Loading...
HomeMy WebLinkAbout1000-37.-6-7.1To OFFICE LOCATION: Town Hall Annex 54375 State Route 25 (cor. Main Rd. & Youngs Ave.) Southold, NY 11971 MAILING ADDRESS: P.O. Box 1179 Southold, NY 11971 Telephone: 631 765-1938 Fax: 631 765-3136 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM John Bredemeyer, President Town of Southold Board of Trustees From: Mark Terry, Principal Planner LWRP Coordinator Date: August 18, 2014 Re: Proposed Wetland Permit for RICHARD AND JOANN SAVARESE SCTM# 1000-37-6-7.1 Mark Schwartz, Architect on behalf of RICHARD AND JOANN SAVARESE requests an Administrative Amendment to Wetland Permit #8356 to remove existing and install new septic system. Located: 2575 Old Orchard Road, East Marion. SCTM# 37-6-7.1 The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed actions are CONSISTENT with the Policy Standards and therefore are CONSISTENT with the LWRP. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Lori Hulse, Assistant Town Attorney Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS I AUG 0 8 2014 Board 1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to its significant beneficial and adverse effects upon the coastal area (which includes all of Southold Town). 3. If any question in Section C on this form is answered "yes", then the proposed action may affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action should be analyzed in more detail and, if necessary, modified prior to making a determination that it is consistent to the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as consistent with the LWRP policy standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office.�l - Q ),7t f F B. DESCRIPTION OF SITE AND PROPOSED ACTION i SCTM# 37 06 7.1 ? ` AUG - 1 2014 - - The Application has been submitted to (check appropriate response): Town Board ❑ Planning Dept. ❑ Building Dept. ❑ Board of Trustees M 1. Category of Town of Southold agency action (check appropriate response): (a) Action undertaken directly by Town agency (e.g. capital ❑ construction, planning activity, agency regulation, land transaction) ❑ (b) Financial assistance (e.g. grant, loan, subsidy) (c) Permit, approval, license, certification: ✓� Nature and extent of action: Replace existing septic system per SCHDS. Location of action: 2575 Old Orchard Road, Southold, NY Site acreage: 0.17 Present land use: single family residential Present zoning classification: R40 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: Richard and Joann Savarese (b) Mailing address: 2575 Old Orchard Road, Southold, NY (c) Telephone number: Area Code ( ) 334-2736 (d) Application number, if any: Will the action be directly undertaken, require funding, or approval by a state or federal agency? Yes ❑ No Q If yes, which state or federal agency? DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III — Policies; Page 2 for evaluation criteria. ❑Yes ❑ No ❑✓ (Not Applicable - please explain) Replace existing septic system per SCHDS. Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III — Policies Pages 3 through 6 for evaluation criteria ❑ Yes ❑ No a (Not Applicable — please explain) The subject property does not contain nor does the project affect historic or archeological resources; nor is the project located in a historic maritime area. Policy 2 is not applicable to the project. Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III — Policies Pages 6 through 7 for evaluation criteria ❑✓ Yes ❑ No ❑ (Not Applicable — please explain) To the extent that this policy is applicable to the proposed project, visual quality and scenic resources will be protected at the site through the protection and maintenace of the well vegetated area buffering the developed portion of the site from the tidal wetlands of Orient Bay. Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III — Policies Pages 8 through 16 for evaluation criteria ❑ Yes ❑ No ❑ (Not Applicable — please explain) The project does not address nor affect erosion control structures or other erosion/flooding control initiatives. Policy 4 is not applicable to the project. Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III — Policies Pages 16 through 21 for evaluation criteria El Yes ❑ No ❑ (Not Applicable — please explain) Replace existing septic system per SCHDS. Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III — Policies; Pages 22 through 32 for evaluation criteria. ✓❑ Yes ❑ No[—] (Not Applicable — please explain) This project will be consistent with Policy 6 for the same reasons described for Policy 5; because there will be no loss of wetlands and because the statutory and regulatory requirements of both the Southold Town Trustees and the New York State Department of Conservation will be complied with. Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. See Section III — Policies Pages; 34 through 38 for evaluation criteria. ❑ Yes ❑ No ❑✓ (Not Applicable — please explain) The project will neither affect nor have an impact on air quality in the Town of Southold, Policy 7 is not applicable to the project. Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III — Policies; Pages 34 through 38 for evaluation criteria. ❑ Yes ❑ No a (Not Applicable — please explain) The project will neither create nor rrequire the handling of solid waste or hazardous substances. Policy 8 is not applicable to the project. PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III — Policies; Pages 38 through 46 for evaluation criteria. ❑ Ye❑ No ❑✓ (Not Applicable —please explain) The project is limited to the upland portion of the property, public access and recreational use of the adjacent coastal waters and public lands and resources will not be affected by the project. Policy 9 is not applicable to the project. Attach additional sheets if necessary WORKING COAST POLICIES Policy 10. Protect Southold's water -dependent uses and promote siting of new water -dependent uses in suitable locations. See LWRP Section III — Policies; Pages 47 through 56 for evaluation criteria. ❑ Yes ❑ No✓❑ (Not Applicable — please explain) The project neither proposes nor affects water -dependent uses. Policy 10 is not applicable to the project. Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III — Policies; Pages 57 through 62 for evaluation criteria. ❑ Yes ❑ No ❑✓ Not Applicable — please explain The project neither proposes nor affects commercial or recreational fisheries or other uses associated with the living marine resources of Long Island Sound. Policy 11 is not applicable to the project. Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III — Policies; Pages 62 through 65 for evaluation criteria. ❑ Yes ❑ No❑ Not Applicable — please explain The project site is neither situated on nor adjacent to agricultural lands. Policy 12 is not applicable to the project. Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III — Policies; Pages 65 through 68 for evaluation criteria. ❑ Yes ❑ No ❑✓ Not Applicable — please explain The project affects neither the use nor development of energy and mineral resources. Policy 13 is not applicable to the project. 0 ti BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD, NEW YORK PERMIT NO. 8356 DATE: DECEMBER 11, 2013 ISSUED TO: RICHARD & JOANN SAVARESE PROPERTY ADDRESS: 2575 OLD ORCHARD ROAD, EAST MARION SCTM# 37-6-7.1 AUTHORIZATION Pursuant to the provisions of Chapter 275 of the Town Code of the Town of Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on December 11, 2013 and in consideration of application fee in the sum of $250.00 paid by Richard & Joann Savarese and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and permits the following: Wetland Permit to raise the existing dwelling, and remove and re -construct the foundation to raise finished floor height to elevation 14.0; re -construct existing 16'x16' deck with 3.61x4' steps and 6' wide x V deep step to the ground; and re -construct existing front stoop; and as depicted on the site plan prepared by Mark