Loading...
HomeMy WebLinkAbout37304-Z f Town of Southold Annex 11/25/2014 P.O.Box 1179 54375 Main Road '$6 p Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 37292 Date: 11/25/2014 THIS CERTIFIES that the building ACCESSORY GARAGE Location of Property: 4425 Nassau Point Rd, Cutchogue, SCTM#: 473889 Sec/Block/Lot: 111.-9-7 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 4/5/2012 pursuant to which Building Permit No. 37304 dated 6/19/2012 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: unheated non-habitable accessory garage with workshop and half bath as applied for. The certificate is issued to Malter,Michael&Malter,Daryl (OWNER) of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL R10-12-0029 11/18/2014 ELECTRICAL CERTIFICATE NO. 37304 5/22/2013 PLUMBERS CERTIFICATION DATED 3/20//2013 Peconic Plumbing&Heat. Auto ' ed 'gnature TOWN OF SOUTHOLD BUILDING DEPARTMENT ' TOWN CLERK'S OFFICE '�► 1 SOUTHOLD, NY tie BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 37304 Date: 6/19/2012 Permission is hereby granted to: Malter, Michael & Malter, Daryl 44 Grace Ct Brooklyn, NY 11201 To: construct an unheated accessory detached garage with workshop as applied for At premises located at: 4425 Nassau Point Rd, Cutchogue SCTM # 473889 Sec/Block/Lot# 111.-9-7 Pursuant to application dated 4/5/2012 and approved by the Building Inspector. To expire on 12/19/2013. Fees: ALTERATION OF ACCESSORY BUILDINGS $1,000.00 CO -ACCESSORY BUILDING $50.00 Total: $1,050.00 Building Inspector Form No.6 TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN HALL 765-1802 APPLICATION FOR CERTIFICATE OF OCCUPANCY This application must be filled in by typewriter or ink and submitted to the Building Department with the following: A. For new building or new use: 1. Final survey of property with accurate location of all buildings,property lines,streets,and unusual natural or topographic features. 2. Final Approval from Health Dept.of water supply and sewerage-disposal (S-9 form). 3. Approval of electrical installation from Board of Fire Underwriters. 4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1% lead. 5. Commercial building, industrial building,multiple residences and similar buildings and installations,a certificate of Code Compliance from architect or engineer responsible for the building. 6. ' Submit Planning Board Approval of completed site plan requirements. B. For existing buildings(prior to April 9, 1957)non-conforming uses,or buildings and "pre-existing" land uses: 1. Accurate survey of property showing all property lines,streets, building and unusual natural or topographic features. 2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is denied,the Building Inspector shall state the reasons therefor in writing to the applicant. C. Fees 1. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00,Alterations to dwelling$50.00, Swimming pool $50.00,Accessory building$50.00,Additions to accessory building$50.00, Businesses$50.00. 2. Certificate of Occupancy on Pre-existing Building- $100.00 3. Copy of Certificate of Occupancy -$.25 4. Updated Certificate of Occupancy- $50.00 5. Temporary Certificate of Occupancy- Residential $15.00,Commercial $15.00 Date. New Construction: Old or Pre-existing Building: (check one) Location of Property: 2� I V r�SS ��1y� p a,t 11q_35 House No. Street ; Hamlet Owner or Owners of Property: I Suffolk County Tax Map No 1000, Section Block Lot Subdivision ~� Filed Map. Lot: Permit No. ! Date of Permit. Applicant: Health Dept. Approval: Underwriters Approval: Planning Board Approval: j Request for: Temporary Certificate Final Certificate: i // (check one) Fee Submitted: $ 61 JA14ic��igna`iure S�FFO�fi Town Hall Annex �p� C Telephone(631)765-1802 54375 Main Road Fax (631)765-9502 P.O. Box 1179 • Southold, NY 11971-0959 y4j►�l �p0� roper.richert()town.southold.nv.us BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICIAL COMPLIANCE SITE LOCATION Issued To: Malter Address: 4425 Nassau Point Rd City:Cutchogue St: NY Zip: 11935 Building Permit#. 37304 Section: 1 1 1 Block: 9 Lot: 7 WAS EXAMINED AND FOUND TO BE IN WITH THE NATIONAL ELECTRIC CODE Contractor: DBA: Twin Fork Electric Inc License No: 3488-e SITE DETAILS Office Use Only Residential X Indoor X Basement X Service Only Commerical Outdoor X 1st Floor X Pool New Renovation 2nd Floor X Hot Tub Addition Survey Attic Garage X INVENTORY Service 1 ph 300a Heat Duplec Recpt 21 Ceiling Fixtures 12 HID Fixtures Service 3 ph Hot Water GFCI Recpt 3 Wall Fixtures 7 Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Fluorescent Fixture 7 Pumps Transformer Appliances Dryer Recpt Emergency Fixtures Time Clocks Disconnect Switches Id Twist Lock Exit Fixtures TVSS Other Equipment: garage,300a underground service, 1-exhaust fan Notes: Inspector Signature: Date: May 22 2013 Electrical Certificate.xls 0 g Fax(631)765-9502 Town Hall,53095 Main Road O `F P.O.Box 1179 'y Telephone(631)765-1802 Southold,New York 11971-0959 BUILDING DEPARTMENT TOWN OF SOITMOLD CERTIFICATION Date: Building Permit No. 3-73c) �1 Owner: fAIC"PtL pPuy L MA (please print) Plumber: iS e (please print) pec©n NH I certify that the solder used in the water supply system contains less than 2114 of 1% lead. & Z 4(Pbers�- ) Sworn to before me this day of a , 20� VKX 1.LOPER Notary Public,State of New York 'VA No.O1L06010081 Oualified in Suffolk Co y Commission Expires Notary Public, C,��County o��,oF soory� 373o * * TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION FOUNDATION 1 ST [ ] ROUGH PL13G. