Loading...
HomeMy WebLinkAbout11/2014 SOUTHOLD PLANNING BOARD Monthly Report Summary, November, 2014 Planning Board Applications Currently Processing Subdivisions: 19 Site Plans: 15 New this Month Subdivisions: 1 Site Plans: 2 Special Exceptions: 0 Wireless Facilities Up-grade/Modification Reviews: 0 Application Fees Collected: $1,860.00 Park&Playground Fees Collected: $0 Admin./Inspection Fees Collected: $0 Pre-submission Meetings: 6 Actions Taken at Public Meeting Public Hearings: 4 Site Plan Decisions: 4 Subdivision Decisions: 4 Referrals for Comments from Other Boards • Town Board Local Laws & Other Issues: 1 • ZBA: 1 LWRP Consistency Reviews: 16 SEQRA Reviews for Town Board: 1 Other Projects Summary & Progress • Provided training to the ZBA for one hour: Jurisdiction &roles of the Planning Board • Provided training to the Planning Board for 0.25 hours: Subdivision Design Planning Board Monthly Report - Subdivisions Hamlet Project Name Tax Map# Type Zone Status Submitted Next Steps, Comments Cutchogue Cutchogue Business Center 83.-3-4.6 STANDARD Ll CONDITIONAL 9/6/2012 The Planning Board at their SUBDIVISION PRELIMINARY 11/17/14 work session will APPROVAL SU BDIV review revised maps. The Vines 73.-1-1 CONSERVATION A-C PENDING 11/14/2013 The Planning Board reviewed SUBDIVISION the revised map at their November 7th work session hand requested that further review of the site plan is needed to confirm that the development area allotted for the wine production facility is adequate. East Marion Aries Estates 22.-3-2 STANDARD R-80 CONDITIONAL FINAL 5/31/2006 The Planning Board granted SUBDIVISION APPROVALSUBDIV an extension of Conditional Final Plat Approval at their September 8, 2014 public meeting. Fishers Island Fishers Island Utility Company 9.-2-13.1 RESUBDIVISION R-80 PENDING 6/11/2014 The Planning Board agreed to & Coleman (LOT LINE issue a determination at MODIFICATION) their 12/14/14 public Friday, December 12,2014 Page 1 of 4 Hamlet Project Name Tax Map# Type Zone Status Submitted Next Steps, Comments Fishers Island Utility 9.-2-13.1 STANDARD R-80 PENDING 9/16/2014 On 10/28/14 the Board of Company, Inc. SUBDIVISION Trustees, NYS DEC and Planning Staff conducted a site inspection of the property to verify the accuracy of the Existing Resource Site Analysis Plan (ERSAP). After review of the site, wetland areas were required to be re-evaluated and flagged. Gordon, Estate of Albert H. 9.-7-8.2 RESUBDIVISION R-80 PENDING 5/9/2014 The Planning Board agreed to (LOT LINE issue a determination at MODIFICATION) their 12/15/14 public Ridgway 6.-1-3 STANDARD R-80 PENDING 12/23/2013 The Planning Board at their SUBDIVISION 9/8/14 work session discussed lot design and the applicant requested changes to be made to the map. Ski 10.-10-8.1 STANDARD R-80 PENDING 7/21/2014 The Planning Board agreed to SUBDIVISION hold the preliminary public hearing at their 12/15/14 public meeting. Mattituck Harold R. Reeve & Sons, Inc. 140.-1-6 STANDARD B CONDITIONAL 2/18/2014 The Planning Board agreed to SUBDIVISION SKETCH APPROVAL issue a Sketch Plan SUBDIV determination at their 12/15/14 public meeting. James Creek Landing 122.-3-1.4 STANDARD R-80, B CONDITIONAL 8/25/2005 The Planning Board reviewed SUBDIVISION PRELIMINARY the application at their May APPROVALSUBDIV 19, 2014 work session and requested items to be submitted. Friday, December 12,2014 Page 2 of 4 Hamlet Project Name Tax Map# Type Zone Status Submitted Next Steps, Comments Koehler Family Limited 115.-10-1 STANDARD R-80 CONDITIONAL 4/6/2012 On 11/13/14 Staff requested Partnership SUBDIVISION SKETCH APPROVAL the conditions of Sketch Plan SUBDIV approval be met before the Preliminary Plat application can be deemed complete. Neumann, James 107.-1-1.3 STANDARD R-80 CONDITIONAL 7/9/2008 Waiting for applicant to SUBDIVISION PRELIMINARY submit changes to the open APPROVAL SU BDIV space easement as discussed with the applicant's agent while concurrently, Planning Staff is coordinating with the Engineering Department to finalize the drainage easement language. Orient Mazzoni, 500 Soundview 13.-2-8.2 STANDARD PENDING 3/12/2014 The Planning Board at their Drive, LLC SUBDIVISION 11/17/14 work session will review revised maps. Tuthill Conservation 17.-4-16 CONSERVATION R-80, PENDING 7/2/2014 The Planning Board agreed to Subdivision SUBDIVISION R-200 hold open the public hearing to 12/15/14 public meeting. Peconic Beninati, Lee & Marie 74.