K. Schwartz, Architect, last dated November 15, 2013 and stamped approved on December 11, 2013. IN WITNESS WHEREOF, the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of this date. MA� i rr �_ rr TERMS AND CONDITIONS The Permittee, Richard & Joann Savarese residing, at 2575 Old Orchard Road East Marion, New York as part of the consideration for the issuance of the Permit does understand and prescribe to the following: That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for damages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will, at his or her own expense, defend any and all such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto, to the complete exclusion of the Board of Trustees of the Town of Southold. 2. That this Permit is valid for a period of 24 months, which is considered to be the estimated time required to complete the work involved, but should circumstances warrant, request for an extension may be made to the Board at a later date. 3. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved, to provide evidence to anyone concerned that authorization was originally obtained. 4. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. 5. That there will be no unreasonable interference with navigation as a result of the work herein authorized. 6. That"there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. 7. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees, the work shall cause unreasonable obstruction to free navigation, the said Permittee will be required, upon due notice, to remove or alter this work project herein stated without expenses to the Town of Southold. S. That the said Board will be notified by the Permittee of the completion of the work authorized. 9. That the Permittee will obtain all other permits and consents that may be required supplemental to this permit, which may be subject to revoke upon failure to obtain same. is OFFICE LOCATION: Town Hall Annex 54375 State Route 25 (cor. Main Rd. & Youngs Ave.) Southold, NY 11971 MAILING ADDRESS: P.O. Box 1179 Southold, NY 11971 Telephone: 631765-1938 Fax: 631765-3136 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM DEC -92013 To: Jim King, President Town of Southold Board of Trustees soudto o kv' i From: Mark Terry, Principal Planner LWRP Coordinator Date: December 9, 2013 Re: Proposed Wetland Permit for RICHARD & JOANN SAVARESE SCTM#1000-37-6-7.1 Mark Schwartz, Architect on behalf of RICHARD & JOANN SAVARESE requests a Wetland Permit to raise the existing dwelling, and remove and re -construct the foundation to raise finished floor height to elevation 14.0; re -construct existing 16'x16' deck with 3.6'x4' steps and 6' wide x 1' deep step to the ground; and re -construct existing front stoop. Located: 2575 Old Orchard Road, East Marion. SCTM# 37-6-7.1 It is my recommendation that the proposed action is CONSISTENT with LWRP policy standards to the greatest extent practicable, and therefore is CONSISTENT with the LWRP. Due to parcel size and configuration, there is no ability to relocate the structure outside of Flood Zone AE EI 7 (see figure 1.). Figure 1. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Lori Hulse, Assistant Town Attorney DEVELOPED PUBLIC WATER EXISTING SEPTIC TO BE REMOVED AND FILLED PER SCHDS REQUIREMEN CONSTRUCTION DJ/MPSTE0. TO REMAIN ON FfE FOR O LDURATION IF CONSTRUCTION N 4714 p ,oo. R cL-1 - \HEAD wOOO 1w A K PALE BROWN FINE SAND �\ SP WATER IN PALE BROWN FINE SAND SP ----------- 14 WATER ENCOUNTERED 7.5' BELOW SURFACE TEST HOLE DATA DATA SUPPLIED BY: McDONALD GEOSCIENCE BOX 1000, SOUTHOLD, NY 11791 (631) 765-3677 ANV DAMAGE ON ADIACENT P_E R Sp STREET DUE REUTED TO WORK F�TO� SITE PLAN CONSTRUCTION (INCLUDING HAY BALES AND SILT FENCING, CONSTRUCTO VEHICLES, DUMMERS, ETC.) IS THE RESPONSIBILITY OF GENERAL CONTRACT REPAIR AS REQUIRED. NO WELLS W/i 150' SCALE: 1" = 20'-0' OF S SCTM# 1000-37-6-7.1 REVISIONS: HEALTH 06/04/2010 DEPT. 0 ti w a a U Z LF) s 6 U ttd �W x Q w � a W H O� W Z 1�0 a w O O 06 DRAWN_ MH, MS SCALE: 1" = 20' JOB #: April 21, 2014 SHEET NUMBER: S-1 r FIN. FLOC EL. 14.0' FINISHED GRADE: EL. 9.0 MIN. GRADE: 1-3 BEDROOM HOUSE (ALTERNATE DESIGN) MIN. GRADE: EL. 8.6' HOUSE o , .