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING/STRAPPING [ ] FINAL ( ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRIXTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) REMARKS: oop DATE ��7�� INSPECTOR ��_�Of�04ryo6 373 of �` w TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION FOUNDATION 1 ST [ ] ROUGH PL13G. L�OUNDATION 2ND [ ] INSULATION [ ) FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) REMARKS: D DATE -INSPECTOR �� - 43 '73 TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ;FOUNDATION NDATION IST [ ] ROUGH PLBG. [ 2ND [ ] INSULATION [ ] FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROU ) [ ] ELECTRICAL (FINAL) REMARKS: DATE / INSPECTOR 3 7 TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1 ST [ ] ROUGH PLBG. [ J F DATION 2ND [ ] INSULATION [ FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE A CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRIC (ROUGH) [ ] ELECTRICAL (FINAL) REMARK t-,77 !ti /;7 4.lk ��X-r C.0 sr DATE INSPECTOR f�f M� TOWN OF SOUTIIOLD BUILDING DE ov 765.1802 INSPECTION 1 [ J FOUNDATION 1ST [ ] ROUGH PLBa. [ ] FOUNDATION 2ND [ ] INSULATION l FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ 1 FIRE RESISTANT COIiSTR11CT10N [ ] FOIE RESISTANT PENETRATION �J-ELECTRICAL(ROUGH) [ ] ELECTRICAL(FINAL) REMARKS: DATE 2 � /13 INSPECTOR�i:,V2� 37 .QoftB4T,y, i l TOWN OF SOUT110LD BUILDING DEPT. 765.1802 INSPECT [ ] FOUNDATION iST [ R DH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE &CHIMNEY [ ] FIRE SAFETY INSPECTION I I FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION I ] ELECTRICAL (RgfJGN) [ ] ELECTRICAL (FIN REMARKS: DATE 3 INSPECTOR Q o�`�'Of soUryo TOWN OF SOUTHOLD BUILDING DEPT. 765.1802 INSPECTION [ ] FOUNDATION 1 ST [ ] ROUGH PL13G. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL(FINAL) REMARKS: DATE —INSPECTOR -37;o TOWN OF SOUTNOLD BUILDING DEPT. 765.1802 INSPECTION [ ] FOUNDATION 1ST [ ] DH PLBG. [ ] FOUNDATION 2ND [ '--INSULATION i [ ] FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ) FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ 1 FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH/) [ ] ELECTRICAL(FINAL) REMARKS: DATE � �l INSPECTOR TOWN OF SOUTNOLD BUILDING DEPT. 765-1802 INSPECTIO [ ] FOUNDATION IST [ ] RO PLBG. 1 [ ] FOUNDATION 2ND [ NSULATI [ FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ 1 FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION 1 ELECTRICAL (ROUEN) [ ] ELECTRICAL (FINAL) REMARK n 41 b DATE � INSPECTOR TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 1 N S P E C T 10 N [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) 01-ELECTRICAL (FINAL) REMARKS: DATE ?/Z' INSPECTOR<:TI o 3 �3 TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTIO [ ] FOUNDATION 1ST [ ROUG BG. [ ] FOUNDATION 2ND [ ) I LATION [ ] FRAMING /STRAPPING [ FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) REMARKS• Ao� c r DATE INSPECTOR oFsouy°� TOWN OF SOUTHOLD BUILDING DEPT. 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PL13G. [ ] FOUNDATION 2ND [ ] IN CATION [ ] FRAMING /STRAPPING [ FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (RO GH) [ ] ELECTRICAL (FINAL) REMARKS: T DATE Din //75o INSPECTOR ` 32 TOWN OF SOUTFIOLD BUILDING DEPT. 765.1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] IN ATION [ ] FRAMING/STRAPPING [ FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) REMARKS: DATE [/31NSPECTOR RCHITECT MARK SCHWARTZ&ASSOCIATES 28493 Main Road•PO Box 933•Cutchogue, NY 11935 631.734.4183 1 www.mksarchitcct.com June 24,2013 Southold Town Building Department P.O.Box 1179 Main Road Southold,New York 11971 Re: Malter House 4425 Nassau Point Road Cutchogue,New York Permit#32531 Z 130M To Whom This May Concern: I have been on site the aforementioned site during the construction phase and have reviewed the project strapping. The strapping of the framing, to the best of my knowledge, has been completed as per plans and the work meets or exceeds NYS code requirements. Please call this office if you have any questions or require additional information. Very truly yours, 1N '�.N ' . r SCE WE Mark Schwan , JW 25 BLDG.DEPT. TOWN OF SOUTHOLD AIA Mc,mbcr A;,icrican lw itute of lArchite tui ;�[c � ht�}�;,a�y o ;d• • 1 L • 1 I;M a WE LME. AW PLUMBING nib- AMR ■� -.�- ," - - STATE ENERGYCODE _ MOPE � 2), _ 0 .r COMNSKS - • - TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST BUILDING DEPARTMENT Do you have or need the following,before applying? TOWN HALL Board of Health SOUTHOLD, NY 11971 4 sets of Building Plans TEL: (631) 765-1802 Planning Board approval FAX: (631) 765-9502 Survey South oldTown.NorthFo rk.net PERMIT NO. Check Septic Form N.Y.S.D.E.C. Trustees D C.O.Application Flood Permit Examined 20 Single&Separate APR — 5 2012 Storm-Water Assessment Form Contact: BLDG. DEPT. Approved G 20) Z _ TOWN OF SOUTHOLD Mail to: ��C� 7-L.- Disapproved a/c Phone: 7 ¢ � Expiration Z ��20 J-3 Building Inspector APPLICATION FOR BUILDING PERMIT Date 4 ljr— , 20 INSTRUCTIONS a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 4 sets of plans, accurate plot plan to scale. Fee according to schedule. b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or areas, and waterways. c. The work covered by this application may not be commenced before issuance of Building Permit. d. Upon approval of this application, the Building Inspector will issue a Building Permit to the applicant. Such a permit shall be kept on the premises available for inspection throughout the work. e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector issues a Certificate of Occupancy. f. Eve6.bbilding permit shall expire if the work authorized has not commenced within 12 months after the date of issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the property have been enacted in the interim, the Building Inspector may authorize, in writing, the extension of the permit for an addition six months. Thereafter, a new permit shall be required. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws, Ordinances or Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The applicant agrees to comply with all applicable laws, ordinances, building code, housing code, and regulations, and to admit authorized inspectors on premises and in building for necessary inspections. (Signature of applicant or name, if a corporation) (Mailing address of applicant) State whether applicant is owner, lessee, age , architect gineer, general contractor, electrician, plumber or builder Name of owner of premises �� Lkk y L (As on the tax roil or latest deed) If applicant is a corporation, signature of duly authorized officer (Name and title of corporate officer) Builders License No. Plumbers License No. Electricians License No. Other Trade's License No. 1. Locar�on f land on which, roposed work will be done: House Number Street Hamlet County Tax Map No. 1000 Section Block d Lot C Subdivision Filed Map No. Lot 2. State existing use and occupancy of premises and intended use and occupancy of proposed construction: a. Existing use and occupancy S/^/G („E "..