HomeMy WebLinkAbout10/2014
Department of Public Works
Monthly Report
Date: October 2014
Town Hall
- Repaired Supervisor’s outer office bathroom
- Painted east end entrance doors
- Developed and researched plan for Justice Court Safety Plan
- Fixed Justice Court roof
Fishers Island
- Repaired water damage at Theater
Beaches & Road Ends
- Winterized all beach bathrooms
- Repaired guardrail and replaced broken stair planks at 67 Steps
- Assisted with rock armorment for Pipes Neck replacement bridge
project
HRC
- Repaired gas fireplace
PCC
- Repaired east side emergency flood lights
- Repaired lock on door
Annex
- Repaired lighting in Planning Dept
HWY
- Installation of ADA ramp
- Resided front of office building, fixed all rot, trimmed windows out
with Azec, aluminum top of building
HWY cont.
- Installed Fetterville Building, framed out flooring for cement
installation, installed wind barrier for side door
- Installed electric service in new building
Parks
- Installed rods and cranks after the resurfacing job on Tennis
Courts at Tasker
- Over seeded and aerated park grass
DSW
Cleaned out gutters
Repair to toilet at Laurel Info Booth
Prepared Dean’s parking lot for resurfacing job
Mowed and maintained all Town Properties
2014 Hunting season began October 1. DPW supported program and
staffed the Town Cooler
Maintain all paperwork relating to Deer Management Program
Transported donated to deer to Oakdale facility for processing
Conducted DMP meetings
Flagged Strawberry Fields for reseeding project
Striped Southold Village Parking Lot