HomeMy WebLinkAboutSlurry Seal Roads - Fishers Island Town Hall, 53095 Main Road
P.O. Box 1179
� . Y Southold, New York 11971
. '!
JUDITH T.TERRYlXZTy FAX(516)765-1823
TQWN CLERK TELEPHONE(S 16)765-1801
REGISTRAR OF VITAL STATISTICS OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
August 22, 1989
Thomas H. Gannon, Jr. , President
Thomas H. Gannon & Sons, Inc.
P. O. Box 505
Middle Island, New York 11953
Dear Mr. Gannon:
I have been advised by Superintendent of Highways Jacobs that the
Slurry Seal project on Fishers Island has been completed, therefore, I am
return herewith your $500.00 bid deposit check.
Very truly yours,
Judith T. Terre
Southold Town Clerk
Enclosure
gZ E f
,fit
. 4,.
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
JUDITH T.TERRY FAX(516)765-1823
TOWN CLERK
TELEPHONE(516)765-1801
REGISTRAR OF VITAL STATISTICS OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
March 17, 1989
Thomas H. Gannon, Jr. , President
Thomas H. Gannon S Sons, Inc.
P. O. Box 505
Middle Island, New York 11953
Dear Mr. Gannon:
The Southold Town Board, at their regular meeting held on March 14,
1989, accepted your bid in the amount of $. 85 per square yard for furnish-
ing and placing Slurry Seal on Town Roads on Fishers Island.
Please contact Superintendent of Highways Jacobs concerning this slurry
seal project.
Your $500.00 bid deposit check will be returned to you upon completion
of the project.
Very truly yours,
Judith T. Terry
Southold Town Clerk
cc: Supt. of Highways Jacobs
.O
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
FAX(516)765-1823
JUDITH T.TERRY
TELEPHONE(516)765-1801
TOWN CLERK
REGISTRAR OF VITAL STATISTICS OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
March 17, 1989
Bruce C. Streuli, President
Ascon Distributing Corporation
P. O. Box 629
Bay Shore, New York 11706
Dear Mr. Streuli:
The Southold Town Board, at their regular meeting held on March 14,
1989, accepted the bid of Thomas H. Gannon E Sons, Inc., in the amount of
$. 85 per square yard, for furnishing and placing Slurry Seal on Town Roads
on Fishers Island. Your $875. 00 bid deposit check is returned herewith.
Thank you for submitting your bid for this project.
Very truly yours,
Judith T. Terry
Southold Town Clerk
Enclosure
o��FFour�D�
o
s
Town Hall, 53095 Main Road
qF
P.O. Box 1179
Southold, New York 11971
JUDITH T.TERRY FAX(516)765-1823
TELEPHONE(516)765-1801
TOWN CLERK
REGISTRAR OF VITAL STATISTICS OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION WAS ADOPTED BY THE
SOUTHOLD TOWN BOARD AT A REGULAR MEETING HELD ON MARCH 14, 1989:
RESOLVED that the Town Board of the Town of Southold hereby accepts
the bid of Thomas H. Gannon and Sons, Inc. for furnishing and placing
approximately 25,000 square yards of Slurry Seal on Town Roads on Fishers
Island, at a cost of $. 85 per square yard.
Judith T. Terry
Southold Town Cie k
March 16, 1989
•
Ca JJosc.
P.O. BOX 505 MIDDLE ISLAND,N.Y. 11953 • 736-3116
MArch 9, 1989
Town Clerk
Town of Southold
Main Road
Southold, N. Y .
We submit the following price for the purpose of furnishing
and placing Slurry Seal on Town Roads on Fishers Island,N.Y .
--2-4 $ p/s.y .
Very truly yours ,
Thos . HI:. Ga on & Sons, Inc.
Thomas H. Gannon, Jr .
President
t
NON-COLLUSIVE BID CERTIFICATE
The undersigned bidder certifies that this bid has been arrived at
by the bidder independently and has been submitted without collusion
with any other vendor of materials, supplies or equipment of the type
described in the invitation for bids, and the contents of this bid have
not been communicated by the bidder, nor, to its best knowledge and
belief, by any of its employees or agents, to any person not an
employee or agent of the bidder or its surety on any bond furnished
herewith prior to the official opening of the bid.
(Signed)
(Corporate Title) _
(if any)
Bid on Slurry Seal Roads - Fishers Island '
:t,
! i
ASCON DISTRIBUTING CORPORATION
W W
F m
?, P. O. Box 629 Phone 516/586-4230
4s e' BAY SHORE, NEW YORK 11706
30CIAT'O
March 03, 1989
Town of Southold
Office of Town Clerk
Southold, N. Y. 11971
Re : BID ON SLURRY SEAL P.OADS-FISHERS ISLAND
To Whom It May Concern:
Our price to furnish and place approximately 25 ,000 square yards
of Slurry Seal is $1. 75 per square yard.
Sincerely yo rs
Bruce C. Streuli
BCS/kb President
NON-COLLUSIVE BID CERTIFICATE
The undersigned bidder certifies that this bid has been arrived at
by the bidder independently and has been submitted without collusion
with any other vendor of materials, supplies or equipment of the type
described in the invitation for bids, and the contents of this bid have
not been communicated by the bidder, nor, to its best knowledge and
belief, by any of its employees or agents, to any person not an
employee or agent of the bidder or its surety on any bond furnished
herewith prior to the official opening of the bid.
(Signed)
(Corporate Title)
(if any)
Bid on Slurry Seal Roads - Fishers Island '
Acon .2%b-d ufing Corp.
P. O. BOX 629 (�M
l x
i AR-3'�
BAY SHORE, N. Y. 11706 R 354 849 803
�_... f
Office of Town Clerk
Town of Southold ,Main Road ;� .3 �•.,:
Judith T. Terry, Town Clerk
Southold, N. Y. 11971
.1
BID TO SLURRY SEAL ROADS ON FISHERS ISLAND
Thursday, March 09 , 1989 11 : 00 A. M.
a f
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
JUDITH T.TERRY -- ' : J TELEPHONE( -1823 765
TOWN CLERK 516)765-1801
REGISTRAR OFF VITAL STATISTICS OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
March 9, 1989
Frank Costello, President
Costello Industries, Inc.
123 Costello Road
P. O. Box 11444
Newington, Connecticut 06111
Dear Mr. Costello:
I am returning herewith your $855. 00 bid deposit check with respect
to your bid to Slurry Seal Town Roads on Fishers Island, New York.
Your bid was received at 12:35 P.M. today which made it ineligible for
consideration whereas the bid opening was 11 :00 A.M.
You might wish to know that the Town received two other bids: Ascon
Distributing Corporation, Bay Shore: $1. 75 per square yard, and Thomas H.
Gannon and Sons, Inc. , Middle Island: $. 85 per square yard.
Very truly yours,
t` DATE INVOICE AMOUNT 51-44
Costello Industries, Inc, 119
123 COSTELLO'ROAD- P.O. BOX 11444 - No 1 9 5 6 4
NEWINGTON, CONNECTICUT 06111
PAY :i 5100STEt..1.4
AMOUNT IUD. ` i 1,:,.1. .I„I L�I„..1 (,,„II ( ,ll L. �.�I DOLLARS
DATE /wip,;;::� ,J _ a4f ORDER OF ' 5 f” GR.ACT.PAY ALLOW. DISC. CHECK AMOUNT
/f ? JJ �(
C 7 � '1 G' S ` dU
! o W ° STELLO I DUSTRIES, INC.
afall .
q
Lj
i
YAAESIDENT
11 z
11@0 L 9 S 6 L L 9 0 0 4 4 51: ab� J4i� i i f
r .J
CISTEXII INDUSTRIES, INC.
123 COSTELLO ROAD - P. 0. BOX 11444 - NEWINGTON, CONN. 06111
OPERATING DIVISIONS . SLURRY SEAL PAVEMENTS FLORIDA SLURRY SEAL PAVEMENTS • HIGHWAY CONSTRUCTION
MILLING • RECLAMATION RECYLING • AIRPORT CONSTRUCTION
TEL. (203) 666-3311
FAX. (203)666-2749
March 8, 1989
Office of the Town Clerk
Town of Southold Ohl
Town Hall
Main Rd.
Southold, NY 11971 MAR 91989
Attention: Judith T. Terry Sawmid Tow, rw*
Southold Town Clerk • � s���, ,�
Dear Ms. Terry:
We are pleased to quote the following slurry seal work
on Fishers Island.
25,000 S.Y. @ $1.71 P/S/Y = $42,750.00
All work shall be in full accordance with your invitation
to bid, published February 23, 1989, and the specifications for
slurry seal attached to our bid.
Very truly rs,
COS NDUSTRIES, INC.
�s tt
�I
Frank Costello
President
FC/jk
cc: bid file
AN EQUAL OPPORTUNITY EMPLOYER, M/F
HIGHWAY CONSTRUCTION . COLD PLANING . CRACK & JOINT SEALING SLURRY PAVEMENT
PAVEMENT REINFORCING FABRICS • BRIDGE DECK MEMBRANE SYSTEMS
MILLING • RECLAMATION . RECYCLING
LEGAL NOTICE
NOTICE TO BIDDERS
NOTICE IS HEREBY GIVEN in accordance with the provisions of Section
103 of the General Municipal Law, that sealed bids are sought and requested
from qualified contractors to furnish and place 25,000 square yards, more or
less as may be needed at the discretion of the Superintendent of Highways,
of Slurry Seal on Town Roads on Fishers Island, New York. The price per
square yard is requested. Specifications for the above may be obtained at
the Office of the Town Clerk, Town of Southold, Town Hall, Main Road,
Southold, New York 11971.
