOWN OF SOUTHOLD "VI,i)ING DEPARTMENT TOWN HALL SOUTHOLD, NY 11971 TEL: (631) 765-1802, FAX: (631) 765-9502 SoutholdTown.NorthFork.net Examined , 20 5 Approved 20 Disapproved a/c Expiration , 20__0 BUILDING PERMIT APPLICATION CHECKLIST PERMIT NO. E ll E 2 9 2014 Bl DG. DEPT. i`, OF SOUTF' Building Inspector Do you have or need the following, before applying? Board of Health 4 sets of Building Plans Planning Board approval Survey Check Septic Form N.Y.S.D.E.C. Trustees Flood Permit Storm -Water Assessment Form Contacf: 1_,W io P &kl u 1b�Es�1-ta: Phone: (D3 t ' -oN - (34d)Ll FOR BUILDING PERMIT INSTRUCTIONS Date 17— 1 3 , 2014 a. This application MUgI`li6�co�pteTery filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application, the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e. No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim, the Building Inspector may authorize, in writing, the extension of the permit for an addition six months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County, New York, and other applicable Laws, Ordinances or Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances, building code, housing code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. TnsAcyn &W4RU,;,1NaC=-2 (Signature of apblicaut or name, if a corporation) astem Ene 2 Et9Y Systems Inc. 7470 Sound Ava �— a9rog a dress of applicant) APP", VEn P,,0 NOT EL Statewhetherwhether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder / a-- n a L J_ _ DATE LA!L B.P #�9 2�. v i - - FEE: "Yy Name of owner of premises NOTIFY BUILDiNG ^DEAFPTC�iENT AT (As on the tax roll or 1 0 G INSPECTIONS: If ap licant is a corporation, signature of duly authorize icer 1. FOUNDATION - TWO REQUIRED //� ..�---�'•� �/ry,,�1.e- a�ap�'i,:s-.ap FOR P7���?'�D CONCRETE r�bb'Vv41dP4 l.N , , (Name and title of corporate officer-,il v __ 2. ROUGH - FF\Ai'N . PLUMBiNG, � STRAPPING ELECTRICAL &CAULKING Builders License No. i 3 INSULATION Plumbers License No. / u 9 .::1 t t_a 6 a" , M 4 ,� FINAL -CONSTRUCTION &ELECTRICAL Electricians License No. y ° a , a MUST BE COMPLETE FOR C.O. (rel — INIa's (^)t , rr ``' +. (: E ALL MEET THE _ � ALL CONSTRUCTION SH Other Trade's License No. \t-- rc -/yic &L Z"Af err d: ll REQUIREMENTS Or THE CODES OF NEW Gv�i2F� YORK STATE. NOT RESPONSIBLE FOR 1. Location of land on which proposed work will be done: / DESIGN OR CONSTRUCTION ERRORS. 9U15-- C1Q �Y 1' e.(:f e� C/TJn v f" /M ;A nfl7,f (1� House Number Street County Tax Map No. 1000 Subdivision Section __L Block -Lot / S 3 Filed Map No. Lot 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy [^. Intended use and occupancy 3. Nature of work (check which applicable): New Building Addition Alteration Repair Removal Demolition Other Work \0.-c IN ( te-'Aky\� i i (Description) 4. Estimated Cost t a) -J U , U Fee (To be paid on filing this application) Number of dwelling units on each floor 5. If dwelling, number of dwelling units If garage, number of cars 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. 