Loading...
HomeMy WebLinkAbout39483-zLUIG1 CLAUDIO S P.E. 5 Wesleyan court • Smithtown, NY 11787-3011 • (631) 543-2953 Enn% l:-4C,-4dQ": : Sunday, December 21, 2014 Eastern Energy System 7470 Sound Avenue Mattit &, New York 14 Tel. 631-779-4004 Attn.: Mr. Mike Lawton Engineer/Project Manager Dear Mr. Lawton: fax(631)543-1526 Re: Thirty eight "to', -ion W P V Roof Ton Solar Panel Arra- 10 64 kW, Too#a� pu n„t for MOn8C0 Resid�nr 65 Aauavia� r-erlUe East Marion New York 11939 Pursuant to your request, I have reviewed the following information regarding the subject roof top solar panel array: COver Street wrttf Sft ~r' tMMWed by USys represe� ung specific site information including size and spacing of rafters for the existing roof. • Design drawings of the proposed system to include site Ian, for the solar panels. This information was prepared by E2Sys and wll be uf plan, ttilized fong r approval by the Town of Southold and for construction of the proposed system. Based on the above documentation, I have evaluated the structural capacity of the existing system to support the additional loads imposed by the solar panel arrays and offer the followin comments: The existing roof type is provided with composite shingles, two (2) layer, 2"x10" Douglas Fir 16" on center. Our review of the phi otos w� f exterior ref indicate 2'x1��� 35 rWo€ ' : _ : � underlying structural members signs of settlement or misalignment caused by overstressed Structural Anal Tl* SWXtZ- anal . carr� Design wind speed (3 sec. gust): Ground snow load: 120 mph Solar Arrays 1- 3 Dead toed: 20 lbs/sq. ft. Total Weight of Array 1: 2'S lbs 582.721bs Q �l 0J — "-7/ — �Z Total Weight of Array 2: 621.98lbs Total Weight of Array 3: 621.98lbs The abOve vahm we Y#*M acceptable tib of recognmVd industry, stanriards for sitar structures. The structural analysis, performed for the existing structure and for the solar panel arrays, utilizing the above design loads, indicates that the existing roof rafters will be able to supports the additional panel weight without damage, if instaffed correctly. The onsite *Wectm and the #photographs sly #vat # M& ftmg is Ja good mndi bmw However, the dwelling owners are to be made aware that long term build up of heavy snow conditions may produce deflections in the roof structure. If any deflection is noticed, than it is recommended that the solar pants be cleared of a==uiated snow more than one (1) foot deep over a period of one week. If no deflections are visible under any snow loading over a period of Ume, then, thereisn Med to dw thesolar: pwial.. Based on the above evaluation, it is the opinion of the undersigned professional engineer, that with aMm esOW pent anchcxsbe#V ut*zed, theroof sys#ern w # ade� supper the additional loading imposed by the solar panel arrays. This evaluation is in conformance with the 2010 Residential Code of New York State, the 2001 Wood Frame construction Manual, SEI ASCE 7 "Minimum Design Loads for Buildings and Other,StrWtwee, current irdustcy standards and practice and based on documentation and data supplied by E2Sys at the time of this report. Should you have any questions regarding the above or if you require additional information, do not hesitate to contact me. Sincerely, Claudio V. t. of NEW gvJ`�y\ C. SCIA/V, '4 r � Qe'093 0 R°FE8s10N�' F SCOPE OF WORK TO INSTALL A 10.640 KW SOLAR PHOTOVOLTAIC (PV) SYSTEM AT THE MONACO RESIDENCE, LOCATED AT 65 AQUAVIEW AVENUE, EAST MARION, NY 