-W /C b. Intended use and occupancy 2A,"E �✓� /g/L,q-�..g 3. Nature of work (check which applicable): New Building Addition Alteration Repair Removal Demolition Other Work (Description) 4. Estimated Cost Fee (To be paid on filing this application) 5. If dwelling, number of dwelling units Number of dwelling units on each floor If garage, number of cars 6. If business, commercial or mixed occupancy, specify nature and extent of each type of use. 7. Dimensions�f�sting stro tre us, if any: Front Rear Depth Height Number of Stories Dimensions of same structure with alterations or additions: Front Rear Depth Height Number of Stories 8. Dimensions of entire new construction: Front Rear Depth Height Number of Stories /y 9. Size of lot: Front Rear Depth 10. Date of Purchase Name of Former Owner 11. Zone or use district in which premises are situated le ¢- b 12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO 13. Will lot be re-graded? YES NO_yWill excess fill be removed from premises? YES_NO 14. Names of Owner of premises 14'&&]r A Address Phone No. Name of Architect 3C, f/G✓ 27"Z-- Address ?,I Phone No Name of Contractor Address G L Z h4G v C- Phone'. 15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES V/NO * IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS JAY BE REQUIRED. b. Is this property within 300 feet of a tidal wetland? * YES t/NO * IF YES, D.E.C. PERMITS MAY BE REQUIRED. 16. Provide survey, to scale, with accurate foundation plan and distances to property lines. 17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey. 18. Are there any covenants and restrictions with respect to this property? * YES NOY, * IF YES, PROVIDE A COPY. STATE OF NEW YORK) SS. COUNTY OFY6A%�jL Z— being duly sworn, deposes and says that(s)he is the applicant (Name qof�dividual signing contract)above named, (S)He is the J`'/:-G (Contractor, Agent, Corpo to Off idler, etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application; that all statements contained in this application are true to the best of his knowledge and belief, and that the work will be performed in the manner set forth in the application filed therewith. Sworn to before me this / day of 20 C Notary Public Signature f Applicant Town Fall Annex [ rogeTelephone(631))165--18.02 cn1ihld54375'Main Road rAcherAfflowsOu02ny .us P.O.Box 1179 G Southold,NY 11971-0959 BUILDING DEPARTMENT TOWN OF SOUTHOLD APPLICATION FOR ELECTRICAL INSPECTION REQUESTED BY: /► 1t�✓ �-r/ �' - Date: 2 /.3 Company Name: z L Name: r u License No.: 3 Address: j� ��-r✓1. o Phone No.: �' 2 o Q JOBSITE INFORMATION: (*Indicates required information) *Name: lA-� *Address: y y 2-oEi; All"s *Cross Street: *Phone No.: Permit No.: Tax Map District: 1000 Section: Block:` Lot: *BRIEF DESCRIPTION OF W RK ase Print Clearly) (Please Circle Alt That Apply) � Is Job ready for inspection: NO ou h `M Final *Do.you need a Temp Certificate: 1WNO . I �` Temp Information-(If nroved) *Service Size: as 313hase 100 150 200 350 400 Other *New Service: sect n erground Number of Meters ange of Servi Overhead Additional Information: PAYMENT DUE WITH APPLICATION ft9_Rcuuoaaf fnr IncnPefinn Fnm7 SUFFQ/r Town of Southold ? Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM tT PROPERTY LOCATION: S.C.T.M.til: THE FOLLOWING ACTIONS MAY REQUIRE THE SUBMISSION OF A �j to* fit 09 40'7 STORM-WATER,GRADING,DRAINAGE AND EROSION CONTROL PLAN n -015EF- TT� CERTIFIED BY A DESIGN PROFESSIONAL IN THE STATE OF NEW YORK. SCOPE OF WORK - PROPOSED CONSTRUCTION ITEM# / WORK ASSESSMENT Yes No a. What is the Total Area of the Project Parcels? Will this Project Retain All Storni-Water Run-Off (Induce Total Area of all Parcels boated within G Generated by a Two(2")Inch Rainfall on Site? the Scope of Work for Proposed Construction) s item will include all run-off created b v—/ (s.F.r Anes) (This y site b. What is the Total Area of Land Clearing clearing and/or construction activities as well as all and/or Ground Disturbance for the proposedSite Improvements and the permanent creation of construction activity? O us surfaces.) (S.F.r case) i 2 Does the Site Plan and/or Survey Show All Proposed / PROVIDE BRIEF PROJECT' DFSCREMON (Pro—mcI taw Prep.as Naedul) Drainage Structures Indicating Size&Location?This / Item shall include all Proposed Grade Changes and QQQ— 'A14 ��T�G � G"� .� Slopes Controlling Surface Water Flow. 3 Does the Site Plan and/or Survey describe the erosion and sediment control practices that will be used to — ❑ control site erosion and storm water discharges. This Item must be maintained throughout the Entire Construction Period. 4 Will this Project Require any Land Filling,Grading or Excavation where there is a change to the Natural a Existing Grade Involving more than 200 Cubic Yards Lz of Material within any Parcel? fj Will this Application Require Land Disturbing Activities Encompassing an Area in Excess of Five Thousand E-1 — (5,000 S.F.)Square Feet of Ground Surface? 6 is there a Natural Water Course Running through the Site? Is this Project within the Trustees jurisdiction / General DEC SWPPP Requirements: or within One Hundred(100')feet of a Weiland or -tom Submission of a SWPPP is required for all Construction activities invdving soil Beach? disturbances of one(1)or more acres; including disturbances of less than one acre that 7 Will there be Site preparation on Existing Grade Slopes are part of a larger common plan that will ultimately disturb one or more acres of land; which Exceed Fifteen(15)feet of Vertical Rise to r ✓ including Construction activities involving soil disturbances of less than one(1)acre where One Hundred(100')of Horizontal Distance? the DEC has determined that a SPDES permit is required for storm water discharges. (SWPPP's Shall most the Minimum Requirements of the SPDES General Permit 8 Will Driveways,Parking Areas or other Impervious for Storm Water Discharges from Construction activity-Permit No.GP-0-10-001.) Surfaces be Sloped to Direct Storm-Water Run-Off ❑ — 1.The SWPPP shall be prepared prior to the submittal of the NOT.The NOI shad be into and/or in the direction of a Town right-of-way? submitted to the Department prior to the commencement of construction activity. 