The sealed bids, together with a Non-Collusive Bid Certificate, bank
draft or certified check in the amount equal to 20 of the amount of the bid,
based upon 25,000 squre yards, will be received by the Town Clerk of the
Town of Southold, at the Southold Town Hall, Main Road, Southold, New York,
until 11 :00 A.M. , Thursday, March 9, 1989, at which time they will be opened
and read aloud in public. The Town Board of the Town of Southold reserves
the right to reject any and all bids and waive any and all informality in any
bid should it be deemed in the best interest of the Town of Southold to do so.
All bids must be signed and sealed in envelopes plainly marked "Bid to
Slurry Seal Roads on Fishers Island", and submitted to the Office of the Town
Clerk. The bid price shall not include any tax, federal, state or local, from
which the Town of Southold is exempt.
DATED : February 7, 1989.
JUDITH T. TERRY
SOUTHOLD TOWN CLERK
PLEASE PUBLISH ONCE, FEBRUARY 23, 1989, AND FORWARD ONE (1)
AFFIDAVIT OF PUBLICATION TO JUDITH T. TERRY, TOWN CLERK,
TOWN HALL, MAIN ROAD, SOUTHOLD, NEW YORK 11971.
Copies to the following:
The Suffolk Times
The Long Island Traveler-Watchman
Town Board members
Town Clerk's Bulletin Board
Superintendent of Highways Jacobs
Dodge Reports
The Day Publishing Company
NON-COLLUSIVE BID CERTIFICATE
The undersigned bidder certifies that this bid has been arrived at
by the bidder independently and has been submitted without collusion
with any other vendor of materials, supplies or equipment of the type
described in the invitation for bids, and the contents of this bid have
not been communicated by the bidder, nor, to its best knowledge and
belief, by any of its employees or agents, to any person not an
employee or agent of the bidder or its surety on any bond furnished
herewith prior to the official opening of the bid.
COSTELLO IMN, TRIES, INC.
(Signed)
(Corporate Title)
(if any)
Bid on Slurry Seal Roads - Fishers Island
*PECIFICATIONS FOR SLURRY S L
It is the intent of these specifications to insure the fact that the
slurry seal contractor submitting a bid for the work realizes that the
standards and requirements of the contract are at least equal to the
standards set by the International Slurry Seal Association guide
Specifications A-105 , dated February 1972 .
SCOPE
The work covered by this specification consists of furnishing all plant ,
labor , equipment , and materials in performing all operations necessary
in connection with the application of slurry seal surface on the
designated surface , in complete and strict accordance with the
specifications .
APPLICABLE SPECIFICATIONS
The materials used in the composition of the slurry seal surface shall
be in strict accordance with the following specifications and shall pass
the necessary testing procedures as follows :
Test Method for Aggregate and Mineral Filler
AASHO T2-60 Sampling Stone
AASHO T27-60 Sieve analysis of fine or coarse aggregate
AASHO Tll-60 Amount of material finer than 200 sieve
AASHO T176-56 Sand equivalent test ate
AASHO T84-60 Specific gravity and absorbtion of fine aggregate
AASHO T19-56 Unit weight of aggregate
AASHO T96-60 Abrasion of coarse aggregate
AASHO T127-60 Sampling hydraulic cement
AASHO T37-56 Sieve. analysis ominral filleruse of sodium
AASHO T104-56 Soundness of aggregate
Sulfate or magnesium sulfate
Test Method for Asphalt Emulsions
AASHO T40-56 Sampling bituminous material
AASHO T59-60 Testing emulsified asphalts
AASHO T182-57 Stripping test for bituminous mixtures
AASHO T59A Positive particle charge test must show positive
AASHO T59 Cement mixing test
Test Method for Bituminous Slurry Surfaces
AASHO T164-60 Bitumen content of paving mixture
AASHO T30-55 Mechanical analysis of extracted aggregate
SPECIFICATIONS FOR MINERAL FILLER
ASTM D242-64 Mineral fillers for bituminous mixture
At the discretion of the Contracting Officer'', any of the materials used
in the Slurry Surface may be tested according to the above procedures .
SPECIFICATIONS FOR ASPHALT EMULSION USED IN SLURRY SEAL
The asphlat emulsion shall conform to the requirements of a cationic
quick-set emulsion , type CSS-1H . This emulsion shall pass the positive
particle test for cationic emulsions and shall show a PH factor of 6 . 5 .
The cationic quick-setting emulsion shall show a positive break and
resistance to rain in 1 to 2 hours .
The contractor shall furnish a certified statement from the emulsion
manufacturer giving analysis of the base asphalt used in the manufactor
of the emulsion . The statement shall also certify that the material
represented in a true cationic quick-set emulsion passing all the above
testing procedures .
SPECIFICATIONS FOR THE AGGREGATE USED IN SLURRY SEAL
The mineral aggregate shall consist of natural of manufactured slag or
crushed stone . The aggregate shall be clean and free from vegetable
matter and other deleterious substances . When tested by AASHO T176 , the
aggregate blend shall have a sand equivalent of not less than 45 .
Mineral fillers such as Portland Cement , Limestone Dust , Fly Ash and
others shall be considered as part of the blended aggregate and shall be
used in mimimun required amounts . They shall meet the gradation
requirements of ASTM D242-64 . Mineral fillers shall only be used if
needed to improve the workability of the mix or the gradation of the
aggregate . The combined mineral aggregate shall conform to the
following gradation when tested by the previously mentioned test:
SIEVE-SIZE TYPE II-PERCENT PASSING
3/8 100
#4 98-100
#8 65-90
#16 45-70
#30 35-50
#50 18-35
#100 10-21
#200 5-15
Theoretical Asphalt content & Dry Aggregate
7 . 5-13 . 5
WATER
All water used with the slurry mixture shall be potable and free from
harmful solubIL- salts .
LABORATORY TESTING
Sbui•cbs of all materials shall be selected prior to the time the
materials are required for use in the work . All samples shall be taken
according to previously mentioned methods . All materials shall be
pertested in a qualified laboratory as their suitability for use in
Slurry Seal . The theoretical asphalt content shall be determined. The
laboratory shall also determine if a mineral filler is required , and if
so , how much should be used . Test samples shall be made and tested on as
Wet Track Abrasion Machine .
A complete laboratory analysis and test report accompanied by abrated
and unabrated slurry samples shall be submitted by the Contractor before
the job starts .
At least three days prior to the start of Slurry application a Job-mix
formula for the Slurry Mixture shall be submitted to the Contracting
Officer for approval . No Slurry shall be applied until such approval is
received in writing from the Contracting Officer .
The Job-Mix formula shall include the following :
1. Sieve analysis of aggregate used
2 . % of mineral filler
3 . % of water
4 . % of asphalt emulsion
5 . Unit weight of Dry Aggregate in lbs . /cu . ft . loose and compacted .
6 . Sample mixes should be evaluated by acceptable testing procedures as
to their setting time , mixing characteristics , resistance to rain and
abrasion . The results of the wet track abrasion test should be
included in this report .
7 . Observed effects of moisture content on the specific weights for the
test aggregate .
PREPARATION OF THE SURFACE
Immediately prior to the application of the Slurry Seal the surface
shall be cleaned of all loose material , silt spots , vegetation and other
objectionable material . Any standard method will be acceptable , except
water flushing will not be permitted in areas where considerable cracks
are present in the pavement surface . When required a tack coat of 4
parts water , 1 part cationic emulsion shall be applied to all concrete
surfaces prior to the application of the Slurry Seal . This shall be
applied at air temperature and allowed to cure before the slurry
operation .
COMPOSITION AND RATE OF APPLICATION OF THE SLURRY MIX
The amount of asphalt emulsion to be blended with the aggregate shall be
that as determined by the laboratory report after final adjustments in
the field . A minimum amount of water will be added as necessary to
obtain a fluid homogeneous mixture . The rate of application shall be a
minimum of 10 lbs . , but not greater than 15 lbs . of aggregate per sq . yd .
The engineer will give final approval to the design and rate of
application used .
WEATHER
The Slurry Seal shall not be applied if the pavement or the air
temperature is 55 degrees F . or below and falling , but may be applied
when both the air and pavement temp . is 45 degrees F . or above and
rising . The mixture should not be applied if high relative humidity
prolongs the curing time . beyond a reasonable amount .
TRAFFIC CONTROL
Suitable methods such as barricades , flagmen , pilot cars , etc . shall be
used to protect the uncured slurry surface from all types of traffic ,
Any damage to the uncured slurry will be the responsiblility of the
contractor . The engineer or Contracting Officer shall give final
approval of the method used . If damage occurs where suitable means have
been made to protect the uncured slurry , violators will be prosecuted
and the contractor will be reimbursed for the damages .
APPLICATION OF THE SLURRY SURFACE
A . General - The surface shall be fogged with water directly preceding
the spreader . The Slurry mixture shall be of the desired consistancy
when deposited on the surface and no additional elements shall be added .