11939. THE POWER GENERATED BY THE PV SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT. THE PV SYSTEM DOES NOT INCLUDE STORAGE BATTERIES. SYSTEM RATING 10.640 kW DC STC 9.407 kW DC PTC 7.069 kW CEC-AC EQUIPMENT SUMMARY 38 LG280SIC-63 PV MODULES 2 SMA SB 5000TL US 22 INVERTERS I IRONRIDGE XRS1000 MOUNTING SYSTEM SHEET INDEX PV -1 COVER PV -2 SITE PLAN PV -2.1 ROOF PV LAYOUT PV -3 STRUCTURAL/ DETAILS & SECTIONS GOVERNING CODES 2011 NATIONAL ELECTRICAL CODE 2010 RESIDENTIAL BUILDING CODE OF NEW YORK STATE UNDERWRITERS LABORATORIES (UL) STANDARDS OSHA 29 CFR 1910.269 GENERAL NOTES 1. CONTRACTOR SMALL CHECK AND VERIFY ALL CONDITIONS AT THE SITE PRIOR TO STARTING TO WORK AND SHALL FAMILIARIZE HIMSELF WITH THE INTENT OF THESE PLANS AND MAKE WORK AGREE THE SAME; 2. CONTRACTOR OR OWNER SHALL OBTAIN ALL REQUIRED APPROVALS, PERMITS, CERTIFICATES OF OCCUPANCY, INSPECTION APPROVALS, ETC., FOR WORK PERFORMED FROM AGENCIES HAVING JURISDICTION THEREOF, IF REQUIRED. 3. ALL WORK SHALL CONFORM TO CONSTRUCTION CODE AND ALL RULES AND REGULATIONS OF THE RESPONSIBLE JURISDICTION. 4. IF IN THE COURSE OF CONSTRUCTION A CONDITION EXISTS WHICH DISAGREES WITH THAT AS INDICATED ON THESE PLANS, THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE ENGINEER. SHOULD HE FAIL TO FOLLOW THIS PROCEDURE AND CONTINUE WITH THE WORK, HE SHALL ASSUME ALL RESPONSIBILITY AND LIABILITY THEREFROM 5. ALL STRUCTURAL STEEL SHALL BE A-36 AND SHALL BE FABRICATED AND INSTALLED AS PER LATEST A.I.S.0 SPECIFICATIONS. 6. ALL ELECTRICAL WORK SHALL BE BOARD OF FIRE UNDERWRITERS APPROVED AND IN ACCORDANCE WITH N.E.C. & NYS CODES & REGULATIONS 7. ANY DEVIATION FROM THESE PLANS WITHOUT THE WRITTEN CONSENT OF THE ENGINEER WILL NEGATE THE ENGINEER'S CERTIFICATION OF THESE PLANS. 8. THESE DRAWINIOS AS INSTRUCMENTS OF SERVICE ARE AND SHALL REMAIN THE PROPERTY OF THE ENGINEEIR WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE NOT TO BE USED ON ANY OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT 9. CONTRACTOR SMALL PROTECT, PATCH AND REPAIR ALL EXISTING WORK ADJACENT TO HIS WORK, OR DAMAGED AS RESULT OF HIS WORK. 10. CONTRACTOR TO EFFECT AND MAINTAIN INSURANCE, IA. CONTRACTOR'S LIABILITY, WORKMAN'S COMPENSATION, COMPLETED OPERATION, ETC. ADEQUATE FOR THE PURPOSES OF THIS PROJECT AND FURNISH PROOF OF SAME PRIOR TO COMMENCING WITH WORK. 11. EACH SUBCONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SAFETY ON THE JOB SITE DURING THE CONSTRUCTION PHASE TO COMPLY WITH THE REGULATIONS AND REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION. THIS SHALL INCLUDE, BUT ARE NOT LIMITED TO: PROVIDING FOR ADEQUATE AND PROPER BRACING, SAFETY RAILINGS AND SECURE FOOTINGS FOR ALL TEMPORARY SCAFFOLDING, STAIRS, ETC.. AS WELL AS PERMANENT CONSTRUCTION. 12. FIGURED DIMENSIONS SHALL GOVERN. DO NOT SCALE DRAWINGS, WHERE DIMENSIONS ARE ES' ABLISHED BY EXISTING CONDITIONS. EACH CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO ORDERING MATERIALS AND COMMENCING WITH WORK. 13. CONTRACTOR TO REMOVE ALL DEBRIS CREATED BY THIS WORK FROM THE SITE AND DISPOSE OF IN A LEGAL MANNER ON A WEEKLY BASIS OR SOONER IF CONDITIONS WARRANT. 