Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1000-36.-1-1
SO OFFICE LOCATION: Q !/Ty�lo MAILING ADDRESS: Town Hall Annex P.O. Box 1179 54375 State Route 25 Southold, NY 11971 (cor.Main Rd:&Youngs Ave.) G Southold, NY 11971 Telephone: 631 765-1938 � COU �'�� Fax: 631 765-3136 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM To: John Bredemeyer, President Town of Southold Board of Trustees From: Mark Terry, Principal Planner LWRP Coordinator Date. January22, 2014 Re: Local Waterfront Revitalization Program Coastal Consistency Review for BREWER YACHT YARD AT GREENPORT SCTM# 1000-36-1-1 High Point Engineering on behalf of BREWER YACHT YARD AT GREENPORT requests a Wetland Permit for the replacement of+/-205 linear feet of existing timber bulkhead with proposed vinyl bulkhead raised 18" higher to match existing adjacent bulkhead elevation to the south; demolish and reconstruct existing restroom building within existing footprint with roof runoff to drain to grade and discharge to the Eastern Basin via NYSDEC Approved Outfall 003 to the north per existing conditions; existing timber docks to be replace in-kind as follows: 125 linear feet of 6'-8'wide fixed dock fronting building/bulkhead, 75' of 3'-4'wide fixed dock fronting bulkhead to the north, two(2)4'x53'fixed docks perpendicular to bulkhead, and one (1)6'x48'floating dock with 15' ramp perpendicular to bulkhead. Located: 1410 Manhasset Avenue, Greenport. SCTM#36-1-1 n reviewed to Chapter 268 Waterfront Consistency The proposed action has been p y Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my determination that the proposed actions are INCONSISTENT with the below listed LWRP.policy and therefore are INCONSISTENT with the LWRP: 6.3 Protect and restore tidal and freshwater wetlands. A. Comply with statutory and regulatory requirements of the Southold Town Board of Trustees laws and regulations for all Andros Patent and other lands under their jurisdiction 1. Comply with Trustee regulations and recommendations as set forth in Trustee permit conditions. Town records indicate that the structures were constructed without the benefit of review of the Board of Trustees. In the event that the actions are approved it is recommended that the Board condition that the site meets Chapter 236 Stormwater Management of the Southold Town Code. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed actions. Cc: Lori Hulse, Assistant Town Attorney I ' s Town of Southold I LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS INSTRUCTIONS 1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 3 " 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to its significant beneficial and adverse effects upon the coastal area(which includes all of Southold Town) 3. If any question in Section C on this form is answered "yes" or "no", then the proposed action will affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, each answer must be explained in detail, listing both supporting and non- supporting facts. if an action cannot be certified as consistent with the LWRP policy standards and conditions,it shall not be undertaken. A copy of the LWRP is available in the following places: online at of Southold's website ,southoldtown.northfork.net ( ) the Board of Trustees Offic 1��'ui `g; e local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTIONJUL 2 5 2013 SCTM#_ _ 36 -/—/ Southold Town PROJECT NAME Brewer Stirling Harbor-Bulkhead/Dock Replacement a Tr The Application has been submitted to(check appropriate response): Town Board ❑ Planning Board❑ Building Dept. ❑ Board of Trustees ✓❑ 1. Category of Town of Southold agency action(check appropriate response): j (a) Action undertaken directlyb e. Y Town agency Y( g.capital ❑ construction,planning activity,agency regulafl-W,,l fld i�rarrsact r} , ❑ (b) Financial assistance(e.g. grant,loan,subsidy) JA i 2014 (c) Permit,approval,license,certification: ❑ Nature and extent of action: Replacement of+/-205 linear feet of existing timber bulkhead and dock(varying width)with proposed vinyl bulkhead and dock. No change to bulkhead or dock location. Top of bulkhead elevation to be raised 18"to meet adjacent bulkhead elevation. Renovations to existing +/-1,300 SF restroom building landward of bulkhead. E f , e maker, Amanda anda From: Zack Collins <zcollins@hpeng.com> Sent: Friday, December 27, 2013 3:17 PM To: Nunemaker,Amanda Cc: Chris Tartaglia;Jesse Gaffga Subject: Brewer Yacht Yard- BOT Applications Attachments: SWPPP Drainage Area Map.PDF Importance: High Amanda, As discussed below Please find a detailedp proposed description of the ro osed aPp lication: Removal/replacement of+/-200'of existing dilapidated timber bulkhead with proposed Vinyl bulkhead raised 18"to match existing adjacent bulkhead elevation to the south. Demolition of existing restroom building to facilitate Bulkhead installation, & reconstruction of said restroom building on existing footprint, no change to use, location or size of building&as approved by TOS ZBA. No changes are proposed to the existing sanitary system. Roof runoff shall drain to grade&discharge to the Eastern Basin via NYSDEC Approved Outfall 003 to the north per existing conditions, as depicted on the attached SWPPP Drainage Area Map prepared by Triton Environmental (hard copies of said plan have been sent to your office). Existing timber docks to be replaced in kind as follows: 125 LF of 6'-8'fixed dock fronting building/bulkhead, 75' of 3-4'fixed dock fronting bulkhead to the north,two (2)4'wide by 53' long fixed docks perpendicular to bulkhead,and one(1) 6'wide by 48' long floating dock with 15' ramp, perpendicular to bulkhead. Please confirm that as discussed we will be placed on the January BOT Calendar. Please feel free to contact me with any questions. Thank you, Zack Collins High Point Engineering 521 Conklin Street Farmingdale, NY 11735 ph: 516-777-4320 fax: 516-777-4321 email:zcollins@HPEna.com web: www.HPEng.com 1 Location of action: 1410 Manhasset Ave, Greenport, NY 11944 Site acreage: 10.0 Present land use: Marina Present zoning classification: Mil (Marina II) . 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: L (a) Name of applicant: Brewer Yacht Yard @ Greenport, Inc. address: 1410 Manhasset Ave, Greenport, NY 11944 (b Mallin) g i (c) Telephone number:Area Code 631-477-0828 i (d) Application number,if any: Will the action be directly undertaken,require funding,or approval by a state or federal agency? Yes 0 No❑ If yes,which state or federal agency? NYS DEC Tidal Wetland Permit I C. Evaluate the project to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. I DEVELOPED COAST POLICY �. Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure,makes beneficial use of a coastal location,and minimizes adverse effects of development. See LWRP Section III—Policies; Page 2 for evaluation criteria. ✓�Yes E] No Not Applicable The project includes the replacement of the existing old/aging timber bulkhead with a new vinyl bulkhead, an j attractive upgrade in keeping with the character of the surrounding area, consistent with LWRP Policy#1. I Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LW"Section III-Policies Pages 3 through 6 for evaluation criteria ❑ Yes ❑ No ✓ Not Applicable � ❑ The project has no impact on LWRP Policy#2, as it is not within the Long Island Sound, historical site or an archeological site. Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III—Policies Pages 6 through 7 for evaluation criteria ✓ Yes Applicable ❑ No ❑ Not PP The project will enhance the visual quality of the site by replacing the weathered timber bulkhead and with vinyl bulkhead and dock, an attractive upgrade in keeping with the character of the surrounding area, consistent with LWRP Policy#3. Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP I Section III—Policies Pages 8 through 16 for evaluation criteria 21 Yes ❑ No ❑ Not Applicable The project is proposing to replace the existing weathered timber bulkhead with a proposed vinyl bulkhead, with an estimated service life of+/-50 years, increasing the safety of nearby structures and persons, consistent with LWRP Policy#4. Attach additional sheets if necessary I s Policy 5. Protect and improve water quality and supply in the Town of.Southold. See LWRP Section III �. —Policies Pages 16 through 21 for evaluation criteria 1 i ❑ 0 Not Applicable Yes No � The project has no impact on LWRP Policy#5, as it is replacing an existing Timber bulkhead and dock with a proposed vinyl bulkhead and dock with no change to bulkhead or dock location and no impact on water quality and/or safety. i i• Attach additional na sheets eets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III—Policies; Pages 22 through 32 for evaluation criteria. i I I i Yes❑No❑� Not Applicable The project has no impact on LWRP Policy#6, as it is replacing an existing timber bulkhead and dock with a proposed vinyl bulkhead and dock with no change to bulkhead or dock location. i Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. ' ❑ Yes ❑ No ✓❑ Not Applicable The project has no impact on LWRP Policy#7, as the proposed project will have no effect on air quality. i j. I Attach additional sheets if necessary I Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III—Policies; Pages 34 through 38 for evaluation criteria. ❑ Yes ❑ No Z Not Applicable The project has no impact on LWRP Policy#8, as the proposed project has no effect on generation of solid or hazardous waste. i PUBLIC COAST POLICIES L. i Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the.Town of Southold. See LWRP Section III-Policies; Pages 38 through 46 for evaluation E criteria. i i 0 YeF-1 No❑ Not Applicable , The project involves repair/maintenance to an existing marina and the current use and operation of the Marina will remain the same. The Marina is a water dependent use and provides access to coastal waters to it's patrons. Attach additional sheets if necessary �I l . WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III Policies; Pages 47 through 56 for evaluation criteria. © Yes ❑ No ❑ Not Applicable The existing Marina use will continue to operate as a water dependant business use, consistent with LWRP Policy#10. Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters.See LWRP Section III—PoIicies; Pages 57 through 62 for evaluation criteria. ❑ Yes ✓❑ No❑ Not Applicable The project has no impact on LWRP Policy#11 as it is replacing an existing bulkhead and dock with a new one. No change to location and no adverse effect on living marine resources. i. Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III —Policies; Pages 62 through 65 for evaluation criteria. ❑ Yes ❑ No W Not Applicable The work scope takes place entirely on private property which does not include areas defined as agricultural land. l j Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III—Policies; Pages 65 through 68 for evaluation criteria. © Yes ❑ No ❑ Not Applicable The project will comply with local building codes to promote the energy efficient design to the extent possible, consistent. with LWRP Policy#13. I I PREPARED BY Chris Tartaglia. PE TITLE Professional Engineer DATE 7/22/13 C6 . ^ N n t/ \ u t an ------------- ".Er 19 ♦♦♦ /� a, 13 I/y. r � i I at /eaR Pa.xo ". I iQI FCL NC. �/ �M103-0OIC_ NMRLw xHax:.xJ. siticx¢ N.a j .. op — — -- -- NaTa 4 \ ♦ NOTICE COUNTY OF SUFFOLK © E s WYTtpD SEMON NO G...,+.�.. la+l O 1W--.-- --"-- Real PropTax Benita Agensy r N w 36 F. PROPERTYNM erty Brewer Stirling Harbor Marina- 1410 Manhasset Ave, Greenport, NY EXISTING SITE CONDITIONS PHOTO EXHIBIT L I`- vUL 2 5 Southold Town r f Tr f Photo #1 (Taken June 10, 2013) Brewer Stirling Harbor Marina- 1410 Manhasset Ave, Greenport, NY EXISTING SITE CONDITIONS PHOTO EXHIBIT t Ilp Photo #2 (Taken June 10, 20131 Brewer Stirling Harbor Marina- 1410 Manhasset Ave, Greenport, NY EXISTING SITE CONDITIONS PHOTO EXHIBIT k �. -_- ;4;.;. ':'''� :•:•�:• •:��':;:: .0000 '•:':O;y. Photo #3 (Taken June 10, 2013) Brewer Stirling Harbor Marina- 1410 Manhasset Ave, Greenport, NY EXISTING SITE CONDITIONS PHOTO EXHIBIT r 40 AbLw r wr ifi4~a t i Photo #4 (Taken June 10, 2013) Brewer Stirling Harbor Marina- 1410 Manhasset Ave, Greenport, NY EXISTING SITE CONDITIONS PHOTO EXHIBIT Photo #5 (Taken June 10, 2013) i I i • I L,N pLACE . - I 0 •q p SURVEY OF PROPERTY A T GREENPORT \ �s� TO WN OF SO UTHOLD Na SUFFOLK COUNTY, N. Y. 1000-36-01-01 .. .1001-03-01-01.. SCALE: 1'--30' - JUNE 15, 2000 \ JANUARY 10, 2006 (REVISIONS) JANUARY-25,"2006'(NEW POOL CORR£C770N)•• FEBRUARY 8, 2006 (REVISIONS) NOVEMBER 1, 2006 (FUEL TANK) \ s� JANUARY 11, 2011 (UPDATE & ELEVATIONS) �e- p E C E I V E JUL 3 1 2013 cSouthold own v 9 \ Board of Trustees ' •9 I C C O N C R E T E l kO All �v• q mss. � �' 1 1 �e+ Cn f . I !� 1x BOSS " 6 .° xs q 2 y ti x�r. 11�4K A�b y s. 0 � x itib •s. , i I y �2q9 b I Z s I q A I • ^ 4p / y C I Iry I J IV ti 9d � � y / s • x • Or 1� s3• 5 c" g #� Z • • ••• • 0 3RF��jgy�CT 11 4 • • • ci cp 4i -a b � Q� e M d I / I� M • Ai4 1 • 2 %9p, J� • R►.µP x 46" S � • • • • g 0 • AZ(h I • f c� \ /v y cl 10004 �o ti• �e.