Total time of mixing shall not exceed four minutes . A sufficient amount
of slurry shall be kept in all parts of the spreader at all times so the
complete coverage is obtained . No lumping , balling or unmixed aggregate
shall be permitted . No segregation of the emulsion and the aggregate
fines from the coarse aggregate shall be permitted . If the coarse
aggregate settles to the bottom of the mix , the slurry will be removed
from the pavement . No excessive breaking of the emulsion in the spreader
box will be permitted . No streaks such as left by oversized aggregate
shall be left in the finished pavement .
B . Joints - No excessive build up no unsightly appearance shall be
permitted along longitudinal or transverse joint.
C. Handwork - Approved squeeges shall be used to spread the slurry in
the areas not accessible to the slurry mixer . Care will be exercised in
leaving no unsightly appearance from hand work .
0 . Curing - Treated areas will be permitted to cure until such time as
the Engineer permits the opening to traffic .
STOCKPILING OF AGGREGATE
Precautions shall be taked to insure that stockpiles do not become
contaminated with oversized rock , clay , silt , or excessive amounts of
moisture . The stockpile shall be kept in areas that drain readily .
Segregation of the aggregate shall not be permitted .
STORAGE
The contractor shall provide suitable storage facilities for the asphalt
emulsion . The container shall be equipped to prevent water from
entering the emulsion . Suitable heat shall be provided to prevent
freezing .
SAMPLING
Samples of materials and of the finished slurry surface shall be
furnished by the contractor as directed by the Engineer (or Contracting
Officer) during the progress of the work . Test reports may be requested
of the contractor as new materials arrive .
EQUIPMENT
All equipment , tools , and machines used in the performance of this work
shall be maintained in satisfactory° working order at all times .
Descriptive information on the slurry mixing equipment to be used shall
be submitted for approval not less than 10 days before the work starts .
Slurry Mixing Equipment - The slurry mixing machine shall be a continuos
flow mixing unit , and be capable of delivering a predetermined
proportion of aggregate , water , and asphalt emulsion to the mixing
chamber and to discharge the thoroughly mixed product on a continuos
basis . The aggregate shall be prewetted just prior to mixing with the
emulsion . The mixing chamber of the mixing unit shall be capable of
thoroughly mixing all the ingredients together to form the proper blend .
No violent mixing shall be permitted .
The slurry mixing machine shall be equipped with an approved fines
feeder that provides and accurate metering device or method to introduce
a predetermined amount of moneral filler into the mixer at the same time
and locations the aggregate is fed . The fines feeder shall be used
whenever added mineral filler is a part of the aggregate blend .
The mixing machine shall be equipped with a water pressure system and
fog type spray bar adequate for the complete fogging of the surface
prior to the spreading equipment , with a maximum application of 0 . 05
gallons per sq . yd . The slurry machine must contain a 8 yd . storage
capacity to properly mix and apply a minimum of eight tons of Slurry
Seal.
Spreading Equipment - Attached to the mixing machine shall be a
mechanical type squeegee distributor equipped with hydraulic augers and
flexible material in contact with the surface to prevent the loss of
slurry from the distributor . It shall ber4iaintained so as to prevent
loss of slurry on varying grades and crown by adjustments to insure
uniform spread . The box shall be kept clean and buildup of asphalt and
aggregate shall not be permitted .
CLEANING EQUIPMENT
Power brooms , power blowers , air compressors , water flushing equipment
and hand brooms shall be suitable for cleaning the surface and cracks of
the old surface .
AUXILARY EQUIPMENT
Hand squeegees , shovels and other equipment shall be provided as
necessary to perform the work .
VTUM/NOUSMATER/ALS,SALES&CONSULTANTS
Mom
ISR 91999
March 7 , 1989
Ms . Judith T. Terry
Town Clerk
Town Hall
Main Road
Southold, New York 11971
Dear Ms . Terry:
Enclosed is the proposal and specifications for furnishing
and placing 25 ,000 square yards of Slurry Seal on Town Roads
on Fishers Island, NY. Bimasco, Inc. will not place a bid
for this job. However, we do thank you for giving us the
opportunity.
Sincerely,
A x.,
Maureen Toto
MT/df
encls .
242 RABRO DRIVE • P.O. DRAWER 298 • HAUPPAUGE,NEW YORK 11788 • (516)234-3100
0
LEGAL NOTICE
NOTICE TO BIDDERS
NOTICE IS HEREBY GIVEN in accordance with the provisions of Section
103 of the General Municipal Law, that sealed bids are sought and requested
from qualified contractors to furnish and place 25,000 square yards, more or
less as may be needed at the discretion of the Superintendent of Highways,
of Slurry Seal on Town Roads on Fishers Island, New York. The price per
square yard is requester. Specifications for the above may be obtained at
the Office of the Town Clerk, Town of Southold, Town Hall, Main Road,
Southold, New York 11971.
The sealed bids, together with a Non-Collusive Bid Certificate, bank
draft or certified check in the amount equal to 20 of the amount of the bid,
based upon 25,000 squre yards, will be received by the Town Clerk of the
Town of Southold, at the Southold Town Hall, Main Road, Southold, New York,
until 11 :00 A.M. , Thursday, March 9, 1989, at which time they will be opened
and read aloud in public. The Town Board of the Town of Southold reserves
the right to reject any and all bids and waive any and all informality in any
bid should it be deemed in the best interest of the Town of Southold to do so.
All bids must be signed and sealed in envelopes plainly marked "Bid to
Slurry Seal Roads on Fishers Island", and submitted to the Office of the Town
Clerk. The bid price shall not include any tax, federal, state or local, from
which the Town of Southold is exempt.
DATED : February 7, 1989.
JUDITH T. TERRY
SOUTHOLD TOWN CLERK
PLEASE PUBLISH ONCE, FEBRUARY 23, 1989, AND FORWARD ONE (1)
AFFIDAVIT OF PUBLICATION TO JUDITH T. TERRY, TOWN CLERK,
TOWN HALL, MAIN ROA[ , SOUTHOLD, NEW YORK 11971.
Copies to the following:
The Suffolk Times .
The Long Island Traveler-Watchman
Town Board members
Town Clerk's Bulletin Board
Superintendent of Highways Jacobs
Dodge Reports
The Day Publishing Company
NON-COLLUSIVE BID CERTIFICATE
The undersigned bidder certifies that this bid has been arrived at
by the bidder independently and has been submitted without collusion
with any other vendor of materials, supplies or equipment of the type
described in the invitation for bids, and the contents of this bid have
not been communicated by the bidder, nor, to its best knowledge and
belief, by any of its employees or agents, to any person not an
employee or agent of the bidder or its surety on any bond furnished
herewith prior to the official opening of the bid.
(Signed)
(Corporate Title)
(if any)
Bid on Slurry Seal Roads - Fishers Island
IRPECIFICATIONS FOR SLURRY SEAL
It is the intent of these specifications to insure the fact that the
slurry seal contractor submitting a bid for the work realizes that the
standards and requirements of the contract are at least equal to the
standards set by the International Slurry Seal Association guide
Specifications A-105 , dated February 1972 .
SCOPE
The work covered by this specification consists of furnishing all plant ,
labor , equipment , and materials in performing all operations necessary
in connection with the application of slurry seal surface on the
designated surface , in complete and strict accordance with the
specifications .
APPLICABLE SPECIFICATIONS
The materials used in the composition of the slurry seal surface shall
be in strict accordance with the following specifications and shall pass
the necessary testing procedures as follows :
Test Method for Aggregate and Mineral Filler
AASHO T2-60 Sampling Stone
AASHO T27-60 Sieve analysis of fine or coarse aggregate
AASHO Tll-60 Amount of material finer than 200 sieve
AASHO T176-56 Sand equivalent test
AASHO T84-60 Specific gravity and absorbtion of fine aggregate
AASHO T19-56 Unit weight of aggregate
AASHO T96-60 Abrasion of coarse aggregate
AASHO T127-60 Sampling hydraulic cement
AASHO T37-56 Sieve; analysis of mineral filler
AASHO T104-56 Soundness of aggregate by use of sodium
Sulfate or magnesium sulfate
Test Method for Asphalt Emulsions
AASHO T40-56 Sampling bituminous material
AASHO T59-60 Testing emulsified asphalts
AASHO T182-57 Stripping test for bituminous mixtures
AASHO T59A Positive particle charge test must show positive
AASHO T59 Cement mixing test
Test Method for Bituminous Slurry Surfaces
AASHO T164-60 Bitumen content of paving mixture
AASHO T30-55 Mechanical analysis of extracted aggregate
SPECIFICATIONS FOR MINERAL FILLER
ASTM D242-64 Mineral fillers for bituminous mixture
At the discretion of the Contracting Officer , any of the materials used
in the Slurry Surface may be tested according to the above procedures .
SPECIFICATIONS FOR ASPHALT EMULSION USED IN SLURRY SEAL
The asphlat emulsion shall conform to the requirements of a cationic
quick-set emulsion , type CSS-1H . This emulsion shall pass the positive
particle test for cationic emulsions and shall show a PH factor of 6 . 5 .
The cationic quick-setting emulsion shall show a positive break and
resistance to rain in 1 to 2 hours .