-3-15 STANDARD Ro CONDITIONAL 5/13/2014 The Planning Board at their SUBDIVISION SKETCH APPROVAL 9/8/14 public meeting issued SUBDIV Conditional Sketch Plan approval. Skwara, The Estate of Joyce 86.-1-14 STANDARD R-80 CONDITIONAL 2/24/2014 The Planning Board will SUBDIVISION PRELIMINARY review map revisions at their APPROVAL SU BDIV 11/17/14 work session. Southold Friday, December 12,2014 Page 3 of 4 Hamlet Project Name Tax Map# Type Zone Status Submitted Next Steps, Comments Bayberry Estates 2006 55.-6-35 STANDARD R-80 CONDITIONAL FINAL 3/17/2006 Conditional Final Approval SUBDIVISION APPROVALSUBDIV has expired and the applicant has not fulfiled the requested conditions. Colony Pond 52.-5-60.3 STANDARD R-80 CONDITIONAL FINAL 6/9/2006 The Planning Board at their SUBDIVISION APPROVALSUBDIV 12/1/14 work session will review revised C&Rs. Sutton, Alexander &Tracy 78.-9-54 STANDARD CONDITIONAL 5/20/2008 The Planning Board at their SUBDIVISION SKETCH APPROVAL 10/20/14 work session SUBDIV requested revisions to the map be made and C&Rs be submitted for review. Friday, December 12,2014 Page 4 of 4 Planning Board Monthly Report - Site Plans Hamlet Project Name Tax Map# Type Zone Status Submitted Next Steps, Comments Cutchogue 8 Hands Farm Amended 96.-2-10.1 AMENDED SITE AC PENDING 10/30/2014 To be reviewed for PLAN completeness at PB's 11/17/14 work session Belle River Properties, LLC 102.-4-6.1 SITE PLAN AC PENDING 9/2/2014 Accepted as complete; public hearing has been held and closed, referral review set for PB'a work session 12/1/14 Cutchogue Business Center 83.-3-4.6 AMENDED SITE LI PENDING 2/15/2013 PB reviewed the revised site Site Plan PLAN plan at their 6/16/14 work session, all site plan elements have been met. Site plan approval is contingent on the concurrent subdivision. Malon Industries, Inc. 97.-5-4.5 AMENDED SITE PENDING 8/23/2013 PB awaiting response from Amended PLAN letter sent to the agent dated 9/24/14 as a followup to the 9/22/14 work session N & L Properties, LP 73.-2-4 AMENDED SITE AC R- PENDING 10/27/2014 The application has been PLAN 80 accepted as complete with revisions to be made immediately; revised plans forthcoming Rising Sun Woodworking 96.-5-8 SITE PLAN LB PENDING 7/22/2014 Public hearing has been held and closed, referral review conducted, applicant is currently working through approval from SCDHS East Marion Friday, December 12,2014 Page 1 of 3 Hamlet Project Name Tax Map# Type Zone Status Submitted Next Steps, Comments The Blue Inn 31.-6-17.2 AMENDED SITE RO PENDING 7/8/2013 PB has received and PLAN reviewed the required revised site plan and has scheduled the application for a determination on 11/17/14 Greenport 170 Moore's Lane Realty Corp. 45.-7-3 SITE PLAN LI PENDING 9/30/2014 Accepted as complete at PB's 10/20/14 work session; public hearing is set and referrals have been distributed Mattituck Captain Red's Marine Sales 122.-6-12 AMENDED SITE PENDING 11/13/2014 1 nc. PLAN Royalton Equestrian 113.-7-19.23 SITE PLAN Ac PENDING 8/6/2014 Pending site plan application; applicant is before the ZBA as of 11/17/14 seeking a special exception Showalter Farms, LLC 108.-4-1.4 SITE PLAN A-c, R- PENDING 6/20/2014 Revised site plan to be 40 reviewed at PB's 11/17/14 work session; special exception received from ZBA on 11/6/14 with ten conditions Peconic Berry & Berry, LLC 75.-5-13 SITE PLAN B PENDING 12/2/2014 Pre-submission conference held, site plan application submission forthcoming. Southold Creative Courses Catering, LLC 59.-10-4 SITE PLAN LB PENDING 11/19/2014 Pre-submission. Notice of Disapproval has been issued Friday, December 12,2014 Page 2 of 3 Hamlet Project Name Tax Map# Type Zone Status Submitted Next Steps, Comments Filipkowski Air, Inc. 59.-10-5 SITE PLAN LB PENDING 4/15/2014 Revised site plan reviewed by ZBA and PB (preliminary); special exception and multiple area variances required for the proposed project; applicant has met with PB staff to discuss options and is currently working on a revised site plan to include a Smalling building and more landscaping (11/17/14) New Cingular Wireless at 63.-1-10 SITE PLAN Ll PENDING 10/27/2014 Revised application to be 1040B Horton Lane reviewed by PB at their 11/17/14 work session Surrey Lane, LLC Amended 69.-5-18.6 AMENDED SITE A-c PENDING 8/14/2013 Public hearing closed. SEQRA PLAN Type II. Referral review conducted with no further revisions. SCDHS approval needed from the SC Board of Review in order to receive PB determination. Friday, December 12,2014 Page 3 of 3