2.The SWPPP shall describe the erosion and sediment control practices and where 9 Will this Project Require the Placement of Material, required,post-consfructlon storm water management practices that will be used and/or Removal of Vegetation and/or the Construction of anyf / constructed to reduce the pollutants In storm water discharges and to assure Item Within the Town Right-of-Way or Road Shoulder v compliance with the terns and conditions of this permit —In addition,the SWPPP ahaN — ktentify potential sources of pollution which may reasonably be erected to affect the Area?m t.tam writ Nor include the Imhaaa.n at Drrwway Apron..) quality of storm water discharges. NOTE: if Any Answer to Questions One through Nine Is Answered with a Check Mark 3.AN SWPPPs that require the post-construction storm water management practice in a Box and the construction site disturbance Is between 5,000 S.F.&.1 Acne In area, component shall be prepared by a qualified Design Professional Licensed in New York a Storm4lfater,Grading,Drainage&Erosion Control Plan is Required by tip Town of that is knowledgeable in the principles and practices of Storm Water Management Southold and Must be Submitted for Review Prior to Issuance of Any Building PermiL (NOTE A Check Mark(4)ardlor An war for each Question is Required fore Complete Application) STATE OF NEW YORK, COUNTY OF...... �.... �.�.! .........SS That I................ �.,..-...I .. 7 •••ening C�l w .�'eing duly sworn,deposes and says that he/she is the applicant for Permit, (Name of hdhvidual signing Document) And that he/she is the ..........................................dn . .Co; . o.....ntractor ) Owner and/or representative of the Owner or Owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his knowledge and belief;and that the work will be performed in the manner set forth in the application filed herewith. Sworn to before me this; NotaryPublic: .......................................................................................... .............. ......... .. ...... ...................................: (Signet Applicant) FORM - 06/10 TOS "SWPPP" Preparation - Chapter 236 Article 11 - Storm Water Management Storm Water Pollution Prevention Plan Review Checklist Checklist 1 REQUIRED PLAN INFORMATION AND IMPLEMENTATION DETAILS: € € € Plan Sheet YES€ NO €N.A.€ Explanation for NO or N.A.Does the 3WPPP Adequate) Provide for and/or Indicate the Following:) , Location(pg.#) 1. Drainage Calculations tormwater BMPs Designed to contain a wo Inch Rainfall On-Site. € ____________ _._ _ _ __ ____________ _______________________.. 2 Construction Phasing Plan Indicating Sequence of Proposed Construction Activities. €Q€ €Q ______.__._..____..___..____ 3 General Location Map •_____________ €�¥ 4 Plan Drawn to Scale of not less than Sixtyf(60 tfeet to the Inch Indicating the Following € €Q€ a__LocationandDescn---nofPrgpertyBoundaries _._..___..___.._____ 6.- S€teAcreage;.______ a s�s� c All Existing,Natural and/or Man Made Features on and within 500'of the Property Boundary;_ Q Q d Test Hole Data Indicating Soil Characteristics&Depth to Seasonal High Water Table; V€= e Contours Indicating Property Elevations(Min.2'); €0€0 f Spot Grade 8�F€n€sh Floor Elevations for Existing and Proposed Strictures; °0€ Q€ g Location o Wooded Areas&Isolati6TFe;es i 4 6 a Minimum Dimension 6 f fl P Diameter; h:Soil onservafionbistnciSoi'Survey.-_________________________ _______i 5. Background Information about the Scope of the Project,Location&Description of the Site, € € Proposed Changes to the Site and All Existing Develo menton the site Ind ding the Following. € € €0 _ gg _._ P________ _� _______ _; _._.. a,...All_1Lnproyam�ntslrlGl.Udl09Ti?? fAraaPt adLd�.lsttub c@$_T.OtaI5ftaArea-___-_____.iDiDi� ..._._ b. All Excavation,Filling,Stripping 8 Grading Proposed and Identified as to depth,Volume �i�€�;� �(L ficCA�VOA &_Nature of M--------terials Involved € € ____ ___,.____.____.._.M._____._____..__.__________.__.___...._� __.c._, AIIAreasRequiringClearing_and/or Grubbing: d. All Areas Where Topsoil is to be Removed,Stockpiled and where Topsoil will ultimately ; be placed; - €r--':, € e. All Temporary 8 Permanent Ye station to be Placed on Site; € ____ __ f. All Temporary&Permanent Storm Water Runoff BMP Control Measures Proposed: i� �€ __._. __, g. The Anticipated Pattem of Surface Drainage During Periods of Peak Runoff, J € €0 ^ h. The Location of all Roads Driveways Sidewalks,Palos Structures,ULbftes 8 Other Improvements,Including Temporary Access 8 nstruction Staging Areas; f € s € - _______----___________----_____ 0€ €0� -_ 6. A Schedule of the Sequence for the Installation of All Planned Soil Erosion,Sedimentation oT,.__ mm mm &Stormwater Runoff Control Measures. 0€�€0 i F CiR V" _._______ _.____._._______ ______ __._____...__________________.___,_._.___.___._._____._._. � s �___....,.____.___�.�_._._...__.._. . ._-____._..____ 7.-'b---!'-­-r- _ _ __ 00 � •__ _____ ------------------- 8. _ _________ . _ 8. A Description of the Minimum Erosion 8 Sediment Control Practices to be Installed and/or € nCa€r— F ���+��G 1, _Implemented for Each Construction Activity that----ll result in Soil Disturbance.__-______,___ s € € 9. Description of Construction&Waste materials Expected to be Stored On-Site. _ __ _ Q ;Q ____._ ____________...____.___ ---------- 10. Temporary&Permanent Soil Stabilization Plan that meets the Current Version of the _ € _New_York State Storm Water Design Manual Technical Standard. �i 0 tt € -------------------------------------- if. --___________________._______.________ 11. _Gene_ral_Sit4 Plan an_d Construction Drawings forth_e P_nject.------------------ s €0€ Dimensions.Material Specifications 8 lnstallation_Details for Al Erosion&Sediment Control Practices. ®jQ ---------------------------------------------------------- 12'_ - --- € f I ____._________________________ 13. _Tem oraryPracticesthat --§-Converted to---------manent----tro_IMeasures.� - ________���0€��_____________,_________ _ � M_______-_____ 14. Implementation Schedule for Staging Temporary Erosion Control Practice or BMP. _ _ _ Q ® Q _ ___ ___ __ _ _ Maintenance Schedule to Ensure Continuous&Effective Operation of Erosion& €O €O _ Sediment Control Practices. _ _ _ ; ai _� € s € __...