The contractor shall furnish a certified statement from the emulsion
manufacturer giving analysis of the base asphalt used in the manufactor
of the emulsion . The statement shall also certify that the material
represented in a true cationic quick-set emulsion passing all the above
testing procedures .
SPECIFICATIONS FOR THE AGGREGATE USED IN SLURRY SEAL
The mineral aggregate shall consist of natural of manufactured slag or
crushed stone . The aggregate shall be clean and free from vegetable
matter and other deleterious substances . When tested by AASHO T176 , the
aggregate blend shall have a sand equivalent of not less than 45 .
Mineral fillers such as Portland Cement , Limestone Dust , Fly Ash and
others shall be considered as part of the blended aggregate and shall be
used in mimimun required amounts . They shall meet the gradation
requirements of ASTM D242-64 . Mineral fillers shall only be used if
needed to improve the workability of the mix or the gradation of the
aggregate . The combined mineral aggregate shall conform to the
following gradation when tested by the previously mentioned test:
SIEVE-SIZE TYPE II-PERCENT PASSING
3/8 100
#4 98-100
#8 65-90
#16 45-70
#30 35-50
#50 18-35
#100 10-21
#200 5-15
Theoretical Asphalt content & Dry Aggregate
7 . 5-13 . 5
WATER
All water used with the slurry mixture shall be potable and free from
harmful solublie salts .
LABORATORY TESTING
Source's of all materials shall be selected prior to the time the
materials are required for use in the work . All samples shall be taken
according to previously mentioned methods . All materials shall be
pertested in a qualified laboratory as their suitability for use in
Slurry Seal . The theoretical asphalt content shall be determined . The
laboratory shall also determine if a mineral filler is required , and if
so , how much should be used . Test samples shall be made and tested on as
Wet Track Abrasion Machine .
A complete laboratory analysis and test report accompanied by abrated
and unabrated slurry samples shall be submitted by the Contractor before
the job starts .
At least three days prior to the start of Slurry application a Job-mix
formula for the Slurry Mixture shall be submitted to the Contracting
Officer for approval . No Slurry shall be applied until such approval is
received in writing from the Contracting Officer .
The Job-Mix formula shall include the following :
1 . Sieve analysis of aggregate used r
2 . % of mineral filler
3 . % of water
4 . % of asphalt emulsion
5 . Unit weight of Dry Aggregate in lbs . /cu . ft . loose and compacted .
6 . Sample mixes should be evaluated by acceptable testing procedures as
to their setting time , mixing characteristics , resistance to rain and
abrasion . The results of the wet track abrasion test should be
included in this report .
7 . Observed effects of moisture content on the specific weights for the
test aggregate .
•
PREPARATION OF THE SURFACE
Immediately prior to the application of the Slurry Seal the surface
shall be cleaned of all loose material , silt spots , vegetation and other
objectionable material . Any standard method will be acceptable , except
water flushing will not be permitted in areas where considerable cracks
are present in the pavement surface . When required a tack coat of 4
parts water , 1 part cationic emulsion shall be applied to all concrete
surfaces prior to the application of the Slurry Seal . This shall be
applied at air temperature and allowed to cure before the slurry
operation .
COMPOSITION AND RATE OF APPLICATION OF THE SLURRY MIX
The amount of asphalt emulsion to be blended with the aggregate shall be
that as determined by the laboratory report after final adjustments in
the field . A minimum amount of water will be added as necessary to
obtain a fluid homogeneous mixture . The rate of application shall be a
minimum of 10 lbs . , but not greater than 15 lbs . of aggregate per sq . yd .
The engineer will give final approval to the design and rate of
application used .
WEATHER
The Slurry Seal shall not be applied if the pavement or the air
temperature is 55 degrees F . or below and falling , but may be applied
when both the air and pavement temp . is 45 degrees F . or above and
rising . The mixture should not be applied if high relative humidity
prolongs the curing time . beyond a reasonable amount .
TRAFFIC CONTROL
Suitable methods such as barricades , flagmen , pilot cars , etc . shall be
used to protect the uncured slurry surface from all types of traffic ,
Any damage to the uncured slurry will be the responsiblility of the
contractor . The engineer or Contracting Officer shall give final
approval of the method used . If damage occurs where suitable means have
been made to protect the uncured slurry , violators will be prosecuted
and the contractor will be reimbursed for the damages .
APPLICATION OF THE SLURRY SURFACE
A . General - The surface shall be fogged with water directly preceding
the spreader . The Slurry mixture shall be of the desired consistancy
when deposited on the surface and no additional elements shall be added .
Total time of mixing shall not exceed four minutes . A sufficient amount
of slurry shall be kept in all parts of the spreader at all times so the
complete coverage is obtained . No lumping , balling or unmixed aggregate
shall be permitted . No segregation of the emulsion and the aggregate
fines from the coarse aggregate shall be permitted . If the coarse
aggregate settles to the bottom of the mix , the slurry will be removed
from the pavement . No excessive breaking of the emulsion in the spreader
box will be permitted . No streaks such as left by oversized aggregate
shall be left in the finished pavement . f
B . Joints - No excessive build up no unsightly appearance shall be
permitted along longitudinal or transverse joint,
C. Handwork - Approved squeeges shall be used to spread the slurry in
the areas not accessible to the slurry mixer . Care will be exercised in
leaving no unsightly appearance from hand work .
D . Curing - Treated areas will be permitted to cure until such time as
the Engineer permits the opening to traffic .
STOCKPILING OF AGGREGATE
do not become
or excessive amounts of
Precautions shall be taked to insure thasiltstockpiles
contaminated with oversized rock , clay , areas that drain readily .
moisture . The stockpile shall be keptpermitted .
Segregation of the aggregate shall not be p
STORAGE
rovide suitable storage facilities for the asphalt
The contractor shall p to prevent water from
emulsion . The container shall be equippedprovided to prevent
entering the emulsion . Suitable heat shall be p
freezing .
SAMPLING
Samples of materials and of the finished they surface Engineer (orll be
Contracting
furnished by the contractor as directed byy
Engineer nested
Officer) during the progress of the work . Test reports may be req
of the contractor as new materials arrive .
EQUIPMENT
All equipment , tools , and machines used in the performance of this work
shall be maintained in satisfactorrry mixing
order
ui mentltotbees .
used shall
Descriptive information on the slurry mixing eq p
be submitted for approval not less than 10 days before the work starts .
Equipment - The slurry mixing machine shall be a continuos
Slurry Mixinga redetermined
flow mixing unit , and be capable of delivering p
proportion of aggregate , water , and asphalt emulsion to the mixing
chamber and to discharge the thoroughly mixed product on a continuos
shall be prewetted just prior to mixing with the
basis . The aggregate
emulsion . The mixing chamber of the mixing unit shall be capa e o proper blend.
thoroughly mixing all the ingredients together to form the
No violent mixing shall be permitted .
The slurry mixing machine shall be equipped with an approved to fines
feeder that provides and accurate meterifillernintovice or the mixertatdthe sametime
a predetermined amount of monera
fed . The finesfeeder egshall use
and locations the aggregate is ggrablend .
a
whenever added mineral filler is a part of the gg 9
The mixing machine shall be equipped with a water pressure system and
fogtype spray bar adequate for the complete fogging of the surface
y ment , with a maximum application of 0 . 05
prior to the spreading equip d . storage
gallons per sq . yd . The slurry machine must contain a 8 y
capacity to properly mix and apply a minimum of eight tons of Slurry
Seal .
Attached to the mixe�gwithh
ine shall be a
Spreading Equipment _ hydraulic augers and
mechanical type squeegee distributor equipp
urface to prevent the loss of
flexible material in contact with the sprevent
slurry from the distibtorshall
crownr+lbyntained so adjustmentsstooinsure
loss of slurry on varying grades and
uniform spread . The box shall kept clean and buildup of asphalt an
aggregate shall not be perms
d .
CLEANING EQUIPMENT
Power brooms , ater flushing equipment
power blowers , air compressors , w
ms shall be suitable for cleaning the surface and cracks o
and hand broo
the old surface .
AUXILARY EQUIPMENT
Hand squeegees , shovels and other equipment shall be provided as
necessary to perform the work .
BIDS — SLURRY SEAL FISHERS ISLAND ROADS
Bid opening: 11 :00 A.M., March 9, 1989, Southold Town Hall.
1. Thomas H. Gannon & Sons, P.O. Box 505, Middle Island, N.Y. 11953
2. Richard Murphy d/b/a Point Recreation, 1057 115th St., College Pt,NY 11356
3//j9 4. ka ate . �i�p, 4G,6 G a-s Q /! 7e)
43/ q bG�k,, � � d�GG�Cs.LG+ e•hi'�eal. � /.2 3 G�.Ct� F.ar.
3 k7 7. liae� dk c_. G'T
3
8.
9.
10.
'i
Account Number.$3503. . . . . . . Invoice . . . . . . . . . . . . . Date. . 19.89. . . . . . . .
TOWN OF SOUTHOLD, COUNTY OF SUFFOLK, N.Y., Dr.
PAY TO: Payee Identification
Payee Name: or Social Security Number:
. . . . . .Q6033,7.5 60. . . . . . . . . . . . . . . . . . . .