7. Dimensions of existing structures, if any: Front Height Number of Stories Rear Dimensions of same structure with alterations or additions: Front Depth Height Number of Stories Depth 8. Dimensions of entire new construction: Front Rear Depth Height Number of Stories 9. Size of lot: Front Rear Depth 10. Date of Purchase Name of Former Owner 11. Zone or use district in which premises are situated Rear 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NOV 13. Will lot be re -graded? YES NO V Will excess fill be removed from premises? YES NO 14. Names of Owner of premises C-4 MfcM@1fCO Address20l5-_CjA `eJ14 6V�Phone No. 111— 01 C1 " a4 61 Name of Architect ' Address3d�414,d% gw'N Phone No%rfi A -&,q 5S4 Name of Contractor Address-14-1D0�tArA Pore- Phone No. 631—M i -4o4 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO * IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES NO__Ll"- * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES NO i/ * IF YES, PROVIDE A COPY. STATE OF NEW YORK) COUNTY OF SS: #DtV (Name of individual (S)He is the being duly_ sworn, deposes and says that (s)he is the applicant contract) above named, (Contractor, Agent, Corporate Officer, etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be performed in the manner set forth in the application filed therewith. Sworn to before me this �4161 day of 20 / P�T'1�'1$rIA �t'ivTAY NOTARY -PUBLIC -STATE OF NEW.YORK No. O1 MA4676634 Qualified In Suffolk County My Commission Expires MiaLch 30, 2018 Signature of Applicant i Scott A. Russell `' 5u �`fFFQ` 5�C'(a�][�I��ICWA,`]F]E]E� r SUPERVISOR I��IEA\1A(G�]E��II]E1��C' SOUTHOLD TOWN HALL- P. O. Box 1179 p ' 53095 Main Road - SOUTHOLD, NEIN Town of Southold YORK 11971 ��� �(�'- t>X1 CHAPTER 236 - STO>AIWATEI21ANAGEMENT WORK SHEET ( TO BE COMPLETED BY THE APPLICANT) DOES THIS 5 yes[w V i} F,rA. Clearing, grubbing, grading or stripping of land which affects more ,�� than 5,000 square feet of ground surface. E2" 13. Excavation or filling involving more than 200 cubic yards of material within any parcel or any contiguous area. FR®JECr Ii+IVaLVE ANY OF THE FOLLOWING (CHECK ALL THAT APPLY) N U 100 feet of horizontal distance. l_ Q EYD. Site preparation within 100 feet of wetlands, beach, bluff or coastal erosion hazard area. E. Site preparation within the one -hundred --year f loodplain as depicted on FIRM Map of any watercourse. Q E. Installation of new or resurfaced impervious surfaces of 1,000 square feet or more, unless prior approval of a Stormwater Management Control Plan was received by the Town and the proposal includes in-kind r..eplacement of impervious. surfaces. If you answered NO to all of the questions above STOP! Complete the Applicant section below with your Name, Signature, Contact Information, Date _& County Tax Map Number! Chapter 236 does not apply to your project. - c- If you answered YES to one or more of the above, please submit Two copies of a Stormwater Management Control Plan and a completed Check List Form to the Building I1epar'bnent with your Building Permit Application. APPLICANT: (Property Owner, Design Professional, Agent, Contractor, Other) NAME: ,,t J Contact Information: ��. - 1 +_0...—_... _.,__._.__....... Property Address / Location of Construction Work: 01.t ......_�� al✓r�'t..C. 7_4_-........ ----- _.... _._... __.......... . .................... t F'ORttil ' SNI C? -11-0-S TV1AY 20111 S.C.T.M. ": 1000 trate` District Section Block Lot .s,< I t:)F� 'LliL1)i1':a DFP A}?"I't iEN 1 USE Ci_tiL.l' :, RCviewed _Ry:gq'a tS1. �' ........_._. lute: IXA Approved for proses irig Bitiiding Per;nit. Storni wv,.Ief- vlanageiiient Control Plar; Nut Required, _ .�.. stofn'iwater ti'lana=aemcnt Cortro! Piart is Required, t> C�:''Wa("d 10 l•..it`tf':e['r:'rl� Df: (}a rriit;'Iif .tin 7�eVic'r.'.