________ _______.__.__ _..._________ 16. Names of Potential Surface Waters of the State of New York and/or MSW that may be __ i € €O€ v TG,� Impacted by Development. _ i, _ _ _ _ 17.-Delineation of Storm Water Control Plan Implementation Responsibilitiesfor Each partofthe__�=!=:� M� AQlm-J_____x_____ ____,w_________ ___________ __ProectConstructionSite. _ _ € € ��� _________________.._________...._____________________________� € € �___ _ ________..________._______._________ _.-_________ 18. PJl other Existing Data that Describes Storm Water Runoff and/or Natural Drainage ---------------------------------------------------- U _ _ ______ _ _ _ _ _ _ _ __ _ _ _ ____ 19.-Identification of All Contractors)%Sub-Contractors) Responsible for Installing,Constructing, ��; €� Repairing,Replacing,Insand Maintainingthe Erosion 8 Sediment Control Practices. mm Storm Water Management Control Plan Checklist#1 : 03-12 w Verity, Mike From: Robert Gabrielsenbuild <gabrielsenbuild@optonline.net> Sent: Friday, February 15, 2013 10:07 AM To: Verity, Mike Attachments: photo.JPG;ATT27923.txt Mike, Can you show Gary Fisch this photo as I do not have his email address. Please confirm this photo is all he needs to see to complete theinsulation inspection at the Malter residence in Nassau Point.At the time of the site inspection the insulator had ran a few pieces short in the stairwell.Thanks for your time Thanks, Ron Gabrielsen SO�jyolo Town Hall Annex Telephone(631)765-1802 54375 Main Road Fax(631)765-9502 P.O.Box 1179 Wr Southold,NY 11971-0959 Oly �Q CoUlm,� BUILDING DEPARTMENT TOWN OF SOUTHOLD August 12, 2013 r Michael & Daryl Malter 44 Grace Ct (� 0 Brooklyn, NY 11201 Re: 4425 Nassau Point Rd, Cutchogue TO WHOM IT MAY CONCERN: The Following Items(if Checked)Are Needed To Complete Your Certificate of Occupancy: Application for Certificate of Occupancy. (Enclosed) Electrical Underwriters Certificate. (contact your electrician) A fee of$50.00. Final Health Department Approval. Plumbers Solder Certificate. (All permits involving plumbing after 4J1/84) Trustees Certificate of Compliance. (Town Trustees#795-1892) Final Planning Board Approval. (Planning#795-1938) Final Fire Inspection from Fire Marshall. Final Landmark Preservation approval. Final inspection by Building Dept BUILDING PERMIT: 37304 —Accessory Garage TOWN OF SOUTHOLD OkOPERTY RECORD CARD OWNER 6�alty✓ M i�,�,qei( + STREETS" VILLAGE DISTRICT SUB. LOT, '�7 F&u L122 C 44 Y K ✓ ,WV>;R T ` CU TG.�J (i 0 .i7, FORMER OWNER N E ACREAGE 1 ' S U - S W TY E O , I L NG , r�5�160 SEAS. VL. FARM COMM. IND. CB. MISC. LAND IMP. TOTAL DATE REMARKS f /G dl ��/� , �,��„ ���1�'`�s� � l:( D 'q00 •( 5 'd ( � 0 �&'Aa#4' a3hA SOC7 n p� p o 73i9tWIL - . D `tN,a 7R is D 'Erro _Qz 37� esu 1J 'S�`���� �.(��/►�� �9D �d ��ji�o r A zr, S-? — o bG 3 GE ggo BUILDING O DIri TI N _ 3 QONEW 00 NORMAL qVOVy� ABOVE P 3 2Q S • Farm Acre Value Per Acre Value _PpivAt 0 Tillable 1 Tillable 2 Tillable, 3 I a1 (�p �j5S �tQJlr •���' Woodland Swampland Brushlanc House Plot Tota l ■■■■■■■■■■■■■MMAN 0 ON M■■■■■■I■ MME ■■■■■■i ■■■■HII■■EMMEMB _M EMEM9110MEMENEV so ■■■■■11■■■■ERZ4 ' lfiSON ■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■ t. Walls Interior Finish Fire Place corn ratio Rooms 2nd Floor I � • •• Driveway �'� �>� o , fr , _ n� j 1 �I 1��,.. ',,� f�t�i ��� ,., i Sq.. ys, �. ,», � � � �� � i. t, g � � � ,n ., �"k', ���� �f SURVEY OF PROPERTY S N� AT NASSAU POINT TO YIN OF SO UTHOLD SUFFOLKCOUNTY, 1�. Y mem 'WOOD RETAINING WAU S 1000-111-09-07 SCALE. 1'=30' 94.13' WAS FEBRUARY 2, 2012 3 ,5 LOT `3 01 2Ln 6 G WOOp RETAINING WAU y WAIL -iE� ?'S LA r =y,�-.�- ut SEP LpCA�ON 28.Ns WOOD STAIRS rfi 'XiX�X X x w -N �X iX�X K 4 r, DEER XiX�X _XIX FE 8• -go'50 70 p.g'N i ]X pEENGE O o � _ A s rN � ( FENCE �0 t"I \ ' . i o Q + GRAVEL _x� 1g O �\ �.OT "/ TEST HOLE DATA BY McDONALD GEOSCIENCE 2/2/2012 �0 F o 1 +73.0' 1 �y v m o O STONE STAIRSo m BROWN SILTY SAND SIA O Z ` �O +72.;Y O Z m 2' Zy ( \ 1/ O 11Z LE � I z; 9 i } 0132 i 4i0OO RETAINING WAW a1.1�, PALE BROWN nNE SAND SP Lvo rn \ \ — ) / / 6 T� O \\ O \\ I I i x J /DEER PE �iX�'X•�— i �p tY —✓ / i OVERHEAD POLEf' WI �E� 17' C ✓ 1' 6/c �.✓ i WIRES _,_.��_ WOOO RETAINING WALL oLE � r o- 650 —� 9.3 ~ S X_ QLO LUTIONG NOVRJ �� n 00 C, * ., . /�— OaE C LOGA SEP / fes Elevations referenced to N.A.V.D. 88 �� � �C; � ::�,��,��. � �: �:�-=i.•. I am familiar with the STANDARDS FOR APPROVAL 03 �" AND CONSTRUCTION OF SUBSURFACE SEWAGE DISPOSAL SYSTEMS FOR SINGLE FAMILY RESIDENCES and will abide by the conditions set forth therein and on the DAD permit to construct. E ' +,R R CARP r.. The location of public water, wells and cesspools shown hereon are from field observations and or from data obtained from others. ANY ALTERATION OR ADDI770M TO THIS SURVEY IS A VIOLATION YS. LIC. NO. 49618 OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW. ECONIC VEYORS, P.C. EXCEPT AS PER SEC77ON 7209—SUBDIVISION 2. ALL CER77FICA77ONS � �Q-� �3,76� SQ. �--. w�- LOT NUMBERS REFER TO "A►,IENDED MAP A OF NASSAU 631) 765-5020 FAX (631) 765-1797 HEREON ARE VALID FOR THIS MAP AND COPIES THEREOF ONLY IF _ POINT CLUB PROPERTY INC FILED IN THE SUFFOLK P.O. BOX 909 SAID MAP OR COPIES BEAR THE IMPRESSED SEAL OF THE SURVEYOR WHOSE S/GNA TURF APPEARS HEREON. 0 TIE LINE COUNTY CLERK'S OFFICE ON AUGUST 16, 1922 AS MAP NO. 156. 1230 TRAVELER STREET I SOUTHOLD, N. Y 11971 12-110 SCDHS Ref# RIO-12-0029 SURVEY OF PROPERTY N GARAGE SANITARY SYSTEM (0.5 BATH) �," 2 1 1,000 GALLON SEPTIC TANK A T NASSA U POINT 1 8' DIA. x 12' DEEP LEACHING POOL TOWN OF SOUTHOLD WITH 3' SAND COLLAR 3' ABOVE GROUND WATER �� G`� `..F_m_`��•:-�°.�;m..e:_w:�-''�-�-� ' SUFFOLK COUNTY, N. Y. WO0D RETAINING WAU S N EXISTING WELL TO BE ABANDONED 1000-111-09-07 Pools �� wAu SCALE: 1'=30� 8L�D 1N SpI M p001 S�� 3 WAS ole v� S'nNG 011 "7 FEBRUARY 2, _2012 26 jp gE REP g1 LEACHING �94•� � ,ss APRIL 11, 2012 (PROP. GAR.) LOT G y�1TH LECA RE1PaNINGYI J APRIL 16, 2012 (REVISIONS) QpWE�-�'�N JKN 'Nom r owN wAu L=! AUGUST 28, 2012 (REVISIONS) LocA:oN Zs J OCTOBER 9, 2012 (FOUNDATION LOC. & REVISIONS) SEPr� FE ,N g1p1RS (r1 MARCH 20, 2013 (revision) .2 VIA WOOD .x - DEERt X�x�X Y�cX�'X�x xK I EMSTI G SEPTIC tA rn N78 38,50 E 0.9,14 )x� RN \s�rsTE►Y+------- ' �x 0 \ x x�x wELI- ED)� cn a •8 ►-. pgAN� �'�`� /a _ 7Z x (10 BE y1 J� "� �.7' 16� X8.9 I m � �N off` CE �� > e. ._ t � Pl ,, '� c CD 0O 4e r n �. —p N S 27 z >_ 11 r GRAVEL �p _ \ i J ' `� Z m j TEST HOLE DATA o B.B. . o. o k� }1a.o � �, ge �.z� Pin 4p, �+ry e BY McDONALD GEOSCIENCE k 2/2/20120. vj \ 5t MIN. �`� STONE STq�Rs �o ='• a BROWN SILTY SAND SM Day MIN +72.3' OSE a4 Z " 2' 0-04 51 1 �ql� ' Q _ \•TEST HOLE X I o �- E1. 