Loading...
HomeMy WebLinkAbout10/2014 Department of Public Works Monthly Report Date: October 2014 Town Hall - Repaired Supervisor’s outer office bathroom - Painted east end entrance doors - Developed and researched plan for Justice Court Safety Plan - Fixed Justice Court roof Fishers Island - Repaired water damage at Theater Beaches & Road Ends - Winterized all beach bathrooms - Repaired guardrail and replaced broken stair planks at 67 Steps - Assisted with rock armorment for Pipes Neck replacement bridge project HRC - Repaired gas fireplace PCC - Repaired east side emergency flood lights - Repaired lock on door Annex - Repaired lighting in Planning Dept HWY - Installation of ADA ramp - Resided front of office building, fixed all rot, trimmed windows out with Azec, aluminum top of building HWY cont. - Installed Fetterville Building, framed out flooring for cement installation, installed wind barrier for side door - Installed electric service in new building Parks - Installed rods and cranks after the resurfacing job on Tennis Courts at Tasker - Over seeded and aerated park grass DSW Cleaned out gutters Repair to toilet at Laurel Info Booth Prepared Dean’s parking lot for resurfacing job Mowed and maintained all Town Properties 2014 Hunting season began October 1. DPW supported program and staffed the Town Cooler Maintain all paperwork relating to Deer Management Program Transported donated to deer to Oakdale facility for processing Conducted DMP meetings Flagged Strawberry Fields for reseeding project Striped Southold Village Parking Lot