} Town Hall Annex 54375 Main road P.O. Box 1179 Southold, NY 11971-0959 Telephone (631)765-1802 roaer.richert #o`rNn soutf90 6.ny.us BUa DI NG DEPARTMENT TOWN OF SOUTHOLD APPLICATION FOR ELECTRICAL INSPECTION REQUESTED BY: OaA*a,l�lfil��l� Date: 111gAj`F Company Name: 1�a,:-;P (ll TIC/ Name: a License No.: l gq A6 Address: W10 CD90(7d Ave, P'6_ Phone No.: x(11 -ftq K 16& JOBSITE INFORMATION: (*Indicates required information) *Name: *Address: *Cross Street: *Phone No.: Permit No.: Tax -Map District: 1000 Section: Block: Lot: �53 (Please Circle All That Apply) Is job ready for inspection: YES NO Rough In Final *Do- you need a Temp Certificate:YE t NO Temp Information If d] *Service Size: 1 Phase 3Phase 100 150 200 300 350 400 Other *New Service: connect Underground Number of Meters Change of Service Overhead Additional Information: PAYMENT DUE WITH APPLICATION I 1 - l l� 7 I 82=Request for Inspection Form d co CONSENT TO INSPECTION CU(q Dema(co , the undersigned, do(es) hereby state: Owner(s) Name(s) That the undersigned (is (are) the owners) of the premises in the Town of Southold, located at (104 which is shown and designated on the Suffolk County Tax Map as District 1000, Section 10'�3 , Block 4 , Lot Ir That the undersigned (has) (have) filed, or cause to be filed, an application in the Southold Town Building Inspector's Office for the following: p6irock M004keay .�5 S)1 P\(� ski 1 )--,C) \&- 5 \rn� ��ls lmc � �t�s- ma5o c'�c��k> c� I sM A 5B,3909 That the undersigned do(es) hereby give consent to the Building Inspectors of the Town of Southold to enter upon the above described property, including any and all buildings located thereon, to conduct such inspections as they may deem necessary with respect to the aforesaid application, including inspections to determine that said premises comply with all of the laws, ordinances, rules and regulations of the Town of Southold. The undersigned, in consenting to such inspections, do(es) so with the knowledge and understanding that any information obtained in the conduct of such inspections may be used in subsequent prosecutions for violations of the laws, ordinances, rules or regulations of the Town of Southold. Dated: I961 P Tviw*.r (Signature) (Print Name) LA --7 TOWN OF SOUTHOLD PROPERTY -RECORD CARD OWNER STREET e,?o , VdLLAGE DIST. SUB. LOT -7 --ou'ri-d Aqih-�qck - !IS -A-- ACR. REMARKS F E L CK so n TYPE OF BLD. L pzol-hlioeef; -f-6 L �le v 0 -or'' gq;w, 006 PROP. CLASS * -iayltof, 'PO* 1 _Z11 LAND IMP. TOTAL DATE I N 'a Igo a/p, 517 7 - /jj q� - L I IgSt,,) E L C 7 --c) 1,;z te 165 P 34 G s7 85-0-1 2 or --),z 31z 196 1.0 eAf.s iiv-) rA- Elle C -b -6rlo\-7 -7 [dob I ( i- r - t ll 30 re-qla-Ce-S 1; PA 2-,59,3,r--1 aw) ),b 5-00 FRONTAGE ON WATER TILLABLE FRONTAGE ON ROAD WOODLAND DEPTH MEADOWLAND BULKHEAD HOUSE/LOT TOTAL 0 0 m Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, NY 11971-0959 April 1, 2015 Eastern Energy Systems 7470 Sound Ave Mattituck NY 11952 BUILDING DEPARTMENT TOWN OF SOUTHOLD Re: DeMarco, 2015 Gabriella Ct, Mattituck TO WHOM IT MAY CONCERN: Telephone (631) 765-1802 Fax (631) 765-9502 The Following Items (if Checked) Are Needed To Complete Your Certificate of Occupancy: "NOTE: Engineer's Certification required stating the panels were installed to the roof per NYS Building Code Application for Certificate of Occupancy. (Enclosed) Electrical Underwriters Certificate. A fee of $50.00. Final Health Department Approval. Plumbers Solder Certificate. (All permits involving plumbing after 4/1/84) Trustees Certificate of Compliance. (Town Trustees # 765-1892) Final Planning Board Approval. (Planning # 765-1938) Final Fire Inspection from Fire Marshall. Final Landmark Preservation approval. Final inspection by Building