Loading...
HomeMy WebLinkAbout06/2014 Department of Public Works Monthly Report Date: June 2014 Town Hall - Coordinated installation of charge station in parking lot - Installed name plate for new ATA at Annex - Cleaned up and repaired leak in the Computer Service room located in basement - Replaced leaking PVC pipe (A/C drain) on east end of the building Beaches & Road Ends - Managed beach sand recovery in coordination with Terry Latham - Cut a hole in the bulkhead at Pequash Marina for HWY drainage project - Enhanced HC parking area and relined parking lot at NS beach - Installed replacement split rail fencing at Marratooka Lake Park - Completed paint project on bath house at McCabes Beach - Scrapped and painted lifeguard stands - Put out lifeguard stands out for summer season - Repaired and installed lifelines - Repaired leaky faucet in Men’s Bathroom at Town Beach - Installed boundary posts and signage on beaches - Painted bathroom doors at New Suffolk Beach - Replaced rotten fascia & port chop on New Suffolk Beach bathrooms - Installed toilet tissue holders at McCabes & Kenny’s beaches HRC - Police Dept - Hung pictures (installed on concrete walls) Down’s Farm - Repaired lock on schoolhouse building Town Parks & Info Centers - Repaired flagpole topper at Laurel Ballfield - Repaired gate at dog park - Installed sign at Bay Ave project - Prepared barrels and delivered to Strawberry Fields for festival - Installed banners at ballfields - Sandpro ballfields regularly - Repaired outside water spigot leak, installed screens - Shaped up shrubs and bushes - Planted donated flowers Animal Shelter - Repaired alarm sensor issue - Repaired sanitizer HWY - Repaired leaky roof on salt barn PCC - Repaired leak on drain catch on Ladies Room sink Maintained all grass & planted areas at all Town parks and facilities Replaced broken boards on fencing at Dean’s parking lot