The Day Publishing Co. Payee Reference:
Address: P.O. Box 1231 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. New.London, .Ct. . .06320 . . . . . . . . . . Phone No. (. . . .). . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Vendor Contact
CashDiscount. . . . . . . . . . . . . . . . . . % . . . . . . . . .Days . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Item Description of Material/Service Quantity Unit Amount
No. Price
2/25 Slurry Seal Bid 53 . 84 44.52
Y
%a Est
A 1109>01 } g g
a Total
o
�� x
Its
Is ac 4� Discount 2% . 89
J Net 43. 63
The undersigned (Claimant) (Acting on behalf of above named claimant) does hereby certify that
the foregoing claim is true and correct and that no part thereof has been paid, except as therein stated,
and that the balance therein stated is actually due and owing.
Dated. . . . . . . �. . .,19 _ . . . .
Signature
LEGAL NOTICE
NOTICE TO 111I,pDE1RS
NOTICE IS HEREBY GIVEN in STATE OF NEW YORK)
accordance with the provisions of ) ,
Section 103 of the General Municipal
Law,that sealed bids are sought and COUNTY OF SUFFOLK)
requested from qualified contractors to
furnish and place 25,000 square yards,
more or less as may be needed at the Maribeth Powers of Mattituek, in
discretion of the Superintendent of
Highways,of Slurry Seal on Town said County, being duly sworn,says that he/she is Principal
Ronda on Fuser:Island,New York.
The Price Per square Yard is requested. Clerk of THE SUFFOLK TIMES, a Weekly Newspaper,
S»ecifications for the above may be published at Mattituek, in the Town of Southold, County of
obtaked at the Office of the Town
Cleric, Town of Southold, Town Suffolk and State of New York,and that the Notice of which
Ham. Mafia Road, Southold, New
York 11971. the annexed is a printed copy,has been regularly published in
The sealed bids,together with a said Newspaper once each week for 1 weeks
Nan-Collusive Bid Certificate,bank successively, commencing on the _ day of
draft or certified check in the amount
equal to 2%of the amount of the bid, F p r r a r y 19$�
based upon 25,000 square yards,win
be received by the Town Clerk of the
Town of Southold,at the Southold
Town Hall, Main Road, Southold,
New York,until 11:00 A.M.,Thurs-
day,March 9, 1989,at which time
they will be opened and read aloud in . Principal Clerk
public.The Town Board of the Town
Of Southold reserves the right to ra-
jest Any and all bids and waive any,
and all informality in any Edd should
it be defined in the best interest of the Sworn to bef re this
Town of Southold to do so.
62?
All bids must be signed and sealed day Of 1Y K.[l (;f'n¢f
m envelopes plainly marked"Bid to r!„ , itM t k.�,:York
Slurry Seal Roads on Fishers Island•,
60
and submitted to the Office of the ry Expires Fe ru Ors ��39
ut expires Ee���ar9
Town Clerk.The bid price shall not
"'''`"""������
include any tax,federal,state or local,
from which the Town of Southold is
exempt
DATED:February 7,1989.
JUDITH T.TERRY
SOUTHOLD TOWN CLERK
6198-1TF23
I
i,
I I
COUNTY OF SUFFOLK ss:
LEGAL NOTICE STATE OF NEW YORK
NOTICE IS HEREBY .
GIVEN in accordance with the
provisions of Section 103 of the
General Municipal Law, that Patricia Wood, being duly sworn, says that she is the
sealed bids are sought and re-
quested from qualified contrac- Editor, of THE LONG ISLAND TRAVELER-WATCHMAN,
r
tors to furnish and place 25,000 a public newspaper printed at Southold, in Suffolk County;
square yards, more or less as and that the notice of which the annexed is a printed copy,
may be needed at the discretion
of the Superintendent of High- has been published in said Long Island Traveler-Watchman
ways, of Slurry Seal on Town once each week for . . . . . . . . . . . . . . . . . . . . . . . . . . weeks
Roads on Fishers Island, New
York.The price per square yard
is requested. Specifications for successively, commencing on the . . . . . . . . . . . . . . . . . . . . . . [
the above may be obtained at day of . . . .-.'. . . . . . . 19
r
the Office of the Town Clerk, ��.csy�
Town of Southold, Town Hall,
Main Road, Southold, New
York 11971.
The sealed bids,together with --
g
a Non-Collusive Bid.Certificate,
x
bank draft or certified check in
the amount equal to 2010 of the ,/
amount of the bid, based upon
I,
25,000 square yards, will be re- Sworn to before me this . . . . . . . . . . . . . . . . . . . . . day of
ceived by the Town Clerk of the
Town of Southold,at the South-
old Town Hall, Main Road, . . . . . . l 19
Southold, New York,until 11:00
A.M.,Thursday,March 9, 1989,
at which time they will be open-
ed and read aloud in public.The
Town Board of the Town of
Southold reserves the right to re-
ject any and all bids and waive Notary Public
any and all informality in any EAr,;OARA A.SCHNEIDER
bid should it be deemed in the No7 4 RY Pi."?LIC, State of New York,
best interest of the Town of No. 4806846
Southold to do so. QtWified in Suffolk County
All bids must be signed and CQ[;jniisslon Expires 77 119 v
sealed in envelopes plainly
marked "Bid to Slurry Seal
Roads on Fishers Island," and
submitted to the Office of the
Town Clerk.The bid price shall
not include any tax, federal,
state or local, from which the
Town of Southold is exempt.
DATED: February 7, 1989
JUDITH T. TERRY
SOUTHOLD TOWN CLERK
1X, 2/23/89(11)
i
I,
STATE OF NEW YORK)
SS:
COUNTY OF SUFFOLK)
JUDITH T. TERRY, Town Clerk of the Town of Southold, New York,
being duly sworn, says that on the 17th day of February 19 89
she affixed a notice of which the annexed printed notice is 'a true copy, in
a proper and substantial manner, in a most public place in the Town of
Southold, Suffolk County, New York, to wit:
Town Clerk's Bulletin Board, Southold Town Hall, Main Road,
Southold, New York 11971.
Legal Notice, Notice to Bidders : Slurry Seal Town Roads on Fishers Island.
Bid opening : 11 :00 A.M. , Thursday, March 9, 1989. Southold Town
Hall.
Judith T. Terry
Southold Town Clerk
Sworn to before me this
17th day of February 19 89
Notary Public
ELIZABETH ANN NEVILLE
Notarryy Public,State of New York
No.52-8125850,Suffolk Cour,
Term Expires October 31. I&I
I�
LEGAL NOTICE
NOTICE TO BIDDERS
NOTICE IS HEREBY GIVEN in accordance with the provisions of Section
103 of the General Municipal Law, that sealed bids are sought and requested
from qualified contractors to furnish and place 25,000 square yards, more or
less as may be needed at the discretion of the Superintendent of Highways,
of Slurry Seal on Town Roads on Fishers Island, New York. The price per
square yard is requested. Specifications for the above may be obtained at
the Office of the Town Clerk, Town of Southold, Town Hall, Main Road,
III
Southold, New York 11971 .
The sealed bids, together with a Non-Collusive Bid Certificate, bank
draft or certified check in the amount equal to 20 of the amount of the bid,
based upon 25,000 squre yards, will be received by the Town Clerk of the
Town of Southold, at the Southold Town Hall, Main Road, Southold, New York,l
until 11 :00 A.M. , Thursday, March 9, 1989, at which time they will be opened
I
and read aloud in public. The Town Board of the Town of Southold reserves li
the right to reject any and all bids and waive any and all informality in any
bid should it be deemed in the best interest of the Town of Southold to do so.
All bids must be signed and sealed in envelopes plainly marked "Bid to j
I
i Slurry Seal Roads on Fishers Island", and submitted to the Office of the Town'i
Clerk. The bid price shall not include any tax, federal, state or local, from
which the Town of Southold is exempt.
DATED : February 7, 1989.
JUDITH T. TERRY
i
SOUTHOLD TOWN CLERK
PLEASE PUBLISH ONCE, FEBRUARY 23, 1989, AND FORWARD ONE (1)
AFFIDAVIT OF PUBLICATION TO JUDITH T. TERRY, TOWN CLERK,
TOWN HALL, MAIN ROAD, SOUTHOLD, NEW YORK 11971.
Copies to the following:
The Suffolk Times
The Long Island Traveler-Watchman
Town Board members
Town Clerk's Bulletin Board
Superintendent of Highways Jacobs I
I
Dodge Reports
The Day Publishing Company
i
I
I
i
I
i
i
LEGAL NOTICE
NOTICE TO BIDDERS
NOTICE IS HEREBY GIVEN in accordance with the provisions of Section
103 of the General Municipal Law, that sealed bids are sought and requested
from qualified contractors to furnish and place 25,000 square yards, more or
less as may be needed at the discretion of the Superintendent of Highways,
of Slurry Seal on Town Roads on Fishers Island, New York. The price per
square yard is requested. Specifications for the above maybe obtained at
the Office of the Town Clerk, Town of Southold, Town Hall, Main Road,
Southold, New York 11971.
The sealed bids, together with a Non-Collusive Bid Certificate, bank
draft or certified check in the amount equal to 2% of the amount of the bid,
based upon 25,000 squre yards, will be received by the Town Clerk of the
Town of Southold, at the Southold Town Hall, Main Road, Southold, New York,
until 11 :00 A.M. , Thursday, March 9, 1989, at which time they will be opened
and read aloud in public. The Town Board of the Town of Southold reserves
the right to reject any and all bids and waive any and all informality in any
bid should it be deemed in the best interest of the Town of Southold to do so.