Dept. Final Storm Water Runoff Approval from Town Engineer BUILDING PERMIT — 39476 — Solar Panels December 3, 2014 Revised December 15, 2014 Ms. Darlene Kong Sungevity 66 Franklin Street Oakland, CA 94607 RE: Gerard Demarco Residence Solar Installation - #1355836 2015 Gabriella Court Mattituck, NY 11952 Structural Assessment of Roof Framing MPP Project No: 14-1565 Dear Ms. Kong: Pursuant to your request, MPP Engineers has performed a limited structural evaluation of the roof framing at the above referenced site to determine if the roof has adequate capacity to support the proposed solar panels. Our analysis was based on the framing information and configurations provided by Sungevity. It is our understanding that the structural components of the existing roof framing are in a good condition. It is further understood that all existing connections between the various roof framing members are adequate to resist the current loading conditions and behave in the manner that a typical rafter -ceiling tie system is intended to behave prior to installation of the solar panels. Structural Data and Code Information Our analysis was performed in accordance with the requirements of the 2010 New York State Residential Code. Wood members are analyzed and designed in accordance with the NDS 2005. The roof of this residence is framed in a gable configuration with conventional roof rafters. The existing roof structure is in a good condition and currently has one layer of asphalt shingles. The pertinent data is listed below: Roof 1-17 panels total Roof Rafters: 2x8 Nominal (#2 D. Fir or Hem -Fir Assumed) Rafter Span: 12'-6" (horizontal projected span) Spacing: 16" o.c. Roof Slope: 20 Degrees Roof Sheathing: OSB Condition of Framing: Good Roof Covering: Asphalt Shingles MPP Engineers, LLC 134 South Main Street, Suite D I Allentown, NJ 08501 609-489-5511(Phone) I 609-489-5916(Fax) its®4 ■N- .eeE '.��^ seem nee ■eekd ■ea eYey ■■em, STRUCTURAL EN< M December 3, 2014 Revised December 15, 2014 Ms. Darlene Kong Sungevity 66 Franklin Street Oakland, CA 94607 RE: Gerard Demarco Residence Solar Installation - #1355836 2015 Gabriella Court Mattituck, NY 11952 Structural Assessment of Roof Framing MPP Project No: 14-1565 Dear Ms. Kong: Pursuant to your request, MPP Engineers has performed a limited structural evaluation of the roof framing at the above referenced site to determine if the roof has adequate capacity to support the proposed solar panels. Our analysis was based on the framing information and configurations provided by Sungevity. It is our understanding that the structural components of the existing roof framing are in a good condition. It is further understood that all existing connections between the various roof framing members are adequate to resist the current loading conditions and behave in the manner that a typical rafter -ceiling tie system is intended to behave prior to installation of the solar panels. Structural Data and Code Information Our analysis was performed in accordance with the requirements of the 2010 New York State Residential Code. Wood members are analyzed and designed in accordance with the NDS 2005. The roof of this residence is framed in a gable configuration with conventional roof rafters. The existing roof structure is in a good condition and currently has one layer of asphalt shingles. The pertinent data is listed below: Roof 1-17 panels total Roof Rafters: 2x8 Nominal (#2 D. Fir or Hem -Fir Assumed) Rafter Span: 12'-6" (horizontal projected span) Spacing: 