14. AT THE COMPLETION OF WORK, THE SITE TO BE CLEARED OF ALL DEBRIS AND EXCESS MATERIALS. THE FACILITY IS TO BE LEFT BROOM CLEAN AND WORK IS TO BE COMPLETED TO THE TOTAL SATISFACTION OF THE OWNER PRIOR TO RELEASE OF FINAL PAYMENT. PROJECT LOCATION DESIGN & DRAFTING BY: JAMIE MINNICK NABCEP CERTIFIED 051112-129 _ REVISIONS DESCRIPTION DATE REV OR 12-17-2014 CONTRACTOR SOLAR UNIVERSE 7470 SOUND AVE MATTITUCK, NY 11952 LICENSE # 43889 H PROJECT NAME w�rn � ZW Q Z wWz WO O� Q zcy2 c° a n C Q l� w SHEET NAME COVER DRAWING SCALE N.T.S. SHEET NUMBER PV -1 LEGEND P EXISTING UTILITY METER MAIN SEPiVICE PANEL NEW PV SUB -PANELS A/C D*CONNECT COMBINER INVERTERS GND ELECTRODE PV MODULE .ice RACKING RAIL O ATTACHMENT POINT --- RAFTERS i0 --ROOF PITCH ANGLE FFISUNRUN METER 11,f-0 VENT V PLUMBING VENT SKY LIGHT CHIMNEY COMPOSITE SHINGLES GOOD CONDITION POTENTIAL SHADING ISSUES TRIM/REMOVE AS NECESSARY CONSTRUCTION SUMMARY (38) LG280S1C-03 PV MODULES, 10.640 kW DC STC - (86) ATTACHMENT POINTS @ 64" OC MAX. (278) LF ALUMINUM UNPACK RADS Roof Type = Comp Shingle, # of Layers: 2 Roof/Array #1 - Pitch: 350, Azimuth: 153° Roof Structure = 2X10 Douglas Fir Rafters @ 16" O -C„ 1/2" Plywood Decking, 2x10 JOIST Roof/Array #2 - Pitch: 350, Azimuth: 333° Roof Structure = 2x10 Douglas Fir Rafters @ 16" O.C„ 1/2" Plywood Decking, 2x10 JOIST Roof/Array #3 - Pitch: 350, Azimuth: 333° Roof Structure = 2x10 Douglas Fir Rafters @ 16" O.C., 1/2" Plywood Decking, 2x10 JOIST CONSTRUCTION NOTES 1.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. 2.) ALL OUTDOOR EQUIPMENT SHALL BE RAINTIGHT WITH MINIMUM NEMA 3R RATING. 3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. DESIGN & DRAFTING BY: JAMIE MINNICK NASCEP CERTIFIED 051112-129 REVISIONS DESCRIPTION IITDATE REV ORIGINAL 12-17-2014 T CONTRACTOR SOLAR UNIVERSE 7470 SOUND AVE MATTITUCK, NY 11952 LICENSE # 43889 H PROJECT W � U Z Cn Z W 9 Z W Z W W 0 o>a� Q�� o�� � In `O w 'SHEET NAME SITE PLAN DRAWING SCALk N.T.S. SHEET NUMBEIV PV -2 rl LEGEND EXISTING UTILITY METER k94MAIN SERVICE PANEL NEW Pv BUB -PANELS A/C DISCONNECT COMBINER INVERTERS GND ELECTRODE PV MODULE RACKING RAIL b ATTACHMENT POINT -' - RAFTERS #--ROOF PITCH ANGLE SUNRUN METER VENT PLUMBING VENT SKY LIGHT CHIMNEY �COMPOSITE SHINGLES GOOD CONDITION POTENTIAL SHADING ISSUES TRIM/REMOVE AS NECESSARY OF NEW Y0 g� JAG` C. SC1gNO RA- V 4�n '� W� `4 060935- r1G\ \OFESSIO140' No 09 ?40, � X900 11800 7t 120, `` 0 NOTE: 126" SPACING BETWEEN PV MODULES TYP. DIMENSIONS ARE FROM EDGE OF PV MODULES TO EDGE OF ROOF SHINGLES TYp. 5" DESN$N & DRAFTING; BY: JAMIE MINNICk NABCEP CERTIFIED 05111 2-12 9 DESCRIPTION I DATE ORIGINAL 12-17-2014 CON —TR— SOLAR UNIVERSE 7470 SOUND AVE MATTITUCK, NY 11952 LICENSE # 43889 H W C311W —) V l Z Z .-_ Q Z U)<C crW0 0>cr Qm < O < Ln U) w SHEET NAME ROOF DETAIL DRAWN_ G SA�E N.T.S. SHEET NUMBER PV- 3 LOAD CALCULATIONS ARRAY #1 ! ARRAY #2 AY #3 Module W'I ht 36.96 Lbs 36.96 Lbs 36.96 Lbs # of Modules 12 13 13 Total Module Weight 443.52 Lbs 480.48 Lbs 480.48 Lbs Total Length of Rail 88 Ft 95 Ft 95 Ft Rail Weight per Foot 0.9 Lbs 0.9 Lbs 0.9 Lbs Total Rail Wei ht # of Standoffs 79.2 Lbs 30 85.5 Lbs 28 85.5 Lbs 28 Wei ht er standoff Total Standoff Weiaht 2 Lbs 60 Lbs 2 Lbs 2 Lbs 56 Lbs 56 Lbs Total Array Weight 582.72 Lbs 621.98 Lbs I 621.98 Lbs Point Load 25 Lbs 25 lbs 25 Lbs Total Array Area 216 Sq Ft 234 Sq_ Ft 234 Ft Array Dead Load 2.61-bs/ Ft 2.61-bs/ Ft 2.6Lbs/Sq Ft Os0935-" AROFESS101`tP�' v net =u ret 1 vnet3U (eq b -e) KZ1 (sec b.5.7) I I F'netJU ttaDle b-3) # CLIMACTIC AND Groundand Speed Live load, Point Max fastener GEOGRAPHIC DESIGN Category Snow Load 3 sec gust pnet30 per pullout load Fastener Type spacing along CRITERIA Pg mph ASCE7, psf Ib. rails, in. A # B Roof Section # 20 120 1 # TYP. TYP. # 468 5/16" x 