HomeMy WebLinkAbout06/2014
Department of Public Works
Monthly Report
Date: June 2014
Town Hall
- Coordinated installation of charge station in parking lot
- Installed name plate for new ATA at Annex
- Cleaned up and repaired leak in the Computer Service room
located in basement
- Replaced leaking PVC pipe (A/C drain) on east end of the building
Beaches & Road Ends
- Managed beach sand recovery in coordination with Terry Latham
- Cut a hole in the bulkhead at Pequash Marina for HWY drainage
project
- Enhanced HC parking area and relined parking lot at NS beach
- Installed replacement split rail fencing at Marratooka Lake Park
- Completed paint project on bath house at McCabes Beach
- Scrapped and painted lifeguard stands
- Put out lifeguard stands out for summer season
- Repaired and installed lifelines
- Repaired leaky faucet in Men’s Bathroom at Town Beach
- Installed boundary posts and signage on beaches
- Painted bathroom doors at New Suffolk Beach
- Replaced rotten fascia & port chop on New Suffolk Beach
bathrooms
- Installed toilet tissue holders at McCabes & Kenny’s beaches
HRC
-
Police Dept
- Hung pictures (installed on concrete walls)
Down’s Farm
- Repaired lock on schoolhouse building
Town Parks & Info Centers
- Repaired flagpole topper at Laurel Ballfield
- Repaired gate at dog park
- Installed sign at Bay Ave project
- Prepared barrels and delivered to Strawberry Fields for festival
- Installed banners at ballfields
- Sandpro ballfields regularly
- Repaired outside water spigot leak, installed screens
- Shaped up shrubs and bushes
- Planted donated flowers
Animal Shelter
- Repaired alarm sensor issue
- Repaired sanitizer
HWY
- Repaired leaky roof on salt barn
PCC
- Repaired leak on drain catch on Ladies Room sink
Maintained all grass & planted areas at all Town parks and facilities
Replaced broken boards on fencing at Dean’s parking lot