16" o.c. Roof Slope: 20 Degrees Roof Sheathing: OSB Condition of Framing: Good Roof Covering: Asphalt Shingles MPP Engineers, LLC 134 South Main Street, Suite D I Allentown, NJ 08501 609-489-5511(Phone) I 609-489-5916(Fax) Gerard Demarco Residence Solar Installation Page 2 Ground Snow Load, Pg: 20 PSF (Southern portion of Warren County) Importance Factor, I: 1.0 Exposure Factor, Ce: 1.0 (Conservatively taken as Partially Exposed) Thermal Factor, Ct: 1.1 with Panels (Cold Roof) 1.0 existing condition (Warm Roof) Design Snow Loads On sloped roof: 14.0 PSF (Existing — Unobstructed Warm Roof) 12.8 PSF (New Condition — Slippery Surface on Cold Roof) Basic Wind Speed: 120 MPH Importance Factor: 1.0 Exposure: B Analysis Results: General Considerations ➢ The proposed solar panels consist of solar panels which imposes a total weight of approximately 3 to 3.5 pounds per square foot (PSF) on the roof surface. From a practical standpoint, the International Residential Code allows up to 2 roof coverings on a residential dwelling. Each layer of roofing imposes a net load of about 2.5 to 3.0 PSF on the roof. From this perspective, since the existing roof has only a single layer of shingles, a second layer is allowed to be added by the code without analysis. This 21 layer of shingles essentially weighs the same as the proposed solar panels that will be added instead. Gravity Loading: Given the size, spacing, and configuration of the existing roof framing, we have determined that the framing is adequate to support the proposed solar panels, rails, and mounting hardware. It is our understanding that the panels will be installed using IronRidge rail with L -brackets (or equal) at approximately 48 inches on center. The mounting brackets will be fastened directly into the existing members with 5/16" diameter lag screws with a minimum embedment of 2-1/2". In addition, it is important that the rail mounting support locations be staggered between adjacent panels so that no single member supports more load than under the existing conditions. Wind Loading: Based on our calculations, the net wind loads imposed on the roof framing with an attachment spacing as indicated above will be less than the current loading on the roof framing. In addition, provided that the mounting brackets are attached to the roof framing members in a typical staggered fashion, the overall wind loading imposed on the structure and the individual framing members will not be impacted to any great extent. Conclusions: Given the size, spacing and configuration of the existing roof framing, we have determined that the roof framing is adequate to support the proposed solar arrays without the need for any strengthening. Page 2 'I Gerard Demarco Residence Solar Installation Page 3 If you have any questions regarding this matter, please feel free to contact my office at 609-489-5511. We appreciate the opportunity to assist you with this evaluation. Page 3 I\t U-1 MPP Engineers LLC Project # 14-1565 .e 34 S. Main Street Project: Demarco Allentown, NY 08501 Date: 12/3/2014 t4 609-489-5511 Engineer: SWM rVT P l=' Subject: Roof 1 INPUT: OUTPUT: PROJECT LOCATION: Street Address: City: State: Zip Code: Building Category: 2015 Gabriella Court Mattituck NY 11952 11- All Buildings Unless Otherwise Classified SNOW LOAD PARAMETERS Ground Snow Load: 20 Terrain Category: B Exposure Category: Partially Exposed WIND LOAD PARAMETERS Basic Wind Speed: Importance Factor: Exposure Category: B ROOF PARAMETERS Roof Pitch (degrees): Horiz. Rafter