3-1/2" Stainless Steel TYP. Lag Bolts TABLE RR301.2(1) CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA W WIND Z SUBJECT TO DAMAGE FROM WWZ M GROUND' SPEEDd �0 Q FROST 0~ SNOW 3 SEC SEISMIC �O LINE ICE SHIELD LOAD GUST DESIGN DEPTHb TERMITE` UNDERLAYMENT FLOOD (PSF) (MPH) CATEGORY' WEATHERING' (FTaN) REQUIRED° HAZARDr 20 110 C SEVERE Y-0" MODERATE YES NO ,.,.... TO HEAVY �. _.. r._.._ r".. ...,.............. ..... .. .......... , ....... ,.... ..ww. - ..www nn"n a. Weathering may require a higher strength concrete or grade of masonry than necessary to satisfy the structural requirements of this code. The weathering column shah be filled in with the weathering index (i,e., "negligible," "moderate" or "severe") for concrete as determined from the Weathering Probability Map [Figure R301.2(3)]. The grade of masonry units shall be determined from ASTM C 34, C 55, C 62, 0 73, C 90, C 129, C 216 or C 652. b. The frost line depth may require deeper footings than indicated in Figure R403.1(1). The jurisdiction shall fill in the frost line depth column With the minimum depth of footing below finish grade. C, The jurisdiction shall fill in this part of the table to indicate the need for protection depending on whether there has been history of local subterranean termite damage. d. The jurisdiction shall fill in this part of the table with the wind speed from the basic wind speed map [Figure R301.2(4)]. Wind exposure category shall be determined on a site-specific basis in accordance with Section R301.2.1.4. e. The jurisdiction shall fill in this part of the table with the Seismic Design Category determined from Section R301.2.2.1. f. The Jurisdiction shall fill in this part of the table with (a) the date of the jurisdiction's entry into the National Flood Insurance Program (date of adoption of the 11rst code or ordinance for management of flood hazard areas), (b) the date(s) of the currently effective FIRM and FBFM, or other flood hazard map adopted by the community, as may be amended. g. In accordance with Sections R905.2.7.1, R905.4.3.1, R905.5.3.1, R905.6.3,1, R905.7.3.1 and R905.8.3.1, where there has been a history of local damage from the effects of ice damming, the jurisdiction shall fill in this part of the table with"YES," Otherwise, the jurisdiction shall fill in this part of the table with "NO." The ground snow loads to be used In determining the design snow loads for roofs are given in Figure R301.2(5) for sites at elevations up to 1000 feet. Sites at elevations above 1000 feet shall have their ground snow load increased from the mapped value by 2 psf for every 100 feet above 1000 feet. 72" (E) 2x10 RAFTER DOUG FIR @ 16" O.C. ARRAY #1,2,3 3 5 DEG 8 1„ 12 (E) 2x10 CEILING JOIST DOUG FIR @ 16" O.C.- (E) EXTERIOR WALL MODULE MOUNTING CLIP SOLAR MODULE-- \� 11 UNIRAC ALUMINUM RAIL//'" ALUMINUM "L" BRACKET) COMPOSITION SITION ROOF—I RAFTER ROOF FRAMING DETAIL 1 SCALE: 1/2" = 1'-0" STAINLESS STEEL 3/8" BOLT AND NUT \ALUMINUM FLASHING _ALUMINUM PV QUICKMOUNT 5/16" x 6" STAINLESS STEEL LAG BOLT WITH 1-2 1/2" MIN THREAD PENETRATION SEALED WITH GEOCEL 4SOO MOUNTING DETAIL ] SCALE: 1 1/2" = 1'-0" DESIGN & DRAFTING BY: JAMIE MINNICK NABCEP CERTIFIED 0$1112-129 REVISIONS r ESCRIPTION DATE 1 REV IGINAL 12-17-2014 CONTRACTOR SOLAR UNIVERSE 7470 SOUND AVE MATTITUCK, NY 11952 LICENSE # 43889 H PROJECT NAME UZrn W a) Z W Q r' Z WWZ M 0 0>X �0 Q G 0~ �O W SHEET NAME STRUCTURAL DRAWING SCALE AS NOTED SHEET NUMBER PV -4