72 c� G �s y r� ♦�'✓` 'L � � x I '�� � .x rn RETAINING WALL PALE BROWN FINE SAND SP L Z \ \ Zg 0 i )k ER FENT�i Og N , C` uTY tT -s...:.� maaprx.wws,rna.as.MWk"!'" OVERHEAD Q U� MESER i? i ,..,,.. W.F.,a F a'7 r;.:�t ;' 17 WIRES — —\ WI RETAMING`NpV !p 9+,p.,lf,1..��w ' �`,�: �ss'� Cli �4 :.T _ �11UTM �---.• w0� Q t1t i We.i•i 4.ia.JMkV I i :� ° n• ..r•y�iC i 1, ik�•'�, :'C C`• v f " GLE �,_ _i .s P S78036►5�� W �O`,,���NG) i E^�„�T i=0i;�tFf� QD WOtNA UNKNOWN 0.85 SE 2.,E ,•...�:_... .w--` ��, G�' __,�-.., Elevations referenced to N.A.V.D. 88 O D, aF, _ 1 X I am familiar with the STANDARDS FOR APPROVAL j;k1l�-%1 ”" , ` AND CONSTRUCTION OF SUBSURFACE SEWAGE .,. •s.t �-; ;'�(� • ::. AIL DISPOSAL SYSTEMS FOR SINGLE FAMILY RESIDENCES ? 0'`` ' r t'• .;.�� �.,.� and will abide by the conditions set forth therein and on the �� ' D 'ter ": ROA T nb permit to construct. PErJq' ,R Water Line(s) MUS► Be Inspected By Tho CA Suffolk County Dept., 01-Health Services. The location of public water, wells and cesspools-shown hereon are Cali 852-5700, 48 Hours dIn Advance, y��'"'•- ^ill V-0 N'�t•` from field observations and or from data obtained from others. To Schedule Inspection(s). N.Y.S LIC. NO. 49618 ANY ALTERATION OR ADDITION TO THIS SURVEY IS A VIOLATION ECONIC S YORS, P.C. OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW. 631 765-5020 FAX 631 765-1797 EXCEPT AS PER SECTION 7209—SUBDIVISION 2. ALL CERTIFICATIONS LOT NUMBERS REFER TO "AMENDED MAP A OF NASSAU HEREON ARE VALID FOR THIS MAP AND COPIES THEREOF ONLY IF AREA=38,769 SO. FT. POINT CLUB PROPERTY INC" FILED IN THE SUFFOLK P.O. BOX 909 SAID MAP OR COPIES BEAR THE IMPRESSED SEAL OF THE SURVEYOR WHOSE SIGNATURE APPEARS HEREON. TOME LINE COUNTY CLERKS OFFICE ON AUGUST 16, 1922 AS MAP NO. 156. 1230OTRAVELER S 9EE T 12-110 .. . g f i SURVEY OF PROPERTY N �oq A T NA SSA U -POINT N� (� TOWN OF SO UTHOLD r i Q SUFFOLK COUNTY, N. Y. m� WDA RET "�"�WA11 S 1000-111-09-07 �g WALL OCT 1 1 c"012 SCALE: 1'=30' ° OD� � r FEBRUARY 2, 2012 4,�3 wAu 6LDG. DEPL 1N`NG ,39 55 0 TOWN or SOUTNOLD OCTOBER 9, 2012 (FOUNDATION LOCATION) LDS 26 14 G WA`s Wap RETA v lAT°� O� ' UNKNO = �c 2 9 H WOOD STAIRS SEP XX �I C FE to m 0 •3rl 00E 0.9'N \ ` , r GRAVEL �XP \ w, a LD 2 A z m �► I 4tA :A 03 ✓ ( B.B. 4 0 WAV i TEST HOLE DATA o ,, � t^ e F BY McDONALD GEOSCIENCE k 2/2/2012 � N Z� 1` +73.0 STONE STAIRS to m BROWN SILTY SAND SM O 2 +72.3' j�E z �� 4,TEST HDA ` 72 c►�� ( I �13Z I 1� 0 86�.k ? WO�p RETAIH�NG 1 WAu 1.13 PALE BROWN nNE SAND SP ,� \\ 2s5-d / / / e I 38 xI ►� . O \ E EER \0 40.19 \ �-72- - - g9• 0.8 J / // ��P / Q W�` w / l OVERHEAD MEiE �. 17' — / WIRES -' � RETAINJHG WAIT �y 2$ P� OO8 S , ` Pp�A�ON UNKNpYM TIC2.1E Elevations referenced to N.A.V.D. '88 0 ' �� /� '; <•_ ! � > o I am familiar with the STANDARDS FOR APPROVAL AND CONSTRUCTION OF SUBSURFACE SEWAGE .- , DISPOSAL SYSTEMS FOR SINGLE FAMILY RESIDENCES ✓ ! s nµ;. k and will abide by the conditions set forth therein and on the A a. 'ROAD = 5 permit to construct. NTER The location of public water, wells and cesspools shown hereon are from field observations and or from data obtained from others. `LJC.' NO. 49618 ANY ALTERATION OR ADDI77ON TO THIS SURVEY IS A VIOLATION ECONIC S R YORS, -P.C. OF SEC77ON 7209 OF THE NEW YORK STATE EDUCATION LAW. 631 765-5020 FAX 631 765-1797 EXCEPT AS PER SEC PON 7209—SUBDIVISION 2. ALL CER 77FICA TONS LOT NUMBERS REFER TO "AMENDED MAP A OF NASSAU HEREON ARE VALID FOR THIS MAP AND COPIES THEREOF ONLY IF AREA-38,769 SQ. FT. POINT CLUB PROPERTY INC" FILED IN THE SUFFOLK P.O. BOX 909 SAID MAP OR COPIES BEAR THE IMPRESSED SEAL OF THE SURVEYOR TO IE LINE TRAVEET WHOSE SIGNATURE APPEARS HEREON. COUNTY CLERKS OFFICE ON AUGUST 16, 1922 AS MAP N0. 156. SOUT HOLD,NER S 971 12_110 LOT NUMBERS REFER TO "AMENDED MAP A OF NASSAU R E C El SURVEY OF PROPERTY POINT CLUB PROPERTY INC" FILED IN THE SUFFOLK SCDHS REF. No. R10-12-0029 AT NASSAU POINT COUNTY CLERK'S OFFICE ON AUGUST 16, 1922 AS MAP NO. 156. NOV 0 7 201It TO WN OF SO UTHOLD SUFFOLK COUNTY, N. Y. UOFFICEca. �' LE E ��` mgr WOODAMONG Ww� N 1000-111-09-07 SCALE. 1'=30' �c!;E PaEc�s� + ~$ OIL t" FEBRUARY 2, 2012 LOT 26 SSU �N K�No `�+�TM �Ag4,13 w APRIL 16, 2012 APRIL 11, 2012 (REMSIO S)) CD �1NG) °` RFP WAIL *000 R�AINMG �' 0 ArON UNKN AUGUST 28, 2012 (REVISIONS) SEP L� M' OCTOBER 9, 2012 FOUNDATION LOC. & REVISIONS) 2gN AUG. 13, 2014 (GARAGE FINAL) WOOD STAIRS rr1 NOV. 4, 2014 (WATER LINE REVISED) �.XiX�x�X�X�X xLA DEER�NCE � i'AREA OFof ~ir 'XIX �X�x o EXISTING SEPTIC m N 036950"E D.9= �' � �x--X'�X�"� � �.�s,rs,�____--� �, O 7a /' �N � CE Z x GRAVEL \-x a�,co,JN�� j `OT 27 'z 9ba TEST HOLE DATA o ✓ L911 3�- \\ rl BY McDONALD GEOSCIENCEP '' n a i o x 2/2/2012 aN (Ag.2 BROWN SILTY SAND SM O� \f V1 STONE sT7�0 v 2. � 2 •A �ry1(` s'T m �z Z ; 'TESW 40 y +moi 7t y Q+ LA • T72pLE 70 1' XSd v i 0 PALE BROWN FINE SAND SP L -PISN 3 x AWOGo ►�MMG*ALL 81., 3+ { `aC1 � zg I �X�. SUFFOLK COUNTY y O cpm " Fay'X DEPARTMENT OF : ry :. . e APPROVAL OF CONSTRUCTEDHEALTH SERVICES Ir POLL oVERHEWJ w�µ WGRKS FpR MARES _ — MpC�o RETAINING WALL •. NOV �.ouTY Date _ 8 20 p -504 w LOT 2a TnQ —'.`— ti-S. Ref. Pia S.R.F. 78'36'50 W INO� .� //0 �X�- \D � OWN seuvpg d:?r W ! C. D e S T�LOCNT%0N ; r�spFjO}��a»;ior cerLf$ e�::*� uuppry face"':- .s tyis HOZ KAON UNKN ,Csdi arr 2,jE SEP11C sat CL FpR T by tills Dep`rtnc;�t ar awy bca,rcr have been T L�MUM 0:- ?9Rn�w.. � �and found� Elevations referenced to N.A.V.D. '88 0 ° ID DR06MS. I am familiar with the STANDARDS FOR APPROVAL G o ma°' UValt yb ft .1 lie le R. AND CONSTRUCTION OF SUBSURFACE SEWAGE 0 < � •� �� DISPOSAL SYSTEMS FOR SINGLE FAM/LY RESIDENCES �, ! Tent and will abide by the conditions set forth therein and on the permit to construct. ENTER gOAD CARP ��.+±✓ a,,�,r� �. � The location of public water, wells and cesspools shown hereon are < ' GARAGE SANITARY SYSTEM (0.5 BATH) from field observations and or from data obtained from others. SEPTIC LOCATION [1] 1,000 GALLON SEPTIC TANKN.Y.S. UC. N0. 