°, xq2. t i pin° Al • V ' \ 10 13 1 kIV � • f�°P cMTM I ti ^lbA 0 9.A. ' i • .y5 � m� $ x � • o • 'Le', 2 M \ • • � y Ar t 6µ s. • \ O �g. • 'Y • ate 0 • I • Z k 4eOle- fjrNt� • f 2 v/V 41 • m V �, 0 tDw BULKHEAD I - At titi T , 13 ti 5 / 464- I C,ROSS--SECTIONS OF DEPTHS TOP OF DULKHEAD i TOP OF BLIKHEAD I � TOP OF BLLKHEAD — MNV.M, _ I Ln MR-VX ML.VM � e w i —�' -- — M,L.V.M. 6 W 1 GROUND GROUND GROUND A SECTION 0 SECTION WORK DOCK ,3 ! ."tet• Izt I - x z NOTESt M,14W.M, at bulkheads f — --=WOOD FENCE } N.YS. LIC. NO. 49618 ANY ALTERATION OR ADDITION TO THIS SURVEY IS A VIOLATION - -=OVERHEAD WIRES PECON/C l% ;YORS,''P.C. .�; OF SECTION. 72090E ;HE.NEW YORK STA TE EDUCATION LAW. . 631 76 —5020`FAX - ' EXCEPT AS PER SECTION 7209—SUBDIVISION 2. ALL CERTIFICA77ONS (6JY ••765-1797 THE LOCATION OF PILINGS SHOWN HEREON HEREON ARE VALID FOR THIS MAP AND COPIES THEREOF ONLY IF P.O. BOX 909 ARE FROM ,FIELD OBSERVATIONS AND 0 SAID MAP OR COPIES BEAR THE IMPRESSED SEAL OF THE SURVEYOR 1230 TRAVELER STREET 91 DATA OBTAINED FROM OTHERS. ELEVA TIONS REFERENCED TO N.A. V.D. '88 WHOSE SIGNATURE APPEARS HEREON. SOUTHOLD, N.Y. 11971 �� I ' • •4'OOD DFCk V� // Od cf,<.TO v •� �»`� � �. �" w'"' k .. ry't'-t-i.` � ! "�1 T T O / C s » jr _7 '4� HIGH e.;,, '{; ,�r�tlflit1CJ• POINT ,' £Cl * i 01 `*' . N T � ��� : ri= _ . '' :3, N ERIN G . • / • / � �Jv `JQW // f' �''�f r�„,"ry,1,',"*.'�� T' +'r'yF�.,�.` a, 3 t - 'Y i, ;, 44 Brew5 521 CONKLIN STREET Eastern Lon I gne ''" '' w<,, : . • FARMINGDALE,NY 11735 Islridiaspil'al s»et�ery . x,+::1` 13 AX: (516) �� (516) 777-4320 F 777-4321 '4 ALL PHASES OF ENGINEERING DESIGN , } h SURVEYING CODE CONSULTING, ZONING ANALYSIS &BIDSPECIFICATION eSITE q` / KEY MAP www.HPEng.com 3p v a° RFrF C / • N.T.S. i •--- -- 0 vR8 03,E APO FCO9TIiyG � • , aPCF o Qa % dO�Ks � �.�► CHRIS M TARTAGLIA • `°ham pq� �' q� l l O� NEZINW DEC 2 7 2013 ITco los ------------------ yFAO • �3 � o,°, �`p� •�\ woo -CC Bad IX/ST, LEACHING POOL LP TO REMAIN(IYP. OF 4) 5 / RO ro�cy�c'°oo�jl LP • 00 DW EXIST SEPTIC TANK TO , Rte, �.�\ � PROFESSIONAL ENGINEER / / • \ NEW YORK LICENSE No. 078209 / �0 ST . DUST U/CSANITARY l THE EDUCATION LAW OF THE STATE OF NEW YORK � PROHIBITS ANY PERSON ALTERING ANYTHING ON THESE��+ + PIPE 70 REM4/N(1}PJ / / DRAWINGS AND/OR THE ACCOMPANYING SPECIFICATIONS, • a • ��� lam•. 70 EW / / UNLESS IT IS UNDER THE DIRECTION OF A LICENSED •, 9°C� . !++•.+_ / •, wo PROFESSIONAL ENGINEER. WHERE SUCH ALTERATIONS ARE MADE, THE PROFESSIONAL ENGINEER MUST SIGN AND SEAL, •' °9 �' I S`/ `` � . `` i • y i o F<O9TjNC / \ \ Q r DATE AND DESCRIBE THE FULL EXTENT OF THE ALTERATION •• f1�69 02 ''FR 8�d \GY, op \\\ / GENERAL NOTES ON THE DRAWING AND/OR IN THE SPECIFICATIONS. (NYS EDUCATION LAW SECTION 7209-2) C-) 1. APPLICANT: BREWER YACHT YARD 0 GREENPORT e', _p °� fi Cip v Q / / �O 1410 MANHASSEIT AVE, GREENPORT, NY 11944 od o� o n �� J / q0 •� w 2. THIS PLAN IS REFERENCES: A SURVEY PREPARED BY: '` •. PECONIC SURVEYORS INC. 1230 TRAVELERS ST. O=� `\ SOUTHOLD, NY 11971 DATED: 6/15/00 AN APPROVED� / GORDON K. AHLERS,GP E ISPOSAL PLAN PREPARED BY: Z 30 • MANOR LANE \ n O EXIST BULKHEAD/ 04 \ w°o JAMESPORT, NY \ / p DOCK TO REWN DATED: 4/10/73 3. THE SCOPE OF THIS DRAWING IS FOR BULKHEAD REPLACEMENT AND \ // RESTROOM BUILDING RESTORATION ONLY. ALL OTHER INFORMATION \ \ PROP• REPLACEMENT F DEPICTED ON THIS PLAN IS PER REFERENCE DOCUMENTS AVAILABLE AT ti TIME OF PLAN PREPARATION AND IS SHOWN FOR INFORMATIONAL EXISTDOCK \ / . / O \\ / BULKHEAD PURPOSES ONLY. W n V o o IXIST. STEPS TO p _ • \ � , __.. Q \ \ \ /• # / REMNN Z r 04 \\ GAZZEBp \ \ N l~ \\ G \ \\ TOjp / u ® CZ V U SSP \ n � 2 2 Off, �0°9 9° I I` a CII y Qz EXIST, FIXED DOCK TO BE \\ 5 EXIST, RETAINNG WALL REPLACED \ '70 REMAIN .