All bids must be signed and sealed in envelopes plainly marked "Bid to
Slurry Seal Roads on Fishers Island", and submitted to the Office of the Town
Clerk. The bid price shall not include any tax, federal, state or local, from
which the Town of Southold is exempt.
DATED : February 7, 1989.
JUDITH T. TERRY
SOUTHOLD TOWN CLERK
PLEASE PUBLISH ONCE, FEBRUARY 23, 1989, AND FORWARD ONE (1)
AFFIDAVIT OF PUBLICATION TO JUDITH T. TERRY, TOWN CLERK,
TOWN HALL, MAIN ROAD, SOUTHOLD, NEW YORK 11971.
Copies to the following:
The Suffolk Times
The Long Island Traveler-Watchman
Town Board members ,
Town Clerk's Bulletin Board
Superintendent of Highways Jacobs
Dodge Reports
The Day Publishing Company
LEGAL NOTICE
NOTICE TO BIDDERS
NOTICE IS HEREBY GIVEN in accordance with the provisions of Section
103 of the General Municipal Law, that sealed bids are sought and requested
from qualified contractors to furnish and place 25,000 square yards, more or
less as may be needed at the discretion of the Superintendent of Highways,
of Slurry Seal on Town Roads on Fishers Island, New York. The price per
square yard is requested. Specifications for the above may be obtained at
the Office of the Town Clerk, Town of Southold, Town Hall, Main Road,
Southold, New York 11971.
The sealed bids, together with a Non-Collusive Bid Certificate, bank
draft or certified check in the amount equal to 2% of the amount of the bid,
based upon 25,000 squre yards, will be received by the Town Clerk of the
i
Town of Southold, at the Southold Town Hall, Main Road, Southold, New York,
until 11 :00 A.M. , Thursday, March 9, 1989, at which time they will be opened
and read aloud in public. The Town Board of the Town of Southold reserves
the right to reject any and all bids and waive any and all informality in any
bid should it be deemed in the best interest of the Town of Southold to do so.
All bids must be signed and sealed in envelopes plainly marked "Bid to
Slurry Seal Roads on Fishers Island", and submitted to the Office of the Town
Clerk. The bid price shall not include any tax, federal, state or local, from
which the Town of Southold is exempt.
DATED: February 7, 1989.
JUDITH T. TERRY
SOUTHOLD TOWN CLERK
PLEASE PUBLISH ONCE, FEBRUARY 23, 1989, AND FORWARD ONE (1)
AFFIDAVIT OF PUBLICATION TO JUDITH T. TERRY, TOWN CLERK,
TOWN HALL, MAIN ROAD, SOUTHOLD, NEW YORK 11971.
Copies to the following:
The Suffolk Times
The Long Island Traveler-Watchman
Town Board members
Town Clerk's Bulletin Board
Superintendent of Highways Jacobs
Dodge Reports
The Day Publishing Company
NON-COLLUSIVE BID CERTIFICATE
The undersigned bidder certifies that this bid has been arrived at
by the bidder independently and has been submitted without collusion
with any other vendor of materials, supplies or equipment of the type
described in the invitation for bids, and the contents of this bid have
not been communicated by the bidder, nor, to its best knowledge and
belief, by any of its employees or agents, to any person not an
employee or agent of the bidder or its surety on any bond furnished
herewith prior to the official opening of the bid.
(Signed)
(Corporate Title)
(if any)
Bid on Slurry Seal Roads - Fishers Island
.� SPECIFICATIONS FOR SLURRY SEAL
It is the intent of these specifications to insure the fact that the
slurry seal contractor submitting a bid for the work realizes that the
standards and requirements of the contract are at least equal to the
standards set by the International Slurry Seal Association guide
Specifications A-105 , dated February 1972 .
SCOPE
The work covered by this specification consists of furnishing all plant ,
labor , equipment , and materials in performing all operations necessary
in connection with the application of slurry seal surface on the
designated surface , in complete and strict accordance with the
specifications .
APPLICABLE SPECIFICATIONS
The materials used in the composition of the slurry seal surface shall
be in strict accordance with the following specifications and shall pass
the necessary testing procedures as follows :
Test Method for Aggregate and Mineral Filler
AASHO T2-60 Sampling Stone „
AASHO T27-60 Sieve analysis of fine or coarse aggregate
AASHO Tll-60 Amount of material finer than 200 sieve
AASHO T176-56 Sand equivalent test
AASHO T84-60 Specific gravity and absorbtion of fine aggregate
AASHO T19-56 Unit weight of aggregate
AASHO T96-60 Abrasion of coarse aggregate
AASHO T127-60 Sampling hydraulic cement
AASHO T37-56 Sieve; analysis of mineral filler
AASHO T104-56 Soundness of aggregate by use of sodium
Sulfate or magnesium sulfate
Test Method for Asphalt Emulsions
AASHO T40-56 Sampling bituminous material
AASHO T59-60 Testing emulsified asphalts
AASHO T182-57 Stripping test for bituminous mixtures
AASHO T59A Positive particle charge test must show positive
AASHO T59 Cement mixing test
Test Method for Bituminous Slurry Surfaces
AASHO T164-60 Bitumen content of paving mixture
AASHO T30-55 Mechanical analysis of extracted aggregate
SPECIFICATIONS FOR MINERAL FILLER
ASTM 0242-64 Mineral fillers for bituminous mixture
At the discretion of the Contracting Officer'', any of the materials used
in the Slurry Surface may be tested according to the above procedures .
SPECIFICATIONS FOR ASPHALT EMULSION USED IN SLURRY SEAL
The asphlat emulsion shall conform to the requirements of a cationic
quick-set emulsion , type CSS-1H . This emulsion shall pass the positive
particle test for cationic emulsions and shall show a PH factor of 6 . 5 .
The cationic quick-setting emulsion shall show a positive break and
resistance to rain in 1 to 2 hours .
The contractor shall furnish a certified statement from the emulsion
manufacturer giving analysis of the base asphalt used in the manufactor
of the emulsion . The statement shall also certify that the material
represented in a true cationic quick-set emulsion passing all the above
testing procedures .
SPECIFICATIONS FOR THE AGGREGATE USED IN SLURRY SEAL
The mineral aggregate shall consist of natural of manufactured slag or
crushed stone . The aggregate shall be clean and free from vegetable
matter and other deleterious substances . When tested by AASHO T176 , the
aggregate blend shall have a sand equivalent of not less than 45 .
Mineral fillers such as Portland Cement , Limestone Dust , Fly Ash and
others shall be considered as part of the blended aggregate and shall be
used in mimimun required amounts . They shall meet the gradation
requirements of ASTM D242-64 . Mineral fillers shall only be used if
needed to improve the workability of the mix or the gradation of the
aggregate . The combined mineral aggregate shall conform to the
following gradation when tested by the previously mentioned test :
SIEVE-SIZE TYPE II-PERCENT PASSING
3/8 100
#4 98-100
#8 65-90
#16 45-70
#30 35-50
#50 18-35
#100 10-21
#200 5-15
Theoretical Asphalt content & Dry Aggregate
7 . 5-13 . 5
WATER
All water used with the slurry mixture shall be potable and free from
harmful solublo salts .
LABORATORY TESTING
Source's of all materials shall be selected prior to the time the
materials are required for use in the work . All samples shall be taken
according to previously mentioned methods . All materials shall be
pertested in a qualified laboratory as their suitability for use in
Slurry Seal . The theoretical asphalt content shall be determined . The
laboratory shall also determine if a mineral filler is required , and if
so , how much should be used . Test samples shall be made and tested on as
Wet Track Abrasion Machine .
A complete laboratory analysis and test report accompanied by abrated
and unabrated slurry samples shall be submitted by the Contractor before
the job starts .
At least three days prior to the start of Slurry application a Job-mix
formula for the Slurry Mixture shall be submitted to the Contracting
Officer for approval . No Slurry shall be applied until such approval is
received in writing from the Contracting Officer .
The Job-Mix formula shall include the following :
1 . Sieve analysis of aggregate used 1
2 . % of mineral filler
3 . % of water
4 . % of asphalt emulsion
5 . Unit weight of Dry Aggregate in lbs . /cu . ft . loose and compacted .
6 . Sample mixes should be evaluated by acceptable testing procedures as
to their setting time , mixing characteristics , resistance to rain and
abrasion . The results of the wet track abrasion test should be
included in this report .
7 . Observed effects of moisture content on the specific weights for the
test aggregate .
NI
PREPARATION OF THE SURFACE
Immediately prior to the application of the Slurry Seal the surface
shall be cleaned of all loose material , silt spots , vegetation and other
objectionable material . Any standard method will be acceptable , except
water flushing will not be permitted in areas where considerable cracks
are present in the pavement surface . When required a tack coat of 4
parts water , 1 part cationic emulsion shall be applied to all concrete
surfaces prior to the application of the Slurry Seal . This shall be
applied at air temperature and allowed to cure before the slurry
operation .