Span: Roof Construction: Roof Rafter Size: Rafter Spacing (inches): Input Fb (unadjusted) Dead Load (Existing) Panel Weight Ex. Flat Snow Load: Sloped Roof Factor, Cs = Sloped Snow Load: % Reduction: Importance Factor: Exposure Factor: Maximum Bending Moment: 120 Bending Stresses: 1 Size Factor: Allowable Bending Stresses: Stresses Check: 20 0.349 12.50 Rafter Framing 2 x 8 16 1.15 Repetitive Use 850 #2 D. Fir Assumed 10 3 14 Warm roof - no slope reduction With Panels Added 1 0.83 14.00 12.83 8% Delta 1.17 1.0 Adjusted Flat Snow Load 11.33 1.0 Sloped Length 13.30 Maximum Uniform Loading 32.44 8611 In -Lbs. 655.33 Sx= 13.14 1.2 CF 1.2 1349.0 Ix= 47.64 e� 0.49 Okay C PHOTOVOLTAIC SYSTEM SYSTEM SIZE: AC / DC kW STC EQUIPMENT: PV MODULES: INVERTER(S): 3.661 kW \ 4.25kW J; v� o' (17) Hyundai HIS-M250MG(BK) (1) SMA SUNNY BOY 380OTL-US-22 ��'``•�\ �` SCOPE OF WORK: � / "1" -.#* \ \ INSTALLATION OF A SAFE AND CODE -COMPLIANT GRID -TIED SOLAR PV SYSTEM ON AN EXISTING RESIDENTIAL ROOF TOP. 4 , , , \ , tl , , SITE PLAN N SCALE: N.T.S. SUf1GEVITYe GE1'dERATE POSOTIVE` 11 SUNGEV17Y INC. 66 FRANKLIN ST SUITE 310 OAKLAND, CA M07 By: Troque Date:72172114 Location: C:lUsersVtoquelDowNoads%SaNstomelD CastomerslDenatco - \ E \ ICE , DRAWINGS, SPECIFICATIONS, AND DESIGNS ARE THE PROPERTY OF SUNGEVITY INC. NO PART SHALL BE COPIED OR USED FOR OR WITH ANY 67 SHEETINDEX PV0.0 COVER AND SITE PLAN PV0.1 SITE PLAN DETAIL PV1.0 GENERAL NOTES PV2.0 ARRAY LAYOUT PV3.0 LINE DIAGRAM PV4.0 LABELS 2010 NYS BUILDING CODE 2010 NYS RESIDENTIAL CODE 2010 NYS PLUMBING CODE 2010 NYS MECHANICAL CODE 2008 NATIONAL ELECTRICAL CODE EASTERN ENERGY SYSTEMS - MATTITUCK I E 7470 SOUND AVE MATTITUCK, NY 11952 INFORMATION: SOUTHOLD, TOWN OF 54375 ROUTE 25, P.O. BOX 1179 SOUTHOLD, NY 11971 TO INSTALLER: DC RUN: CONDUIT RUN FROM ARRAY, ATTIC MOUNTED, OUT AND ON EXTERIOR WALL TO BOS. AC RUN: CONDUIT RUN FROM BOS ON AND THROUGH EXTERIOR WALL TO (E) MSP IN BASEMENT. CONDUIT SHALL BE ETCHED AND PAINTED TO MATCH EXISTING ROOF COLOR. POC: BREAKER IN (E) MSP. NO I CERTIFY THAT NO CHANGES HAVE I BEEN MADE TO THE ARRAY LAYOUT: CUSTOMER INFORMATION: GERARD DEMARCO 2015 GABRIELLA COURT MATTITUCK, NY 11952 (347) 907-2057 / #1355836 DESIGNED BY: IREV #: DATE: TM 1 1 12/12/14 PV- 0-0 OTHER THAN THE. SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN DEVELOPED WITHOUT OUR WRITTEN CONSENT KEY: ---- PROPERTY LINE SUBPANEL — — — CONDUIT RUN oc DC DISCONNECT - --- DRIVEWAY SAC DISCONNECT •—�-- FENCE SOLAR MODULE ®° ®JUNCTION BOX -N MAIN SERVICE PANEL MONITORING UNIT ❑"' UTILITY METER °B COMBINER BOX ® PV METER ROOF OBSTRUCTION Irav INVERTER 2010 NYS BUILDING CODE 2010 NYS RESIDENTIAL CODE 2010 NYS PLUMBING CODE 2010 NYS MECHANICAL CODE 2008 NATIONAL ELECTRICAL CODE EASTERN ENERGY SYSTEMS - MATTITUCK I E 7470 SOUND AVE MATTITUCK, NY 11952 INFORMATION: SOUTHOLD, TOWN OF 54375 ROUTE 25, P.O. BOX 1179 SOUTHOLD, NY 11971 TO INSTALLER: DC RUN: CONDUIT RUN FROM ARRAY, ATTIC MOUNTED, OUT AND ON EXTERIOR WALL TO BOS. AC RUN: CONDUIT RUN FROM BOS ON AND THROUGH EXTERIOR WALL TO (E) MSP IN BASEMENT. CONDUIT SHALL BE ETCHED AND PAINTED TO MATCH EXISTING ROOF COLOR. POC: BREAKER IN (E) MSP. NO I CERTIFY THAT NO CHANGES HAVE I BEEN MADE TO THE ARRAY LAYOUT: CUSTOMER INFORMATION: GERARD DEMARCO 2015 GABRIELLA COURT MATTITUCK, NY 11952 (347) 907-2057 / #1355836 DESIGNED BY: IREV #: DATE: TM 1 1 12/12/14 PV- 0-0 OTHER THAN THE. SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN DEVELOPED WITHOUT OUR WRITTEN CONSENT am 7■ J sunGEVITYe