• C� ----- - -- - - - ., f� ROPTIMBER . / y EXIST. PUMP STATION • TO RMN PILE (TYP.) EXIST. FLOATING DOCKoo° o z TO BE REPLACED N 0 (SETBACK BLDG. / Qz FACE TO BULKHEAD) CL o� EXIST. ±1,300 SF EXIST, BULKHEAD ' RESTROOM :::.:::.:; ;::;:: TO BE REPLACED/ BUILDING TO BE RAISED 18" PROP. REPLACEMENT OF / 1 \\ ' RECONSTRUCTED EXIST. DOCK/ BULKHEAD • \ IN—KIND TOFACILITATE \\\ ..9 EXIST. FIXED BULKHEAD \\ \ REPLACEMENT DOCK TO BE K TO flEUAIN ```•^ l \ \ PLACED •S . \ • A GROUND KS 70 REMAIN \ BREWER STIRLING HARBOR \\\ SITE good 86' EXIST, CAS DJSP. ON \ kelp, SKI57 C TO CONC. ISLAND BEHIND \ —, BULKHEAD TO REMAIN ��, / ? MARINA 0ST TIMBER PM 70 q l E 1410 MANHASSET AVENUE REWN 3 MONTAUK, \\ o1 0 UST DOCK SHED / 70`REMAIN GREENPORT, NY 11944 L yam• a _ s SCTM 1001-003-01-001 & v� IXIST 77MBER t RETAINING WALL 70 ^^^^^^� ,,� 1000-036-01-001 REMAIN oe DIESEL DISPON 1 =30 BREW08-01 • IXIST. . �" 2 � � SCAM � HPE CONC. LSLAND BEHIND / ®� ' BULKHEAD Jj DAADWG TO REWN 7/23/13^^^^ (GRBREW08-01—PHII—BSP.2b • D=7. AVEL TLE TO Rf W IV 30 UNE OF TO / . Q. EXIST, 8'DOCK TO � 10 REMAIN ' Rte'" BULKHEAD/DOCK/ 'kCITY0 << ,� RESTROOM BLGD . REPLACEMENT W \ �, f III \ N �Q� ��p� SITE PLAN z �\ m N:A �o STERLING �Qv SHEET � BASIN GRAPHIC SCALE \ �� 30 0 15 3 Cq<<—THEN e ® LI-" (IN FEET) 1 Inch 30 feet / W REV. 2 OF 2 HIGH Q POINT DOCK WIDTH VARIES (SEE PLAN) 4' WIDE GRAVEL AREA ENGINEERING PROP. WOODEN CCA DOCK PLA NKIN Y)x 12 CGA—\ /\ 521 CONKLIN STREET CAP / \ \/ FARMINGDALE,NY 11735 (516)777-4320 FAX: (516)777-4321 ALL PHASES OF ENGINEERING DESIGN, ELEV._+6.0' / \\/\\/\\/\�*/\\/\\/\\/\\/\\/\\/ SURVEYING,CODE CONSULTING, 6"x8" CCA \// ZONING ANALYSIS &BID SPECIFICATION WHALER 6x8" CCA \�//\//\/ www.HPEng.com WHALER EXCAVATE AND RE-USE AS FILL ELEV.=+2.5' MHW 1'x16" TIE ROD CHRIS M TAR TA GLIA 10" D/A. x 25' CCA 10 DIA. x 25' CCA PILE NEW PILE pF IAV y ELEV.=0.0 MLW � NtAR/{T9�O�� CO 6'x6" CCA 6'x8" CCA r WHALER HORIZONTAL v ' DEADMAN F,�o o PON 6" D/A. x 8' OFFS BACKING PILE R ESS NA GINEER 18' 9000C VIN NEW YORK NSE No. 078209 SHEATHING THE EDUCATION LAW OF THE STATE OF NEW YORK PROHIBITS ANY PERSON ALTERING ANYTHING ON THESE DRAWINGS ORELEV.=-6.0' BOTTOM UNLESS IT SD UNDERETHECOMPANYING DIRECTION OF AIFICATIONSLICENSED PROFESSIONAL ENGINEER. WHERE SUCH ALTERATIONS ARE MADE, THE PROFESSIONAL ENGINEER MUST SIGN AND SEAL, DATE AND DESCRIBE THE FULL EXTENT OF THE ALTERATION ON THE DRAWING AND/OR IN THE SPECIFICATIONS. (NYS EDUCATION LAW SECTION 7209-2) i ELEV.=-19.0' — o CO I kz o i Q W � � 1 m v cz o 0 o Z EXIST. RETAINING t WAIL o DOCK WIDTH VARIES (SEE PLAN) 3'x12" CC PROP. WOODEN CCA DOCK \\// CAP PLANKING \\�% CLIENT ELEV.=+6.0' \j j 6'x8" CCA WHALER \/ EXCAVATE AND ELEV.=+2.5' MHWRE-USE AS FILL 1"x 16" TIE ROD SITE ADDRESS. 10" DIA. x 25' CCA PILE BREWER STIRLING HARBOR MARINA ELEV.=0.0' MLW 1410 MANHASSET AVENUE MONTAUK, 6'x8" CCA 6'x6" CCA GREENPORT, NY 11944 WHALER HORIZONTAL DEADMAN SCTM#1001-003-01-001 & 6" DIA. x 8' BACKING PILE 1000-036-01-001 SCALE. AS SHOWN HPE `' BREW08-01 DA 18' 9000C VIN 723 f 13 DWG SHEATHING .nl ELEV.=-6.0' BOTTOM PHASE II BULKHEAD/DOCK REPLACEMENT DETAILS SHEET N0: ELEV.=-19.0' REV. 2 OF 2