COMPOSITION AND RATE OF APPLICATION OF THE SLURRY MIX
The amount of asphalt emulsion to be blended with the aggregate shall be
that as determined by the laboratory report after final adjustments in
the field . A minimum amount of water will be added as necessary to
obtain a fluid homogeneous mixture . The rate of application shall be a
minimum of 10 lbs . , but not greater than 15 lbs . of aggregate per sq . yd .
The engineer will give final approval to the design and rate of
application used .
WEATHER
The Slurry Seal shall not be applied if the pavement or the air
temperature is 55 degrees F . or below and falling , but may be applied
when both the air and pavement temp . is 45 degrees F . or above and
rising . The mixture should not be applied if high . relative humidity
prolongs the curing time . beyond a reasonable amount .
TRAFFIC CONTROL
Suitable methods such as barricades , flagmen , pilot cars , etc . shall be
used to protect the uncured slurry surface from all types of traffic ,
Any damage to the uncured slurry will be the responsiblility of the
contractor . The engineer or Contracting Officer shall give final
approval of the method used . If damage occurs where suitable means have
been made to protect the uncured slurry , violators will be prosecuted
and the contractor will be reimbursed for the damages .
APPLICATION OF THE SLURRY SURFACE
A. General - The surface shall be fogged with water directly preceding
the spreader . The Slurry mixture shall be of the desired consistancy
when deposited on the surface and no additional elements shall be added .
Total time of mixing shall not exceed four minutes . A sufficient amount
of slurry shall be kept in all parts of the spreader at all times so the
complete coverage is obtained . No lumping , balling or unmixed aggregate
shall be permitted . No segregation of the emulsion and the aggregate
fines from the coarse aggregate shall be permitted . If the coarse
aggregate settles to the bottom of the mix , the slurry will be removed
from the pavement . No excessive breaking of the emulsion in the spreader
box will be permitted . No streaks such as left by oversized aggregate
shall be left in the finished pavement . f
B . Joints - No excessive build up no unsightly appearance shall be
permitted along longitudinal or transverse joint,
C . Handwork - Approved squeeges shall be used to spread the slurry in
the areas not accessible to the slurry mixer. Care will be exercised in
leaving no unsightly appearance from hand work .
D . Curing - Treated areas will be permitted to cure until such time as
the Engineer permits the opening to traffic .
STOCKPILING OF AGGREGATE
o
Precautions shall be takedamounts of
to insure that stockpiles do not become
contaminated with oversized
rock clay , silt , or excessive am
shall be kept is areas that drain readily .
moisture . The stockpilere ate shall not be permitted .
Segregation of the agg 9
STORAGE halt
provide suitable storage facilities for the asp
The contractor shall p prev
water from
emulsion . The container shall be equipped to P provided to prevent
entering the emulsion . Suitable heat shall be p
freezing .
SAMPLING
surface shall be
the Engineer (or Contracting
Samples of materials and of the finished slurry be requested
furnished by the contractor as directed by Test reports may
Officer) during the progress of the work .
of the contractor as new materials arrive .
EQUIPMENT
All equipment , tools ,
and machines used in the performance of this work
Y• g ment to be used
Descriptive informatio s
Imes .
hall
shall be maintained innsonithecslurryomixingoequipat al a work starts .
be submitted for approval not less than 10 days before t
Equipment - The slurry mixing machine shall be a continuos
Slurry Mixinga redetermined
flow mixing unit , and be capable of asphaltemulsionto the mixing
proportion of aggregate , water , and asp
chamber and to discharge the thoroughly mixed product on a continuos
just prior to mixing with the
basis . The aggregate shall be prewetted j able of
e ingredients the
together to form the proper blend .
emulsion . The mixing chamber of the mixing unit shall a cap
thoroughly mixing all t
No violent mixing shall be permitted .
roved fines
The slurry mixing machine shall be equipped with an app
ice or
to
duce
feeder that provides and accurate filler mixertatdthe sametime
a predetermined amount of moneral fi The fines feeder shall be used
and locations the aggregate is fed . gg 9 re ate blend .
whenever added mineral filler is a part of the a
with a water pressure system and
The mixing machine shall be equippedg in of the surface
fog type spray bar adequate for the chmalmaximumgapplication of 0 .05
prior to the spreading equipment , d . storage
gallons per sq . yd . The slurry maehminimumne tofoeight tonsofSlurry
capacity to properly mix and apply
Seal .
Spreading Equipment _ Attached to the uiixedgwithmachine
draulic augers and
P y
mechanical type squeegee distributor eq pP
flexible material in contact with the surface to prevent the loss of
f prevent
gra be
and crown by adjustments to insure
slurry from the distributor . It shall be r�iaint8ned so as ashalt and
loss of slurry on varying 9 t clean and buildup of p
uniform spread . The boxshall
e kep
aggregate shall not be permitted .
CLEANING EQUIPMENT ui ment
Power brooms , power blowers , air compressors , water flushing eq p
and hand brooms shall be suitable for cleaning the surface and cracks o
the old surface .
AUXILARY EQUIPMENT
Lt� other equipment shall be provided as
Hand squeegees , shovels and
necessary to perform the work .
F OL/(CD`�l�
Town Hall, 53095 Main Road
yO P.O. Box 1179
Southold, New York 11971
01 FAX(516)765-1823
JUDITH T.TERRY TELEPHONE(516)765-1801
TOWN CLERK
REGISTRAR OF VITAL STATISTICS OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY
THAT
ATTHE
REGULARFOLLOWING
MEETRESOLUTION
ONWAS
FEBRADOPTED
UARY 7B 1 89E
SOUTHOLD TOWN BOARD
RESOLVED that the Town Board of the Town of Southold hereby authorizes
the Town Clerk toa dvertise for bids for resurfacing Town Roads on Fishers
Island with slurry seal.
Aludit�hf Terry
Southold Town Clerk
February 9, 1989
Highway Department
Town of Southold
Peconic Lane
I Peconic, N.Y. 11958
r! Tel.765-3140
RAYMOND L.JACOBS 734-5211
Superintendent
RESOLUTION BY:
SECONDED BY:
RESOLVED: That the Town Board of the Town of Southold
hereby authorizes the Town clerk to advertise for bids
for the Superintendent of Highways for- the purchase of :
RESURFACING TOWN ROADS ON FISHERS ISLAND
WITH SLURRY SEAL .
VOTE OF THE TOWN BOARD
Supervisor Frank J. Murphy (Yes) (No)
Justice Raymond W. Edwards (Yes) (No)
Councilwoman Jean W. Cochran (Yes) (No)
Councilman George L. Penny IV (Yes) (No)
Councilwoman Ruth D. Oliva (Yes) (No)
Councilwoman Ellen M. Larsen (Yes) (No)
Dated: February 7 , 1989
Town Clerk, Town of Southold
Town Hall, 53095 Main Road
4p Off- P.O. Box 1179
Southold, New York 11971
JUDITH T.TERRY 1 TELEPHONE
TOWN CLERK (516) 765-1801
REGISTRAR OF VITAL STATISTICS OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION WAS ADOPTED BY THE
SOUTHOLD TOWN BOARD AT A REGULAR MEETING HELD ON MAY 17, 1988:
RESOLVED that the Town Board of the Town of Southold hereby authorizes
and directs the Town Clerk to advertise for bids for resurfacing Town Roads
on Fishers Island.
Judith T. Terr
Y
Southold Town Clerk
May 18, 1988
Highway Department
Town of Southold
Peconic Lane
Peconic, N.Y. 11958
RAYMOND L.JACOBS
Superintendent Tel.765-3140
734-5211
RESOLUTION BY:
SECONDED BY:
RESOLVED: That the Town Board of the Town of Southold
hereby authorizes the Town clerk to advertise for bids
for the Superintendent of Highways for the resurfacing
of Town Roads on Fishers Island, New York.
VOTE OF THE TOWN BOARD
Supervisor Frank J. Murphy (Yes) (No)
Justice Raymond W. Edwards (Yes) (No)
Councilwoman Jean W. Cochran (Yes) (No)
Councilman George L. Penny IV (Yes) (No)
Councilwoman Ruth D. Oliva (Yes) (No)
Councilwoman Ellen M. Larsen (Yes) (No)
Dated: May 17, 1988
Town Clerk, Town of Southold
SPECIFICATIONS FOR SLURRY SEAL
It is the intent of these specifications to insure the fact that the
slurry seal contractor submitting a bid for the work realizes that the
standards and requirements of the contract are at least equal to the
standards set by the International Slurry Seal Association guide
Specifications A-105 , dated February 1972 .
SCOPE
The work covered by this specification consists of furnishing all plant ,
labor , equipment , and materials in performing all operations necessary
in connection with the application of slurry seal surface on the
designated surface , in complete and strict accordance with the
specifications .
