HomeMy WebLinkAboutTaylor Air Inc ®� RESOLUTION 2014-823
ADOPTED
DOC ID: 10162
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO.2014-823 WAS
ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON
OCTOBER 7,2014:
RESOLVED that the Town Board of the Town of Southold hereby authorizes and directs
Supervisor Scott A. Russell to execute the Service Agreement between the Town of Southold
and Taylor-Air Inc. in connection with maintenance and cleaning of all refrigeration systems at
the Human Resource Center, for a term of one year at a cost of$1,810.68, subject to the approval
of the Town Attorney.
Elizabeth A. Neville
Southold Town Clerk
RESULT: ADOPTED [UNANIMOUS]
MOVER: William P. Ruland, Councilman
SECONDER:Louisa P. Evans, Justice
AYES: Ghosio, Dinizio Jr, Ruland, Doherty, Evans, Russell
HVAC-R - 2 SERVICE AGREEMENT
Southold Town HRC
750 Pacific St.
Mattituck, NY 11952
AIR CONDITION/NC - BEATING - REFRIGERATION
989191891A! • NENiNENTIAL
637433 �3070
Po BOX 442 LAKE GROVE, W 11755
FAX # (631 ) 846 - 1933 E-MAIL - taylor&09@gmail.com
TAY18HAIRI.C.
Service Agreement
AIR CONDITIONING-HEATING -WRWRATIDN
CIOOEICIAI • IEIIIEIiIAI
7637433-3070
00"0 Customer: Southold Town HRC
Location: 750 Pacific St.
Mattituck, NY 11952
Po BOX 442 LAKE GROVE, NY 11755
FAX# (631) 846 -1933 E-MAIL -taylorair09@Umail.com phone #: (631) 298 - 4460 Fax#:
E-Mail:
Agreement Type: HVAC-R -2
Agreement Dates: 12/01/2014 thru 12/01/2015
Agreement: (2) Maintenance and cleaning of all Refrigeration systems
Operating Hours: (1) Service Agreement hours are from 7:00am to 5:00pm Mon. — Fri.
(2) All emergency calls outside of these hours are billed at normal rates plus
One half per hour. $92.00 plus $46.00 per hour for mechanic and
$75.00 plus $37.50 per hour for second mechanic when needed
General: Taylor Air Inc. agrees to maintain equipment according to manufacturers
Recommendations. Our Mechanics are fully certified by the EPA for the
Use of and transport of all Refrigerant types. Upon maintenance and service
Of equipment all costs above 0.00 will be quoted verbally and written.
1 OF 6
TAYIDN-AIR„.
AIN CINIMINIMU RATING•RUMINATION
unnnu.umnnu
b,31433-3070
Refrigeration Maintenance and Cleaning included:
- Lubrication of bearings, linkages and motors
- Replacement of Water filters
- Check and brush cleaning of Evaporator coil
- Check and chemical cleaning of condensate drain pan and piping
- Check and blow out of condenser fins (combed were needed)
- Check of all safety devises
- Check of all voltage and amperage on all compressors and motors
- Check of all Refrigerant circuits
- Check for refrigerant acid and moisture
- Check of Refrigerant piping line set (were applicable)
- Check and tightening of all electrical connections.
- Check for proper level of units and pitch of condensate drains.
- Cycle and operation check of thermostats or temperature controls
- Chemical cleaning of ice machines
2of6
MIDR-a�R„t.
�IOffil-0m10•O►mff"HIr
uuuuu.uunnw
6;1433-3070
Labor included in agreement:
- All labor for Maintenance and cleaning
- First hour diagnostic for service calls during service agreement hours.
- Warranty Labor for new equipment repair must be paid by customer to Taylor Air Inc.
Customer may then submit bill from Taylor Air inc. to Manufacturer for reimbursement.
Materials and Parts:
-All Necessary Chemicals and materials for maintenance and cleaning are
Included in agreement.
- Parts and refrigerants are not included in agreement.
-Taylor Air Inc. honors all Manufacturers' warranties on parts and compressors.
3of6
TAYIDR-Affi i.
A19"mtrttrtrt•r€AINI-offtittilltg#
piiHF/fi•flRtF,1Fff4
433-3070
Terms and Conditions of Agreement:
(1)Customer agrees to make all payments in a timely manner.
(2)Customer agrees to allow access to all areas of building needed to properly service units. If access
Is not granted Taylor Air inc. cannot be held responsible for incomplete service.
(3)Customer agrees to purchase all air filters and belts from Taylor Air inc:`
(4)Taylor Air inc. shall not be held responsible for any damage to equipment due to fire, act of God,
Extreme weather conditions (Hurricanes, Floods, Nor Easters, ect.)
(5)Taylor Air inc. shall not be held responsible for any damage to equipment due to work performed
By other contractors, customer or customers employees.
(6)Taylor Air inc. shall not be held responsible for any damage to equipment due to quoted repairs
Not being accepted in a timely manner.
(7)Taylor Air inc. shall be given at least 30 days notice upon customers cancellation of agreement and
$hail be given proper access to,all areas of building to retrieve any materials and parts not yet
Purchased by customer.
(8)Where applicable customer must pay full amount of deposit for repairs before any parts can be
Ordered or repairs started.
(9)Taylor Air inc. will cover all units listed on equipment sheet attached only.
(10) Customer agrees to call Taylor-Air Inc.for any and all Refrigeration servicing needs.
(11)Taylor Air inc. agrees to respond physically to all service calls on the same day the.call
Is placed unless_otherwise agreed upon by both parties.
40F6
rarIoR-AtR..
A116/NIfI HINI•HAfINN•1//IIIIRAUON
urruuu•mnanu
631433-3070
Agreement costs and payment
- Price per unit:
- Cost per year:_ $1810.68 Tax Exempt form on file
- Payment: Annual — ( X ) Semi-annual — ( )
- Payments must be received 15 days prior to renewal date. -
( ) I herby accept the terms and conditions as they are written in this agreement
Customer: -
Siniature Print rc,4 A. L el Title ,-v�.rov-Date soh I
4 rTaylor Air inc.: -
PrintG �-- Dated -
Signiature = '" ��k Title��es•� o
Payment type: Check— ( ) # Amount -
Corporate credit card: Card type: Visa ( ) Master Card ( ) American Express ( )
Name as it appears on card -
Card number -
Expiration Date - SEC # -
Signature -
50F6
TAYIDR-AIR...
AIN NNNNI HINN•NfAHNN•NFHININAFill
uunaw•uuu�rw
63,433-3070
Equipment Covered
# Make Capacity Location
1 Reach in Refrigerator Kitchen
1 Walk-in-freezer Kitchen
1 Walk-in-refrigerator Kitchen
1 Ice Machine Kitchen