49618 ANY ALTERATION OR ADD177ON TO THIS SURVEY IS A VIOLATION "A` "B" OF SECTION 7209 OF THE NEW YORK STA TF EDUCATION LAW. 1 8 DIA. X 12 DEEP LEACHING POOL ` _� � + � EC�3N1� MORS, P.C. EXCEPT AS PER SECTION 7209—SUBD/VIS/ON 2. ALL CER77nCA77ONS f �� v WITH 3 SAND COLLAR 3 ABOVE GROUND WATER ST 12' 25' HEREON ARE VALID FOR THIS MAP AND COP/ES THEREOF ONLY IF AREA=38,769 SQ. FT. (631) 765-5020 FAX (631) 765-1797 SAID MAP OR COPIES BEAR THE IMPRESSED SEAL OF THE SURVEYOR i�i f-l�G AON 1► '' EXISTING WELL TO BE ABANDONED LP 15' 37.5' P.O. BOX 909 TO 11E LINE rr 1230 TRAVELER STREET WHOSE SIGNATURE APPEARS HEREON. `` (�l"t M; SOUTHOLD, N.Y. 11971 12-110 lig REVISIONS El T `j ,tea r Li. u 2 C5 s ♦ O a� W � N EAST ELEVATION W W SCALE: 1/4" = V Q' H o � z W mo o a a RAA M o 0 -- n = : . DO NOT PROCEED WITH �- ;_.--- olid FRAMING UNTIL.SURVEY . OF FOUNDATION! :OCATION ' HAS BEEN AFFnO`JED, i� Q) Q 0CC;UA �1 `° OR z PROVED AS NOTED - - -- x SE 1S UNLAWFUL � X 11' — - -— DATE E 9/ B.P # 73D A.y' " '� � ! CERTIFICATE 0 O FEE: / SU BY �� ''re., p" s i IE� P11�++ ' U) U NOTIFY BUILDING DE R i MENT AT I�-"+�s� U) I`— '765-1802 8 AM TO a PM FOR THE Z U FOLLOWWG INSPECTIONS .1: FOUNDATION -TWO REQUIRED a NrNr FOR POURED CONCRETE . - , . • . <�",^n�-� �. -FRAMING.PLUMBING, , ,a,UROUGH STRAPPING. ELECTRICAL Si CAULKING INSULATION . FINAL-CONSTRUCTION&ELECTRICAL MUST BE COMPLETE FOR C.O. r {�. ALL CONSTR, TION SHALL MEET H REQUIREML NTS OF THE CODES OF NEW - DRAWN: MH/MS RK STA'E NOT RESPONSIBLE FOR "'%. SCALE: 1/411 -01, DESIGN OR CONSTRUCTION ERRORS. JOB#: NORTH ELEVATION F , � June 13,EE 2012 SHEET NUMBER: SCALE: 1/4A, 1= � ELECTRICAL eQfl .CT��� UIRE� A- 1 T MAINTAIN CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS,THE SPECIFICATIONS.AND THE FIELD CONDITIONS.AND SHALL REQUEST CLARIFICATION BEFORE COMMENCING WORK.CONTRACTOR SHALL VERIFY ALL GENERAL CONTRACTOR TO COORDINATE MEETING WITH 0� APPROVAL OF ALL GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BUILDING DEPARTMENT INSPECTIONS PAINTER TO PRIME AND PAINT ALL DOOR EDGES O MANUFACTURER'S WARRANTY AND SHALL BE INSPECTED TO VERIFY ALL WORK DIMENSIONS AND CONDITIONS AT JOB SITE,INCLUDING BUILDING AND SITE CLEARANCES FOR DELIVERY OF EQUIPMENT AND MATERIALS,AND REMEDY ALL DISCREPANCIES WITH ARCHITECT PRIOR TO THE COMMENCEMENT OR CONTINUATION OF WORK. ROUGH ELECTRIC,PLUMBING,AND HVAC PRIOR TO INSULATING AND SHEETROCKING AND SHALL SECURE THE C of O PRIOR TO RECEIVING FINAL PAYMENT FROM pWNERS. REVISIONS aC� --- _ - CID H M U) O oo " t a � u N 1150 WEST ELEVATION SCALE: 1/4" = 1' w a w H o Q - — - — - — - — - — - — - — - — - — - — - - - H O � cld ct LU Q O W 0O 4J Uco U r r - ct Z ` DRAWN: MH MS SOUTH ELEVATION { '°�` _�tr��,r ��'r•�* •�° 4� SCALE: 114"=1'-0„ i l' JOB#: SCALE: 1/4" = 1' z " June 13,2012 x. '" ' n SHEET NUMBER: MINTER TO CRIME AND MINT ALL DOOR EDGES TO MAINTAIN CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS,THE SPECIFICATIONS,AND THE FIELD CONDITIONS,AND SHALL REQUEST CLARIFICATION BEFORE COMMENCING WORK CONTRACTOR SHALL VERIFY ALL GENERAL CONTRACTOR TO GDORDR4ATE MEETING WITH OWNERS FOR APPROVAL OF ALL GENERAL CONTRACTOR SHALL DE RE5rON5 BLE FOR ALL BUILDING DEPARTMENT INSPECTIONS �►-2 MANUFACTURER'S WARRANTY AND SHALL BE INSPECTED TO VERIFY ALL WORK. DIMENSIONS AND CONDITIONS AT JOB SITE,INCLUDING BUILDING AND SITE CLEARANCES FOR DELIVERY OF EQUIPMENT AND MATERIALS,AND REMEDY ALL DISCREPANCIES WITH ARCHITECT PRIOR TO THE COMMENCEMENT OR CONTINUATION OF WORK, ROUGH ELECTRIC,PLUMBING,AND HVAC PRIOR TO INSULATING AMC)SHEETROCKING AND SHALL SECURE THE C of 0 PRIOR TO RECEIVING FINAL PAYMENT FROM OWNERS_ REVISIONS a o 0 B A 30' -0$' a t~ + e p• —�a ♦ Qp— O• 0• • gyp— 0♦ �• • Qp O• va • Op — p• Oa + '"�� n� o- -trd--'-•- •m-- b- - p-e -_ ' --�+- •- D-d -a -'-- -•-aa- ,a -p-`-+- -ate - -be- '--'+ p' - ------------- ---------------------- i ---------------------------- --------- • N PROVIDE DRAINAGE -- apv °m ti ' BATH VALVE(VIF) 4+ 6'Fm •a I o � t 1 ;i el •---------- -------- -------- --------------- ---- --------------a _ 1 , FLOOR DRAIN; FIjJOR DItA1N , I 1 1 1 1 1 1 b CV CONC.AREA WELL �— a (STUCCO INSIDE) w/REMOVABLE * W10X30 STEEL BEAM W10X30 STEEL BEAM W10X301STEEL BEAM W10X30 STEEL BEAM I HINGED GRATE — - —!- 4 AND EGRESS LADDER 5X5XIN TUBE STEEL COLUMN ' ! 6'-6"X6'-6"XP-0"CONC.FTG. �. Q�•�^ .� c a REINFORCED W/(7)#5 REBAR e.w. , a t i i I t 1 1 1 (TYPICAL) 1 I ! 1 I I I I t iLu ! �g 0 a Z g ! ol• , I I I 1 1 t2 t i I I I I - 1O LL + -----------' `- V �� ------- 3'NLOK-FLOOR16ga.G60STEELDECKING ------------------ ,Iw p Q CV t 5 :T S PC SLAB w/#5REBAR @12"OC e.w. t Ni pl !� - ------------------- e------ ----------- a •-------------------a iN n {� :x `. x t 1 t 1 I I t t 1 i.n i E pt 1 t a a Q":.. ,, PROVIDE DRAINS AT WINDOW WELLS j WIOX30 SfEEI BEAM _WlOX30 Sr�EL BEAM W1DX30tSTEEL BEAM W10X30 STEEL BEAM 1 p- i . . CONNECT TO DRYWELLS(TYPICAL) yy + a+ + 5 t",TUPFEL GOLUMN I 1 1 I + o'• ' 6-6 X6'-6"XP-0"CONC.FTG. ' ' ' ' ' •' 4s-0" /1 Q , ! , REINFORCED w/(7)#5 REBAR e.w. (TYPICAL) STEELCOLUMNt 1 t a7• ; I T/,� r�rQj�� 2'-6"XT-6"XY-0"1 -------------------- a------ -------- - --------------- 10 --------------'O �EINFORCED I ' I ❑ tdl#5 R BAR e.w� ! a W10X30 STEEL BEAM O * C p FLOOR DRAIN i 1 -a4— .4 x tb t 1 1 I t 1 I.41. a Jl1 ,------------------------ -----------�- -t-�'3 �i' - - -- -1 - -- -- ------ •O .a op •P •'� oV •O .a o •D ,a o •4- •a 1),10-THICK POURED CONCRETE FOUNDATION,4000psi.WALL HEIGHT TO BE 9' HIGH.VERIFY ALL HEIGHTS PRIOR TO COMENCEMENT OF WORK.EXTERIOR TO BE DAMPPROOFD PER NYS CODE. 30._0, 2).36"X12"POURED CONCRETE FOOTING,4000psi.REINFORCE FOOTING WITH (4)#5 CONTINUOUS REBAR.ALL FOOTINGS TO REST ON UNDISTURBED SOIL. 0 3).REVIEW PLAN FOR STEM WALLS SUPPORTING STEEL BEAMS.ADJUST HEIGHTS O B A -, FOR FINISHED SLAB TO BE EVEN WITH TOP OF WALL.EACH STEM WALL TO uj l of } LL HAVE 2 VERTICAL REBARS AND HORIZONTAL REBAR AT 12"OC INTO WALL. Z Z W 4).CONCRETE STAIR WELL TO BE TIED INTO WALL w.REBAR @ 12"OC(FYP.) ct 0 = S N P ROJ ECT N 0 RT H FOUNDATION PLAN 5).INSULATE EXTERIOR WALL WITH 2"RIO T&G DOW BOARD. j O E SCALE: 1/4�� = 1� &FOR VIDE ALTERNATIVE COST U ONLY (NO BASEMENT) Z U LO