APPLICABLE SPECIFICATIONS
The materials used in the composition of the slurry seal surface shall
be in strict accordance with the following specifications and shall pass
the necessary testing procedures as follows :
Test Method for Aggregate and Mineral Filler
AASHO T2-60 Sampling Stone
AASHO T27-60 Sieve analysis of fine or coarse aggregate
AASHO Tll-60 Amount of material finer than 200 sieve
AASHO T176-56 Sand equivalent test
AASHO T84-60 Specific gravity and absorbtion of fine aggregate
AASHO T19-56 Unit weight of aggregate
AASHO T96-60 Abrasion of coarse aggregate
AASHO T127-60 Sampling hydraulic cement
AASHO T37-56 Sieve; analysis of mineral filler
AASHO T104-56 Soundness of aggregate by use of sodium
Sulfate or magnesium sulfate
Test Method for Asphalt Emulsions
AASHO T40-56 Sampling bituminous material
AASHO T59-60 Testing emulsified asphalts
AASHO T182-57 Stripping test for bituminous mixtures
AASHO T59A Positive particle charge test must show positive
AASHO T59 Cement mixing test
Test Method for Bituminous Slurry Surfaces
AASHO T164-60 Bitumen content of paving mixture
AASHO T30-55 Mechanical analysis of extracted aggregate
SPECIFICATIONS FOR MINERAL FILLER
ASTM D242-64 Mineral fillers for bituminous mixture
At the discretion of the Contracting Office, any of the materials used
in the Slurry Surface may be tested according to the above procedures .
SPECIFICATIONS FOR ASPHALT EMULSION USED IN SLURRY SEAL
The asphlat emulsion shall conform to the requirements of a cationic
quick-set emulsion , type CSS-1H . This emulsion shall pass the positive
particle test for cationic emulsions and shall show a PH factor of 6 . 5 .
The cationic quick-setting emulsion shall show a positive break and
resistance to rain in 1 to 2 hours .
The contractor shall furnish a certified statement from the emulsion
manufacturer giving analysis of the base asphalt used in the manufactor
of the emulsion . The statement shall also certify that the material
represented in a true cationic quick-set emulsion passing all the above
testing procedures .
SPECIFICATIONS FOR THE AGGREGATE USED IN SLURRY SEAL
The mineral aggregate shall consist of natural of manufactured slag or
crushed stone . The aggregate shall be clean and free from vegetable
matter and other deleterious substances . When tested by AASHO T176 , the
aggregate blend shall have a sand equivalent of not less than 45 .
Mineral fillers such as Portland Cement , Limestone Dust , Fly Ash and
others shall be considered as part of the blended aggregate and shall be
used in mimimun required amounts . They shall meet the gradation
requirements of ASTM D242-64 . Mineral fillers shall only be used if
needed to improve the workability of the mix or the gradation of the
aggregate . The combined mineral aggregate shall conform to the
following gradation when tested by the previously mentioned test :
SIEVE-SIZE TYPE II-PERCENT PASSING
3/8 100
#4 98-100
#8 65-90
#16 45-70
#30 35-50
#50 18-35
#100 10-21
#200 5-15
Theoretical Asphalt content & Dry Aggregate
7 . 5-13 . 5
WATER
All water used with the slurry mixture shall be potable and free from
harmful solub1h salts .
LABORATORY TESTING
Sources of all materials shall be selected prior to the time the
materials are required for use in the work . All samples shall be taken
according to previously mentioned methods . All materials shall be
pertested in a qualified laboratory as their suitability for use in
Slurry Seal . The theoretical asphalt content shall be determined . The
laboratory shall also determine if a mineral filler is required , and if
so , how much should be used . Test samples shall be made and tested on as
Wet Track Abrasion Machine .
A complete laboratory analysis and test report accompanied by abrated
and unabrated slurry samples shall be submitted by the Contractor before
the job starts .
At least three days prior to the start of Slurry application a Job-mix
formula for the Slurry Mixture shall be submitted to the Contracting
Officer for approval . No Slurry shall be applied until such approval is
received in writing from the Contracting Officer .
The Job-Mix formula shall include the following :
1 . Sieve analysis of aggregate used
2 . % of mineral filler
3 . % of water
4 . % of asphalt emulsion
5 . Unit weight of Dry Aggregate in lbs . /cu . ft . loose and compacted .
6 . Sample mixes should be evaluated by acceptable testing procedures as
to their setting time , mixing characteristics , resistance to rain and
abrasion . The results of the wet track abrasion test should be
included in this report .
7 . Observed effects of moisture content on the specific weights for the
test aggregate .
PREPARATION OF THE SURFACE
Immediately prior to the application of the Slurry Seal the surface
shall be cleaned of all loose material , silt spots , vegetation and other
objectionable material . Any standard method will be acceptable , except
water flushing will not be permitted in areas where considerable cracks
are present in the pavement surface . When required a tack coat of 4
parts water , 1 part cationic emulsion shall be applied to all concrete
surfaces prior to the application of the Slurry Seal . This shall be
applied at air temperature and allowed to cure before the slurry
operation .
COMPOSITION AND RATE OF APPLICATION OF THE SLURRY MIX
The amount of asphalt emulsion to be blended with the aggregate shall be
that as determined by the laboratory report after final adjustments in
the field . A minimum amount of water will be added as necessary to
obtain a fluid homogeneous mixture . The rate of application shall be a
minimum of 10 lbs . , but not greater than 15 lbs . of aggregate per sq . yd .
The engineer will give final approval to the design and rate of
application used .
WEATHER
The Slurry Seal shall not be applied if the pavement or the air
temperature is 55 degrees F . or below and falling , but may be applied
when both the air and pavement temp . is 45 degrees F . or above and
rising . The mixture should not be applied if high relative humidity
prolongs the curing time . beyond a reasonable amount .
TRAFFIC CONTROL
Suitable methods such as barricades , flagmen , pilot cars , etc . shall be
used to protect the uncured slurry surface from all types of traffic ,
Any damage to the uncured slurry will be the responsiblility of the
contractor . The engineer or Contracting Officer shall give final
approval of the method used . If damage occurs where suitable means have
been made to protect the uncured slurry , violators will be prosecuted
and the contractor will be reimbursed for the damages .
APPLICATION OF THE SLURRY SURFACE
A . General - The surface shall be fogged with water directly preceding
the spreader . The Slurry mixture shall be of the desired consistancy
when deposited on the surface and no additional elements shall be added .
Total time of mixing shall not exceed four minutes . A sufficient amount
of slurry shall be kept in all parts of the spreader at all times so the
complete coverage is obtained . No lumping , balling or unmixed aggregate
shall be permitted . No segregation of the emulsion and the aggregate
fines from the coarse aggregate shall be permitted . If the coarse
aggregate settles to the bottom of the mix , the slurry will be removed
from the pavement . No excessive breaking of the emulsion in the spreader
box will be permitted . No streaks such as left by oversized aggregate
shall be left in the finished pavement . r
B . Joints - No excessive build up no unsightly appearance shall be
permitted along longitudinal or transverse joint.
C . Handwork - Approved squeeges shall be used to spread the slurry in
the areas not accessible to the slurry mixer . Care will be exercised in
leaving no unsightly appearance from hand work .
D . Curing - Treated areas will be permitted to cure until such time as
the Engineer permits the opening to traffic .
ti
STOCKPILING OF AGGREGATE
Precautions shall be taked to insure that stockpiles do not become
contaminated with oversized rock , clay , silt , or excessive amounts of
moisture . The stockpile shall be kept in areas that drain readily .
Segregation of the aggregate shall not be permitted .
STORAGE
The contractor shall provide suitable storage facilities for the asphalt
emulsion . The container shall be equipped to prevent water from
entering the emulsion . Suitable heat shall be provided to prevent
freezing .
SAMPLING
Samples of materials and of the finished slurry surface shall be
furnished by the contractor as directed by the Engineer (or Contracting
Officer) during the progress of the work . Test reports may be requested
of the contractor as new materials arrive .
EQUIPMENT
All equipment , tools , and machines used in the performance of this work
shall be maintained in satisfactory working order at all times .
Descriptive information on the slurry mixing equipment to be used shall
be submitted for approval not less than 10 days before the work starts .
Slurry Mixing Equipment - The slurry mixing machine shall be a continuos
flow mixing unit , and be capable of delivering a predetermined
proportion of aggregate , water , and asphalt emulsion to the mixing
chamber and to discharge the thoroughly mixed product on a continuos
basis . The aggregate shall be prewetted just prior to mixing with the
emulsion . The mixing chamber of the mixing unit shall be capable of
thoroughly mixing all the ingredients together to form the proper blend .
No violent mixing shall be permitted .
The slurry mixing machine shall be equipped with an approved fines
feeder that provides and accurate metering device or method to introduce
a predetermined amount of moneral filler into the mixer at the same time
and locations the aggregate is fed . The fines feeder shall be used
whenever added mineral filler is a part of the aggregate blend .
The mixing machine shall be equipped with a water pressure system and
fog type spray bar adequate for the complete fogging of the surface
prior to the spreading equipment , with a maximum application of 0 . 05
gallons per sq . yd . The slurry machine must contain a 8 yd . storage
capacity to properly mix and apply a minimum of eight tons of Slurry
Seal.
Spreading Equipment = Attached to the mixing machine shall be a
mechanical type squeegee distributor equipped with hydraulic augers and
flexible material in contact with the surface to prevent the loss of
slurry from the distributor . It shall be diaintained so as to prevent
loss of slurry on varying grades and crown by adjustments to insure
uniform spread . The box shall be kept clean and buildup of asphalt and
aggregate shall not be permitted .
CLEANING EQUIPMENT
Power brooms , power blowers , air compressors , water flushing equipment
and hand brooms shall be suitable for cleaning the surface and cracks of
the old surface .
AUXILARY EQUIPMENT
Hand squeegees , shovels and other equipment shall be provided as
necessary to perform the work .