HomeMy WebLinkAbout08/2014
Department of Public Works
Monthly Report
Date: August 2014
Annex
- Install ½ door at Town Attorney’s Office
Town Hall
- Repair urinal in east end Men’s room
- Trimmed and tiled kitchen area in Supervisor’s Office
Beaches & Road Ends
- Unclogged beach bathrooms on a regular basis
- Repair to broken toilet tank lever at New Suffolk Beach bathroom
- Clean main drain to cesspool at Kenney’s Beach
- Scraped and painted exterior trim on New Suffolk Beach bath
house
- Secured planks on Gull Pond boat ramp
- Installed latch on Ladies’ Room stall at McCabe’s Beach
- Repaired toilet float at McCabe’s Beach
HRC
- Repaired irrigation system
- Installed network cables
PCC
- Replaced leaky fitting on circulator pump
- Cleared bushes from around the storage barn
Police Dept
- Lined guest parking space
Installed Plexiglas shield to reinforce fish tank stand at Down’s Farm
Supervised summer interns
Relined Southold Village parking lot
Mowed and maintained all Town Properties