LOd- : �. DRAWN: MH MS SCALE: 1/4"=1'-0" M. s JOB#: June 13,2012 SHEET NUMBER: PAINTER TO!RIME AND MINT ALL DOOR EDGES TO MAINTAIN CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS,THE SPECIFICATIONS,AND THE FIELD CONDITIONS,AND SMALL REQUEST CLARIFICATION BEFORE COMMENCING WORK.CONTRACTOR SHALL VERIFY ALL GENERAL CONTRACTOR TO COORDINATE MEETING WITH OWNERS FOR APPROVAL OF ALL GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BUILDING DEPARTMENT INSPECTIONS MANUFACTURER'S WARRANTY AND SHALL BE INSPECTED TO VERIFY ALL WORK DIMENSIONS AND CONDITIONS AT 108 SITE,INCLUDING BUILDING AND SITE CLEARANCES FOR DELIVERY OF EQUIPMENT AND MATERIALS,AND REMEDY ALL DISCREPANCIES WITH ARCHITECT PRIOR TO THE COMMENCEMENT OR CONTINUATION OF WORK ROUGH ELECTRIC,PLUMBING,AND HVAC PRIOR TO INSULATING AND SHEETROCKING AND SHALL SECURE THE C of 0 PRIOR TO RECEIVING FINAL PAYMENT FROM OWNERS. REVISIONS L/ c t B Ar.' 30' -02' 5'-63' 9'-6" -j 2'DEEP STONE APRON w/FRENCH DRAIN(TO It! 'T1 I T 'I CONNECT TO DRYWELL) 11111"1111 TCft1W11171,11F1q1 Mill 'Il i 'I "I If If fill....... ill-0. ',Z _01 -4' ------------------ , , : 'A 0 ---------- 0 STUCCO WALL,29'rad.,64 ht..STONE CAF' - ----- --- ------------------------- ------------ - - STUCCO WALL,29 rad.,6 4'ht.,STONE CAP �72 ------ ------- --- (2)9�ML w/3/4'1 STEEL PLATE 1 (2)7-1/4 ML w/3/4"STEEL PLATE (2)7-1/4 ML w/3/4"STEEL PLATE ------------------------------ rz! Q. 121-0" 12P-010 L '.j r C5 10 00 u :A1 -! �`�-----------► -- :___ - Ll��� ! ' -� � w 11).WALL HEIGHT AT 9-41/2"UNLESS OTHERWISE NOTED. Lu M 0 2).EXTERIOR WALLS TO BE FRAMED WITH 2X6 DF112 STUDS AT 16'O.C-. ) In C14 Lo CN 3).EXTERIOR SHEATHING TO BE 5/8"THICK FIR CDX PLYWOOD. -------- --- zLi 4).DOUBLE UP FLOOR JOISTS UNDER PARALLEL WALLS ABOVE.PROVIDE x c BLOCKING AT 8'-G'O.C.AND MIDSPAN. 5).PROVIDE 3-2XI0 DF#2 HEADERS OVER ALL OPENINGS UNLESS � OTHERWISE NOTED.ALL OPENINGS OVER 3 FT.TO HAVE 2 JACK STUDS o ON EACH SIDE OF OPENING.PROVIDE 3 JACK STUDS ON EACH SIDE FOR 0 —10112 MICROLAM HEADERS. o-4 w 5/8"TYPE-X FIRE RATED 6).MIN.1-1/2'INSULATION AT EXTERIOR.STUCCO FINISH-INSTALL PER cn 0 45min.FIRE RATED DOOR SHEETROCK ON MANUFACTURE'S WRITTEN INSTRUCTIONS. I w/SELF-CLOSING HINGES C AND STEEL JAMB PER CODE NON-REAPINGWALL WALLS AND CEILING 7).ALL EXTERIOR OPENINGS TO HAVE DESIGN-PRESSURE UPGRADES WHERE T-0' APPLICABLE PROVIDE DEBPI-PROTECTION PANELS WITH FASTENING HARDWARE UNLESS OPENINGS HAVE IMPACT GLAZING. RATED OR 0 C\I P HINGES E R CODE 8).INSULATE EXTERIOR WALLS WITH R19 INSULATION. UPI 9).INSULATE CEILINGS WITH P30 INSULATION. (3) 4A.- olll- 4 1 V.? fw WE I .111-1801L I,IDT, (3 10 DF#2 HD 3t.6" Ali '1111- *11- 10).ALL WALLS AND CEILINGS TO BE PROVIDED WITH 5/8'TYPE-X A AW451 SHEET POCK TAPE AND PAINT(TYPICAL). ANDERSEN AHIAD � AW451 0 '3/6X7/0 ARCH STYLE" CUSTOM DOOR -, STONE LANDING (MATCH HOUSE) 4'-6" 5'-91/z" 0 5'-91/21' FLOOR PLAN: 750 SQ. FT. < 99-21/2$1 9'-21/2 Ak 30' -0" 03 ;_0 Z Lj 03 - 0 < A 0 a: S N 1ST. FLOOR PLAN <60 0 PROJECT NORTH. co < E SCALE: 1/4" = 1' C:) Lo A DRAWN: MH NIS SCALE: 1/4"=I'-0" JOB June 13,2012 SHEET NI_WBER; PAINTER TO PRIME AND PAINT ALL DOOR EDGES TO MAINTAIN CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS,THE SPECIFICATIONS,AND THE FIELD CONDITIONS,AND SHALL REQUEST CLARIFICATION BEFORECOMMENCING WORK.CONTRACTOR SHALL VERIFY ALL GENERAL CONTRACTOR To COORDINATE MEbETING WITH OWNERS FOR APPROVAL OF ALL GENERAL CONTRACTOR SHALL BE RE,51"ONS115LE FOR ALL BUILDING DEPARTMENT rNSFIECTIONS MANUFACTURER'S WARRANTY AND SHALL BE INSPECTED TO VERIFY ALL\Y)OR, DIMENSIONS AND CONDITIONS AT 308 SITE,INCLUDING BUILDING AND SITE CLEARANCES FOP,DELIVERY OF EQUIPMENT AND MATERJALS,AND REMEDY ALL DISCREPANCIES WITH ARCHITECT PRIOR TO THE COMMENCEMENT OR CONTINUATION OF WORK. ROUGH ELECTRIC,PLUMBING,AND 44VAr-PRIOR 70 INSULATING AND 814EETROCKINc. AND SHALL SECURE THE C of 0 PRIOR TO RECEIVINra FINAL PAYMENT FROM OWNERS, REVISIONS 77 © o B A 30' 0" 9'-0" 12' 0" 9'-0" ol 6'-0" 6'-0" o N CX14-3 ISR `) h 2X6 PLATE N a L m m a mN a k (3)1-3/4X7-1/4 ML HEAD R u 1 U:7-0' co PLT.HT. O n 1 � v m m kz - m 1 1 O x 1 1 N 1 1 N 1 1 ' T-0"PLATE HEIGHT i 1 2X6 WALL 1 1 1 1 i n SHELVES -------------------------------------------------- --------- --- --`"'J-- ----------� CD 2X6 DF 2 WORK SHOP v 2� o `f PENDING SUFFOLK °D X CJ @16"OC CATHEDRAL CEILING ( r N I U-) 8'-6"AFF PLYWOOD FLOORS COUNTY HEALTH ' Q N (UNDER RIDGE) (NO SHEETROCK) co DEPT.APPR a, N m m --— - -- -------------- ;----------------- --------,--- ------DN ----- Iz 1 2X6 WALL A O 7-0"PLATE HEIGHT 1 w t N � � PROVIDE PLUMBING N --------- 1 1 DRAINAGE VALVE N -- O FOR 1/2 BATH(VIF) ^ . I 1 FSM 1 � 1 1 1 1 1 1 1 1 T-0"PLT.HT. 1 h"+� = ' (3)1-3/4X7-1/4 ML HEAD R i I 1 1 , 1 , 1 1 2X6 PLATE CX14-3 LSR e- 6 -0 1 6'-0" 9'-0" 12' 0" 9'-0" 30'-0" O rY � �:> 1).CATHEDRAL CEILING AT APROX.8'-6"AFF. (� z B A s.—, 2).EXTERIOR WALLS TO BE FRAMED WITH 2X6 DF#2 STUDS AT 16"O.C.. c O � 3).EXTERIOR SHEATHING TO BE 5/8"THICK FIR CDX PLYWOOD. = O 4).SEE PLANS FOR REQUIRED HEADERS.PROVIDE 3 JACK STUDS ON EACH SIDE FOR Q = W MICROLAM HEADERS. _� tC S N PROJECT N0RTH 2ND. FLOOR. P LAN 5).ALL EXTERIOR OPENINGS APPLICABLE.PROVIDE DE RIO ROTECHAVEDTION PANELS WITH FASTDENING ES ERE ct Z V E SCALE. 1/`i = 11 HARDWARE UNLESS OPENINGS HAVE IMPACT GLAZING. v 6).UNFINISHED INTERIOR WALLS,CEILING AND FLOOR EXCEPT AT BATH. 4fj; hey Ny;-- x a + Y DRAWN: MH/MS r ° - SCALE: 1/4"=V-0" JOB#: June 13,2012 SHEET NUMBER: PAINTER TO PRIME AND PAINT ALL DOOR EDGES TO MAINTAIN CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEEN THE DRAWINGS,THE SPECIFICATIONS,AND THE FIELD CONDITIONS,AND SHALL REQUEST CLARIFICATION BEFORE COMMENCING WORK.CONTRACTOR SHALL VERIFY ALL GENERAL CONTRACTOR TO COORDINATE MEETING WITH OWNERS FOR APPROVAL OF ALL GENERAL CONTRACTOR SHALL DE RESPONSIDLE FOR ALL BUILDING DEPARTMENT INSPECTIONS A�5 MANUFACTURER'S WARRANTY AND SHALL BE INSPECTED TO VERIFY ALL WORK DIMENSIONS AND CONDITIONS AT JOB SITE,INCLUDING BUILDING AND SITE CLEARANCES FOR DELIVERY OF EQUIPMENT AND MATERIALS,AND REMEDY ALL DISCREPANCIES WITH ARCHITECT PRIOR TO THE COMMENCEMENT OR CONTINUATION OF WORK ROUGH ELECTRIC,PLUMBING,AND HVAC PRIOR TO INSULATING AND SHEETROCKING AND SHALL SECURE THE C of 0 PRIOR TO RECEIVING FINAL PAYMENT FROM OWNERS.