Loading...
HomeMy WebLinkAbout1000-35.-8-3.1P: 1 OFFICE LOCATION: Q'�QF SoUryOl MAILING ADDRESS: l � O Town Hall Annex P.O. Box 1179 54375 State Route 25 Southold, NY 11971 (cor. Main Rd. & Youngs Ave.) Southold, NY 11971 % • �O Telephone: 631 765-1938 Fax: 631 765-3136 �y00UNT1,� LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM To: Donald Wilcenski, Chair Town of Southold Planning Board From: Mark Terry, Principal Planner 444"', LWRP Coordinator Date: April 18, 2014 V Re: LWRP Coastal Consistency Review for Crescent Beach Condominiums SCTM# 1000-35-8-3.1 19 ddb This site plan is for the demolition of an existing barn and the proposed construction of a 2,797 sq. ft. one-story storage facility on 0.41 acres in the RR Zoning District. The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my determination that the action is EXEMPT from LWRP review pursuant to: § 268-3. Definitions. MINOR ACTIONS item "B" which state: B. Replacement, rehabilitation or reconstruction of a structure or facility, in kind, on the same site (in place), including upgrading buildings to meet building or fire codes, except for structures in areas designated by the Coastal Erosion Hazard Area (CEHA) law where structures may not be replaced, rehabilitated or reconstructed without a permit and shoreline erosion control structures (including, but not limited to, groins, jetties, bulkheads, filled piers) located within Great Peconic Bay, Cutchogue Harbor, Little Peconic Bay, Hog Neck Bay, Noyack Bay, Southold Bay, Shelter Island Sound, Pipes Cove, Orient Harbor, Gardiners Bay, Long Island Sound, Fishers Island Sound and Block Island Sound (excluding all creeks); Pursuant to Chapter 268,. the Board shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Brian Cummings, Planner