GENF-RATE POSITIVE' SUNGEVITY INC. 66 FRANKLIN ST SUITE 31D OAKLAND, CA 94607 By: Toque Dale:12112114 Loca6an: C:\Users@roque\Dowrdoads\Salesturoe\D CustemerslDemamo- EXTERIOR WALL SITE PLAN DETAIL N SCALE: ; N.T.S. OCATION OF (E) MSP J BASEMENT M IF., IE MC I TM 1 1 112/12/141 ' ' -. * I THESE DRAWINGS, SPECIFICATIONS, AND DESIGNS ARE THE PROPERTY OF SUNGEVITY INC. NO PART SHALL BE COPIED OR USED FOR OR WITH ANY OTHER WORK OTHER THAN THE SPECIFIC PROJECT FOR WHICH THEY I4AVP RFFN nrvFi ncFn LuTwnurnUR WRITTEN mmsENT C GENERAL NOTES: GENERAL NOTES: N1. DRAWINGS ARE DIAGRAMMATIC ONLY. THE LOCATION AND ROUTING OF RACEWAYS SHALL BE DETERMINED BY THE CONTRACTOR UNLESS OTHERWISE NOTED OR STANDARDIZED. N2. ALL EQUATIONS ACCOUNT FOR WORST CASE CONDITIONS. N3. IF A DISCREPANCY IN QUANTITY OR SIZE OF CONDUIT, WIRE, EQUIPMENT DEVICES, OVERCURRENT PROTECTION, GROUNDING SYSTEMS, ETC. (ALL EQUIPMENT AND MATERIALS) THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIALS AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS IN THE SPECIFICATIONS OR NOTED ON THE PLANS TO ENSURE COMPLETE COMPLIANCE WITH ALL CODES AND TO ENSURE THE LONGEVITY AND SAFETY OF THE OPERABLE SYSTEM. N4. ALL OUTDOOR EQUIPMENT SHALL BE MIN. NEMA 311 RATED. N5. METAL CONDUIT AND ENCLOSURES SHALL BE USED WHERE PV SOURCE OR OUTPUT CIRCUITS ARE RUN INSIDE A BUILDING. N6. MODULES SHALL NOT BE PLACED OVER ANY PLUMBING VENTS AND AT LEAST 6" ABOVE FLUSH VENTS. N7. THE ELECTRICAL CONTRACTOR SHALL COMPLY WITH ANY AND ALL REQUIREMENTS GIVEN BY UTILITY COMPANIES. N8. FOR ADDITIONAL EQUIPMENT SPECIFICATIONS, SEE PROVIDED CUT SHEETS. N9. ALL LABELS AND MARKINGS SHALL BE ATTACHED ACCORDING TO REQUIREMENTS BY NEC AND THE LOCAL AHJ. THE AH1 MAY HAVE SPECIAL LABEL REQUIREMENTS BEYOND THE SCOPE OF THIS DOCUMENT. THIS MAY ENCOMPASS LANGUAGE INCLUDING, BUT NOT LIMITED TO, THAT FOUND IN NEC ARTICLES 690.5 (C), 690.14 (C)(2), 690.17, 690.53,690.35(F), 690.54, 690.64(6)(7) and 705.10 N10. INSTALLER TO FOLLOW ALL LOCAL JURISDICTION GUIDELINES. N11. ALL NEC REFERENCES SHALL BE DIRECTLY INTERCHANGEABLE WITH CEC REFERENCES. STRUCTURAL NOTES: S1. MOUNTS ARE DIAGRAMMATIC AND EXACT LOCATION MAY CHANGE, BUT SHALL BE ACCURATELY SPACED. S2. MOUNTS SHALL BE STAGGERED WHEN NECESSARY TO EVENLY DISTRIBUTE LOAD AMONGST RAFTERS. S3. DO NOT SPLICE RAILS IN: MIDDLE 50% OF SPAN BETWEEN TWO MOUNTS. sunGEVITY GENERATE POSITIVE" SUNGEVITY INC. 66 FRANKLIN ST SUITE 310 OAKLAND, CA 94807 J ELECTRICAL NOTES: E1. ALL EQUIPMENT IS LISTED FOR USE. E2. MAXIMUM VOLTAGE DOES NOT EXCEED 600VDC. E3. ANY EQUIPMENT OR ELECTRICAL MATERIALS USED FOR THIS INSTALLATION SHALL BE NEW AND LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY. E4. AN INVERTER IN AN INTERACTIVE SOLAR PV SYSTEM SHALL AUTOMATICALLY DE -ENERGIZE ITS OUTPUT TO THE CONNECTED; -ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED. E5. ALL PV ARRAYS SHALL BE EQUIPPED WITH DC GROUND FAULT PROTECTION. E6. ANY AC COMPONENT SHALL MEET OR EXCEED THE AVAILABLE FAULT CURRENT CALCULATED AT THAT COMPONENT. E7. ALL MODULES AND ANY RELATED ROOF MOUNTED METALLIC EQUIPMENT SHALL BE PROPERLY GROUNDED. E8. DC EQUIPMENT SHALL BE 60OVDC RATED MINIMUM. E9. MARKINGS SHALL BE PROVIDED TO INDICATE THAT ALL CONTACTS OF THE DISCONNECT EQUIPMENT MIGHT BE ENERGIZED. E10. CONDUIT RUNS SHALL BE PROVIDED WITH SUFFICIENT WEATHERPROOF PULL BOXES OR JUNCTION BOXES/COMBINER BOXES PER APPROPRIATE JURISDICTIONAL REQUIREMENTS. E11. FOR ANY UNGROUNDED PV SYSTEM, A LABEL READING:. "WARNING,- ELECTRICAL SHOCK