� 6 4 E _ INV. EL.: 8. cZ=Z=Z= ' I V. EL.: 7.6' • --_-_-_21�_-_- 10.0' 0 0 0 0 0 0 APPROVED PIPE INV. EL.: " -_ " _ " - d: 8.0' MIN. PITCH: 7.5' S INV. EL.: APPROVED PIPE INV. EL.: 0 00 0 R 1/4" / F' 0" 7.0' MIN. PITCH: 6.8' N1/8" / 1'-0" LEACHING POOL o m LEACHING POOL o °•• SEPTIC TANK 5.1' INV. ELIGROUNDWATER . MIN. 2' TO HIGH 8'-o". .r ° 8'-0" 2' MIN. CLEAN SAND COLLAR GROUNDWATER _- - EL. 1.5 PROPOSED SEPTIC SYSTEM DETAIL N.T.S. SEPTIC TANK, NOTES: 1). MINIMUM SEPTIC TANK CAPACITIES IS 1000 GALLONS. 2). CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 psi AT 28 DAYS. 3). WALL THICKNESS SHALL BE A MINIMUM OF 3", A TOP THICKNESS OF 6" AND A BOTTOM THICKNESS OF 4". ALL WALLS, BOTTOM AND TOP SHALL CONTAIN REINFORCING TO RESIST AN APPLIED FORCE OF 300 psf. 4). ALL JOINTS SHALL BE SEALED SO THAT THE TANK IS WATERTIGHT. 5). THE SEPTIC TANK SHALL BE INSTALLED AT LEVEL IN ALL DIRECTIONS (WITH A MAX. TOLERANCE OF +/- 1/4") ON A MINIMUM 3" THICK BED OF COMPACTED SAND OR PEA GRAVEL. 6). A 10' MIN. DISTANCE BETWEEN SEPTIC TANK AND HOUSE SHALL BE MAINTAINED. LEACHING POOLS NOTES: 1). MINIMUM LEACHING SYSTEM IS 5 POOLS; 2' DEEP, 8' DIA. 2). LEACHING POOLS ARE TO BE CONSTRUCTED OF PRECAST REINFORCED CONCRETE (OR EQUAL). 3). ALL COVERS SHALL BE OF PRECAST REINFORCED CONCRETE (OR EQUAL). 4). A MINIMUM DISTANCE BETWEEN LEACHING POOLS AND WATER LINE SHALL BE MAINTAINED. 5). AN B' MIN. DISTANCE BETWEEN ALL LEACHING POOLS AND SEPTIC TANK SHALL BE MAINTAINED. 6). A 10' MIN. DISTANCE BETWEEN LEACHING POOLS AND WATER LINE SHALL BE MAINTAINED. SEWER LINE REOUIREMENTS NOTES: 1). ALL SEWER LINES SHALL BE A MINIMUM OF FOUR INCHES IN DIAMETER. 2). THERE SHALL BE A LENGTH OF CAST-IRON SEWER LINE EXTENDING THROUGH THE FOUNDATION TO A POINT A MINIMUM OF TWO FEET BEYOND THE FOUNDATION WALL. 3). THE SEWER LINE FROM THE BUILDING CAST-IRON PIPE TO THE SEPTIC TANK AND TO THE LEACHING POOL(S) SHALL MEET OR EXCEED COMMERCIAL STANDARDS CLASS 2400 SEWER PIPE, OR ASTM STANDARDS FOR PLASTIC SEWER PIPE WITH A MINIMUM SDR 35 RATING. 4). SLIP -RING CONNECTORS OF THE PROPER TYPE SHALL BE USED AT THE CAST-IRON JOINT. 5). THE SEWER LINE FROM THE BUILDING TO THE SEPTIC TANK SHALL HAVE A MINIMUM PITCH OF ONE-QUARTER INCH PER FOOT AND A CLEAN-OUT OR MANHOLE EVERY FIFTY (50) FEET. 6). THE SEWER LINE FROM THE SEPTIC TANK TO THE LEACHING POOL(S) SHALL HAVE A MINIMUM PITCH OF ONE -EIGHT INCH PER FOOT. 7). SEWER LINE TRENCH(ES) SHALL BE FIRMLY TAMPERED. ALL BACKFILL SHALL BE FIRMLY TAMPERED BY HAND ABOUT THE PIPE. THE PIPE(S) SHALL BE SECURELY CEMENTED AT THE POINT OF ENTRY INTO THE SEPTIC TANK AND LEACHING POOL(S). B). THERE SHALL BE NO BENDS IN THE SEWER LINES TO THE SEPTIC TANK. IF BENDS ARE UNAVOIDABLE, THEN, FOR BENDS WITHIN THE FIRST TEN FEET FROM THE HOUSE FOUNDATION, THE SEWER LINE SHALL BE CONSTRUCTED OF CAST-IRON FROM THE HOUSE FOUNDATION UP TO AND INCLUDING THE BEND. LONG SWEEP ELBOWS SHALL BE USED AND BENDS SHALL NOT EXCEED FOURTY-FIVE (45) DEGREES AS MEASURED ALONG THE AXIS OF THE STARTING PIPE. FOR BENDS FURTHER THAN TEN FEET FROM THE HOUSE FOUNDATION AN APPROVED MANHOLE COVER OR CLEAN-OUT SHALL BE INSTALLED. 9). ALL SEWER LINES SHALL BE STRAIGHT. WHEN SECTIONS OF PIPES ARE USED, THEY SHALL BE OF THE SAME MATERIAL AND CONNECTED WITH COUPLINGS OF THE SAME MATERIAL. THE COUPLINGS SHALL BE SECURELY INSTALLED AND WATERTIGHT. DIRECTIONAL CHANGES THROUGH THE USE OF APPURTENANCES MAY BE PERMITTED IF ABSOLUTELY NECESSARY. 10). WHEN USING MORE THAN ONE TYPICAL LEACHING POOL, ALL SEWER LINES FROM THE DISTRIBUTION BOX TO THE POOLS SHALL BE SET IN THE DISTRIBUTION BOX AT THE SAME ELEVATION. SCTM# 1000-37-6-7.1 REVISIONS: HEALTH 06/D4/2010 DEPT. 0 ti .N N J z U d � � U a w F.I.I C7 CA F -I q w U 0 w a W a Com/] O O Acq � OW N DRAWN: MH!MS SCALE: 111=201 JOB #: April 21, 2014 SHEET NUMBER: S-2