HAZARD. THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED." SHALL BE PLACED AT EACH JUNCTION BOX, COMBINER BOX, DISCONNECT AND DEVICE WHERE ENERGIZED, UNGROUNDED CIRCUITS MAY BE EXPOSED DURING SERVICE. E12. INVERTER(S) SHALL CONTAIN A GROUND FAULT DETECTION AND INTERRUPTION DEVICE. E13. ALL METALLIC RACEWAYS AND EQUIPMENT SHALL BE BONDED AND ELECTRICALLY CONTINUOUS. E14. THE POINT OF CONNECTION COMPLIES WITH APPLICABLE CEC/NEC. E15. BACKFED SOLAR BREAKER(S) SHALL BE INSTALLED AT THE OPPOSITE END OF THE CIRCUIT OR FURTHEST AWAY FROM THE MAIN BREAKER. E16. ALL WIRE, VOLTAGES, AMPERAGES AND EQUIPMENT IS SIZED ACCORDING TO TEMPERATURE DERATING AND LOCATION. E17. ONLY COPPER (CU) CONDUCTORS SHALL BE USED. CONDUCTORS SHALL BE STRANDED OR SOLID WITH PROPERLY RATED CONNECTORS. E18. DISCONNECT SHALL BE WIRED SO NO BLADES ARE ENERGIZED E19. ALL MODULES AND RACKING SHALL BE GROUNDED VIA IRON RIDGE RAIL INTEGRATED GROUNDING (PLEASE SEE DATA SHEET) OR WITH TIN PLATED DIRECT BURIAL RATED LAY IN LUGS USING STAINLESS STEEL HARDWARE, STAR WASHERS, AND THREAD FORMING BOLTS OR WEEBS. 4 E20. ALL EQUIPMENT SHALL BE GROUNDED, IN BONDING JUMPERS WHERE NECESSARY ACROSS RAIL SPLICE PLATES TO BOND INDIVIDUAL PIECES OF RAIL. By: Troque DatoA2112f14 Loce9on: CAUserektmque\Downloads%aleslorceXD CustomerslDemarco - THESE DRAWINGS, SPECIFICATIONS, AND DESIGNS ARE THE PROPERTY OF SUNGEV17Y INC. NO PART SHALL BE COPIED OR USED FOR OR WITH ANY 5 WORK OTHER THAN THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN DEVELOPED WITHOUT OUR WRITTEN CONSENT BI A SUf1GEVITYe I f— 4'-3" 3 Solar Module IronRidge XR10 L -Foot QMLPC Shingle - Low Profile ------ Composite Shingl 5" x 5/16". -Lag 2x8 Nominal, 16 O.C. MOUNTING DETAIL Ilk 2 SCALE: NTS 16'-3" 11-411 12'-31r RRAY LAYOUT - I 9' - 5 MODULE SPECIFIC) S (17) Hyundai HIS-M250MG(BK) SYMBOL KEY: 41.9 ® MOUNT MODULE WIDTH: ------- RAIL ROOF 1SPECS — — — — RAFTERS RAFTER SPAN: 12'- 6" ROOF -- -- SETBACK ® SOLAR MODULE TOTAL MOD. WEIGHT (Ibs): ®......•.•.••• ® STRING CONFIG. RACKING WEIGHT (Ibs): 90.6 SKYLIGHT A ARRAY AREA (sgft): 295.9 ARRAY DEAD LOAD (Ibs/sgft): ® CHIMNEY 38 LOAD PER MOUNT(Ibs): PLUMBING OR ARRAY AZIMUTH(') G ATTIC VENT 20 0 ATTIC VENT BI A SUf1GEVITYe I f— 4'-3" 3 Solar Module IronRidge XR10 L -Foot QMLPC Shingle - Low Profile ------ Composite Shingl 5" x 5/16". -Lag 2x8 Nominal, 16 O.C. MOUNTING DETAIL Ilk 2 SCALE: NTS 16'-3" 11-411 12'-31r RRAY LAYOUT - I 9' - 5 MODULE SPECIFIC) S (17) Hyundai HIS-M250MG(BK) MODULE WEIGHT: 41.9 MODULE LENGTH: 64.76 MODULE WIDTH: 38.7 ROOF 1SPECS RAFTER SIZE: 2X8 NOMINAL RAFTER SPAN: 12'- 6" RAFTER SPACING: 16" ROOF MATERIAL: COMPOSITE SHINGLE ARRAY 1 SPECS NUMBER OF MODULES: 17 TOTAL MOD. WEIGHT (Ibs): 712,3 RACKING WEIGHT (Ibs): 90.6 ARRAY WEIGHT (Ibs): 802.9 ARRAY AREA (sgft): 295.9 ARRAY DEAD LOAD (Ibs/sgft): 2.7 NUMBER OF MOUNTS: 38 LOAD PER MOUNT(Ibs): 21,1 ARRAY AZIMUTH(') 234 ARRAY TILT(') 20 NUMBER OF FLOORS 2 �F Ne McCOti� 1O OPESSIOtv CUSTOMER INFORMATION: GERARD DEMARCO 2015 GABRIELLA COURT MATTITUCK, NY 11952 (347) 907-2057 / #1355836 DESIGNED BY: TM REV #: DATE: 1 12/12/14 W B C GENERATE POSI'T'IVE' PV- 2.0 SUNGEVITY INC. 66 FRANKLIN ST SUITE 310 OAKLAND, CA M607 By: Troque Data:17/12/74 Locellon:C:\UsersUroque&DownloaddlSelesfotcelD CustomenlDemarco- THESE DRAWINGS, SPECIFICATIONS, AND DESIGNS ARE THE PROPERTY OF SUNGEVITY INC. NO PART SHALL BE COPIED OR USED FOR OR NTH ANY OTHER WORK OTHER THAN THE SPECIFIC PROJECT FOR WHICH THEY HAVE BEEN DEVELOPED WITHOUT OUR WRITTEN CONSENT W B C